Tahun Q (m³/det)
1999 29.6
2000 64
2001 48
2002 181.2
2003 70.8
2004 58.8
2005 120.1
2006 79.9
2007 87.8
2008 179.5
2009 108.2
2010 77
2011 59.1
2012 45.2
2013 91.4
2014 82.4
2015 83.9
2016 65
2017 95.7
2018 110.2
2019 51.2
Rata-Rata 85.190
MENCARI KEMIRINGAN SUNGAI RATA - RATA
Kedalaman Elevasi ( m ) Jarak
No. Kemiringan
Sungai ( m ) Tertinggi Terendah (m)
HULU
1 1.5 97.550 93.100 100 0.04450
2 1.5 93.100 93.031 100 0.00069
Kemiringan Rata - Rata Hulu 0.02260
HILIR
1 1.5 96.320 92.886 100 0.03434
2 1.5 92.886 92.621 100 0.00265
3 1.5 92.621 92.420 100 0.00201
4 1.5 92.420 92.321 100 0.00099
5 1.5 92.321 92.240 100 0.00081 0.04080
Kemiringan Rata - Rata Hilir 0.00816 0.00816
Grafik Hubungan y vs Q
2.50
2.00
1.50
y (m)
1.00
0.50
0.00
50 100 150 200 250 300 350 4
Q (m³/det)
MUKA AIR DI TITIK BENDUNG
I v Q 181.200 <-- DISALIN
(m) (m/s) (m /det) benar
3
ungan y vs Q
m³/det)
0.0154 -500
PERENCANAAN MERCU BENDUNG
1 Elevasi Sawah Tertinggi 94.86 m
2 Kehilangan Tinggi Air di Sawah 0.1 m
Kehilangan Tekanan :
Tersier ke Sawah 0.6 m
Sekunder ke Tersier 0.1 m
3 Primer ke Sekunder 0.1 m
Sungai ke Primer 0.2 m
Kemiringan Sungai 0.15 m ?
Alat - Alat Ukur 0.4 m
Persediaan Tekanan :
4 Eksploitasi 0.1 m
Lain - Lain 0.25 m
Elevasi Mercu Bendung 96.86 m 96.36
97.100
Tahun Q (m³/det)
1999 29.6
2000 64
2001 48
2002 181.2
2003 70.8
2004 58.8
2005 120.1
2006 79.9
2007 87.8
2008 179.5
2009 108.2
2010 77
2011 59.1
2012 45.2
2013 91.4
2014 82.4
2015 83.9
2016 65
2017 95.7
2018 110.2
2019 51.2
Rata-Rata 85.190
Tabel 7.4 Hasil Perhitungan Kemiringan Rata-Rata Sungai
MENCARI KEMIRINGAN SUNGAI RATA - RATA
Kedalaman Elevasi ( m ) Jarak
No. Kemiringan
Sungai ( m ) Tertinggi Terendah (m)
HULU
1 4 93.000 92.253 100 0.00747 0.00747
2 4 93.450 93.000 100 0.00450 0.0045
3 4 93.760 93.450 100 0.00310 0.0031
4 4 94.200 93.760 100 0.00440 0.0044
5 4 94.500 94.200 100 0.00300 0.003
Kemiringan Rata - Rata Hulu 0.00449 0.00449
HILIR
1 4 93.253 92.950 100 0.00303
2 4 93.198 92.400 100 0.00798 0.02301
3 4 92.400 92.000 100 0.00400 0.004602
4 4 92.000 91.760 100 0.00240
5 4 91.760 91.200 100 0.00560
Kemiringan Rata - Rata Hilir 0.00460
2.329
Kemiringan Rata - Rata Sungai 0.00455
96.300
0.03216
500
ANALISA HIDROLIS
Tabel 7.6 MENENTUKAN TINGGI MUKA AIR DI TITIK BENDUNG
b z y P A R
m c
(m) (m) (m) (m) (m )
2
(m)
22 1.000 1.450 26.101 34.003 1.303 2.36 28.360
22 1.000 1.600 26.525 37.760 1.424 2.36 29.214
22 1.000 1.750 26.950 41.563 1.542 2.36 29.996
22 1.000 1.900 27.374 45.410 1.659 2.36 30.717
22 1.000 2.050 27.798 49.303 1.774 2.36 31.384
22 1.000 2.200 28.223 53.240 1.886 2.36 32.006
elevasi muka air di hilir bendung 96.30
Grafik Hubungan y vs Q
2.50
2.00
1.50
y (m)
1.00
0.50
0.00
70 80 90 100 110 120 130 140 150
Q (m³/det)
MUKA AIR DI TITIK BENDUNG
I v Q 157.720 <-- DISALIN
(m) (m/s) (m /det)
3
benar
0.00455 2.183 74.225
0.00455 2.351 88.761
0.00455 2.512 104.412
0.00455 2.668 121.155
0.00455 2.819 138.968
0.00455 2.965 157.832
gan y vs Q
det)
0.0045 -500
PERHITUNGAN MERCU ALA INDONESIA
DATA :
A DATA DEBIT BANJIR RENCANA (Qd) = 157.7201 m3/s
B LEBAR SUNGAI (B) = 25 m
C KETINGGIAN MERCU = 95.60 m
D KETINGGIAN DASAR SUNGAI = 94.10 m
E KETINGGIAN MUKA AIR BANJIR = 98.00 m
F TINGGI PEMBENDUNGAN (P) = 1.5 m
G TINGGI MUKA AIR BANJIR (Hd) = 2.4 m
H LEBAR MERCU (B) = 30 m
I Kp = 0.01
J Ka = 0.1
0,7*H = 1.773 r=
Dengan tinggi muka air banjir = 1,506 m, maka berdasarkan syarat 0,7 H ≤ r ≤ H; maka : r berada antar
Dengan jari-jari 1,25 meter dan tinggi muka air di hulu 1,054, dari grafik 4.2, didapat harga q = 4,50 m
Untuk pintu bilas yang lebarnya 1 meter Sehingga lebar efektif untuk mercu s
lebar efektif = 0.8 23.200
* Ketinggian muka air banjir didapat dari persamaan : Elevasi Dasar Sungai + P + Hu
asumsi
2.557342
ketentuan Hd 2/3
= 3.700407
ketentuan Hd = 2.392396
m
m
m
m 3.125 2.5
= 9.81
1.266686
≤ H; maka : r berada antara 0,7 x 1,70520 = 1,19364 meter dan 1,70520 m diambil r = 1,5 meter
24 2.7
1.773
= 3.9 ===> P + Hu
0.380006
Data Data Irigasi
Debit Banjir = 157.72013 m3/dtk
Lebar Sungai (B) = 25 m
Elevasi Mercu = 96.86 m
Elevasi Dasar Sungai = 94.10 m
Tinggi Bendung = 1.5 m
Jari-jari Mercu
V1 = 1.618 m/dtk
ha = 0.133 m
H1 = 2.533 m
r = 2.1 m
H q
1 1.80 4.5
interpolasi 2.533 8.167
2 2.70 9
Beff = 19.31 m
= 24.00 m
Elevasi muka air banjir = 96.87 m
Menentukan Kordinat
y/Hd = 1/k*((x/Hd)^1,776)
Y/1.878 = 1/1,873((x/1.450)^1,776)
Y = 0.532 X^1,776
H1 = 1.5
Beff = 10
q = 15.27
v = 5.09
Ha = 1.320
Hd = 0.18
ketinggian muka air banjir = 98.36 Dengan Perencanaan Pilar-Pilar Sebag
* Pilar Jembatan 3 buah deng
r = 0.0809204 * Pilar bendung 1 buah denga
jarak = 0.021399 * Pilar pembilas bawah 2 bua
* Pintu bilas (Pb) lebarnya
3 m
2 m
0.75 m
0.7 m
b 2.8 h1 2.216
25 22.5 4 0.1 0.01
Be 19.080
0.28 h1 2.506196
hd+p 4.650 49.37
0.70 h1
157.72 157.744
V1 1.571
ha 0.126
hd 2.090
0 1 1.5
B 23 y 0 0.301296 0.619058
r 0.836
jarak 0.249
h1/r 2.650437 1.060175
p/h1 1.155235
p/hd 1.224751
p/hd
cd 1.470
0.140
0.280
30
19.7
bendung ogee
0.119hd 0.248736
r 0.45hd 0.9406
3.364
x 0 0.5 1 1.5 2.5 2.76
y 0 0.09 0.30 0.61 1.51 1.80
DATA - DATA PERENCANAAN TIPE KOLAM LONCAT AIR
a. Debit Banjir Rencana ( Qr ) 157.72 m3/detik ΔH atau Z 0.889
b. Lebar Sungai ( b ) 25 m V1 =
c. Elevasi Mercu 96.860 m y1 =
d. Elevasi Dasar Sungai 94.100 m Fr =
e. Jari - Jari Mercu 0.79 m y2 =
f. Lebar Kolam Olakan (Bbr) 22.500 m yu =
g. Elevasi Muka Air Hilir 96.300 m n =
h. Tinggi Energi ( ha ) 0.316 m n3 =
i. Elevasi Muka Air Banjir 96.873 m 0.375 =
j. Hd 1.273 m 0.5 =
k. H1 1.589 m 0.2 =
k. B eff 23.000 m 0.75 =
Panjang air loncat =
puncak mercu 97.1
98.133 Tinggi tanggul =
b = 23.000
h = 1.273
m = 1 muka hulu
R = 1.16198168179
c = 4.06369979937 25
I = 0.00486111111
v = 0.00036534483
H1 1.589
Z 0.889
q 6.308805148259
hc 1.594930415965 4.057189
z / hc 0.557473217076
t 4.873704346895
a 0.598119233417
elevasi 91.388
D 5.472
ONCAT AIR
m
5.748 m/det
1.098 m 4.80 dapat dari grafik usbr type 3
1.752
2.225 m v1 15.316
0.448 m
0.491 m
0.429 m
0.161 m
0.224 m 6.007287 91.66
0.086 m
0.322 m
10.680 m 5.44
3.240
1.033
3.500
z v1 y1 fr y2 y2` elevasi
2 7.405 0.852 2.561 2.689 1.200 95.1
3 8.628 0.731 3.222 2.986 2.200 94.1
4 9.699 0.650 3.840 3.222 3.200 93.1
5 10.663 0.592 4.426 3.419 4.200 92.1
5.44 11.05994 0.57042 4.675422 3.4972 4.64 91.66 syarat y2` ≥ y2
t+a > Y2
5.39 > 2.942 ok
2.1
2.8
Dari grafik untuk Fr = 3,374 di dapat L/y2 = 5,4 sehingga :
L/y2 = 4.62
L = 13.6 m
Data-Data Balok Pintu Bilas (Kelas 1)
Lebar Pintu Bilas = 1.25 m slentur =
Tinggi Pintu Bilas = 1.50 m (T.Bendung) starik = stekan =
gair = 1 t/m3 E kayu =
g sungai = 1.86 t/m 3
gkayu belian =
E. Muka Air Banjir = 97.69 m tekanan tanah (w) =
E. Dasar Sungai = 94.10 m
1 kg/cm2
9. Kontrol Tegangan
0.03 m M = 1845.2813 kg cm
1.25 m s = 174.74254
9. Kontrol Lendutan
1158.18 kg cm I = 182.25 cm4
Δmaks = 0.113 cm yg terjadi
Δizin = 0.3375 cm
3 cm
3.93 cm Δmaks < Δizin
9 cm 0.113 < 0.3375 ok
m = 1708.5938 kg/cm
w = 1.2204241 cm3
0.1750000
0.0270620
=
DATA - DATA PERENCANAAN ɣw 1 t/m3 ɣ lumpur 1.86 balok 3 x 9
Lebar Pintu Pembilas 1.25 m ɣ lumpur 0.86 t/m3 Q 66.178 kg
Tinggi Pintu Pembilas (P) 1.50 m ɸ 30 o τ 3.677 kg/cm2
Pintu Ganda : C 0.18 t/m2 τ' 15 kg/cm2
Pembilas Atas ( ha ) 0.80 m ok
Pembilas Bawah ( hb ) 0.7 m
H1 4.65 m panjang balok = 1.450 m
H2 1.50 m berat jenis kayu = 0.900 t/m3
*Tekanan akibat air *Tekanan akibat lumpur tinggi pintu = 1.500 m
Ta = 4.650221 t/m2 Ka 0.333 P 0.059 t
Pa = 3.09952 t/m2 lumpur kohesi 58.725 kg
PL 0.430 Tc 0.21 t/m2
PL 0.323 t/m Pc 0.312 t/m M 2128.78 kg.cm
τa 1400 kg/cm2
Ptotal 3.530 t/m W 1.521 cm3
h 4.201 cm 17.648
h 9.000 cm
I 182.250 cm4
F 0.015 cm
F' 0.313 cm
ok
Data :
Debit banjir = 85.19 m/detik
Lebar Sungai = 20 m
Ketinggian Mercu = 99.150 m
Ketinggian Sungai = 97.550 m
Ketinggian Air Banjir = 99.800 m
Tinggi Air Hilir = 95.551 m
Jari_Jari Mercu = 1.5 m
Lebar Kolam Olakan = 20 m
Tinggi energi (ha) = 0.0401 m
H1 1.5401 1.64
Z 2.290 Tekanan Akibat Air :
96.860
Vi 7.7486 3.599
y1 0.5497
Tekanan Akibat Lumpur :
Fr 3.3367
Y2 0.9171
Perhitungan untuk pembila
Panjang air Loncatan *Dicari di grafik
Panjang Kolam Olakan *Dicari di grafik
Panjang air Loncatan Grafik *Dicari di grafik
Tekanan Total Pembilas a
Mendimensi Balok
Direncanakan Balok
Kontrol Lendutan
Lendutan terjadi
Lendutan izin
Kontrol
Data : Lebar Papan ( B )
Lebar Pintu Bilas = 1.5 m Lebar Pintu bilas ( L)
Tinggi Pembilas = 4.000 m Dicoba menggunakan Kayu Jati
Perencanaan Pintu = 2 Buah Tegangan izin lentur
Pembilas Atas(Ha) = 3.000 m Tegangan izin tarik
Pembilas Bawah(Hb) = 1.00 m tekanan tanah
Lebar Pintu Bilas = 0.60 m Modulus Elastisitas
γw = 1.00 t/m Dicoba menggunakan Baja U
γL = 1.92 t/m δa
H1 = 1.54 t/m h 120
C = 0.50 t/m b 55
Ø = 30 t 9
Perhitungan Intake
NFR 1.028
t/m2 Debit yang dialirkan + pengambilan
t/m2 Q 75.000
t/m2 0.075
Debit Kantong Lumpur
QKL 0.090
t/m2 Tinggi Ambang
t/m2 H1^5/2 0.049
H1 0.299
t/m b 0.747
t/m H' 0.199
t/m syarat H' < 2/3 H1
Panjang Ambang
t/m 327.544 L 0.598
Tinggi Ambang = Pembendungan
kg/m t 1
Dimensi Intake
kg.m Z 2.290
H 1.500
m b 0.008
m Dari Tabel
b/h 1.500
------- ok h 2.250
w 0.5
cm^4 k 35
v 0.7
A 5.400
Kontrol Gaya Geser
ok τ 0.000016
Pada tebing Saluran
kg/cm τ 0.000012
kg/cm Kontrol Terhadap Endapan
0.290
kg/cm2 Kontruksi Aman Keliling Basah
P 12.74525
Jari_jari ( R )
R 0.4236872
kg.cm Kemiringan stickler
cm^4 I 0.0372391
1.7813421
Kontruksi Aman 0.0067336 0.0014542
Data :
0.00 ha Lebar pintu bilas = 0.80
8.883 mm/hari Tinggi Air Disaign = 0.50
1 Buah Debit yang dialirkan = 0.075
9.810 m/s Gaya Gravitasi = 9.81
1.00 m Viskositas = 1.02E-07
1.500 m Kec. Jenis Air = 0.1019
1.00 t/m Kec.Jenis pasir = 0.27
1.92 t/m Dim. Partikel Terkeci; = 7.00E-05
2.53 t/m Waktu Pembilasan = 7
0.50 t/m Kandungan Sedimen = 0.07
30 Kec. Air normal 0.4
Data
L 21.351
V 23
ds 0.225
V
7.52
Maka panjang kantong Lumpur
P 123.000
m
m
L^3/detil
m/s
t/ms
t^3/s
t^3/s
m
Hari
t^3/s
m^2
m^3
m/detik
m^2
ok...!!
m^2
m
m
m
m
m
m^3/detik
m^2
m
m
Kritis
N/m^2
N/m^2
N/m^2
Terbilas>>
sisa
15.16 >>>>> sisa sampai NOL
DEBIT YANG HARUS DIALIRKAN KE SALURAN PINTU, DATA YANG DIBUTUHKAN YAITU :
Peta
- LUAS DAERAH YANG DIALIRI (A) = 262.913 Ha
- KEBUTUHAN AIR DI SAWAH (NFR) = 1.763 lt/det/Ha
- KOEFISIEN PENGURANGAN AKIBAT SISTEM GOLONGAN DIAMBIL C = 1,00. KARENA MENURUT STANDAR PERENCANAAN
---> C = 1
---> e = 0.684 Rentang e = 0,59 - 0,73. et*es*ep
C NFR A
Q =
e
1 1.763 262.913
Q =
0.684
- SYARAT ALIRAN YANG MELEWATI AMBANG LEBAR, MELIMPAH SEMPURNA : h' ≤ 2/3 h1
==> Maka :
Q = 0.678 M b h1 2 (2 . g . h1 )1/2
Q = 0.678 M b h1 2 (2 . g . h1 )1/2
0.6776
h1 5/2 =
0.678 0.9 2.5 (2 . 9,81) 1/2
- b = 2.5 h1 = 0.853 m
= 1.159 Meter
- KONTROL
h1 < 1/3 t
DIMENSI INTAKE
Z = 95.6 - 96.30
Z = 0.70 Meter
H = 95.6 - 94.10
H = 1.50 Meter
- SEHINGGA
Q = M b h1 (2 . g . z)1/2
b = 0.595 Meter
DIMENSI SALURAN
- DEBIT YANG MELALUI INTAKE (Q) = 0.678 m3/det
- LUAS DAERAH YANG DIALIRI = 262.913 Ha
- PENAMPANG SALURAN = TRAPESIUM
- m = 1
- w = 0.3
- k = 45
P = b + 2h (1+m2)1/2
P = 0.741 + 1.058 (1+12)1/2
P = 2.237 Meter
A
R =
P
0.392
R =
2.237
R = 0.175 Meter
V = K R2/3 I1/2
V2
I =
K2 R4/3
1.1
I =
45 0.175
I = 0.00610 m
τ < τ ijin
9.385555 < 15 ==> OK
26291.25 m2
262.9125 ha
T STANDAR PERENCANAAN IRIGASI, UNTUK PROYEK IRIGASI YANG KURANG DARI 10.000 Ha DAN MENGAMBIL AIR LANGSUNG DARI SUNGAI.
2.5 h1
4.457045
h1 0.152032
= 1.0 Meter
0.396981
h
1.40 h
1.40 0.529
0.741 Meter
b h2
1.40 h2
0.392 m2
Q Q
==> V =
A A
0.678
V =
0.392
DEBIT YANG HARUS DIALIRKAN KE SALURAN PINTU, DATA YANG DIBUTUHKAN YAITU :
C NFR A
Q =
e
1 1.763 71.663
Q =
0.684
Q = 0.678 M b h1 2 (2 . g . h1 )1/2
==> Maka :
Q = 0.678 M b h1 2 (2 . g . h1 )1/2
Q = 0.678 M b h1 2 (2 . g . h1 )1/2
0.1847
h1 5/2 =
0.385 0.9 2.5 (2 . 9,81) 1/2
- b = 2.5 h1 = 0.507 m
- TINGGI AMBANG(t) = P - h1
= 1.5 - 0.203
= 1.297 Meter
- KONTROL
h1 < 1/3 t
DIMENSI INTAKE
Z = 95.6 - 96.30
Z = 0.70 Meter
H = 95.6 - 94.10
H = 1.50 Meter
- SEHINGGA
Q = M b h1 (2 . g . z)1/2
0.185 = 0.6766 b
b = 0.273 Meter
DIMENSI SALURAN
- DEBIT YANG MELALUI INTAKE (Q) = 0.185 m3/det
- LUAS DAERAH YANG DIALIRI = 71.663 Ha
- PENAMPANG SALURAN = TRAPESIUM
- b/h = 1.00 - 1
- m = 1
- w = 0.3
- k = 35
P = b + 2h (1+m2)1/2
P = 2.025 Meter
A
R =
P
0.280
R =
2.025
R = 0.138 Meter
V = K R2/3 I1/2
V2
I =
I =
K2 R4/3
0.3
I =
35 0.138
I = 0.00103 m
τ = 0.97 w h I
= 0.97 0.3 0.529 0.00103
= 0.000158 kg/m2
= 1.583214 kg/cm2
τ < τ ijin
1.583214 < 15 ==> OK
IBUTUHKAN YAITU :
Peta 7166.3 m2
71.663 ha
MBIL C = 1,00. KARENA MENURUT STANDAR PERENCANAAN IRIGASI, UNTUK PROYEK IRIGASI YANG KURAN
0,73. et*es*ep
si (0,85 - 0,9)
9.81 m/s2
= 2.5 h1
m Melewati Pintu
DIAMBIL = 1.0 Meter
0.181995
ERENCANAAN IRIGASI
1
1.00
1.00 h
= 1.00 h
= 1.00 0.529
= 0.529 Meter
KONTROL
= b h2
= 1.00 h2
= 0.280 m2
= Q Q
==> V =
A A
0.185
V =
0.280
8B2 = 46.175
B2 = 5.771861
B = 2.40
L = 19.21976
= 43
L/B > 8
17.898 > 8 OK
+ 0.443 + -55.853
L
Rumus abc
(L )1
2
134.777 m
(L2)2 1934.82 m
PERENCANAAN KANTONG LUMPUR
Ukuran Partikel Rencana 0.07
Volume Kantong Lumpur
a. Kandungan sedimen 0.6 o/oo
b. Qn 0.678
c. Jarak waktu pembilasan 7 hari
V 204.910 m3
1:m 2
8B2 = 169.403
B2 = 21.17543
B = 4.60
L = 36.81341
= 43
L/B > 8
9.344 > 8 OK
204.910 = 0.813136324502 L 1.161718
204.910 = 1.974854483367 L
204.9109011941 L
103.76
4.41794702
Rumus abc
(L )1
2
103.760 m
(L2)2 -176.39 m
L
PERENCANAAN KANTONG LUMPUR
Ukuran Partikel Rencana 0.07
Volume Kantong Lumpur
a. Kandungan sedimen 0.6 o/oo
b. Qn 0.185
c. Jarak waktu pembilasan 7 hari
V 55.853 m3
1:m 2
8B2 = 46.175
B2 = 5.771861
B = 2.40
L = 19.21976
= 43
L/B > 8
17.898 > 8 OK
+ 0.222 + -55.853
L
Rumus abc
(L )1
2
55.318 m
(L2)2 -70.88 m
PERENCANAAN UNDER SLUICE
UNDER SLUICE adalah suatu pelat penutup setebal 0,25 yang fungsinya untuk mencegah angkutan se
- Selain itu pelat beton mendatar ini membagi dua kedalaman air di depan pintu.
Qu = μ a Bp (2.g.h)1/2
==> Maka : Qu = μ
Qu = 0.95
Qu = 6.227
Qp = c B' Hu 3/2
m = Tinggi Pintu
m = 0.7
m = 0.95
Hu = 2.4
Maka : Qp
Qs = 0.385 x μ
Qs = 0.385 x 0.95
Qs = 0.678 m3/detik
Q = Qu + Qp
Q = 6.227 + 18.871
Q = 25.775 m3/detik
a = 1/4 D
a = 1/4 0.7
a = 0.175 meter
Qu = μ a
Qu = 0.95 0.175
Qu = 1.557 m3/detik
Q = Qu +
Q = 1.557 +
Q = 21.105 m3/detik
a = 1/2 D
a = 1/2 0.7
a = 0.35 meter
Qu = μ a
Qu = 0.95 0.35
Qu = 3.113 m3/detik
Q = Qu +
Q = 3.113 +
Q = 22.662 m3/detik
a = 3/4 D
a = 3/4 0.7
a = 0.525 meter
Qu = μ a
Qu = 0.95 0.525
Qu = 4.670 m3/detik
Q = Qu +
Q = 4.670 +
Q = 24.218 m3/detik
untuk mencegah angkutan sedimen dasar masuk ke intake.
di depan pintu.
Keadaan air dalam keadaan debit sungai yang masuk, mungkin masuk ke intake (tinggi air normal)
a Bp (2.g.h)1/2
m3/s
Tinggi Pintu
0.7 + 0.25
meter
u Bendung
= 18.871 m3/detik
x b x h x (2 . g . h)1/2
+ Qs
+ 0.678
Bp (2.g.h)1/2
1.25 (2.9,81.3,055)1/2
Qp + Qs
18.871 + 0.678
Bp (2.g.h)1/2
1.25 (2.9,81.3,055)1/2
Qp + Qs
18.871 + 0.678
Bp (2.g.h)1/2
1.25 (2.9,81.3,055)1/2
Qp + Qs
18.871 + 0.678
P = 2.86 meter (Tinggi Bendung).
g = 9.81 m/s2
Lantai muka adalah lantai yang dipasang pada dinding udik bendung.
Lantai muka ini akan memperpanjang jalur rembesan, sebaiknya lantai muka itu dibuat dari beton bertu
Dan kalau dibuat dari pasangan batu kali, untuk mencegah terjadinya rembesan akibat retaknya lantai m
Menurut standar Perencanaan Irigasi, tebal lantai muka ini dapat dibuat dari beton bertulang dengan teb
Perbedaan tinggi muka air antara hulu dan hilir bendung akan menimbulkan perbedaan tekanan yang m
Untuk mencari besarnya gaya angkat pada pintu bendung harus terlebih dahulu dicari "UPLIFT PRESS
==> ∆H
Vx = Hx - Lx
∆L
# Di mana :
- Vx = Uplift Pressure
- Hx = Tinggi Tekanan x dihitung terhadap tinggi air hulu
- Lx = Panjang garis rayapan
- ∆L = Panjang total garis rayapan
- ∆H = Beda tinggi muka air di hulu dan di hilir bendung
# Untuk perhitungan gaya-gaya uplift pressure perlu diketahui terlebih dahulu panja
c = 3
ƩLV =
ƩLV =
ƩLV =
ƩLH =
ƩLH =
ƩLH =
SYARAT :
/ - CL
- CL
- CL
- L
sigma Lv
sigma Lv
lh
LV+ 1/3XLH
CL
an akibat retaknya lantai muka diberi lapisan lempung, sedangkan pada pertemuan di bendung diberi sekat dari karet untuk m
eton bertulang dengan tebal 01,0 meter atau pasangan batu kali dengan tebal 0,20 – 0,25 meter.
erbedaan tekanan yang menyebabkan timbulnya suatu gaya yang berusaha mengangkat tubuh bendung ke atas.
lu dicari "UPLIFT PRESSURE" yang terjadi pada tiap titik sdut bendung kontak gaya angkat.
hilir bendung
= 95.60 - 0.00
= 98.13 - 0.00
Kaki bendung 1 + Kaki bendung 1 + Kaki bendung 2
0.5 + 0.5 + 1
5.58 meter
5.020 + 29.49
34.509 meter
= 5.58 + 11.50 /
diberi sekat dari karet untuk mencegah rembesan pada pertemuan antara lantai muka dengan tubuh bendung.
bendung ke atas.
= 95.60
= 98.13
+ Kaki bendung 2 + Kaki bendung+2 GH
+ 1.000 + 1+ 1.576
C ∆H
98.13
Bagian dari lantai muka, mercu bendung dan kolam olakan secara keseluruhan disebut "tebuh bendung"
Dalam merencanakan suatu tubuh bendung, perlu diperiksa terhadap kekuatan bangunannya.
Gaya-Gaya
` Yang Bekerja Pada Tubuh Bendung:
Titik Berat
ΣGX
x =
x =
ΣG
ΣGY
y =
ΣG
Berat sediri
G 30.05 ton/m
Mtahanan 256.603 ton
akibat gempa
ad = 85.247 cm/dt2
2 E = 0.087
K = 26.117 KN
2.612 ton
Dengan y = 732,707 meter
Mh = 4.921 Tonm
Ø 40.000 tan Ø
ɤ lumpur 0.900 SF
3 h=p 1.500 m
h1 -0.600 m
h2 = r 2.100 m
ka 0.217
P1 0.220 ton
y 1.500 m
Mguling 0.330 tonm
P2 5.040 ton
x 1.250
Mtahanan 6.301 tonm
KONTROL GULING
SF 5.242 > 2
OK!!
Uplift Preasure
a. kondisi air normal
6 Px = 9.5925
Puplift = W >
30.055 >
b. kondisi air banjir
Px = 24.9405
Puplift = W >
30.055 >
4.245
3.966
4.688
2.457
4.106
4.352
4.013
1.004
100
ϒ = 2.3 ton/m3
ΣGX 256.603
= =
= =
ΣG 30.055
ΣGY 56.628
= =
ΣG 30.055
z 0.560 di kalimantan
ac 160.000 cm/dt2
Tanah alluvium (n) 1.560
m 0.890
G 30.055 ton/m
G 300.549 Kn/m
0.839
19.080 > 2
OK!!
Kontrol geser
f = 0.839
SF 19.209 > 1.5
OK!!
1.063 t/m2
5.569 t/m2
OK!!
KONTROL GESER
f = 0.839
SF = 3.323 >
OK!!
2.828
2.550 t/m2
6.525 t/m2
32.443 t/m2
41.394 t/m2
2.253 t/m2
2.828 t/m2
6.826 t/m2
3.375
3.999
16.734 Kontrol Geser
kontrol guling f
Mg1 + Mg2 - Mg5 2.249 OKE!!! SF
0.0029445383507312
0.0993781693371793
0.996430485291234
Px
9.5925 OKE!!!
Px
24.9405 OKE!!!
- WARNA MERAH :
5.0167
8.538 m
8.538 m
1.884 m
1.5
0.839
3.511390113664 > 1.5
G . X (ton) Y (titik berat) G . Y (ton) W WX
7901.201 211.830 1673711.434 12.906 7901.201
61.127 368.500 22525.178 0.109 61.127
27.043 402.000 10871.294 0.049 27.043
11.786 418.750 4935.206 0.022 11.786
31.668 431.310 13658.657 0.059 31.668
120.662 410.370 49516.263 0.216 120.662
53.966 422.940 22824.426 0.098 53.966
23.418 429.220 10051.652 0.043 23.418
1819419.901 1818427.228
3094.920
178.33 492.414
Gaya Hidrostatis
WY Kondisi air normal Kondisi Air Banjir
0.281
0.281
1.788
28.276
6.325
1.125 7.605
15.634
1.732
2.310
WY
1188.631
17.462
8.548
3.931
11.086
38.479
17.987 794.6
8.022
613.500
495.380
WY 477.170
1188.631 460.920
17.462 437.420
8.548 492.240
3.931 474.350
11.086 458.440
38.479
17.987
8.022
895.1
PERENCANAAN TEMBOK TEGAK
Ø 30
ɤtanah 1.65
c 0.5
α 50
ɤ 20.000
= #REF!
= #REF!
ɤtembok 2.2 pasangan batu
i 0
h1 4.900
B 2.3275
b 1.27
0.3
V3 0.382
Mt3 0.292
V4 3.226
Mt4 6.387
3
2.475
0.825
= 0
= 0
= 0
1. Akibat Berat Sendiri Tubuh Bendung
2. Akibat Gempa
Bagian dari lantai muka, mercu bendung dan kolam olakan secara keseluruhan disebut "tebuh bendung"
Dalam merencanakan suatu tubuh bendung, perlu diperiksa terhadap kekuatan bangunannya.
Gaya-Gaya
` Yang Bekerja Pada Tubuh Bendung:
Titik Berat
ΣGX
x =
x =
ΣG
ΣGY
y =
ΣG
Berat sediri
G 39.11 ton/m
Mtahanan 22844.899 ton
akibat gempa
ad = 85.247 cm/dt2
2 E = 0.087
K = 33.988 KN
3.399 ton
Dengan y = 732,707 meter
Mh = 2488.962 Tonm
Ø 35.750 tan Ø
ɤ lumpur 0.900 SF
3 h=p 1.500 m
h1 -0.600 m
h2 = r 2.100 m
ka 0.262
P1 0.266 ton
y 1.500 m
Mguling 0.399 tonm
P2 5.040 ton
x 6.708
Mtahanan 33.806 tonm
KONTROL GULING
SF 28.124 > 2
OK!!
Uplift Preasure
a. kondisi air normal
6 Px = 9.5925
Puplift = W >
39.113 >
b. kondisi air banjir
Px = 24.9405
Puplift = W >
39.113 >
disebut "tebuh bendung".
angunannya.
ϒ = 2.3 ton/m3
ΣGX 22844.899
= =
= =
ΣG 39.113
ΣGY 28642.338
= =
ΣG 39.113
z 0.560 di kalimantan
ac 160.000 cm/dt2
Tanah alluvium (n) 1.560
m 0.890
G 39.113 ton/m
G 391.130 Kn/m
0.720
84.820 > 2
OK!!
Kontrol geser
f = 0.720
SF 13.655 > 1.5
OK!!
1.063 t/m2
29.882 t/m2
OK!!
KONTROL GESER
f = 0.720
SF = 2.851 >
OK!!
2.828
2.550 t/m2
6.525 t/m2
32.443 t/m2
41.394 t/m2
2.253 t/m2
2.828 t/m2
6.826 t/m2
3.375
3.999
16.734 Kontrol Geser
kontrol guling f
Mg1 + Mg2 - Mg5 2.249 OKE!!! SF
0.0035537027822113
0.119937468899631
0.825625539779123
Px
9.5925 OKE!!!
Px
24.9405 OKE!!!
* KETERANGAN
- WARNA MERAH :
584.074 m
584.074 m
732.297 m
1.5
0.720
3.012561410683 > 1.5
FIX
Gaya Hidrostatis
WY Kondisi air normal Kondisi Air Banjir
56.433
56.433
304.290
3354.854
1273.315
1.125 7.605
2501.789
220.263
293.684
Tabel IX.1 Perhitungan Berat Sendiri Tubuh Bendung
Luas (A) G X G.X Y G.Y W WX WYKondisi airKondisi
normal Air Banjir
Gaya
(m2) (ton) (m) (ton) (m) (ton)
G1 0.167 0.625 0.052 0.120 446.587 53.755 468.835 56.433 0.120369 53.75526 56.43323 8.69445 16.07445
G2 0.167 0.625 0.052 0.120 404.920 48.740 468.835 56.433 0.120369 48.73984 56.43323
G3 0.625 1.083 0.338 0.778 509.087 396.105 391.084 304.290 0.778068 396.1045 304.2901
G4 3.633 3.633 6.598 15.175 242.169 3674.809 221.084 3354.854 15.17457 3674.809 3354.854
G5 1.25 1.083 1.353 3.112 425.753 1325.060 409.127 1273.315 3.112274 1325.06 1273.315
G6 1.875 2.550 4.781 10.997 457.003 5025.605 227.500 2501.789 10.99688 5025.605 2501.789
G7 2.554 0.5 1.277 2.937 438.025 1286.407 75 220.263 2.936836 1286.407 220.2627
G8 2.554 1 2.554 5.874 112.688 661.892 50 293.684 5.873671 661.8922 293.6836
Σ 17.006 39.113 22844.899 28658.377
584.074
732.707
5. Akibat Uplift