NO HARI/TANGGAL JUMLAH JAM DRILLING JUMLAH LUBANG KEDALAMAN(METER)

1 SABTU/ 21-5-2022 6
2 MINGGU/ 22-5-2022 6
3 SENIN/ 23-5-2022 6
4 SELASA/ 24-5-2022 6
5 RABU/ 25-5-2022 6 75 298.1
6 KAMIS/ 26-5-2022 6
7 JUMAT/ 27-5-2022 6
TOTAL 42 75 298.1

TOTAL SELURUH LUBANG = 75 LUBANG


TOTAL SELURUH KEDALAMAN = 298,1 METER