SCHEDULE PELAKSANAAN

TARGET
NO ITEM PEKERJAAN
Mulai Selesai

1 SURAT PERINTAH KERJA 12/1/2022 12/1/2022

2 PEKERJAAN PERSIAPAN 12/1/2022 1/31/2023

3 ENGINEERING (Forcon to shop dwg approval) 1/1/2023 6/30/2023

4 PEKERJAAN INFRASTRUKTURE 1/1/2023 1/31/2024


- pekerjaan cut - fil & pematangan tanah 1/1/2023 5/31/2023
- pekerjaan jalan, zona merah 6,050 2/1/2023 12/31/2023
- pekerjaan jalan, zona kuning 13,291 2/1/2023 10/31/2023
- pekerjaan jalan, zona hijau 5,671 10/1/2023 11/14/2023
- pekerjaan saluran/drainage 1/14/2023 6/30/2023
- pekerjaan Jembatan 1/14/2023 2/28/2023
- pekerjaan Dekker 1/14/2023 2/28/2023
- pekerjaan sumur bor 8/1/2023 9/30/2023
- pekerjaan penghijauan 11/1/2023 1/31/2024
- pekerjaan penerangan area luar 7/1/2023 10/31/2023

5 PEKERJAAN BROILER FARM/KANDANG 24 unt 2/1/2023 10/12/2023


- FLOCK - 1 2/1/2023 5/31/2023
- FLOCK - 2 2/1/2023 5/31/2023
- FLOCK - 3 3/1/2023 7/14/2023
- FLOCK - 4 4/1/2023 8/14/2023
- FLOCK - 5 5/1/2023 9/13/2023
- FLOCK - 6 6/1/2023 10/14/2023
- TRIAL FARM 6/14/2023 10/12/2023

6 PEKERJAAN UTILITAS 6/14/2023 10/12/2023


- Main Gate (H) 11/1/2023 12/31/2023
- Security Post & Clinic (H) 11/1/2023 12/31/2023
- Garbage (H) 10/1/2023 10/31/2023
- Gudang Pakan 1, 2, Gd. Sekam, & Car Dip & Spray (I) 8/15/2023 10/14/2023
- Bio Security 1 - Kawasan (J) 9/16/2023 10/31/2023
- Kantor (K) & Lanudry (L) 10/1/2023 12/31/2023
- Water Tank & Pump Room 8/1/2023 10/31/2023
- Jembatan Timbang Uk.nett 340 x 1000 cm (M) 10/1/2023 12/31/2023
- Ruang Cuci Tray (M) - Prov. Sum 10/1/2023 12/31/2023
- Gudang Mekanik, Umum, & OVK (N,O,P) 10/1/2023 12/31/2023
- Reservoir and Pump Room 2 - (Q) 8/1/2023 10/31/2023
- Bio Security 2 (R) 9/16/2023 10/31/2023
- Cardip Flocks (S) 10 7/1/2023 10/31/2023
- IPAL (T) 3 9/16/2023 10/31/2023
- Incinerator/Tempat Pembakaran Ayam (U) 1 9/16/2023 10/31/2023
- Bio Security 3-Flocks (a) 7 7/1/2023 10/31/2023
- Power House Flocks (b) 7 7/1/2023 10/31/2023
- Pekerjaan MEP 8/1/2023 1/31/2024

7 TEST & COMMISSIONING 12/15/2023 1/31/2024

8 CHECK LIST & REPAIR 10/1/2023 1/31/2024

9 SERAH TERIMA 1/31/2024 1/31/2024


TARGET 2022 2023
Durasi NOP DES JAN PEB MRT APR MEI JUN JUL
(hari) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

61

180

395
150
perkerasan badan jalan
333
272 perkerasan badan jalan

44 perkerasan badan jalan

167
45
45
60
91
122

253
119
119
135
135
135
135
120

120
60
60
30
60
45
91
91
91
91
91
91
45
122
45
45
122
122
183

47

122

-
23 2024
AGST SEPT OKT NOP DES JAN PEB MRT APR REMARK
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

finishing asphalt hotmix


finishing asphalt hotmix
finishing asphalt hotmix
REMARK
STRUKTUR O
BROILER CLOSED FARM -

TTL
MPP
1
-
6
-
-
- PEM
3 1
-
-
- Site Eng. QS CE Sch+Rprt Surveyor CM Infra
19 3 2 1 1 4 1
-
- Drafter BBS SUPERVISI
21 3 1 Ass.surv. 2
17 3
-
-
2
-
-
1
70
STRUKTUR ORGANISASI PROYEK
ER CLOSED FARM - PRACIMANTORO, JAWA TENGAH

PM
1
QC SHE
3 3

POM PAM
1 1

CM Broiler CM Utility Cost Ctrl Procure Logistik


1 1 1 1 1

SUPERVISI SUPERVISI SUPERVISI PERALATAN


10 2 3 Staff
3
HC/GA Docon
1 1

Security Staff
10 1

Driver
2

OB
1