No Xi
(mm)
1 164.82 3255.96
2 195.43 699.66
3 198.73 535.97
4 201.79 403.65
5 206.52 235.96
6 226.51 21.43
7 231.4 90.61
8 233.29 130.17
9 278.27 3179.72
10 282.05 3620.31
Ʃ 2218.81 12173.42
= 221.881
s= 36.78
n=10 maka
Sn 0.9497
Yn 0.4952
Yt(2,5,10,2 0.3065 1.4999 2.2504 2.9702 3.1255
0,25,50,100
)
TR K S XTR
2 221.881 -0.1987 36.78 214.573
5 221.881 1.0579 36.78 260.789
10 221.881 1.8482 36.78 289.852
20 221.881 2.6061 36.78 317.727
25 221.881 2.7696 36.78 323.741
50 221.881 3.5871 36.78 353.808
100 221.881 4.3223 36.78 380.846
a. Menghitung intensitas hujan rencana (akibat hujan 5, 10, 20, 25, 50, 100 tahun).
90% 4
I5= 58.677
I10= 65.217
I20= 71.489
I25= 72.842
I50 79.607
I100= 85.690
Tabel 5.7 Perhitungan Nilai Intensitas Hujan Recana Dan Lengkung Jakarta
Intensitas Hujan Rencana (mm/Jam)
T (menit)
I5(desain) I10 I20 I25 I50
5 399.49 444.01 486.71 495.92 541.98
10 355.55 395.17 433.18 441.38 482.37
15 320.32 356.02 390.25 397.64 434.57
20 291.44 323.92 355.07 361.79 395.39
30 246.92 274.44 300.83 306.52 334.99
45 200.89 223.27 244.75 249.38 272.54
60 169.32 188.19 206.29 210.19 229.71
80 139.99 155.59 170.55 173.78 189.92
120 103.97 115.56 126.67 129.07 141.06
180 75.02 83.38 91.40 93.13 101.78
240 58.68 65.22 71.49 72.84 79.61
0,83542 V
V h2 3
3.9019 4.6001
50 100
3.5871 4.3223
I100
583.40
519.23
467.78
425.61
360.59
293.37
247.27
204.44
151.83
109.55
85.69
Q = 0,278 CIA
L 3.5 L 3L 2
So 0.02 So 0.04 So 0.04
ndA 0.013 ndB 0.1 ndT 0.02
CA 0.9 CB 0.5 CT 0.2
0 ,167
tof = 2 3, 28 L nd
3
So
tofA 0.943
tofB 1.219
tofC 0.871
Total 3.033
L
tdf = 80V
tdf 1= 0,625/V
tdf 2= 0,875/V
tc = tof + tdf
tc1 3,03 + 0,625/V
tc2 3,03 + 0,875/V
Qr = 0,278 x C.I.A
= 0,278. I . (CA.AA + CB.AB + CT.AT) = 0.028078 x I
h 0,83542 V
Qs V h2 3
Tabel 5.8 Perhitungan Qr, Qs, dan h untuk sebelah kiri sungai
V 0.5 0.6 0.7 0.8 0.82559 0.9 1 1.1
tc1 4.280 4.072 3.923 3.811 3.787 3.724 3.655 3.598
I1 168.090 168.975 169.615 170.099 170.302 170.472 170.778 171.027
Qr1 4.720 4.744 4.762 4.776 4.782 4.787 4.795 4.802
h1 0.418 0.502 0.585 0.669 0.691 0.753 0.836 0.920
Qs1 0.151 0.262 0.416 0.620 0.682 0.883 1.212 1.613
0.62744
Tabel 5.9 Perhitungan Qr, Qs, dan h untuk sebelah kanan sungai
V 0.5 0.6 0.7 0.8 0.81755 0.9 1 1.1
tc1 4.780 4.488 4.280 4.124 4.100 4.002 3.905 3.825
I1 165.910 167.210 168.010 168.753 168.855 169.275 169.692 170.034
Qr1 4.658 4.695 4.717 4.738 4.741 4.753 4.765 4.774
h1 0.418 0.502 0.585 0.669 0.684 0.753 0.836 0.920
Qs1 0.151 0.262 0.416 0.620 0.662 0.883 1.212 1.613
0.61830
4.2 Evaluasi LHR
Jenis kendaraan volume lalu lintas (kendaraan/hari)
635.428
bus/truk ringan dan sejenisnya
118.243
bus besar 2sumbu
226.51
206.52
233.29
282.05
278.27
231.40
195.43
201.79
164.82
198.73
221.88
koefisien (emp) vol kend x emp
Presentase Total
1 1145 35.34496064 %
2 1236
2.5 287.5 100
64.65503936 %
3 249
7 322
1394.825
752.840
140.092
101.110
56.037
2444.902
0.5
862.0000
% > 30 %
*angka yg di bold adalah amgka dari data soal masing-masing
volume lalu
koefisien
Jenis kendaraan lintas
(kendaraan/hari) (emp) vol kend x emp
mobil penumpang dan
1145 1 1145
sjenisnya
bus/truk ringan dan
618 2 1236
sejenisnya
LANGKAH 1 Perhitungan ∑LHR (Lalu lintas Harian Rata-Rata) ∑▒ 〖𝐿𝐻𝑅 = ∑▒ 〖 (𝑉𝑜𝑙𝑢𝑚𝑒 𝑘𝑒𝑛𝑑
∑LHR= 3147.5 ×𝑒𝑚𝑝) 〗〗
LANGKAH 3 ∑LHR pada akhir umur rencana = ∑LHR awal umur rencana x i umur rencana
data soal no 5 Umur rencana = 10
pertumbuhan lalu lintas s 1.7% 0.0171 pertahun
Fp= 1.185
7070.505
LHR Rata- KLAS. JALAN
rata dalam
SMP
>20000 I
6000-20000 IIA
1500-8000 IIB
<2000 IIC
GAMBAR DI PETA…
LANGKAH 5 MENGHITUNG KOORDI (tanda pengoperasian + atau - tergantung dari titik 0)
skala peta = 10000
skala batang = 1.0000
x y = skala peta - (jarak pake mistar x skala batang)
TITIK D
jarak pake mistar = 30.07
xC = 9969.93 m
jarak pake mistar = 399.67
yC= 9600.33 m
TITIK T (tikungan)
jarak pake mistar = 104.62
xT= 10104.62 m
jarak pake mistar = 251.82
yT= 9748.18 m
TITIK U (tikungan)
jarak pake mistar = 397.31
xU= 10397.31 m
jarak pake mistar = 317.64
yU= 9682.36 m
TITIK L
jarak pake mistar = 691.66
xL= 10691.66 m
jarak pake mistar = 140.75
yL= 9859.25 m
MENGHITUNG
LANGKAH 8 SUDUT TANGEN
1 X U XT
tan azimut TU= -77.326184572 102.673815428
Y U YT
108o25'22,83” konversi manual
Perbedaan
Titik Tinggi
Titik Stationing Elevasi
Kemiringan melintang
1.1589
rata-rata=
maka medan jalur tersebut adalah datar (<3%).
: 3537,736
Lalu lintas rata-rata
emp
Kecepatan Rencana : 80 km/jam
Lebar daerah penguasaan minimum : 30 m
Lebar Perkerasan : 2 x 3,5 m
Lebar Bahu : 3,00 m
Lereng melintang perkerasan : 2%
Lereng melintang bahu jalan : 6%
Jari-jari lengkung minimum : 210 m
Miring Tikungan Maksimum : 10 %
: Penetrasi Berganda
Volume Lalu Lintas Harian Rata-Rata (LHR)
titik atau ruas pada fasilitas jalan untuk kedua
oleh jumlah hari dalam satu tahun
2007
0.0282 pertahun
i umur rencana
ntung dari titik 0)
=
= 843.4143
=
500.0021
Jarak (m)
∆
Grafis
343.3404
60.3405808426
316.5355
43.6776305287
168.6101
659.8759
n setinggi 0,50 m. KHUSUS RUMUS BIKIN SENDIRI, Karna gabole minus hasilnya, jadi angka bisa dibolak balik
Jarak Antar
Titik
50 0.4000 G1
50 1.0000 G2
50 0.6000 G3
Stationing
50 0.4000 G4
Sta 0+00
50 0.1000 G5
Sta 0+50
50 2.0000 F
Sta 0+100
50 4.3000 F1
Sta 0+150
50 1.7000 F2
Sta 0+200
50 2.1000 F3
Sta 0+250
50 2.5000 M
Sta 0+300
50 1.4000 M1
Sta 0+350
50 0.4000 M2
Sta 0+400
50 0.3000 M3
Sta 0+450
50 0.2000 M4
Sta 0+500
50 0.3000 M5
Sta 0+550
35.6 0.8427
Sta 0+600
Sta 0+700
Sta 0+750
Sta 0+785,6
Titik Stationing
Titik Stationing
G Sta 0+00
G1 Sta 0+50
G2 Sta 0+100
G3 Sta 0+150
E1 Sta 0+250
E2 Sta 0+300
E3 Sta 0+350
E4 Sta 0+400
E5 Sta 0+450
F Sta 0+500
: Penetrasi Berganda
F1 Sta 0+550
F2 Sta 0+600
F3 Sta 0+650
F4 Sta 0+700
F5 Sta 0+750
F6 Sta 0+800
J Sta 0+843,42
∑
alu Lintas Harian Rata-Rata (LHR) adalah volume total yang melintasi suatu
uas pada fasilitas jalan untuk kedua jurusan, selama satu tahun dibagi
h hari dalam satu tahun
oleh kendaraan jenis lain dalam kondisi jalan, lalu lintas dan
n yang berlaku.
92.15
91.95
91.45
91.15
91.35
91.40
90.40
88.25
87.40
86.35
87.60
88.30
88.50
88.35
88.25
88.10
88.40
1.1043
𝐿𝐻𝑅= 〖 (1+𝑖) 〗
^𝑛
Stationing Elevasi Tanah Asli Elevasi Tanah Rencana
VR 80 (km/jam)
T 2.5 detik (nilai T sesuai ketetapan)
g 9.81 m/s^2
f 0.35
55.556
71.913
127.469
127.4686 m
Dari tabel di atas maka didapat jarak pandang henti minimumnya adalah
Dengan VR = 80 km/jam
kelandaian jalan maksimum = 5%
MENENTUKAN Ls
1. Ls = =
(T= 3 detik)
2. Ls = =
Dimana :
C = perubahan percepatan (m/det3) yang bernilai 1-3 m/det3
e = didapat dalam tabel 4.1 Silvia Sukirman. 1999. Dasar-Dasar
Ls = =
Dimana :
em = superelevasi maksimum
en = superelevasi normal 2%
re = tingkat pencapaian perubahan kemiringan melintang jalan
untuk VR ≤ 70 km/jam re-max =
untuk VR ≥ 80 km/jam re-max =
Ls = 90.000 m
Rc = 210 m
∆T = 60.34058 1.053141808
108 25'22,83”
o
θs = = 12.28389445
6° 53' 9"
θc = ∆ - 2 θs = 35.77279194
22° 19' 1"
Lc = = 131.04766
p = = 1.6071
Didapat nilai p > 0,25 m maka lengkung peralihan tidak diperlukan sehingga tipe tikungan bukan Full C
Jadi jenis tikungan yang digunakan adalah Spiral – Circle – Spiral (S – C – S).
p = p Ls = 1.665
k k Ls = 44.9277
(k* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129)
hasil interpolasi didapat k* = 0.4991966 0.4991966
VR 80 km/jam
∆ 60.34058084256
θs 12.2838944495 59.829709579
Rc 210 m 72.113604028
Es 34.831 m xs 89.587
Ts 169.109 m
LTotal 311.048 m
e 0.1
Ls 90.000
Lc 131.048
p 1.665
k 44.92769
em 0.1
en 0.02
120 m
40 30 20
200 150 100
997. Tabel II.11
550 m
50 40 <40
9 10 10
97. Tabel II.10
40 30 20
50 30 15
997. Tabel II.16
55.556
10.607
71.111
0.02
ngan melintang jalan
0.035 m/m/det
0.025 m/m/det
Ls= 90
Le= 120
6.1419472
konversi manual
17.886396
konversi manual
262.09532 > 25 m (S – C – S)
T ACAD
ES 8.773664 0.424645
RC 210 10.164
SUDUT C 11.19403 0.541791
SUDUT S 9.705793 0.46976
TS 93.26007 4.513787
LS 71.11111 3.441778
P 1.016932 0.049219
LC 41.00746 1.984761
35.52125 1.719229
0
VR 80 (km/jam)
T 2.5 detik
g 9.81 m/s^2
f 0.35
Dari tabel di atas maka didapat jarak pandang henti minimumnya adalah
Dengan VR = 80 km/jam
kelandaian jalan maksimum = 5%
MENENTUKAN Ls
1. Ls =
(T= 3 detik)
2. Ls =
Dimana :
C = perubahan percepatan (m/det3) yang bernilai 1-3 m/det3
e = didapat dalam tabel 4.1 Silvia Sukirman. 1999. Dasar-Da
Ls =
Dimana :
em = superelevasi maksimum
en = superelevasi normal
re = tingkat pencapaian perubahan kemiringan melintang jalan
untuk VR ≤ 70 km/jam
untuk VR ≥ 80 km/jam
Ls = 90.000 m
Rc = 210 m
∆U = 43.6776 L
67° 15' 24"
· Mencari sudut-sudut tikungan dan panjang tikungan
θs = =
θc = ∆ - 2 θs =
Lc = =
p = =
Didapat nilai p > 0,25 m maka lengkung peralihan tidak diperlukan sehingga tipe tikungan bukan Full C
Jadi jenis tikungan yang digunakan adalah Spiral – Circle – Spiral (S – C – S).
p = p L s = 1.665
k k Ls = 44.92769
(k* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129)
hasil interpolasi didapat k* = 0.4991966
VR 80 km/jam
∆ 43.677630528725
θs 12.2838944495 68.1611847356
Rc 210 m 80.4450791851
Es 18.030 m
Ts 130.891 m
LTotal 250.006 m
e 0.1
Ls 90.000
Lc 70.006
p 1.665
k 44.928
em 0.1
en 0.02
120 m
50 40 30 20
250 200 150 100
amarga. 1997. Tabel II.11
550 m
60 50 40 <40
8 9 10 10
marga. 1997. Tabel II.10
50 40 30 20
80 50 30 15
amarga. 1997. Tabel II.16
= 55.556
= 15.911
= 71.111
2% 0.02
ahan kemiringan melintang jalan
re-max = 0.035 m/m/det
re-max = 0.025 m/m/det
didapat: Ls= 90
Le= 120
12.28389445
6° 53' 9" konversi manual
19.10984163 9.5549208
53° 29' 6" konversi manual
129
70.0057 140.01144 > 25 m (S – C – S)
1.6071
Sukirman hal.129
0.0185025 U ACAD
ES 13.75129 0.665563
RC 210 10.164
Sukirman hal.129) SUDUT C 19.4352 0.940663
0.4991966 SUDUT S 9.705793 0.46976
TS 109.9289 5.320558
LS 71.11111 3.441778
P 1.016932 0.049219
130.891 LC 71.1976 3.445964
`
%
VR 80 (km/jam)
T 2.5 detik
g 9.81 m/s^2
f 0.35
Dari tabel di atas maka didapat jarak pandang henti minimu 120 m
Dengan VR = 80 km/jam
kelandaian jalan mak 5%
MENENTUKAN Ls
1. Ls = = 55.556
(T= 3 detik)
2. Ls = = 15.911
Dimana :
C = perubahan percepatan (m/det3) yang bernilai 1-3 m/det3
e = didapat dalam tabel 4.1 Silvia Sukirman. 1999. Dasar-Dasar Perencanaan Geometrik J
Ls = = 71.111
Dimana :
em = superelevasi maksimum
en = superelevasi normal 2% 0.02
re = tingkat pencapaian perubahan kemiringan melintang jalan
untuk VR ≤ 70 km/jam re-max = 0.035 m/m/det
untuk VR ≥ 80 km/jam re-max = 0.025 m/m/det
Berdasarkan perhitu= 90 m
Ls = 90.000 m
Rc = 210 m
∆U = 43.6776 L
67° 15' 24"
· Mencari sudut-sudut tikungan dan panjang tikungan
θs = = 12.28389
6° 53' 9" konversi manual
θc = ∆ - 2 θs = 19.10984 9.554921
53° 29' 6" konversi manual
129
Lc = = 70.0057 140.0114
p = = 1.6071
Didapat nilai p > 0,25 m maka lengkung peralihan tidak diperlukan sehingga tipe tikungan bukan Full Circl
Jadi jenis tikungan yang digunakan adalah Spiral – Circle – Spiral (S – C – S).
= Lc +
Ltotal
2Ls = 250.006
p = p Ls = 1.597
k k Ls = 44.933
(k* diperoleh dari tabel 4.10 buku Silvia Sukirman hal.129)
hasil interpolasi didapat k* = 0.499197 0.499197
VR 80 km/jam
∆ 43.677631
θs 12.28389 68.16118
Rc 210 m 80.44508
Es 17.957 m
Ts 130.900 m
LTotal 250.006 m
e 0.1
Ls 90.000
Lc 70.006
p 1.597
k 44.933
em 0.1
en 0.02
U ACAD
ES 13.75129 0.665563
RC 210 10.164
SUDUT C 19.4352 0.940663
SUDUT S 9.705793 0.46976
TS 109.9289 5.320558
LS 71.11111 3.441778
P 1.016932 0.049219
LC 71.1976 3.445964
`
2.2 Sistem Penomoran Jalan (TIKUNGAN T)
STA CS = Sta Sc + Lc
= 251.9408
STA ST = Sta Cs + Ls
= 341.9408
STA U = Sta ST – Ts +
= 472.8309
e. Pelebaran
Pelebaran = Wc - Wn = 1.821
LS= 71.111
67.500 = X+2
90.000 12
STA CS = Sta Sc + Lc
= 529.1172
STA ST = Sta Cs + Ls
= 619.1172
STA L = Sta ST – Ts +
= 831.6388
67.500 = X+2
90.000 12
TIKUNGAN T
A= 0.817
Perhitungan Menurut Jarak Pandang Henti (Jh)
Dari tabel 2.2, diketahui jarak pandang henti untuk V R = 80 km/jam adalah 120
Ø Jh < L
Ø Jh > L
L= = -248.372093 MEMENUHI
Ø Jd > L
L= = 71.84822521 MEMENUHI
`
L= 0,60V = 48
Untuk lengkung cembung dengan kerb dari rumus 4.42 (Buku Ir. Hamurhan Saodang MSCE)
L= 40 A = 32.68
7. Tabel II.24
40
10
7. Tabel II.21
10
200
800
7. Tabel II.2
TIKUNGAN U
A= -1.68
Perhitungan Menurut Jarak Pandang Henti (Jh)
Dari tabel 2.2, diketahui jarak pandang henti untuk V R = 80 km/jam adalah
Ø Jh < L
L= = -60.6316 MEMENUHI
Ø Jh > L
Ø Jd > L
L= = 1600 MEMENUHI
L= 0,60V = 48
Untuk lengkung cembung dengan kerb dari rumus 4.42 (Buku Ir. Hamurhan Saodang MSCE)
L= 40 A = -67.2
m/jam adalah 120
BEDA
TITIK STA ELEVASI JARAK KEMIRINGAN
TINGGI
G 0+000 76.2
0.1 343.59 0.03
F 0+299,9988 76.1
3.7 316.60 1.17
M 0+499,9930 79.8
7.6 168.75 4.50
L 0+770,3034 87.4
PPV 1 (TIKUNGAN T)
A= g2-g1 0.817
Dari tabel 2.2, diketahui jarak pandang henti untuk VR = 80 km/jam adalah 120 m
Jh= 120
Untuk Jh<Lv, maka
A Jh 2
Lv = 21.79 (tidak memenuhi)
120 3,5 Jh
120 3,5 Jh
Lv 2 Jh = -420.95 (memenuhi)
A
Panjang lengkung vertical minimum yang dapat memenuhi syarat kenyamanan adalah:
A V 2
Lv = 13.76
380
Panjang lengkung vertikal untuk keperluan drainase adalah:
Lv 50 A = 40.85
A Lv
Ev = 0.07337
800
EPPV 1 = 299.9988
Y STA 0+
0 C
50
100
150
200
250
264.0747 PLV1 35.92411584
299.9988 PPV1(T)
300
335.9229 PTV1
350
400
450
462.6682 PLV2
486.6682 PPV2(U)
500 24.00
510.6682 PTV2
550
600
650
700 50.00
750.00
785.6
marga. 1997. Tabel II.24
50 40
9 10
marga. 1997. Tabel II.21
)
9 10
230 200
90 800
marga. 1997. Tabel II.2
BEDA TINGGI
x100%
JARAK
g1
-1.14
g2
-3.34
g3
PPV 2 (TIKUNGAN U)
A= g3-g2 -1.68
Dari tabel 2.2, diketahui jarak pandang henti untuk VR = 80 km/jam adalah 120 m
Jh=
Untuk Jh<Lv, maka
A Jh 2
Lv = -44.80 (tidak memenuhi)
120 3,5 Jh
120 3,5 Jh
Lv 2 Jh = 561.429 (memenuhi)
A
Panjang lengkung vertical minimum yang dapat memenuhi syarat kenyamanan adalah:
A V 2
Lv = -28.29
380
Panjang lengkung vertikal untuk keperluan drainase adalah:
Lv 50 A = -84.00
A Lv
Ev = -0.31500
800
(tidak memenuhi)
(memenuhi)
kenyamanan adalah:
TITIK STA
DAFTAR SEWA PERALATAN PERJAM KERJA
Biaya sewa
No. Uraian harga Alat per jam Keterangan
(diluar PPN)
1 AMP Rp 3,500,000,000.00 Rp 5,260,659.69 Alat Baru
2 Aspal Finisher Rp 400,000,000.00 Rp 184,955.61 Alat Baru
3 Aspal Sprayer Rp 300,019,600.00 Rp 96,944.03 Alat Baru
4 Buldozer Rp 575,000,000.00 Rp 370,661.82 Alat Baru
5 Compresor Rp 40,000,000.00 Rp 161,387.41 Alat Baru
6 Concrete mixer Rp 6,000,000.00 Rp 51,552.55 Alat Baru
7 Crane Rp 140,000,000.00 Rp 293,384.49 Alat Baru
8 Dump truck Rp 200,000,000.00 Rp 179,822.74 Alat Baru
9 Excavator Rp 570,000,000.00 Rp 274,791.97 Alat Baru
10 Generator set Rp 50,000,000.00 Rp 313,627.11 Alat Baru
11 Motor Grader Rp 1,000,000,000.00 Rp 437,899.44 Alat Baru
12 Whell Loader Rp 750,000,000.00 Rp 352,806.72 Alat Baru
13 Three Whell Roller Rp 168,000,000.00 Rp 149,275.68 Alat Baru
14 Stone Cruher Rp 800,000,000.00 Rp 545,205.26 Alat Baru
15 Vibro Roller Rp 350,000,000.00 Rp 227,994.11 Alat Baru
16 Water Tanker Rp 210,000,000.00 Rp 229,362.45 Alat Baru
17 Concrete Vibrator Rp 1,150,000.00 Rp 42,774.43 Alat Baru
DAFTAR HARGA SATUAN UPAH DAN BAHAN
NO KELOMPOK/NAMA BAHAN/MATERIAL
1 2
I KELOMPOK BATU, PASIR, TANAH DAN MATERIAL BETON
1 Abu Batu
2 Adukan Beton Redy Mix B. 0 ( Tanpa Pompa + Slang )
3 Adukan Beton Redy Mix K. 100 ( Tanpa Pompa + Slang )
4 Adukan Beton Redy Mix K. 125 ( Tanpa Pompa + Slang )
5 Adukan Beton Redy Mix K. 150 ( Tanpa Pompa + Slang )
6 Adukan Beton Redy Mix K. 175 ( Tanpa Pompa + Slang )
7 Adukan Beton Redy Mix K. 200 ( Tanpa Pompa + Slang )
8 Adukan Beton Redy Mix K. 225 ( Tanpa Pompa + Slang )
9 Adukan Beton Redy Mix K. 250 ( Tanpa Pompa + Slang )
10 Adukan Beton Redy Mix K. 275 ( Tanpa Pompa + Slang )
11 Adukan Beton Redy Mix K. 300 ( Tanpa Pompa + Slang )
12 Adukan Beton Redy Mix K. 350 ( Tanpa Pompa + Slang )
13 Adukan Beton Redy Mix K. 400 ( Tanpa Pompa + Slang )
14 Adukan Beton Redy Mix K. 500 ( Tanpa Pompa + Slang )
15 Adukan Beton Redy Mix Mortar ( Tanpa Pompa + Slang )
16 Bata Merah Lokal (9,0x20x3,5 cm)
17 Bata Merah Produksi Pulang Pisau (9,5x19x4,0 cm)
18 Bata Rooster ( Karawang )
19 Bataco Hitam (17x8x40 cm)
20 Batako 1 Zak 70
21 Batako 1 Zak 95
22 Batu Alam Andesit Polos Bakar
23 Batu Alam Andesit Polos Bakar (10 x 20)
24 Batu Alam Andesit Polos Bakar (15 x 20)
25 Batu Alam Andesit Polos Bakar (20 x 40)
26 Batu Alam Andesit Bintik Bakar
27 Batu Alam Andesit Alur
28 Batu Alam Andesit Alur (15 x 30)
29 Batu Alam Andesit Alur (20 x 40)
30 Batu Alam Palimanan
31 Batu Alam Paras
32 Batu Candi Polos
33 Batu Apung (Gosok )
34 Batu Candi Alur
35 Batu Belah (Tangkiling - dalam kota)
36 Batu Belah 10/15 cm.
37 Batu Belah 5/7 cm.
38 Batu Belah Hitam
39 Batu Kapur
40 Batu Pecah Mesin/ Screen 3 mm s/d 5 mm
41 Batu Pecah 1 -2 cm. (split)
42 Batu Pecah 2-3 cm.
43 Batu Pecah 3-5 cm.
44 Batu Pecah 5-7 cm.
45 Batu Pecah Mesin 1 - 2
46 Batu Pecah Mesin 2 - 3
47 Batu Pecah Mesin 3 - 5
48 Batu Pecah Tidak Tersaring ( Sawur )
49 Batu Koral Sikat Hitam ( Terpasang )
50 Batu Koral Sikat Abu ( Terpasang )
51 Batu Koral Sikat Warna ( Terpasang )
52 Beton Rooster / Kerawang (ukuran kecil)
53 Beton Ringan (Hebel) 10x20x60 cm.
54 Beton Ringan (Hebel) 7,5x20x60 cm.
55 Buis Beton 20 cm x 100 cm (tebal 5 cm)
56 Buis Beton 40 cm x 100 cm (tebal 5 cm)
57 Buis Beton 50 cm x 100 cm (tebal 5 cm)
58 Buis Beton 30 cm x 100 cm (tebal 10 cm)
59 Buis Beton 30 cm x 100 cm (tebal 5 cm)
60 Buis Beton 40 cm x 100 cm (tebal 15 cm)
61 Buis Beton 60 cm x 50 cm (tebal 10 cm)
62 Buis Beton 60 cm x 50 cm (tebal 5 cm)
63 Buis Beton 70 cm x 50 cm (tebal 5 cm)
64 Buis Beton 80 cm x 50 cm (tebal 10 cm)
65 Buis Beton 80 cm x 50 cm (tebal 5 cm)
66 Buis Beton 100 cm x 50 cm (tebal 10 cm)
67 Kapur Pasang / Kapur Padam
68 Kerikil Sungai
69 Pasir Beton (Sungai)
70 Pasir Pasang
71 Pasir Urug
72 Sirtu Tak Tersaring / Kerikil
73 Tanah Subur
74 Tanah Urugan Biasa / Granit
75 Tanah Urugan Pilihan / Tanah Kuning
76 Paving Stone/conblock Putih segi empat, tinggi 8 cm.
77 Paving Stone/conblock Hitam segi empat, tinggi 8 cm.
78 Paving Stone/Conblock Putih Segi enam, tinggi 8 cm.
79 Paving Stone/Conblock Hitam segi enam, tinggi 8 cm.
80 Pengeras Beton (5 Kg)
81 Pengeras Beton (30 Kg)
82 Plastik Cor (25 m /bks)
83 Semen Portland (Semen PC) @ 40 Kg/Zak
84 Semen Portland (Semen PC) @ 40 Kg/Zak
85 Semen Portland (Semen PC) @ 40 Kg/Zak
86 Semen Portland (Semen PC) @ 40 Kg/Zak
87 Semen Portland (Semen PC) @ 40 Kg/Zak
88 Semen Putih
89 Semen putih (40 Kg/Zak)
90 Semen putih (40 Kg/Zak)
91 Semen Warna
92 Semen Warna
93 Semen Grouting
II KELOMPOK KAYU
1 Bambu Ø 5
2 Batang Cangkok
3 Gebalan rumput
4 Ijuk
5 Kayu Bakar
6 Kayu Balok Klas I (ulin) 10/10 - P. 4 m
7 Kayu Balok Klas I (ulin) 5/7 - P. 4 m
8 Kayu Balok Klas I (ulin) 5/10 - P. 4 m
9 Kayu Balok Klas I (ulin) 6/12 - P. 4 m
10 Kayu Balok Klas II (Banuas)
11 Kayu Balok Klas II (Blangiran)
12 Kayu Balok Klas II (Lanan)
13 Kayu Balok Klas III (hutan/campuran)
14 Kayu Balok Meranti 5/10 - P. 4 m.
15 Kayu Balok Meranti 6/12 - P. 4 m.
16 Kayu Balok Meranti 8/12 - P. 4 m.
17 Kayu Bekisting (Albasiah/Stoot)
18 Kayu Bulat (Untuk Matting) Ø 30 - 40 cm, P. 8 m.
19 Kayu Bulat (Untuk Perancah) Ø 3 - 5 cm, P. 4 m.
20 Kayu Dolken / Galam Ø 10 - 12 cm, P. 4 m.
21 Kayu Dolken / Galam Ø 6 - 10 cm, P. 4 m.
22 Kayu Dolken / Kanopel Ø 10 - 12 cm, P. 4 m.
23 Kayu Dolken / Kanopel Ø 8 - 10 cm, P. 4 m.
24 Kayu Dolken / Kanopel Ø 6 - 8 cm, P. 4 m.
25 Kayu Dolken / Balawan Ø 10 - 12 cm, P. 3,9 m.
26 Kayu Dolken / Balawan Ø 6 - 10 cm, P. 3,9 m.
27 Kayu Lapis Teakwood 4 mm. (Kecil/Uk. Pintu)
28 Kayu Lapis Teakwood 4 mm. (122x244 cm)
29 Kayu Lapis Triplek 3 mm, 120x240 cm.
30 Kayu Lapis Triplek 4 mm, 120x240 cm.
31 Kayu Lapis Triplek 6 mm, 120x240 cm.
32 Kayu Lapis Triplek 9 mm, 120x240 cm.
33 Kayu Lapis Triplek 12 mm, 120x240 cm.
34 Kayu Lapis Triplek 4 mm (80x200 cm) ukuran Pintu
35 Kayu Lapis Triplek Serat Sungkai
36 Kayu Moulding / Papan Lap-lapan (Alau)
37 Kayu Moulding / Papan Lap-lapan (Bangkirai)
38 Kayu Moulding / Papan Lap-lapan (Alau)
39 Kayu Moulding / Papan Lap-lapan (Bangkirai)
40 Kayu Papan Klas I (Ulin)
41 Kayu Papan Klas II (Banuas)
42 Kayu Papan Klas II (Blangiran)
43 Kayu Papan Klas II (Lanan)
44 Kayu Papan Klas III ( Hutan / campuran )
45 Kayu Papan Meranti 2/20 - P. 4 m.
46 Kayu Papan Meranti 3/20 - P. 4 m.
47 Kayu Papan Meranti 3/30 - P. 4 m.
48 Kayu Reng Klas II (Meranti) 3/5 - P. 4 m
49 Kayu Reng Klas II (Meranti) 2/3 - P. 4 m.
50 List Kayu Profil (Moulding) L.2,5 cm - Tebal 1,5 cm - P. 4m.
51 List Kayu Profil (Moulding) L.3 cm - Tebal 1,5 cm - P. 4m.
52 List Kayu Profil (Moulding) L.3,5 cm - Tebal 1,5 cm - P. 4m.
53 List Kayu Profil (Moulding) L.4 cm - Tebal 1,5 cm - P. 4m.
54 List Kayu Profil (Moulding) L.4 cm - Tebal 1,5 cm - P. 4m.
55 List Kayu Sudut 5 cm - P. 4m
56 List Kayu Siku 5 cm - P. 4m
57 Melamin 4 mm.
58 White Board
1 Alumunium Foil
2 Alumunium Foil
3 Alumunium Foil
4 Alumunium Foil 3 mm (25 m)
5 Alumunium Foil 4 mm (25 m)
6 Asbes nok Gelombang besar
7 Asbes nok Gelombang kecil
8 Atap Asbes gelombang besar 180 x 80 x 4 mm
9 Atap Asbes gelombang besar 180 x 80 x 4 mm
10 Atap Asbes gelombang besar 150 cm x 012 cm x 6 mm
11 Atap Fibreglass ( 80 X 180 )
12 Atap Fibreglass ( 80 X 180 )
13 Atap Metal Zincalume Soka tbl. 0,22 mm (1,2 M2/lembar)
14 Atap Metal Zincalume Soka tbl. 0,25 mm (73x180 cm)
15 Atap Metal Zincalume Spandek tbl. 0,3 mm - Lbr. 72 cm
16 Atap Metal Zincalume Spandek tbl. 0,3 mm (106 x 600 cm)
17 Atap Polycarbonat tbl. 4 mm, (2,1x 11,8 m)
18 Atap Polycarbonat tbl. 5 mm, (2,1x 11,8 m)
19 Atap Polycarbonat tbl. 6 mm, (2,1x 11,8 m)
20 Atap Polycarbonat tbl. 10 mm, (2,1x 11,8 m)
21 Atap Plastik Gelombang
22 Bubungan Genteng Metal Zincalume bentuk C, P. 75 cm.
23 Bubungan Genteng Metal Zincalume bentuk U, P. 75 cm.
24 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
25 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
26 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
27 Genteng Zincalume berlapis batuan tbl. 0,30 mm, 1,80 Lbr / per M2
28 Genteng Zincalume Colour tbl. 0,25 mm, 1,62 Lbr / per M2
1 Karpet Standart
2 Keramik 10/20 & 20/20 Anti Slip Corak / Warna
3 Keramik 10/20 & 20/20 Anti Slip Corak / Warna
4 Keramik 10/20 & 20/20 Corak / Warna
5 Keramik 10/20 & 20/20 Corak / Warna
6 Keramik 10/20 & 20/20 Polos
7 Keramik 25/40 Polos
8 Keramik 20/20 Corak / Warna Km/wc
9 Keramik 20/20 Corak / Warna Km/wc
10 Keramik 20/25 Corak / Warna
11 Keramik 30 x 30 cm anti slip
12 Keramik 30/30 Corak / Warna
13 Keramik 30/30 Corak / Warna
14 Keramik 30/30 Polos
15 Keramik 30/30 Polos
16 Keramik 50/50
17 Keramik 40/40 ( Kasar )
18 Keramik 40/40 ( Polished )
19 Keramik 40/40 Corak
20 Keramik Dasar Batu Warna 30 X 30
21 Keramik Granito 60/60 (Polished)
22 Keramik Granito 60/60 (Kasar)
23 Keramik List Dinding 6/20 cm.
24 Tegel Abu-abu / Teraso 40x 40 cm.
1 Door Closer
2 Door Closer
3 Door Closer
4 Door Closer
5 Door Closer
6 Door Closer
7 Engsel Jendela / Engsel Kupu-Kupu 3"
8 Engsel Jendela / Engsel Kupu-Kupu 3"
9 Engsel Jendela SKK 3"
10 Engsel Jendela Untuk Alumunium
11 Engsel Patrom / Engsel H
12 Engsel Pintu 4"
13 Engsel Pintu 4"
14 Engsel Pintu 4"
15 Engsel Pintu 4"
16 Engsel Pintu 4"
17 Engsel Pintu SKK 4"
18 Engsel Pintu Untuk Alumunium
19 Glass Blok 20 X 20
20 Grendel 2"
21 Grendel 2"
22 Grendel 3"
23 Grendel 3"
24 Grendel 3"
25 Grendel 4"
26 Grendel 4"
27 Grendel 10"
28 Grendel 12"
29 Grendel 12"
30 Grendel Rantai
31 Grendel Tanam
32 Grendel Tanam
33 Grendel Tanam
34 Hak Angin 8" stainless steel
35 Hak Angin 8" stainless steel
36 Hak Angin 8" stainless steel
37 Hak Angin 9" stainless steel
38 Hak Angin 10" stainless steel
39 Hak Angin Dorong/Ramskar stainless steel
40 Hak Angin Dorong/Ramskar stainless steel
41 Handel Jendela
42 Handel Jendela
43 Handel Jendela
44 Handel Jendela
45 Handel Pintu
46 Handel Pintu
47 Handel Pintu
48 Handle Alumunium
49 Handle Alumunium
50 Kaca Polos / Bening 2 mm
51 Kaca Polos / Bening 3 mm
52 Kaca Polos / Bening 5 mm
53 Kaca Polos / Bening 8 mm
54 Kaca Rayben 3 mm
55 Kaca Rayben 5 mm
56 Kaca Rayben 8 mm
57 Kaca Rayben 10 mm
58 Kaca Tempered 5 mm
59 Kaca Tempered 6 mm
60 Kaca Tempered 8 mm
61 Kaca Tempered 10 mm
62 Kaca Tempered 12 mm
63 Kaca Tempered 15 mm
64 Kaca Tempered 16 mm
65 Kaca Es / Buram 3 mm
66 Kaca Es / Buram 5 mm
67 Kaca One Way 5 mm
68 Kaca Naco 5 mm + rangka 12 daun
69 Kaca Naco 5 mm + rangka 8 daun
70 Kait Angin untuk Alumunium
71 Kawat Nyamuk Plastik
72 Kawat Nyamuk Plastik
73 Kunci Alumunium
74 Kunci Gembok
75 Kunci Gembok
76 Kunci Pintu Tanam Kecil Lengkap (standart)
77 Kunci Pintu Tanam Kecil Lengkap (standart)
78 Kunci Pintu Tanam Lengkap
79 Kunci Pintu Tanam Lengkap
80 Kunci Pintu Tanam Lengkap
81 Kunci Pintu Tanam Lengkap
82 Kunci Pintu Tanam Lengkap
83 Kunci Pintu Tanam Lengkap
84 Kunci Pintu Tanam Lengkap
85 Kunci Pintu Tanam Lengkap
86 Kunci Pintu Tanam Lengkap
87 Kunci Pintu Tanam Lengkap
1 Amplas Besi
2 Amplas Kayu
3 Amplas Kayu
4 Cat Alkali (2,5 Liter)
5 Cat Besi
6 Cat Besi
7 Cat Besi
8 Cat Besi
9 Cat Kayu
10 Cat Kayu
11 Cat Kayu
12 Cat Kayu & Cat Besi
13 Cat Kayu & Cat Besi
14 Cat Genteng
15 Cat Genteng
16 Cat Hamertoon
17 Cat Kayu Dasar
18 Cat Marka Jalan Warna Putih (5 Kg)
19 Cat Marka Jalan Thermoplastic Warna Putih
20 Cat Marka Jalan Thermoplastic Warna Putih
21 Cat Marka Jalan Thermoplastic Warna Kuning
22 Cat Tembok (20 Liter)
23 Cat Tembok (20 Liter)
24 Cat Tembok (20 Kg)
25 Cat Tembok (20 Kg)
26 Cat Tembok (25 Kg)
27 Cat Tembok (25 Kg)
28 Cat Tembok (5 Kg)
29 Cat Tembok (5 Kg)
30 Cat Tembok (5 Kg)
31 Cat Tembok (5 Kg)
32 Cat Tembok (5 Kg)
33 Cat Tembok (5 Kg)
34 Cat Tembok (5 Kg)
35 Cat Tembok (2,5 Liter)
36 Cat Tembok (2,5 Liter)
37 Cat Tembok (2,5 Liter)
38 Cat Tembok (2,5 Liter)
39 Cat Tembok Eksterior (20 Liter)
40 Cat Tembok Eksterior (20 Liter)
41 Cat Tembok Eksterior (20 Liter)
42 Cat Tembok Eksterior (2,5 Liter)
43 Cat Tembok Eksterior (2,5 Liter)
44 Cat Tembok Eksterior (2,5 Liter)
45 Dempul Gipsum @ 20 Kg
46 Dempul Gipsum @ 20 Kg
47 Dempul Gipsum @ 20 Kg
48 Dempul Kayu
49 Dempul Kayu
50 Kuas 2"
51 Kuas 2"
52 Kuas 3"
53 Kuas 3"
54 Kuas 4"
55 Kuas 4"
56 Lem Kuning
57 Lem Putih
58 Lem Putih
59 Melamik
60 Meni Besi ( Sinkromat )
61 Meni Besi ( Sinkromat ) @ 5Kg
62 Meni Besi ( Sinkromat ) @ 5Kg
63 Meni Kayu
64 Minyak cat / Thinner
65 Minyak cat / Thinner
66 Minyak cat / Thinner
67 Minyak cat / Thinner (1 Kg)
68 Minyak cat / Thinner (5 Kg)
69 Plamur Kayu
70 Plamur Tembok 4 Kg
71 Plamur Tembok 5 Kg
72 Plamur Tembok 3,5 Kg
73 Plamur Tembok
74 Plamur Tembok
75 Plamur Tembok 5 Kg
76 Plamur Tembok 5 Kg
77 Plamur Tembok
78 Plamur Tembok 5 Kg
79 Plamur Tembok 4 Kg
80 Plamur Tembok 4,5 Kg
81 Plamur Tembok 20 Kg
82 Plamur Tembok 5 Kg
83 Plamur Tembok
84 Plamur Tembok 5 Kg
85 Plamur Tembok 5 Kg
86 Plamur Tembok 20 Kg
87 Plamur Tembok 4,5 Kg
88 Plamur Tembok 3,5 Kg
89 Plamur Tembok 4 Kg
90 Plamur Tembok 20 Kg
91 Plamur Tembok 25 Kg
92 Plamur Tembok 20 Kg
93 Plamur Tembok 20 Kg
94 Plester Gipsum
95 Residu / Teer Kayu
96 Roll Cat
97 Roll Cat
98 Roll Cat
99 Sealant (80 Gram)
100 Selfdrilling Scew ( 12x50 mm )
101 Sending Sealer
102 Sealen kaca
103 Sinkromat
104 Waterproof
105 Waterproof
106 Wood Filler
1 Doof F 2"
2 Doof F 2,5"
3 Doof F 3"
4 Knee GIP Ø 1/2"
5 Knee GIP Ø 1"
6 Knee GIP Ø 1.1/4"
7 Knee GIP Ø 1.1/2"
8 Pipa galvanized GIP F Ø 2''
9 Pipa galvanized GIP F Ø 2,5 ''
10 Pipa galvanized GIP F Ø 3 ''
11 Knee GIP Ø 4"
12 Knee GIP Ø 3/4"
13 Pipa Galvanized GIP Medium B Ø 1/2"
14 Pipa Galvanized GIP Medium B Ø 3/4"
15 Pipa Galvanized GIP Medium B Ø 1"
16 Pipa Galvanized GIP Medium B Ø 1.1/4"
17 Pipa Galvanized GIP Medium B Ø 1.1/2"
18 Pipa Galvanized GIP Medium B Ø 2"
19 Pipa Galvanized GIP Medium B Ø 2,5"
20 Pipa Galvanized GIP Medium B Ø 3"
21 Pipa Galvanized GIP Medium B Ø 4
22 Pipa PVC AW Ø 1/2" - P. 4 m.
23 Pipa PVC AW Ø 1/2" - P. 4 m.
24 Pipa PVC AW Ø 1/2" - P. 4 m.
25 Pipa PVC AW Ø 3/4 '' - P. 4 m.
26 Pipa PVC AW Ø 3/4 '' - P. 4 m.
27 Pipa PVC AW Ø 3/4 '' - P. 4 m.
28 Pipa PVC AW Ø 3/4 '' - P. 4 m.
29 Pipa PVC AW Ø 1" - P. 4 m.
30 Pipa PVC AW Ø 1" - P. 4 m.
31 Pipa PVC AW Ø 1" - P. 4 m.
32 Pipa PVC AW Ø 1" - P. 4 m.
33 Pipa PVC AW Ø 1.1/4" - P. 4 m.
34 Pipa PVC AW Ø 1.1/4" - P. 4 m.
35 Pipa PVC AW Ø 1.1/4" - P. 4 m.
36 Pipa PVC AW Ø 1.1/4" - P. 4 m.
37 Pipa PVC AW Ø 1.1/2" - P. 4 m.
38 Pipa PVC AW Ø 1.1/2" - P. 4 m.
39 Pipa PVC AW Ø 1.1/2" - P. 4 m.
40 Pipa PVC AW Ø 1.1/2" - P. 4 m.
41 Pipa PVC AW Ø 2 '' - P. 4 m.
42 Pipa PVC AW Ø 2 '' - P. 4 m.
43 Pipa PVC AW Ø 2 '' - P. 4 m.
44 Pipa PVC AW Ø 2 '' - P. 4 m.
45 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
46 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
47 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
48 Pipa PVC AW Ø 2 1/2 '' - P. 4 m.
49 Pipa PVC AW Ø 3 '' - P. 4 m.
50 Pipa PVC AW Ø 3 '' - P. 4 m.
51 Pipa PVC AW Ø 3 '' - P. 4 m.
52 Pipa PVC AW Ø 3 '' - P. 4 m.
53 Pipa PVC AW Ø 4'' - P. 4 m.
54 Pipa PVC AW Ø 4'' - P. 4 m.
55 Pipa PVC AW Ø 4'' - P. 4 m.
56 Pipa PVC AW Ø 4'' - P. 4 m.
57 Pipa PVC AW Ø 5" - P. 4 m.
58 Pipa PVC AW Ø 6" - P. 4 m.
59 Pipa PVC AW Ø 8" - P. 4 m.
60 Pipa PVC AW Ø 10" - P. 4 m.
61 Pipa PVC AW Ø 12'' - P. 4 m.
62 Pipa PVC AW Ø 5" - P. 4 m.
63 Pipa PVC AW Ø 6" - P. 4 m.
64 Pipa PVC AW Ø 8" - P. 4 m.
65 Pipa PVC AW Ø 10" - P. 4 m.
66 Pipa PVC D Ø 1 1/4" - P. 4 m.
67 Pipa PVC D Ø 1 1/4" - P. 4 m.
68 Pipa PVC D Ø 1 1/4" - P. 4 m.
69 Pipa PVC D Ø 1 1/2" - P. 4 m.
70 Pipa PVC D Ø 1 1/2" - P. 4 m.
71 Pipa PVC D Ø 1 1/2" - P. 4 m.
72 Pipa PVC D Ø 2" - P. 4 m.
73 Pipa PVC D Ø 2" - P. 4 m.
74 Pipa PVC D Ø 2" - P. 4 m.
75 Pipa PVC D Ø 2 1/2 - P. 4 m.
76 Pipa PVC D Ø 2 1/2 - P. 4 m.
77 Pipa PVC D Ø 2 1/2 - P. 4 m.
78 Pipa PVC D Ø 3" - P. 4 m.
79 Pipa PVC D Ø 3" - P. 4 m.
80 Pipa PVC D Ø 3" - P. 4 m.
81 Pipa PVC D Ø 4" - P. 4 m.
82 Pipa PVC D Ø 4" - P. 4 m.
83 Pipa PVC D Ø 4" - P. 4 m.
84 Pipa PVC D Ø 5" - P. 4 m.
85 Pipa PVC D Ø 5" - P. 4 m.
86 Pipa PVC D Ø 6" - P. 4 m.
87 Pipa PVC D Ø 8" - P. 4 m.
88 Pipa PVC D Ø 10" - P. 4 m.
89 Pipa PVC D Ø 12" - P. 4 m.
90 Pipa PVC D Ø 6" - P. 4 m.
91 Pipa PVC D Ø 8" - P. 4 m.
92 Pipa PVC D Ø 10" - P. 4 m.
93 Pipa PVC D Ø 12" - P. 4 m.
94 Pipa PVC C Ø 5/8" - P. 4 m.
95 Pipa PVC C Ø 1/2" - P. 4 m.
96 Pipa PVC C Ø 3/4" - P. 4 m.
97 Pipa PVC C Ø 1" - P. 4 m.
98 Sok Drat Luar Ø 1"
99 Sok Drat Luar Ø 1,5"
1 Air Accu
2 Kunci Ring-Pass
3 Kunci Ring-Pass
4 Oli Mesin Bensin
5 Oli Mesin Solar
6 Soda api Kering (sebuk)
7 Spritus
8 Wallpaper
AN UPAH DAN BAHAN (BASIC PRICE)
M001 M3 367,500.00
M02a M3 1,170,700.00
M02b M3 1,375,500.00
M02c M3 1,212,700.00
M02d M3 1,396,500.00
M02e M3 1,438,500.00
M02f M3 1,533,000.00
M02g M3 1,585,500.00
M02h M3 1,622,200.00
M02i M3 1,680,000.00
M02j M3 1,732,500.00
M02k M3 1,869,000.00
M02l M3 1,501,500.00
M02m M3 1,606,500.00
M02n M3 1,470,000.00
M03a Buah 1,500.00
M03b Buah 1,500.00
M04a Buah 47,000.00
M04b Buah 4,200.00
M05a Buah 32,500.00
M05b Buah 3,100.00
M05c M2 262,500.00
M06a M2 231,000.00
M06b M2 252,000.00
M06c M2 315,000.00
M06d M2 262,500.00
M06e M2 262,500.00
M06f M2 252,000.00
M06g M2 252,000.00
M06h M2 262,500.00
M06i M2 262,500.00
M06j M2 252,000.00
M07k Kg 15,700.00
M08a M2 252,000.00
M08b M3 550,000.00
M08c M3 625,000.00
M08d M3 620,000.00
M08e M3 620,000.00
M08f M3 273,000.00
M09g M3 625,000.00
M10a M3 625,000.00
M10b M3 650,000.00
M10c M3 650,000.00
M11a M3 650,000.00
M11b M3 650,000.00
M11c M3 650,000.00
M11d M3 650,000.00
M11e M3 580,000.00
M11f M2 367,500.00
M11g M2 367,500.00
M11h M2 367,500.00
M11i Buah 23,100.00
M12a Buah 13,300.00
M12b Buah 12,000.00
M12c Buah 126,000.00
M12d Buah 168,000.00
M12e Buah 189,000.00
M12f Buah 210,000.00
M12g Buah 168,000.00
M12h Buah 252,000.00
M12i Buah 168,000.00
M12j Buah 126,000.00
M12k Buah 157,500.00
M12l Buah 178,500.00
M12m Buah 147,000.00
M12n Buah 260,000.00
M13 Kg 27,000.00
M14 M3 650,000.00
M15a M3 320,000.00
M15b M3 320,000.00
M15c M3 135,000.00
M20 Kg 650,000.00
M21a M3 330,000.00
M21b M3 160,000.00
M21c M3 265,000.00
M16a M3 2,800.00
M16b Buah 2,800.00
M16c Buah 3,200.00
M16d Buah 3,200.00
M17a Liter Multidex 67,650.00
M17b Liter Multidex 748,000.00
M18 Bungkus 82,000.00
M19a Zak Acian 102,190.00
M19b Zak Gresik 63,800.00
M19c Zak Conch 61,600.00
M19d Zak Holchi 52,800.00
M19e Zak Tiga Roda 59,950.00
M19f Kg Tiga Roda 3,850.00
M19g zak GML 99,000.00
M19h Zak Tiga Roda 121,000.00
M19i Kg MU 18,700.00
M19j Zak GML 18,700.00
M19k zak Sika 335,500.00
M94 M2 13,600.00
M95a Dus Asia Tile 71,400.00
M95b Dus Roman 112,700.00
M95c Dus Setara 68,600.00
Mulia/Arwana
M95d Dus Setara Roman 63,000.00
M95e Dus Setara 75,300.00
Mulia/Arwana
M95f Dus Arwana/Diamond 84,000.00
M95g Dus Setara 65,300.00
Mulia/Arwana
M95h Dus Asia Tile 68,200.00
M95i Dus Setara Mulia 78,700.00
M95j Dus KIA 78,700.00
M95k Dus Setara 75,700.00
M95l Dus Mulia/Arwana
Setara Roman 141,700.00
M95m Dus Setara 63,000.00
M95n Dus Mulia/Arwana
Setara Roman 66,500.00
M95o Dus Platinum 105,000.00
M95p Dus Essenza 89,200.00
M95q Dus Essenza 81,900.00
M95r Dus Roman 115,500.00
M95s Dus Platinum 78,700.00
M95t Dus Garuda 294,000.00
M95u Dus Essenza 294,000.00
M95v Buah 7,300.00
M96 Dus Teraso Nilam 78,700.00
M204a Kg 17,400.00
M204b Drum 2,697,000.00
Rp 3,925
Per kg : 14040.084388
Per kg : 13972.972973
Per kg : 13981.308411
Per kg : 14010.526316
per buah Rp 6,882
per buah Rp 12,882
DAFTAR HARGA SATUAN UPAH DAN BAHAN (BASIC PRICE)
II PEKERJAAN BESI
1 Mandor L.04
2 Kepala Tukang Besi L.03
3 Tukang Besi L.02
IV PEKERJAAN CAT
1 Mandor L.04
2 Kepala Tukang Cat L.03
3 Tukang Cat L.02
VI PEKERJA/ BURUH
A KONSTRUKSI
SATUAN HARGA UPAH
4 5
Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00
Org/Hari 173,000.00
Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00
Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00
Org/Hari 262,000.00
Org/Hari 210,000.00
Org/Hari 183,000.00
Org/Hari 577,000.00
Org/Hari 525,000.00
Org/Hari 525,000.00
Org/Hari 288,000.00
Org/Hari 288,000.00
Org/Hari 210,000.00
Org/Hari 168,000.00
Org/Hari 183,000.00
Org/Hari 178,000.00
Org/Hari 315,000.00
Org/Hari 183,000.00
Org/Hari 262,000.00
Org/Hari 183,000.00
Org/Hari 183,000.00
Org/Hari 183,000.00
PERHITUNGAN BIAYA PELAKSANAAN
SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) KONST
Harga
No Uraian Satuan Volume
Satuan
1 Penyiapan RK3K terdiri atas :
Pembuatan Manual, Prosedur, Instruksi Kerja,
a Set 1 Rp 350,000
Izin Kerja, dan Formulir
TOTAL
SANAAN
AN KERJA (SMK3) KONSTRUKSI
Total Harga
Keterangan
(Rp)
Rp 350,000
Rp 50,000
Rp 300,000
Rp 1,000,000
Rp 1,000,000
Rp 150,000
Rp 150,000
Rp 150,000
Rp 300,000
Rp 600,000
Rp 150,000
Rp 300,000
Rp 9,725,000
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILITAS
B. PERALATAN LS 11
1 Aspal Finisher
2 Aspal Sprayer
3 Buldozer
4 Compresor
5 Dump truck
6 Excavator
7 Generator set
8 Motor Grader
9 Three Whell Roller
10 Vibro Roller
11 Water Tanker
3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
4 Concrete Testing
Slump Cone Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi LS 1
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli Jembatan
4 .............................
5 .............................
LS
G. DEMOBILISASI 1
Rp 3,000.00 Rp 900,000.00
Rp 100,000,000.00 Rp 100,000,000.00
Rp 100,000,000.00 Rp 100,000,000.00
Rp 124,000,000.00 Rp 124,000,000.00
Rp 25,000,000.00 Rp 25,000,000.00
Rp 50,000,000.00
Rp 130,290,000.00 Rp 130,290,000.00
Rp 530,190,000.00
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 2.1 (1)
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air
SATUAN PEMBAYARAN : M3
B BAHAN
-
JU
C PERALATAN
1. Excavator (E10a) Jam
2. Dump Truck (E08) Jam
3. Alat Bantu LS
JUMLA
AN (A+B+C) Rp 56,244.496
Rp 5,624.450
Rp 61,868.945
DIVISI III PEKERJAAN TANAH
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 3.3 (1)
JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2
Perkiraan
No. Komponen Satuan
Kuantitas
A. TENAGA
1. Pekerja (L01) Jam 0.0034
2. Mandor (L03) Jam 0.0017
JUMLAH HAR
B BAHAN
-
JUMLAH HA
C PERALATAN
1. Motor Grader (E13) Jam 0.0017
2. Tandem/Vibro Roller (E17) Jam 0.0244
3. Alat Bantu LS 1
JUMLAH HARGA
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 3.1.(6)
JENIS PEKERJAAN : Galian dengan kedalaman 4-6 meter
SATUAN PEMBAYARAN : M3
Perkiraan
No. Komponen Satuan
Kuantitas
A. TENAGA
1. Pekerja (L01) Jam 0.0461
2. Mandor (L03) Jam 0.0038
JUMLAH HAR
B BAHAN
1. Urugan Pilihan (EI-32 2) M3 1.875
2. Bahan Pengamatan Tebing Galian M3 0.6
JUMLAH HA
C PERALATAN
1. Excavator (E10a) Jam 0.0038
2. Dump Truck (E08) Jam 0.033347
3. Alat Bantu LS 1
JUMLAH HARGA
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 3.2.(2a)
JENIS PEKERJAAN : Timbunan Biasa Dari Hasil Galian
SATUAN PEMBAYARAN : M3
Perkiraan
No. Komponen Satuan
No. Komponen Satuan
Kuantitas
A. TENAGA
1. Pekerja (L01) Jam 0.0159
2. Mandor (L03) Jam 0.004
JUMLAH HAR
B BAHAN
1. Bahan Pilihan (M09) M3 1.2
JUMLAH HA
C PERALATAN
1. Wheel Loader (E15) Jam 0.0085
2. Dump Truck (E09) Jam 0.141
3. Motor Grader (E13) Jam 0.004
4. Tandem (E17) Jam 0.0112
5. Water Tanker (E23) Jam 0.0341
6. Alat Bantu LS 1
JUMLAH HARGA
Rp 30,000.000 Rp 102.000
Rp 37,428.571 Rp 63.629
JUMLAH HARGA TENAGA Rp 165.629
Rp 440,419 Rp 748.712
Rp 259,857 Rp 6,340.513
Rp -
JUMLAH HARGA PERALATAN Rp 7,089.225
Rp 7,254.854
Rp 725.485
Rp 7,980.339
PERKIRAAN VOL PEK : 1,00
TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK
Rp 30,000.000 Rp 1,383.000
Rp 37,428.571 Rp 142.229
JUMLAH HARGA TENAGA Rp 1,525.229
Rp 265,000 Rp 496,875
Rp 1,250,000 Rp 750,000
JUMLAH HARGA BAHAN Rp 1,246,875
Rp 632,144 Rp 2,402.145
Rp 355,058 Rp 11,840.117
Rp -
JUMLAH HARGA PERALATAN Rp 14,242.262
Rp 1,262,642.491
Rp 126,264.249
Rp 1,388,906.740
Rp 24,714.286 Rp 392.957
Rp 37,428.571 Rp 149.714
JUMLAH HARGA TENAGA Rp 542.671
Rp 25,000 Rp 30,000
JUMLAH HARGA BAHAN Rp 30,000
Rp 344,983
Rp 2,932.358
Rp 556,006
Rp 78,396.809
Rp 440,419
Rp 1,761.676
Rp 259,857
Rp 2,910.399
Rp 371,529
Rp 12,669.127
Rp -
JUMLAH HARGA PERALATAN Rp 98,670.369
Rp 129,213.040
Rp 12,921.304
Rp 142,134.344
DIVISI 4 PEKERJAAN PERKERASAN DAN BAHU JALAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 5.1.(3)
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S
SATUAN PEMBAYARAN : M3
B BAHAN
1. Agregat S M3 M3
JU
C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. Motor Grader (E13) Jam
4. Vibratory Roller (E19a) Jam
5. Alat Bantu LS
JUMLA
N (A+B+C) Rp 894,972.569
Rp 89,497.257
Rp 984,469.826
DIVISI V PEKERJAAN BERBUTIR
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 5.1.(1)
JENIS PEKERJAAN : Lapis Pondasi Atas Agregat Kelas A
SATUAN PEMBAYARAN : M3
B BAHAN
1. Agregat A M26 M3
JU
C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. Motor Grader (E13) Jam
4. Vibratory Roller (E19a) Jam
5. Alat Bantu LS
JUMLA
B BAHAN
1. Agregat B M26 M3
JU
C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. Motor Grader (E13) Jam
4. Vibratory Roller (E19a) Jam
5. Alat Bantu LS
JUMLA
N (A+B+C) Rp 895,028.212
Rp 89,502.821
Rp 984,531.033
PERKIRAAN VOL PEK : 1,00
si Bawah Agregat Kelas B TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK
N (A+B+C) Rp 1,027,230.324
Rp 102,723.032
Rp 1,129,953.356
DIVISI VI PEKERJAAN ASPAL
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 6.1.(1)
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair/Emulsi
SATUAN PEMBAYARAN : Liter
B BAHAN
1. Aspal Emulsi CSS-1 (M31a) Kg
JU
C PERALATAN
1. Asp. Distributor (E41) Jam
2. Compressor (E05) Jam
JUMLA
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 6.3.(5a)
JENIS PEKERJAAN : Laston Lapis Aus (AC - WC)
SATUAN PEMBAYARAN : Ton
B BAHAN
1. A g r Peh Mesin 5 - 10 & 10 - 15 (M92) M3
2. A g r Peh Mesin 0 - 5 (M91) M3
3. Semen (M12) Kg
4. Aspal (M10) Kg
JU
C PERALATAN
1. Wheel Loader (E15) Jam
2. AMP (E01) Jam
3. Genset (E12) Jam
4. Dump Truck (E09) Jam
5. Asp. Finisher (E02) Jam
6. Tandem Roller (E17a) Jam
7. P. Tym Roller (E18) Jam
8. Alat Bantu (E01) LS
JUMLA
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 6.2.(1)
JENIS PEKERJAAN : Agregat Penutup BURTU
SATUAN PEMBAYARAN : M2
B BAHAN
1. Chipping (M92) M3
JU
C PERALATAN
1. Wheel Loader (E15) Jam
2. Dump Truck (E09) Jam
3. P. Tyre Roller (E18) Jam
4. Alat Bantu (E01) LS
JUMLA
N (A+B+C) Rp 18,249.143
Rp 1,824.914
Rp 20,074.058
PERKIRAAN VOL PEK : 1,00
s Aus (AC - WC) TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK
N (A+B+C) Rp 1,817,955.407
Rp 181,795.541
Rp 1,999,750.947
PERKIRAAN VOL PEK : 1,00
utup BURTU TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK
N (A+B+C) Rp 9,341.199
Rp 934.120
Rp 10,275.319
DIVISI VII PEKERJAAN HARIAN & LAIN - LAIN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 9.2 (1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2
B BAHAN
1. Cat Marka Termoplastik (M17b) Kg
2. Glass Bead (M34) M3
JU
C PERALATAN
1. Dump Truck (E08) Jam
2. Thermoplastic Road Marking Machine (E85) Jam
3. Alat Bantu LS
JUMLA
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 9.2 (3a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaan
Pemantul Engineering Grade
SATUAN PEMBAYARAN : M3
B BAHAN
1. Plat Rambu (M35a) Buah
2. Pipa Galvanis Diameter 5" (M24) Batang
3. Beton Fc' = 20 Mpa (M60) M3
JU
C PERALATAN
1. Dump Truck (E08) Jam
2. Alat Bantu LS
JUMLA
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
:
PROP/KAB/KODYA :
ITEM PEMBAYARAN NO. : 7.3 (1)
JENIS PEKERJAAN : Baja Tulangan Polos BjTP 280
SATUAN PEMBAYARAN : M3
B BAHAN
1. Rel Pengaman (Termasuk Tiang Blok Baut) (M36) M
JU
C PERALATAN
1. Dump Truck (E08) Jam
2. Alat Bantu LS
JUMLA
) Rp 95,693.635
Rp 9,569.364
Rp 105,262.999
PERKIRAAN VOL PEK : 1,00
Tunggal dengan Permukaan
gineering Grade TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK
1 Rp 176,000 Rp 176,000
1 Rp 1,921,500.000 Rp 1,921,500
0.016 Rp -
JUMLAH HARGA BAHAN Rp 2,097,500
) Rp 2,151,738.688
Rp 215,173.869
Rp 2,366,912.557
PERKIRAAN VOL PEK : 1,00
n Polos BjTP 280 TOTAL HARGA (Rp.)
0% THD. BIAYA PROYEK
0.2021
1 Rp -
JUMLAH HARGA PERALATAN Rp -
) Rp 2,641,699.700
Rp 264,169.970
Rp 2,905,869.670
PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI VOLUME SATUAN
JUMLAH KOEFISIEN
M M M
I DIVISI 1. MOBILISASI
Mobilisasi dan Demobilisasi
1.1
STA 0 s/d STA 843,43 - x - x - x - x - -
II DIVISI 2. DRAINASE
Galian Tanah Saluran Drainase
2.1
STA 0 s/d STA 843,43 0.885 + 0.615 x 0.65 / 2 x 843.43 822.344 M3
Timbunan Tanah
STA 500 s/d STA 550 50 x( -0.350 x / 2 ) -8.750 M3
STA 550 s/d STA 600 50 x( -4.340 x / 2 ) -108.500 M3
STA 600 s/d STA 650 50 x( -9.696 x / 2 ) -242.400 M3
3.2 STA 650 s/d STA 700 50 x( -13.125 x / 2 ) -328.125 M3
STA 700 s/d STA 800 50 x( -8.890 x / 2 ) -222.250 M3
STA 750 s/d STA 800 50 x( -2.906 x / 2 ) -72.650 M3
STA 800 s/d STA 843,43 43.43 x( -1.191 x / 2 ) -29.775 M3
TOTAL -1003.700 M3
Rel Pengaman
STA 30,89 s/d STA 369,11 313.048 x x x x 313.048 M
8.3
STA 369,11 s/d STA 630,89 252.006 x x x x 252.006 M
TOTAL 565.054 M
DAFTAR KUANTITAS DAN HARGA
Rp 530,190,000 Rp 530,190,000
Rp 530,190,000
Rp 61,868.945 Rp 50,877,571.354
Rp 50,877,571.354
Rp 7,980.339 Rp 47,116,001.435
Rp 142,134.344 Rp 142,660,241.482
Rp 1,388,906.740 Rp 940,081,526.927
Rp 1,129,857,769.844
Rp 984,469.826 Rp 747,298,246.620
Rp 747,298,246.620
Rp 984,531.033 Rp 1,162,536,212.703
Rp 1,129,953.356 Rp 667,125,591.535
Rp 1,829,661,804.237
Rp 1,999,750.947 Rp 9,445,239,672.093
Rp 10,275.319 Rp 6,976,542.344
Rp 9,452,216,214.437
Rp 105,262.999 Rp 29,763,807.566
Rp 2,366,912.557 Rp 4,733,825.114
Rp 2,905,869.670 Rp 1,641,973,280.512
Rp 1,676,470,913.192
REKAPITULASI
RENCANA ANGGARAN BIAYA
Kegiatan :
Pekerjaan :
Lokasi :
Tahun Anggaran :
No. Uraian
1 DIVISI 1. UMUM
2 DIVISI 2. DRAINASE
3 DIVISI 3. PEKERJAAN TANAH
4 DIVISI 4. PEKERJAAN PERKERASAN
5 DIVISI 5. PEKERJAAN BERBUTIR
6 DIVISI 6. PEKERJAAN ASPAL
7 DIVISI 7. PEKERJAAN HARIAN & LAIN - LAIN
Terbilang : "LIMA BELAS MILIYAR SERATUS EMPAT BELAS JUTA SERATUS DUA BELAS RIBU
ASI
RAN BIAYA
Rp 13,740,101,606.493
Rp 1,374,010,160.649
Rp 15,114,111,767.142
Rp 15,114,112,000