Anda di halaman 1dari 4

3

Target Produksi pertahun 2,680,989 2680989 180000


Target Produksi perbulan 223415.75 15000
Target Produksi/day 8936.63 8936.63 600
Diameter (D) 3 0.0762 4
Bj Badak 0,85 0.85 0,85
BJ Batuan 3.3 3.3 3.3
Tinggi Jenjang (H) 10 10 10
Burden (B) 120 3.048 160
Spasi (S) 3.048
Subdrilling (J) 0.762
Stemming (T) 2.0574
L 10.762
Pc 8.7046
Volume Badak 92.90304
Jumlah Lubang Ledak 96.19308474728
total bahan peledak 837.3223254912
Powder factor 0.093695534613
Total Badak per bulan 20933.05813728
4 5
2680989 180000 2680989
15000
8936.63 600 8936.63
0.127 5 0.127
0.85 0,85 0.85
3.3 3.3 3.3
10 10 10
4.064 200 5.08
4.064 5.08
1.27 1.27
3.429 3.429
11.27 11.27
7.841 7.841
165.16096 258.064
54.1086101703453 34.629510509021
424.265612345678 271.529991901234
0.0474748996372993 0.03038393576787
10606.6403086419 6788.24979753084
Target Produksi pertahun 2808000 2808000 180000 2808000 180000
Target Produksi perbulan 234000 15000 15000
Target Produksi/day 9360 9360 600 9360 600
Diameter (D) 3 0.0762 4 0.127 5
Bj Badak 0,85 0.85 0,85 0.85 0,85
BJ Batuan 3.3 3.3 3.3 3.3 3.3
Tinggi Jenjang (H) 10 10 10 10 10
Burden (B) 120 3.048 160 4.064 200
Spasi (S) 3.048 4.064
Subdrilling (J) 0.762 1.27
Stemming (T) 2.0574 3.429
L 10.762 11.27
Pc 8.7046 7.841
Volume Badak 92.90304 165.16096
Jumlah Lubang Ledak 100.7502015 56.671988344
total bahan peledak 876.99020398 444.36506061
Powder factor 0.09369553461 0.0474748996
Total Badak per bulan 21924.7550995 11109.126515
2808000

9360
0.127
0.85
3.3
10
5.08
5.08
1.27
3.429
11.27
7.841
258.064
36.27007254015
284.3936387873
0.030383935768
7109.840969682
2495554.180358

Anda mungkin juga menyukai