Anda di halaman 1dari 16

DAFTAR PEMBANGUNAN PRIORITAS TINGKAT RT UNTUK TAHUN 2025

RT : 001 FORM I RT
RW : 001
KELURAHAN : TAMANBARU
KECAMATAN : CITANGKIL

SUMBER DANA PENERIMA MANFAAT


No JENIS KEGIATAN LOKASI LINK RT/RW VOLUME SATUAN ESTIMASI BIAYA
DPWKEL LK PR
1 87 M1 34,800,000
DRAINASE RT.001/001 √
2 130 M1 52,000,000
DRAINASE RT.001/001 √
3 37 M2 7,400,000
PAVING BLOCK RT.001/001 √
4 29 M2 5,800,000
PAVING BLOCK RT.001/001 √

100,000,000
Cilegon,……............ 2022
Ketua RT.001 RW.001

ZAENAL ABIDIN
Prioritas 1,2,3

Cilegon,……............ 2022
Ketua RT.001 RW.001

ZAENAL ABIDIN
DAFTAR PEMBANGUNAN PRIORITAS TINGKAT RW UNTUK TAHUN 2025

RW : 001 FORM II RW SALIRA


KELURAHAN : TAMANBARU
KECAMATAN : CITANGKIL

USULAN OPRASIONAL
LOKASI
KEGIATAN ANGGARAN
No JENIS KEGIATAN VOLUME SATUAN
LINK RT/RW FISIK CSR/SUMBER
DPWKEL APBD/OPD APBD/POKIR APBN
LAINNYA JUMLAH
1 70 M1 40,000,000
DRAINASE LINK.KUBANG LESUNG GEGUNUNG RT.001/001 √ 40,000,000
2 80 M1 60,000,000
TPT LINK.LELEBAK RT.002/001 √ 60,000,000

JUMLAH 100,000,000 100,000,000

Cilegon…….......... 20…......
KETUA RW …...

…...................................
Prioritas 1,2,3

1
DAFTAR SKALA PRIORITAS PEMANGKU KEPENTINGAN KELURAHAN UNTUK TAHUN 2025
NAMA LEMBAGA/ORGANISASI LKK
KELURAHAN : TAMANBARU KECAMATAN CITANGKIL

KATAGORI KEGIATAN (√)


SUMBER ANGGARAN
No JENIS KEGIATAN PRIORITAS POTENSI PEMECAHAN MASALAH LOKASI KEGIATAN VOLUME SATUAN
FISIK NON FISIK CSR/SUMBER
DPWKEL OPD/APBD APBN
LAINNYA
1 KETERBATASAN BIAYA MONITORING POSYANDU PEMBERIAN MAKANAN TAMBAHAN KELURAHAN √ 12 PAKET 24,000,000

KELENGKAPAN ALAT POSYANDU (PENGADAAN


2 KURANGNYA MEUBELAIR POSYANDU KELURAHAN √ 12 UNIT 24,000,000
MEJA KERJA)

KELENGKAPAN ALAT PKK (PENGADAAN


3 MENINGKATKAN KINERJA PKK DALAM HAL PELAPORAN KELURAHAN √ 1 UNIT 15,000,000
LAPTOP)

4 KURANGNYA KETERAMPILAN DALAM HAL PUBLIK SPEAKING KELURAHAN √ 30 ORANG 25,000,000


PELATIHAN PUBLIK SPEAKING
SEBAGIAN BELUM MENDAPAT SERAGAM DAN YANG SUDAH
5 PENGADAAN SERAGAM LINMAS BARU KELURAHAN √ 60 ORANG 60,000,000
ADA TIDAK LAYAK PAKAI

6 MINIMNYA KOMUNIKASI DALAM MENJALAKAN TUGAS PENGADAAN HT KELURAHAN √ 60 UNIT 18,000,000

7 PELATIHAN LAS PELATIHAN LAS KELURAHAN √ 22 ORANG 22,000,000

8 PELATIHAN FORKLIFT PELATIHAN FORKLIFT KELURAHAN √ 22 ORANG 22,000,000

MENINGKATKAN KINERJA KARANG TARUNA DALAM HAL KELENGKAPAN ALAT KARANGTARUNA


9 KELURAHAN √ 1 UNIT 15,000,000
PELAPORAN (PENGADAAN LAPTOP)

MENINGKATKAN KINERJA KARANG TARUNA DALAM HAL KELENGKAPAN ALAT KARANGTARUNA


10 KELURAHAN √ 1 UNIT 5,000,000
PELAPORAN (PENGADAAN PRINTER)

KESULITAN DALAM MENGELOLA LAHAN UNTUK BERCOCOK


11 PENGADAAN TRAKTOR KELURAHAN √ 4 UNIT 60,000,000
TANAM, DIPERLUKAN ALAT BERAT
12 KURANGNYA BENIH PADI PENAMBAHAN BENIH PADI KELURAHAN √ 100,000,000

13 UNTUK KESERAGAMAN KADER POSYANDU PENGADAAN SERAGAM KADER POSYANDU KELURAHAN √ 48 ORANG 7,200,000

14 UNTUK BERJALANNYA KEGIATAN POSYANDU KELURAHAN √ 12 ORANG 43,200,000


PENAMBAHAN HONOR KADER 12 ORANG
15 MENGURANGI ANGKA PENGANGGURAN PELATIHAN TATA BOGA KELURAHAN √ 1 PAKET 50,000,000

16 UNTUK KESERAGAMAN DAN KESERASIAN KELURAHAN √ 50 ORANG 15,000,000


PENGADAAN SERAGAM KADER PKK
17 KESULITAN DALAM HAL IDENTITAS RT/RW KELURAHAN √ 43 UNIT 25,800,000
PENGADAAN PLANG NAMA RT/RW
18 UNTUK MEMANDIKAN JENAZAH AGAR LEBIH SESUAI ATURAN KELURAHAN √ 44 ORANG 22,000,000
PELATIHAN MEMANDIKAN JENAZAH

MENINGKATKAN KINERJA KARANG TARUNA DALAM HAL KELENGKAPAN ALAT KARANGTARUNA


19 KELURAHAN √ 1 UNIT 1,000,000
PELAPORAN (PENGADAAN HARDISK)

MENINGKATKAN KINERJA KARANG TARUNA UNTUK SEMUA


20 KELURAHAN √ 1 UNIT 6,000,000
KEGIATAN PENGADAAN KAMERA SLR
21 KURANGNYA PEMAHAMAN TERKAIT BUDIDAYA MELON KELURAHAN √ 4 PAKET 20,000,000
PELATIHAN BUDIDAYA MELON
22 BUTUHNYA ALAT UNTUK KEGIATAN PENYULUHAN KELURAHAN √ 12 UNIT 36,000,000
PENGADAAN ALAT SOUND SYSTEM
23 UNTUK BERJALANNYA KEGIATAN POSYANDU KELURAHAN √ 60 ORANG 216,000,000
KENAIKAN HONOR KADER POSYANDU
24 TERBATASNYA PENDANAAN MODAL USAHA UP2K KELURAHAN √ 50 ORANG 20,000,000
PERMODALAN DAN KOPERASI
KURANGNYA WAWASAN PENGEMBANGAN TP.PKK
25 KELURAHAN √ 50 ORANG 20,000,000
KELURAHAN STUDY BANDING
26 UNTUK MENGATASI KEBAKARAN KELURAHAN √ 43 UNIT 43,000,000
PENGADAAN HYDRAN UMUM
PERLUNYA PELATIHAN PENYEMBELIHAN HEWAN QURBAN
27 KELURAHAN √ 86 ORANG 50,000,000
AGAR LEBIH SESUAI ATURAN PELATIHAN PENYEMBELIHAN HEWAN QURBAN
28 PERLUNYA PELATIHAN KHUTBAH AGAR LEBIH SESUAI ATURAN KELURAHAN √ 86 ORANG 50,000,000
PELATIHAN KHUTBAH
29 KELURAHAN √ 7 ORANG 50,000,000
PEMBINAAN BUNDA PAUD

TOTAL ANGGARAN

Cilegon, ……Nopember 2
Mengetahui : Ketua Lembaga Kemasyarakatan
Lurah

( AHMAD BUHARI,S.Ag) ( ZAENAL ARIFIN )


FORM III (MLK)

SUMBER ANGGARAN

JUMLAH (Rp)

24,000,000

24,000,000

15,000,000

25,000,000

60,000,000

18,000,000

22,000,000

22,000,000

15,000,000

5,000,000

60,000,000

100,000,000

7,200,000

43,200,000

50,000,000

15,000,000

25,800,000

22,000,000

1,000,000

6,000,000

20,000,000

36,000,000

216,000,000

20,000,000
20,000,000

43,000,000

50,000,000

50,000,000

50,000,000

1,065,200,000

Cilegon, ……Nopember 2023


Ketua Lembaga Kemasyarakatan Kelurahan

( ZAENAL ARIFIN )
RUMUSAN KEGIATAN UNTUK DIUSULKAN KE MUSRENBANGCAM UNTUK TAHUN 2024
YANG DIBIAYAI SKPD DLAM APBD KOTA CILEGON

KECAMATAN : CITANGKIL
KELURAHAN : TAMANBARU FORM IVA SKPD KE KEC
BIDANG : FISIK & NON FISIK

No USULAN KEGIATAN PRIORITAS VOLUME SATUAN JUMLAH BIAYA LOKASI LINK RT/RW SKPD PELAKSANA

1 PAVING BLOCK 648 M2 129,600,000 EMIRA LELEBAK RT.02/01 PERKIM


2 TPT SAWAH BAYUR 100 M1 75,000,000 RT.003/001 DPUPR
3 DRAINASE 150 M1 60,000,000 RT.003/001 RUMAH PAK FURKON PERKIM
4 TPT MAKAM 400 M1 300,000,000 RT.003/001 & RT.002/001 PERKIM
5 DRAINASE 200 M1 80,000,000 RT.003/001 BELAKANG MIRA-MUHLAS PERKIM
6 Penomoran Rumah 60 BUAH 3,000,000 Rw.01 PERKIM
7 Meja Tenis 2 SET 4,000,000 Rw.01 DISPORA
8 Bola Volly 2 BUAH 500,000.00 Rw.01 DISPORA
9 Tong Sampah 80 BUAH 12,000,000 Rw.01 DLH
10 Mesin Potong Rumput 2 BUAH 5,000,000 Rw.01 DLH
11 Penomoran Rumah 120 BUAH 6,000,000 Rw.02 PERKIM
12 PJU Jalan Lingkungan 1 PAKET 38,000,000 Rw.02 DISHUB
13 RTLH 2 UNIT 30,000,000 Rw.02 DINSOS
14 Gapura 2 UNIT 50,000,000 Link sondol PERKIM
15 Pemagaran Makam 50 M1 60,000,000 Link sondol PERKIM
16 Paving Block 310 M3 93,000,000 Link sondol PERKIM
17 Pos Ronda 1 UNIT 25,000,000 Link sondol PERKIM
18 GUDANG MUSHOLLA 1 UNIT 100,000,000 LINK.SONDOL RT.002/002 JLN.BUNUT PERKIM
19 PENGAMANAN JALAN 80 M3 60,000,000 LINK.SONDOL RT.003/002 DISHUB
20 PENGAMANAN JALAN 90 M3 80,000,000 LINK.SONDOL RT.003/002 DISHUB
21 PENGAMANAN JALAN 50 M3 50,000,000 LINK.SONDOL RT.002/002 JLN BUNUT DISHUB
22 TPT 100 M3 75,000,000 LINK.SONDOL RT.002/002 JLN.BUNUT PERKIM
23 TPT 40 M3 30,000,000 LINK.SONDOL RT.002/002 JLN.H.KALAM PERKIM
24 DRAINASE 500 M3 200,000,000 LINK.SONDOL RT.003/002 PERKIM
25 Peralatan Olahraga Volly 1 PAKET 5,000,000 Rw.03 DISPORA
26 Peralatan Olahraga Tenis Meja 1 PAKET 5,000,000 Rw.03 DISPORA
27 Tiang Listrik 5 BUAH 25,000,000 Rw.03 DISPERINDAG
28 Bedah Rumah 4 UNIT 80,000,000 Rw.03 DINSOS
29 Mesin Potong Rumput 1 BUAH 2,500,000 Rw.03 DLH
30 PEMAGARAN MAKAM ATAS 1 Paket 60,000,000 001/003 PERKIM
31 PELEBARAN JEMBATAN PERBATASAN 1 TITIK 150,000,000 JLN KULON RT.003/004 DPUPR
32 TPT 100 M1 65,000,000 JLN KULON RT.004/004 PERKIM
33 Alat Kerja Linmas 1 PAKET 5,000,000 Rw.04 SATPOL PP
34 Pembinaan Kepemudaan 3 KEG 45,000,000 Rw.04 DISPORA
35 Pembinaan Masyarakat 1 KEG 15,000,000 Rw.04 DISPERINDAG
36 Penambahan Linmas 1 ORANG 2,400,000 Rw.04 SATPO PP
37 Perawatan Jalan Kimadi Jabar Kubang Lesung Kulon 1500 M1 1,200,000,000 Rw.04 DPUPR
38 Tiang Listrik 10 BUAH 50,000,000 Rw.04 DISPERINDAG
39 Perlengkapan Olahraga 1 PAKET 5,000,000 Rw.04 DISPORA
40 RTLH 6 UNIT 120,000,000 Rw.04 DINSOS
41 Tong Sampah 5 BUAH 5,000,000 Rw.04 DLH
42 PAVING BLOCK 60 M2 12,000,000 RT.001/005 DEPAN MANG RUN PERKIM
43 TPT 80 M1 52,000,000 RT.002/005 DPUPR
44 PAVING BLOCK 200 M2 40,000,000 RT.002/005 PERKIM
45 TPT 80 M1 52,000,000 RT.002/005 PERKIM
46 DRAINASE 5 M1 20,000,000 RT.003/005 PERKIM
47 PELATIHAN HANTARAN PENGANTIN 1 KEG 15,000,000 Rw.05 DISPUDPAR
48 DRAINASE JALAN BAWAH 160 M1 64,000,000 LINK.KUBANG BALE CIKAPAL RT.003/006 DPUPR
49 PAVING BLOCK JLN BAWAH 240 M2 48,000,000 LINK.KUBANG BALE CIKAPAL RT.003/006 DPUPR
50 TPT DEPAN RUMAH PAK RT 90 M1 67,500,000 LINK.KUBANG BALE CIKAPAL RT.003/006 DPUPR
51 Betonisasi Jalan Kubang Bale - Lembang 1000 M1 1,000,000,000 Rw.06 DPUPR
52 Drainase Jalan Kubang Bale - Lembang 500 M2 400,000,000 Rw.06 DPUPR
53 TPT JLN BAWAH 80 M1 60,000,000 LINK.KUBANG BALE CIKAPAL RT.003/006 PERKIM
54 TIANG LISTRIK 4 BUAH 20,000,000 LINK.KUBANG BALE CIKAPAL RT.003/006 DISPERINDAG
55 DRAINASE 200 M1 90,000,000 LINK.KUBANG BALE CIKAPAL RT.003/006 PERKIM
56 PJU LINGKUNGAN 5 TIANG 38,000,000 LINK.KUBANG BALE CIKAPAL RT.003/006 DISHUB
57 Drainase 210 M1 84,000,000 Link.Kedawung Rt.01/07 PERKIM
58 Paving Block 368 M2 73,600,000 Link.Kedawung Rt.01/07 PERKIM
59 Paving Block 300 M2 60,000,000 Link.Kedawung Rt.002/007 PERKIM
60 Pemagaran Makam 300 M1 60,000,000 Link.Kedawung Rt.002/007 PERKIM
61 PAVING BLOCK 240 M2 48,000,000 LINK.KEDAWUNG RT.003/007 PERKIM
62 DRAINASE 100 M3 45,000,000 LINK.KEDAWUNG RT.003/007 PERKIM
63 TIANG LISTRIK 8 BUAH 40,000,000 Rw.07 DISPERINDAG
64 PJU 2 TITIK 76,000,000 Rw.07 DISHUB
65 TEMPAT SAMPAH 50 BUAH 25,000,000 Rw.07 DLH
66 GAPURA 1 unit 25,000,000 Kavling Blok C PERKIM
67 RENOVASI MUSHOLLA 1 UNIT 25,000,000 RW.009 PERKIM
68 PEMASANGAN CCTV 10 UNIT 80,000,000 RW.009 PERKIM
69 Perawatan Jalan Kavling Blok C 1000 M1 800,000,000 RW.009 DPUPR
70 PENGASPALAN 3500 M1 3,500,000,000 RW.009 DPUPR
71 PJU 2 TITIK 76,000,000 RW.009 DISHUB
72 TAMAN LAYAK ANAK 1 UNIT 10,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 PERKIM
73 LAPANGAN OLAHRAGA/FUTSAL 1 UNIT 30,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 PERKIM
74 RUANG TERBUKA HIJAU 3 UNIT 100,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 DISPORA
75 KELOMPOK TANI 1 UNIT 30,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 PERKIM
76 ALAT PELATIHAN 1 PAKET 30,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 DISPERINDAG
77 TEMPAT SAMPAH 100 UNIT 5,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 DLH
78 PLANG NOMOR RUMAH 150 UNIT 10,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 DAMKAR
79 HYDRAN ( PEMADAM) 10 UNIT 200,000,000 LINK.PERUM BUKIT TAMAN BARU RT.001/010 DISPORA
80 GUDANG SARANA RT 1 UNIT 100,000,000 LINK.PERUM BUKIT TAMAN BARU RT.002/010 PERKIM
81 TENDA WARGA 12X4 M1 6,000,000 LINK.PERUM BUKIT TAMAN BARU RT.002/010 DISPERINDAG
82 TPT JLN BARU (SAWAH MAKAM LOR) 300 M3 225,000,000 KUBANG LESUNG RT.003/011 DPUPR
83 PEMAGARAN MAKAM UMUM H.BUNGSU 30 M3 60,000,000 KUBANG LESUNG RT.001/011 PERKIM
84 Perawatan Jalan Gotong Royong 1000 M1 800,000,000 Rw.011 DPUPR
85 DRAINASE 494 M2 395,200,000 Rw.011 DPUPR
86 PENAMBAHAN HONOR KADER 12 ORANG 12 Orang 43,200,000 Kelurahan DINKES
87 PENGADAAN SERAGAM LINMAS BARU 60 ORANG 60,000,000 Kelurahan PERKIM

MENGETAHUI : Cilegon,……………..20….
LURAH TAMANBARU KETUA MUSRENBANGKEL

( AHMAD BUHARI,S.Ag) ( SUHILMAN)


NIP : 19721025 200212 1 005
DAFTAR SKALA PRIORITAS USULAN MUSRENBANGKEL UNTUK TAHUN 2025
YANG DIBIAYAI DANA PEMBANGUNAN WILAYAH KELURAHAN (DPWKEL)
KECAMATAN : CITANGKIL
KELURAHAN : TAMANBARU FORM IVB FISIK DPWKEL
BIDANG : SARPRASWIL
No USULAN KEGIATAN PRIORITAS VOLUME SATUAN SWADAYA Rp JUMLAH BIAYA (Rp) LOKASI LINK RT/RW PRIORITAS 1,2,3

1 70 M1 2,000,000 40,000,000
DRAINASE LINK.KUBANG LESUNG GEGUNUNG RT.001/001 1
2 80 M1 3,000,000 60,000,000
TPT LINK.LELEBAK RT.002/001 1
107 M3 4,000,000 80,000,000
3 TPT LINK SONDOL RW. 02 1
100 M2 1,000,000 20,000,000
4 PAVING BLOCK LINK SONDOL RW. 02 1
1 UNIT 1,000,000 20,000,000
5 RTLH ( BPK.SULEMAN) 001/003 1
1 UNIT 1,000,000 20,000,000
6 RTLH (BPK. MUHAMAD) 002/003 1
50 M1 1,875,000 37,500,000
7 TPT LINK. PABUARAN RW.003 1
DRAINASE 57 M3 1,125,000 22,500,000
8 LINK. PABUARAN RW.003 1
M1 3,150,000 63,000,000
9 TPT MAKAM 84 LINK.KUBANG LESUNG KULON RW.004 1
UNIT 1,000,000 20,000,000
10 RTLH (IBU EEM ) 1 LINK.KUBANG LESUNG KULON RT.002/004 1
M2 850,000 17,000,000
11 PAVING BLOCK 100 LINK.KUBANG LESUNG KULON RT.003/004 1
1 Unit 1,000,000 20,000,000
12 RTLH( Ibu Sulyanah) Link. Brangbang Rt.002/005 1
100 M1 2,000,000 40,000,000
13 Drainase Link. Brangbang Rt.001/005 1
60 M1 2,000,000 40,000,000
14 TPT Link. Brangbang Rt.003/005 1
UNIT UNIT 1,000,000 20,000,000
15 RUTILAHU LINK.KUBANG BALE RT.001/006 1
M2 M2 1,952,500 39,050,000
16 PAVING BLOCK LINK.KUBANG BALE RT.002/006 1
M1 M3 2,047,500 40,950,000
17 TPT JLN BAWAH LINK.KUBANG BALE RT.003/006 1
250 M3 5,000,000 100,000,000
18 DRAINASE (GANG BEO) LINK.KEDAWUNG RW. 007 1
93 M1 1,850,000 37,000,000
19 DRAINASE LINK. TEGAL CABE RT.001/008 1
1 PAKET 1,250,000 25,000,000
20 GAPURA LINK. TEGAL CABE RT.002/008 1
1 PAKET 1,900,000 38,000,000
21 PJU LINK. TEGAL CABE RT.002/008 1
1 PAKET 1,250,000 25,000,000
22 GAPURA JLN.LUMBA-LUMBA RT.001/009 1
1 PAKET 500,000 10,000,000
23 POS RONDA JLN GERONG/DUYUNG RT.001/009 1
1 PAKET 1,000,000 20,000,000
24 RUTILAHU JLN KAKAP RT.002/009 1
PJU 1 PAKET 1,900,000 38,000,000 JLN GERPUH RT.003/009
25 1
350,000
26 PAVING BLOCK 46 M2 7,000,000 GANG PAUS RT.003/009 1
2 PAKET 3,800,000 76,000,000
27 PJU CA'ANG LINK.PERUM BUKIT TAMAN BARU RW.010 1
35 M1 700,000 14,000,000
28 DRAINASE LINK.PERUM BUKIT TAMAN BARU RW.010 1
1 UNIT 500,000 10,000,000
29 POS RONDA LINK.PERUM BUKIT TAMAN BARU RW.010 1
150 M3 3,000,000 60,000,000
30 DRAINASE KUBANG LESUNG RW.011 1
27 M3 1,000,000 20,000,000
31 TPT KUBANG LESUNG RW.011 1
1 UNIT 1,000,000 20,000,000
32 RUTILAHU ( ROHMAWATI) KUBANG LESUNG RW.011 1

JUMLAH
1,100,000,000

MENGETAHUI : Cilegon,……………..20….
LURAH TAMANBARU KETUA MUSRENBANGKEL

( AHMAD BUHARI,S.Ag) ( SUHILMAN)


NIP : 19721025 200212 1 005
DAFTAR SKALA PRIORITAS USULAN MUSRENBANGKEL UNTUK TAHUN 2025
YANG DIBIAYAI DANA PEMBANGUNAN WILAYAH KELURAHAN (DPWKEL)
KECAMATAN :
KELURAHAN : FORM IVB NON FISIK DPWKEL
BIDANG :
No USULAN KEGIATAN PRIORITAS VOLUME SATUAN SWADAYA Rp JUMLAH BIAYA (Rp) LOKASI LINK RT/RW PRIORITAS 12,3

1 KELENGKAPAN ALAT PKK (PENGADAAN LAPTOP) 1 UNIT 750,000 15,000,000 KELURAHAN 1

2 PELATIHAN PUBLIK SPEAKING 30 ORANG 1,250,000 25,000,000 RW.001/011 1

3 PENGADAAN SERAGAM LINMAS BARU 60 ORANG 3,000,000 60,000,000 RW.001/011 1

4 Penomoran Rumah 60 BUAH 150,000 3,000,000 Rw.01 1

KELENGKAPAN ALAT KARANGTARUNA (PENGADAAN LAPTOP) 1 UNIT 750,000 15,000,000 KELURAHAN 1


5
KELENGKAPAN ALAT KARANGTARUNA (PENGADAAN PRINTER) 1 UNIT 250,000 5,000,000 KELURAHAN 1
6
7 Penomoran Rumah 120 BUAH 300,000 6,000,000 Rw.02 1

8 PENAMBAHAN HONOR KADER 12 ORANG 12 Orang 2,160,000 43,200,000 KELURAHAN 1

9 PELATIHAN TATA BOGA 1 PAKET 2,500,000 50,000,000 RW.001/011 1

10 PENGADAAN PLANG NAMA RT/RW 43 UNIT 1,290,000 25,800,000 RW.001/011 1

PELATIHAN FORKLIFT 22 ORANG 1,100,000 22,000,000 RW.001/011 2


11
12 PENGADAAN KAMERA SLR 1 UNIT 300,000 6,000,000 KELURAHAN 2

13 PENGADAAN SERAGAM KADER POSYANDU 48 ORANG 360,000 7,200,000 RW.001/011 2


KELENGKAPAN ALAT KARANGTARUNA (PENGADAAN HARDISK) 1 UNIT 50,000 1,000,000 KELURAHAN
14 2
15 Pembinaan Kepemudaan 3 KEG 2,250,000 45,000,000 Rw.04 3
16 Pembinaan Masyarakat 1 KEG 750,000 15,000,000 Rw.04 3
17 Penambahan Linmas 1 ORANG 120,000 2,400,000 Rw.04 3
18 PELATIHAN HANTARAN PENGANTIN 1 KEG 750,000 15,000,000 Rw.05 3

MENGETAHUI : Cilegon,……………..20….
LURAH TAMANBARU KETUA MUSRENBANGKEL
( AHMAD BUHARI,S.Ag) ( SUHILMAN)
NIP : 19721025 200212 1 005
DAFTAR SKALA PRIORITAS USULAN MUSRENBANGKEL UNTUK TAHUN 2025
YANG DIBIAYAI APBD KOTA MELALUI POKIR DEWAN
KECAMATAN : CITANGKIL
KELURAHAN : TAMANBARU
BIDANG : POKIR
No USULAN KEGIATAN PRIORITAS POTENSI PEMECAHAN MASALAH VOLUME SATUAN JUMLAH BIAYA LOKASI LINK RT/RW

1 TPT 183 M1 137,250,000 RT.003/006


2 DRAINASE 153 M1 61,200,000 RT.003/006
3 PAVING BLOCK 300 M2 60,000,000 RT.003/006
4 PAVING BLOCK 1000 M2 200,000,000 RW.04
5 TPT 250 M1 187,500,000 RW.11
6 PAVING BLOCK 600 M2 120,000,000 RW.01
7 DRAINASE 100 M1 40,000,000 RT.003/004

MENGETAHUI : 4Cilegon,……JANUARI 2023


LURAH TAMANBARU KETUA MUSRENBANGKEL

( AHMAD BUHARI,S.Ag) ( SUHILMAN)


NIP : 19721025 200212 1 005

Anda mungkin juga menyukai