Anda di halaman 1dari 19

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL SUMBER DAYA AIR


SATUAN KERJA PERANGKAT DAERAH-TUGAS PEMBANTUAN
DINAS PENGELOLAAN SUMBER DAYA AIR PROVINSI LAMPUNG
UPTD PSDA WILAYAH II - METRO
Jalan : Z.A Pagar Alam No. 42 Telp (0725) 41496

RENCANA POLA TANAM DAN TATA TANAM GLOBAL


MT. I (RENDENG) 2022 - 2023 DAN MT. II (GADU) 2023
DI. SEKAMPUNG SISTEM
LAMPIRAN II : KEPUTUSAN GUBERNUR LAMPUNG
NOMOR : G/ /V.04/HK/2022
TANGGAL :

PENETAPAN POLA TANAM DAN PENGGUNAAN AIR IRIGASI MT.I (REDENG) TAHUN 2022/ 2023
DAN MT.II (GADU) 2023 PADA DAERAH IRIGASI SEKAMPUNG SISTIM
Hal. 1
NAMA DAERAH IRIGASI LUAS AREAL (Ha) GOL PEMBERIAN AIR AREAL TANAMAN (H) JUMLAH KET
NO KABUPATEN KECAMATAN POTENSI FUNGSI ALIH PADI PALAWIJA PADI PALAWIJA 13=9+10+11+12
FUNGSI MT.I MT.II MT. I MT. II MT. III MT. I MT. II MT. III MT. I MT. II MT. III MT. I MT. II MT. III
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

A DI. WAY SEKAMPUNG

1. KAB. LAMPUNG TENGAH 2,450.00 2,230.00 - 2,230.00 2,230.00 - - 4,460.00


I UPTD. ARGOGURUH
1 Kecamatan Trimurjo 2,450.00 2,230.00 - 2,230.00 2,230.00 - - 4,460.00
- KH.2 Ki, BPU.1a 490.00 426.00 - II II 16 Okt 2022 s/d 16 Feb 2023 s/d 426.00 426.00 - - 852.00
15 Feb 2023 15 Juni 2023
- Sal. Sekampung Batanghari 1,014.00 1,011.00 - I I 01 Okt 2022 s/d 01 Feb 2023 s/d 1,011.00 1,011.00 - - 2,022.00
KH.1,Ki,Ka,KH.2Ka,KBH.1-KBH.4Ka 31 Jan 2023 31 Mei 2023

- Sal. Sekampung Bunut 946.00 793.00 - I I 01 Okt 2022 s/d 01 Feb 2023 s/d 793.00 793.00 - - 1,586.00
KH.3Ki,Ka - KR.2 e 31 Jan 2023 31 Mei 2023

Kebutuhan Air 23,381.55 16,250.98 39,632.53

2. KOTA METRO 3,766.00 2,923.00 2,923.00 2,923.00 - - 5,846.00


-
II UPTD. METRO 3,766.00 2,923.00 - 2,923.00 2,923.00 - - 5,846.00
1 Kecamatan Metro Barat 702.00 512.00 - 512.00 512.00 - - 1,024.00
- Sal. Skp, Batanghari 423.00 303.00 - V V 01 Des 2022 s/d 01 April 2023 s/d 303.00 303.00 - - 606.00
KBH. 4 Ki - KBH. 5 Ki 31 Mart 2023 31 Juli 2023
- Sal. Skp. Bunut 279.00 209.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 209.00 209.00 - - 418.00
KB.1 - KB. 2 B 15 Mart 2023 15 Juli 2023
2 Kecamatan Metro Selatan 946.00 862.50 - 862.50 862.50 - - 1,725.00
- Sal. Skp. Batanghari 946.00 862.50 - V V 01 Des 2022 s/d 01 April 2023 s/d 862.50 862.50 - - 1,725.00
KBH.5 Ka - KBH. 7 Ka 31 Mart 2023 31 Juli 2023
3 Kecamatan Metro Timur 508.00 448.50 - 448.50 448.50 - - 897.00
- Sal. Skp. Batanghari 327.00 291.50 - V V 01 Des 2022 s/d 01 April 2023 s/d 291.50 291.50 - - 583.00
- KBH. 8A - KBH. 8 C Ki 31 Mart 2023 31 Juli 2023
- Sal. Skp. Bunut
KB. 2 c Ka - KB.5a Ka 181.00 157.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 157.00 157.00 - - 314.00
15 Mart 2023 15 Juli 2023
4 Kecamatan Metro Utara 1,079.00 766.00 - 1,242.00 1,242.00 - - 2,484.00
- Sal. Sekampung Bunut 1,079.00 766.00 - 766.00 766.00 - - 1,532.00
KR.2 - KR. 4.C Ki 651.00 476.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 476.00 476.00 - - 952.00
15 Mart 2023 15 Juli 2023
- KBW. 1 - KBW. 3 428.00 290.00 - 290.00 290.00 - - 580.00

5 Kecamatan Metro Pusat 531.00 334.00 - 334.00 334.00 - - 668.00


- Sal. Sekampung Bunut 531.00 334.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 334.00 334.00 - - 668.00
KB. 2 C Ka - KB. 3 - KBW. 1B 15 Mart 2023 15 Juli 2023
Kebutuhan Air 30,647.66 20,724.07 51,371.73

3 . KAB LAMPUNG TIMUR 13,881.00 9,996.00 - 9,996.00 9,996.00 - - - - 19,992.00


III KORWIL. BATANGAHARI 4,143.00 3,920.00 - 3,920.00 3,920.00 - - 7,840.00
1 Kecamatan Batanghari 4,143.00 3,920.00 - III III 01 Nov 2022 s/d 01 Mart 2023 s/d 3,920.00 3,920.00 - - 7,840.00
- Sal. Sekampung Batanghari 28 Feb 2023 30 Juni 2023
KBH.8D Ki - KBH. 12, KDY, KBMI
Kebutuhan Air 41,101.20 27,792.80 68,894.00
Hal. 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
IV KORWIL. SEKAMPUNG 5,516.00 3,464.00 - 3,464.00 3,464.00 - - - 6,928.00
1 Kec. Sekampung 5,094.00 3,101.00 - 3,101.00 3,101.00 - - - 6,202.00
- KBH.13 - KBH.16,KSI.1A.Ki - KSI.6 KMI 5,094.00 3,101.00 - III III 01 Nov 2022 s/d 01 Mart 2023 s/d 3,101.00 3,101.00 - - - 6,202.00
28 Feb 2023 30 Juni 2023
2 Kecamatan Batanghari 201.00 200.00 - 200.00 200.00 - - - 400.00
- KSI.1B Ka - KSI.2,Ka. 201.00 200.00 - III III 01 Nov 2022 s/d 01 Mart 2023 s/d 200.00 200.00 - - - 400.00
28 Feb 2023 30 Juni 2023
3 Kecamatan Bumi Agung 221.00 163.00 - 163.00 163.00 - - - 326.00
- Sal. Sekampung Batanghari 221.00 163.00 - III III 01 Nov 2022 s/d 01 Mart 2023 s/d 163.00 163.00 - - - 326.00
KMI.5 28 Feb 2023 30 Juni 2023
Kebutuhan Air 36,320.04 24,559.76 60,879.80

V KORWIL. PEKALONGAN 4,222.00 2,612.00 - 2,612.00 2,612.00 - - - 5,224.00


1 Kecamatan Pekalongan
- Sal. Sekampung Bunut 4,222.00 2,612.00 - 2,612.00 2,612.00 - - - 5,224.00
KR. 4 D - KR 5 967.00 585.00 - I I 01 Okt 2022 s/d 01 Feb 2023 s/d 585.00 585.00 - - - 1,170.00
31 Jan 2023 31 Mei 2023
- KB.5 - KB.12, KBZ, KBM, KBO 3,255.00 2,027.00 - I I 01 Okt 2022 s/d 01 Feb 2023 s/d 2,027.00 2,027.00 - - - 4,054.00
31 Jan 2023 31 Mei 2023

Kebutuhan Air 26,228.24 18,519.08 44,747.32


JUM LAH A 20,097.00 15,149.00 - 15,149.00 15,149.00 - - - - 30,298.00
JUMLAH KEBUTUHAN AIR (A) 157,678.69 107,846.69 - - 265,525.37
B DI. PUNGGUR UTARA
1 . KAB. LAMPUNG TENGAH 36,203.00 27,993.00 - 27,993.00 27,993.00 - - - - 55,986.00
VI UPTD. TRIMURJO 6,196.00 5,136.00 - 5,136.00 5,136.00 - - 10,272.00
1 Kecamatan Trimurjo II II 16 Okt 2022 s/d 16 Feb 2023 s/d
- BPU. 1 - BPU.2 240.00 211.00 - 15 Feb 2023 15 Juni 2023 211.00 211.00 - - 422.00
- BPU.3 - BPU.7 BA.1 - BA.2,BB.1 - BB.4 2,656.00 1,984.00 1,984.00 1,984.00 - - 3,968.00
VI VI 16 Des 2022 s/d 16 April 2023 s/d
2 Kecamatan Gunung Sugih (Trimurjo) 1,195.00 1,147.00 - 1,147.00 1,147.00 - - 2,294.00
15 April 2023 15 Agust 2023
- BGS.1 - BGS.5, BC.8 - BC. 10
3 Kecamatan Punggur (Trimurjo) 2,105.00 1,794.00 - VI VI 16 Des 2022 s/d 16 April 2023 s/d 1,794.00 1,794.00 - - 3,588.00
- BPU.8,BC.1 - BC.7, BZ 15 April 2023 15 Agust 2023
Kebutuhan Air 55,494.48 35,682.36 91,176.84
VII UPTD. PUNGGUR 4,201.00 4,152.00 - 4,152.00 4,152.00 - - 8,304.00
1 Kecamatan Punggur 1,659.00 1,648.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 1,648.00 1,648.00 - - 3,296.00
- BPU.9 - BPU.13, BD.1-BD.6, BE, BT 30 April 2023 31 Agust 2023
2 Kecamatan Gunung Sugih 631.00 593.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 593.00 593.00 - - 1,186.00
- BF.4 - BF.7, BX.1 - BX.2 30 April 2023 31 Agust 2023
3 Kecamatan Kota Gajah 1,911.00 1,911.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 1,911.00 1,911.00 - - 3,822.00
- BPU.14 - BPU.15,BG.1 - BG.4, BD.6 - BD.9,. 30 April 2023 31 Agust 2023
BF.1 - BF.3, BS, BT, BU.1
Kebutuhan Air 46,050.12 31,139.28 77,189.40
VIII UPTD. KOTA GAJAH 4,021.00 2,687.00 - 2,687.00 2,687.00 - - - 5,374.00
1 Kecamatan Kota Gajah
- BPU.16 Ki 1, Ki2 360.00 265.00 - 265.00 265.00 - - - 530.00
VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d
- BPU.17Ki-BPU.20,BH.1-BH.2,BI.1,Ka.1, -
650.00 458.00 30 April 2023 31 Agust 2023 458.00 458.00 - - - 916.00
2 Kecamatan Gunung Sugih
- BI.1 - BI. 9 2,012.00 1,084.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 1,084.00 1,084.00 - - - 2,168.00
30 April 2023 31 Agust 2023
3 Kecamatan Seputih Raman
- BPU.19 - BPU.21, BL, UB, BK 999.00 880.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 880.00 880.00 - - - 1,760.00
30 April 2023 31 Agust 2023
Kebutuhan Air 28,173.20 19,050.83 - 47,224.03
IX UPTD. SEPUTIH RAMAN 6,621.00 4,035.00 - 4,035.00 4,035.00 - - - - 8,070.00
1 Kecamatan Seputih Raman 6,621.00 4,035.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 4,035.00 4,035.00 - - - 8,070.00
- BPU.22 - BPU. 26, BN, BO, BP, BR, BUA 15 Mart 2023 15 Juli 2023
BUE,BQ,QY,BV,QA,BUD,BPU.22,UF (R.Endah)
Kebutuhan Air 42,306.98 28,608.15 - - - 70,915.13
Hal. 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
X UPTD. RUKTI ENDAH. 2,589.00 1,877.00 - 1,877.00 1,877.00 - - - 3,754.00
2 Kecamatan Seputih Raman
- BPU.22, UF 644.00 390.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 390.00 390.00 - - - - 780.00
15 Mart 2023 15 Juli 2023
- BM.1 - BM.5 1,945.00 1,487.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 1,487.00 1,487.00 - - - - 2,974.00
15 Mart 2023 15 Juli 2023
Kebutuhan Air 19,046.86 4,223.25 - - - 23,270.11
XI UPTD. BEKRI 6,500.00 5,000.00 - 5,000.00 5,000.00 - - - - 10,000.00
- Bekri. 1(BK.0 - BA.15) 6,500.00 2,571.00 - VI VI 16 Des 2022 s/d 16 April 2023 s/d 2,571.00 2,571.00 - - - - 5,142.00
15 April 2023 15 Agust 2023
- Bekri. 2(BK.11 - BK.14) - 2,429.00 - VI VI 16 Des 2022 s/d 16 April 2023 s/d 2,429.00 2,429.00 - - - - 4,858.00
15 April 2023 15 Agust 2023
Kebutuhan Air 52,425.00 35,450.00 - - - 87,875.00
XII UPTD. RUMBIA 6,075.00 5,106.00 - 5,106.00 5,106.00 - - - 10,212.00
- BRB.1 - BRB.3 6,075.00 2,621.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 2,621.00 2,621.00 - - - - 5,242.00
30 April 2023 31 Agust 2023
- BRB.4 - BRB.8 - 2,485.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 2,485.00 2,485.00 - - - - 4,970.00
30 April 2023 31 Agust 2023
Kebutuhan Air 53,536.41 36,201.54 89,737.95
1 . KAB. LAMPUNG TIMUR
XIII KORWIL. RANTAU FAJAR 5,722.00 3,294.00 - 3,294.00 3,294.00 - - 6,588.00
1 Kecamatan Batanghari Nuban 2,449.00 1,297.00 - 1,297.00 1,297.00 - - 2,594.00
- BD.10 - BD.13, BG.5 439.00 240.00 - VII VII 01 Jan 2023 s/d 01 Mei 2023 s/d 240.00 240.00 - - 480.00
30 April 2023 31 Agust 2023
- BPU.17, KA.2, BH.2 - BH.11, BJ, BK 2,010.00 1,057.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 1,057.00 1,057.00 - - 2,114.00
15 Mart 2023 15 Juli 2023
2 Kecamatan Raman Utara 3,273.00 1,997.00 - 1,997.00 1,997.00 - - 3,994.00
- BM.6 - BM.13,BMC, BME, BMD 3,273.00 1,997.00 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 1,997.00 1,997.00 - - 3,994.00
BMF, BMG, BMH 15 Mart 2023 15 Juli 2023
Kebutuhan Air 31,347.20 11,987.38 - 43,334.58
JUM LAH B 41,925.00 31,287.00 - 31,287.00 31,287.00 - - - - 62,574.00
JUMLAH KEBUTUHAN AIR (B) 328,380.24 202,342.79 - - - 530,723.03
C DI. RAMAN UTARA
1 . KAB. LAMPUNG TIMUR 6,304.00 4,216.00 - 4,216.00 4,216.00 - - 8,432.00
XIV KORWIL. RAMAN UTARA 6,304.00 4,216.00 - 4,216.00 4,216.00 - - 8,432.00
1 Kecamatan Pekalongan 217.00 201.00 - 201.00 201.00 - - 402.00
- BRU.1A - BRU.2 217.00 201.00 - III III 01 Nov 2022 s/d 01 Mart 2023 s/d 201.00 201.00 - - 402.00
28 Feb 2023 30 Juni 2023
2 Kecamatan Batanghari Nuban 2,096.00 1,267.00 - 1,267.00 1,267.00 - - 2,534.00
- BRU.3, - BRU.6,BA,BB,BC 1,569.00 951.00 - III III 01 Nov 2022 s/d 01 Mart 2023 s/d 951.00 951.00 - - 1,902.00
- BRU.7-BRU.9 Ka1,2 BE 527.00 316.00 - 28 Feb 2023 30 Juni 2023 316.00 316.00 - - 632.00

3 Kecamatan Raman Utara 3,991.00 2,748.00 - 2,748.00 2,748.00 - - 5,496.00


- BA. 5 Kn. BA. 6 491.00 322.00 - III III 01 Nov 2022 s/d 01 Mart 2023 s/d 322.00 322.00 - - 644.00
- BRU.7-BRU.9 Ki 1,2-BRU.19,BD,BF,BG,BH 3,500.00 2,426.00 - 28 Feb 2023 30 Juni 2023 2,426.00 2,426.00 - - 4,852.00
JUMLAH KEBUTUHAN AIR (C) 44,204.76 33,938.80 - - 78,143.56
JUM LAH C 6,304.00 4,216.00 - 4,216.00 4,216.00 - - 8,432.00
D DI. BATANGHARI UTARA
1 . KAB. LAMPUNG TIMUR 7,680.00 4,721.00 - 4,721.00 4,721.00 - - 9,442.00
XV KORWIL. PURBOLINGGO 7,680.00 4,721.00 - 4,721.00 4,721.00 - - 9,442.00
1 Kecamatan Batanghari Nuban 35.00 23.50 - 23.50 23.50 - - 47.00
- G. 1A, G. 1B 35.00 23.50 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 23.50 23.50 - - 47.00
15 Mart 2023 15 Juli 2023
2 Kecamatan Purbolinggo 3,882.00 2,659.50 - 2,659.50 2,659.50 - - 5,319.00
- G. 1F - G.8, Ki, TE, TK 3,882.00 2,659.50 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 2,659.50 2,659.50 - - 5,319.00
15 Mart 2023 15 Juli 2023
441.00 363.75 - 363.75 363.75 - - 727.50
G. 9A Ka - G. 10 B Ka, PU 441.00 363.75 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 363.75 363.75 - - 727.50
15 Mart 2023 15 Juli 2023
3 Kecamatan Way Bunggur 3,322.00 1,674.25 - 1,674.25 1,674.25 - - 3,348.50
- G. 10 - G. 18, P 3,322.00 1,674.25 - IV IV 16 Nov 2022 s/d 16 Mart 2023 s/d 1,674.25 1,674.25 - - 3,348.50
15 Mart 2023 15 Juli 2023
JUMLAH KEBUTUHAN AIR (D) 49,499.69 33,471.89 - - 82,971.58
JUM LAH D 7,680.00 4,721.00 - 4,721.00 4,721.00 - - 9,442.00
JUMLAH (A + B + C + D ) 76,006.00 55,373.00 - 55,373.00 55,373.00 - - 110,746.00
JUMLAH KEBUTUHAN AIR (A+B+C+D) 579,763.37 377,600.17 - - - - 957,363.54
Hal. 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
E DI. WAY JEPARA
1 . KAB. LAMPUNG TIMUR 6,651.00 5,192.75 - 5,192.75 2,916.25 - 2,276.50 10,385.50
XVII KORWIL. Way Jepara 6,651.00 5,192.75 - 5,192.75 2,916.25 - 2,276.50 10,385.50
1 Kemantren 1, Labuhan Ratu Idan Braja Sakti 6,651.00 2,227.25 - 2,227.25 2,227.25 - - 4,454.50
BJKi I - BJKi XI dan A,T,B,N 6,651.00 2,227.25 - I I 01 Nov 2022 s/d 01 Mart 2023 s/d 2,227.25 2,227.25 - - 4,454.50
28 Feb 2023 30 Juni 2023
2 Kemantren 2, Braja selebah, Braja Sakti - 2,276.50 - 2,276.50 - - 2,276.50 4,553.00
BJKi XI - bjkI xxv, K,L M dan BJKi XI Ka - 2,276.50 - II II 01 Jan 2023 s/d 01 Mei 2023 s/d 2,276.50 - - 2,276.50 4,553.00
30 April 2023 31 Agust 2023
3 Kemantren 3, Jepara - 689.00 - 689.00 689.00 - - 1,378.00
BJKa IV s/d BJKA VIII Dan Sek G,H - 689.00 - I I 01 Nov 2022 s/d 01 April 2023 s/d 689.00 689.00 - - 1,378.00
28 Feb 2023 31 Juli 2023
JUMLAH KEBUTUHAN AIR (E) 36,951.09 15,816.64 - - - 52,767.73
JUM LAH E 6,651.00 5,192.75 - 5,192.75 2,916.25 - 2,276.50 8,109.00
F DI. WAY CURUP
1 . KAB. LAMPUNG TIMUR 4,706.00 3,629.00 - 3,629.00 3,629.00 - - 7,258.00
XVIII KORWIL. Way Curup 4,706.00 3,629.00 - 3,629.00 3,629.00 - - 7,258.00
1 Way Curup Hulu 2,162.00 1,597.00 - 1,597.00 1,597.00 - - 3,194.00
Sal. Induk Ki BKD.I-BKDIX,BKD.VI-BWH.VI 2,162.00 1,597.00 - III III 16 Jan 2022 s/d 16 Agust 2022 s/d 1,597.00 1,597.00 - - 3,194.00
Sal. Sek BF,BA,BB,BC,BVK,BC-HILIR 15 Mei 2021 15 Des 2022

Sal. Induk Ka BWC.i-BWC.IX 641.00 606.00 - 606.00 606.00 - - 1,212.00


Sal. Sek BVM 641.00 606.00 - II II 01 Jan 2023 s/d 01 Juli 2023 s/d 606.00 606.00 - - 1,212.00
30 April 2023 30 Okt 2023
2 Way Curup Hilir 1,903.00 1,426.00 - 1,426.00 1,426.00 - - 2,852.00
Sal. Induk BWH.VII-VIII 1,903.00 1,426.00 - I I 01 Nov 2022 s/d 01 Mei 2023 s/d 1,426.00 1,426.00 - - 2,852.00
Sal. Sek D,E,G,H,I,J,M,N,O,P 28 Feb 2023 31 Agust 2023
JUMLAH KEBUTUHAN AIR (F) 24,677.20 23,769.95
JUM LAH F 4,706.00 3,629.00 - 3,629.00 3,629.00 - - 7,258.00
G DI. WAY SEPUTIH
1 . KAB. LAMPUNG TENGAH 20,201.00 14,569.00 - 11,131.00 3,594.00 - 6,313.00 21,038.00
XIX DI.WAY SEPUTIH 20,201.00 14,569.00 - 11,131.00 3,594.00 - 6,313.00 21,038.00
- UPTD. Bendung Way Seputih 588.00 334.00 - I I 16 Des 2021 s/d 16 Feb 2022 s/d 334.00 334.00 - - 668.00
15 April 2022 15 Juni 2022
- UPTD. Simp. Agung 4,138.00 -
BWS.1 & BWS.2 324.00 I I 16 Des 2021 s/d 16 Feb 2022 s/d 324.00 - - 324.00 648.00
15 April 2022 15 Juni 2022
- UPTD. Simp. Agung 3,114.00 III III 01 Jan 2023 s/d 01 Mei 2023 s/d 3,114.00 - - 3,114.00 6,228.00
30 April 2023 31 Agust 2023
- UPTD. Terbanggi Besar 5,618.00 4,484.00 - II II 01 Des 2022 s/d 01 April 2023 s/d 4,484.00 3,260.00 - - 7,744.00
31 Mart 2023 31 Juli 2023
- UPTD. Spt. Mataram 4,857.00 3,630.00 - III III 01 Jan 2023 s/d 01 Mei 2023 s/d 3,630.00 - - 3,630.00 7,260.00
30 April 2023 31 Agust 2023
- UPTD. Bdr. Mataram 5,000.00 2,683.00 - II II 01 Des 2022 s/d 01 April 2023 s/d 2,683.00 - - 2,683.00 5,366.00
31 Mart 2023 31 Juli 2023
JUMLAH KEBUTUHAN AIR (G) 25,601.30 7,888.83 - - 9,469.50 43,586.00
JUM LAH G 20,201.00 14,569.00 - 11,131.00 3,594.00 - 6,313.00 27,914.00
H DI. WAY PENGUBUAN
1 . KAB. LAMPUNG TENGAH 5,000.00 3,500.75 - 3,500.75 3,034.00 - 1,655.75 6,534.75
XX DI. WAY PENGUBUAN 5,000.00 3,500.75 - 3,500.75 3,034.00 - 1,655.75 6,534.75
1 KMT. Gedong Harta 466.75 - II II 16 Nov 2022 s/d 16 Mart 2023 s/d 466.75 - - 466.75 933.50
15 Mart 2023 15 Juli 2023
2 KMT. Suka Jaya 1,189.00 - II II 16 Nov 2022 s/d 16 Mart 2023 s/d 1,189.00 1,189.00 - 1,189.00 3,567.00
15 Mart 2023 15 Juli 2023
3 KMT. Gedong Sari 723.00 - I I 01 Nov 2022 s/d 01 Mart 2023 s/d 723.00 723.00 - - 1,446.00
28 Feb 2023 30 Juni 2023
4 KMT. Bandar Putih Tua 1,122.00 - I I 01 Nov 2022 s/d 01 Mart 2023 s/d 1,122.00 1,122.00 - - 2,244.00
28 Feb 2023 30 Juni 2023
JUMLAH KEBUTUHAN AIR (H) 19,426.55 11,568.15 - - 2,483.63 33,478.33
JUM LAH H 5,000.00 3,500.75 - 3,500.75 3,034.00 - 1,655.75 8,190.50
JUMLAH KEBUTUHAN AIR (G+H) 45,027.85 19,456.98 - - 11,953.13 76,437.96
JUMLAH G + H 25,201.00 18,069.75 - 14,631.75 6,628.00 - 7,968.75 29,228.50
Hal. 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
I DI. SEDERHANA 4,470.00 - 4,470.00 4,470.00 - - - 8,940.00
XXI 1 DI. Way Tipo Balak 1,133.00 - I 01 Des 2022 s/d 01 April 2023 s/d 1,133.00 1,133.00 - - 2,266.00
31 Mart 2023 31 Juli 2023

XXI 2 DI. Way Sri Katon 1,220.00 - I 01 Des 2022 s/d 01 April 2023 s/d 1,220.00 1,220.00 - - 2,440.00
31 Mart 2023 31 Juli 2023

XXI 3 DI. Way Tatayan Kota Baru 1,120.00 - I 01 Des 2022 s/d 01 April 2023 s/d 1,120.00 1,120.00 - - 2,240.00
31 Mart 2023 31 Juli 2023

XXI 4 DI. Way Kali Pasir 997.00 - I 01 Des 2022 s/d 01 April 2023 s/d 997.00 997.00 - - 1,994.00
31 Mart 2023 31 Juli 2023
JUMLAH KEBUTUHAN AIR (I) 22,736.40 28,026.90 - - - 50,763.30
JUMLAH I - 4,470.00 - 4,470.00 4,470.00 - - - - 8,940.00
JUMLAH TOTAL KEBUTUHAN AIR UPTD WILAYAH II - - - 709,155.91 464,670.64 - - 11,953.13 1,185,779.67
JUMLAH TOTAL LUASAN UPTD WILAYAH II 112,564.00 86,734.50 - 83,296.50 73,016.25 - - 10,245.25 - 166,558.00
PEDOMAN OPERASI MT.I RENDENG 2022-2023 & MT.II, MT.III GADU 2023 DAERAH IRIGASI SEKAMPUNG SISTIM TERHADAP ALOKASI AIR DI WAY SEKAMPUNG dan TAMBAHAN SUPLAY (minimal) DARI WADUK BATU TEGI

September Oktober November Desember Januari Februari Maret April Mei Juni Juli Agustus September
Gol Lokasi MT-I MT-II
(Ha.) (Ha.) 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
DI. SKP BATANGHARI
I KH.2 Ka, KBH.1-KBH.4,Ka 1,011.0 1,011.0 - - 834.1 1,668.2 1,582.2 1,496.3 1,496.3 1,496.3 1,016.1 535.8 950.3 1,364.9 1,268.8 1,172.8 1,172.8 1,172.8 1,304.7 556.1 278.0 - - - - - - -
V KBH.4 Ki - KBH.8 C 1,457.0 1,457.0 - - - - - - 1,202.0 2,404.1 2,280.2 2,156.4 2,156.4 2,156.4 1,464.3 772.2 1,369.6 1,967.0 1,828.5 1,690.1 1,690.1 1,690.1 1,245.7 801.4 400.7 - - -
III KBH.8 D - KBH.12 3,920.0 3,920.0 - - - - 3,234.0 6,468.0 6,134.8 5,801.6 5,801.6 5,801.6 3,939.6 2,077.6 3,684.8 5,292.0 4,919.6 4,547.2 4,547.2 4,547.2 3,351.6 2,156.0 1,078.0 - - - - -
III KBH.13 - KBH 16 3,464.0 3,464.0 - - - - 2,857.8 5,715.6 5,421.2 5,126.7 5,126.7 5,126.7 3,481.3 1,835.9 3,256.2 4,676.4 4,347.3 4,018.2 4,018.2 4,018.2 2,961.7 1,905.2 952.6 - - - - -
# Q.KH.2-KBH 9,852.0 9,852.0 - - 834.1 1,668.2 7,674.0 13,679.9 14,254.3 14,828.7 14,224.6 13,620.5 10,527.6 7,434.7 9,674.1 11,913.4 11,809.3 11,705.2 11,698.7 10,811.6 8,281.5 5,751.3 3,276.3 801.4 400.7 - - -
DI. SKP BUNUT
II KH.2 Ki - BPU.1a 426.0 426.0 - - - 351.5 702.9 666.7 630.5 630.5 630.5 428.1 225.8 400.4 575.1 534.6 494.2 494.2 494.2 364.2 234.3 117.2 - - - - - -
I KH.3 KI, Ka-KR.1 - Kr.2E 793.0 793.0 - - 654.2 1,308.5 1,241.0 1,173.6 1,173.6 1,173.6 797.0 420.3 745.4 1,070.6 995.2 919.9 919.9 919.9 678.0 436.2 218.1 - - - - - - -
IV KR.2 - KR. 4 C 476.0 476.0
IV KB.1 - KB5A,KBW 990.0 990.0
1,466.0 1,466.0 - - - - - 1,209.5 2,418.9 2,294.3 2,169.7 2,169.7 2,169.7 1,473.3 777.0 1,378.0 1,979.1 1,839.8 1,700.6 1,700.6 1,700.6 1,253.4 806.3 403.2 - - - -
I KR.4 D - KR. 5 585.0 585.0
I KB.5 - KB.5A, KBW,KBZ-KBO. 2,027.0 2,027.0
2,612.0 2,612.0 - - 2,155 4,310 4,088 3,866 3,866 3,866 2,625 226 2,455.3 3,526.2 3,278.1 3,029.9 3,029.9 3,029.9 2,233.3 1,436.6 718.3 - - - - - - -

Suplesi RU 4,216.0 4,216.0 - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - - -
Suplesi BU 4,721.0 4,721.0 - - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - -
PDAM Metro 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0
## KANAL I 24,086.0 24,086.0 50.0 50.0 3,693.2 7,687.9 16,255.7 25,645.4 27,393.0 27,842.8 25,496.8 21,914.4 21,173.8 18,955.3 20,349.4 22,825.8 23,282.3 23,038.9 21,854.7 19,799.2 16,202.7 12,171.9 9,132.6 3,754.5 450.7 50.0 50.0 50.0

II Trimurjo -1 211.0 211.0 - - - 348.2 330.2 312.3 312.3 312.3 212.1 111.8 198.3 284.9 264.8 244.8 244.8 244.8 244.8 180.4 116.1 58.0 - - - - - -
VI Trimurjo -2 4,925.0 4,925.0 - - - - - - - 8,126.3 7,707.6 7,289.0 7,289.0 7,289.0 4,949.6 2,610.3 4,629.5 6,648.8 6,180.9 5,713.0 5,713.0 5,713.0 5,713.0 4,210.9 2,708.8 1,354.4 - -
VII Punggur 4,392.0 4,392.0 - - - - - - - - 3,623.4 7,246.8 6,873.5 6,500.2 6,500.2 6,500.2 4,414.0 2,327.8 4,128.5 5,929.2 5,512.0 5,094.7 5,094.7 5,094.7 3,755.2 2,415.6 1,207.8 -

VII Kt.Gajah 2,687.0 2,687.0 - - - - - - - 2,216.8 4,433.6 4,205.2 3,976.8 3,976.8 3,976.8 2,700.4 1,424.1 2,525.8 3,627.5 3,372.2 3,116.9 3,116.9 3,116.9 2,297.4 1,477.9 738.9 -

IV Spt.Raman 4,035.0 4,035.0 - - - - - 3,328.9 6,657.8 6,314.8 5,971.8 5,971.8 5,971.8 4,055.2 2,138.6 3,792.9 5,447.3 5,063.9 4,680.6 4,680.6 4,680.6 3,449.9 2,219.3 1,109.6 - - - -

IV R. Fajar 1,057.0 1,057.0 - - - - - 872.0 1,744.1 1,654.2 1,564.4 1,564.4 1,564.4 1,062.3 560.2 993.6 1,427.0 1,326.5 1,226.1 1,226.1 1,226.1 903.7 581.4 290.7 - - - -

IV R.Endah 1,877.0 1,877.0 - - - - - 1,548.5 3,097.1 2,937.5 2,778.0 2,778.0 2,778.0 1,886.4 994.8 497.4 563.1 563.1 563.1 563.1 563.1 563.1 563.1 563.1 - - - -
IV R. Fajar 1,997.0 1,997.0 - - - - - 1,647.5 3,295.1 3,125.3 2,955.6 2,955.6 2,955.6 2,007.0 1,058.4 529.2 599.1 599.1 599.1 599.1 599.1 599.1 599.1 599.1 - - - -
VI Bekri-1 2,571.0 2,571.0 - - - - - - - 2,121.1 4,242.2 4,023.6 3,805.1 3,805.1 3,805.1 2,583.9 1,362.6 2,416.7 3,470.9 3,226.6 2,982.4 2,982.4 2,982.4 2,198.2 1,414.1 707.0 - -
VI Bekri-2 2,429.0 2,429.0 - - - - - - - 2,003.9 4,007.9 3,801.4 3,594.9 3,594.9 3,594.9 2,441.1 1,287.4 2,283.3 3,279.2 3,048.4 2,817.6 2,817.6 2,817.6 2,076.8 1,336.0 668.0 - -
VII Rumbia-1 2,621.0 2,621.0 - - - - - - - - 2,162.3 4,324.7 4,101.9 3,879.1 3,879.1 3,879.1 2,634.1 1,389.1 2,463.7 3,538.4 3,289.4 3,040.4 3,040.4 3,040.4 2,241.0 1,441.6 720.8 -
VII Rumbia-2 2,485.0 2,485.0 - - - - - - - - 2,050.1 4,100.3 3,889.0 3,677.8 3,677.8 3,677.8 2,497.4 1,317.1 2,335.9 3,354.8 3,118.7 2,882.6 2,882.6 2,882.6 2,124.7 1,366.8 683.4 -

## KANAL II 31,287.0 31,287.0 - - - 348.2 330.2 7,709.2 15,106.2 26,595.3 39,492.0 48,600.8 47,226.5 42,018.5 35,400.2 31,726.9 27,806.6 25,604.2 31,698.5 35,687.1 33,990.1 31,221.5 29,610.4 25,183.0 15,876.9 9,431.1 3,350.9 -
Periode ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Total Kebutuhan Air 0.05 0.05 3.69 8.04 16.59 33.35 42.50 54.44 64.99 70.52 68.40 60.97 55.75 54.55 51.09 48.64 53.55 55.49 50.19 43.39 38.74 28.94 16.33 9.48 3.40 0.05
Q.Andal Sungai - - - - 1.72 4.20 3.90 17.64 33.84 16.27 30.60 43.82 40.53 27.93 47.46 13.09 7.83 7.57 5.45 0.85 0.65 0.41 0.26 0.31 - -
Q.rencana Spl.B.Tegi 0.05 0.05 3.69 8.04 14.86 29.15 38.60 36.79 31.15 54.24 37.80 17.15 15.22 26.63 3.63 35.55 45.72 47.91 44.74 42.54 38.10 28.53 16.07 9.17 3.40 0.05
Q.nyata Sungai

Grafik alokasi air di Bendung Argoguruh

80.00

70.00

60.00

50.00
Liter/detik

40.00

30.00

20.00

10.00

-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
T. Kebutuhan Air 0.05 0.05 3.69 8.04 16.59 33.35 42.50 54.44 64.99 70.52 68.40 60.97 55.75 54.55 51.09 48.64 53.55 55.49 50.19 43.39 38.74 28.94 16.33 9.48 3.40 0.05
Q. Andalan Sungai - - - - 1.72 4.20 3.90 17.64 33.84 16.27 30.60 43.82 40.53 27.93 47.46 13.09 7.83 7.57 5.45 0.85 0.65 0.41 0.26 0.31 - -
Q. rencana Spl B. Tegi 0.05 0.05 3.69 8.04 14.86 29.15 38.60 36.79 31.15 54.24 37.80 17.15 15.22 26.63 3.63 35.55 45.72 47.91 44.74 42.54 38.10 28.53 16.07 9.17 3.40 0.05

TAHUN 2021-2022
RENCANA POLA TANAM DAN TATA TANAM GLOBAL
MT.I (RENDENG) 2022-2023 Dan MT.II (GADU) 2023
DI. SEKAMPUNG SISTEM
Area (ha) September Oktober November Desember Januari Februari Maret April Mei Juni Juli Agustus September Keterangan
Kebutuhan Air di Sawah Lokasi Gol
MT. I MT. II 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 A. Semai

Waktu MT.I MT.II + Pengol 30 Hari 1 Bln

Pengolahan 1.25 1.02 DI Sekampung A B 426 Ha C A B 426 Ha C B.Pertumb 60 Hari 2 Bln

Pertumbuhan 1.12 0.88 KH2, BPU1a 426.0 426.0 II C.Pemas 30 Hari 1 Bln

Pemasakan 0.40 0.42 KH.3 KI, Ka-KR.1 - Kr.2E 793.0 793.0 I B 793 Ha B 793 Ha C
Total 120 Hari 4 Bln
A C A
Kebutuhan Air di Bendung
KR.2 - KR.4c, KB.1-5 a,KBW 1,466.0 1,466.0 IV
A B 1.466 Ha C A B 1.466 Ha C
Waktu MT.I MT.II
Pengolahan 1.65 1.35 KR.5,KB.5-KB.12, KBZ, KBM, KBO 2,612.0 2,612.0 I
Pertumbuhan 1.48 1.16 KH.2 Ka, KBH.1-KBH.4,Ka 1,011.0 1,011.0 I A B 3.623 Ha C A B 3.623 Ha C

Pemasakan 0.53 0.55


Palawija 0.30 0.30 KBH.4 Ki - KBH.8 C 1,457.0 1,457.0 V
A B 1.457 Ha C A B 1.457 Ha C

KBH.8 D - KBH.12, KDY,KBMI 3,920.0 3,920.0 III


KBH.13-KBH.16,KSI,KMI 3,464.0 3,464.0 III A B 7.384 Ha C A B 7.384 Ha C

DI.Punggur Utara
A B 211 Ha C A B 211 Ha C
BPU.1-BPU.2 211.0 211.0 II

BPU.3- BPU.8,BA,BB,BC, 4,925.0 4,925.0 VI A B 4.925 Ha C A B 4.925 Ha C


BGS,BZ

BPU.9-BPU.15,BE,BF.1-BF.3,BX,BG 4,392.0 4,392.0 VII


A B 4.392 Ha C A B 4.392 Ha C
BD.10 - BD.13 (R.F),

BPU.17 - BPU.21, BI, BL, BU, 2,687.0 2,687.0 VII A B 2.687 Ha C A B 2.565 Ha C

BPU.22-BPU.26,UF, BO,BP,BR,BUA, 4,035.0 4,035.0 IV


A B 4.035 Ha C A B 2.006 Ha C
BUE,BQ, BY,BV,QA.

BH,BJ,BK (RF), BD 1,057.0 1,057.0 IV


A B 1.057 Ha C A B 1.057 Ha C
BM.1 - BM.5 1,877.0 1,877.0 IV

A B 3.874 Ha C A B 3.874 Ha C
BM.6 - BM.13 1,997.0 1,997.0 IV

Bekri-1 (BK.0 - BA.15) 2,571.0 2,571.0 VI


B 5.000 Ha C A B 5.000 Ha C
A
Bekri-2 (BK.11 - BK.14) 2,429.0 2,429.0 VI

Rumbia-1 (BRB.1 - BRB.3) 2,621.0 2,621.0 VII B 5.106 Ha B 5.106 Ha C


A C A

Rumbia-2 (BRB.4 - BRB.9) 2,485.0 2,485.0 VII

DI Sekampung
KH2, BPU1a 426.0 426.0 II - - - 351.5 702.9 666.7 630.5 630.5 630.5 428.1 225.8 400.4 575.1 534.6 494.2 494.2 494.2 364.2 234.3 117.2 - - - - - -
KH.3 KI, Ka-KR.1 - Kr.2E 793.0 793.0 I - - 654.2 1,308.5 1,241.0 1,173.6 1,173.6 1,173.6 797.0 420.3 745.4 1,070.6 995.2 919.9 919.9 919.9 678.0 436.2 218.1 - - - - - - -
KR.2 - KR.4c, KB.1-5 a,KBW 1,466.0 1,466.0 IV - - - - - 1,209.5 2,418.9 2,294.3 2,169.7 2,169.7 2,169.7 1,473.3 777.0 1,378.0 1,979.1 1,839.8 1,700.6 1,700.6 1,700.6 1,253.4 806.3 403.2 - - - -
KR.5,KB.5-KB.12, KBZ, KBM, KBO 2,612.0 2,612.0 I - - 2,154.9 4,309.8 4,087.8 3,865.8 3,865.8 3,865.8 2,625.1 225.8 2,455.3 3,526.2 3,278.1 3,029.9 3,029.9 3,029.9 2,233.3 1,436.6 718.3 - - - - - - -
KH.2 Ka, KBH.1-KBH.4,Ka 1,011.0 1,011.0 I - - 834.1 1,668.2 1,582.2 1,496.3 1,496.3 1,496.3 1,016.1 535.8 950.3 1,364.9 1,268.8 1,172.8 1,172.8 1,172.8 1,304.7 556.1 278.0 - - - - - - -
KBH.4 Ki - KBH.8 C 1,457.0 1,457.0 V - - - - - - 1,202.0 2,404.1 2,280.2 2,156.4 2,156.4 2,156.4 1,464.3 772.2 1,369.6 1,967.0 1,828.5 1,690.1 1,690.1 1,690.1 1,245.7 801.4 400.7 - - -

KBH.8 D - KBH.12, KDY,KBMI 3,920.0 3,920.0 III - - - - 3,234.0 6,468.0 6,134.8 5,801.6 5,801.6 5,801.6 3,939.6 2,077.6 3,684.8 5,292.0 4,919.6 4,547.2 4,547.2 4,547.2 3,351.6 2,156.0 1,078.0 - - - - -

KBH.13-KBH.16,KSI,KMI 3,464.0 3,464.0 III - - - - 2,857.8 5,715.6 5,421.2 5,126.7 5,126.7 5,126.7 3,481.3 1,835.9 3,256.2 4,676.4 4,347.3 4,018.2 4,018.2 4,018.2 2,961.7 1,905.2 952.6 - - - - -

Suplesi KH2-Raman Utara 4,216.0 4,216.0 III - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - - -
Suplesi KH2-Batanghari Utara 4,721.0 4,721.0 IV - - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - -
PDAM Metro 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0
Feeder Canal I 24,086.0 24,086.0 50.0 50.0 3,693.2 7,687.9 16,255.7 25,645.4 27,393.0 27,842.8 25,496.8 21,914.4 21,173.8 18,955.3 20,349.4 22,825.8 23,282.3 23,038.9 21,854.7 19,799.2 16,202.7 12,171.9 9,132.6 3,754.5 450.7 50.0 50.0 50.0

DI.Punggur Utara
BPU.1-BPU.2 211.0 211.0 II - - - 348.2 330.2 312.3 312.3 312.3 212.1 111.8 198.3 284.9 264.8 244.8 244.8 244.8 244.8 180.4 116.1 58.0 - - - - - -
BPU.3- BPU.8,BA,BB,BC, 4,925.0 4,925.0 VI - 8,126.3 7,707.6 7,289.0 7,289.0 7,289.0 4,949.6 2,610.3 4,629.5 6,648.8 6,180.9 5,713.0 5,713.0 5,713.0 5,713.0 4,210.9 2,708.8 1,354.4 - -
BGS,BZ
BPU.9-BPU.15,BE,BF.1-BF.3,BX,BG 4,392.0 4,392.0 VII - - - - - - - - 3,623.4 7,246.8 6,873.5 6,500.2 6,500.2 6,500.2 4,414.0 2,327.8 4,128.5 5,929.2 5,512.0 5,094.7 5,094.7 5,094.7 3,755.2 2,415.6 1,207.8 -
BD.10 - BD.13 (R.F),
BPU.17 - BPU.21, BI, BL, BU, 2,687.0 2,687.0 VII - - - - - - - - 2,216.8 4,433.6 4,205.2 3,976.8 3,976.8 3,976.8 2,700.4 1,424.1 2,525.8 3,627.5 3,372.2 3,116.9 3,116.9 3,116.9 2,297.4 1,477.9 738.9 -

MT. I Fungsi Real


FC. I 24,086 24,086.0 BPU.22-BPU.26,UF, BO,BP,BR,BUA, 4,035.0 4,035.0 IV - - - - - 3,328.9 6,657.8 6,314.8 5,971.8 5,971.8 5,971.8 4,055.2 2,138.6 3,792.9 5,447.3 5,063.9 4,680.6 4,680.6 4,680.6 3,449.9 2,219.3 1,109.6 - - - -
FC. II 21,181 31,287.0 BUE,BQ, BY,BV,QA.
Bek-Rum 10,106
Total 55,373 55,373.0 BH,BJ,BK (RF), BD 1,057.0 1,057.0 IV - - - - - 872.0 1,744.1 1,654.2 1,564.4 1,564.4 1,564.4 1,062.3 560.2 993.6 1,427.0 1,326.5 1,226.1 1,226.1 1,226.1 903.7 581.4 290.7 - - - -

MT. II Fungsi Real BM.1 - BM.5 1,877.0 1,877.0 IV - - - - - 1,548.5 3,097.1 2,937.5 2,778.0 2,778.0 2,778.0 1,886.4 994.8 497.4 563.1 563.1 563.1 563.1 563.1 563.1 563.1 563.1 - - - -
FC. I 24,086 24,086.0
FC. II 21,181 31,287.0 BM.6 - BM.13 1,997.0 1,997.0 IV - - - - - 1,647.5 3,295.1 3,125.3 2,955.6 2,955.6 2,955.6 2,007.0 1,058.4 529.2 599.1 599.1 599.1 599.1 599.1 599.1 599.1 599.1 - - - -
Bek-Rum 10,106
Total 55,373 55,373.0 Bekri-1 (BK.0 - BA.15) 2,571.0 2,571.0 VI - - - - - - - 2,121.1 4,242.2 4,023.6 3,805.1 3,805.1 3,805.1 2,583.9 1,362.6 2,416.7 3,470.9 3,226.6 2,982.4 2,982.4 2,982.4 2,198.2 1,414.1 707.0 - -
Bekri-2 (BK.11 - BK.14) 2,429.0 2,429.0 VI - - - - - - - 2,003.9 4,007.9 3,801.4 3,594.9 3,594.9 3,594.9 2,441.1 1,287.4 2,283.3 3,279.2 3,048.4 2,817.6 2,817.6 2,817.6 2,076.8 1,336.0 668.0 - -
Waduk Batutegi elv vol
Mercu Spillway 274.00 687,767 Rumbia-1 (BRB.1 - BRB.3) 2,621.0 2,621.0 VII - - - - - - - - 2,162.3 4,324.7 4,101.9 3,879.1 3,879.1 3,879.1 2,634.1 1,389.1 2,463.7 3,538.4 3,289.4 3,040.4 3,040.4 3,040.4 2,241.0 1,441.6 720.8 -
Dead Storage 208.00 23,371 Rumbia-2 (BRB.4 - BRB.9) 2,485.0 2,485.0 VII - - - - - - - - 2,050.1 4,100.3 3,889.0 3,677.8 3,677.8 3,677.8 2,497.4 1,317.1 2,335.9 3,354.8 3,118.7 2,882.6 2,882.6 2,882.6 2,124.7 1,366.8 683.4 -
Feeder Canal II 31,287.0 31,287.0 - - - 348.2 330.2 7,709.2 15,106.2 26,595.3 39,492.0 48,600.8 47,226.5 42,018.5 35,400.2 31,726.9 27,806.6 25,604.2 31,698.5 35,687.1 33,990.1 31,221.5 29,610.4 25,183.0 15,876.9 9,431.1 3,350.9 -
Luas Fungsi 55,373 lt/dt 50 50 3,693 8,036 16,586 33,355 42,499 54,438 64,989 70,515 68,400 60,974 55,750 54,553 51,089 48,643 53,553 55,486 50,193 43,393 38,743 28,937 16,328 9,481 3,401 50
Renc Tanam 110,746 Total Kebutuhan di Bendung Argoguruh m3/dt 0.05 0.05 3.69 8.04 16.59 33.35 42.50 54.44 64.99 70.52 68.40 60.97 55.75 54.55 51.09 48.64 53.55 55.49 50.19 43.39 38.74 28.94 16.33 9.48 3.40 0.05
IP 2.00 x1000 m3 64.80 69.12 4,786.39 11,108.97 21,495.40 37,463.94 55,079.00 75,255.28 84,225.42 91,387.63 88,646.82 84,290.08 72,251.50 70,700.35 66,211.22 67,244.30 69,404.82 76,704.16 65,049.93 56,237.83 50,210.97 37,502.97 21,160.57 12,287.54 4,407.53 69.12
PEDOMAN OPERASI MT.I RENDENG 2022-2023 & MT.II, MT.III GADU 2023 DAERAH IRIGASI SEKAMPUNG SISTIM TERHADAP ALOKASI AIR DI WAY SEKAMPUNG dan TAMBAHAN SUPLAY (minimal) DARI WADUK BATU TEGI

September Oktober November Desember Januari Februari Maret April Mei Juni Juli Agustus September
Gol Lokasi MT-I MT-II
(Ha.) (Ha.) 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
DI. SKP BATANGHARI
I KH.2 Ka, KBH.1-KBH.4,Ka 1,011.0 1,011.0 - - 834.1 1,668.2 1,582.2 1,496.3 1,496.3 1,496.3 1,016.1 535.8 950.3 1,364.9 1,268.8 1,172.8 1,172.8 1,172.8 1,304.7 556.1 278.0 - - - - - - -
V KBH.4 Ki - KBH.8 C 1,457.0 1,457.0 - - - - - - 1,202.0 2,404.1 2,280.2 2,156.4 2,156.4 2,156.4 1,464.3 772.2 1,369.6 1,967.0 1,828.5 1,690.1 1,690.1 1,690.1 1,245.7 801.4 400.7 - - -
III KBH.8 D - KBH.12 3,920.0 3,920.0 - - - - 3,234.0 6,468.0 6,134.8 5,801.6 5,801.6 5,801.6 3,939.6 2,077.6 3,684.8 5,292.0 4,919.6 4,547.2 4,547.2 4,547.2 3,351.6 2,156.0 1,078.0 - - - - -
III KBH.13 - KBH 16 3,464.0 3,464.0 - - - - 2,857.8 5,715.6 5,421.2 5,126.7 5,126.7 5,126.7 3,481.3 1,835.9 3,256.2 4,676.4 4,347.3 4,018.2 4,018.2 4,018.2 2,961.7 1,905.2 952.6 - - - - -
# Q.KH.2-KBH 9,852.0 9,852.0 - - 834.1 1,668.2 7,674.0 13,679.9 14,254.3 14,828.7 14,224.6 13,620.5 10,527.6 7,434.7 9,674.1 11,913.4 11,809.3 11,705.2 11,698.7 10,811.6 8,281.5 5,751.3 3,276.3 801.4 400.7 - - -
DI. SKP BUNUT
II KH.2 Ki - BPU.1a 426.0 426.0 - - - 351.5 702.9 666.7 630.5 630.5 630.5 428.1 225.8 400.4 575.1 534.6 494.2 494.2 494.2 364.2 234.3 117.2 - - - - - -
I KH.3 KI, Ka-KR.1 - Kr.2E 793.0 793.0 - - 654.2 1,308.5 1,241.0 1,173.6 1,173.6 1,173.6 797.0 420.3 745.4 1,070.6 995.2 919.9 919.9 919.9 678.0 436.2 218.1 - - - - - - -
IV KR.2 - KR. 4 C 476.0 476.0
IV KB.1 - KB5A,KBW 990.0 990.0
1,466.0 1,466.0 - - - - - 1,209.5 2,418.9 2,294.3 2,169.7 2,169.7 2,169.7 1,473.3 777.0 1,378.0 1,979.1 1,839.8 1,700.6 1,700.6 1,700.6 1,253.4 806.3 403.2 - - - -
I KR.4 D - KR. 5 585.0 585.0
I KB.5 - KB.5A, KBW,KBZ-KBO. 2,027.0 2,027.0
2,612.0 2,612.0 - - 2,155 4,310 4,088 3,866 3,866 3,866 2,625 226 2,455.3 3,526.2 3,278.1 3,029.9 3,029.9 3,029.9 2,233.3 1,436.6 718.3 - - - - - - -

Suplesi RU 4,216.0 4,216.0 - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - - -
Suplesi BU 4,721.0 4,721.0 - - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - -
PDAM Metro 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0
## KANAL I 24,086.0 24,086.0 50.0 50.0 3,693.2 7,687.9 16,255.7 25,645.4 27,393.0 27,842.8 25,496.8 21,914.4 21,173.8 18,955.3 20,349.4 22,825.8 23,282.3 23,038.9 21,854.7 19,799.2 16,202.7 12,171.9 9,132.6 3,754.5 450.7 50.0 50.0 50.0

II Trimurjo -1 211.0 211.0 - - - 348.2 330.2 312.3 312.3 312.3 212.1 111.8 198.3 284.9 264.8 244.8 244.8 244.8 244.8 180.4 116.1 58.0 - - - - - -
VI Trimurjo -2 4,925.0 4,925.0 - - - - - - - 8,126.3 7,707.6 7,289.0 7,289.0 7,289.0 4,949.6 2,610.3 4,629.5 6,648.8 6,180.9 5,713.0 5,713.0 5,713.0 5,713.0 4,210.9 2,708.8 1,354.4 - -
VII Punggur 4,392.0 4,392.0 - - - - - - - - 3,623.4 7,246.8 6,873.5 6,500.2 6,500.2 6,500.2 4,414.0 2,327.8 4,128.5 5,929.2 5,512.0 5,094.7 5,094.7 5,094.7 3,755.2 2,415.6 1,207.8 -

VII Kt.Gajah 2,687.0 2,687.0 - - - - - - - 2,216.8 4,433.6 4,205.2 3,976.8 3,976.8 3,976.8 2,700.4 1,424.1 2,525.8 3,627.5 3,372.2 3,116.9 3,116.9 3,116.9 2,297.4 1,477.9 738.9 -

IV Spt.Raman 4,035.0 4,035.0 - - - - - 3,328.9 6,657.8 6,314.8 5,971.8 5,971.8 5,971.8 4,055.2 2,138.6 3,792.9 5,447.3 5,063.9 4,680.6 4,680.6 4,680.6 3,449.9 2,219.3 1,109.6 - - - -

IV R. Fajar 1,057.0 1,057.0 - - - - - 872.0 1,744.1 1,654.2 1,564.4 1,564.4 1,564.4 1,062.3 560.2 993.6 1,427.0 1,326.5 1,226.1 1,226.1 1,226.1 903.7 581.4 290.7 - - - -

IV R.Endah 1,877.0 1,877.0 - - - - - 1,548.5 3,097.1 2,937.5 2,778.0 2,778.0 2,778.0 1,886.4 994.8 497.4 563.1 563.1 563.1 563.1 563.1 563.1 563.1 563.1 - - - -
IV R. Fajar 1,997.0 1,997.0 - - - - - 1,647.5 3,295.1 3,125.3 2,955.6 2,955.6 2,955.6 2,007.0 1,058.4 529.2 599.1 599.1 599.1 599.1 599.1 599.1 599.1 599.1 - - - -
VI Bekri-1 2,571.0 2,571.0 - - - - - - - 2,121.1 4,242.2 4,023.6 3,805.1 3,805.1 3,805.1 2,583.9 1,362.6 2,416.7 3,470.9 3,226.6 2,982.4 2,982.4 2,982.4 2,198.2 1,414.1 707.0 - -
VI Bekri-2 2,429.0 2,429.0 - - - - - - - 2,003.9 4,007.9 3,801.4 3,594.9 3,594.9 3,594.9 2,441.1 1,287.4 2,283.3 3,279.2 3,048.4 2,817.6 2,817.6 2,817.6 2,076.8 1,336.0 668.0 - -
VII Rumbia-1 2,621.0 2,621.0 - - - - - - - - 2,162.3 4,324.7 4,101.9 3,879.1 3,879.1 3,879.1 2,634.1 1,389.1 2,463.7 3,538.4 3,289.4 3,040.4 3,040.4 3,040.4 2,241.0 1,441.6 720.8 -
VII Rumbia-2 2,485.0 2,485.0 - - - - - - - - 2,050.1 4,100.3 3,889.0 3,677.8 3,677.8 3,677.8 2,497.4 1,317.1 2,335.9 3,354.8 3,118.7 2,882.6 2,882.6 2,882.6 2,124.7 1,366.8 683.4 -

## KANAL II 31,287.0 31,287.0 - - - 348.2 330.2 7,709.2 15,106.2 26,595.3 39,492.0 48,600.8 47,226.5 42,018.5 35,400.2 31,726.9 27,806.6 25,604.2 31,698.5 35,687.1 33,990.1 31,221.5 29,610.4 25,183.0 15,876.9 9,431.1 3,350.9 -
Periode ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Total Kebutuhan Air 0.05 0.05 3.69 8.04 16.59 33.35 42.50 54.44 64.99 70.52 68.40 60.97 55.75 54.55 51.09 48.64 53.55 55.49 50.19 43.39 38.74 28.94 16.33 9.48 3.40 0.05
Q.Andal Sungai - - - - 1.72 4.20 3.90 17.64 33.84 16.27 30.60 43.82 40.53 27.93 47.46 13.09 7.83 7.57 5.45 0.85 0.65 0.41 0.26 0.31 - -
Q.rencana Spl.B.Tegi 0.05 0.05 3.69 8.04 14.86 29.15 38.60 36.79 31.15 54.24 37.80 17.15 15.22 26.63 3.63 35.55 45.72 47.91 44.74 42.54 38.10 28.53 16.07 9.17 3.40 0.05
Q.nyata Sungai

Grafik alokasi air di Bendung Argoguruh

80.00

70.00

60.00

50.00
Liter/detik

40.00

30.00

20.00

10.00

-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
T. Kebutuhan Air 0.05 0.05 3.69 8.04 16.59 33.35 42.50 54.44 64.99 70.52 68.40 60.97 55.75 54.55 51.09 48.64 53.55 55.49 50.19 43.39 38.74 28.94 16.33 9.48 3.40 0.05
Q. Andalan Sungai - - - - 1.72 4.20 3.90 17.64 33.84 16.27 30.60 43.82 40.53 27.93 47.46 13.09 7.83 7.57 5.45 0.85 0.65 0.41 0.26 0.31 - -
Q. rencana Spl B. Tegi 0.05 0.05 3.69 8.04 14.86 29.15 38.60 36.79 31.15 54.24 37.80 17.15 15.22 26.63 3.63 35.55 45.72 47.91 44.74 42.54 38.10 28.53 16.07 9.17 3.40 0.05

TAHUN 2021-2022
RENCANA POLA TANAM DAN TATA TANAM GLOBAL
MT.I (RENDENG) 2022-2023 Dan MT.II (GADU) 2023
DI. SEKAMPUNG SISTEM
Area (ha) September Oktober November Desember Januari Februari Maret April Mei Juni Juli Agustus September Keterangan
Kebutuhan Air di Sawah Lokasi Gol
MT. I MT. II 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 A. Semai

Waktu MT.I MT.II + Pengol 30 Hari 1 Bln

Pengolahan 1.25 1.02 DI Sekampung A B 426 Ha C A B 426 Ha C B.Pertumb 60 Hari 2 Bln

Pertumbuhan 1.12 0.88 KH2, BPU1a 426.0 426.0 II C.Pemas 30 Hari 1 Bln

Pemasakan 0.40 0.42 KH.3 KI, Ka-KR.1 - Kr.2E 793.0 793.0 I B 793 Ha B 793 Ha C
Total 120 Hari 4 Bln
A C A
Kebutuhan Air di Bendung
KR.2 - KR.4c, KB.1-5 a,KBW 1,466.0 1,466.0 IV
A B 1.466 Ha C A B 1.466 Ha C
Waktu MT.I MT.II
Pengolahan 1.65 1.35 KR.5,KB.5-KB.12, KBZ, KBM, KBO 2,612.0 2,612.0 I
Pertumbuhan 1.48 1.16 KH.2 Ka, KBH.1-KBH.4,Ka 1,011.0 1,011.0 I A B 3.623 Ha C A B 3.623 Ha C

Pemasakan 0.53 0.55


Palawija 0.30 0.30 KBH.4 Ki - KBH.8 C 1,457.0 1,457.0 V
A B 1.457 Ha C A B 1.457 Ha C

KBH.8 D - KBH.12, KDY,KBMI 3,920.0 3,920.0 III


KBH.13-KBH.16,KSI,KMI 3,464.0 3,464.0 III A B 7.384 Ha C A B 7.384 Ha C

DI.Punggur Utara
A B 211 Ha C A B 211 Ha C
BPU.1-BPU.2 211.0 211.0 II

BPU.3- BPU.8,BA,BB,BC, 4,925.0 4,925.0 VI A B 4.925 Ha C A B 4.925 Ha C


BGS,BZ

BPU.9-BPU.15,BE,BF.1-BF.3,BX,BG 4,392.0 4,392.0 VII


A B 4.392 Ha C A B 4.392 Ha C
BD.10 - BD.13 (R.F),

BPU.17 - BPU.21, BI, BL, BU, 2,687.0 2,687.0 VII A B 2.687 Ha C A B 2.565 Ha C

BPU.22-BPU.26,UF, BO,BP,BR,BUA, 4,035.0 4,035.0 IV


A B 4.035 Ha C A B 2.006 Ha C
BUE,BQ, BY,BV,QA.

BH,BJ,BK (RF), BD 1,057.0 1,057.0 IV


A B 1.057 Ha C A B 1.057 Ha C
BM.1 - BM.5 1,877.0 1,877.0 IV

A B 3.874 Ha C A B 3.874 Ha C
BM.6 - BM.13 1,997.0 1,997.0 IV

Bekri-1 (BK.0 - BA.15) 2,571.0 2,571.0 VI


B 5.000 Ha C A B 5.000 Ha C
A
Bekri-2 (BK.11 - BK.14) 2,429.0 2,429.0 VI

Rumbia-1 (BRB.1 - BRB.3) 2,621.0 2,621.0 VII B 5.106 Ha B 5.106 Ha C


A C A

Rumbia-2 (BRB.4 - BRB.9) 2,485.0 2,485.0 VII

DI Sekampung
KH2, BPU1a 426.0 426.0 II - - - 351.5 702.9 666.7 630.5 630.5 630.5 428.1 225.8 400.4 575.1 534.6 494.2 494.2 494.2 364.2 234.3 117.2 - - - - - -
KH.3 KI, Ka-KR.1 - Kr.2E 793.0 793.0 I - - 654.2 1,308.5 1,241.0 1,173.6 1,173.6 1,173.6 797.0 420.3 745.4 1,070.6 995.2 919.9 919.9 919.9 678.0 436.2 218.1 - - - - - - -
KR.2 - KR.4c, KB.1-5 a,KBW 1,466.0 1,466.0 IV - - - - - 1,209.5 2,418.9 2,294.3 2,169.7 2,169.7 2,169.7 1,473.3 777.0 1,378.0 1,979.1 1,839.8 1,700.6 1,700.6 1,700.6 1,253.4 806.3 403.2 - - - -
KR.5,KB.5-KB.12, KBZ, KBM, KBO 2,612.0 2,612.0 I - - 2,154.9 4,309.8 4,087.8 3,865.8 3,865.8 3,865.8 2,625.1 225.8 2,455.3 3,526.2 3,278.1 3,029.9 3,029.9 3,029.9 2,233.3 1,436.6 718.3 - - - - - - -
KH.2 Ka, KBH.1-KBH.4,Ka 1,011.0 1,011.0 I - - 834.1 1,668.2 1,582.2 1,496.3 1,496.3 1,496.3 1,016.1 535.8 950.3 1,364.9 1,268.8 1,172.8 1,172.8 1,172.8 1,304.7 556.1 278.0 - - - - - - -
KBH.4 Ki - KBH.8 C 1,457.0 1,457.0 V - - - - - - 1,202.0 2,404.1 2,280.2 2,156.4 2,156.4 2,156.4 1,464.3 772.2 1,369.6 1,967.0 1,828.5 1,690.1 1,690.1 1,690.1 1,245.7 801.4 400.7 - - -

KBH.8 D - KBH.12, KDY,KBMI 3,920.0 3,920.0 III - - - - 3,234.0 6,468.0 6,134.8 5,801.6 5,801.6 5,801.6 3,939.6 2,077.6 3,684.8 5,292.0 4,919.6 4,547.2 4,547.2 4,547.2 3,351.6 2,156.0 1,078.0 - - - - -

KBH.13-KBH.16,KSI,KMI 3,464.0 3,464.0 III - - - - 2,857.8 5,715.6 5,421.2 5,126.7 5,126.7 5,126.7 3,481.3 1,835.9 3,256.2 4,676.4 4,347.3 4,018.2 4,018.2 4,018.2 2,961.7 1,905.2 952.6 - - - - -

Suplesi KH2-Raman Utara 4,216.0 4,216.0 III - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - - -
Suplesi KH2-Batanghari Utara 4,721.0 4,721.0 IV - - - - - 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 2,500.0 - - - -
PDAM Metro 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0
Feeder Canal I 24,086.0 24,086.0 50.0 50.0 3,693.2 7,687.9 16,255.7 25,645.4 27,393.0 27,842.8 25,496.8 21,914.4 21,173.8 18,955.3 20,349.4 22,825.8 23,282.3 23,038.9 21,854.7 19,799.2 16,202.7 12,171.9 9,132.6 3,754.5 450.7 50.0 50.0 50.0

DI.Punggur Utara
BPU.1-BPU.2 211.0 211.0 II - - - 348.2 330.2 312.3 312.3 312.3 212.1 111.8 198.3 284.9 264.8 244.8 244.8 244.8 244.8 180.4 116.1 58.0 - - - - - -
BPU.3- BPU.8,BA,BB,BC, 4,925.0 4,925.0 VI - 8,126.3 7,707.6 7,289.0 7,289.0 7,289.0 4,949.6 2,610.3 4,629.5 6,648.8 6,180.9 5,713.0 5,713.0 5,713.0 5,713.0 4,210.9 2,708.8 1,354.4 - -
BGS,BZ
BPU.9-BPU.15,BE,BF.1-BF.3,BX,BG 4,392.0 4,392.0 VII - - - - - - - - 3,623.4 7,246.8 6,873.5 6,500.2 6,500.2 6,500.2 4,414.0 2,327.8 4,128.5 5,929.2 5,512.0 5,094.7 5,094.7 5,094.7 3,755.2 2,415.6 1,207.8 -
BD.10 - BD.13 (R.F),
BPU.17 - BPU.21, BI, BL, BU, 2,687.0 2,687.0 VII - - - - - - - - 2,216.8 4,433.6 4,205.2 3,976.8 3,976.8 3,976.8 2,700.4 1,424.1 2,525.8 3,627.5 3,372.2 3,116.9 3,116.9 3,116.9 2,297.4 1,477.9 738.9 -

MT. I Fungsi Real


FC. I 24,086 24,086.0 BPU.22-BPU.26,UF, BO,BP,BR,BUA, 4,035.0 4,035.0 IV - - - - - 3,328.9 6,657.8 6,314.8 5,971.8 5,971.8 5,971.8 4,055.2 2,138.6 3,792.9 5,447.3 5,063.9 4,680.6 4,680.6 4,680.6 3,449.9 2,219.3 1,109.6 - - - -
FC. II 21,181 31,287.0 BUE,BQ, BY,BV,QA.
Bek-Rum 10,106
Total 55,373 55,373.0 BH,BJ,BK (RF), BD 1,057.0 1,057.0 IV - - - - - 872.0 1,744.1 1,654.2 1,564.4 1,564.4 1,564.4 1,062.3 560.2 993.6 1,427.0 1,326.5 1,226.1 1,226.1 1,226.1 903.7 581.4 290.7 - - - -

MT. II Fungsi Real BM.1 - BM.5 1,877.0 1,877.0 IV - - - - - 1,548.5 3,097.1 2,937.5 2,778.0 2,778.0 2,778.0 1,886.4 994.8 497.4 563.1 563.1 563.1 563.1 563.1 563.1 563.1 563.1 - - - -
FC. I 24,086 24,086.0
FC. II 21,181 31,287.0 BM.6 - BM.13 1,997.0 1,997.0 IV - - - - - 1,647.5 3,295.1 3,125.3 2,955.6 2,955.6 2,955.6 2,007.0 1,058.4 529.2 599.1 599.1 599.1 599.1 599.1 599.1 599.1 599.1 - - - -
Bek-Rum 10,106
Total 55,373 55,373.0 Bekri-1 (BK.0 - BA.15) 2,571.0 2,571.0 VI - - - - - - - 2,121.1 4,242.2 4,023.6 3,805.1 3,805.1 3,805.1 2,583.9 1,362.6 2,416.7 3,470.9 3,226.6 2,982.4 2,982.4 2,982.4 2,198.2 1,414.1 707.0 - -
Bekri-2 (BK.11 - BK.14) 2,429.0 2,429.0 VI - - - - - - - 2,003.9 4,007.9 3,801.4 3,594.9 3,594.9 3,594.9 2,441.1 1,287.4 2,283.3 3,279.2 3,048.4 2,817.6 2,817.6 2,817.6 2,076.8 1,336.0 668.0 - -
Waduk Batutegi elv vol
Mercu Spillway 274.00 687,767 Rumbia-1 (BRB.1 - BRB.3) 2,621.0 2,621.0 VII - - - - - - - - 2,162.3 4,324.7 4,101.9 3,879.1 3,879.1 3,879.1 2,634.1 1,389.1 2,463.7 3,538.4 3,289.4 3,040.4 3,040.4 3,040.4 2,241.0 1,441.6 720.8 -
Dead Storage 208.00 23,371 Rumbia-2 (BRB.4 - BRB.9) 2,485.0 2,485.0 VII - - - - - - - - 2,050.1 4,100.3 3,889.0 3,677.8 3,677.8 3,677.8 2,497.4 1,317.1 2,335.9 3,354.8 3,118.7 2,882.6 2,882.6 2,882.6 2,124.7 1,366.8 683.4 -
Feeder Canal II 31,287.0 31,287.0 - - - 348.2 330.2 7,709.2 15,106.2 26,595.3 39,492.0 48,600.8 47,226.5 42,018.5 35,400.2 31,726.9 27,806.6 25,604.2 31,698.5 35,687.1 33,990.1 31,221.5 29,610.4 25,183.0 15,876.9 9,431.1 3,350.9 -
Luas Fungsi 55,373 lt/dt 50 50 3,693 8,036 16,586 33,355 42,499 54,438 64,989 70,515 68,400 60,974 55,750 54,553 51,089 48,643 53,553 55,486 50,193 43,393 38,743 28,937 16,328 9,481 3,401 50
Renc Tanam 110,746 Total Kebutuhan di Bendung Argoguruh m3/dt 0.05 0.05 3.69 8.04 16.59 33.35 42.50 54.44 64.99 70.52 68.40 60.97 55.75 54.55 51.09 48.64 53.55 55.49 50.19 43.39 38.74 28.94 16.33 9.48 3.40 0.05
IP 2.00 x1000 m3 64.80 69.12 4,786.39 11,108.97 21,495.40 37,463.94 55,079.00 75,255.28 84,225.42 91,387.63 88,646.82 84,290.08 72,251.50 70,700.35 66,211.22 67,244.30 69,404.82 76,704.16 65,049.93 56,237.83 50,210.97 37,502.97 21,160.57 12,287.54 4,407.53 69.12
RENCANA POLA TANAM DAN TATA TANAM GLOBAL
MT.I (RENDENG) 2022-2023 Dan MT.II (GADU) 2023
DAERAH IRIGASI BATANGHARI UTARA

Kebutuhan Air di Sawah MT-I MT-II September Oktober Nopember Desember Januari Februari Maret April Mei Juni Juli Agustus September

Gol
Lokasi Keterangan
Waktu MT.I MT.II (Ha.) (Ha.) I II I II I II I II I II I II I II I II I II I II I II I II I II

Pengolahan 1.25 1.02 Bendung Garongan A. Semai

Pertumbuhan 1.12 0.88 DI.BATANGHARI UTARA + Pengolahan 30 Hari 1 Bln


Pemasakan 0.40 0.42 B.Pertumbuhan 60 Hari 2 Bln
Kebutuhan Air di Bendung Kmt.G.5 - TE - TK - PU 2,683.00 2,683.00 IV C.Pemasakan 30 Hari 1 Bln
A B 2.683 Ha C A B 2.683 Ha C
Waktu MT.I MT.II ( G.0 - G.8,Ki ) Total 120 Hari 4 Bln
Pengolahan 1.65 1.35
Pertumbuhan 1.48 1.16
Pemasakan 0.53 0.55 Kmt.G.9.A - P - G.18 2,038.00 2,038.00 IV B 2.038 Ha B 2.038 Ha
A C A C
( G.9A Ka - G.18,p )
Waktu MT.I MT.II
Palawija 0.30 0.30

Kebutuhan air di sawah (lt/dt) Bendung Garongan


Luas x satuan kebutuhan DI.BATANGHARI UTARA

Kmt.G.5 - TE - TK - PU 2,683.00 2,683.00 IV - - - - - 2,213.5 4,427.0 4,198.9 3,970.8 3,970.8 3,970.8 2,696.4 1,422.0 2,522.0 3,622.1 3,367.2 3,112.3 3,112.3 3,112.3 2,294.0 1,475.7 737.8 - - - -
( G.0 - G.8,Ki )

Kmt.G.9.A - P - G.18 2,038.00 2,038.00 IV - - - - - 1,681.4 3,362.7 3,189.5 3,016.2 3,016.2 3,016.2 2,048.2 1,080.1 1,915.7 2,751.3 2,557.7 2,364.1 2,364.1 2,364.1 1,742.5 1,120.9 560.5 - - - -
( G.9A Ka - G.18,p )

Total kebutuhan Air l/dt - - - - - 3,894.8 7,789.7 7,388.4 6,987.1 6,987.1 6,987.1 4,744.6 2,502.1 4,437.7 6,373.4 5,924.9 5,476.4 5,476.4 5,476.4 4,036.5 2,596.6 1,298.3 - - - -
Debit Andalan l/dt 12,411 12,411 11,291 11,354 10,510 10,507 9,593 8,917 6,803 5,837 5,393 5,183 3,646 3,662 2,881 1,753 1,486 1,393 958 435 800 1,052 1,840 6,003 12,411 12,411
Suplesi - - - - - - - - 184 1,150 1,594 - - 776 3,492 4,172 3,990 4,083 4,518 3,601 1,797 246 - - - -

GRAFIK KEBUTUHAN AIR DAN DEBIT ANDALAN


14,000

12,000

10,000
LITER/DETIK

8,000

6,000

4,000

2,000

-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 0 0
Kebutuhan Air - - - - - 3,894. 7,789. 7,388. 6,987. 6,987. 6,987. 4,744. 2,502. 4,437. 6,373. 5,924. 5,476. 5,476. 5,476. 4,036. 2,596. 1,298. - - - -
Q Andalan 80% 12,411 12,411 11,291 11,354 10,510 10,507 9,593 8,917 6,803 5,837 5,393 5,183 3,646 3,662 2,881 1,753 1,486 1,393 958 435 800 1,052 1,840 6,003 12,411 12,411
Suplesi - - - - - - - - 184 1,150 1,594 - - 776 3,492 4,172 3,990 4,083 4,518 3,601 1,797 246 - - - -
TAHUN 2021-2022

4,721 - - - - - 0.83 1.65 1.57 1.48 1.48 1.48 1.01 0.53 0.94 1.35 1.26 1.16 1.16 1.16 0.86
RENCANA GLOBAL PELEPASAN AIR WADUK BATU TEGI
UNTUK KEBUTUHAN IRIGASI TAHUN 2022 - 2023

DEBIT KELUAR ( M3 / Dt )
BULAN TAHUN KETERANGAN
MINGGU I + II MINGGU III + IV

Oktober 3.69 8.04


November 2022 16.59 33.35
Desember 42.50 54.44
Januari 64.99 70.52
Februari 68.40 60.97
Maret 55.75 54.55
April 51.09 48.64
Mei 2023 53.55 55.49
Juni 50.19 43.39
Juli 38.74 28.94
Agustus 16.33 9.48
September 3.40 0.05
JADWAL POLA TANAM DAN MUSIM TANAM
( MT. I RENDENG TAHUN 2022 - 2023 & MT. II GADU TAHUN 2023 )
DAERAH IRIGASI WAY SEPUTIH
334 3438 4257 3630 2638
URAIAN KEBUTUHAN D.I. WAY SEPUTIH / OKT NOV DES JAN FEB MARET APRIL MEI JUNI JULI AGUST SEPT
UPTD
Gol KETERANGAN
Waktu MT.I MT.II I II I II I II I II I II I II I II I II I II I II I II I II

Pengolahan 1.25 1.125


Pertumbuhan 0.80 0.82 PROSES PEMBERIAN
Pemasakan 0.25 0.25 UPTD Bend. Way Seputih I A B. 334 Ha C A B. 334 Ha C

Kehilangan Air A. Semai + Penjenuhan


A B. 324 Ha C PALAWIJA
UPTD Simpang Agung
di Saluran I + Pengolahan = 30 hari
BWS.1 & BWS.2
A B. 3,114 Ha C PALAWIJA
Induk 10% UPTD Simpang Agung III

Sekunder 10% B. Pertumbuhan = 60 hari


Tersier 20% UPTD Terbanggi Besar II A B. 4,484 Ha C A B. 3.260 Ha C C. Pemasakan = 30 hari
Jumlah = 120 hari
A B. 3,630 Ha C PALAWIJA
UPTD Seputih Mataram III

Rencana Tanam MT.I ( Rendeng)


B. 2.683 Ha C PALAWIJA
UPTD Bandar Mataram II A Luas sawah Rencana
Gol
(Ha) Padi (Ha)
99 99 1,138 1,138 1,763 1,719 1,355 1,381 908 895 675 675 354 331 331 321 98 98 I 334 334
UPTD Bend. Way Seputih I - 418 418 267 267 267 267 84 84 376 376 274 274 274 274 84 84 - - - - - - - I 324 324
UPTD Simpang Agung I BWS.1
- & BWS.2
405 405 259 259 259 259 81 81 - - - - - - - - - - - - - - - III 3,114 3,114
Kebutuhan air di sawah UPTD Simpang Agung III - - - - - - 3,893 3,893 2,491 2,491 2,491 2,491 779 779 - - - - - - - - - - II 4,484 4,484
(l/dt/Ha) UPTD Terbanggi Besar II - - - - 5,605 5,605 3,587 3,587 3,587 3,587 1,121 1,121 3,668 3,668 2,673 2,673 2,673 2,673 815 815 - - - - III 3,630 3,630
UPTD Seputih Mataram III - - - - - - 4,538 4,538 2,904 2,904 2,904 2,904 908 908 - - - - - - - - - - II 2,683 2,683
UPTD Bandar Mataram II - - - - 3,354 3,354 2,146 2,146 2,146 2,146 671 671 - - - - - - - - - - - - Jumlah 14,569 14,569
Rencana Tanam MT.II ( Gadu )
Jumlah Kebutuhan Air di Sawah (l/dt/Ha) - 823 823 526 9,485 9,485 14,690 14,328 11,293 11,505 7,563 7,461 5,627 5,627 2,947 2,757 2,757 2,673 815 815 - - - - Gol Luas sawah Rencana
(Ha) Padi (Ha)
Kebutuhan Air di Pintu Tersier (l/dt/Ha) - - 987 987 11,382 11,382 17,628 17,194 13,552 13,805 9,075 8,953 6,753 6,753 3,536 3,308 3,308 3,208 978 978 - - - - I 334 334
II 3,260 3,260
Kebutuhan Air di Bendung (l/dt/Ha) - - 1,020 1,020 11,762 11,762 18,216 17,767 14,004 14,266 9,378 9,251 6,978 6,978 3,654 3,418 3,418 3,315 1,011 1,011 - - - -

Jumlah 3,594 3,594


Debit Sungai Handal 80% (l/dt/Ha) 6,439 35,109 11,013 10,606 21,902 19,481 17,365 19,693 21,888 13,581 10,918 11,598 8,078 5,332 3,829 6,024 3,688 3,352 1,852 1,731 4,070 6,439 4,070 5,256 Pemberian air untuk palawija
diberikan bila kebutuhan air
Debit Sungai Kenyataan (l/dt/Ha) Tahun 2022 - 2023 2,050 2,100 2,430 2,400 18,160 22,000 21,000 20,631 17,000 23,000 21,690 16,102 11,000 8,150 7,253 3,853 4,480 3,725 2,000 2,000 1,200 1,200 2,010 2,050 padi mencukupi (0,25 l/dt/Ha)

KETERANGAN : MT.I RENDENG 2022-2023 MT.II GADU 2023

A PENGOLAHAN A PENGOLAHAN

B PERTUMBUHAN B PERTUMBUHAN

C PEMASAKAN C PEMASAKAN
JADWAL POLA TANAM DAN MUSIM TANAM
( MT. I RENDENG TAHUN 2022 - 2023 & MT. II GADU TAHUN 2023 )
D.I.WAY PENGUBUAN ( UPTD. WAY PENGUBUAN )
453.5 670 376 652
URAIAN KEBUTUHAN OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER
D.I. / UPTD / KEMANTREN Gol KETERANGAN
Waktu MT.I MT.II I II I II I II I II I II I II I II I II I II I II I II I II
Pengolahan 1.25 1.125
Pertumbuhan 0.82 0.88 PROSES PEMBERIAN
Pemasakan 0.25 0.25 KMT. Gedong Harta II A B. 466,75 Ha C PALAWIJA

Kehilangan Air A. Semai + Penjenuhan


di Saluran + Pengolahan = 30 hari
B. 1.189 Ha PALAWIJA
Induk 20% KMT. Suka Jaya II A C B. Pertumbuhan = 60 hari
Sekunder 10% C. Pemasakan = 30 hari
Tersier 10% Jumlah = 120 hari
KMT. Gedong Sari I A B. 723 Ha C A B. 723 Ha C
Rencana Tanam MT.I (Rendeng)

Luas sawah Rencana


Gol
KMT. Bandar Putih Tua I A B. 1.122 Ha C A B. 1.122 Ha C (Ha) Padi (Ha)
II 466.75 466.75
II 1,189.00 1,189.00
I 723.00 723.00
KMT. Gedong Harta II 583 583 383 383 383 383 117 117 I 1,122.00 1,122.00
Kebutuhan air di sawah KMT. Suka Jaya II 1,486 1,486 975 975 975 975 297 297 Jumlah 3,500.75 3,500.75
(l/dt/Ha) KMT. Gedong Sari I 904 904 593 593 593 593 181 181 813 813 636 636 636 636 181 181
Rencana Tanam MT.II ( Gadu)
KMT. Bandar Putih Tua I 1,403 1,403 281 281 281 281 281 281 1,262 1,262 987 987 987 987 281 281

Luas sawah Rencana


Gol
Jumlah Kebutuhan Air di Sawah (l/dt/Ha) 2,306 4,376 2,943 2,231 2,231 2,231 1,819 875 2,490 2,076 1,624 1,624 1,624 1,624 461 461 - (Ha) Padi (Ha)
I 723.00 723.00
Kebutuhan Air di Pintu Tersier (l/dt/Ha) 2,537 5,251 3,532 2,677 2,677 2,677 2,183 1,050 2,987 2,491 1,948 1,948 1,948 1,948 554 554 - I 1,122.00 1,122.00

Kebutuhan Air di Bendung (l/dt/Ha) 2,814 5,251 3,532 2,677 2,677 2,677 2,183 1,050 2,987 2,491 1,948 1,948 1,948 1,948 554 554 - Jumlah 1,845.00 1,845.00
Pemberian air untuk palawija
Debit Handal 80% (l/dt/Ha) 2,077 970 1,359 2,076 2,409 3,008 3,549 3,741 3,527 6,522 3,768 3,844 3,047 2,488 2,591 2,478 2,070 1,475 1,583 1,089 1,238 1,176 1,122 896 diberikan bila kebutuhan air
padi mencukupi (0,25 l/dt/Ha)
Debit Kenyataan (l/dt/Ha) Tahun 2022 - 2023 2,010 2,150 3,740 4,075 5,323 4,996 4,804 3,824 3,126 3,538 3,126 3,538 3,552 4,895 4,732 4,718 2,131 1,089 1,238 1,176 1,122 1,100 1,100

Keterangan :
MT. I ( Rendeng ) 2022-2023 MT. II ( Gadu ) 2023
PENGOLAHAN PENGOLAHAN

PERTUMBUHAN PERTUMBUHAN

PEMASAKAN PEMASAKAN
RENCANA POLA TANAM DAN RENCANA TATA TANAM GLOBAL
MT. I ( RENDENG ) 2022/2023 DAN MT. II ( GADU ) 2023
DAERAH IRIGASI WAY CURUP
Kebutuhan Air MT-I MT-II Oktober Nopember Desember Januari Februari Maret April Mei Juni Juli Agustus September Oktober Nopember Desember

Gol
Lokasi Keterangan
Waktu MT.I MT.II (Ha.) (Ha.) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 23 24 23 24 5 6
Pengolahan 1.250 1.125 D.I. WAY CURUP A. Semai
Pertumbuhan 0.85 0.85 Kemantren Way Curup hulu + Pengolahan 30 Hari 1 Bulan
Pemasakan 0.45 0.45 Sal. Induk Kiri : B.Pertumbuhan 60 Hari 2 Bulan
- BKD.I s/d BKD.IX 1,597 1,597 III
A B.1597 Ha C PALAWIJA A B.1597 Ha C C.Pemasakan 30 Hari 1 Bulan
Waktu MT.I MT.II - BKD.VI s/d BWH.IV Total 120 Hari 4 Bulan
Palawija 0.50 0.50 Sal. Sekunder
BF,BA,BC,BVK,BB,BC Hilir

Sal. Induk Kanan : 606 606 II A B. 606 Ha C A B. 606 Ha C


- BWC.I s/d BWC.IX
Sal. Sekunder
BVM

Kemantren Way Curup hilir 1,426 1,426 I


Sal. Induk Way curup hilir :
A B.1426 Ha C A B.1426 Ha C PALAWIJA PALAWIJA
- BWH.V,V,VII,VIII
Sal. Sekunder
D,E,G,H,I,J,K,L,M,N,O,P

Kebutuhan air di sawah (lt/dt) D.I. WAY CURUP


Luas x satuan kebutuhan Kemantren Way Curup hulu
Sal. Induk Kiri :
- BKD.I s/d BKD.IX 1,597 1,597 III - - - - - - - 998.1 1,996.3 1,676.9 1,357.5 1,357.5 1,357.5 1,038.1 718.7 359.3 - - - - - 898.3 1,796.6 1,577.0 1,357.5 1,357.5 1,357.5 1,038.1 718.7 359.3
- BKD.VI s/d BWH.IV
Sal. Sekunder
BF,BA,BC,BVK,BB,BC Hilir

Sal. Induk Kanan : 606 606 II - - - - - - 378.8 757.5 636.3 515.1 515.1 515.1 393.9 272.7 136.4 - - - 340.9 681.8 598.4 515.1 515.1 515.1 393.9 272.7 136.4 - - -
- BWC.I s/d BWC.IX
Sal. Sekunder
BVM

Kemantren Way Curup hilir


Sal. Induk Way curup hilir : 1,426 1,426 I - - 891.3 1,782.5 1,497.3 1,212.1 1,212.1 1,212.1 926.9 641.7 320.9 - - - 802.1 1,604.3 1,408.2 1,212.1 1,212.1 1,212.1 926.9 641.7 320.9 - - - - - - -
- BWH.V,V,VII,VIII
Sal. Sekunder
D,E,G,H,I,J,K,L,M,N,O,P
Total kebutuhan Air l/dt - - 891 1,783 1,497 1,212 1,591 2,968 3,559 2,834 2,193 1,873 1,751 1,311 1,657 1,964 1,408 1,212 1,553 1,894 1,525 2,055 2,633 2,092 1,751 1,630 1,494 1,038 719 359
RENCANA POLA TANAM DAN RENCANA TATA TANAM GLOBAL
MT. I ( RENDENG ) 2022/2023 DAN MT. II ( GADU ) 2023
DAERAH IRIGASI WAY JEPARA
Kebutuhan Air MT-I MT-II Oktober Nopember Desember Januari Februari Maret April Mei Juni Juli Agustus September

Gol
Lokasi Keterangan
Waktu MT.I MT.II (Ha.) (Ha.) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Pengolahan 1.250 1.125 D.I. WAY JEPARA A. Semai
Pertumbuhan 0.85 0.85 + Pengolahan 30 Hari 1 Bulan
Pemasakan 0.45 0.45 - Kemantren 1, Labuhan Ratu I B.Pertumbuhan 60 Hari 2 Bulan
dan braja sakti, BJKi I - 2,227.25 2,227.25 I A B. 2,227.25 Ha C A B. 2,227.25 Ha C PALAWIJA C.Pemasakan 30 Hari 1 Bulan
Waktu MT.I MT.II BJKi XI dan A,T,B,N Total 120 Hari 4 Bulan
Palawija 0.50 0.50

A B. 2,276.50 Ha C PALAWIJA
- Kemantren 2, braja selebah 2,276.50 - II
dan baraja sakti BJKi XI - bjkI xxv
K,L M dan BJKi XI Ka

- Kemantren 3, jepara BJKa IV s/d 689.00 689.00 I A B. 689 Ha C A B. 689 Ha C PALAWIJA


BJKA VIII Dan Sek G,H

Kebutuhan air di sawah (lt/dt) D.I. WAY JEPARA


Luas x satuan kebutuhan
- Kemantren 1, Labuhan Ratu I
dan braja sakti, BJKi I - 2,227.25 2,227.25 II - - 2,784.1 2,784.1 1,893.2 1,893.2 1,893.2 1,893.2 1,002.3 1,002.3 2,505.7 2,505.7 1,893.2 1,893.2 1,893.2 1,893.2 1,002.3 1,002.3 - - - - - -
BJKi XI dan A,T,B,N

- Kemantren 2, braja selebah 2,276.50 - I - - - - - - 2,845.6 2,845.6 1,935.0 1,935.0 1,935.0 1,935.0 1,024.4 1,024.4 - - - - - - - - - -
dan baraja sakti BJKi XI - bjkI xxv
K,L M dan BJKi XI Ka

- Kemantren 3, jepara BJKa IV s/d 689.00 689.00 I - - 861.3 861.3 585.7 585.7 585.7 585.7 310.1 310.1 775.1 775.1 585.7 585.7 585.7 585.7 310.1 310.1 - - - - - -
BJKA VIII Dan Sek G,H

Total kebutuhan Air l/dt - - 3,645 3,645 2,479 2,479 5,324 5,324 3,247 3,247 5,216 5,216 3,503 3,503 2,479 2,479 1,312 1,312 - - - - - -
JADWAL POLA TANAM DAN MUSIM TANAM
( MT. I RENDENG TAHUN 2021 - 2022 & MT. II GADU TAHUN 2022 )
D.I.SEDERHANA ( UPTD BANGUN REJO )
453.5 670 376 652
URAIAN KEBUTUHAN NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPT OKTOBER
D.I. / UPTD / KEMANTREN Gol KETERANGAN
Waktu MT.I MT.II I II I II I II I II I II I II I II I II I II I II I II I II
Pengolahan 1.25 1.125
Pertumbuhan 0.82 0.88 PROSES PEMBERIAN
Pemasakan 0.25 0.25 D.I. Way Tipo Balak I A B. 1.133 Ha C A B. 1.133 Ha C

Kehilangan Air A. Semai + Penjenuhan


di Saluran + Pengolahan = 30 hari
A B. 1.220 Ha C A B. 1.220 Ha C
Induk 20% D.I. Way Srikaton I B. Pertumbuhan = 60 hari
Sekunder 10% C. Pemasakan = 30 hari
Tersier 10% Jumlah = 120 hari
D.I. Way Tatayan I A B. 1.120 Ha C A B. 1.120 Ha C
Rencana Tanam MT.I (Rendeng)

Luas sawah Rencana


Gol
(Ha) Padi (Ha)
I 1,133.00 1,133.00
I 1,220.00 1,220.00
I 1,120.00 1,120.00
D.I. Way Tipo Balak I 1416.25 1,416 929 929 929 929 283 283 1,275 1,275 997 997 997 997 283 283

Kebutuhan air di sawah D.I. Way Srikaton I 1,525 1,525 305 305 305 305 305 305 1,373 1,373 1,074 1,074 1,074 1,074 305 305 Jumlah 3,473.00 3,473.00
(l/dt/Ha) D.I. Way Tatayan I 1,400 1,400 280 280 280 280 280 280 1,260 1,260 986 986 986 986 280 280
Rencana Tanam MT.II ( Gadu)

Luas sawah Rencana


Gol
Jumlah Kebutuhan Air di Sawah (l/dt/Ha) (Ha) Padi (Ha)
I 1,133.00 1,133.00
Kebutuhan Air di Pintu Tersier (l/dt/Ha) I 1,220.00 1,220.00
I 1,120.00 1,120.00
Kebutuhan Air di Bendung (l/dt/Ha) Jumlah 3,473.00 3,473.00
Pemberian air untuk palawija
Debit Handal 80% (l/dt/Ha) diberikan bila kebutuhan air
padi mencukupi (0,25 l/dt/Ha)
Debit Kenyataan (l/dt/Ha) Tahun 2021 - 2022

Keterangan :
MT. I ( Rendeng ) 2021 - 2022 MT. II ( Gadu ) 2022
PENGOLAHAN PENGOLAHAN

PERTUMBUHAN PERTUMBUHAN

PEMASAKAN PEMASAKAN
DRAFT JADWAL POLA TANAM DAN MUSIM TANAM
( MT. I RENDENG TAHUN 2022 - 2023 & MT. II GADU TAHUN 2023 )
D.I. WAY KALI PASIR ( UPTD. RUMBIA TIMUR )

URAIAN KEBUTUHAN NOP DES JAN FEB MAR APR MEI JUN JUL AGUST SEPT SEPT
DAERAH IRIGASI Gol KETERANGAN
Waktu MT.I MT.II I II I II I II I II I II I II I II I II I II I II I II I II
Pengolahan 1.25 1.125
Pertumbuhan 0.82 0.88 PROSES PEMBERIAN

Pemasakan 0.25 0.25


A. Semai + Penjenuhan
+ Pengolahan = 30 hari
Kehilangan Air , B. Pertumbuhan = 60 hari
di Saluran C. Pemasakan = 30 hari
D.I. Way Kali Pasir I A B. 997 Ha C A B. 997 Ha C Jumlah =120 hari

Induk 10% Rencana Tanam MT.I (Rendeng)


Sekunder 10% Gol Luas sawah Rencana
Tersier 20% (Ha) Padi (Ha)

I 997.00 997.00

Jumlah MT.I 997.00 997.00

Rencana Tanam MT.II ( Gadu )


Gol Luas sawah Rencana
(Ha) Padi (Ha)

Kebutuhan air di sawah D.I. W. Kali Pasir I 1,246 1,246 818 818 818 818 249 249 1,122 1,122 877 877 877 877 249 249 I 997.00 997.00
(l/dt/Ha)

Jumlah Kebutuhan Air di Sawah (l/dt/Ha) - - 1,246 1,246 - - - Jumlah MT.II 997.00 997.00
818 818 818 818 249 249 1,122 1,122 877 877 877 877 249 249 - -

Keterangan :
MT. I ( Rendeng ) 2022 - 2023 MT. II ( Gadu ) 2023

PENGOLAHAN PENGOLAHAN

PERTUMBUHAN PERTUMBUHAN

PEMASAKAN PEMASAKAN
BBS.12

BBS.13

BBS.14

BBS.15

BBS.16

BBS.20

BBS.21

BBS.24

BBS.25
SKEMA JARINGAN IRIGASI SEKAMPUNG SISTIM
BBS.11 UPTD. PSDA WILAYAH II - METRO
BTM BBS.10 BEKRI MUSIM TANAM I (RENDENG) TAHUN 2021/2022
BBS.9 BQ.4 SB.2 SB.1 KB.9

BWS BBS.8 BQ.3 DY.3 KB.8

PUNGGUR UTARA

BBM
BWS BBS.7 BC.10 BP.5 BO.6 QA.2 QA.1 BQ.2 WN.2 DY.2 KB.7

BBS.6 BBR
BGR.1 BC.9 BP.4 BO.5 BQ.1 WN1. DY.1 KB.6

BGR.2

BGR.3

BGR.4

BGR.5

BGR.6

BGR.7
BBS.5

BBS.4

BBS.3

BBS.2

BBS.1

BK.14 BC.8 BF.4 BF.5 BF.7 BP.3 BO.4 BR,2 BQ.0 BDY.4 BDY.6 KB.5 SN.1 SN.2 SN.3 SN.4

BDY.10
BDY.7
BF.6

BDY.8

BDY.9
BI.3

BI.4

BI.5

BI.6

BI.7

BI.8

BI.9
BBU.3 BC.7 BE.4 BX.2 BP.2 BO.3 BR.1 BPU.25 BPU.26 BDY.5 WN.1 KB.4

BK.13 BBU.2 BC.6 BE.3 BX.1 BF.3 BP.1 BO.2 BPU.24 BDY.3 WN.2 SKB.2 SKA.3 KB.3

BL.3 BUD
BBU.1 BC.5 BE.2 BF.2 BI.2 BL.2 UB BO.1 BUA BDY.2 SKC WN.3 SKB.2.A SKA.2 KB.2

BGS.5

BGS.4

BGS.3

BGS.2

BGS.1
BSR.1

BSR.2

BSR.3

BSR.4

BK.12 BC.4 BE.1 BF.1 BI.1 BL.1 BN.2 BN.1 BDY.1 SKB.1 SKA.1 KB.1

BPU.10

BPU.19
BPU.9

BRB.1

BRB.2
BPU.23 BT.1 BT.2

BC.2

BC.1
BSR.1 BPU.8 BPU.11 BPU.17 BRB.3 BRB.8 BRB.9
BC.3

BPU.13

BPU.14

BPU.15

BPU.16

BPU.22
BPU.12 BPU.18 BPU.20 BPU.21
BSR.2

BSR.3

BSR.4

BSR.5
BK.11 BBA.14 BRB.4 BRB.5 BRB.6 BRB.7 BR.1

BJ.1 BJ.2 BK.1 BK.2 BK.3 BK.4 BHG.1 BHG.2 BHG.3 TH.1.1 TH.21
BW.13 BSR.6 BBA.13 BB.3 BPU.7 BR.2
BB.4 BHG.4 TH.1.2

BH.2

BH.3

BH.4

BH.5

BH.6

BH.7

BH.8

BH.9

BH.10

BH.11
BH.1 TH.22
BK.10 BK.9 BK.8 SR.13 BBA.12 BB.2 BG.3 BHS.3 BHS.2 BHS.1 BHG.5 RUMBIA BARAT BR.3

WT.1 BG.1 BG.2 BG.4 BG.5 TH.1.3 TH.23


BW.12 BBA.11 BB.1 BPU.6 BMC.2 BME BR.4

BU.2 BMA.2 TH.1.4 TH.24


BW.11 BW.10 BK.7 BSJ 10 BBA.9 BBA.8 BS.1 BU.1 BM.1 BMC.1 BME BR.5 BM.1 BM.2
BMA.1 BMF BMF TH.25
BBA.7 BPU.5 BW.0 BM.2 BR.6

BD.1

BD.2

BD.3

BD.4

BD.5

BD.6

BD.7

BD.8

BD.9

BD.10

BD.11

BD.12

BD.13
BBA.1

BBA.2

BBA.3

BBA.4

BBA.5

BM.3

BM.4

BM.5

BM.6

BM.7

BM.8

BM.9
BM.1 BW.8 BK.6 BBA.6 BW.1 BMI BMG BR.7

BT.1 BM.10

BB.1

BB.2
BM.2 BW.2 BMI BMH BR.8 BM.21 BM.22

BT.2 BM.11 BM.23


BM.3 BW.7 BK.5 BPU.4 BR.9
BM.12
BA.2

BA.1

BD.1

BD.2

BD.3
BA.1

BA.2

BA.3

BA.4

BA.5

BA.6
BM.4 BSA.2 BDG RAMAN BR.10
BM.13
BM.5 BW.6 BSA.1 BK.5 BSM.1 BSM2 BSM.3 BPU.3 BRU.4 BRU.5 BRU.9 RAMAN UTARA

11

12

13

14
BRU.1.A

BRU.19.C
BRU.1

BRU.2

BRU.3

BRU.7

BRU.8

BRU.15

BRU.16

BRU.17

BRU.18

BRU.19
BRU.1.B
BRU.6
BM.6 BE
BF.1

BG.1

BG.2

BG.3
BW.5 BW.3 BW.1 BK.4 BSK.1 BSK.2 BSK.3 BSK.4 BPU.2
BW.2 BF.2

PU.4

PU.3

PU.2

PU.1
GW GW
KLB
WS
BW.4

G.10
KR.2

KR.2

KR.2

KR.2

KR.3

KR.3

KR.4

KR.4

G.1

G.2

G.3

G.4

G.5

G.9
BK.1 KR.2

G.6

TP.1 G.7

TP.2 G.8

TK.3 G.11

G.12

G.13

G.14

G.15

G.16

G.17

G.18
KR.4

KR.5

KR.5
BK.3 BK.2 BPU.1

TK.1

TK.2
KR.2 KBW KB.12 TE.1
BATANGHARI UTARA

KB.8

KB.10
BK.0 BPU.A KB.2 KB.5.A

TE.2

TE.3
KR.1
KB.3

KB.6

KB.7

KB.9
KBO BDG. GARONGAN
KH.1
KH.3

KH.3

KETERANGAN
KB.1

KB.2

KB.2

KB.5

BDG ARGOGURUH BP
KBH.1
GOLONGAN I
KBH.2 KMI.5
DM KPD PU PENG. SEKAMPUNG
KMI.4
GOLONGAN II SB KS
KBH.3 KBMI KMI.3
HG TM.2
KBH.4 KMI.2
GOLONGAN III TM.1
KMI.1
KBH.8 KBH.9 KBH.10 KBH.13
KBH.11

KBH.12

KBH.14
KBH.6 KBH.7 14.A 14.B 14.C BKH.15.A KBH.15 KBH.16
GOLONGAN IV KBH.5
SN.1
KSI.1

KSI.2

KSI.3

KSI.4

KSI.5

KSI.6
BBJ. SN.2
GOLONGAN V KDJ.1
SN.3

SN.4
GOLONGAN VI KDJ.2 SEKAMPUNG BATANGHARI

KDJ.3 KDJ.4 KDJ.5 KDJ.6 KDJ.7 KDJ.8


GOLONGAN VII

Anda mungkin juga menyukai