Tabel 7.

1 Perhitungan Debit Rencana Banjir Metode Gumbell


Data Hujan
Tahun (Xi - X) (Xi - X)² (Xi - X)³ (Xi - X)/S ((Xi - X)/S)4
(Xi)
1999 29.6 -55.590 3090.301 -171791.307 -1.426 4.129
2000 64 -21.190 449.036 -9515.293 -0.543 0.087
2001 48 -37.190 1383.132 -51439.320 -0.954 0.827
2002 181.2 96.010 9217.829 884999.340 2.462 36.740
2003 70.8 -14.390 207.086 -2980.063 -0.369 0.019
2004 58.8 -26.390 696.457 -18379.838 -0.677 0.210
2005 120.1 34.910 1218.675 42543.359 0.895 0.642
2006 79.9 -5.290 27.989 -148.076 -0.136 0.000
2007 87.8 2.610 6.810 17.770 0.067 0.000
2008 179.5 94.310 8894.286 838815.904 2.418 34.206
2009 108.2 23.010 529.438 12182.121 0.590 0.121
2010 77 -8.190 67.084 -549.449 -0.210 0.002
2011 59.1 -26.090 680.713 -17760.125 -0.669 0.200
2012 45 -39.990 1599.238 -63954.297 -1.025 1.106
2013 91 6.210 38.558 239.428 0.159 0.001
2014 82 -2.790 7.787 -21.729 -0.072 0.000
2015 84 -1.290 1.665 -2.149 -0.033 0.000
2016 65 -20.190 407.655 -8230.755 -0.518 0.072
2017 96 10.510 110.450 1160.778 0.269 0.005
2018 110 25.010 625.476 15642.864 0.641 0.169
2019 51 -33.990 1155.352 -39270.981 -0.872 0.577
Jumlah 1789 0.000 30415.018 1411558.183 0.000 79.115
Rata-rata 85.190 0.000 1448.334 67217.056 0.000 3.767
S 38.997
N 21
a 0.033
X0 67.447
aX0 2.219
Tabel 7.3 Periode Ulang Debit Rencana Banjir Metode Gumbell
Y + aXo
Rx =
a
0.366 + 2.219
R2 = = 78.572
0.033
1.510 + 2.219
R5 = = 113.343
0.033
2.250 + 2.219
R10 = = 135.836
0.033
2.970 + 2.219
R20 = = 157.720
0.033
3.125 + 2.219
R25 = = 162.431
0.033
3.900 + 2.219
R50 = = 185.987
0.033
4.600 + 2.219
R100 = = 207.264
0.033
5.290 + 2.219
R200 = = 228.237
0.033
6.210 + 2.219
R500 = = 256.200
0.033

Tabel 7.2 Nilai Variasi Reduksi Gumbel


Periode
Pelua
Ulang T YT
ng
(tahun)
1.001 0.999 -1.930
1.11 0.99 -0.834
2 0.5 0.366
2.5 0.4 0.671 Interpolasi
3.33 0.3 1.030 20 2.97
4 0.25 1.240 25 x
5 0.2 1.510 50 3.9
10 0.1 2.250
20 0.05 2.970
50 0.02 3.900 x = 3.125
100 0.01 4.600
200 0.005 5.290
500 0.002 6.210
1000 0.001 6.900
PERENCANAAN MERCU BENDUNG
1 Elevasi Sawah Tertinggi 94.86 m
2 Kehilangan Tinggi Air di Sawah 0.1 m
Kehilangan Tekanan :
Tersier ke Sawah 0.1 m
Sekunder ke Tersier m
3 Primer ke Tersier 0.1 m
Sungai ke Primer 0.2 m
Kemiringan Sungai 0.25 m
Alat - Alat Ukur 0.4 m
Persediaan Tekanan :
4 Eksploitasi 0.1 m
Lain - Lain 0.25 m
Elevasi Mercu Bendung 96.36 m

MENENTUKAN TINGGI BENDUNG


1 Elevasi Lokasi Bendung Rencana 95.00 m
2 Kedalaman Sungai 1.5 m
3 Elevasi Dasar Sungai 93.50 m
4 Elevasi Mercu Bendung 96.36 m
Tingggi Bendung ( P ) 2.860 m

Tahun Q (m³/det)
1999 29.6
2000 64
2001 48
2002 181.2
2003 70.8
2004 58.8
2005 120.1
2006 79.9
2007 87.8
2008 179.5
2009 108.2
2010 77
2011 59.1
2012 45.2
2013 91.4
2014 82.4
2015 83.9
2016 65
2017 95.7
2018 110.2
2019 51.2
Rata-Rata 85.190
MENCARI KEMIRINGAN SUNGAI RATA - RATA
Kedalaman Elevasi ( m ) Jarak
No. Kemiringan
Sungai ( m ) Tertinggi Terendah (m)
HULU
1 1.5 97.550 93.100 100 0.04450
2 1.5 93.100 93.031 100 0.00069
Kemiringan Rata - Rata Hulu 0.02260
HILIR
1 1.5 96.320 92.886 100 0.03434
2 1.5 92.886 92.621 100 0.00265
3 1.5 92.621 92.420 100 0.00201
4 1.5 92.420 92.321 100 0.00099
5 1.5 92.321 92.240 100 0.00081 0.04080
Kemiringan Rata - Rata Hilir 0.00816 0.00816

Kemiringan Rata - Rata Sungai 0.01538


0.06434
500
MENENTUKAN TINGGI MUKA AIR DI TITIK BENDUNG
b z y P A R
m c
(m) (m) (m) (m) (m )
2
(m)
30 0.500 1.000 32.236 30.500 0.946 2.36 25.392
30 0.500 1.250 32.795 38.281 1.167 2.36 27.321
30 0.500 1.500 33.354 46.125 1.383 2.36 28.934
30 0.500 1.750 33.913 54.031 1.593 2.36 30.317
30 0.500 2.000 34.472 62.000 1.799 2.36 31.525
30 0.500 2.250 35.031 70.031 1.999 2.36 32.595

Grafik Hubungan y vs Q
2.50

2.00

1.50
y (m)

1.00

0.50

0.00
50 100 150 200 250 300 350 4

Q (m³/det)
MUKA AIR DI TITIK BENDUNG
I v Q 181.200 <-- DISALIN
(m) (m/s) (m /det) benar
3

0.01538 3.063 93.416


0.01538 3.660 140.125
0.01538 4.219 194.616
0.01538 4.745 256.394
0.01538 5.243 325.047
0.01538 5.715 400.222

ungan y vs Q

250 300 350 400 450

m³/det)
0.0154 -500
PERENCANAAN MERCU BENDUNG
1 Elevasi Sawah Tertinggi 94.86 m
2 Kehilangan Tinggi Air di Sawah 0.1 m
Kehilangan Tekanan :
Tersier ke Sawah 0.6 m
Sekunder ke Tersier 0.1 m
3 Primer ke Sekunder 0.1 m
Sungai ke Primer 0.2 m
Kemiringan Sungai 0.15 m ?
Alat - Alat Ukur 0.4 m
Persediaan Tekanan :
4 Eksploitasi 0.1 m
Lain - Lain 0.25 m
Elevasi Mercu Bendung 96.86 m 96.36

MENENTUKAN TINGGI BENDUNG


1 Elevasi Lokasi Bendung Rencana 95.60 m
2 Kedalaman Sungai 1.5 m
3 Elevasi Dasar Sungai 94.10 m
4 Elevasi Mercu Bendung 95.60 m
Tingggi Bendung ( P ) 1.500 m
97.690

97.100

Tahun Q (m³/det)
1999 29.6
2000 64
2001 48
2002 181.2
2003 70.8
2004 58.8
2005 120.1
2006 79.9
2007 87.8
2008 179.5
2009 108.2
2010 77
2011 59.1
2012 45.2
2013 91.4
2014 82.4
2015 83.9
2016 65
2017 95.7
2018 110.2
2019 51.2
Rata-Rata 85.190
Tabel 7.4 Hasil Perhitungan Kemiringan Rata-Rata Sungai
MENCARI KEMIRINGAN SUNGAI RATA - RATA
Kedalaman Elevasi ( m ) Jarak
No. Kemiringan
Sungai ( m ) Tertinggi Terendah (m)
HULU
1 4 93.000 92.253 100 0.00747 0.00747
2 4 93.450 93.000 100 0.00450 0.0045
3 4 93.760 93.450 100 0.00310 0.0031
4 4 94.200 93.760 100 0.00440 0.0044
5 4 94.500 94.200 100 0.00300 0.003
Kemiringan Rata - Rata Hulu 0.00449 0.00449
HILIR
1 4 93.253 92.950 100 0.00303
2 4 93.198 92.400 100 0.00798 0.02301
3 4 92.400 92.000 100 0.00400 0.004602
4 4 92.000 91.760 100 0.00240
5 4 91.760 91.200 100 0.00560
Kemiringan Rata - Rata Hilir 0.00460
2.329
Kemiringan Rata - Rata Sungai 0.00455

96.300
0.03216
500
ANALISA HIDROLIS
Tabel 7.6 MENENTUKAN TINGGI MUKA AIR DI TITIK BENDUNG
b z y P A R
m c
(m) (m) (m) (m) (m )
2
(m)
22 1.000 1.450 26.101 34.003 1.303 2.36 28.360
22 1.000 1.600 26.525 37.760 1.424 2.36 29.214
22 1.000 1.750 26.950 41.563 1.542 2.36 29.996
22 1.000 1.900 27.374 45.410 1.659 2.36 30.717
22 1.000 2.050 27.798 49.303 1.774 2.36 31.384
22 1.000 2.200 28.223 53.240 1.886 2.36 32.006
elevasi muka air di hilir bendung 96.30

Grafik Hubungan y vs Q
2.50

2.00

1.50
y (m)

1.00

0.50

0.00
70 80 90 100 110 120 130 140 150

Q (m³/det)
MUKA AIR DI TITIK BENDUNG
I v Q 157.720 <-- DISALIN
(m) (m/s) (m /det)
3
benar
0.00455 2.183 74.225
0.00455 2.351 88.761
0.00455 2.512 104.412
0.00455 2.668 121.155
0.00455 2.819 138.968
0.00455 2.965 157.832

gan y vs Q

120 130 140 150 160 170

det)
0.0045 -500
PERHITUNGAN MERCU ALA INDONESIA

DATA :
A DATA DEBIT BANJIR RENCANA (Qd) = 157.7201 m3/s
B LEBAR SUNGAI (B) = 25 m
C KETINGGIAN MERCU = 95.60 m
D KETINGGIAN DASAR SUNGAI = 94.10 m
E KETINGGIAN MUKA AIR BANJIR = 98.00 m
F TINGGI PEMBENDUNGAN (P) = 1.5 m
G TINGGI MUKA AIR BANJIR (Hd) = 2.4 m
H LEBAR MERCU (B) = 30 m
I Kp = 0.01
J Ka = 0.1

Dengan Perencanaan Pilar-Pilar Sebagai Berikut :


* Pilar Jembatan 3 buah dengan lebar = 3
* Pilar bendung 1 buah dengan lebar = 1
* Pilar pembilas bawah 2 buah dengan lebar = 1
* Pintu bilas (Pb) lebarnya = 1

Menentukan Jari-Jari Mercu


V1 = Qd = 1.618 m
/s g
{B'(P+Hd)}
Ha = V2 = 0.133 m
2g
H1 = Hd + Ha = 2.533 m

0,7*H = 1.773 r=

Dengan tinggi muka air banjir = 1,506 m, maka berdasarkan syarat 0,7 H ≤ r ≤ H; maka : r berada antar

Dengan jari-jari 1,25 meter dan tinggi muka air di hulu 1,054, dari grafik 4.2, didapat harga q = 4,50 m

Untuk menghasilkan debit sebesar 20 m3/s, diperlukan lebar efektif :


Beff = Q = 157.720129 = 19.312 m
mercu q 8.16686207

Untuk pintu bilas yang lebarnya 1 meter Sehingga lebar efektif untuk mercu s
lebar efektif = 0.8 23.200

Maka lebar efektif :


Beef = Bbr - 2 (n. Kp + Ka) H1 - Ʃb -0,2 Pb
Bbr = Beef + 2 (n.Kp + Ka) H1 + Ʃb +0,2 Pb 0.557
Bbr = 29.86 m 5.0
0.2
25.070
Bbr < 1,2*B
29.86 < 30 = OK

Bbr = lebar kotor bendung


3.90

* Ketinggian muka air banjir didapat dari persamaan : Elevasi Dasar Sungai + P + Hu

asumsi
2.557342
ketentuan Hd 2/3
= 3.700407
ketentuan Hd = 2.392396

m
m
m
m 3.125 2.5

= 9.81

1.266686

2.1 dari grafik

≤ H; maka : r berada antara 0,7 x 1,70520 = 1,19364 meter dan 1,70520 m diambil r = 1,5 meter

, didapat harga q = 4,50 m 3/s untuk setiap meter lebar mercu.

24 2.7

lebar efektif untuk mercu saja

1.773
= 3.9 ===> P + Hu

0.380006
Data Data Irigasi
Debit Banjir = 157.72013 m3/dtk
Lebar Sungai (B) = 25 m
Elevasi Mercu = 96.86 m
Elevasi Dasar Sungai = 94.10 m
Tinggi Bendung = 1.5 m

Tinggi Muka Air Banjir


Cd = 1.00
Hd = 2.392 » 2.4 m

Jari-jari Mercu
V1 = 1.618 m/dtk
ha = 0.133 m
H1 = 2.533 m

0,7 H1 < r < Hd


1.77 < r < 2.4

r = 2.1 m

H q
1 1.80 4.5
interpolasi 2.533 8.167
2 2.70 9

Beff = 19.31 m
= 24.00 m
Elevasi muka air banjir = 96.87 m

ogee dengan kemiringn hulu 1:1 terdapat lengkung dengan :


r (jari2) = 0.795 m
Jarak = 0.152 m

Menentukan Kordinat
y/Hd = 1/k*((x/Hd)^1,776)
Y/1.878 = 1/1,873((x/1.450)^1,776)
Y = 0.532 X^1,776

X 0 0.5 1 1.5 2 2.42 3 3.185 4 4.5 4.87


Y 0.00 0.16 0.53 1.09 1.82 2.56 3.74 4.16 6.24 7.69 8.84
Debit Banjir = 157.72 m3/dtk
Lebar Sungai (B) = 25.00 m
Elevasi Mercu = 96.86 m
Elevasi Dasar Sungai = 94.10 m
Tinggi Bendung = 1.5 m
Kp = 0.01 m
Ka = 0.1 m

H1 = 1.5
Beff = 10
q = 15.27
v = 5.09
Ha = 1.320
Hd = 0.18
ketinggian muka air banjir = 98.36 Dengan Perencanaan Pilar-Pilar Sebag
* Pilar Jembatan 3 buah deng
r = 0.0809204 * Pilar bendung 1 buah denga
jarak = 0.021399 * Pilar pembilas bawah 2 bua
* Pintu bilas (Pb) lebarnya

Dengan Perencanaan Pilar-Pilar Sebagai Berikut :


* Pilar Jembatan 3 buah dengan lebar =
* Pilar bendung 1 buah dengan lebar =
* Pilar pembilas bawah 2 buah dengan lebar =
* Pintu bilas (Pb) lebarnya =

Maka lebar efektif :


Beef = Bbr + 2 (n. Kp + Ka) H1 + Ʃb + 0,2 Pb
Bbr = Beef + 2 (n.Kp + Ka) H1 + Ʃb +0,2 Pb
Bbr = 13.94 m

Bbr < 1,2*B


13.94 < 30 = OK
erencanaan Pilar-Pilar Sebagai Berikut :
Pilar Jembatan 3 buah dengan lebar = 1 m
Pilar bendung 1 buah dengan lebar = 1 m
Pilar pembilas bawah 2 buah dengan lebar = 1 m
Pintu bilas (Pb) lebarnya = 1.4 m

3 m
2 m
0.75 m
0.7 m
b 2.8 h1 2.216
25 22.5 4 0.1 0.01

Be 19.080
0.28 h1 2.506196
hd+p 4.650 49.37
0.70 h1

157.72 157.744

V1 1.571
ha 0.126
hd 2.090

0 1 1.5
B 23 y 0 0.301296 0.619058

r 0.836
jarak 0.249
h1/r 2.650437 1.060175
p/h1 1.155235
p/hd 1.224751
p/hd

cd 1.470
0.140
0.280
30
19.7

bendung ogee
0.119hd 0.248736
r 0.45hd 0.9406

3.364
x 0 0.5 1 1.5 2.5 2.76
y 0 0.09 0.30 0.61 1.51 1.80
DATA - DATA PERENCANAAN TIPE KOLAM LONCAT AIR
a. Debit Banjir Rencana ( Qr ) 157.72 m3/detik ΔH atau Z 0.889
b. Lebar Sungai ( b ) 25 m V1 =
c. Elevasi Mercu 96.860 m y1 =
d. Elevasi Dasar Sungai 94.100 m Fr =
e. Jari - Jari Mercu 0.79 m y2 =
f. Lebar Kolam Olakan (Bbr) 22.500 m yu =
g. Elevasi Muka Air Hilir 96.300 m n =
h. Tinggi Energi ( ha ) 0.316 m n3 =
i. Elevasi Muka Air Banjir 96.873 m 0.375 =
j. Hd 1.273 m 0.5 =
k. H1 1.589 m 0.2 =
k. B eff 23.000 m 0.75 =
Panjang air loncat =
puncak mercu 97.1
98.133 Tinggi tanggul =

b = 23.000
h = 1.273
m = 1 muka hulu
R = 1.16198168179
c = 4.06369979937 25
I = 0.00486111111
v = 0.00036534483

H1 1.589
Z 0.889
q 6.308805148259
hc 1.594930415965 4.057189
z / hc 0.557473217076
t 4.873704346895
a 0.598119233417
elevasi 91.388
D 5.472
ONCAT AIR
m
5.748 m/det
1.098 m 4.80 dapat dari grafik usbr type 3
1.752
2.225 m v1 15.316
0.448 m
0.491 m
0.429 m
0.161 m
0.224 m 6.007287 91.66
0.086 m
0.322 m
10.680 m 5.44

3.240

1.033

muka hulu 99.8

3.500
z v1 y1 fr y2 y2` elevasi
2 7.405 0.852 2.561 2.689 1.200 95.1
3 8.628 0.731 3.222 2.986 2.200 94.1
4 9.699 0.650 3.840 3.222 3.200 93.1
5 10.663 0.592 4.426 3.419 4.200 92.1
5.44 11.05994 0.57042 4.675422 3.4972 4.64 91.66 syarat y2` ≥ y2

elevasi olakan 91.66


1. Data Data Irigasi
Debit Banjir = 157.72013 m3/det
Lebar Mercu = 19.08 m 25
Elevasi Mercu = 95.60 m
Elevasi Dasar Sungai = 94.10 m
Elevasi Muka Air Banjir = 97.69 m
Tinggi Muka Air Hilir Bendung = 2.200 m
Tinggi Energi (ha) = 0.126 m
Tinggi Muka Air Banjir (Hd) = 2.090 m
Elevasi Muka Air Dihilir Bendung = 96.30 m
Tinggi Bendung = 1.50 m
H1=(Hd + ha) = 2.216 m 2.216

Kolam Olakan Vlughter


Z = 1.52 m
q = 6.31
hc = 1.59 m
z/hc = 0.95

2 < z/hc < 15


t = 4.94
a = 0.46

Elevasi Kolam Olakan = 90.91 m


z/Hi = 0.7 m
D=R=L jika 4/3 < z/Hi < 10
D = 2.625 m

Kontrol Terhadap Loncat Air


V1 = 7.153 m/det 8.2
Y1 = 1.156 m 0.87
Fr = 2.125
Y2 = 2.942 m 2.8

t+a > Y2
5.39 > 2.942 ok

2.1
2.8
Dari grafik untuk Fr = 3,374 di dapat L/y2 = 5,4 sehingga :
L/y2 = 4.62
L = 13.6 m
Data-Data Balok Pintu Bilas (Kelas 1)
Lebar Pintu Bilas = 1.25 m slentur =
Tinggi Pintu Bilas = 1.50 m (T.Bendung) starik = stekan =
gair = 1 t/m3 E kayu =
g sungai = 1.86 t/m 3
gkayu belian =
E. Muka Air Banjir = 97.69 m tekanan tanah (w) =
E. Dasar Sungai = 94.10 m

1.Tekanan Akibat Air 5.Muatan Terbagi Rata


h1 = 3.59 m Lebar Papan (B) =
sair = 3.59 t/m 2
Lebar Pintu Bilas (Lpb) =
Pair = 6.44 t/m
q =
2.Tekanan Akibat Lumpur =
g lumpur = 0.86 t/m3
f = 30 o
5.Momen Maksimum
c = 0.18 t/m2 Mmax =
ka = 0.333
6. Mendimensi Balok
Plumpur = 0.32 t/m Lebar Balok (b) =
pa = 2.15 t/m h =
=
3. Kohesi dimensi balok 20 x 8 cm
skohesi = 0.21 t/m2 7. Penetapan Rangka Pintu Bilas
Pkohesi = 0.31 t/m panjang balok =
=
4.Tekanan Total P (Berat Pintu Bilas) =
P total = 2.47 t/m =
Profil Baja C.50.38.5.7
150 kg/cm 2
h = 50 mm r
130 kg/cm2 b = 38 mm w
125000 kg/cm2 d = 5 mm sbaja
0.9 t/m 3

1 kg/cm2

9. Kontrol Tegangan
0.03 m M = 1845.2813 kg cm
1.25 m s = 174.74254

0.059 t/m s < sbaja


0.59 kg/cm 174.74254 < 1400 ok

9. Kontrol Lendutan
1158.18 kg cm I = 182.25 cm4
Δmaks = 0.113 cm yg terjadi
Δizin = 0.3375 cm
3 cm
3.93 cm Δmaks < Δizin
9 cm 0.113 < 0.3375 ok

10. Kontrol Terhadap Geser


1.35 m Q = 37.06 kg
135 cm Ꚍ = 2.06 kg/cm2
0.054675 ton Ꚍizin = 15 kg/cm2
54.675 kg
Ꚍ < Ꚍizin
2.06 < 15 ok
= 7 mm
= 10.56 cm3
= 1400 kg/cm2

m = 1708.5938 kg/cm
w = 1.2204241 cm3

Kontrol s = 161.80 kg/cm2

syarat = 1400 = 1400 aman

0.1750000
0.0270620
=
DATA - DATA PERENCANAAN ɣw 1 t/m3 ɣ lumpur 1.86 balok 3 x 9
Lebar Pintu Pembilas 1.25 m ɣ lumpur 0.86 t/m3 Q 66.178 kg
Tinggi Pintu Pembilas (P) 1.50 m ɸ 30 o τ 3.677 kg/cm2
Pintu Ganda : C 0.18 t/m2 τ' 15 kg/cm2
Pembilas Atas ( ha ) 0.80 m ok
Pembilas Bawah ( hb ) 0.7 m
H1 4.65 m panjang balok = 1.450 m
H2 1.50 m berat jenis kayu = 0.900 t/m3
*Tekanan akibat air *Tekanan akibat lumpur tinggi pintu = 1.500 m
Ta = 4.650221 t/m2 Ka 0.333 P 0.059 t
Pa = 3.09952 t/m2 lumpur kohesi 58.725 kg
PL 0.430 Tc 0.21 t/m2
PL 0.323 t/m Pc 0.312 t/m M 2128.78 kg.cm
τa 1400 kg/cm2
Ptotal 3.530 t/m W 1.521 cm3

Kontrol lendutan W untuk C5 10.56 cm3


Papan 3 cm 5 cm τ 201.589 kg/cm2
b lebar papan 0.03 m 0.05 m ok
L lebar pintu bilas 1.00 m
q 0.106 t/m
105.886 kg/m
Mmax 0.013236 t.m
13.236 kg.m
1323.570 kg.cm 0.0145
Tekanan izin lentur kayu = 150 kg/cm2
Tekanan izin tekan/lentur = 130 kg/cm2
Tekanan tanah (w) = 1
Modulus Elastis = 125000 kg/cm2

h 4.201 cm 17.648
h 9.000 cm
I 182.250 cm4
F 0.015 cm
F' 0.313 cm
ok
Data :
Debit banjir = 85.19 m/detik
Lebar Sungai = 20 m
Ketinggian Mercu = 99.150 m
Ketinggian Sungai = 97.550 m
Ketinggian Air Banjir = 99.800 m
Tinggi Air Hilir = 95.551 m
Jari_Jari Mercu = 1.5 m
Lebar Kolam Olakan = 20 m
Tinggi energi (ha) = 0.0401 m

Lagkah : Perhitungan Kolam Olakan

H1 1.5401 1.64
Z 2.290 Tekanan Akibat Air :
96.860
Vi 7.7486 3.599
y1 0.5497
Tekanan Akibat Lumpur :
Fr 3.3367

Y2 0.9171
Perhitungan untuk pembila
Panjang air Loncatan *Dicari di grafik
Panjang Kolam Olakan *Dicari di grafik
Panjang air Loncatan Grafik *Dicari di grafik
Tekanan Total Pembilas a

Menghitung muatan terbag

Besar momen maksimum

Mendimensi Balok

Direncanakan Balok

Kontrol Lendutan

Lendutan terjadi

Lendutan izin

Kontrol Terhadap Geser

Tegangan Geser izin

Berat Pintu sebenarnya

Rangka pintu baja profil

Kontrol
Data : Lebar Papan ( B )
Lebar Pintu Bilas = 1.5 m Lebar Pintu bilas ( L)
Tinggi Pembilas = 4.000 m Dicoba menggunakan Kayu Jati
Perencanaan Pintu = 2 Buah Tegangan izin lentur
Pembilas Atas(Ha) = 3.000 m Tegangan izin tarik
Pembilas Bawah(Hb) = 1.00 m tekanan tanah
Lebar Pintu Bilas = 0.60 m Modulus Elastisitas
γw = 1.00 t/m Dicoba menggunakan Baja U
γL = 1.92 t/m δa
H1 = 1.54 t/m h 120
C = 0.50 t/m b 55
Ø = 30 t 9

Perhitungan Pintu Pembilas Atas Perhitungan Pintu Pembilas Bawah


Tekanan Akibat Air : Tekanan Akibat Air :
P1 1.540 t/m2 P1 1.540
P2 4.540 t/m2 P2 4.540
P3 5.540 t/m2 P3 5.540
Tekanan Akibat Lumpur : Tekanan Akibat Lumpur :
Ka 0.333 Ka 0.333
PL1 0.343 t/m2 PL1 0.343
PL2 0.649 t/m2 PL2 0.649
Perhitungan untuk pembilas Atas Perhitungan untuk pembilas Atas
A1 4.620 t/m A1 4.540
A2 4.500 t/m A2 0.5
A3 0.514 t/m A3 0.325
Tekanan Total Pembilas atas Tekanan Total Pembilas atas
Ptotal 9.634 t/m Ptotal 5.365
Menghitung muatan terbagi rata Menghitung muatan terbagi rata
q 1164.600 kg/m q 715.306
Besar momen maksimum Besar momen maksimum
Mmax 327.544 kg.m Mmax 201.180
Mendimensi Balok Mendimensi Balok
h2 1.9653 m h2 0.0121
h 1.4019 m h 0.1099
Direncanakan Balok Direncanakan Balok
h 8 ------- ok h 7
Kontrol Lendutan Kontrol Lendutan
I 85333333.3 cm^4 I 57166666.667
Lendutan terjadi Lendutan terjadi
f 0.00227 f 0.000
Lendutan izin Lendutan izin
f" 0.5 ok f" 0.5
Kontrol Terhadap Geser Kontrol Terhadap Geser
Q 8.735 kg/cm Q 5.365
ț 0.467 kg/cm ț 3.662
Tegangan Geser izin Tegangan Geser izin
ț 15 kg/cm2 Kontruksi Aman ț 15
Berat Pintu sebenarnya Berat Pintu sebenarnya
P 0.714 P 0.238
Rangka pintu baja profil Rangka pintu baja profil
M 3034.500 kg.cm M 1011.5
W 2.168 cm^4 W 0.7225
Kontrol Kontrol
δ 287.357955 δ 95.7859848485
Syarat Kontruksi Aman Syarat δ < δa
0.2 m Data :
1.50 m Sin α 30 Luas Daerah diairi =
nakan Kayu Jati Sin α 0.500 Dr =
200 kg/cm2 Koefisien Kontraksi =
130 kg/cm2 Gaya Gravitasi =
1 Lebar Ambang =
125000 kg/cm2 Tinggi mercu =
nakan Baja U γw =
1400 kg/cm2 γL =
r1 4.5 H1 =
Wx 10.56 C =
Ø =

Perhitungan Intake
NFR 1.028
t/m2 Debit yang dialirkan + pengambilan
t/m2 Q 75.000
t/m2 0.075
Debit Kantong Lumpur
QKL 0.090
t/m2 Tinggi Ambang
t/m2 H1^5/2 0.049
H1 0.299
t/m b 0.747
t/m H' 0.199
t/m syarat H' < 2/3 H1
Panjang Ambang
t/m 327.544 L 0.598
Tinggi Ambang = Pembendungan
kg/m t 1
Dimensi Intake
kg.m Z 2.290
H 1.500
m b 0.008
m Dari Tabel
b/h 1.500
------- ok h 2.250
w 0.5
cm^4 k 35
v 0.7
A 5.400
Kontrol Gaya Geser
ok τ 0.000016
Pada tebing Saluran
kg/cm τ 0.000012
kg/cm Kontrol Terhadap Endapan
0.290
kg/cm2 Kontruksi Aman Keliling Basah
P 12.74525
Jari_jari ( R )
R 0.4236872
kg.cm Kemiringan stickler
cm^4 I 0.0372391
1.7813421
Kontruksi Aman 0.0067336 0.0014542
Data :
0.00 ha Lebar pintu bilas = 0.80
8.883 mm/hari Tinggi Air Disaign = 0.50
1 Buah Debit yang dialirkan = 0.075
9.810 m/s Gaya Gravitasi = 9.81
1.00 m Viskositas = 1.02E-07
1.500 m Kec. Jenis Air = 0.1019
1.00 t/m Kec.Jenis pasir = 0.27
1.92 t/m Dim. Partikel Terkeci; = 7.00E-05
2.53 t/m Waktu Pembilasan = 7
0.50 t/m Kandungan Sedimen = 0.07
30 Kec. Air normal 0.4

Perhitungan Kantong Lumpur


L^3/detik Volume kantong Lumpur
pengambilan V 22.680
L^3/detik 23
m^3/detik Kecepatan Endapan
W 0.00439
m^3/detik Luas Medan Endapan
Lb 17.081
m L 21.351
m Kontrol L/B > 8
m 7.117
m Luas penampang diperlukan
H' < 2/3 H1 An 0.188
Lebar Rata-Rata
m Hn 0.094
bendungan Perhitungan penampang
m b 0.613
P 1.143
m Rn 0.164
m In 0.001454
m Panjang Bag. Peralihan
z 0.094
m Lp 0.94
m Debit dalam Pembilasan
m Qs 0.090
m Lebar dasar Tampungan
m b 0.613
m^2 Kecepatan Aliran
As 0.225
kg/m^2 Kedalaman yang diperlukan
Hs 0.367
kg/m^2 Rs 0.197
apan Is 0.005805
m/detik Fr 0.211
Pengecekan
m Ppasir 2649.681
2650
m τ 55.427
Lihat Grafik VI.II
τ 55.427
Grafik 4.000
Kontrol < 5 mm

Data
L 21.351
V 23
ds 0.225
V

7.52
Maka panjang kantong Lumpur
P 123.000
m
m
L^3/detil
m/s
t/ms
t^3/s
t^3/s
m
Hari

t^3/s

m^2
m^3

m/detik

m^2

ok...!!

m^2

m
m
m

m
m

m^3/detik

m^2

m
m

Kritis

N/m^2
N/m^2

N/m^2
Terbilas>>

sisa
15.16 >>>>> sisa sampai NOL

<<<<<<< Trial n Error


PERENCANAAN INTAKE

PERHITUNGAN INTAKE (PINTU PENGAMBILAN) KIRI

DEBIT YANG HARUS DIALIRKAN KE SALURAN PINTU, DATA YANG DIBUTUHKAN YAITU :
Peta
- LUAS DAERAH YANG DIALIRI (A) = 262.913 Ha
- KEBUTUHAN AIR DI SAWAH (NFR) = 1.763 lt/det/Ha
- KOEFISIEN PENGURANGAN AKIBAT SISTEM GOLONGAN DIAMBIL C = 1,00. KARENA MENURUT STANDAR PERENCANAAN
---> C = 1
---> e = 0.684 Rentang e = 0,59 - 0,73. et*es*ep

C NFR A
Q =
e

1 1.763 262.913
Q =
0.684

Q = 677.614 lt/det = 0.678 m3/det

- DEBIT YANG HARUS DIALIRKAN KE KANTONG LUMPUR

QKL = 120% Q ==> QKL =

- SYARAT ALIRAN YANG MELEWATI AMBANG LEBAR, MELIMPAH SEMPURNA : h' ≤ 2/3 h1

Dimana : h1' = Tinggi Muka Air Ambang

- DEBIT YANG DIALIRKAN


Q = 0.678 M b h1 2 (2 . g . h1 )1/2

Dimana : - M = Koefisien Kontraksi (0,85 - 0,9)


- g = Gravitasi Bumi = 9.81
- b = Lebar Ambang, diambil =
- h1 = Tinggi Air Sebelum Melewati Pintu

==> Maka :
Q = 0.678 M b h1 2 (2 . g . h1 )1/2

Q = 0.678 M b h1 2 (2 . g . h1 )1/2

0.6776
h1 5/2 =
0.678 0.9 2.5 (2 . 9,81) 1/2

h1 5/2 = 0.0680 ==> h1 = 0.341 m

- b = 2.5 h1 = 0.853 m

- h' = 2/3 h1 = 0.227 m

- PANJANG AMBANG ==> C > 2 . h1

==> 1 > 0.682 ==> DIAMBIL

- TINGGI AMBANG (t) = P - h1


= 1.5 - 0.341

= 1.159 Meter

- KONTROL

h1 < 1/3 t

0.341 < 0.386 ===> OK

DIMENSI INTAKE

- Z = ELEVASI MERCU - ELEVASI MUKA AIR HILIR

Z = 95.6 - 96.30

Z = 0.70 Meter

- H = ELEVASI MERCU - ELEVASI DASAR SUNGAI

H = 95.6 - 94.10

H = 1.50 Meter

- SEHINGGA

Q = M b h1 (2 . g . z)1/2

0.678 = 0.9 b 0.341 (2 . 9,81 . 2,52)1/2


0.678 = 1.1379 b

b = 0.595 Meter

DIMENSI SALURAN
- DEBIT YANG MELALUI INTAKE (Q) = 0.678 m3/det
- LUAS DAERAH YANG DIALIRI = 262.913 Ha
- PENAMPANG SALURAN = TRAPESIUM

TABEL IV. KARAKTERISTIK SALURAN TANAH MENURUT STANDAR PERENCANAAN IRIGASI

DARI TABEL TERSEBUT DIPEROLEH :

- b/h = 1.30 - 1.5

- m = 1

- w = 0.3

- k = 45

- V = 1.1 m/s ===> Kecepatan Rencana

==> A = (b + m.h) h ==> m = 1


b/h = 1.40
b = 1.40
Q = A V
0.678 = A 1.1
A = 0.616 m2

==> A = (b+ m.h) h ==> b =


b =
0.616 = (1,2 h+1.h)h b =

0.616 = 2,2 h2 ==> KONTROL


A =
h2 = 0.280 Meter A =
A =
h = 0.529 Meter
=
V

==> KELILING BASAH (P)

P = b + 2h (1+m2)1/2
P = 0.741 + 1.058 (1+12)1/2

P = 2.237 Meter

==> JARI - JARI HIDROLIS

A
R =
P

0.392
R =
2.237

R = 0.175 Meter

==> RUMUS STICKLER (KEMIRINGAN DASAR SUNGAI)

V = K R2/3 I1/2

V2
I =
K2 R4/3

1.1
I =
45 0.175

I = 0.00610 m

==> KONTROL GAYA GESER


τ = 0.97 w h I
= 0.97 0.3 0.529 0.00610
= 0.000938556 kg/m2
= 9.385555005 kg/cm2

τ < τ ijin
9.385555 < 15 ==> OK
26291.25 m2
262.9125 ha

T STANDAR PERENCANAAN IRIGASI, UNTUK PROYEK IRIGASI YANG KURANG DARI 10.000 Ha DAN MENGAMBIL AIR LANGSUNG DARI SUNGAI.

813.136 lt/det ==> 0.813 m3/det


/
m 2
s

2.5 h1

4.457045
h1 0.152032

= 1.0 Meter
0.396981

h
1.40 h
1.40 0.529
0.741 Meter

b h2
1.40 h2
0.392 m2

Q Q
==> V =
A A

0.678
V =
0.392

V = 1.73 m/s > Vrencana = 1.1 m/s ==>


G DARI SUNGAI.
OK
PERENCANAAN INTAKE

PERHITUNGAN INTAKE (PINTU PENGAMBILAN) KIRI

DEBIT YANG HARUS DIALIRKAN KE SALURAN PINTU, DATA YANG DIBUTUHKAN YAITU :

- LUAS DAERAH YANG DIALIRI (A) = 71.663 Ha


- KEBUTUHAN AIR DI SAWAH (NFR) = 1.763 lt/det/Ha
- KOEFISIEN PENGURANGAN AKIBAT SISTEM GOLONGAN DIAMBIL C = 1,00. KAREN
---> C = 1
---> e = 0.684 Rentang e = 0,59 - 0,73. et*es*ep

C NFR A
Q =
e

1 1.763 71.663
Q =
0.684

Q = 184.700 lt/det = 0.185 m3/det

- DEBIT YANG HARUS DIALIRKAN KE KANTONG LUMPUR

QKL = 120% Q ==> QKL

- SYARAT ALIRAN YANG MELEWATI AMBANG LEBAR, MELIMPAH SEMPURNA : h' ≤

Dimana : h1' = Tinggi Muka Air Ambang

- DEBIT YANG DIALIRKAN

Q = 0.678 M b h1 2 (2 . g . h1 )1/2

Dimana : - M = Koefisien Kontraksi (0,85 - 0,9)


- g = Gravitasi Bumi =
- b = Lebar Ambang, diambil
- h1 = Tinggi Air Sebelum Melewati Pintu

==> Maka :
Q = 0.678 M b h1 2 (2 . g . h1 )1/2

Q = 0.678 M b h1 2 (2 . g . h1 )1/2
0.1847
h1 5/2 =
0.385 0.9 2.5 (2 . 9,81) 1/2

h1 5/2 = 0.0185 ==> h1 = 0.203 m

- b = 2.5 h1 = 0.507 m

- h' = 2/3 h1 = 0.135 m

- PANJANG AMBANG ==> C > 2 . h1

==> 1 > 0.406 ==>

- TINGGI AMBANG(t) = P - h1

= 1.5 - 0.203

= 1.297 Meter

- KONTROL

h1 < 1/3 t

0.203 < 0.432 ===> OK

DIMENSI INTAKE

- Z = ELEVASI MERCU - ELEVASI MUKA AI

Z = 95.6 - 96.30

Z = 0.70 Meter

- H = ELEVASI MERCU -ELEVASI DASAR SUNGAI

H = 95.6 - 94.10

H = 1.50 Meter

- SEHINGGA
Q = M b h1 (2 . g . z)1/2

0.185 = 0.9 b 0.203 (2 . 9,81 . 2,52)1/2

0.185 = 0.6766 b

b = 0.273 Meter

DIMENSI SALURAN
- DEBIT YANG MELALUI INTAKE (Q) = 0.185 m3/det
- LUAS DAERAH YANG DIALIRI = 71.663 Ha
- PENAMPANG SALURAN = TRAPESIUM

TABEL IV. KARAKTERISTIK SALURAN TANAH MENURUT STANDAR PERENCANAAN IRIGAS

DARI TABEL TERSEBUT DIPEROLEH :

- b/h = 1.00 - 1

- m = 1

- w = 0.3

- k = 35

- V = 0.3 m/s ===> Kecepatan Rencana

==> A = (b + m.h) h ==> m =


b/h =
b =
Q = A V
0.185 = A 0.3
A = 0.616 m2

==> A = (b+ m.h) h ==> b


b
0.616 = (1,2 h+1.h)h b
0.616 = 2,2 h2 ==> KONTROL
A
h2 = 0.280 Meter A
A
h = 0.529 Meter
V

==> KELILING BASAH (P)

P = b + 2h (1+m2)1/2

P = 0.529 + 1.058 (1+12)1/2

P = 2.025 Meter

==> JARI - JARI HIDROLIS

A
R =
P

0.280
R =
2.025

R = 0.138 Meter

==> RUMUS STICKLER (KEMIRINGAN DASAR SUNGAI)

V = K R2/3 I1/2

V2
I =
I =
K2 R4/3

0.3
I =
35 0.138

I = 0.00103 m

==> KONTROL GAYA GESER

τ = 0.97 w h I
= 0.97 0.3 0.529 0.00103
= 0.000158 kg/m2
= 1.583214 kg/cm2

τ < τ ijin
1.583214 < 15 ==> OK
IBUTUHKAN YAITU :
Peta 7166.3 m2
71.663 ha

MBIL C = 1,00. KARENA MENURUT STANDAR PERENCANAAN IRIGASI, UNTUK PROYEK IRIGASI YANG KURAN

0,73. et*es*ep

= 221.639 lt/det ==> 0.222 m3/det

PAH SEMPURNA : h' ≤ 2/3 h1

si (0,85 - 0,9)
9.81 m/s2
= 2.5 h1
m Melewati Pintu
DIAMBIL = 1.0 Meter
0.181995

ERENCANAAN IRIGASI

1
1.00
1.00 h

= 1.00 h
= 1.00 0.529
= 0.529 Meter
KONTROL
= b h2
= 1.00 h2
= 0.280 m2

= Q Q
==> V =
A A

0.185
V =
0.280

V = 0.66 m/s >


K IRIGASI YANG KURANG DARI 10.000 Ha DAN MENGAMBIL AIR LANGSUNG DARI SUNGAI.
Vrencana = 0.3 m/s ==> OK
PERENCANAAN KANTONG LUMPUR
Ukuran Partikel Rencana 0.07
Volume Kantong Lumpur
a. Kandungan sedimen 0.6 o/oo
b. Qn 0.185
c. Jarak waktu pembilasan 7 hari
V 55.853 m3
1:m 2

Luas Medan Endapan (LB) Kemiringan energi


diameter 0.07 m Qs 0.222 m3/dtk
suhu 20 o b 2.095 m
w 0.004 m/dtk Vs 0.500 m/detik
L.B 46.175 m2 As 0.443 m2
hs 0.212 m
B 2.402 m rs 0.176 m 2.518141
L 43.00 k 40
L/b > 8 17.90 Is 0.00040
Fr 0.347 OK
Perhitungan Kemiringan Normal τ 21.780 N/m2
Vn 0.5 m/detik Panjang Kantong Lumpur
An 0.369 m2 L 134.777 m
B 2.402 m Vs 55.853 m/detik
hn 0.154 m ds -0.028 -0.00021
b 2.095 m L2
P 2.783 m
R 0.133 m
In 0.00060
Bagian Peralihan
z 0.154
LP 1.54 m
1.23 m
LP 4m

8B2 = 46.175
B2 = 5.771861
B = 2.40
L = 19.21976
= 43

L/B > 8
17.898 > 8 OK
+ 0.443 + -55.853
L

-0.443 0.386 -0.00043


(-b) (b2-4ac)0,5 2.a

Rumus abc
(L )1
2
134.777 m
(L2)2 1934.82 m
PERENCANAAN KANTONG LUMPUR
Ukuran Partikel Rencana 0.07
Volume Kantong Lumpur
a. Kandungan sedimen 0.6 o/oo
b. Qn 0.678
c. Jarak waktu pembilasan 7 hari
V 204.910 m3
1:m 2

Luas Medan Endapan (LB) Kemiringan energi


diameter 0.07 m Qs 0.813 m3/dtk
suhu 20 o b 4.013 m
w 0.004 m/dtk Vs 1.000 m/detik
L.B 169.403 m2 As 0.813 m2
hs 0.203 m
B 4.602 m rs 0.184 m
L 43.00 k 40
L/b > 8 9.34 Is 0.00597
Fr 0.709 OK
Perhitungan Kemiringan Normal τ 118.674 N/m2
Vn 0.5 m/detik Panjang Kantong Lumpur
An 1.355 m2 L 103.760 m
B 4.602 m Vs 204.910 m/detik
hn 0.295 m ds 0.579
b 4.013 m
P 5.330 m
R 0.254 m
In 0.00039
Bagian Peralihan
z 0.295
LP 2.95 m
2.36 m
LP 3m

8B2 = 169.403
B2 = 21.17543
B = 4.60
L = 36.81341
= 43

L/B > 8
9.344 > 8 OK
204.910 = 0.813136324502 L 1.161718
204.910 = 1.974854483367 L
204.9109011941 L
103.76

4.41794702

0.01120 + 0.813 + -204.910


L2 L

-0.813 3.137 0.022392


(-b) (b -4ac)
2 0,5
2.a

Rumus abc
(L )1
2
103.760 m
(L2)2 -176.39 m
L
PERENCANAAN KANTONG LUMPUR
Ukuran Partikel Rencana 0.07
Volume Kantong Lumpur
a. Kandungan sedimen 0.6 o/oo
b. Qn 0.185
c. Jarak waktu pembilasan 7 hari
V 55.853 m3
1:m 2

Luas Medan Endapan (LB) Kemiringan energi


diameter 0.07 m Qs 0.222 m3/dtk
suhu 20 o b 2.095 m
w 0.004 m/dtk Vs 1.000 m/detik
L.B 46.175 m2 As 0.222 m2
hs 0.106 m
B 2.402 m rs 0.096 m 2.306547
L 43.00 k 40
L/b > 8 17.90 Is 0.01420
Fr 0.982 OK
Perhitungan Kemiringan Normal τ 390.560 N/m2
Vn 0.5 m/detik Panjang Kantong Lumpur
An 0.369 m2 L 55.318 m
B 2.402 m Vs 55.853 m/detik
hn 0.154 m ds 0.752 0.01425
b 2.095 m L2
P 2.783 m
R 0.133 m
In 0.00060
Bagian Peralihan
z 0.154
LP 1.54 m
1.23 m
LP 4m

8B2 = 46.175
B2 = 5.771861
B = 2.40
L = 19.21976
= 43

L/B > 8
17.898 > 8 OK
+ 0.222 + -55.853
L

-0.222 1.798 0.028491


(-b) (b2-4ac)0,5 2.a

Rumus abc
(L )1
2
55.318 m
(L2)2 -70.88 m
PERENCANAAN UNDER SLUICE

UNDER SLUICE adalah suatu pelat penutup setebal 0,25 yang fungsinya untuk mencegah angkutan se

- Selain itu pelat beton mendatar ini membagi dua kedalaman air di depan pintu.

PERHITUNGAN UNDER SLUICE

- Menentukan Tinggi UnderSluice

* Syarat : - D min 1,0 meter terhadap lantai muka bendung.

- D "Lebih dari" 1,3 H - 1,4 H

* Dimana : - D : Tinggi lubang pembilas bawa

- H : Keadaan air dalam keadaan d

- Menghitung Debit yang mengalir pada Undersluice

- Debit yang mengalir dalam pembilas bawah :

Qu = μ a Bp (2.g.h)1/2

Di mana : - μ = Koefisien Kontraksi

- a = Tinggi Bukaan Pintu Bilas B

- Bp = Lebar Pintu Bilas Bawah

==> Maka : Qu = μ

Qu = 0.95

Qu = 6.227

Debit yang mengalir di atas pintu pembilas

Qp = c B' Hu 3/2

- Di mana : B' = Lebar Pintu Bilas Total


Qp = Debit Yang Melalui Pintu Pe

c = Koefisien Pengaliran Yang D

m = Tinggi Pintu

t = Tinggi Air di Atas Pintu (Hd

* m = Tinggi Pintu Pembilas Bawah

m = 0.7

m = 0.95

* Keadaan Air Menuju Bendung

Hu = 2.4

Maka : Qp

Debit Yang Mengalir di Intake

* Debit Perencanaan Intake Diperoleh

Qs = 0.385 x μ

Qs = 0.385 x 0.95

Qs = 0.678 m3/detik

* Debit Yang Menuju Pembilas Bawah

Q = Qu + Qp

Q = 6.227 + 18.871

Q = 25.775 m3/detik

===> Variasi Bukaan Pintu Undersluice


- Untuk Bukaan 1/4 D (a = D = 1)

a = 1/4 D

a = 1/4 0.7

a = 0.175 meter

Qu = μ a

Qu = 0.95 0.175

Qu = 1.557 m3/detik

Q = Qu +

Q = 1.557 +

Q = 21.105 m3/detik

- Untuk Bukaan 1/2 D (a = D = 1)

a = 1/2 D

a = 1/2 0.7

a = 0.35 meter

Qu = μ a

Qu = 0.95 0.35

Qu = 3.113 m3/detik

Q = Qu +

Q = 3.113 +

Q = 22.662 m3/detik

- Untuk Bukaan 3/4 D (a = D = 1)

a = 3/4 D
a = 3/4 0.7

a = 0.525 meter

Qu = μ a

Qu = 0.95 0.525

Qu = 4.670 m3/detik

Q = Qu +

Q = 4.670 +

Q = 24.218 m3/detik
untuk mencegah angkutan sedimen dasar masuk ke intake.

di depan pintu.

adap lantai muka bendung.

Tinggi lubang pembilas bawah

Keadaan air dalam keadaan debit sungai yang masuk, mungkin masuk ke intake (tinggi air normal)

Koefisien Kontraksi ==> 0.95 meter -

Tinggi Bukaan Pintu Bilas Bawah ==> 0.7 meter

Lebar Pintu Bilas Bawah ==> 1.25 meter

a Bp (2.g.h)1/2

0.7 1.25 (2 . 9,81 . 3,055)1/2

m3/s

Lebar Pintu Bilas Total ===> B' = 1.250 meter


Debit Yang Melalui Pintu Pembilas

Koefisien Pengaliran Yang Dihitung Menurut Rumus

= 1.78 + 0.27 x t/m

Tinggi Pintu

Tinggi Air di Atas Pintu (Hd) = 2.4 meter

Tinggi Pintu Pembilas Bawah + Tebal Pelat

0.7 + 0.25

meter

u Bendung

+ 0.95 = 3.350 meter

= 18.871 m3/detik

x b x h x (2 . g . h)1/2

x 0.853 x 0.227 x (2 . 9,81 . 0,4795)1/2

+ Qs

+ 0.678
Bp (2.g.h)1/2

1.25 (2.9,81.3,055)1/2

Qp + Qs

18.871 + 0.678

Bp (2.g.h)1/2

1.25 (2.9,81.3,055)1/2

Qp + Qs

18.871 + 0.678
Bp (2.g.h)1/2

1.25 (2.9,81.3,055)1/2

Qp + Qs

18.871 + 0.678
P = 2.86 meter (Tinggi Bendung).

g = 9.81 m/s2
Lantai muka adalah lantai yang dipasang pada dinding udik bendung.

Lantai muka ini akan memperpanjang jalur rembesan, sebaiknya lantai muka itu dibuat dari beton bertu

Dan kalau dibuat dari pasangan batu kali, untuk mencegah terjadinya rembesan akibat retaknya lantai m

Menurut standar Perencanaan Irigasi, tebal lantai muka ini dapat dibuat dari beton bertulang dengan teb

Perbedaan tinggi muka air antara hulu dan hilir bendung akan menimbulkan perbedaan tekanan yang m
Untuk mencari besarnya gaya angkat pada pintu bendung harus terlebih dahulu dicari "UPLIFT PRESS

==> ∆H
Vx = Hx - Lx
∆L

# Di mana :

- Vx = Uplift Pressure
- Hx = Tinggi Tekanan x dihitung terhadap tinggi air hulu
- Lx = Panjang garis rayapan
- ∆L = Panjang total garis rayapan
- ∆H = Beda tinggi muka air di hulu dan di hilir bendung

# Untuk perhitungan gaya-gaya uplift pressure perlu diketahui terlebih dahulu panja

- Mencari Panjang Lantai Muka :

Untuk mencari perhitungan lantai muka dipakai cara IBLEIGH dengan

* Asumsi jenis tanah di lokasi lempung sedang, maka harga ko

c = 3

* ∆ H ; diambil yang paling kritis

a) ∆H kondisi air normal

b) ∆H kondisi air banjir


* ∆H Kondisi Air Banjir

ƩLV =

ƩLV =

ƩLV =

ƩLH =

ƩLH =

ƩLH =

SYARAT :

/ - CL

- CL

- CL

- L

TAMBAHAN PANJANG LANTAI M

sigma Lv
sigma Lv
lh
LV+ 1/3XLH

CL

MAKA, PERLU LANTAI MUKA


PERENCANAAN LANTAI MUKA

itu dibuat dari beton bertulang.

an akibat retaknya lantai muka diberi lapisan lempung, sedangkan pada pertemuan di bendung diberi sekat dari karet untuk m

eton bertulang dengan tebal 01,0 meter atau pasangan batu kali dengan tebal 0,20 – 0,25 meter.

erbedaan tekanan yang menyebabkan timbulnya suatu gaya yang berusaha mengangkat tubuh bendung ke atas.
lu dicari "UPLIFT PRESSURE" yang terjadi pada tiap titik sdut bendung kontak gaya angkat.

p tinggi air hulu

hilir bendung

ahui terlebih dahulu panjang lantai muka :

ai cara IBLEIGH dengan ketentuan :

ng sedang, maka harga koefisien rembesan;

==> Angka rembesan lane.

= 95.60 - 0.00

= 98.13 - 0.00
Kaki bendung 1 + Kaki bendung 1 + Kaki bendung 2

0.5 + 0.5 + 1

5.58 meter

Panjang Bendung + Panjang kolam olak

5.020 + 29.49

34.509 meter

= ∆L / H LEBIH BESAR DARI

= 5.58 + 11.50 /

= 0.17 KURANG DARI

LEBIH BESAR DARI 573.600

AN PANJANG LANTAI MUKA 556.521

1 0.5 0.5 0.5 0.5


5.50
12.000 2.4
0.097 > 556.521
tidak
0.271 > 6
tidak
NTAI MUKA
AI MUKA

diberi sekat dari karet untuk mencegah rembesan pada pertemuan antara lantai muka dengan tubuh bendung.

bendung ke atas.

= 95.60

= 98.13
+ Kaki bendung 2 + Kaki bendung+2 GH

+ 1.000 + 1+ 1.576

C ∆H

98.13

==> Diambil C = 573.60 meter

0.5 0.5 0.5 0.5 0.5


ANALISA KONSTRUKSI

ANALISA STABILITAS BENDUNG

Bagian dari lantai muka, mercu bendung dan kolam olakan secara keseluruhan disebut "tebuh bendung"
Dalam merencanakan suatu tubuh bendung, perlu diperiksa terhadap kekuatan bangunannya.

* Pemeriksaan ini meliputi :

1. Pemantapan Tubuh Bendung


2. Ketebalan Lantai Muka dan Kolam Olakan
3. Panjang Lantai Muka

* Pemeriksaan Pemantapan Tubuh Bendung Perlu Ditinjau Pada Waktu :


a. Kondisi Air Normal
b. Kondisi Air Banjir

Gaya-Gaya
` Yang Bekerja Pada Tubuh Bendung:

1. Berat Sendiri Bendung


2. Gaya Gempa
3. Tekanan Lumpur
4. Tekanan Air
5. Gaya Uplift Pressure

1 BERAT SENDIRI TUBUH BENDUNG

Konstruksi bendung mempunyai berat jenis

GAYA 0.5 Alas m


G1 0.50 0.137 100
G2 0.50 0.137 100
G3 0.50 0.492 100
G4 0.50 3.687 100
G5 0.838 100
G6 1.330 100
G7 2.008 100
5.596 G8 2.008 100
Σ

Titik Berat

ΣGX
x =
x =
ΣG

ΣGY
y =
ΣG

Berat sediri
G 30.05 ton/m
Mtahanan 256.603 ton

akibat gempa
ad = 85.247 cm/dt2
2 E = 0.087
K = 26.117 KN
2.612 ton
Dengan y = 732,707 meter
Mh = 4.921 Tonm

Ø 40.000 tan Ø
ɤ lumpur 0.900 SF
3 h=p 1.500 m
h1 -0.600 m
h2 = r 2.100 m
ka 0.217
P1 0.220 ton
y 1.500 m
Mguling 0.330 tonm
P2 5.040 ton
x 1.250
Mtahanan 6.301 tonm

Akibat tekanan air


a. kondisi air normal (P) 1.500 m
4 b. Kondisi air banjir ( P +Hd) 3.900

a. kondisi air normal


ɤw 1 t/m3
h=p 1.500 m
h1 = a2 -0.600 m
h2 2.100 m
Besar gaya gaya yang bekerja
W1 1.125 Mguling
W2 4.455 Mtahanan
Didapat :
Gaya Horizontal W1 1.125 tm
Gaya Vertikal W2 4.455 tm

KONTROL GULING
SF 5.242 > 2
OK!!

b. kondisi air banjir


h=p 1.500 m Hw6
ɤw 1 t/m2
h1 = a2 -0.6 m
h2 2.1 m
hd 2.4 m

Besarnya gaya gaya yang bekerja


W1 1.125 Mguling1
W2 2.250 Mguling2
W3 5.760 Mtahanan1
W4 6.615 Mtahanan2
W5 0.360 Mtahanan3
W6 3.999 Mtahanan4
W7 3.999 Mtahanan5

Gaya horizontal ke kanan =


gaya horizontal ke kiri =
Gaya vertikal ke bawah =

Mguling 9.075 ton/m2


Mtahanan 85.744 ton/m2

Akibat tekanan tanah


ada 2 tekanan tanah
5 a. tekanan tanah aktif
b. tekanan tanah pasif
Data tanah jenis lempung sedang
ɤt 1.3 t/m3
Ø 40.000
ka 0.217
Kp 4.599

Tekanan tanah yang terjadi


Pa1 0.0353345 Mguling1
Pa2 0.0795025 Mguling2
Pp1 0.7473229 Mtahanan

gaya horizontal ke kanan 0.1148369957


gaya horizontal ke kiri 0.747322864
Mguling 0.1023227077
Mtahanan 0.9964304853

Uplift Preasure
a. kondisi air normal
6 Px = 9.5925
Puplift = W >
30.055 >
b. kondisi air banjir
Px = 24.9405
Puplift = W >
30.055 >

GAYA 0.5 Alas m


G1 0.50 3.350 100
G2 0.50 0.189 100
G3 0.50 0.169 100
G4 0.50 0.149 100
G5 0.50 0.408 100
G6 0.187 100
G7 0.169 100
G8 0.149 100
Σ
9 0.5 2.35

GAYA 0.5 Alas m


G1 0.50 3.350 100
G2 0.50 0.189 100
G3 0.50 0.169 100
G4 0.50 0.149 100
G5 0.50 0.408 100
G6 0.187 100
G7 0.169 100
G8 0.149 100
Σ
9 0.5 3.35
10 0.5 0.91
disebut "tebuh bendung".
angunannya.

4.245
3.966
4.688
2.457
4.106
4.352
4.013
1.004
100

ϒ = 2.3 ton/m3

Tinggi m LUAS (A) (m2) G(ton) X (titik berat)


0.419 100 0.029 0.066 9.841
0.419 100 0.029 0.066 9.562
0.868 100 0.214 0.491 10.284
3.218 100 5.932 13.643 8.053
0.868 100 0.727 1.672 9.702
2.350 100 3.1 7.19 9.948
0.500 100 1.00 2.310 9.609
1.000 100 2.0 4.62 6.600
13.067 30.055 73.598

ΣGX 256.603
= =
= =
ΣG 30.055

ΣGY 56.628
= =
ΣG 30.055

z 0.560 di kalimantan
ac 160.000 cm/dt2
Tanah alluvium (n) 1.560
m 0.890
G 30.055 ton/m
G 300.549 Kn/m

0.839
19.080 > 2
OK!!

Kontrol geser
f = 0.839
SF 19.209 > 1.5
OK!!
1.063 t/m2
5.569 t/m2
OK!!

KONTROL GESER
f = 0.839
SF = 3.323 >
OK!!

2.828

2.550 t/m2
6.525 t/m2
32.443 t/m2
41.394 t/m2
2.253 t/m2
2.828 t/m2
6.826 t/m2

3.375
3.999
16.734 Kontrol Geser
kontrol guling f
Mg1 + Mg2 - Mg5 2.249 OKE!!! SF
0.0029445383507312
0.0993781693371793
0.996430485291234

Px
9.5925 OKE!!!

Px
24.9405 OKE!!!

Tinggi m LUAS (A) (m2) G(ton) X (titik berat)


3.350 100 5.611 5.611 1408.100
0.503 100 0.047 0.047 1289.980
0.251 100 0.021 0.021 1271.770
0.126 100 0.009 0.009 1255.520
0.126 100 0.026 0.026 1232.020
0.503 100 0.1 0.094 1286.840
0.251 100 0.04 0.043 1268.950
0.126 100 0.0 0.019 1253.040
5.870 5.870 10266.220
2.35 2.761 2.761 156.67

Tinggi m LUAS (A) (m2) G(ton) X (titik berat)


3.350 100 5.611 5.611 1508.600
0.503 100 0.047 0.047 1390.480
0.251 100 0.021 0.021 1372.270
0.126 100 0.009 0.009 1356.020
0.126 100 0.026 0.026 1332.520
0.503 100 0.1 0.094 1387.340
0.251 100 0.04 0.043 1369.450
0.126 100 0.0 0.019 1353.540
5.870 5.870 11070.220
3.35 5.611 5.611 223.66
1 0.455 0.455 1332.52
* KETERANGAN

- WARNA MERAH :

beton tumbuk Gaya gaya yang bekerja


Gaya Berat (W) Gaya Hidrostatis
G . X (ton) Y (titik berat) G . Y (ton) W WX
0.649 4.264 0.281 0.066 0.649
0.631 4.264 0.281 0.066 0.631
5.054 3.639 1.788 0.491 5.054
109.866 2.073 28.276 13.643 109.866
16.217 3.784 6.325 1.672 16.217
71.505 2.2 15.634 7.188 71.505
22.192 1 1.732 2.310 22.192
30.488 1 2.310 4.619 30.488
256.603 56.628
21.448

5.0167
8.538 m
8.538 m

1.884 m
1.5

0.839
3.511390113664 > 1.5
G . X (ton) Y (titik berat) G . Y (ton) W WX
7901.201 211.830 1673711.434 12.906 7901.201
61.127 368.500 22525.178 0.109 61.127
27.043 402.000 10871.294 0.049 27.043
11.786 418.750 4935.206 0.022 11.786
31.668 431.310 13658.657 0.059 31.668
120.662 410.370 49516.263 0.216 120.662
53.966 422.940 22824.426 0.098 53.966
23.418 429.220 10051.652 0.043 23.418
1819419.901 1818427.228
3094.920
178.33 492.414

G . X (ton) Y (titik berat) G . Y (ton) W WX


8465.132 211.830 1793168.859 12.906 8465.132
65.889 368.500 24280.074 0.109 65.889
29.180 402.000 11730.384 0.049 29.180
12.729 418.750 5330.252 0.022 12.729
34.251 431.310 14772.839 0.059 34.251
130.086 410.370 53383.398 0.216 130.086
58.240 422.940 24632.105 0.098 58.240
25.297 429.220 10857.844 0.043 25.297
1950071.479 1950607.576
3094.920
211.830 1188.631
606.297 0.000
FIX

Gaya Hidrostatis
WY Kondisi air normal Kondisi Air Banjir
0.281
0.281
1.788
28.276
6.325
1.125 7.605
15.634
1.732
2.310
WY
1188.631
17.462
8.548
3.931
11.086
38.479
17.987 794.6
8.022

613.500
495.380
WY 477.170
1188.631 460.920
17.462 437.420
8.548 492.240
3.931 474.350
11.086 458.440
38.479
17.987
8.022

895.1
PERENCANAAN TEMBOK TEGAK
Ø 30
ɤtanah 1.65
c 0.5
α 50
ɤ 20.000

GAYA-GAYA YANG BEKERJA


1. BERAT SENDIRI BALOK
V1 0.363
Mt1 0.054
V2 17.103
Mt2 14.452
SV 21.074
SMt 21.185

3. TEKANAN TANAH HORIZONTAL TERHADAP TEMBOK (Pa)


Ka 0.333 Kp
Pa 6.596 Pp
Mg 10.774 Mt

DATA YANG DIPEROLEH


Pa 6.596
V1+V2+V3 21.074
Mg 10.774
Mt 22.010

KONTROL STABILITAS TEMBOK TEGAK


1. kontrol terhadap guling
Fs 2.043 > 1.5
oke
2. kontrol terhadap geser
Fs 3.835 > 1.5
oke
3. kontrol terhadap eksentrisitas
x 0.533
e 11.967

4. kontrol terhadap daya dukung tanah

max 172.385 < 392.05


oke
min -130.238 < 392.05
oke
#REF!
= #REF!

= #REF!
= #REF!
ɤtembok 2.2 pasangan batu
i 0
h1 4.900
B 2.3275
b 1.27
0.3

V3 0.382
Mt3 0.292
V4 3.226
Mt4 6.387

3
2.475
0.825
= 0

= 0

= 0
1. Akibat Berat Sendiri Tubuh Bendung

Berat Sendiri Tubuh Bendung


Luas (A) Berat (G) Lengan Momen Mx My
No.
(m )
2
(ton) x (m) y (m) (ton.m) (ton.m)
1 0.029 0.066 9.841 4.264 0.649 0.281
2 0.029 0.066 9.562 4.264 0.631 0.281
3 0.214 0.491 10.284 3.639 5.054 1.788
4 5.932 13.643 8.053 2.073 109.866 28.276
5 0.727 1.672 9.702 3.784 16.217 6.325
6 3.125 7.188 9.948 2.175 71.505 15.634
7 1.004 2.310 9.609 0.750 22.192 1.732
8 2.008 4.619 6.600 0.500 30.488 2.310
9 2.798 6.435 2.798 0.750 18.006 4.827
10 3.000 6.900 11.0167 0.500 76.015 3.450
Jumlah 18.865 43.390 350.625 64.905

Letak Titik Berat Mercu:


x= ΣMx / ΣG = 8.081 m
y= ΣMy / ΣG = 1.496 m

Berat Sendiri Bendung


G= ΣA.Y = 43.390 m
Mv = G.x = 350.625 ton.m

2. Akibat Gempa

n = 1.56 Koefisien Jenis Tanah


m = 0.89 (Alluvium)
ac = 160 cm/det2
z = 0.56 (Kalimantan Barat)
g = 981 cm/det2
ad = n x (ac x z)m
= 85.247 cm/det2
E = ad /g
= 0.087
K = GxE
= 2.612 ton

Momen Horizontal (Mh)


Mh = Kxy
= 3.907 ton.m
ANALISA KONSTRUKSI

ANALISA STABILITAS BENDUNG

Bagian dari lantai muka, mercu bendung dan kolam olakan secara keseluruhan disebut "tebuh bendung"
Dalam merencanakan suatu tubuh bendung, perlu diperiksa terhadap kekuatan bangunannya.

* Pemeriksaan ini meliputi :

1. Pemantapan Tubuh Bendung


2. Ketebalan Lantai Muka dan Kolam Olakan
3. Panjang Lantai Muka

* Pemeriksaan Pemantapan Tubuh Bendung Perlu Ditinjau Pada Waktu :


a. Kondisi Air Normal
b. Kondisi Air Banjir

Gaya-Gaya
` Yang Bekerja Pada Tubuh Bendung:

1. Berat Sendiri Bendung


2. Gaya Gempa
3. Tekanan Lumpur
4. Tekanan Air
5. Gaya Uplift Pressure

1 BERAT SENDIRI TUBUH BENDUNG

Konstruksi bendung mempunyai berat jenis

GAYA 0.5 Alas m


G1 0.50 0.167 100
G2 0.50 0.167 100
G3 0.50 0.625 100
G4 0.50 3.633 100
G5 1.250 100
G6 1.875 100
G7 2.554 100
G8 2.554 100
Σ

Titik Berat

ΣGX
x =
x =
ΣG

ΣGY
y =
ΣG

Berat sediri
G 39.11 ton/m
Mtahanan 22844.899 ton

akibat gempa
ad = 85.247 cm/dt2
2 E = 0.087
K = 33.988 KN
3.399 ton
Dengan y = 732,707 meter
Mh = 2488.962 Tonm

Ø 35.750 tan Ø
ɤ lumpur 0.900 SF
3 h=p 1.500 m
h1 -0.600 m
h2 = r 2.100 m
ka 0.262
P1 0.266 ton
y 1.500 m
Mguling 0.399 tonm
P2 5.040 ton
x 6.708
Mtahanan 33.806 tonm

Akibat tekanan air


a. kondisi air normal (P) 1.500 m
4 b. Kondisi air banjir ( P +Hd) 3.900

a. kondisi air normal


ɤw 1 t/m3
h=p 1.500 m
h1 = a2 -0.600 m
h2 2.100 m
Besar gaya gaya yang bekerja
W1 1.125 Mguling
W2 4.455 Mtahanan
Didapat :
Gaya Horizontal W1 1.125 tm
Gaya Vertikal W2 4.455 tm

KONTROL GULING
SF 28.124 > 2
OK!!

b. kondisi air banjir


h=p 1.5 m Hw6
ɤw 1 t/m2
h1 = a2 -0.6 m
h2 2.1 m
hd 2.4 m

Besarnya gaya gaya yang bekerja


W1 1.125 Mguling1
W2 2.250 Mguling2
W3 5.760 Mtahanan1
W4 6.615 Mtahanan2
W5 0.360 Mtahanan3
W6 3.999 Mtahanan4
W7 3.999 Mtahanan5

Gaya horizontal ke kanan =


gaya horizontal ke kiri =
Gaya vertikal ke bawah =

Mguling 9.075 ton/m2


Mtahanan 85.744 ton/m2

Akibat tekanan tanah


ada 2 tekanan tanah
5 a. tekanan tanah aktif
b. tekanan tanah pasif
Data tanah jenis lempung sedang
ɤt 1.3 t/m3
Ø 35.750
ka 0.262
Kp 3.811

Tekanan tanah yang terjadi


Pa1 0.0426444 Mguling1
Pa2 0.09595 Mguling2
Pp1 0.6192192 Mtahanan

gaya horizontal ke kanan 0.1385944085


gaya horizontal ke kiri 0.6192191548
Mguling 0.1234911717
Mtahanan 0.8256255398

Uplift Preasure
a. kondisi air normal
6 Px = 9.5925
Puplift = W >
39.113 >
b. kondisi air banjir
Px = 24.9405
Puplift = W >
39.113 >
disebut "tebuh bendung".
angunannya.

ϒ = 2.3 ton/m3

Tinggi m LUAS (A) (m2) G(ton) X (titik berat)


0.625 100 0.052 0.120 446.587
0.625 100 0.052 0.120 404.920
1.083 100 0.338 0.778 509.087
3.633 100 6.598 15.175 242.169
1.083 100 1.353 3.112 425.753
2.550 100 4.8 11.00 457.003
0.500 100 1.28 2.937 438.025
1.000 100 2.6 5.87 112.688
17.006 39.113 3036.232

ΣGX 22844.899
= =
= =
ΣG 39.113

ΣGY 28642.338
= =
ΣG 39.113

z 0.560 di kalimantan
ac 160.000 cm/dt2
Tanah alluvium (n) 1.560
m 0.890
G 39.113 ton/m
G 391.130 Kn/m

0.720
84.820 > 2
OK!!

Kontrol geser
f = 0.720
SF 13.655 > 1.5
OK!!
1.063 t/m2
29.882 t/m2
OK!!

KONTROL GESER
f = 0.720
SF = 2.851 >
OK!!

2.828

2.550 t/m2
6.525 t/m2
32.443 t/m2
41.394 t/m2
2.253 t/m2
2.828 t/m2
6.826 t/m2

3.375
3.999
16.734 Kontrol Geser
kontrol guling f
Mg1 + Mg2 - Mg5 2.249 OKE!!! SF
0.0035537027822113
0.119937468899631
0.825625539779123

Px
9.5925 OKE!!!

Px
24.9405 OKE!!!
* KETERANGAN

- WARNA MERAH :

beton tumbuk Gaya gaya yang bekerja


Gaya Berat (W) Gaya Hidrostatis
G . X (ton) Y (titik berat) G . Y (ton) W WX
53.755 468.835 56.433 0.120 53.755
48.740 468.835 56.433 0.120 48.740
396.105 391.084 304.290 0.778 396.105
3674.809 221.084 3354.854 15.175 3674.809
1325.060 409.127 1273.315 3.112 1325.060
5025.605 227.5 2501.789 10.997 5025.605
1286.407 75 220.263 2.937 1286.407
661.892 50 293.684 5.874 661.892
22844.899 28642.338
2311.465

584.074 m
584.074 m

732.297 m
1.5

0.720
3.012561410683 > 1.5
FIX

Gaya Hidrostatis
WY Kondisi air normal Kondisi Air Banjir
56.433
56.433
304.290
3354.854
1273.315
1.125 7.605
2501.789
220.263
293.684
Tabel IX.1 Perhitungan Berat Sendiri Tubuh Bendung
Luas (A) G X G.X Y G.Y W WX WYKondisi airKondisi
normal Air Banjir
Gaya
(m2) (ton) (m) (ton) (m) (ton)
G1 0.167 0.625 0.052 0.120 446.587 53.755 468.835 56.433 0.120369 53.75526 56.43323 8.69445 16.07445
G2 0.167 0.625 0.052 0.120 404.920 48.740 468.835 56.433 0.120369 48.73984 56.43323
G3 0.625 1.083 0.338 0.778 509.087 396.105 391.084 304.290 0.778068 396.1045 304.2901
G4 3.633 3.633 6.598 15.175 242.169 3674.809 221.084 3354.854 15.17457 3674.809 3354.854
G5 1.25 1.083 1.353 3.112 425.753 1325.060 409.127 1273.315 3.112274 1325.06 1273.315
G6 1.875 2.550 4.781 10.997 457.003 5025.605 227.500 2501.789 10.99688 5025.605 2501.789
G7 2.554 0.5 1.277 2.937 438.025 1286.407 75 220.263 2.936836 1286.407 220.2627
G8 2.554 1 2.554 5.874 112.688 661.892 50 293.684 5.873671 661.8922 293.6836
Σ 17.006 39.113 22844.899 28658.377

584.074
732.707
5. Akibat Uplift

Akibat Tekanan Uplift Kondisi Air Normal


Panjang Rembesan
L DH H Ux
Titik Garis Vertikal Horizontal 1/3 Horizontal Lx
(m) (m) (m) (m) (m) (m) (m) (t/m)
0 0.00 4.672 3.350 3.350 3.350
0-1 0.50
1 0.50 4.672 3.350 3.850 3.492
1-2 2.01 0.67
2 1.17 4.672 3.350 3.850 3.011
2-3 0.50
3 1.67 4.672 3.350 3.350 2.153
3-4 1.00 0.33
4 2.00 4.672 3.350 3.350 1.914
4-5 1.00
5 3.00 4.672 3.350 4.350 2.197
5-6 2.01 0.67
6 3.67 4.672 3.350 4.350 1.717
6-7 1.00
7 4.67 4.672 3.350 3.350 0.000
Jumlah 3.00 5.02 1.67 16.69

Akibat Tekanan Uplift Kondisi Air Banjir


Panjang Rembesan
L DH H Ux
Titik Garis Vertikal Horizontal 1/3 Horizontal Lx
(m) (m) (m) (m) (m) (m) (m) (t/m)
0 0.00 4.672 3.355 3.355 3.355
0-1 0.50
1 0.50 4.672 3.355 3.855 3.496
1-2 2.01 0.67
2 1.17 4.672 3.355 3.855 3.015
2-3 0.50
3 1.67 4.672 3.355 3.355 2.156
3-4 1.00 0.33
4 2.00 4.672 3.355 3.355 1.917
4-5 1.00
5 3.00 4.672 3.355 4.355 2.199
5-6 2.01 0.67
6 3.67 4.672 3.355 4.355 1.718
6-7 1.00
7 4.67 4.672 3.355 3.355 0.000
Jumlah 3.00 5.02 1.67 16.69