Anda di halaman 1dari 2

SUMMARY REPORT DRILLING (PA

PROJECT SITE MOROWALI U


PT GUNBUSTER NICKEL INDUSTRY
PERIODE,09 MARET S/D 15 M
2024
NO HARI/TANGGAL JUMLAH JAM DRILLING JUMLAH LUBANG KEDALAMAN(METER)
1 SABTU/09-3-2024 6
2 MINGGU/10-3-2024 6
3 SENIN/11-3-2024 6
4 SELASA/12-3-2024 6
5 RABU/13-3-2024 6
6 KAMIS/14-3-2024 6 137 677.7
7 JUMAT/15-3-2024 6
TOTAL 42 137 677.7

TOTAL SELURUH LUBANG 137 LUBANG


TOTAL SELURUH KEDALAMAN 677.7 METER
PERIODE,09 MARET S/D 15 MARET
EPORT DRILLING (PARKIRAN DT)
CT SITE MOROWALI UTARA
E,09 MARET S/D 15 MARET
2024
MESIN BOR ( KEDALAMAN RATA RATA)

furukawa(4,9m)