Tabel 5.

1 Data Curah Hujan Harian Maksimum Pada Stasiun Setempat


No Tahun Curah hujan ( mm ) kecil ke besar
1 2011 226.51 164.82
2 2012 206.52 195.43
3 2013 233.29 198.73
4 2014 282.05 201.79
5 2015 278.27 206.52
6 2016 231.4 226.51
7 2017 195.43 231.4
8 2018 201.79 233.29
9 2019 164.82 278.27
10 2020 198.73 282.05

5.1.1 Analisa Frekuensi


Data stationing diurutkan dari yang terkecil.

No Xi
(mm)
1 164.82 3255.96
2 195.43 699.66
3 198.73 535.97
4 201.79 403.65
5 206.52 235.96
6 226.51 21.43
7 231.4 90.61
8 233.29 130.17
9 278.27 3179.72
10 282.05 3620.31
Ʃ 2218.81 12173.42

= 221.881
s= 36.78

n=10 maka
Sn 0.9497
Yn 0.4952
Yt(2,5,10,2 0.3065 1.4999 2.2504 2.9702 3.1255
0,25,50,100
)

Nilai K dicari dengan rumus:


K= Yt –Yn / Sn
Tr 2 5 10 20 25
K -0.1987 1.0579 1.8482 2.6061 2.7696

Tabel 5.5 Menentukan nilai XTr


TR = X + K.S

TR K S XTR
2 221.881 -0.1987 36.78 214.573
5 221.881 1.0579 36.78 260.789
10 221.881 1.8482 36.78 289.852
20 221.881 2.6061 36.78 317.727
25 221.881 2.7696 36.78 323.741
50 221.881 3.5871 36.78 353.808
100 221.881 4.3223 36.78 380.846

5.2 Menghitung Intensitas Hujan Rencana (10 tahun)

a. Menghitung intensitas hujan rencana (akibat hujan 5, 10, 20, 25, 50, 100 tahun).
90% 4
I5= 58.677
I10= 65.217
I20= 71.489
I25= 72.842
I50 79.607
I100= 85.690

Tabel 5.6 Nilai ITr, t, dan K berdasarkan nilai Tr yang berbeda


7416.49 35.46

Tr ITr (mm/jam) t (menit) K


5 58.677 240 2.179
10 65.217 240 2.422
20 71.489 240 2.655
25 72.842 240 2.705
50 79.607 240 2.957
100 85.690 240 3.183

Tabel 5.7 Perhitungan Nilai Intensitas Hujan Recana Dan Lengkung Jakarta
Intensitas Hujan Rencana (mm/Jam)
T (menit)
I5(desain) I10 I20 I25 I50
5 399.49 444.01 486.71 495.92 541.98
10 355.55 395.17 433.18 441.38 482.37
15 320.32 356.02 390.25 397.64 434.57
20 291.44 323.92 355.07 361.79 395.39
30 246.92 274.44 300.83 306.52 334.99
45 200.89 223.27 244.75 249.38 272.54
60 169.32 188.19 206.29 210.19 229.71
80 139.99 155.59 170.55 173.78 189.92
120 103.97 115.56 126.67 129.07 141.06
180 75.02 83.38 91.40 93.13 101.78
240 58.68 65.22 71.49 72.84 79.61
 0,83542  V
 V  h2  3
3.9019 4.6001

50 100
3.5871 4.3223
I100
583.40
519.23
467.78
425.61
360.59
293.37
247.27
204.44
151.83
109.55
85.69
Q = 0,278 CIA

L 3.5 L 3L 2
So 0.02 So 0.04 So 0.04
ndA 0.013 ndB 0.1 ndT 0.02
CA 0.9 CB 0.5 CT 0.2

0 ,167
tof =  2  3, 28 L  nd 
3 
 So 
tofA 0.943
tofB 1.219
tofC 0.871
Total 3.033

L
tdf = 80V

tdf 1= 0,625/V
tdf 2= 0,875/V

tc = tof + tdf
tc1 3,03 + 0,625/V
tc2 3,03 + 0,875/V

Qr = 0,278 x C.I.A
= 0,278. I . (CA.AA + CB.AB + CT.AT) = 0.028078 x I

h  0,83542  V
Qs  V  h2  3

Tabel 5.8 Perhitungan Qr, Qs, dan h untuk sebelah kiri sungai
V 0.5 0.6 0.7 0.8 0.82559 0.9 1 1.1
tc1 4.280 4.072 3.923 3.811 3.787 3.724 3.655 3.598
I1 168.090 168.975 169.615 170.099 170.302 170.472 170.778 171.027
Qr1 4.720 4.744 4.762 4.776 4.782 4.787 4.795 4.802
h1 0.418 0.502 0.585 0.669 0.691 0.753 0.836 0.920
Qs1 0.151 0.262 0.416 0.620 0.682 0.883 1.212 1.613

0.62744

Tabel 5.9 Perhitungan Qr, Qs, dan h untuk sebelah kanan sungai
V 0.5 0.6 0.7 0.8 0.81755 0.9 1 1.1
tc1 4.780 4.488 4.280 4.124 4.100 4.002 3.905 3.825
I1 165.910 167.210 168.010 168.753 168.855 169.275 169.692 170.034
Qr1 4.658 4.695 4.717 4.738 4.741 4.753 4.765 4.774
h1 0.418 0.502 0.585 0.669 0.684 0.753 0.836 0.920
Qs1 0.151 0.262 0.416 0.620 0.662 0.883 1.212 1.613

0.61830
4.2 Evaluasi LHR
Jenis kendaraan volume lalu lintas (kendaraan/hari)

mobil penumpang dan sjenisnya 1145


bus/truk ringan dan sejenisnya 618
bus besar 2sumbu 115
truk 2 sumbu 83
truk semi-trailer 3 sumbu 46
∑ 2007

LHR AWAL Tahun 2020 x (1+i)n


i= 0.0282
n= 1
LHR pada tahun ke 10 (2020) akhir umur rencana LHR tahun 2030
Rumus : LHR tahun 2020 x (1+i)n
i= 0.0171
n= 10

mobil penumpang dan sjenisnya 1177.289

635.428
bus/truk ringan dan sejenisnya

118.243
bus besar 2sumbu

truk 2 sumbu 85.341

truk semi-trailer 3 sumbu 47.297


∑ 2063.597

4.4 Menghitung Lintas Ekivalen Permulaan (LEP)


Rumus : LEP = c x LHR Tahun 2019 x E
Angka Ekivalen
Mobil penumpang 0.0004
Bus / truk ringan 0.1593
Bus besar 2 sumbu 0.1987
Truk 2 sumbu 0.3500
Truk semi trailer 3 sumbu 1.0375

Mobil penumpang 0.235


Bus / truk ringan 50.612
Bus besar 2 sumbu 11.747
Truk 2 sumbu 14.935

Truk semi trailer 3 sumbu


24.535
∑ 102.065

4.5 Menghitung Lintas Ekivalen Akhir (LEA)


Mobil penumpang 0.279
Bus / truk ringan 59.964
Bus besar 2 sumbu 13.918
Truk 2 sumbu 17.694
Truk semi trailer 3 sumbu 29.069
∑ 120.924

4.6 Menghitung Lintas Ekivalen Tengah (LET)


LET= 111.494

4.7 Menghitung Lintas Ekivalen Rencana (LER)


umur rencana = 10.000
LER= 111.494

4.8 Mencari ITP untuk Umur Rencana 10 Tahun


cbr= 9.89
0.9952
DDT= 5.9793
LER= 111.4943

4.9 Menentukan Tebal Perkerasan Umur Rencana 10 Tahun

Kelandaian < 4% (liat di 2.6)


% Kendaraan Berat =

% Kendaraan Berat = 42.950

226.51
206.52
233.29
282.05
278.27
231.40
195.43
201.79
164.82
198.73
221.88
koefisien (emp) vol kend x emp
Presentase Total

1 1145 35.34496064 %
2 1236
2.5 287.5 100
64.65503936 %
3 249
7 322

1394.825

752.840

140.092

101.110

56.037
2444.902

0.5
862.0000

% > 30 %
*angka yg di bold adalah amgka dari data soal masing-masing

1. Diketahui Data volume lalu lintas:

a. Mobil penumpang dan


1145 kend/hari
sejenis :
b. Bis/truck ringan dan
618 kend/hari
sejenis :
c. Bis besar 2 sumbu : 115 kend/hari
d. Truck 2 sumbu : 83 kend/hari
e. Truck semi trailer 3
46 kend/hari
sumbu :

volume lalu
koefisien
Jenis kendaraan lintas
(kendaraan/hari) (emp) vol kend x emp
mobil penumpang dan
1145 1 1145
sjenisnya
bus/truk ringan dan
618 2 1236
sejenisnya

bus besar 2sumbu 115 2.5 287.5

truk 2 sumbu 83 3 249


truk semi-trailer 3 sumbu 46 5 230

LANGKAH 1 Perhitungan ∑LHR (Lalu lintas Harian Rata-Rata) ∑▒ 〖𝐿𝐻𝑅 = ∑▒ 〖 (𝑉𝑜𝑙𝑢𝑚𝑒 𝑘𝑒𝑛𝑑
∑LHR= 3147.5 ×𝑒𝑚𝑝) 〗〗

LANGKAH 2 ∑LHR pada awal umur rencana = ∑LHR total x i pelaksanaan


data soal no 4 Jalan dibuka setelah tahun= 1
dengan pertumbuhan lalu lintas selama pelaksanaan sebe 2.82%
FP= 1.028 emp

sehingga LHR awal umur 3236.260

LANGKAH 3 ∑LHR pada akhir umur rencana = ∑LHR awal umur rencana x i umur rencana
data soal no 5 Umur rencana = 10
pertumbuhan lalu lintas s 1.7% 0.0171 pertahun
Fp= 1.185

sehingga LHR akhir umur 3834.245 (klasifikasi jalan)

7070.505
LHR Rata- KLAS. JALAN
rata dalam
SMP
>20000 I

6000-20000 IIA

1500-8000 IIB

<2000 IIC

Jadi jalan tersebut diklasifikasikan sebagai kelas jalan Sekunder IIB.

LANGKAH 4 Lebar penampang melintang jalan

Jalan raya arteri kelas Sekunder IIB

GAMBAR DI PETA…
LANGKAH 5 MENGHITUNG KOORDI (tanda pengoperasian + atau - tergantung dari titik 0)
skala peta = 10000
skala batang = 1.0000
x y = skala peta - (jarak pake mistar x skala batang)
TITIK D
jarak pake mistar = 30.07
xC = 9969.93 m
jarak pake mistar = 399.67
yC= 9600.33 m

TITIK T (tikungan)
jarak pake mistar = 104.62
xT= 10104.62 m
jarak pake mistar = 251.82
yT= 9748.18 m

TITIK U (tikungan)
jarak pake mistar = 397.31
xU= 10397.31 m
jarak pake mistar = 317.64
yU= 9682.36 m
TITIK L
jarak pake mistar = 691.66
xL= 10691.66 m
jarak pake mistar = 140.75
yL= 9859.25 m

LANGKAH 6 MENGHITUNG ANALITIS

DCT= 200.0025 m dCT

DTU= 299.9995 m dTU

DUL= 343.4123 m dUL

LANGKAH 7 MENGHITUNG SECARA GRAFIS


ukur manual= 16.549
skala batang = 20.7469
dCT= 343.3404 m
ukur manual= 15.257
skala batang = 20.7469
dTU= 316.5355 m
ukur manual= 8.127
skala batang = 20.7469
dUL= 168.6101 m

MENGHITUNG
LANGKAH 8 SUDUT TANGEN

1 X T  XC azimut CT= 42.3332345858


tan
Y T  YC 
77o48'52,52” konversi manual

1 X U  XT azimut TU= -77.326184572 102.673815428


tan
Y U  YT  108 25'22,83”
o
konversi manual
Jadi, sudut ∆ = Azimuth CT – Azimuth TU
60.3405808426
30o36'20,22” konversi manual

1 X U  XT
tan azimut TU= -77.326184572 102.673815428
Y U  YT 
108o25'22,83” konversi manual

azimut UL = 58.9961848997 238.9961849


147o16'11,48” konversi manual
X  X U 
tan 1 L
YL  YU  Jadi, sudut ∆ = Azimuth TU – Azimuth UL
43.67763052873
223.677630529 konversi manual

Tabel 1.5 Perhitungan Koordinat, Jarak dan Sudut


Koordinat Jarak (m)
Titik
X Y Analitis
G 9969.93 9600.33
200.0025
E 10104.62 9748.18
299.9995
F 10397.31 9682.36
343.4123
J 10691.66 9859.25
∑ 500.0021

KLASIFIKASI MEDAN JALAN


Elevasi muka jalan di titik awal rencana berada pada timbunan setinggi 0,50 m.

Perbedaan
Titik Tinggi
Titik Stationing Elevasi

G Sta 0+00 92.15


0.20
G1 Sta 0+50 91.95
0.50
G2 Sta 0+100 91.45
0.30
G3 Sta 0+150 91.15
0.20
G4 Sta 0+200 91.35
0.05
G5 Sta 0+250 91.40
1.00
F Sta 0+300 90.40
2.15
F1 Sta 0+350 88.25
0.85
F2 Sta 0+400 87.40
1.05
F3 Sta 0+450 86.35
1.25
M Sta 0+500 87.60
0.70
M1 Sta 0+550 88.30
0.20
M2 Sta 0+600 88.50
0.15
M3 Sta 0+650 88.35
0.10
M4 Sta 0+700 88.25
0.15
M5 Sta 0+750 88.10
0.30
L Sta 0+785 88.40

Kemiringan melintang
1.1589
rata-rata=
maka medan jalur tersebut adalah datar (<3%).

: 3537,736
Lalu lintas rata-rata
emp
Kecepatan Rencana : 80 km/jam
Lebar daerah penguasaan minimum : 30 m
Lebar Perkerasan : 2 x 3,5 m
Lebar Bahu : 3,00 m
Lereng melintang perkerasan : 2%
Lereng melintang bahu jalan : 6%
Jari-jari lengkung minimum : 210 m
Miring Tikungan Maksimum : 10 %
: Penetrasi Berganda
Volume Lalu Lintas Harian Rata-Rata (LHR)
titik atau ruas pada fasilitas jalan untuk kedua
oleh jumlah hari dalam satu tahun

Satuan Mobil Penumpang (SMP) adalah jumla

tempatnya oleh kendaraan jenis lain dalam kon

pengawasan yang berlaku.

Ekivalen Mobil Penumpang (emp) adalah fakt

terhadap mobil penumpang sehubungan denga


mobil penumpang dalam arus lalu lintas camp

2007

∑▒ 〖𝐿𝐻𝑅 = ∑▒ 〖 (𝑉𝑜𝑙𝑢𝑚𝑒 𝑘𝑒𝑛𝑑


×𝑒𝑚𝑝) 〗〗

0.0282 pertahun

i umur rencana
ntung dari titik 0)
=

= 843.4143
=

500.0021

kalau minus +180


αtitik yang ditinjiau = αsebelumnya + Sarah pada titik tinjauan - 180
Sarah pada titik yang ditinjau = αtitik yang ditinjiau - αsebelumnya + 180

Jarak (m)

Grafis

343.3404
60.3405808426
316.5355
43.6776305287
168.6101

659.8759

n setinggi 0,50 m. KHUSUS RUMUS BIKIN SENDIRI, Karna gabole minus hasilnya, jadi angka bisa dibolak balik

Jarak Antar
Titik

d (m) TITIK KONTUR ATAS KONTUR BAWAH


G 92.5 92

50 0.4000 G1

50 1.0000 G2

50 0.6000 G3

Stationing
50 0.4000 G4
Sta 0+00
50 0.1000 G5
Sta 0+50
50 2.0000 F
Sta 0+100
50 4.3000 F1
Sta 0+150
50 1.7000 F2
Sta 0+200
50 2.1000 F3
Sta 0+250
50 2.5000 M
Sta 0+300
50 1.4000 M1
Sta 0+350
50 0.4000 M2
Sta 0+400
50 0.3000 M3
Sta 0+450
50 0.2000 M4
Sta 0+500
50 0.3000 M5
Sta 0+550
35.6 0.8427
Sta 0+600

785.6 18.5427 Sta 0+650

Sta 0+700

Sta 0+750

Sta 0+785,6

Titik Stationing
Titik Stationing

G Sta 0+00

G1 Sta 0+50

G2 Sta 0+100

G3 Sta 0+150

atar (<3%). E Sta 0+200

E1 Sta 0+250

E2 Sta 0+300

E3 Sta 0+350

E4 Sta 0+400

E5 Sta 0+450

F Sta 0+500
: Penetrasi Berganda
F1 Sta 0+550

F2 Sta 0+600

F3 Sta 0+650

F4 Sta 0+700

F5 Sta 0+750

F6 Sta 0+800

J Sta 0+843,42

alu Lintas Harian Rata-Rata (LHR) adalah volume total yang melintasi suatu
uas pada fasilitas jalan untuk kedua jurusan, selama satu tahun dibagi
h hari dalam satu tahun

bil Penumpang (SMP) adalah jumlah mobil penumpang yang digantikan

oleh kendaraan jenis lain dalam kondisi jalan, lalu lintas dan

n yang berlaku.

Mobil Penumpang (emp) adalah faktor dari berbagai kendaraan dibandingkan

mobil penumpang sehubungan dengan pengaruhnya kepada kecepatan


umpang dalam arus lalu lintas campuran.
ilnya, jadi angka bisa dibolak balik senndiri

BAWAH KE TITIK BAWAH KE ATAS


ELEVASI PERHITUNGAN ELEVASI
16.2371 27.0306

Elevasi Tanah Asli


Elevasi Tanah Rencana

92.15
91.95

91.45

91.15

91.35

91.40

90.40

88.25

87.40

86.35

87.60

88.30

88.50

88.35

88.25

88.10

88.40

Perbedaan Titik Jarak Antar


Elevasi Tinggi Titik
Perbedaan Titik Jarak Antar
Elevasi Tinggi Titik
d (m)
92.15
0.20 50 0.4000
92.55
0.50 50 1.0000
92.55
0.30 50 0.6000
92.35
0.05 50 0.1000
92.30
0.05 50 0.1000
92.20
0.45 50 0.9000
91.75
1.00 50 2.0000
90.75
1.65 50 3.3000
89.10
1.05 50 2.1000
88.45
0.95 50 1.9000
87.50
0.70 50 1.4000
87.90
0.40 50 0.8000
87.50
0.15 50 0.3000
87.50
0.10 50 0.2000
87.65
0.15 50 0.3000
89.85
0.65 50 1.3000
90.50
0.90 43.42 2.0728
91.4
∑ 843.42 18.7728

1.1043
𝐿𝐻𝑅= 〖 (1+𝑖) 〗
^𝑛
Stationing Elevasi Tanah Asli Elevasi Tanah Rencana

Sta 0+00 92.15

Sta 0+50 92.55

Sta 0+100 92.55

Sta 0+150 92.35

Sta 0+200 92.30

Sta 0+250 92.20

Sta 0+300 91.75

Sta 0+350 90.75

Sta 0+400 89.10

Sta 0+450 88.45

Sta 0+500 87.50

Sta 0+550 87.90

Sta 0+600 87.50

Sta 0+650 87.50

Sta 0+700 87.65

Sta 0+750 89.85

Sta 0+800 90.50

Sta 0+843,42 91.4


𝐿𝐻𝑅= 〖 (1+𝑖) 〗
^𝑛
INI BAB 2 DESTIA

VR 80 (km/jam)
T 2.5 detik (nilai T sesuai ketetapan)
g 9.81 m/s^2
f 0.35

55.556
71.913
127.469

127.4686 m

Jh yang sesuai dengan VR ditetapkan dari tabel berikut :


Tabel 2.2 Jarak Pandang Henti (Jh) Minimum
VR (km/jam) 120 100 80 60 50
Jh Minimum (m) 250 175 120 75 55
Sumber : Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.10

Dari tabel di atas maka didapat jarak pandang henti minimumnya adalah

Jd yang sesuai dengan VR ditetapkan dari tabel berikut :


Tabel 2.3 Jarak Pandang Mendahului (Jd)
VR (km/jam) 120 100 80 60 50
Jd (m) 800 670 550 350 250
Sumber : Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.11

Dari tabel di atas maka didapat jarak pandang mendahuluinya adalah

Tabel 2.4 Kelandaian Maksimum yang Diizinkan


VR (km/jam) 120 110 100 80 60
Kelandaian Maksimum
3 3 4 5 8
(%)
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.10

Dengan VR = 80 km/jam
kelandaian jalan maksimum = 5%

Tabel 2.5 Panjang Jari-Jari Minimum (dibulatkan)


VR (km/jam) 120 100 80 60 50
Rmin (m) 600 370 210 110 80
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.16

Didapatkan data-data sebagai berikut :


VR = 80 km/jam
Rmin(dari tabel 2.5) = 210 m
emaks = 10 % 0.10

MENENTUKAN Ls

1. Ls = =
(T= 3 detik)

2. Ls = =

Dimana :
C = perubahan percepatan (m/det3) yang bernilai 1-3 m/det3
e = didapat dalam tabel 4.1 Silvia Sukirman. 1999. Dasar-Dasar

Ls = =

Dimana :
em = superelevasi maksimum
en = superelevasi normal 2%
re = tingkat pencapaian perubahan kemiringan melintang jalan
untuk VR ≤ 70 km/jam re-max =
untuk VR ≥ 80 km/jam re-max =

Berdasarkan perhitungan Ls terbesar = 90.000 m

Berdasarkan tabel II.17 VR 80 km/jam didapat:

Ls = 90.000 m
Rc = 210 m
∆T = 60.34058 1.053141808
108 25'22,83”
o

· Mencari sudut-sudut tikungan dan panjang tikungan

θs = = 12.28389445
6° 53' 9"
θc = ∆ - 2 θs = 35.77279194
22° 19' 1"

Lc = = 131.04766

p = = 1.6071

Didapat nilai p > 0,25 m maka lengkung peralihan tidak diperlukan sehingga tipe tikungan bukan Full C
Jadi jenis tikungan yang digunakan adalah Spiral – Circle – Spiral (S – C – S).

2.2 Menghitung Elemen Tikungan T

Ltotal = Lc + 2Ls = 311.048

p = p   Ls = 1.665

(p* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129


hasil interpolasi didapat p* = 0.0185025 0.0185025

k  k   Ls = 44.9277
(k* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129)
hasil interpolasi didapat k* = 0.4991966 0.4991966

Es = (Rc + p) sec ½ ∆ - Rc = 34.831

Ts = (Rc + p) tan ½ ∆ + k = 167.973 169.11

VR 80 km/jam
∆ 60.34058084256
θs 12.2838944495 59.829709579
Rc 210 m 72.113604028
Es 34.831 m xs 89.587
Ts 169.109 m
LTotal 311.048 m
e 0.1
Ls 90.000
Lc 131.048
p 1.665
k 44.92769
em 0.1
en 0.02

Landai relatif jalan = = 0.005


0.4667 %
40 30 20
40 27 16
997. Tabel II.10

120 m

40 30 20
200 150 100
997. Tabel II.11

550 m

50 40 <40
9 10 10
97. Tabel II.10
40 30 20
50 30 15
997. Tabel II.16

55.556

10.607

ernilai 1-3 m/det3


an. 1999. Dasar-Dasar Perencanaan Geometrik Jalan. Hal 76.

71.111

0.02
ngan melintang jalan
0.035 m/m/det
0.025 m/m/det

Ls= 90
Le= 120

6.1419472
konversi manual
17.886396
konversi manual

262.09532 > 25 m (S – C – S)

e tikungan bukan Full Circle (F – C).

T ACAD
ES 8.773664 0.424645
RC 210 10.164
SUDUT C 11.19403 0.541791
SUDUT S 9.705793 0.46976
TS 93.26007 4.513787
LS 71.11111 3.441778
P 1.016932 0.049219
LC 41.00746 1.984761
35.52125 1.719229
0
VR 80 (km/jam)
T 2.5 detik
g 9.81 m/s^2
f 0.35

Jh yang sesuai dengan VR ditetapkan dari tabel berikut :


Tabel 2.2 Jarak Pandang Henti (Jh) Minimum
VR (km/jam) 120 100 80 60
Jh Minimum (m) 250 175 120 75
Sumber : Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.10

Dari tabel di atas maka didapat jarak pandang henti minimumnya adalah

Jd yang sesuai dengan VR ditetapkan dari tabel berikut :


Tabel 2.3 Jarak Pandang Mendahului (Jd)
VR (km/jam) 120 100 80 60
Jd (m) 800 670 550 350
Sumber : Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.11

Dari tabel di atas maka didapat jarak pandang mendahuluinya adalah

Tabel 2.4 Kelandaian Maksimum yang Diizinkan


VR (km/jam) 120 110 100 80
Kelandaian Maksimum (%) 3 3 4 5
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.10

Dengan VR = 80 km/jam
kelandaian jalan maksimum = 5%

Tabel 2.5 Panjang Jari-Jari Minimum (dibulatkan)


VR (km/jam) 120 100 80 60
Rmin (m) 600 370 210 110
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.16

Didapatkan data-data sebagai berikut :


VR = 80 km/jam
Rmin(dari tabel 2.5) = 210 m
emaks = 10 % 0.1

MENENTUKAN Ls

1. Ls =
(T= 3 detik)

2. Ls =

Dimana :
C = perubahan percepatan (m/det3) yang bernilai 1-3 m/det3
e = didapat dalam tabel 4.1 Silvia Sukirman. 1999. Dasar-Da

Ls =

Dimana :
em = superelevasi maksimum
en = superelevasi normal
re = tingkat pencapaian perubahan kemiringan melintang jalan
untuk VR ≤ 70 km/jam
untuk VR ≥ 80 km/jam

Berdasarkan perhitungan Ls terbesar = 90 m

Berdasarkan tabel II.17 VR 80 km/jam

Ls = 90.000 m
Rc = 210 m
∆U = 43.6776 L
67° 15' 24"
· Mencari sudut-sudut tikungan dan panjang tikungan

θs = =
θc = ∆ - 2 θs =

Lc = =

p = =

Didapat nilai p > 0,25 m maka lengkung peralihan tidak diperlukan sehingga tipe tikungan bukan Full C
Jadi jenis tikungan yang digunakan adalah Spiral – Circle – Spiral (S – C – S).

2.2 Menghitung Elemen Tikungan U

Ltotal = Lc + 2Ls = 250.006

p = p   L s = 1.665

(p* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129


hasil interpolasi didapat p* = 0.0185025

k  k   Ls = 44.92769
(k* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129)
hasil interpolasi didapat k* = 0.4991966

Es = (Rc + p) sec ½ ∆ - Rc = 18.030

Ts = (Rc + p) tan ½ ∆ + k = 129.754

VR 80 km/jam
∆ 43.677630528725
θs 12.2838944495 68.1611847356
Rc 210 m 80.4450791851
Es 18.030 m
Ts 130.891 m
LTotal 250.006 m
e 0.1
Ls 90.000
Lc 70.006
p 1.665
k 44.928
em 0.1
en 0.02

Landai relatif jalan = = 0.005


0.5
50 40 30 20
55 40 27 16
amarga. 1997. Tabel II.10

120 m

50 40 30 20
250 200 150 100
amarga. 1997. Tabel II.11

550 m

60 50 40 <40
8 9 10 10
marga. 1997. Tabel II.10
50 40 30 20
80 50 30 15
amarga. 1997. Tabel II.16

= 55.556

= 15.911

/det3) yang bernilai 1-3 m/det3


Silvia Sukirman. 1999. Dasar-Dasar Perencanaan Geometrik Jalan. Hal 76.

= 71.111

2% 0.02
ahan kemiringan melintang jalan
re-max = 0.035 m/m/det
re-max = 0.025 m/m/det

didapat: Ls= 90
Le= 120

12.28389445
6° 53' 9" konversi manual
19.10984163 9.5549208
53° 29' 6" konversi manual
129
70.0057 140.01144 > 25 m (S – C – S)

1.6071

hingga tipe tikungan bukan Full Circle (F – C).

Sukirman hal.129
0.0185025 U ACAD
ES 13.75129 0.665563
RC 210 10.164
Sukirman hal.129) SUDUT C 19.4352 0.940663
0.4991966 SUDUT S 9.705793 0.46976
TS 109.9289 5.320558
LS 71.11111 3.441778
P 1.016932 0.049219
130.891 LC 71.1976 3.445964

`
%
VR 80 (km/jam)
T 2.5 detik
g 9.81 m/s^2
f 0.35

Jh yang sesuai dengan VR ditetapkan dari tabel berikut :


Tabel 2.2 Jarak Pandang Henti (Jh) Minimum
VR
120 100 80 60 50 40 30 20
(km/jam)
Jh
Minimu 250 175 120 75 55 40 27 16
m (m)
Sumber : Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.10

Dari tabel di atas maka didapat jarak pandang henti minimu 120 m

Jd yang sesuai dengan VR ditetapkan dari tabel berikut :


Tabel 2.3 Jarak Pandang Mendahului (Jd)
VR
120 100 80 60 50 40 30 20
(km/jam)
Jd (m) 800 670 550 350 250 200 150 100
Sumber : Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.11

Dari tabel di atas maka didapat jarak pandang mendahuluiny 550 m

Tabel 2.4 Kelandaian Maksimum yang Diizinkan


VR
120 110 100 80 60 50 40 <40
(km/jam)
Kelandai
an
3 3 4 5 8 9 10 10
Maksimu
m (%)
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.10

Dengan VR = 80 km/jam
kelandaian jalan mak 5%

Tabel 2.5 Panjang Jari-Jari Minimum (dibulatkan)


VR
120 100 80 60 50 40 30 20
(km/jam)
Rmin (m) 600 370 210 110 80 50 30 15
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.16

Didapatkan data-data sebagai berikut :


VR = 80 km/jam
Rmin(dari = 210 m
emaks = 10 % 0.1

MENENTUKAN Ls

1. Ls = = 55.556
(T= 3 detik)

2. Ls = = 15.911

Dimana :
C = perubahan percepatan (m/det3) yang bernilai 1-3 m/det3
e = didapat dalam tabel 4.1 Silvia Sukirman. 1999. Dasar-Dasar Perencanaan Geometrik J

Ls = = 71.111

Dimana :
em = superelevasi maksimum
en = superelevasi normal 2% 0.02
re = tingkat pencapaian perubahan kemiringan melintang jalan
untuk VR ≤ 70 km/jam re-max = 0.035 m/m/det
untuk VR ≥ 80 km/jam re-max = 0.025 m/m/det

Berdasarkan perhitu= 90 m

Berdasarkan tabel II. VR 80 km/jam didapat: Ls= 90


Le= 120

Ls = 90.000 m
Rc = 210 m
∆U = 43.6776 L
67° 15' 24"
· Mencari sudut-sudut tikungan dan panjang tikungan

θs = = 12.28389
6° 53' 9" konversi manual
θc = ∆ - 2 θs = 19.10984 9.554921
53° 29' 6" konversi manual
129
Lc = = 70.0057 140.0114

p = = 1.6071

Didapat nilai p > 0,25 m maka lengkung peralihan tidak diperlukan sehingga tipe tikungan bukan Full Circl
Jadi jenis tikungan yang digunakan adalah Spiral – Circle – Spiral (S – C – S).

2.2 Menghitung Elemen Tikungan U

= Lc +
Ltotal
2Ls = 250.006

p = p   Ls = 1.597

(p* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129


hasil interpolasi didapat p* = 0.018503 0.018503

k  k   Ls = 44.933
(k* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129)
hasil interpolasi didapat k* = 0.499197 0.499197

Es = (Rc + p) sec ½ ∆ -= 17.957

Ts = (Rc + p) tan ½ ∆ += 129.732 130.900

VR 80 km/jam
∆ 43.677631
θs 12.28389 68.16118
Rc 210 m 80.44508
Es 17.957 m
Ts 130.900 m
LTotal 250.006 m
e 0.1
Ls 90.000
Lc 70.006
p 1.597
k 44.933
em 0.1
en 0.02

Landai rela= = 0.005


0.5 %
997. Tabel II.10

997. Tabel II.11


97. Tabel II.10

997. Tabel II.16

ar Perencanaan Geometrik Jalan. Hal 76.


> 25 m (S – C – S)

pe tikungan bukan Full Circle (F – C).

U ACAD
ES 13.75129 0.665563
RC 210 10.164
SUDUT C 19.4352 0.940663
SUDUT S 9.705793 0.46976
TS 109.9289 5.320558
LS 71.11111 3.441778
P 1.016932 0.049219
LC 71.1976 3.445964

`
2.2 Sistem Penomoran Jalan (TIKUNGAN T)

STA C = 0 + 000 (awal proyek) TITIK STATIONING


STA C 0+000
STA T = STA C+ STA T 0+
= 200.0025 STA TS 0+
STA SC 0+
STA TS = STA T STA CS 0+
= 30.8931 STA ST 0+
STA U 0+
STA SC = Sta Ts + Ls
= 120.8931

STA CS = Sta Sc + Lc
= 251.9408

STA ST = Sta Cs + Ls
= 341.9408

STA U = Sta ST – Ts +
= 472.8309

Jadi, penampang jalan rencana C ke STA U yaitu : 472.8309 m

2.2 Perhitungan Pelebaran Jalan di Tikungan


Diambil truk sebagai kendaraan standar :
- Jarak gandar (L) = 6,5 m
- Panjang tonjolan depan (A) = 1.2 m
- Kebebasan samping tikungan (C) = 1.5 m
- Lebar kendaraan (M) = 2.5 m
- Jumlah lajur (n) = 2
- Kecepatan rencana (VR) = 80 km/jam
- Radius tikungan N rencana (R) = 210 m
- Lebar perkerasan di penampang normal (Wn) = 7m

a. Jarak lintasan keluar sampai terdalam kendaraan (µ)


µ= M+R- = 2.601

b. Lebar tambahan akibat tonjolan depan (Fa)


Fa= -R = 0.041
c. Lebar tambahan akibat kesukaran dalam mengemudi
Z= = 0.580

d. Lebar perkerasan yang perlu


Wc= n (µ + C) + (n – 1) Fa + Z = 8.821

e. Pelebaran
Pelebaran = Wc - Wn = 1.821

Jadi, dari hasil perhitungan di atas, dapat dikatakan bahwa ditikungan


memerlukan pelebaran sebesar : 1.821 m

Diagram Superelevasi (Tikungan T)

LS= 71.111

67.500 = X+2
90.000 12

810 = 71,111X + 180.000


X = 8.859375
2.2 Sistem Penomoran Jalan (TIKUNGAN U)

STATIONING 343.59 STA T = 200.0025


0+000
343.312 STA U = STA T+
250.052 = 500.0021
321.163
362.171 STA TS = STA U
433.282 = 369.1114
749.817
STA SC = Sta Ts + Ls
= 459.1114

STA CS = Sta Sc + Lc
= 529.1172

STA ST = Sta Cs + Ls
= 619.1172

STA L = Sta ST – Ts +
= 831.6388

Jadi, penampang jalan rencana T ke STA L yaitu : 831.6388 m


Diagram Superelevasi (Tikungan T)

67.500 = X+2
90.000 12

810 = 71,111X + 180.000


X = 7
TITIK STATIONING
STA T 0+0343.59
STA U 0+ 500.002
STA TS 0+ 369.111
STA SC 0+ 459.111
STA CS 0+ 529.117
STA ST 0+ 619.117
STA L 0+ 831.639
3.1 Panjang Minimum Lengkung Vertikal
Tabel 3.1 Panjang minimum lengkung vertikal (Bina Marga)Panjang
Perbedaan
Kecepatan Rencana Kelandaian Lengkun
(km/jam) Memanjang
(%) g
(m)
< 40 1 20 – 30
40 – 60 0.6 40 – 80
> 60 0.4 80 – 150
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.24

Pada panjang minimal lengkung berdasarkan tabel di atas,


maka untuk kecepatan rencana 80 km/jam panjang lengkung diambil adalah
80 – 150 m

Tabel 3.2 Kelandaian maksimum yang diizinkan (Bina Marga)


VR (km/jam) 120 110 100 80 60 50
Kelandaian
3 3 4 5 6 9
maksimum (%)
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.21

Pada kelandaian jalan maksimum berdasarkan tabel diatas,


kecepatan rencana 80 km/jam didapat kelandaiannya 5%

Tabel 3.3 Panjang kritis yang diizinkan (Bina Marga)


Kecepatan pada awal Kelandaian (%)
tanjakan (km/jam)
4 5 6 7 8 9
80 630 460 360 270 230 230
60 320 210 160 120 110 90
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.2

TIKUNGAN T
A= 0.817
Perhitungan Menurut Jarak Pandang Henti (Jh)
Dari tabel 2.2, diketahui jarak pandang henti untuk V R = 80 km/jam adalah 120
Ø Jh < L

L= = 29.48571429 TIDAK MEMENUHI

Ø Jh > L

L= = -248.372093 MEMENUHI

Perhitungan Menurut Jarak Pandang Mendahului (Jd)


Dari tabel 2.3, diketahui jarak pandang mendahului untuk V R = 80 km/jam adalah
Ø Jd < L

L= = 294.2172619 TIDAK MEMENUHI

Ø Jd > L

L= = 71.84822521 MEMENUHI
`

*Untuk lengkung cembung


Berdasarkan keluwasan bentuk dari rumus 4.43 (Buku Ir. Hamurhan Saodang MSCE)

L= 0,60V = 48

Untuk lengkung cembung dengan kerb dari rumus 4.42 (Buku Ir. Hamurhan Saodang MSCE)

L= 40 A = 32.68
7. Tabel II.24

40

10
7. Tabel II.21

10
200
800
7. Tabel II.2

TIKUNGAN U
A= -1.68
Perhitungan Menurut Jarak Pandang Henti (Jh)
Dari tabel 2.2, diketahui jarak pandang henti untuk V R = 80 km/jam adalah
Ø Jh < L

L= = -60.6316 MEMENUHI

Ø Jh > L

L= = 477.5000 TIDAK MEMENUHI

Perhitungan Menurut Jarak Pandang Mendahului (Jd)


550 m Dari tabel 2.3, diketahui jarak pandang mendahului untuk V R = 80 km/jam adalah
Ø Jd < L

L= = -605 TIDAK MEMENUHI

Ø Jd > L

L= = 1600 MEMENUHI

*Untuk lengkung cembung


Berdasarkan keluwasan bentuk dari rumus 4.43 (Buku Ir. Hamurhan Saodang MSCE)

L= 0,60V = 48

Untuk lengkung cembung dengan kerb dari rumus 4.42 (Buku Ir. Hamurhan Saodang MSCE)

L= 40 A = -67.2
m/jam adalah 120

= 80 km/jam adalah 550 m


aodang MSCE)
3.1 Panjang Minimum Lengkung Vertikal
Tabel 3.1 Panjang minimum lengkung vertikal (Bina Marga)
Panjang
Kecepatan Rencana Perbedaan Kelandaian Memanjang
Lengkung
(km/jam) (%) (m)
< 40 1 20 – 30
40 – 60 0.6 40 – 80
> 60 0.4 80 – 150
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.24

Pada panjang minimal lengkung berdasarkan tabel di atas,


maka untuk kecepatan rencana 80 km/jam panjang lengkung diambil adalah80 – 150

Tabel 3.2 Kelandaian maksimum yang diizinkan (Bina Marga)


VR (km/jam) 120 110 100 80 60
Kelandaian
3 3 4 5 6
maksimum (%)
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.21

Pada kelandaian jalan maksimum berdasarkan tabel diatas,


kecepatan rencana 80 km/jam didapat kelandaiannya 5%

Tabel 3.3 Panjang kritis yang diizinkan (Bina Marga)


Kecepatan pada awal Kelandaian (%)
tanjakan (km/jam) 4 5 6 7 8
80 630 460 360 270 230
60 320 210 160 120 110
Sumber: Tata Cara Perencanaan Geometrik Jalan Antar Kota. Direktorat Binamarga. 1997. Tabel II.2

BEDA
TITIK STA ELEVASI JARAK KEMIRINGAN
TINGGI
G 0+000 76.2
0.1 343.59 0.03
F 0+299,9988 76.1
3.7 316.60 1.17
M 0+499,9930 79.8
7.6 168.75 4.50
L 0+770,3034 87.4

LENGKUNG VERTIKAL CEKUNG

PPV 1 (TIKUNGAN T)
A= g2-g1 0.817
Dari tabel 2.2, diketahui jarak pandang henti untuk VR = 80 km/jam adalah 120 m
Jh= 120
Untuk Jh<Lv, maka
A  Jh 2
Lv  = 21.79 (tidak memenuhi)
120  3,5  Jh

Untuk Jh>Lv, maka

120  3,5  Jh
Lv  2  Jh  = -420.95 (memenuhi)
A

Panjang lengkung vertical minimum yang dapat memenuhi syarat kenyamanan adalah:
A V 2
Lv  = 13.76
380
Panjang lengkung vertikal untuk keperluan drainase adalah:

Lv  50 A = 40.85

Berdasarkan Tabel 3.1 Panjang minimum lengkung vertikal (Bina Marga)


maka untuk kecepatan rencana 80 km/jam panjang lengkung diambil adalah

Lv yang digunakan (nilai yang terbesar) adalah = 71.8482 m

Pergeseran vertical dari titik PPV ke bagian lengkung:

A  Lv
Ev  = 0.07337
800

EPPV 1 = 299.9988

STA PLV1= EPPV 1- L/2 264.0747


STA PPV1=0+EPPV 1 0+299,9988
STA PTV1= EPPV 1+ L/2 335.9229

Y STA 0+
0 C
50
100
150
200
250
264.0747 PLV1 35.92411584
299.9988 PPV1(T)
300
335.9229 PTV1
350
400
450
462.6682 PLV2
486.6682 PPV2(U)
500 24.00
510.6682 PTV2
550
600
650
700 50.00
750.00
785.6
marga. 1997. Tabel II.24

50 40

9 10
marga. 1997. Tabel II.21

)
9 10
230 200
90 800
marga. 1997. Tabel II.2

BEDA TINGGI
x100%
JARAK

g1
-1.14
g2
-3.34
g3

PPV 2 (TIKUNGAN U)
A= g3-g2 -1.68
Dari tabel 2.2, diketahui jarak pandang henti untuk VR = 80 km/jam adalah 120 m
Jh=
Untuk Jh<Lv, maka
A  Jh 2
Lv  = -44.80 (tidak memenuhi)
120  3,5  Jh

Untuk Jh>Lv, maka

120  3,5  Jh
Lv  2  Jh  = 561.429 (memenuhi)
A

Panjang lengkung vertical minimum yang dapat memenuhi syarat kenyamanan adalah:
A V 2
Lv  = -28.29
380
Panjang lengkung vertikal untuk keperluan drainase adalah:

Lv  50 A = -84.00

Lv yang digunakan (nilai yang terbesar) adalah = 48


80-150 m
Pergeseran vertical dari titik PPV ke bagian lengkung:

A  Lv
Ev  = -0.31500
800

EPPV 2 = 486.6682 -1.155

STA PLV 2= EPPV 2- L/2 462.6682


STA PPV 2= 0+EPPV 2 0+486,6682
STA PTV 2= EPPV 2+ L/2 510.6682
m adalah 120 m
120

(tidak memenuhi)

(memenuhi)

kenyamanan adalah:

TITIK STA
DAFTAR SEWA PERALATAN PERJAM KERJA

Biaya sewa
No. Uraian harga Alat per jam Keterangan
(diluar PPN)
1 AMP Rp 3,500,000,000.00 Rp 5,260,659.69 Alat Baru
2 Aspal Finisher Rp 400,000,000.00 Rp 184,955.61 Alat Baru
3 Aspal Sprayer Rp 300,019,600.00 Rp 96,944.03 Alat Baru
4 Buldozer Rp 575,000,000.00 Rp 370,661.82 Alat Baru
5 Compresor Rp 40,000,000.00 Rp 161,387.41 Alat Baru
6 Concrete mixer Rp 6,000,000.00 Rp 51,552.55 Alat Baru
7 Crane Rp 140,000,000.00 Rp 293,384.49 Alat Baru
8 Dump truck Rp 200,000,000.00 Rp 179,822.74 Alat Baru
9 Excavator Rp 570,000,000.00 Rp 274,791.97 Alat Baru
10 Generator set Rp 50,000,000.00 Rp 313,627.11 Alat Baru
11 Motor Grader Rp 1,000,000,000.00 Rp 437,899.44 Alat Baru
12 Whell Loader Rp 750,000,000.00 Rp 352,806.72 Alat Baru
13 Three Whell Roller Rp 168,000,000.00 Rp 149,275.68 Alat Baru
14 Stone Cruher Rp 800,000,000.00 Rp 545,205.26 Alat Baru
15 Vibro Roller Rp 350,000,000.00 Rp 227,994.11 Alat Baru
16 Water Tanker Rp 210,000,000.00 Rp 229,362.45 Alat Baru
17 Concrete Vibrator Rp 1,150,000.00 Rp 42,774.43 Alat Baru
DAFTAR HARGA SATUAN UPAH DAN BAHAN

2. HARGA SATUAN BAHAN DAN MATERIAL

2 HARGA SATUAN BAHAN / MATERIAL

NO KELOMPOK/NAMA BAHAN/MATERIAL
1 2
I KELOMPOK BATU, PASIR, TANAH DAN MATERIAL BETON

1 Abu Batu
2 Adukan Beton Redy Mix B. 0 ( Tanpa Pompa + Slang )
3 Adukan Beton Redy Mix K. 100 ( Tanpa Pompa + Slang )
4 Adukan Beton Redy Mix K. 125 ( Tanpa Pompa + Slang )
5 Adukan Beton Redy Mix K. 150 ( Tanpa Pompa + Slang )
6 Adukan Beton Redy Mix K. 175 ( Tanpa Pompa + Slang )
7 Adukan Beton Redy Mix K. 200 ( Tanpa Pompa + Slang )
8 Adukan Beton Redy Mix K. 225 ( Tanpa Pompa + Slang )
9 Adukan Beton Redy Mix K. 250 ( Tanpa Pompa + Slang )
10 Adukan Beton Redy Mix K. 275 ( Tanpa Pompa + Slang )
11 Adukan Beton Redy Mix K. 300 ( Tanpa Pompa + Slang )
12 Adukan Beton Redy Mix K. 350 ( Tanpa Pompa + Slang )
13 Adukan Beton Redy Mix K. 400 ( Tanpa Pompa + Slang )
14 Adukan Beton Redy Mix K. 500 ( Tanpa Pompa + Slang )
15 Adukan Beton Redy Mix Mortar ( Tanpa Pompa + Slang )
16 Bata Merah Lokal (9,0x20x3,5 cm)
17 Bata Merah Produksi Pulang Pisau (9,5x19x4,0 cm)
18 Bata Rooster ( Karawang )
19 Bataco Hitam (17x8x40 cm)
20 Batako 1 Zak 70
21 Batako 1 Zak 95
22 Batu Alam Andesit Polos Bakar
23 Batu Alam Andesit Polos Bakar (10 x 20)
24 Batu Alam Andesit Polos Bakar (15 x 20)
25 Batu Alam Andesit Polos Bakar (20 x 40)
26 Batu Alam Andesit Bintik Bakar
27 Batu Alam Andesit Alur
28 Batu Alam Andesit Alur (15 x 30)
29 Batu Alam Andesit Alur (20 x 40)
30 Batu Alam Palimanan
31 Batu Alam Paras
32 Batu Candi Polos
33 Batu Apung (Gosok )
34 Batu Candi Alur
35 Batu Belah (Tangkiling - dalam kota)
36 Batu Belah 10/15 cm.
37 Batu Belah 5/7 cm.
38 Batu Belah Hitam
39 Batu Kapur
40 Batu Pecah Mesin/ Screen 3 mm s/d 5 mm
41 Batu Pecah 1 -2 cm. (split)
42 Batu Pecah 2-3 cm.
43 Batu Pecah 3-5 cm.
44 Batu Pecah 5-7 cm.
45 Batu Pecah Mesin 1 - 2
46 Batu Pecah Mesin 2 - 3
47 Batu Pecah Mesin 3 - 5
48 Batu Pecah Tidak Tersaring ( Sawur )
49 Batu Koral Sikat Hitam ( Terpasang )
50 Batu Koral Sikat Abu ( Terpasang )
51 Batu Koral Sikat Warna ( Terpasang )
52 Beton Rooster / Kerawang (ukuran kecil)
53 Beton Ringan (Hebel) 10x20x60 cm.
54 Beton Ringan (Hebel) 7,5x20x60 cm.
55 Buis Beton 20 cm x 100 cm (tebal 5 cm)
56 Buis Beton 40 cm x 100 cm (tebal 5 cm)
57 Buis Beton 50 cm x 100 cm (tebal 5 cm)
58 Buis Beton 30 cm x 100 cm (tebal 10 cm)
59 Buis Beton 30 cm x 100 cm (tebal 5 cm)
60 Buis Beton 40 cm x 100 cm (tebal 15 cm)
61 Buis Beton 60 cm x 50 cm (tebal 10 cm)
62 Buis Beton 60 cm x 50 cm (tebal 5 cm)
63 Buis Beton 70 cm x 50 cm (tebal 5 cm)
64 Buis Beton 80 cm x 50 cm (tebal 10 cm)
65 Buis Beton 80 cm x 50 cm (tebal 5 cm)
66 Buis Beton 100 cm x 50 cm (tebal 10 cm)
67 Kapur Pasang / Kapur Padam
68 Kerikil Sungai
69 Pasir Beton (Sungai)
70 Pasir Pasang
71 Pasir Urug
72 Sirtu Tak Tersaring / Kerikil
73 Tanah Subur
74 Tanah Urugan Biasa / Granit
75 Tanah Urugan Pilihan / Tanah Kuning
76 Paving Stone/conblock Putih segi empat, tinggi 8 cm.
77 Paving Stone/conblock Hitam segi empat, tinggi 8 cm.
78 Paving Stone/Conblock Putih Segi enam, tinggi 8 cm.
79 Paving Stone/Conblock Hitam segi enam, tinggi 8 cm.
80 Pengeras Beton (5 Kg)
81 Pengeras Beton (30 Kg)
82 Plastik Cor (25 m /bks)
83 Semen Portland (Semen PC) @ 40 Kg/Zak
84 Semen Portland (Semen PC) @ 40 Kg/Zak
85 Semen Portland (Semen PC) @ 40 Kg/Zak
86 Semen Portland (Semen PC) @ 40 Kg/Zak
87 Semen Portland (Semen PC) @ 40 Kg/Zak
88 Semen Putih
89 Semen putih (40 Kg/Zak)
90 Semen putih (40 Kg/Zak)
91 Semen Warna
92 Semen Warna
93 Semen Grouting

II KELOMPOK KAYU

1 Bambu Ø 5
2 Batang Cangkok
3 Gebalan rumput
4 Ijuk
5 Kayu Bakar
6 Kayu Balok Klas I (ulin) 10/10 - P. 4 m
7 Kayu Balok Klas I (ulin) 5/7 - P. 4 m
8 Kayu Balok Klas I (ulin) 5/10 - P. 4 m
9 Kayu Balok Klas I (ulin) 6/12 - P. 4 m
10 Kayu Balok Klas II (Banuas)
11 Kayu Balok Klas II (Blangiran)
12 Kayu Balok Klas II (Lanan)
13 Kayu Balok Klas III (hutan/campuran)
14 Kayu Balok Meranti 5/10 - P. 4 m.
15 Kayu Balok Meranti 6/12 - P. 4 m.
16 Kayu Balok Meranti 8/12 - P. 4 m.
17 Kayu Bekisting (Albasiah/Stoot)
18 Kayu Bulat (Untuk Matting) Ø 30 - 40 cm, P. 8 m.
19 Kayu Bulat (Untuk Perancah) Ø 3 - 5 cm, P. 4 m.
20 Kayu Dolken / Galam Ø 10 - 12 cm, P. 4 m.
21 Kayu Dolken / Galam Ø 6 - 10 cm, P. 4 m.
22 Kayu Dolken / Kanopel Ø 10 - 12 cm, P. 4 m.
23 Kayu Dolken / Kanopel Ø 8 - 10 cm, P. 4 m.
24 Kayu Dolken / Kanopel Ø 6 - 8 cm, P. 4 m.
25 Kayu Dolken / Balawan Ø 10 - 12 cm, P. 3,9 m.
26 Kayu Dolken / Balawan Ø 6 - 10 cm, P. 3,9 m.
27 Kayu Lapis Teakwood 4 mm. (Kecil/Uk. Pintu)
28 Kayu Lapis Teakwood 4 mm. (122x244 cm)
29 Kayu Lapis Triplek 3 mm, 120x240 cm.
30 Kayu Lapis Triplek 4 mm, 120x240 cm.
31 Kayu Lapis Triplek 6 mm, 120x240 cm.
32 Kayu Lapis Triplek 9 mm, 120x240 cm.
33 Kayu Lapis Triplek 12 mm, 120x240 cm.
34 Kayu Lapis Triplek 4 mm (80x200 cm) ukuran Pintu
35 Kayu Lapis Triplek Serat Sungkai
36 Kayu Moulding / Papan Lap-lapan (Alau)
37 Kayu Moulding / Papan Lap-lapan (Bangkirai)
38 Kayu Moulding / Papan Lap-lapan (Alau)
39 Kayu Moulding / Papan Lap-lapan (Bangkirai)
40 Kayu Papan Klas I (Ulin)
41 Kayu Papan Klas II (Banuas)
42 Kayu Papan Klas II (Blangiran)
43 Kayu Papan Klas II (Lanan)
44 Kayu Papan Klas III ( Hutan / campuran )
45 Kayu Papan Meranti 2/20 - P. 4 m.
46 Kayu Papan Meranti 3/20 - P. 4 m.
47 Kayu Papan Meranti 3/30 - P. 4 m.
48 Kayu Reng Klas II (Meranti) 3/5 - P. 4 m
49 Kayu Reng Klas II (Meranti) 2/3 - P. 4 m.
50 List Kayu Profil (Moulding) L.2,5 cm - Tebal 1,5 cm - P. 4m.
51 List Kayu Profil (Moulding) L.3 cm - Tebal 1,5 cm - P. 4m.
52 List Kayu Profil (Moulding) L.3,5 cm - Tebal 1,5 cm - P. 4m.
53 List Kayu Profil (Moulding) L.4 cm - Tebal 1,5 cm - P. 4m.
54 List Kayu Profil (Moulding) L.4 cm - Tebal 1,5 cm - P. 4m.
55 List Kayu Sudut 5 cm - P. 4m
56 List Kayu Siku 5 cm - P. 4m
57 Melamin 4 mm.
58 White Board

III KELOMPOK MATERIAL PENUTUP ATAP, PARTISI DAN PLAFOND

1 Alumunium Foil
2 Alumunium Foil
3 Alumunium Foil
4 Alumunium Foil 3 mm (25 m)
5 Alumunium Foil 4 mm (25 m)
6 Asbes nok Gelombang besar
7 Asbes nok Gelombang kecil
8 Atap Asbes gelombang besar 180 x 80 x 4 mm
9 Atap Asbes gelombang besar 180 x 80 x 4 mm
10 Atap Asbes gelombang besar 150 cm x 012 cm x 6 mm
11 Atap Fibreglass ( 80 X 180 )
12 Atap Fibreglass ( 80 X 180 )
13 Atap Metal Zincalume Soka tbl. 0,22 mm (1,2 M2/lembar)
14 Atap Metal Zincalume Soka tbl. 0,25 mm (73x180 cm)
15 Atap Metal Zincalume Spandek tbl. 0,3 mm - Lbr. 72 cm
16 Atap Metal Zincalume Spandek tbl. 0,3 mm (106 x 600 cm)
17 Atap Polycarbonat tbl. 4 mm, (2,1x 11,8 m)
18 Atap Polycarbonat tbl. 5 mm, (2,1x 11,8 m)
19 Atap Polycarbonat tbl. 6 mm, (2,1x 11,8 m)
20 Atap Polycarbonat tbl. 10 mm, (2,1x 11,8 m)
21 Atap Plastik Gelombang
22 Bubungan Genteng Metal Zincalume bentuk C, P. 75 cm.
23 Bubungan Genteng Metal Zincalume bentuk U, P. 75 cm.
24 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
25 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
26 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
27 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
28 Genteng Zincalume Colour tbl. 0,25 mm, 1,62 Lbr / per M2

29 Genteng Zincalume Colour tbl. 0,30 mm, 1,62 Lbr / per M2

30 Kaso Metal Zincalume C. 75 X 35 X 0.75 mm - P. 6 Meter.


31 Kaso Metal Zincalume C. 75 X 35 X 0.75 mm - P. 6 Meter.
32 Karpet lebar 90 cm.
33 Karpet Talang 55 cm.
34 List Profil Gipsum Uk. Besar ( 15 cm )
35 List Profil Gipsum Uk. Kecil ( 5 cm )
36 List Profil Gipsum Uk. Sedang ( 10 cm )
37 Papan Plafon kalsiboard tbl. 3,5 mm (120 x 240 cm)
38 Papan Plafon kalsiboard tbl. 3,5 mm (120 x 240 cm)
39 Papan Plafon kalsiboard tbl. 4,5 mm (120 x 240 cm)
40 Papan Plafon kalsiboard tbl. 4,5 mm (120 x 240 cm)
41 Papan Plafon kalsiboard tbl. 6 mm (120 x 240 cm)
42 Papan Plafon kalsiboard tbl. 6 mm (122 x 244 cm)
43 Papan Plafon kalsiboard tbl. 6 mm (120 x 240 cm)
44 Papan Plank kalsiboard tbl. 8 mm (30 x 240 cm)
45 Papan Plank kalsiboard tbl. 9 mm (30 x 240 cm)
46 Papan Plank kalsiboard tbl. 12 mm (30 x 240 cm)
47 Papan Plafond Gypsum tbl. 9 mm (120 X 240 cm)
48 Papan Semen GRC tbl. 4 mm (122 X 244 cm)
49 Papan Semen GRC tbl. 6 mm (122 X 244 cm)
50 Papan Semen GRC tbl. 8 mm (120 X 240 cm)
51 Rangka Atap Baja Ringan (zincalume) C 75x35x0,75
52 Rangka Atap Baja Ringan (zincalume) C 75x35x0,75
53 Rangka Atap Baja Ringan (zincalume) C 75x35x0,65
54 Rangka Atap Baja Ringan (zincalume) C 75x35x0,65
55 Rangka Plafond Baja Ringan (zincalume) hollow 30x30x0,3 mm
56 Rangka Plafond Baja Ringan (zincalume) hollow 20x40x0,3 mm
57 Rangka Plafond Baja Ringan (zincalume) hollow 20x40x0,3 mm
58 Rangka Plafond Baja Ringan (zincalume) hollow 40x40x0,3 mm
59 Rangka Plafond Baja Ringan (zincalume) hollow 40x40x0,3 mm
60 Seng Gelombang BJLS 20 ( 80 X 180 cm. )
61 Seng Gelombang BJLS 20 ( 90 X 240 cm. )
62 Seng Gelombang BJLS 25 ( 80 X 180 cm. )
63 Talang PVC segi empat

IV KELOMPOK BAJA, BESI, SENG, ALUMUNIUM DAN LOGAM LAINNYA

1 Alumunium Plat 1,2 mm Lbr. 60 cm.


2 Baja Profil (CNP C CHANNEL) CNP 15 (2)
3 Baja Profil CNP 75x35x0,9 - P. 6 m.
4 Baja Profil CNP 100x35x1,2 - P. 6 m.
5 Baja Profil CNP 125x35x2,0 - P. 6 m.
6 Baja Profil CNP 8 x 1,2 m (SNI)
7 Baja Profil CNP 8 x 1,5 m (SNI)
8 Baja Profil CNP 8 x 2 m (SNI)
9 Baja Profil CNP 10 x 1,2 m (SNI)
10 Baja Profil CNP 10 x 2 m (SNI)
11 Baja Profil CNP 12 x 1,5 m (SNI)
12 Baja Profil CNP 12 x 2 m (SNI)
13 Baja Profil CNP 15 x 2 m (SNI)
14 Baja Profil CNP 15 x 1,5 m (SNI)
15 Baja Profil CNP 15 x 2,2 m (SNI)
16 Baja Profil CNP 15 x 2,5 m (SNI)
17 Besi Baja Ringan 60 mm (SNI)
18 Besi Baja Ringan 65 mm (SNI)
19 Besi Baja Ringan 75 mm (SNI)
20 Besi Baja Ringan (Reng) (SNI)
21 Besi Baja Ringan (Talang) (SNI)
22 Besi Baja Ringan Multiroof (SNI)
23 Baja profil WF 200x100x5x7 -p.12 m
24 Baja profil WF 250x125x5x7 -p.12 m
25 Baja profil WF 150x75x5x7 -p.12 m
26 Baja profil WF 100x50x5x7 -p.12 m
27 Baja Profil Siku 40x40 - P. 6 m. SNI
28 Baja Profil Siku 40x40 tbl.4,0 mm - P. 6 m.
29 Baja Profil Siku 50x50 tbl.4,8 mm - P. 6 m.
30 Baja Profil UNP 50x38x5 - P. 6 m.
31 Baja Profil UNP 80x45x5 - P. 6 m.
32 Baja Profil UNP 100x50x6 - P. 6 m.
33 Baja Profil UNP 150x75x6,5 - P. 6 m.
34 Baja Plat Hitam (Plat Eser) 2 mm (120x240 cm)
35 Baja Plat Hitam (Plat Eser) 3 mm (120x240 cm)
36 Baja Plat Hitam (Plat Eser) 4 mm (120x240 cm)
37 Baja Plat Hitam (Plat Eser) 6 mm (120x240 cm)
38 Baja Plat Hitam (Plat Eser) 10 mm (120x240 cm)
39 Baut / Mur
40 Baut 38/14 17
41 Baut 38/14 20
42 Baut 38/14 22
43 Baut 38/14 25
44 Besi Beton Polos Ø 4 mm-P.11 m
45 Besi Beton Polos Ø 6 mm-P.11 m
46 Besi Beton Polos Ø 8 mm- P.12 m (SNI)
47 Besi Beton Polos Ø 10 mm-P.12 m (SNI)
48 Besi Beton Polos Ø 12 mm-P.12 m (SNI)
49 Besi Beton Polos Ø 16 mm-P.12 m (SNI)
50 Besi Beton Polos Ø 22 mm-P.12 m (SNI)
51 Besi Beton Polos
52 Besi Hollow Galvalume 5x5x1 mm
53 Besi Hollow Biasa 5x5x1 mm
54 Besi Hollow Galvanis 4x4 mm
55 Besi Hollow Galvanis 4x4x0,6 mm
56 Besi Hollow Galvanis 4x4x0,7 mm
57 Besi Hollow Galvanis 4x4x0,8 mm
58 Besi Hollow Galvanis 4x4x0,9 mm
59 Besi Hollow Galvanis 4x4x1 mm
60 Besi Hollow Galvanis 4x4x1.2 mm
61 Besi Hollow Galvanis 2x2x1 mm
62 Besi Hollow Galvanis 2x2x0,8 mm
63 Besi Hollow Galvanis 2x2x0,9 mm
64 Besi Hollow Galvanis 2x2x1 mm
65 Besi Hollow Galvanis 2x4x0,7 mm
66 Besi Hollow Galvanis 2x4x0,8 mm
67 Besi Hollow Galvanis 2x4x0,9 mm
68 Besi Hollow Galvanis 2x4x1 mm
69 Besi Hollow Galvanis 2x4x1,2 mm
70 Besi Hollow Galvanis 3x3x0,8 mm
71 Besi Hollow Galvanis 3x3x1 mm
72 Besi Hollow Galvanis 3x3x1,2 mm
73 Besi Hollow Galvanis 3x6x0,8 mm
74 Besi Hollow Galvanis 4x6x0.8 mm
75 Besi Hollow Galvanis 4x6x0.9 mm
76 Besi Hollow Galvanis 4x6x1 mm
77 Besi Hollow Galvanis 4x6x1.1 mm
78 Besi Hollow Galvanis 4x6x1.2 mm
79 Besi Hollow Galvanis 5x10x1.2 mm
80 Besi Hollow Galvanis 5x10x1.4 mm
81 Besi Hollow Plafon 1,3 x 3,3 mm
82 Besi Ulir
83 Besi Nako
84 Beugel Plat/ Plat Aisan Kuda-Kuda 10 x 15 cm.
85 Floor Deck/Bondek tbl. 0,7 mm - Lbr. 6 m
86 Floor Deck/Bondek tbl. 0,75 mm - Lbr. 6 m
87 Kawat Ayakan
88 Kawat Beton / Bendrat
89 Kawat Bronjong / Kawat Jaring Galvanized, P. 240 cm.
90 Kawat Duri (50 m/roll)
91 Kawat Harmonika t = 1 m (25 m/roll)
92 Kawat Las Listirk
93 Kawat Nyamuk Aluminium
94 Kawat Nyamuk Baja
95 Kawat Seling
96 Pagar BRC (hot deep galvanized) Ø 6" T. 90 cm - P.240 cm.
97 Pagar BRC (hot deep galvanized) Ø 6" T. 1750 cm - P.2400 cm.
98 Paku Anti Karat (Paku Genteng Metal)
99 Paku Asbes
100 Paku Beton 25 mm
101 Paku Beton 30 mm
102 Paku Beton 40 mm
103 Paku Beton 50 mm
104 Paku Beton 70 mm
105 Paku Beton 80 mm
106 Paku Beton 100 mm
107 Paku Kayu 1 Inchi
108 Paku Kayu 1,25 Inchi
109 Paku Kayu 1,5 Inchi
110 Paku Kayu 2 Inchi
111 Paku Kayu 3 Inchi
112 Paku Kayu 4 Inchi
113 Paku Kayu 5 Inchi
114 Paku Kayu 6 Inchi
115 Paku Besi (Ukuran besar/sedang, 1-6 inchi)
116 Paku Besi (Ukuran kecil/paku reng/paku sirap)
117 Paku Payung / Paku Seng
118 Paku Skrup 3,5"
119 Paku Ulin
120 Pipa Besi Hitam Ø 1/2" (Tbl. 0,8 mm-Panjang 6 m)
121 Pipa Besi Hitam Ø 1/2" (Tbl. 1,2 mm - Panjang. 6 m)
122 Pipa Besi Hitam Ø 3/4" (Tbl. 1,2 mm-Panjang 6 m)
123 Pipa Besi Hitam Ø 1" (Tbl. 1,2 mm-Panjang 6 m)
124 Pipa Besi Hitam Ø 1.1/4" (Tbl. 1,2 mm-Panjang 6 m)
125 Pipa Besi Hitam Ø 1.1/2" (Tbl. 1,2 mm-Panjang 6 m)
126 Pipa Besi Hitam Ø 2" (Tbl. 1,2 mm-Panjang 6 m)
127 Pipa Besi Hitam Ø 4" (Tbl. 2,3 mm-Panjang 6 m)
128 Pipa Besi Galvanis Ø 1/2" (Tbl. 1,2 mm-Panjang. 6 m)
129 Pipa Besi Galvanis Ø 3/4" (Tbl. 1,2 mm-Panjang 6 m)
130 Pipa Besi Galvanis Ø 1" (Tbl. 1,2 mm-Panjang 6 m)
131 Pipa Besi Galvanis Ø 1.1/4" (Tbl. 1,2 mm-Panjang 6 m)
132 Pipa Besi Galvanis Ø 1.1/2" (Tbl. 1,2 mm-Panjang 6 m)
133 Pipa Besi Galvanis Ø 2" (Tbl. 1,2 mm-Panjang 6 m)
134 Pipa Besi Galvanis Ø 4" (Tbl. 2 mm-Panjang 6 m)
135 Pipa Stainless Steel Ø 1/2" (Tbl. 0,8 mm-Panjang 6 m)
136 Pipa Stainless Steel Ø 3/4" (Tbl. 0,8 mm-Panjang 6 m)
137 Pipa Stainless stee Ø 1" (Tbl. 0,8 mm-Panjang 6 m)
138 Pipa Stainless Steel Ø 1,5" (Tbl. 0,8 mm-Panjang 6 m)
139 Pipa Stainless Steel Ø 2" (Tbl. 0,8 mm-Panjang 6 m)
140 Pipa Stainless Steel Ø 2,5" (Tbl. 1,0 mm-Panjang 6 m)
141 Pipa Hollow Stainless Steel 20x40 mm
142 Pipa Hollow Stainless Steel 40x40 mm.
143 Plat Galvanis 260 Ø 0,8 m.
144 Plat Galvanis 260 Ø 1 m.
145 Plat Galvanis 260 Ø 1,2 m.
146 Plat Strip 3/4x4x600 mm
147 Plat Strip 3/4x5x600 mm
148 Plat Strip 3/4x6x600 mm
149 Plat Strip 1x4x300 mm
150 Plat Strip 1x5x600 mm
151 Plat Strip 1x6x600 mm
152 Plat Strip 1.1/4x4x600 mm
153 Plat Strip 1.1/4x5x600 mm
154 Plat Strip 1.1/4x6x600 mm
155 Plat Strip 1.1/2x4x600 mm
156 Plat Strip 1.1/2x5x600 mm
157 Plat Strip 1.1/2x6x600 mm
158 Plat Strip 1.1/2x8x600 mm
159 Plat Strip 2x5x600 mm
160 Plat Strip 2x6x600 mm
161 Plat Strip 2x8x600 mm
162 Plat Strip 3x3 m SNI
163 Plat Strip 4x4 m SNI
164 Plat Strip 5x5 m SNI
165 Plat Strip 6x6 m SNI
166 Plat Strip7x7 m SNI
167 Plat Strip 8x8 m SNI
168 Seng Plat BJLS Galvalum 0,4 mm
169 Seng Plat BJLS Galvalum 0,6 mm
170 Seng Plat BJLS Galvalum 0,7 mm
171 Seng Plat BJLS Galvalum 0,75 mm
172 Seng Plat BJLS Galvalum 0,8 mm
173 Seng Plat BJLS Galvalum 1 mm
174 Seng Plat BJLS Galvalum 1,1 mm
175 Seng Plat BJLS Galvalum 1,2 mm
176 Seng Plat BJLS Galvalum 1,5 mm
177 Tiang BRC GIP Lengkap T. 120 cm.
178 Wiremesh 150x150, besi Ø 4,5 mm, uk. 2,1x54 m.
179 Wiremesh 150x150, besi Ø 5,7 mm, uk. 2,1x54 m.
180 Wiremesh 150x150, besi Ø 6,7 mm, uk. 2,1x54 m.
181 Wiremesh 150x150, besi Ø 8 mm, uk. 2,1x5,4 m.
182 Wiremesh 150x150, besi Ø 10 mm, uk. 2,1x5,4 m.

V KELOMPOK MATERIAL LANTAI

1 Karpet Standart
2 Keramik 10/20 & 20/20 Anti Slip Corak / Warna
3 Keramik 10/20 & 20/20 Anti Slip Corak / Warna
4 Keramik 10/20 & 20/20 Corak / Warna
5 Keramik 10/20 & 20/20 Corak / Warna
6 Keramik 10/20 & 20/20 Polos
7 Keramik 25/40 Polos
8 Keramik 20/20 Corak / Warna Km/wc
9 Keramik 20/20 Corak / Warna Km/wc
10 Keramik 20/25 Corak / Warna
11 Keramik 30 x 30 cm anti slip
12 Keramik 30/30 Corak / Warna
13 Keramik 30/30 Corak / Warna
14 Keramik 30/30 Polos
15 Keramik 30/30 Polos
16 Keramik 50/50
17 Keramik 40/40 ( Kasar )
18 Keramik 40/40 ( Polished )
19 Keramik 40/40 Corak
20 Keramik Dasar Batu Warna 30 X 30
21 Keramik Granito 60/60 (Polished)
22 Keramik Granito 60/60 (Kasar)
23 Keramik List Dinding 6/20 cm.
24 Tegel Abu-abu / Teraso 40x 40 cm.

VI KELOMPOK KACA, MATERIAL PINTU DAN JENDELA

1 Door Closer
2 Door Closer
3 Door Closer
4 Door Closer
5 Door Closer
6 Door Closer
7 Engsel Jendela / Engsel Kupu-Kupu 3"
8 Engsel Jendela / Engsel Kupu-Kupu 3"
9 Engsel Jendela SKK 3"
10 Engsel Jendela Untuk Alumunium
11 Engsel Patrom / Engsel H
12 Engsel Pintu 4"
13 Engsel Pintu 4"
14 Engsel Pintu 4"
15 Engsel Pintu 4"
16 Engsel Pintu 4"
17 Engsel Pintu SKK 4"
18 Engsel Pintu Untuk Alumunium
19 Glass Blok 20 X 20
20 Grendel 2"
21 Grendel 2"
22 Grendel 3"
23 Grendel 3"
24 Grendel 3"
25 Grendel 4"
26 Grendel 4"
27 Grendel 10"
28 Grendel 12"
29 Grendel 12"
30 Grendel Rantai
31 Grendel Tanam
32 Grendel Tanam
33 Grendel Tanam
34 Hak Angin 8" stainless steel
35 Hak Angin 8" stainless steel
36 Hak Angin 8" stainless steel
37 Hak Angin 9" stainless steel
38 Hak Angin 10" stainless steel
39 Hak Angin Dorong/Ramskar stainless steel
40 Hak Angin Dorong/Ramskar stainless steel
41 Handel Jendela
42 Handel Jendela
43 Handel Jendela
44 Handel Jendela
45 Handel Pintu
46 Handel Pintu
47 Handel Pintu
48 Handle Alumunium
49 Handle Alumunium
50 Kaca Polos / Bening 2 mm
51 Kaca Polos / Bening 3 mm
52 Kaca Polos / Bening 5 mm
53 Kaca Polos / Bening 8 mm
54 Kaca Rayben 3 mm
55 Kaca Rayben 5 mm
56 Kaca Rayben 8 mm
57 Kaca Rayben 10 mm
58 Kaca Tempered 5 mm
59 Kaca Tempered 6 mm
60 Kaca Tempered 8 mm
61 Kaca Tempered 10 mm
62 Kaca Tempered 12 mm
63 Kaca Tempered 15 mm
64 Kaca Tempered 16 mm
65 Kaca Es / Buram 3 mm
66 Kaca Es / Buram 5 mm
67 Kaca One Way 5 mm
68 Kaca Naco 5 mm + rangka 12 daun
69 Kaca Naco 5 mm + rangka 8 daun
70 Kait Angin untuk Alumunium
71 Kawat Nyamuk Plastik
72 Kawat Nyamuk Plastik
73 Kunci Alumunium
74 Kunci Gembok
75 Kunci Gembok
76 Kunci Pintu Tanam Kecil Lengkap (standart)
77 Kunci Pintu Tanam Kecil Lengkap (standart)
78 Kunci Pintu Tanam Lengkap
79 Kunci Pintu Tanam Lengkap
80 Kunci Pintu Tanam Lengkap
81 Kunci Pintu Tanam Lengkap
82 Kunci Pintu Tanam Lengkap
83 Kunci Pintu Tanam Lengkap
84 Kunci Pintu Tanam Lengkap
85 Kunci Pintu Tanam Lengkap
86 Kunci Pintu Tanam Lengkap
87 Kunci Pintu Tanam Lengkap

VII KELOMPOK MATERIAL SANITAIR

1 Bak Cuci Piring Alumunium 1 Lubang


2 Bak Cuci Piring Alumunium 1 Lubang
3 Bak Cuci Piring Alumunium 1 Lubang
4 Bak Cuci Piring Alumunium 2 Lubang (Tipe L)
5 Bak Cuci Piring Alumunium 2 Lubang (Tipe L)
6 Bak Cuci Piring Alumunium 2 Lubang (Tipe L + Meja)
7 Bak Mandi Fibreglass uk. 50 X 50 (segi empat kecil)
8 Bak Mandi Fibreglass uk. 50 X 50 (segi empat kecil)
9 Bak Mandi Fibreglass uk. 60 X 60 (120 Liter)
10 Bak Mandi Fibreglass uk. 70 X 70 (segi empat besar)
11 Bak Mandi Fibreglass uk. 70 X 70 (sudut)
12 Bak Mandi Fibreglass uk. 70 X 70 (sudut)
13 Bath Kip Fibre 36x75x170 Lengkap
14 Closet Duduk Putih Lengkap
15 Closet Duduk Putih Lengkap
16 Closet Duduk Putih Lengkap
17 Closet Duduk Putih Lengkap
18 Closet Duduk Warna Lengkap
19 Closet Duduk Warna Lengkap
20 Closet Jongkok Putih
21 Closet Jongkok Putih
22 Closet Jongkok Putih
23 Closet Jongkok Putih
24 Closet Jongkok Putih
25 Closet Jongkok Warna
26 Closet Jongkok Warna
27 Closet Jongkok Warna
28 Closet Jongkok Warna
29 Closet Jongkok Warna
30 Closet Jongkok Warna
31 Drain Floor
32 Kran Air Biasa
33 Kran Air Biasa 1/2
34 Kran Air Biasa 3/4
35 Kran Air Stainless
36 Kran Air Stainless
37 Kran Air Stainless
38 Kran Air Stainless
39 Pompa Air Jet Pump 225 Watt
40 Pompa Air Jet Pump 225 Watt
41 Pompa Air Jet Pump 225 Watt
42 Pompa Air Jet Pump 500 Watt
43 Pompa Air Lengkap 125 Watt (Manual)
44 Pompa Air Lengkap 125 Watt (Otomatis)
45 Pompa Air Lengkap 200 Watt (Manual)
46 Pompa Air Lengkap 200 Watt (Otomatis)
47 Pompa Air Lengkap 200 Watt (Manual)
48 Pompa Air Lengkap 200 Watt (Otomatis)
49 Pompa Air tangan Lengkap
50 Seal Tape
51 Selang Buang Ø 3 ''
52 Selang Hisap Ø 3''
53 Shower Bath Kip
54 Shower Tembok
55 Tangki Air / Reservoir 600 Liter
56 Tangki Air / Reservoir 650 Liter
57 Tangki Air / Reservoir 1100 Liter
58 Tangki Air / Reservoir 1200 Liter
59 Tangki Air / Reservoir 2000 Liter
60 Tangki Air / Reservoir 3000 Liter
61 Tangki Air Stainless 2000 Liter
62 Bio Septic Tank Septic 0,6
63 Bio Septic Tank Septic 0,8
64 Bio Septic Tank Septic 1
65 Bio Septic Tank Septic 2
66 Bio Septic Tank Septic 5
67 Bio Septic Tank BF - 03
68 Bio Septic Tank BF - 04
69 Bio Septic Tank BF - 06
70 Bio Septic Tank BF - 08
71 Bio Septic Tank BST - 01
72 Bio Septic Tank BST - 02
73 Bio Septic Tank BST - 03
74 Bio Septic Tank BST - 04
75 Septic Tank BS 6
76 Septic Tank BS 7
77 Septic Tank BS 8
78 Septic Tank BS 12
79 Septic Tank BS 15
80 Septic Tank BS 16
81 Urinoir Warna Lengkap
82 Wastafel Lengkap + Cermin Putih
83 Wastafel Lengkap + Cermin Putih
84 Wastafel Lengkap + Cermin Putih
85 Wastafel Lengkap + Cermin Putih
86 Wastafel Lengkap + Cermin Putih
87 Wastafel Lengkap + Cermin Putih
88 Wastafel Lengkap Tanpa Cermin
89 Wastafel Lengkap Tanpa Cermin
90 Wastafel Lengkap Tanpa Cermin
91 Wastafel Lengkap Tanpa Cermin

VIII KELOMPOK CAT, PEREKAT DAN PELAPIS

1 Amplas Besi
2 Amplas Kayu
3 Amplas Kayu
4 Cat Alkali (2,5 Liter)
5 Cat Besi
6 Cat Besi
7 Cat Besi
8 Cat Besi
9 Cat Kayu
10 Cat Kayu
11 Cat Kayu
12 Cat Kayu & Cat Besi
13 Cat Kayu & Cat Besi
14 Cat Genteng
15 Cat Genteng
16 Cat Hamertoon
17 Cat Kayu Dasar
18 Cat Marka Jalan Warna Putih (5 Kg)
19 Cat Marka Jalan Thermoplastic Warna Putih
20 Cat Marka Jalan Thermoplastic Warna Putih
21 Cat Marka Jalan Thermoplastic Warna Kuning
22 Cat Tembok (20 Liter)
23 Cat Tembok (20 Liter)
24 Cat Tembok (20 Kg)
25 Cat Tembok (20 Kg)
26 Cat Tembok (25 Kg)
27 Cat Tembok (25 Kg)
28 Cat Tembok (5 Kg)
29 Cat Tembok (5 Kg)
30 Cat Tembok (5 Kg)
31 Cat Tembok (5 Kg)
32 Cat Tembok (5 Kg)
33 Cat Tembok (5 Kg)
34 Cat Tembok (5 Kg)
35 Cat Tembok (2,5 Liter)
36 Cat Tembok (2,5 Liter)
37 Cat Tembok (2,5 Liter)
38 Cat Tembok (2,5 Liter)
39 Cat Tembok Eksterior (20 Liter)
40 Cat Tembok Eksterior (20 Liter)
41 Cat Tembok Eksterior (20 Liter)
42 Cat Tembok Eksterior (2,5 Liter)
43 Cat Tembok Eksterior (2,5 Liter)
44 Cat Tembok Eksterior (2,5 Liter)
45 Dempul Gipsum @ 20 Kg
46 Dempul Gipsum @ 20 Kg
47 Dempul Gipsum @ 20 Kg
48 Dempul Kayu
49 Dempul Kayu
50 Kuas 2"
51 Kuas 2"
52 Kuas 3"
53 Kuas 3"
54 Kuas 4"
55 Kuas 4"
56 Lem Kuning
57 Lem Putih
58 Lem Putih
59 Melamik
60 Meni Besi ( Sinkromat )
61 Meni Besi ( Sinkromat ) @ 5Kg
62 Meni Besi ( Sinkromat ) @ 5Kg
63 Meni Kayu
64 Minyak cat / Thinner
65 Minyak cat / Thinner
66 Minyak cat / Thinner
67 Minyak cat / Thinner (1 Kg)
68 Minyak cat / Thinner (5 Kg)
69 Plamur Kayu
70 Plamur Tembok 4 Kg
71 Plamur Tembok 5 Kg
72 Plamur Tembok 3,5 Kg
73 Plamur Tembok
74 Plamur Tembok
75 Plamur Tembok 5 Kg
76 Plamur Tembok 5 Kg
77 Plamur Tembok

78 Plamur Tembok 5 Kg
79 Plamur Tembok 4 Kg
80 Plamur Tembok 4,5 Kg
81 Plamur Tembok 20 Kg
82 Plamur Tembok 5 Kg
83 Plamur Tembok
84 Plamur Tembok 5 Kg

85 Plamur Tembok 5 Kg
86 Plamur Tembok 20 Kg
87 Plamur Tembok 4,5 Kg
88 Plamur Tembok 3,5 Kg
89 Plamur Tembok 4 Kg
90 Plamur Tembok 20 Kg
91 Plamur Tembok 25 Kg
92 Plamur Tembok 20 Kg
93 Plamur Tembok 20 Kg
94 Plester Gipsum
95 Residu / Teer Kayu
96 Roll Cat
97 Roll Cat
98 Roll Cat
99 Sealant (80 Gram)
100 Selfdrilling Scew ( 12x50 mm )
101 Sending Sealer
102 Sealen kaca
103 Sinkromat
104 Waterproof
105 Waterproof
106 Wood Filler

IX KELOMPOK MATERIAL MEKANIKAL DAN ELEKTRIKAL

1 Balaz Mercury (Bhl) 125 Watt


2 Balaz Mercury (Bhl) 250 Watt
3 Box MCB 1 Phase
4 Box MCB 1 Group
5 Box MCB 2 Group
6 Box MCB 3 Group
7 Box MCB 3 Group
8 Box MCB 4 Group
9 Box MCB 4 Group (Tempel)
10 Box MCB 4 Group (Tanam)
11 Box Panel 20 X 30 X 12 mm
12 Box Panel 20 X 80 X 60 mm
13 Box Panel 40 X 60 X 20 mm
14 Box Panel 40 X 60 X 20 mm
15 Box Panel 60 X 80 X 20 mm
16 Box Panel 60 X 80 X 20 mm
17 Box Panel 40"60x20
18 Box Panel 60"80x20
19 Fitting E27 besi
20 Fitting E40 besi
21 Fitting Plafond
22 Isolasi
23 Isolasi
24 Isolasi TR 2 M
25 Isolasi 3 M 70 1258 jr
26 Kabel BC 16 mm
27 Kabel BC 25 mm
28 Kabel BC 35 mm
29 Kabel NYA 16 mm
30 Kabel NYA 25 mm
31 Kabel NYA 35 mm
32 Kabel NYA 1,5 mm
33 Kabel NYA 1,5 mm
34 Kabel NYA 1,5 mm (50 meter)
35 Kabel NYA 1,5 mm (100 meter)
36 Kabel NYA 1,5 mm (100 meter)
37 Kabel NYA 1,5 mm (100 meter)
38 Kabel NYA 1,5 mm (100 meter)
39 Kabel NYA 2,5 mm
40 Kabel NYA 2,5 mm
41 Kabel NYA 2,5 mm (50 meter)
42 Kabel NYA 2,5 mm (50 meter)
43 Kabel NYA 2,5 mm (100 meter)
44 Kabel NYA 2,5 mm (100 meter)
45 Kabel NYA 2,5 mm (100 meter)
46 Kabel NYA 2,5 mm (100 meter)
47 Kabel NYM 2 X 1,5 mm
48 Kabel NYM 2 X 1,5 mm
49 Kabel NYM 2 X 1,5 mm (50 meter)
50 Kabel NYM 2 X 1,5 mm (50 meter)
51 Kabel NYM 2 X 1,5 mm (100 meter)
52 Kabel NYM 2 X 1,5 mm (100 meter)
53 Kabel NYM 2 X 1,5 mm (100 meter)
54 Kabel NYM 2 X 2,5 mm
55 Kabel NYM 2 X 2,5 mm
56 Kabel NYM 2 X 2,5 mm (50 meter)
57 Kabel NYM 2 X 2,5 mm (50 meter)
58 Kabel NYM 2 X 2,5 mm (100 meter)
59 Kabel NYM 2 X 2,5 mm (100 meter)
60 Kabel NYM 2 X 2,5 mm (100 meter)
61 Kabel NYM 2 X 4 mm
62 Kabel NYM 2 X 4 mm
63 Kabel NYM 2 X 4 mm (100 meter)
64 Kabel NYM 3 X 1,5 mm
65 Kabel NYM 3 X 2,5 mm
66 Kabel NYM 3 X 1,5 mm
67 Kabel NYM 3 X 2,5 mm
68 Kabel NYM 3 X 1,5 mm (50 meter)
69 Kabel NYM 3 X 1,5 mm (50 meter)
70 Kabel NYM 3 X 2,5 mm (50 meter)
71 Kabel NYM 3 X 2,5 mm (50 meter)
72 Kabel NYM 3 X 1,5 mm (100 meter)
73 Kabel NYM 3 X 1,5 mm (100 meter)
74 Kabel NYM 3 X 2,5 mm (100 meter)
75 Kabel NYM 3 X 2,5 mm (100 meter)
76 Kabel NYM 4 X 1,5 mm
77 Kabel NYM 4 X 1,5 mm (100 meter)
78 Kabel NYM 4 X 1,5 mm (100 meter)
79 Kabel NYM 4 X 4 mm
80 Kabel NYM 4 X 4 mm
81 Kabel NYM 4 X 4 mm (100 meter)
82 Kabel NYM 4 X 4 mm (100 meter)
83 Kabel NYY 2 X 2,5 mm
84 Kabel NYY 2 X 2,5 mm (100 meter)
85 Kabel NYY 2 X 2,5 mm (100 meter)
86 Kabel NYY 2 X 6 mm
87 Kabel NYY 2 X 6 mm (100 meter)
88 Kabel NYFgby 4 x 10 mm
89 Kabel NYFgby 4 x 10 mm
90 Kabel NYFgby 4 x 16 mm
91 Kabel NYFgby 4 x 16 mm
92 Kabel SR 2 X 16 mm
93 Kawat BC Ø 16" ( Untuk Penangkal Petir )
94 Kawat BC Ø 25" ( Untuk Penangkal Petir )
95 Kawat BC Ø 50" ( Untuk Penangkal Petir )
96 Konektor Tembus Kedap Air
97 Lampu HPL 125 Watt
98 Lampu HPL 250 Watt
99 Lampu HPL 400 Watt
100 Lampu Pijar 5 Watt
101 Lampu Pijar 5 Watt
102 Lampu Pijar 10 Watt
103 Lampu Pijar 15 Watt
104 Lampu Pijar 25 Watt
105 Lampu Pijar 40 Watt
106 Lampu SL 18 Watt
107 Lampu SL 23 Watt
108 Lampu Spiral 55 Watt
109 Lampu Taman + Tiang
110 Lampu TL 18 Watt Lengkap
111 Lampu TL 36 Watt Lengkap
112 Lampu TL 20 Watt Lengkap
113 Lampu TL 40 Watt Lengkap
114 MCB 1 Ph 10 A
115 MCB 1 Ph 16 A
116 MCB 1 Ph 25 A
117 MCB 1 Ph 32 A
118 MCB 1 Ph 50 A
119 MCB 3 Ph 10 A
120 MCB 3 Ph 16 A
121 MCB 3 Ph 25 A
122 MCB 3 Ph 32 A
123 MCB 3 Ph 50 A
124 Panel KWH 40 X 60
125 Photocell 6 A
126 Photocell 6 A
127 Photocell 10 A
128 Photocell 10 A
129 Saklar Double
130 Saklar Tunggal
131 Speed Arde Ø 1/2" ( Untuk Penangkal Petir )
132 Speed Arde Ø 3/4" ( Untuk Penangkal Petir )
133 Stang PJU 2"2 Meter Lengkap (klamp Plat 5 mm)
134 Stang PJU 2"3 Meter Lengkap (klamp Plat 5 mm)
135 Stop Kontak Biasa
136 Stop Kontak Crem
137 Stop Kontak Putar Crem
138 Stop Kontak Tutup
139 Stop Kontak + Instalasi (Konst. Beton)
140 Stop Kontak + Instalasi (Konst. Kayu)
141 T. Dus, Com Dus
142 Tiang Besi Galvanized Oktagonal - T. 6 m.
143 Tiang Besi Galvanized Oktagonal - T. 9 m.
144 Tiang Besi Galvanized Octagonal - T. 16 m.
145 Tiang Beton 9/200 DA + N (terpasang)
146 Time Switch Theben SUL 181 h
147 Titik Lampu + Instalasi (Konst. Beton)
148 Titik Lampu + Instalasi (Konst. Kayu)
149 Top Konektor
150 Slot tanam Sprinf Knipe
151 Magnetic Contractor Sn 25 A
152 Magnetic Contractor Sn 35 A
153 Magnetic Contractor Sn 50 A
154 Magnetic Contractor Sn 80 A
155 Magnetic Contractor 80 A
156 Kabel TIC 2 x 10 mm
157 Kabel TIC 2 x 25 mm

X KELOMPOK MATERIAL PERPIPAAN AIR BERSIH

1 Doof F 2"
2 Doof F 2,5"
3 Doof F 3"
4 Knee GIP Ø 1/2"
5 Knee GIP Ø 1"
6 Knee GIP Ø 1.1/4"
7 Knee GIP Ø 1.1/2"
8 Pipa galvanized GIP F Ø 2''
9 Pipa galvanized GIP F Ø 2,5 ''
10 Pipa galvanized GIP F Ø 3 ''
11 Knee GIP Ø 4"
12 Knee GIP Ø 3/4"
13 Pipa Galvanized GIP Medium B Ø 1/2"
14 Pipa Galvanized GIP Medium B Ø 3/4"
15 Pipa Galvanized GIP Medium B Ø 1"
16 Pipa Galvanized GIP Medium B Ø 1.1/4"
17 Pipa Galvanized GIP Medium B Ø 1.1/2"
18 Pipa Galvanized GIP Medium B Ø 2"
19 Pipa Galvanized GIP Medium B Ø 2,5"
20 Pipa Galvanized GIP Medium B Ø 3"
21 Pipa Galvanized GIP Medium B Ø 4
22 Pipa PVC AW Ø 1/2" - P. 4 m.
23 Pipa PVC AW Ø 1/2" - P. 4 m.
24 Pipa PVC AW Ø 1/2" - P. 4 m.
25 Pipa PVC AW Ø 3/4 '' - P. 4 m.
26 Pipa PVC AW Ø 3/4 '' - P. 4 m.
27 Pipa PVC AW Ø 3/4 '' - P. 4 m.
28 Pipa PVC AW Ø 3/4 '' - P. 4 m.
29 Pipa PVC AW Ø 1" - P. 4 m.
30 Pipa PVC AW Ø 1" - P. 4 m.
31 Pipa PVC AW Ø 1" - P. 4 m.
32 Pipa PVC AW Ø 1" - P. 4 m.
33 Pipa PVC AW Ø 1.1/4" - P. 4 m.
34 Pipa PVC AW Ø 1.1/4" - P. 4 m.
35 Pipa PVC AW Ø 1.1/4" - P. 4 m.
36 Pipa PVC AW Ø 1.1/4" - P. 4 m.
37 Pipa PVC AW Ø 1.1/2" - P. 4 m.
38 Pipa PVC AW Ø 1.1/2" - P. 4 m.
39 Pipa PVC AW Ø 1.1/2" - P. 4 m.
40 Pipa PVC AW Ø 1.1/2" - P. 4 m.
41 Pipa PVC AW Ø 2 '' - P. 4 m.
42 Pipa PVC AW Ø 2 '' - P. 4 m.
43 Pipa PVC AW Ø 2 '' - P. 4 m.
44 Pipa PVC AW Ø 2 '' - P. 4 m.
45 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
46 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
47 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
48 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
49 Pipa PVC AW Ø 3 '' - P. 4 m.
50 Pipa PVC AW Ø 3 '' - P. 4 m.
51 Pipa PVC AW Ø 3 '' - P. 4 m.
52 Pipa PVC AW Ø 3 '' - P. 4 m.
53 Pipa PVC AW Ø 4'' - P. 4 m.
54 Pipa PVC AW Ø 4'' - P. 4 m.
55 Pipa PVC AW Ø 4'' - P. 4 m.
56 Pipa PVC AW Ø 4'' - P. 4 m.
57 Pipa PVC AW Ø 5" - P. 4 m.
58 Pipa PVC AW Ø 6" - P. 4 m.
59 Pipa PVC AW Ø 8" - P. 4 m.
60 Pipa PVC AW Ø 10" - P. 4 m.
61 Pipa PVC AW Ø 12'' - P. 4 m.
62 Pipa PVC AW Ø 5" - P. 4 m.
63 Pipa PVC AW Ø 6" - P. 4 m.
64 Pipa PVC AW Ø 8" - P. 4 m.
65 Pipa PVC AW Ø 10" - P. 4 m.
66 Pipa PVC D Ø 1 1/4" - P. 4 m.
67 Pipa PVC D Ø 1 1/4" - P. 4 m.
68 Pipa PVC D Ø 1 1/4" - P. 4 m.
69 Pipa PVC D Ø 1 1/2" - P. 4 m.
70 Pipa PVC D Ø 1 1/2" - P. 4 m.
71 Pipa PVC D Ø 1 1/2" - P. 4 m.
72 Pipa PVC D Ø 2" - P. 4 m.
73 Pipa PVC D Ø 2" - P. 4 m.
74 Pipa PVC D Ø 2" - P. 4 m.
75 Pipa PVC D Ø 2 1/2 - P. 4 m.
76 Pipa PVC D Ø 2 1/2 - P. 4 m.
77 Pipa PVC D Ø 2 1/2 - P. 4 m.
78 Pipa PVC D Ø 3" - P. 4 m.
79 Pipa PVC D Ø 3" - P. 4 m.
80 Pipa PVC D Ø 3" - P. 4 m.
81 Pipa PVC D Ø 4" - P. 4 m.
82 Pipa PVC D Ø 4" - P. 4 m.
83 Pipa PVC D Ø 4" - P. 4 m.
84 Pipa PVC D Ø 5" - P. 4 m.
85 Pipa PVC D Ø 5" - P. 4 m.
86 Pipa PVC D Ø 6" - P. 4 m.
87 Pipa PVC D Ø 8" - P. 4 m.
88 Pipa PVC D Ø 10" - P. 4 m.
89 Pipa PVC D Ø 12" - P. 4 m.
90 Pipa PVC D Ø 6" - P. 4 m.
91 Pipa PVC D Ø 8" - P. 4 m.
92 Pipa PVC D Ø 10" - P. 4 m.
93 Pipa PVC D Ø 12" - P. 4 m.
94 Pipa PVC C Ø 5/8" - P. 4 m.
95 Pipa PVC C Ø 1/2" - P. 4 m.
96 Pipa PVC C Ø 3/4" - P. 4 m.
97 Pipa PVC C Ø 1" - P. 4 m.
98 Sok Drat Luar Ø 1"
99 Sok Drat Luar Ø 1,5"

XI KELOMPOK ASPAL DAN MATERIAL PEK. JALAN LAINNYA.

1 Aspal AC 60/70 - 80/100


2 Aspal AC 60/70 - 80/100

XII KELOMPOK MATERIAL / BAHAN LAINNYA.

1 Air Accu
2 Kunci Ring-Pass
3 Kunci Ring-Pass
4 Oli Mesin Bensin
5 Oli Mesin Solar
6 Soda api Kering (sebuk)
7 Spritus
8 Wallpaper
AN UPAH DAN BAHAN (BASIC PRICE)

MERK / TIPE / HARGA SATUAN


KODE SATUAN
MODEL DASAR
3 4 5 6

M001 M3 367,500.00
M02a M3 1,170,700.00
M02b M3 1,375,500.00
M02c M3 1,212,700.00
M02d M3 1,396,500.00
M02e M3 1,438,500.00
M02f M3 1,533,000.00
M02g M3 1,585,500.00
M02h M3 1,622,200.00
M02i M3 1,680,000.00
M02j M3 1,732,500.00
M02k M3 1,869,000.00
M02l M3 1,501,500.00
M02m M3 1,606,500.00
M02n M3 1,470,000.00
M03a Buah 1,500.00
M03b Buah 1,500.00
M04a Buah 47,000.00
M04b Buah 4,200.00
M05a Buah 32,500.00
M05b Buah 3,100.00
M05c M2 262,500.00
M06a M2 231,000.00
M06b M2 252,000.00
M06c M2 315,000.00
M06d M2 262,500.00
M06e M2 262,500.00
M06f M2 252,000.00
M06g M2 252,000.00
M06h M2 262,500.00
M06i M2 262,500.00
M06j M2 252,000.00
M07k Kg 15,700.00
M08a M2 252,000.00
M08b M3 550,000.00
M08c M3 625,000.00
M08d M3 620,000.00
M08e M3 620,000.00
M08f M3 273,000.00
M09g M3 625,000.00
M10a M3 625,000.00
M10b M3 650,000.00
M10c M3 650,000.00
M11a M3 650,000.00
M11b M3 650,000.00
M11c M3 650,000.00
M11d M3 650,000.00
M11e M3 580,000.00
M11f M2 367,500.00
M11g M2 367,500.00
M11h M2 367,500.00
M11i Buah 23,100.00
M12a Buah 13,300.00
M12b Buah 12,000.00
M12c Buah 126,000.00
M12d Buah 168,000.00
M12e Buah 189,000.00
M12f Buah 210,000.00
M12g Buah 168,000.00
M12h Buah 252,000.00
M12i Buah 168,000.00
M12j Buah 126,000.00
M12k Buah 157,500.00
M12l Buah 178,500.00
M12m Buah 147,000.00
M12n Buah 260,000.00
M13 Kg 27,000.00
M14 M3 650,000.00
M15a M3 320,000.00
M15b M3 320,000.00
M15c M3 135,000.00
M20 Kg 650,000.00
M21a M3 330,000.00
M21b M3 160,000.00
M21c M3 265,000.00
M16a M3 2,800.00
M16b Buah 2,800.00
M16c Buah 3,200.00
M16d Buah 3,200.00
M17a Liter Multidex 67,650.00
M17b Liter Multidex 748,000.00
M18 Bungkus 82,000.00
M19a Zak Acian 102,190.00
M19b Zak Gresik 63,800.00
M19c Zak Conch 61,600.00
M19d Zak Holchi 52,800.00
M19e Zak Tiga Roda 59,950.00
M19f Kg Tiga Roda 3,850.00
M19g zak GML 99,000.00
M19h Zak Tiga Roda 121,000.00
M19i Kg MU 18,700.00
M19j Zak GML 18,700.00
M19k zak Sika 335,500.00

M22 Batang 31,500.00


M23 Batang 63,000.00
M24 M2 63,000.00
M25 Kg 73,500.00
M26 M3 254,000.00
M27a M3 9,450,000.00
M27b M4 8,610,000.00
M27c M3 8,925,000.00
M27d M3 8,400,000.00
M28a M3 5,775,000.00
M28b M3 4,725,000.00
M28c M3 3,500,000.00
M29 M3 2,725,000.00
M30a M3 3,415,000.00
M30b M3 3,520,000.00
M30c M3 3,150,000.00
M31 M3 2,625,000.00
M32a Batang 735,000.00
M32b Batang 10,500.00
M33a Batang 31,500.00
M33b Batang 37,000.00
M33c Batang 47,000.00
M33d Batang 42,000.00
M33e Batang 47,000.00
M33f Batang 70,000.00
M33g Batang 47,000.00
M34a Lembar 115,500.00
M34b Lembar 152,000.00
M35a Lembar 80,000.00
M35b Lembar Plywood 115,500.00
M35c Lembar Plywood 189,000.00
M35d Lembar Plywood 249,900.00
M35e Lembar 310,000.00
M35f Lembar 68,000.00
M35g Lembar 126,000.00
M36a Batang 42,000.00
M36b Batang 47,000.00
M36c M3 4,200,000.00
M36d M3 2,730,000.00
M37 M3 15,225,000.00
M38 M3 6,825,000.00
M39 M3 6,825,000.00
M40 M3 5,250,000.00
M41 M3 1,890,000.00
M42 M3 4,200,000.00
M43 M3 4,725,000.00
M44 M3 5,250,000.00
M45a Batang 105,000.00
M45b Batang 21,000.00
M46a Batang Alau 15,700.00
M46b Batang Alau 17,800.00
M46c Batang Alau 18,900.00
M46d Batang Alau 21,000.00
M46e Batang Meranti 18,900.00
M46f Batang Alau 26,200.00
M46g Batang Alau 36,700.00
M47 Lembar 126,000.00
M48 Buah Matahari 168,000.00

M49a Roll RRT 635,000.00


M49b Roll Single Ply 520,000.00
M49c Roll Aplus 472,500.00
M49d Roll GML 861,000.00
M49e Roll GML 2,100,000.00
M50a Biji 49,000.00
M50b Biji 47,000.00
M50c Lembar Djabesmen 45,000.00
M50d Lembar Nusa 37,000.00
M50e Lembar Djabesmen 51,000.00
M51a Lembar Spyro 110,000.00
M51b Lembar Poso 94,500.00
M52a Lembar Soka Jempol 76,400.00
M52b Lembar Sakura MX 155,400.00
M52c M' Spandek 52,500.00
M52d Lembar Spandek 305,500.00
M53 Roll Global 2,300,000.00
M54a Roll Twinlite 2,446,500.00
M54b Roll Twinlite 2,730,000.00
M54c Roll Global 3,685,500.00
M54d Lembar Maspion 78,700.00
M55a Buah Sakura 65,000.00
M55b Buah Spyro 23,000.00
M56a Lembar Spyro 61,400.00
M56b Lembar Spyro Natural 116,300.00
M56c Lembar Surya Roof 78,700.00
M56d Lembar Multi Roof 93,400.00
M56e Lembar Sakura Roof (Tipe
Merpati) 56,700.00
M56f Lembar Sakura Roof (Tipe
Elang) 65,000.00
M57a Batang Spyro 124,900.00
M57b Batang Taso 124,900.00
M58a m' Cap Naga 70,300.00
M58b m' Gajah 28,300.00
M59a m' sp 52,500.00
M59b m' sp 26,200.00
M59c m' sp 42,000.00
M60a Lembar KalsiBoard 68,000.00
M60b Lembar NusaBoard 53,000.00
M60c Lembar KalsiBoard 89,000.00
M60d Lembar NusaBoard 79,000.00
M60e Lembar KalsiBoard 126,000.00
M60f Lembar KalsiBoard 126,000.00
M60g Lembar NusaBoard 114,400.00
M60h Lembar Nusaboard 57,700.00
M61a Lembar Nusaboard 194,000.00
M61b Lembar Nusa Plank 189,000.00
M61c Lembar JayaBoard 142,800.00
M62a Lembar GRC Board 78,700.00
M62b Lembar GRC Board 199,500.00
M62c Lembar GRC Board 94,500.00
M63a Btg Spyro 122,800.00
M63b Btg Taso 131,000.00
M63c Btg Spyro 113,400.00
M63d Btg Taso 120,700.00
M64a Btg 31,500.00
M64b Btg Spyro 31,500.00
M64c Btg Hollow 28,800.00
M64d Btg Spyro 34,600.00
M64e Btg Hollow 37,800.00
M65a Lembar Gajah Roket 67,000.00
M65b Lembar 72,400.00
M65c Lembar 84,000.00
M66 Btg Maspion 157,500.00

M67 m' 472,500.00


M68a Batang 242,000.00
M68b Batang 153,300.00
M68c Batang 192,000.00
M68d Batang 236,000.00
M68e Batang 159,000.00
M69a Batang 190,000.00
M69b Batang 252,000.00
M69c Batang 347,500.00
M69d Batang 362,200.00
M69e Batang 284,500.00
M69f Batang 328,600.00
M69g Batang 397,900.00
M69h Batang 441,000.00
M69i Batang 384,300.00
M69j Batang 542,800.00
M69k Batang 86,000.00
M69l Batang 112,000.00
M69m Batang 126,000.00
M69n Batang 183,700.00
M69o Batang 535,500.00
M70a Batang 29,000.00
M70b Batang 2,141,000.00
M70c Batang 2,987,000.00
M70d Batang 1,408,000.00
M70e Batang 937,600.00
M70f Batang 89,000.00
M70g Batang 179,500.00
M71a Batang 321,300.00
M71b Batang 230,000.00
M71c Batang 342,000.00
M71d Batang 441,000.00
M72a Batang 672,000.00
M72b Lembar 1,200,000.00
M72c Lembar 1,417,500.00
M72d Lembar 1,828,000.00
M72e Lembar 2,650,200.00
M73a Lembar 4,415,200.00
M73b kg 36,700.00
M73c kg 36,700.00
M73d kg 36,700.00
M73e kg 36,700.00
M73f kg 36,700.00
M74a Batang 23,650.00
M74b Batang 38,500.00
M74c Batang 66,550.00
M74d Batang 103,400.00
M74e Batang 149,600.00
M74f Batang 266,200.00
M74g Batang 396,000.00
M74h Kg 14,000.00
M75 Batang 135,400.00
M75a Batang 133,300.00
M75b Batang 114,400.00
M75c Batang 76,600.00
M75d Batang 99,700.00
M75e Batang 115,500.00
M75f Batang 132,300.00
M75g Batang 177,400.00
M75h Batang 164,800.00
M75i Batang 94,500.00
M75j Batang 63,000.00
M76a Batang 66,100.00
M76b Batang 69,300.00
M76c Batang 67,200.00
M76d Batang 80,800.00
M76e Batang 82,900.00
M77a Batang 82,900.00
M77b Batang 111,300.00
M77c Batang 91,300.00
M77d Batang 120,700.00
M77e Batang 109,200.00
M77f Batang 132,300.00
M77g Batang 165,900.00
M77h Batang 204,700.00
M77i Batang 197,400.00
M77j Batang 164,800.00
M77k Batang 236,200.00
M77l Batang 396,900.00
M78a Batang 389,500.00
M78b Batang 128,100.00
M79 Kg 13,600.00
M80 Kg 17,800.00
M81 Buah 29,400.00
M82a M2 Spyro 172,200.00
M82b M2 803,200.00
M83a M2 26,200.00
M83b Kg RRT 35,700.00
M83c Kg 388,800.00
M83d Roll 199,500.00
M83e Roll 406,800.00
M83f Kotak 413,400.00
M83g M2 294,000.00
M83h Roll 325,500.00
M83i m' 21,000.00
M84a Lembar 409,500.00
M84b Lembar 1,114,500.00
M85a Kg 36,700.00
M85b Kg 47,200.00
M85c Kotak 47,200.00
M85d Kotak 26,200.00
M85e Kotak 31,500.00
M85f Kotak 36,700.00
M85g Kotak 47,200.00
M85h Kotak 57,700.00
M85i Kotak 68,200.00
M85j Kg Paku JKT 33,600.00
M85k Kg Paku JKT 29,400.00
M85l Kg Paku JKT 26,200.00
M85m Kg Paku JKT 24,000.00
M85n Kg Paku JKT 24,000.00
M85o Kg Paku JKT 24,000.00
M85p Kg Paku JKT 24,000.00
M85q Kg 24,000.00
M85r Kg 25,200.00
M85s Kg 31,500.00
M85t Kg 47,200.00
M85u Buah 36,700.00
M85v Kg 36,700.00
M86a Batang Spido 122,800.00
M86b Batang 241,500.00
M86c Batang 365,400.00
M86d Batang 634,200.00
M86e Batang 1,184,400.00
M86f Batang 1,897,300.00
M86g Batang 162,700.00
M87a Batang 318,100.00
M87b Batang 174,000.00
M87c Batang 222,500.00
M87d Batang 338,100.00
M87e Batang 447,300.00
M87f Batang 514,500.00
M87g Batang 700,300.00
M87h Batang 1,669,500.00
M88a Batang MP 106,500.00
M88b Batang MP 162,700.00
M88c Batang MP 218,400.00
M88d Batang MP 276,100.00
M88e Batang MP 445,200.00
M88f Batang MP 695,100.00
M88g Batang 415,800.00
M88h Batang MP 580,600.00
M89a Batang 504,000.00
M89b Batang 703,500.00
M89c Batang 871,500.00
M90a Batang 24,100.00
M90b Batang 27,300.00
M90c Batang 36,700.00
M90d Batang 10,500.00
M90e Batang 34,600.00
M90f Batang 46,200.00
M90g Batang 32,500.00
M90h Batang 40,900.00
M90i Batang 60,900.00
M90j Batang 39,900.00
M90k Batang 55,600.00
M90l Batang 73,500.00
M90m Batang 109,200.00
M90n Batang 78,700.00
M90o Batang 96,600.00
M90p Batang 149,100.00
M90q Batang 75,600.00
M90r Batang 140,700.00
M90s Batang 257,200.00
M90t Batang 414,700.00
M90u Batang 483,000.00
M90v Batang 750,700.00
M91a Lembar 288,700.00
M91b Lembar 430,500.00
M91c Lembar 493,500.00
M91d Lembar 535,500.00
M91e Lembar 561,700.00
M91f Lembar 714,000.00
M91g Lembar 756,000.00
M91h Lembar 861,000.00
M91i Lembar 1,071,000.00
M92 Buah 808,500.00
M93a Lembar 283,500.00
M93b Roll 3,512,000.00
M93c Roll 5,000,000.00
M93d Lembar 1,050,000.00
M93e Lembar 1,627,500.00

M94 M2 13,600.00
M95a Dus Asia Tile 71,400.00
M95b Dus Roman 112,700.00
M95c Dus Setara 68,600.00
Mulia/Arwana
M95d Dus Setara Roman 63,000.00
M95e Dus Setara 75,300.00
Mulia/Arwana
M95f Dus Arwana/Diamond 84,000.00
M95g Dus Setara 65,300.00
Mulia/Arwana
M95h Dus Asia Tile 68,200.00
M95i Dus Setara Mulia 78,700.00
M95j Dus KIA 78,700.00
M95k Dus Setara 75,700.00
M95l Dus Mulia/Arwana
Setara Roman 141,700.00
M95m Dus Setara 63,000.00
M95n Dus Mulia/Arwana
Setara Roman 66,500.00
M95o Dus Platinum 105,000.00
M95p Dus Essenza 89,200.00
M95q Dus Essenza 81,900.00
M95r Dus Roman 115,500.00
M95s Dus Platinum 78,700.00
M95t Dus Garuda 294,000.00
M95u Dus Essenza 294,000.00
M95v Buah 7,300.00
M96 Dus Teraso Nilam 78,700.00

M97a Unit Gerber 278,200.00


M97b Unit Stars 175,800.00
M97c Unit Solid 382,200.00
M97d Unit Beluci 274,400.00
M97e Unit Dekson 318,100.00
M97f Unit SES 327,600.00
M98a Pasang Solid 60,900.00
M98b Pasang Gerber 139,100.00
M98c Pasang Union 47,200.00
M98d Buah 36,700.00
M98e Pasang Dekson 248,200.00
M98f Pasang Gerber 89,200.00
M98g Pasang Nylon 73,000.00
M98h Pasang VPR 36,700.00
M98i Pasang Dekson 57,700.00
M98j Pasang SES 262,500.00
M98k Pasang Union 15,700.00
M98l Buah 31,500.00
M99 Buah Mulia 29,400.00
M100a Buah Gerber 47,200.00
M100b Buah Solid 115,500.00
M100c Buah Gerber 47,200.00
M100d Buah Imperial 31,500.00
M100e Buah Solid 29,400.00
M100f Buah Belezza 39,900.00
M100g Buah Solid 88,200.00
M100h Buah Belezza 53,200.00
M100i Buah Gerber 131,200.00
M100j Buah Prime 88,200.00
M100k Buah Solid 88,200.00
M100l Buah Solid 124,300.00
M100m Buah Cobra 84,000.00
M100n Buah Gerber 189,000.00
M101a Buah Gerber 78,700.00
M101b Buah Beluci 48,000.00
M101c Buah Solid 37,200.00
M101d Buah Belezza 55,100.00
M101e Buah Solid 29,400.00
M101f Buah Solid 73,000.00
M101g Set Gerber 199,500.00
M102a Biji Solid 47,200.00
M102b Biji Areel 84,000.00
M102c Biji Miami 15,700.00
M102d Biji Cepelo 45,100.00
M103a Pasang Solid 185,800.00
M103b Pasang Handie 99,700.00
M103c Pasang Gerber 483,000.00
M104a Buah EB 157,500.00
M104b Buah Finotti 236,200.00
M105a M2 68,200.00
M105b M2 99,700.00
M106a M2 115,500.00
M106b M2 168,000.00
M107 M2 78,700.00
M108a M2 86,100.00
M108b M2 152,200.00
M108c M2 262,500.00
M108d M2 241,500.00
M109a M2 294,000.00
M109b M2 420,000.00
M109c M2 451,500.00
M109d M2 504,000.00
M110a M2 2,205,000.00
M110b M2 2,635,500.00
M110c M2 68,200.00
M110d M2 78,700.00
M110e M2 997,500.00
M110f Set 141,700.00
M110g Set 84,000.00
M111 Buah 26,200.00
M112a m' 39,000.00
M112b Roll 472,500.00
M113a Buah Finotti 212,600.00
M113b Buah Majesty 47,200.00
M113c Buah Gerber 76,100.00
M114a Set Urdos 126,000.00
M114b Set Nishio 105,000.00
M114c Set Royal 99,700.00
M114d Set SES 787,500.00
M114e Set Tessa 135,000.00
M114f Set Bellauci 335,000.00
M114g Set Erdos 131,200.00
M114h Set Finotti 240,000.00
M114i Set Kodai 171,500.00
M114j Set Solid 242,800.00
M114k Set Belleza 250,500.00
M114l Set Gerber 317,100.00

M115a Buah Royal 320,000.00


M115b Buah GML 367,700.00
M115c Buah Gabriel 577,500.00
M115d Buah Royal 583,000.00
M115e Buah GML 1,026,200.00
M115f Buah Elite 2,905,800.00
M116a Buah Bak Vue 361,600.00
M116b Buah Alco 394,000.00
M116c Buah Alco 333,000.00
M116d Buah Mardian 332,200.00
M116e Buah Mardian 462,000.00
M116f Buah Alco 1,861,800.00
M117 Unit 2,835,000.00
M118a Set Toto 3,382,300.00
M118b Set American Standart 1,728,100.00
M118c Set Trillion 2,251,300.00
M118d Set INA 2,577,400.00
M118e Set Toto 3,186,700.00
M118f Set American Standart 3,255,000.00
M118g Buah Toto 596,900.00
M118h Buah Duty 197,900.00
M118i Buah INA 262,500.00
M118j Buah TCI 341,200.00
M118k Buah American Standart 438,700.00
M118l Buah Toto 431,700.00
M118m Buah Duty 262,500.00
M119a Buah TCI 173,200.00
M119b Buah American Standart 360,100.00
M119c Buah INA 315,000.00
M119d Buah Trilliun 197,900.00
M119e Buah PVC 78,700.00
M119f Buah Amico 21,000.00
M120a Buah Amico 18,300.00
M120b Buah Amico 20,100.00
M120c Buah San Ei 333,000.00
M120d Buah Oir 333,000.00
M120e Buah Duffi 68,200.00
M120f Buah San Ei 274,100.00
M120g Unit Lakoni 1,162,400.00
M120h Unit Panasonic 682,500.00
M120i Unit Waser 1,222,600.00
M120j Unit Waser 4,429,800.00
M120k Unit Panasonic 557,000.00
M121 Unit Panasonic 525,000.00
M122a Unit Panasonic 787,500.00
M122b Unit Panasonic 1,036,700.00
M122c Unit Sanyo 898,800.00
M122d Unit Sanyo 997,500.00
M122e Unit Dragon 551,200.00
M122f Buah Onda 12,600.00
M122g Meter Sony House 57,700.00
M123a Meter Sony House 57,700.00
M123b Buah 131,200.00
M123c Buah Giosami 236,200.00
M123d Buah Arwana 909,500.00
M123e Buah Arwana 1,102,500.00
M123f Buah Arwana 3,440,800.00
M123g Buah Angsa 1,680,000.00
M123h Buah Arwana 3,333,700.00
M123i Buah Arwana 3,953,200.00
M123j Buah Arwana 5,355,000.00
M123k Buah Bionet 3,675,000.00
M124 Buah Bionet 4,095,000.00
M125a Buah Bionet 4,914,500.00
M125b Buah Bionet 5,691,000.00
M126a Buah Bionet 9,555,000.00
M126b Buah Bio Pro 5,458,400.00
M126c Buah Bio Pro 6,886,700.00
M126d Buah Bio Pro 8,316,500.00
M126e Buah Bio Pro 11,175,600.00
M126f Buah Bio Pro 5,843,100.00
M127a Buah Bio Pro 8,167,000.00
M127b Buah Bio Pro 10,109,100.00
M128a Buah Bio Pro 13,612,300.00
M128b Buah Bioshine 6,825,000.00
M128c Buah Bioshine 7,875,000.00
M128d Buah Bioshine 8,400,000.00
M128e Buah Bioshine 9,450,000.00
M128f Buah Bioshine 30,450,000.00
M128g Buah Bioshine 32,550,000.00
M129 Buah GEMBS 058 808,500.00
M130a Unit GEMBS 046 3,342,300.00
M130b Unit DUTY 525,000.00
M130c Unit American Standart 987,000.00
M130d Unit GML 8,104,500.00
M130e Unit GML 4,401,100.00
M130f Unit GML 2,404,200.00
M130g BUAH GML 1,447,100.00
M130h BUAH GML 2,434,800.00
M130i BUAH Duty 472,500.00
M130j BUAH American Standart 708,700.00

M131a Lembar Niken 99,700.00


M131b Roll Toiyo Jomli 372,700.00
M131c m' Flexigo 10,500.00
M132a Kaleng Dana Paint 157,500.00
M132b Kg Glotex 68,200.00
M132c Kg Avian 78,700.00
M132d Kg Dulux-V.Gloss 63,500.00
M132e kg Platone 68,200.00
M132f kg Avian 78,700.00
M132g Kg Platone 65,500.00
M132h Kg Sendai 68,200.00
M132i Kg Danalac 68,200.00
M132j Kg Nippon Paint 75,100.00
M132k Kg Djarum 199,500.00
M132l Kg Matex 178,500.00
M132m Liter Polibet 68,200.00
M132n Kg Indian 57,700.00
M133a Kg Nipon Paint 399,000.00
M133b M2 399,000.00
M133c Kg 19,900.00
M133d Kg 399,000.00
M134a Peil Mowilex 1,508,300.00
M134b Peil Jotun 1,884,000.00
M134c Peil Matex 498,700.00
M134d Peil Kimex 939,700.00
M134e Peil Vinilex 761,200.00
M134f Peil Peil 602,700.00
M134g Peil Matex 240,400.00
M134h Peil Kimex 110,200.00
M134i Peil Danabrite 147,000.00
M134j Peil Mowilex 174,500.00
M134k Peil Propan 157,500.00
M134l Peil Vinilex 153,300.00
M134m Peil Avitex 182,700.00
M134n Kaleng Mowilex 231,000.00
M134o Kaleng Jotun 325,500.00
M134p Kaleng Dulux Weathersild 399,000.00
M134q Kaleng Propan 231,600.00
M134r Peil Dulux Weathersild 2,572,500.00
M134s Peil Jotun 2,490,900.00
M134t Peil Mowilex 2,479,600.00
M134u Kaleng Dulux Weathersild 367,500.00
M134v Kaleng Mowilex 335,500.00
M134w Kaleng Jotun 346,200.00
M135a Zak Cornis 78,700.00
M135b Zak Master 274,800.00
M135c Zak Aplus 89,200.00
M135d Kaleng Alfha 92,000.00
M135e Kaleng Pedang 34,200.00
M136a Buah Crocodile 21,100.00
M136b Buah Eterna 11,100.00
M136c Buah Eterna 16,600.00
M136d Buah Crocodile 31,100.00
M136e Buah Eterna 31,100.00
M136f Buah Crocodile 48,800.00
M137a Gram Fox 61,900.00
M137b Kg Fox 35,000.00
M137c Gram Fox 23,100.00
M138 Kg Nippon 68,200.00
M139a Kg Polibast 57,700.00
M139b Kg Polibast 218,700.00
M139c Kg Avian 173,200.00
M139d Kg Indian 56,100.00
M140a Kaleng Pegasus 61,100.00
M140b Kaleng Avian 136,500.00
M140c Kaleng Impra 105,000.00
M140d Kaleng Cemerlang 29,500.00
M140e Kaleng Cemerlang 98,300.00
M141a Kg Nipon Paint 68,200.00
M141b Kg Matex 65,100.00
M141c Kg Avitex 63,600.00
M141d Kg Dulux 945,000.00
M141e Kg Propan 23,100.00
M141f Kg Kuda Terbang 23,100.00
M141g Kg Giant Morta GM 30,400.00
M141h Kg Jaguar 24,100.00
Kg Sapporo Wall Putty
M141i 21,000.00
M141j Kg RJ London 65,100.00
M141k Kg Mowilex 99,700.00
M141l Kg Afatex Plamir 89,200.00
M141m Kg Catylac Plamir 283,500.00
M141n Kg Weber Plaints 29,400.00
M141o Kg Mowilex 54,600.00
Kg Sapporo Wall Putty
M141p 52,500.00
M141q Kg Propan 61,900.00
M141r Kg Jaguar 78,700.00
M141s Kg Afatex Plamir 89,200.00
M141t Kg Dulux 96,600.00
M141u Kg Mowilex 102,900.00
M141v Kg Giant Morta GM 147,000.00
M141w Kg Kuda Terbang 257,200.00
M141x Kg Nippon Paint 283,500.00
M141y Kg Afatex Plamir 336,000.00
M142 m' 14,500.00
M143 Kg 42,000.00
M144a Buah Imundex 40,100.00
M144b Buah Eterna 42,000.00
M144c Buah Admiral 37,800.00
M145a tube dextona 30,200.00
M145b Kotak 228,300.00
M146 Kg Impra 348,000.00
M147 Tube Ultra Clear 85,400.00
M148 Kg Nipon Paint 225,700.00
M149a Kg Aqua Proof 189,000.00
M149b Kg No Drof 262,500.00
M149c Kg Infra 52,500.00

M150a Buah Hpin 52,500.00


M150b Buah ml SB white E 40 315,000.00
M151a Unit 12,600.00
M151b Unit Broco 18,900.00
M151c Unit Broco 26,200.00
M151d Unit Broco 33,600.00
M151e Unit Masko 27,300.00
M151f Unit Masko 35,700.00
M151g Unit Broco 65,000.00
M151h Unit Broco 49,800.00
M152a Buah Linder 173,200.00
M152b Buah Linder 924,000.00
M152c Buah Linder 511,300.00
M152d Buah Clipton 428,400.00
M152e Buah Linder 903,000.00
M152f Buah Clipton 1,003,800.00
M152g Buah Linder 511,300.00
M152h Buah Linder 1,031,100.00
M153a Buah Iwata 23,000.00
M153b Buah Iwata 36,700.00
M153c Buah Broco 26,200.00
M154a m Unible 10,500.00
M154b m National 8,400.00
M154c m 57,700.00
M154d m 52,500.00
M155a m BC 30,900.00
M155b m BC 33,000.00
M155c m BC 49,800.00
M156a m BC 23,100.00
M156b m BC 36,700.00
M156c m BC 49,300.00
M156d m 3,200.00
M156e Rol Sutrado 190,000.00
M156f Rol Eterna 178,500.00
M156g Rol Eterna 422,600.00
M156h Rol Sutrado 325,500.00
M156i Rol Eterna 422,600.00
M156j Rol Supreme 234,300.00
M156k m Merah 6,500.00
M156l Rol Sutrado 303,100.00
M156m Rol Eterna 252,000.00
M156n Rol Sutrado 252,000.00
M156o Rol Eterna 987,000.00
M156p Rol Merah 483,000.00
M156q Rol Supreme 385,500.00
M156r Rol Sutrado 303,100.00
M157a m Eterna 13,600.00
M157b Rol Sutrado 7,100.00
M157c Rol Eterna 498,700.00
M157d Rol Sutrado 315,000.00
M158a Rol Eterna 841,400.00
M158b Rol Supreme 810,600.00
M158c Rol Sutrado 740,800.00
M158d m Eterna 15,700.00
M158e Rol Sutrado 10,500.00
M158f Rol Eterna 661,500.00
M158g Rol Sutrado 585,900.00
M158h Rol Eterna 1,323,000.00
M158i Rol Supreme 1,131,900.00
M158j Rol Sutrado 1,058,400.00
M158k m Eterna 19,900.00
M158l Rol Sutrado 15,900.00
M158m Rol Eterna 1,701,000.00
M158n m Eterna 15,700.00
M158o m Eterna 14,700.00
M158p Rol Sutrado 9,200.00
M158q Rol Sutrado 13,100.00
M159a Rol Eterna 609,000.00
M159b Rol Sutrado 404,000.00
M159c Rol Eterna 791,700.00
M159d Rol Sutrado 574,800.00
M159e Rol Eterna 1,050,400.00
M159f Rol Sutrado 808,500.00
M159g Rol Eterna 1,748,200.00
M159h Rol Sutrado 1,149,700.00
M159i Rol Sutrado 27,800.00
M159j Rol Eterna 1,333,500.00
M159k Rol Sutrado 968,600.00
M159l m Eterna 16,500.00
M160a Rol Sutrado 190,000.00
M160b Rol Sutrado 2,675,400.00
M160c Rol Eterna 2,803,500.00
M160d Rol Sutrado 303,100.00
M160e Rol Eterna 1,617,000.00
M160f Rol Sutrado 1,099,300.00
M160g Rol Sutrado 630,000.00
M161a Rol Eterna 2,436,000.00
M161b m Eterna 129,700.00
M161c m Sutrado 92,400.00
M161d m Eterna 157,500.00
M161e m Sutrado 128,100.00
M162 m Ext 15,700.00
M163a Kg RRT 173,200.00
M163b Kg RRT 176,400.00
M164a Kg RRT 191,100.00
M164b Buah 15,700.00
M165 Buah Phillips 124,100.00
M166 Buah Phillips 208,900.00
M167a Buah Phillips 362,200.00
M167b Buah Phillips 17,700.00
M167c Buah Chiyoda 8,900.00
M167d Buah Phillips 37,900.00
M167e Buah Phillips 33,600.00
M167f Buah Phillips 35,900.00
M167g Buah Phillips 61,900.00
M167h Buah Phillips 86,100.00
M167i Buah Phillips 66,100.00
M167j Buah Phillips 105,000.00
M167k Buah Phillips 231,500.00
M167l Set Phillips 136,500.00
M167m Set Phillips 189,000.00
M167n Set Phillips 210,000.00
M167o Set Phillips 262,500.00
M167p Buah Schneider 93,000.00
M167q Buah Schneider 85,000.00
M168a Buah Schneider 92,800.00
M168b Buah Schneider 106,200.00
M168c Buah Schneider 234,800.00
M168d Buah Schneider 271,400.00
M168e Buah Schneider 380,800.00
M169a Buah Schneider 388,000.00
M169b Buah Schneider 442,600.00
M169c Buah Schneider 640,500.00
M169d Buah 562,100.00
M169e Buah Selcon 138,600.00
M169f Buah Ewig 78,700.00
M169g Buah Selcon 192,100.00
M169h Buah Ewig 84,000.00
M169i Buah Broco 21,000.00
M169j Buah Broco 21,000.00
M170 Buah RRT 168,000.00
M171a Buah RRT 198,400.00
M171b Set 288,700.00
M171c Set 393,700.00
M171d Buah Masko 31,500.00
M172a Buah Broco 19,400.00
M172b Buah 26,200.00
M173 Buah Broco 52,500.00
M174a Titik 52,500.00
M174b Titik 231,000.00
M175a Buah Clipton 7,800.00
M175b Batang 5,932,500.00
M176a Batang 8,190,000.00
M176b Batang 13,755,000.00
M176c Batang 4,987,500.00
M176d Buah Theben 483,000.00
M176e Titik 341,000.00
M176f Titik 288,700.00
M177 Set 12,600.00
M178a Buah 36,700.00
M178b Buah Schneider 383,200.00
M178c Buah Schneider 430,500.00
M178d Buah Schneider 351,700.00
M179 Buah Schneider 583,000.00
M180a Buah Schneider 420,000.00
M180b m' Schneider 6,300.00
M181 m' Schneider 13,600.00

M182a Buah Jaya Tibel 10,500.00


M182b Buah Langgeng 7,300.00
M182c Buah Langgeng 8,400.00
M183a Buah 9,400.00
M183b Buah 18,000.00
M183c Buah 6,300.00
M183d Buah 33,900.00
M183e Batang 315,000.00
M183f Batang 411,600.00
M184a Batang 479,800.00
M184b Buah 23,000.00
M184c Buah 22,000.00
M184d Batang Spindo 59,800.00
M184e Batang Spindo 149,900.00
M184f Batang Spindo 390,600.00
M184g Batang Spindo 519,700.00
M184h Batang Spindo 596,400.00
M184i Batang Spindo 806,400.00
M184j Batang Spindo 914,500.00
M184k Batang Spindo 1,328,200.00
M184l Batang Spindo 1,921,500.00
M185a Batang Maspion 57,700.00
M185b Batang Pralon 42,000.00
M185c Batang Wavin 36,700.00
M185d Batang Maspion 71,400.00
M185e Batang Pralon 52,500.00
M185f Batang Wavin 44,100.00
M185g Batang Langgeng 40,400.00
M186a Batang Maspion 94,500.00
M186b Batang Pralon 57,700.00
M186c Batang Wavin 60,900.00
M186d Batang Langgeng 51,300.00
M186e Batang Maspion 126,000.00
M186f Batang Pralon 86,100.00
M186g Batang Power 89,200.00
M186h Batang Langgeng 72,500.00
M186i Batang Maspion 162,700.00
M186j Batang Pralon 105,000.00
M186k Batang Wavin 117,600.00
M186l Batang Langgeng 102,900.00
M187a Batang Maspion 236,200.00
M187b Batang Pralon 126,000.00
M187c Batang Wavin 152,200.00
M187d Batang Langgeng 152,700.00
M187e Batang Maspion 262,500.00
M187f Batang Pralon 206,800.00
M187g Batang Power 189,000.00
M187h Batang Wavin 220,500.00
M188a Batang Maspion 435,700.00
M188b Batang Power 294,000.00
M188c Batang Pralon 267,700.00
M189a Batang Wavin 284,500.00
M189b Batang Wavin 603,700.00
M189c Batang Power 441,000.00
M189d Batang Maspion 446,200.00
M189e Batang Langgeng 414,700.00
M190a Batang Pralon 603,700.00
M190b Batang Power 889,300.00
M191a Batang Power 1,391,200.00
M191b Batang Power 1,958,200.00
M192a Batang Power 2,829,700.00
M192b Batang Power 678,300.00
M193a Batang Power 940,300.00
M193b Batang Power 1,520,700.00
M194 Batang Power 2,351,300.00
M195a Batang Maspion 126,000.00
M195b Batang Pralon 89,200.00
M195c Batang Wavin 86,100.00
M195d Batang Maspion 162,700.00
M196a Batang Pralon 96,600.00
M196b Batang Wavin 85,500.00
M196c Batang Maspion 236,200.00
M196d Batang Wavin 123,900.00
M196e Batang Pralon 140,700.00
M196f Batang Maspion 262,500.00
M197a Batang Wavin 126,000.00
M197b Batang Pralon 189,000.00
M197c Batang Power 252,000.00
M197d Batang Wavin 162,700.00
M197e Batang Pralon 204,700.00
M197f Batang Power 351,700.00
M198a Batang Pralon 336,000.00
M198b Batang Wavin 257,200.00
M198c Batang Power 379,000.00
M198d Batang Pralon 701,400.00
M198e Batang Wavin 504,000.00
M198f Batang Power 822,100.00
M198g Batang Power 1,436,400.00
M199a Batang Power 1,957,200.00
M199b Batang Power 465,000.00
M199c Batang Power 822,000.00
M200a Batang Power 1,252,600.00
M200b Batang Power 1,764,000.00
M201a Batang Pralon 12,600.00
M201b Batang Pralon 31,500.00
M202a Batang Pralon 42,000.00
M202b Batang Pralon 57,700.00
M203a Buah Jaya 7,300.00
M203b Buah Langgeng 10,500.00

M204a Kg 17,400.00
M204b Drum 2,697,000.00

M205 Liter 12,000.00


M206 Set Tekiro 336,000.00
M207 Set Ken Master 157,500.00
M208 Liter Mesram 42,700.00
M209 Liter Mesram 50,000.00
M210 Bungkus NaOH 24,300.00
M211 Liter GML 19,500.00
M212 Roll Zinia 898,800.00
Per kg : Rp 361
Per kg : 228.57142857
Per kg :
Per kg :
Per kg : 2554.75
Per kg : 1595
Per kg : 1540
Per kg : 1320
Per kg : 1498.75
m; Rp 10,500

Rp 3,925
Per kg : 14040.084388
Per kg : 13972.972973
Per kg : 13981.308411
Per kg : 14010.526316
per buah Rp 6,882
per buah Rp 12,882
DAFTAR HARGA SATUAN UPAH DAN BAHAN (BASIC PRICE)

1. UPAH TENAGA KERJA KONSTRUKSI

1 UPAH TENAGA KERJA KONSTRUKSI


NO. URAIAN / TENAGA KERJA KODE
1 2 3

I PEKERJAAN TANAH DAN BATU/ BETON


1 Mandor L.04
2 Kepala Tukang Batu L.03
3 Tukang Batu L.02
4 Tukang Gali Tanah L.02

II PEKERJAAN BESI
1 Mandor L.04
2 Kepala Tukang Besi L.03
3 Tukang Besi L.02

III PEKERJAAN KAYU


1 Mandor L.04
2 Kepala Tukang Kayu L.03
3 Tukang Kayu L.02

IV PEKERJAAN CAT
1 Mandor L.04
2 Kepala Tukang Cat L.03
3 Tukang Cat L.02

V MEKANIK DAN OPERATOR ALAT BERAT


1 Mekanik L.07
2 Operator Terlatih L.08
3 Operator Amphibious Excavator L.08
4 Pembantu Operator L.09
5 Supir Material/Truck L.10
6 Supir Personil L.11
7 Pembantu Supir/ Kenek L.12

VI PEKERJA/ BURUH

1 Pekerja Normalisasi Saluran Drainase/Irigasi L.05


2 Pekerja L01

VII PEKERJAAN TERTENTU

1 Tukang Listrik L.02


2 Pembantu Tukang Listrik L.02
3 Tukang Las L.02
4 Tukang Pancang L.02
5 Tukang Anyam L.02
6 Penjaga Malam L.06
BAHAN (BASIC PRICE)

A KONSTRUKSI
SATUAN HARGA UPAH
4 5

Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00
Org/Hari 173,000.00

Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00

Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00

Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00

Org/Hari 577,000.00
Org/Hari 525,000.00
Org/Hari 525,000.00
Org/Hari 288,000.00
Org/Hari 288,000.00
Org/Hari 210,000.00
Org/Hari 168,000.00

Org/Hari 183,000.00
Org/Hari 178,000.00

Org/Hari 315,000.00
Org/Hari 183,000.00
Org/Hari 262,000.00
Org/Hari 183,000.00
Org/Hari 183,000.00
Org/Hari 183,000.00
PERHITUNGAN BIAYA PELAKSANAAN
SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) KONST

Harga
No Uraian Satuan Volume
Satuan
1 Penyiapan RK3K terdiri atas :
Pembuatan Manual, Prosedur, Instruksi Kerja,
a Set 1 Rp 350,000
Izin Kerja, dan Formulir

2 Sosialisasi dan Promosi K3 Terdiri Atas :


a Pengarahan K3 (Safety Briefing) Orang 5 Rp 10,000

3 Alat Pelindung Kerja (APK) Terdiri Atas


a Pembatas Area (Restricted Area) LS 1 Rp 300,000

4 Alat Pelindung Diri (APD) Terdiri Atas


a Topi Pelindung (Safety Helmet) Buah 5 Rp 65,000
b Pelindung Pernafasan dan Mulut (Masker) Buah 5 Rp 5,000
c Sarung Tangan (Safety Gloves) Pasang 5 Rp 25,000
d Sepatu Keselamatan (Safety Shoes) Pasang 5 Rp 300,000
e Rompi Keselamatan (Safety Fest) Buah 5 Rp 50,000

5 Asuransi dan Perijinan Terdiri Atas


a BPJS Ketenagakerjaan dan Kesehatan Kerja LS 1 Rp 1,000,000

6 Personil K3 Terdiri Atas


a Petugas K3 OB 1 Rp 3,000,000

7 Fasilitas Sarana Kesehatan


a Peralatan P3K (Kotak P3K, Obat Luka, Perban) LS 1 Rp 1,000,000

8 Rambu - Rambu Terdiri Atas


a Rambu Petunjuk Buah 1 Rp 150,000
b Rambu Larangan Buah 1 Rp 150,000
c Rambu Peringatan Buah 1 Rp 150,000
d Tongkat Pengatur Lalu Lintas (Warning Light) Buah 2 Rp 150,000

9 Lain- Lain Terkait Pengendalian Resiko K3


a Alat Pemadam Api Ringan 6 kg (APAR) Buah 1 Rp 600,000
b Lampu Darurat (Emergency Lamp) Buah 1 Rp 150,000
c Pelaporan dan Penyelidikan Insiden LS 1 Rp 300,000

TOTAL
SANAAN
AN KERJA (SMK3) KONSTRUKSI

Total Harga
Keterangan
(Rp)

Rp 350,000

Rp 50,000

Rp 300,000

Rp 325,000 Staf & Tamu


Rp 25,000
Rp 125,000
Rp 1,500,000
Rp 250,000

Rp 1,000,000

Rp 3,000,000 (Resiko K3 Rendah)

Rp 1,000,000

Rp 150,000
Rp 150,000
Rp 150,000
Rp 300,000

Rp 600,000
Rp 150,000
Rp 300,000

Rp 9,725,000
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILITAS

% TERHADAP TOTAL BIAYA PROYEK = 24,4500 %

No. URAIAN SATUAN VOL

A. Sewa Tanah M2 300

B. PERALATAN LS 11
1 Aspal Finisher
2 Aspal Sprayer
3 Buldozer
4 Compresor
5 Dump truck
6 Excavator
7 Generator set
8 Motor Grader
9 Three Whell Roller
10 Vibro Roller
11 Water Tanker

C. Kantor Lapangan Dan Fasilitas 1


1 Base Camp
2 Kantor
3 Barak
4 Bengkel
5 Gudang, dan lain-lain
6 .............

D. MOBILISASI FASILITAS LABORATORIUM set 1


1 Ruang Laboratorium (sesuai Gambar)

2 Soil & Aggregate Testing


Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor

4 Concrete Testing
Slump Cone Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine

5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium)

E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi LS 1
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli Jembatan
4 .............................
5 .............................

F. Manajemen dan keselamatan lalu lintas LS

LS
G. DEMOBILISASI 1

Total Biaya Mobilisasi


Lembar 1.2-1
HARGA JUMLAH
SATUAN HARGA

Rp 3,000.00 Rp 900,000.00

Rp 100,000,000.00 Rp 100,000,000.00

Rp 100,000,000.00 Rp 100,000,000.00

Rp 124,000,000.00 Rp 124,000,000.00
Rp 25,000,000.00 Rp 25,000,000.00

Rp 50,000,000.00

Rp 130,290,000.00 Rp 130,290,000.00

Rp 530,190,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 2.1 (1)
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Mandor (L03) Jam
JU

B BAHAN
-
JU

C PERALATAN
1. Excavator (E10a) Jam
2. Dump Truck (E08) Jam
3. Alat Bantu LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)


PERKIRAAN VOL PEK : 1,00
uk Selokan Drainase dan Saluran Air TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.1606 Rp 30,000.000 Rp 4,818.000


0.0268 Rp 37,428.571 Rp 1,003.086
JUMLAH HARGA TENAGA Rp 5,821.086

JUMLAH HARGA BAHAN 0

0.0268 Rp 632,144 Rp 16,941.447


0.0943 Rp 355,058 Rp 33,481.963
1 Rp - Rp -
JUMLAH HARGA PERALATAN Rp 50,423.410

AN (A+B+C) Rp 56,244.496

Rp 5,624.450

Rp 61,868.945
DIVISI III PEKERJAAN TANAH

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 3.3 (1)
JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2

Perkiraan
No. Komponen Satuan
Kuantitas
A. TENAGA
1. Pekerja (L01) Jam 0.0034
2. Mandor (L03) Jam 0.0017
JUMLAH HAR

B BAHAN
-
JUMLAH HA

C PERALATAN
1. Motor Grader (E13) Jam 0.0017
2. Tandem/Vibro Roller (E17) Jam 0.0244
3. Alat Bantu LS 1
JUMLAH HARGA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 3.1.(6)
JENIS PEKERJAAN : Galian dengan kedalaman 4-6 meter
SATUAN PEMBAYARAN : M3

Perkiraan
No. Komponen Satuan
Kuantitas
A. TENAGA
1. Pekerja (L01) Jam 0.0461
2. Mandor (L03) Jam 0.0038
JUMLAH HAR

B BAHAN
1. Urugan Pilihan (EI-32 2) M3 1.875
2. Bahan Pengamatan Tebing Galian M3 0.6
JUMLAH HA

C PERALATAN
1. Excavator (E10a) Jam 0.0038
2. Dump Truck (E08) Jam 0.033347
3. Alat Bantu LS 1
JUMLAH HARGA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 3.2.(2a)
JENIS PEKERJAAN : Timbunan Biasa Dari Hasil Galian
SATUAN PEMBAYARAN : M3

Perkiraan
No. Komponen Satuan
No. Komponen Satuan
Kuantitas
A. TENAGA
1. Pekerja (L01) Jam 0.0159
2. Mandor (L03) Jam 0.004
JUMLAH HAR

B BAHAN
1. Bahan Pilihan (M09) M3 1.2
JUMLAH HA

C PERALATAN
1. Wheel Loader (E15) Jam 0.0085
2. Dump Truck (E09) Jam 0.141
3. Motor Grader (E13) Jam 0.004
4. Tandem (E17) Jam 0.0112
5. Water Tanker (E23) Jam 0.0341
6. Alat Bantu LS 1
JUMLAH HARGA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)


ANAH

PERKIRAAN VOL PEK : 1,00


TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

Rp 30,000.000 Rp 102.000
Rp 37,428.571 Rp 63.629
JUMLAH HARGA TENAGA Rp 165.629

JUMLAH HARGA BAHAN 0

Rp 440,419 Rp 748.712
Rp 259,857 Rp 6,340.513
Rp -
JUMLAH HARGA PERALATAN Rp 7,089.225

Rp 7,254.854

Rp 725.485

Rp 7,980.339
PERKIRAAN VOL PEK : 1,00
TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

Rp 30,000.000 Rp 1,383.000
Rp 37,428.571 Rp 142.229
JUMLAH HARGA TENAGA Rp 1,525.229

Rp 265,000 Rp 496,875
Rp 1,250,000 Rp 750,000
JUMLAH HARGA BAHAN Rp 1,246,875

Rp 632,144 Rp 2,402.145
Rp 355,058 Rp 11,840.117
Rp -
JUMLAH HARGA PERALATAN Rp 14,242.262

Rp 1,262,642.491

Rp 126,264.249

Rp 1,388,906.740

PERKIRAAN VOL PEK : 1,00


TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

Rp 24,714.286 Rp 392.957
Rp 37,428.571 Rp 149.714
JUMLAH HARGA TENAGA Rp 542.671

Rp 25,000 Rp 30,000
JUMLAH HARGA BAHAN Rp 30,000

Rp 344,983
Rp 2,932.358
Rp 556,006
Rp 78,396.809
Rp 440,419
Rp 1,761.676
Rp 259,857
Rp 2,910.399
Rp 371,529
Rp 12,669.127
Rp -
JUMLAH HARGA PERALATAN Rp 98,670.369

Rp 129,213.040

Rp 12,921.304

Rp 142,134.344
DIVISI 4 PEKERJAAN PERKERASAN DAN BAHU JALAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 5.1.(3)
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S
SATUAN PEMBAYARAN : M3

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Mandor (L03) Jam
JUM

B BAHAN
1. Agregat S M3 M3
JU

C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. Motor Grader (E13) Jam
4. Vibratory Roller (E19a) Jam
5. Alat Bantu LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)


AAN PERKERASAN DAN BAHU JALAN

PERKIRAAN VOL PEK : 1,00


si Agregat Kelas S TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.0779 Rp 25,428.571 Rp 1,980.886


0.0097 Rp 37,428.571 Rp 363.057
JUMLAH HARGA TENAGA Rp 2,343.943

1.289 Rp 650,000 Rp 837,850


JUMLAH HARGA BAHAN Rp 837,850

0.0087 Rp 344,983 Rp 3,001.355


0.136 Rp 355,058 Rp 48,287.878
0.001 Rp 440,419 Rp 440.419
0.0097 Rp 314,327 Rp 3,048.974
1 Rp -
JUMLAH HARGA PERALATAN Rp 54,778.626

N (A+B+C) Rp 894,972.569

Rp 89,497.257

Rp 984,469.826
DIVISI V PEKERJAAN BERBUTIR

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 5.1.(1)
JENIS PEKERJAAN : Lapis Pondasi Atas Agregat Kelas A
SATUAN PEMBAYARAN : M3

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Mandor (L03) Jam
JUM

B BAHAN
1. Agregat A M26 M3
JU

C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. Motor Grader (E13) Jam
4. Vibratory Roller (E19a) Jam
5. Alat Bantu LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)


PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 5.2.(1)
JENIS PEKERJAAN : Lapis Pondasi Bawah Agregat Kelas B
SATUAN PEMBAYARAN : M3

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Mandor (L03) Jam
JUM

B BAHAN
1. Agregat B M26 M3
JU

C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. Motor Grader (E13) Jam
4. Vibratory Roller (E19a) Jam
5. Alat Bantu LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)


I V PEKERJAAN BERBUTIR

PERKIRAAN VOL PEK : 1,00


si Atas Agregat Kelas A TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.0779 Rp 26,143 Rp 2,036.529


0.0097 Rp 37,429 Rp 363.057
JUMLAH HARGA TENAGA Rp 2,399.586

1.289 Rp 650,000 Rp 837,850


JUMLAH HARGA BAHAN Rp 837,850

0.0087 Rp 344,983 Rp 3,001.355


0.136 Rp 355,058 Rp 48,287.878
0.001 Rp 440,419 Rp 440.419
0.0097 Rp 314,327 Rp 3,048.974
1 Rp -
JUMLAH HARGA PERALATAN Rp 54,778.626

N (A+B+C) Rp 895,028.212

Rp 89,502.821

Rp 984,531.033
PERKIRAAN VOL PEK : 1,00
si Bawah Agregat Kelas B TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.1558 Rp 26,143 Rp 4,073.057


0.0195 Rp 37,429 Rp 729.857
JUMLAH HARGA TENAGA Rp 4,802.914

1.289 Rp 748,000 Rp 964,172


JUMLAH HARGA BAHAN Rp 964,172

0.0087 Rp 344,983 Rp 3,001.355


0.136 Rp 355,058 Rp 48,287.878
0.0019 Rp 440,419 Rp 836.796
0.0195 Rp 314,327 Rp 6,129.381
1 Rp -
JUMLAH HARGA PERALATAN Rp 58,255.410

N (A+B+C) Rp 1,027,230.324

Rp 102,723.032

Rp 1,129,953.356
DIVISI VI PEKERJAAN ASPAL

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 6.1.(1)
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair/Emulsi
SATUAN PEMBAYARAN : Liter

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Mandor (L03) Jam
JUM

B BAHAN
1. Aspal Emulsi CSS-1 (M31a) Kg
JU

C PERALATAN
1. Asp. Distributor (E41) Jam
2. Compressor (E05) Jam
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 6.3.(5a)
JENIS PEKERJAAN : Laston Lapis Aus (AC - WC)
SATUAN PEMBAYARAN : Ton

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Mandor (L03) Jam
JUM

B BAHAN
1. A g r Peh Mesin 5 - 10 & 10 - 15 (M92) M3
2. A g r Peh Mesin 0 - 5 (M91) M3
3. Semen (M12) Kg
4. Aspal (M10) Kg
JU

C PERALATAN
1. Wheel Loader (E15) Jam
2. AMP (E01) Jam
3. Genset (E12) Jam
4. Dump Truck (E09) Jam
5. Asp. Finisher (E02) Jam
6. Tandem Roller (E17a) Jam
7. P. Tym Roller (E18) Jam
8. Alat Bantu (E01) LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 6.2.(1)
JENIS PEKERJAAN : Agregat Penutup BURTU
SATUAN PEMBAYARAN : M2

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Mandor (L03) Jam
JUM

B BAHAN
1. Chipping (M92) M3
JU

C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. P. Tyre Roller (E18) Jam
4. Alat Bantu (E01) LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)


SI VI PEKERJAAN ASPAL

PERKIRAAN VOL PEK : 1,00


Pengikat - Aspal Cair/Emulsi TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.0015 Rp 37,428.571 Rp 56.143


0.0007 Rp 25,428.571 Rp 17.800
JUMLAH HARGA TENAGA Rp 73.943

1.7167 Rp 10,500 Rp 18,025.350


JUMLAH HARGA BAHAN Rp 18,025.350

0.0002 Rp 327,474 Rp 65.495


0.00073 Rp 115,556 Rp 84.356
JUMLAH HARGA PERALATAN Rp 149.850

N (A+B+C) Rp 18,249.143

Rp 1,824.914

Rp 20,074.058
PERKIRAAN VOL PEK : 1,00
s Aus (AC - WC) TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.2008 Rp 25,428.571 Rp 5,106.057


0.0201 Rp 37,428.571 Rp 752.314
JUMLAH HARGA TENAGA Rp 5,858.371

0.3206 Rp 625,000 Rp 200,375


0.4193 Rp 650,000 Rp 272,545
9.682 Rp 1,595 Rp 15,442.790
62.315 Rp 17,400 Rp 1,084,281
JUMLAH HARGA BAHAN Rp 1,572,643.790

0.0054 Rp 344,983 Rp 1,862.910


0.0201 Rp 9,722,227 Rp 195,416.757
0.0201 Rp 107,451 Rp 2,159.757
0.0491 Rp 556,006 Rp 27,299.882
0.0125 Rp 550,182 Rp 6,877.281
0.0128 Rp 259,857 Rp 3,326.171
0.0084 Rp 298,868 Rp 2,510.488
1 Rp -
JUMLAH HARGA PERALATAN Rp 239,453.245

N (A+B+C) Rp 1,817,955.407

Rp 181,795.541

Rp 1,999,750.947
PERKIRAAN VOL PEK : 1,00
utup BURTU TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.0132 Rp 26,142.857 Rp 345.086


0.0013 Rp 37,428.571 Rp 48.657
JUMLAH HARGA TENAGA Rp 393.743

0.0132 Rp 625,000 Rp 8,250


JUMLAH HARGA BAHAN Rp 8,250.000

0.00008 Rp 344,983 Rp 27.599


0.00085 Rp 556,006 Rp 472.605
0.00066 Rp 298,868 Rp 197.253
1 Rp -
JUMLAH HARGA PERALATAN Rp 697.456

N (A+B+C) Rp 9,341.199

Rp 934.120

Rp 10,275.319
DIVISI VII PEKERJAAN HARIAN & LAIN - LAIN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 9.2 (1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
JUM

B BAHAN
1. Cat Marka Termoplastik (M17b) Kg
2. Glass Bead (M34) M3
JU

C PERALATAN
1. Dump Truck (E08) Jam
2. Thermoplastic Road Marking Machine (E85) Jam
3. Alat Bantu LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 9.2 (3a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaan
Pemantul Engineering Grade
SATUAN PEMBAYARAN : M3

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
JUM

B BAHAN
1. Plat Rambu (M35a) Buah
2. Pipa Galvanis Diameter 5" (M24) Batang
3. Beton Fc' = 20 Mpa (M60) M3
JU

C PERALATAN
1. Dump Truck (E08) Jam
2. Alat Bantu LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 7.3 (1)
JENIS PEKERJAAN : Baja Tulangan Polos BjTP 280
SATUAN PEMBAYARAN : M3

No. Komponen Satuan


A. TENAGA
1. Pekerja (L01) Jam
2. Tukang (L02) Jam
3. Mandor (L03) Jam
JUM

B BAHAN
1. Rel Pengaman (Termasuk Tiang Blok Baut) (M36) M
JU

C PERALATAN
1. Dump Truck (E08) Jam
2. Alat Bantu LS
JUMLA

D JUMLAH HARGA TENAGA, BAHAN, DAN PERALATAN (A+B+C)

E OVERHEAD & PROFIT (10,0% x D)

F HARGA SATUAN PEKERJAAN (D+E)


AN HARIAN & LAIN - LAIN

PERKIRAAN VOL PEK : 1,00


Termoplastik TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.1428 Rp 26,142.857 Rp 3,733.200


0.0178 25,428.57 Rp 452.629
0.0178 Rp 37,428.571 Rp 666.229
JUMLAH HARGA TENAGA Rp 4,852.057

3.3218 Rp 19,900 Rp 66,103.820


0.4635 Rp 28,600 Rp 13,256.100
JUMLAH HARGA BAHAN Rp 79,359.920

0.0178 Rp 556,005.740 Rp 9,896.902


0.0178 Rp 89,031.219 Rp 1,584.756
1 Rp -
JUMLAH HARGA PERALATAN Rp 11,481.658

) Rp 95,693.635

Rp 9,569.364

Rp 105,262.999
PERKIRAAN VOL PEK : 1,00
Tunggal dengan Permukaan
gineering Grade TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

0.974 Rp 26,142.857 Rp 25,463.143


0.1299 25,428.57 Rp 3,303.171
0.0649 Rp 37,428.571 Rp 2,429.114
JUMLAH HARGA TENAGA Rp 31,195.429

1 Rp 176,000 Rp 176,000
1 Rp 1,921,500.000 Rp 1,921,500
0.016 Rp -
JUMLAH HARGA BAHAN Rp 2,097,500

0.0649 Rp 355,058 Rp 23,043.260


1 Rp -
JUMLAH HARGA PERALATAN Rp 23,043.260

) Rp 2,151,738.688

Rp 215,173.869

Rp 2,366,912.557
PERKIRAAN VOL PEK : 1,00
n Polos BjTP 280 TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK

Perkiraan Harga Satuan Jumlah Harga


Kuantitas (Rp.) (Rp.)

1.6167 Rp 26,142.857 Rp 42,265.157


0.4042 25,428.57 Rp 10,278.229
0.2021 Rp 37,428.571 Rp 7,564.314
JUMLAH HARGA TENAGA Rp 60,107.700

1.03 Rp 2,506,400 Rp 2,581,592.000


JUMLAH HARGA BAHAN Rp 2,581,592.000

0.2021
1 Rp -
JUMLAH HARGA PERALATAN Rp -

) Rp 2,641,699.700

Rp 264,169.970

Rp 2,905,869.670
PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI VOLUME SATUAN
JUMLAH KOEFISIEN
M M M
I DIVISI 1. MOBILISASI
Mobilisasi dan Demobilisasi
1.1
STA 0 s/d STA 843,43 - x - x - x - x - -

II DIVISI 2. DRAINASE
Galian Tanah Saluran Drainase
2.1
STA 0 s/d STA 843,43 0.885 + 0.615 x 0.65 / 2 x 843.43 822.344 M3

III DIVISI 3. PEKERJAAN TANAH


Penyiapan Badan Jalan
STA 0 s/d STA 50 50 x 3.5 x x 2 x 350 M3
STA 50 s/d STA 100 50 x 3.5 x x 2 x 350 M3
STA 100 s/d STA 150 50 x 3.5 x x 2 x 350 M3
STA 150 s/d STA 200 50 x 3.5 x x 2 x 350 M3
STA 200 s/d STA 250 50 x 3.5 x x 2 x 350 M3
STA 250 s/d STA 300 50 x 3.5 x x 2 x 350 M3
STA 300 s/d STA 350 50 x 3.5 x x 2 x 350 M3
STA 350 s/d STA 400 50 x 3.5 x x 2 x 350 M3
3.1 STA 400 s/d STA 450 50 x 3.5 x x 2 x 350 M3
STA 450 s/d STA 500 50 x 3.5 x x 2 x 350 M3
STA 500 s/d STA 550 50 x 3.5 x x 2 x 350 M3
STA 550 s/d STA 600 50 x 3.5 x x 2 x 350 M3
STA 600 s/d STA 650 50 x 3.5 x x 2 x 350 M3
STA 650 s/d STA 700 50 x 3.5 x x 2 x 350 M3
STA 700 s/d STA 750 50 x 3.5 x x 2 x 350 M3
STA 750 s/d STA 800 50 x 3.5 x x 2 x 350 M3
STA 800 s/d STA 843,43 43.43 x 3.5 x x 2 x 304.01 M3
TOTAL 5904.01 M3

Timbunan Tanah
STA 500 s/d STA 550 50 x( -0.350 x / 2 ) -8.750 M3
STA 550 s/d STA 600 50 x( -4.340 x / 2 ) -108.500 M3
STA 600 s/d STA 650 50 x( -9.696 x / 2 ) -242.400 M3
3.2 STA 650 s/d STA 700 50 x( -13.125 x / 2 ) -328.125 M3
STA 700 s/d STA 800 50 x( -8.890 x / 2 ) -222.250 M3
STA 750 s/d STA 800 50 x( -2.906 x / 2 ) -72.650 M3
STA 800 s/d STA 843,43 43.43 x( -1.191 x / 2 ) -29.775 M3
TOTAL -1003.700 M3

Galian Kedalaman Tanah


STA 0 s/d STA 50 50 x( 1.504 x / 2 ) 37.600 M3
STA 50 s/d STA 100 50 x( 2.624 x / 2 ) 65.600 M3
STA 100 s/d STA 150 50 x( 1.679 x / 2 ) 41.975 M3
STA 150 s/d STA 200 50 x( 0.559 x / 2 ) 13.975 M3
STA 200 s/d STA 250 50 x( 2.685 x / 2 ) 67.125 M3
3.3
STA 250 s/d STA 300 50 x( 6.370 x / 2 ) 159.250 M3
STA 300 s/d STA 350 50 x( 6.894 x / 2 ) 172.350 M3
3.3

STA 350 s/d STA 400 50 x( 3.219 x / 2 ) 80.475 M3


STA 400 s/d STA 450 50 x( 0.770 x / 2 ) 19.250 M3
STA 450 s/d STA 500 50 x( 0.770 x / 2 ) 19.250 M3
TOTAL 677 M3

IV. DIVISI 4. PEKERJAAN PERKERASAN BAHU JALAN


Lapisan Pondasi Agregat S
4.1
STA 0 s/d STA 843,43 843.43 x 3 x 0.15 x 2 x 759.087 M3

V. DIVISI 5. PEKERJAAN BERBUTIR


Lapis Pondasi Atas Agregat A
5.1
STA 0 s/d STA 843,43 843.43 x 3.5 x 0.2 x 2 x 1180.802 M3

Lapis Pondasi Bawah Agregat B


5.2
STA 0 s/d STA 843,43 843.43 x 3.5 x 0.1 x 2 x 590.401 M3

VI. DIVISI 6. PEKERJAAN ASPAL


Lapis Resap Pengikat - Aspal Cair
6.1
STA 0 s/d STA 843,43 843.43 x 3.5 x x 2 x 0.8 4723.208 Liter

Laston Lapis Aus (AC - WC)


6.2
STA 0 s/d STA 843,43 843.43 x 3.5 x 0.05 x 2 x 2.3 678.96115 Ton

VIII. DIVISI 8. PEKERJAAN HARIAN DAN LAIN - LAIN


Marka Jalan Termoplastik
Marka Jalan Di tikungan 1 (Menerus) 313.048 x 0.12 x x x 37.56576 M2
Marka Jalan Di tikungan 2 (Menerus) 252.006 x 0.12 x x x 30.24072 M2
8.1
Marka Jalan (Putus - putus) 278.3760 x 0.12 x 3 / 8 x 12.52692 M2
Marka Di tepi kanan dan kiri (Menerus) 843.4300 x 0.12 x x 2 x 202.423 M2
TOTAL 282.7566 M2

8.2 Rambu - Rambu Jalan x x x 3 x 2 Buah

Rel Pengaman
STA 30,89 s/d STA 369,11 313.048 x x x x 313.048 M
8.3
STA 369,11 s/d STA 630,89 252.006 x x x x 252.006 M
TOTAL 565.054 M
DAFTAR KUANTITAS DAN HARGA

No. Uraian Pekerjaan Satuan Perkiraan Kuantitas


a b c d
I DIVISI 1. UMUM
1.1 Mobilisasi dan Demobilisasi LS 1
TOTAL
II DIVISI 2. DRAINASE
2.1 Saluran Drainase Kanan dan Kiri Jalan M3 822.344
TOTAL

III DIVISI 3. PEKERJAAN TANAH


3.1 Penyiapan Badan Jalan M3 5904.010
3.2 Timbunan Biasa Dari Hasil Galian M3 1003.700
3.3 Galian Struktur Dengan Kedalaman M3 676.850
TOTAL

IV DIVISI 4. PEKERJAAN PERKERASAN DAN BAHU JALAN


4.1 Lapisan Pondasi Agregat M3 759.087
TOTAL

V DIVISI 5. PEKERJAAN BERBUTIR


5.1 Lapis Pondasi Atas Agregat M3 1180.802
5.2 Lapis Pondasi Bawah Agregat M3 590.401
TOTAL

VI DIVISI 6. PEKERJAAN ASPAL


6.1 Lapis Resap Pengikat - Aspal Cair M3 4723.208
6.2 Laston Lapis Aus (AC - WC) M3 678.961
TOTAL

VII DIVISI 7. PEKERJAAN HARIAN DAN LAIN - LAIN


5.1 Marka Jalan Termoplastik M2 282.7566
5.2 Rambu - Rambu Jalan Buah 2.000
5.3 Rel Pengaman M 565.054
TOTAL
ARGA

Harga Satuan (Rp) Jumlah Satuan (Rp)


e f = (d x e)

Rp 530,190,000 Rp 530,190,000
Rp 530,190,000

Rp 61,868.945 Rp 50,877,571.354
Rp 50,877,571.354

Rp 7,980.339 Rp 47,116,001.435
Rp 142,134.344 Rp 142,660,241.482
Rp 1,388,906.740 Rp 940,081,526.927
Rp 1,129,857,769.844

Rp 984,469.826 Rp 747,298,246.620
Rp 747,298,246.620

Rp 984,531.033 Rp 1,162,536,212.703
Rp 1,129,953.356 Rp 667,125,591.535
Rp 1,829,661,804.237

Rp 1,999,750.947 Rp 9,445,239,672.093
Rp 10,275.319 Rp 6,976,542.344
Rp 9,452,216,214.437

Rp 105,262.999 Rp 29,763,807.566
Rp 2,366,912.557 Rp 4,733,825.114
Rp 2,905,869.670 Rp 1,641,973,280.512
Rp 1,676,470,913.192
REKAPITULASI
RENCANA ANGGARAN BIAYA
Kegiatan :
Pekerjaan :
Lokasi :
Tahun Anggaran :

No. Uraian
1 DIVISI 1. UMUM
2 DIVISI 2. DRAINASE
3 DIVISI 3. PEKERJAAN TANAH
4 DIVISI 4. PEKERJAAN PERKERASAN
5 DIVISI 5. PEKERJAAN BERBUTIR
6 DIVISI 6. PEKERJAAN ASPAL
7 DIVISI 7. PEKERJAAN HARIAN & LAIN - LAIN

(A) Jumlah Harga Pekerjaan (Termasuk Biaya Umum dan Keuntungan


(B) Pajak Pertambahan Nilai (PPN) = 12% x (A)
(C) Jumlah Total Harga Pekerjaan = (A) + (B)
(D) Jumlah Harga Pekerjaan (Dibulatkan)

Terbilang : "LIMA BELAS MILIYAR SERATUS EMPAT BELAS JUTA SERATUS DUA BELAS RIBU
ASI
RAN BIAYA

Jumlah Harga Pekerjaan


Rp 530,190,000.000
Rp 50,877,571.354
Rp 1,129,857,769.844
Rp 747,298,246.620
Rp 1,829,661,804.237
Rp 9,452,216,214.437
Rp 1,676,470,913.192

Rp 13,740,101,606.493
Rp 1,374,010,160.649
Rp 15,114,111,767.142
Rp 15,114,112,000