Anda di halaman 1dari 27
M tas (MULTI GEOTEKNIK INDONESIA LAPORAN FINAL Specialist Geotechnical Testing, Consultancy & Engineering ea Baar 616 eta oe Song Op Qe Efron west Pengujian PDA dan Analisis CAPWAP Tiang Pancang Spun-300mm PROYEK Pekerjaan Pembangunan Fisik CWR-01 PIU ADB UNRI LOAN ADB 3749-INO LOKASI IC (Integrated Classroom) Universitas Riau, Kampus Bina Widya, JI. Hr. Soebrantas Km 12,5, Kel. Simpang Baru, Kec. Tampan, Pekanbaru, Riau 28293 - Indonesia Pemberi Tugas: PT. PRIMA PONDASI PERKASA Pengujian Dinamis oleh: PT. MULTI GEOTEKNIK INDONESIA Terbit: DESEMBER 2022 531/PDA-308/22 Specialist Geotechnical Testing, Consultancy & Engineering | Pie Testing | Dynamic: OA Tet PIT Teat- CSL) Teat |S: (at Compressive 1 Sol inextgaton | Borg | Sone | COR Tost | Sard Core est 1 Tense - Later) Tost] Diop Harner PT. MULT! GEOTEKNIK INDONESIA Specialist Geotechnical Testing, Consultancy & Engineering Chaat Sonrgm, Pat Vidor Arr Bek O01 No. 07 Depok, 26 Desember 2022 531/MGI/13.22 PT, PRIMA PONDASI PERKASA Subyek: Laporan Final Pengujian PDA dan CAPWAP Analisis untuk tiang pancang, Proyek Pekerjaan Pembangunan Fisik CWR-01 PIU ADB UNRI LOAN ADB 3749-INO, IC (Integrated Classroom) Universitas Riau, Kampus Bina Widya, 31. Hr. Soebrantas Km 12,5, Kel. Simpang Baru, Kec. Tampan, Pekanbaru, Riau 28293 - Indonesia. Dengan hormat, Dengan ini kami sampaikan tiga (3) berkas Laporan Akhir Pengujian Dinamis dengan Pile Driving Analyzer (PDA) untuk tiang pancang, Proyek Pekerjaan Pembangunan Fisik CWR-O1 PIU ADB UNRI LOAN ADB 3749-INO, IC (Integrated Classroom) Universitas Riau, Kampus Bina Widya, JI. Hr. Soebrantas Km 12,5, Kel. Simpang Baru, Kec. Tampan, Pekanbaru, Riau 28293 - Indonesia. Pengujian tersebut dilaksanakan pada tanggal 05 Desember 2022. ‘Apabila diperlukan, kami akan bersedia memberikan penjelasan lebih lanjut ‘mengenai laporan ini dengan senang hati. ‘Akhimya, kami ucapkan terima kasih atas kepercayaan dan kesempatan yang diberikan. Kami harap kerja sama ini dapat ditingkatkan terus di masa yang akan datang. Salam, David Silitonga, S.T. Geotechnical Engineer Specialist Geotechnical Testing, Consutancy & Engineering {Pi esta rans: POA Tat PIT Toot CSL Toot [Sut (ul Caprese Tete Lar} Tot Oop Parse’ Sot vestgaton | Borg Sere | COR Tost | Sand one Tet 2 ce . MULTI GE GEOTEKNIK INDONESIA Daftar Isi COVER ‘SURAT PENGANTAR DAFTAR ISL Bab.1. PENDAHULUAN Bab.2._ PENJELASAN UMUM TIANG Bab.3. __PELAKSANAAN PENGUJIAN TIANG & KUALITAS DATA Bab.4. _INTERPRETASI DAN DATA REKAMAN CAPWAP Bab.5. _REFERENSI DAN HASIL PENGUJIAN 5.1. Keutuhan Tiang (Pile Integrity) 5.2. Efisiensi Energi 5.3, Daya Dukung Tiang Bab.6. __KESIMPULAN (Conclusion) Lamp. 1. FOTO TIANG YANG DIUJI Lamp. II. GRAFIK HASTL PENGUJIAN PDA & CAPWAP. Lamp.IIl, _ KALIBRASI ALAT / SENSOR ‘Specialist Geotechnical Testing, Consultancy & Engineering hel Testing Consltancy & Engineering Soom Vera ren BO OP sr Re ovary oe earn 06 Den rsiet ens e8 Edeamgetan areal con 10-22 23-27 {Pi Tesi | Oyrarc: (PDA Tet PIT Tes- CSL Tet | SUH: (Asal Compressive Tete - Lateral Test] up Haren] {Sod uveatgaton| Boning | Soe | COR Teat | Sand Core Test 3 PT. MULTI GEOTEKNIK INDONESIA Specialist Geotechnical Testing, Consultancy & Engineering ait Sng Ro Ver vr Bet O61 ¥o OF et Retr Roe Song, ep, tae 616 errs 161 Bement 1, PENDAHULUAN Dokumen ini adalah Laporan Akhir Pengujian Dinamis dengan Pile Driving Analyzer (PDA) untuk tiang pancang, Proyek Pekerjaan Pembangunan Fisik CWR-O1 PIU ADB UNRI LOAN ADB 3749-INO, IC (Integrated Classroom) Universitas Riau, Kampus Bina Widya, JI. Hr. Soebrantas Km 12,5, Kel. Simpang Baru, Kec. Tampan, Pekanbaru, Riau 28293 - Indonesia. Pengujian tersebut dilaksanakan pada 05 Desember 2022. 2. PENJELASAN UMUM TIANG Penguijian dilakukan terhadap empat (4) tiang pancang spun. Pengujian dilakukan terhadap tiang dalam keadaan sudah terpancang. Karakteristik tiang ppancang yang diuyji disampaikan dalam Tabel 3. Pada saat pengujian dilakukan, tiang ditumbuk dengan menggunakan drop hammer seberat sekitar 1,2ton. Pengujian dinamis didasarkan pada interpretasi gelombang satu dimensi (ane dimensional wave) yang menjalar pada tiang pondasi akibat ‘tumbukan’ (impact) yang diterima oleh tiang. Untuk tiang pancang, gelombang seperti ini terjadi pada waktu ‘tang ditumbuk dengan palu (ammer). 3. PELAKSANAAN PENGUJIAN TIANG DAN KUALITAS DATA PDA Dua (2) buah strain transducer dan dua (2) buah accelerometer yang dipasang pada bagian atas tiang (minimum 1,5D dari diameter kepala tiang) berfungsi sebagai alat ukur regangan dan percepatan gelombang akibat tumbukan (impact) dengan drop ‘hammer. Selanjutnya hasil pengukuran yang diperoleh tersebut direkam dengan alat Pile driving Analyzer (PDA). PDA sendiri menganalisis hasil pengukuran dengan metode yang dikenal dengan nama ‘Case Method’ di mana metode tersebut didasarkan pada teori gelombang satu dimensi (one dimensional wave theory). Pada tahap persiapan, ada beberapa hal yang harus dilakukan, yaitu: a. Pemancangan lubang untuk memasang strain transducer dan accelerometer pada tang b. Pengumpulan informasi, meliputi: » Tanggal pancang * Panjang tiang dan ukuran penampang * Panjang tiang yang masuk ke dalam tanah Prosedur pengujian dengan menggunakan PDA ini dilakukan sesuai dengan peraturan ASTM D4945, Untuk tiang pancang yang diyji, re-strike dlakukan sebanyak Kira-kira 1-2 kali (blows). Proses re-strike dihentikan setelah diperoleh kualitas rekaman yang cukup baik dan energi pukulan yang relatif tinggi. Dengan demikian, jumlah pukulan yang diperlukan ditentukan oleh fluktuasi besamya energi yang sesungguhnya diterima oleh tiang. Hal ini sepenuhnya tergantung dari efisiensi drop ‘hammer yang digunakan. ‘Specialist Geotechnical Testing, Consultancy & Engineering {Pia Testrg | Dynamic (POA Text- PIT Test - CSL) Test | Sta. (Axl Compressive Tena - Later Tet |Orop Harner | Sl nvestipation | Brig | Src | COR Tat | Sand Cone Test 4 PT. MULTI GEOTEKNIK INDONESIA Specialist Geotechnical Testing, Consultancy & Engineering CN ric tcrstereemenaore oer rine e354 208 Emre dren con 4, INTERPRETASI DATA REKAMAN CAPWAP Hasil rekaman PDA kemudian dianalisis lebih lanjut dengan perangkat lunak CAPWAP. Dari analisis lanjutan ini, dapat diperoleh perkiraan daya dukung aksial tiang, distribusi kekuatan lapisan tanah, dan simulasi pembebanan statik. 5, REFERENST DAN HASIL PENGUJIAN 5.1. Keutuhan Tiang (Pile Integrity) ‘Analisis mengenai keutuhan tiang berdasarkan hasil rekaman PDA dilakukan sebogl bert ._ Karakteristik kurva ‘F’ (gaya) dan ‘V' (kecepatan) Apabila terjadi retak pada tiang, maka kurva ‘akan turun dan kurva 'V’ akan naik pada saat yang sama, b. Apabila karakteristik kurva dan V’ ditemukan seperti dalam butir a, maka tingkat kerusakan dapat diperkirakan dari nilai BTA. Nilai BTA ini menunjukkan besarnya penampang yang masih efektif dan dinyatakan dalam persentase. Dati hasil analisis kurva ‘F’ dan'V’, tidak terdapat Kondisi seperti yang diuraikan dalam butir a di atas, sehingga dapat disimpulkan bahwa tiang berada dalam kondisi baik saat pengujian dilakukan. 4100. Undamaged (Good pile) (80 - <100 ‘Slight damage (Pile still could be used) 60- <80 ‘Significant damage (Bad pile) <60 Broken (bad pile, reject) 5.2. Efisiensi Energi Energi maksimum yang diterima oleh tiang selama pengujian dengan PDA (menggunakan drop hammer 1,2ton). Ringkasan efisiensi energi tumbukan yang digunakan diberikan dalam Tabe! 3. ‘Hydraulic diesel hammers 60-100 ‘Air or Steam hammers 40-70 Diesel hammers 30-60 (Cable diesel hammers 20-80 Efficiencies on concrete piles are lower ~ 10% 5.3. Daya Dukung Tiang Daya dukung aksial tiang pancang diperkirakan dengan menganalisis rekaran yang terbaik, yaitu rekaman gelombang yang dihasilkan oleh pukulan yang memberikan energi tertinggi. Selain itu, diusahakan untuk memilih pukulan yang mula- mula, yaitu pada saat di mana ‘gaya lengketan tanah’ yang bekerja pada dinding tiang Pancang masih maksimum sehingga lebih menggambarkan daya dukung yang mendekati keadaan pada waktu tiang akan menahan beban bangunan. Specialist Geotechnical Testing, Consultancy & Engineering [Pie Testrg | Orraric: (PDA Test- PIT Teat- OSL) Yost | Sta: (Asal Compressive Teste - Letra Test] Orop Hamner Sod investigation | Borg | Sone | COR Text | Sand Cone Test 5 Tosex e195 pune 91 68D | #>H08 | Bang [wow eeeAUT FOBT | muy ig |e (see eft» wnse:ce9 ey) (150-161 VO) SuMUAG | OUN8L | Guyseu6ua @ Aaueynsuoy “6 721U42#1099 3sye—DedS SeaDIO. SeaTIO. SEBO. Buen Bepuoy UeUTITEY, oT v0 Ba cb [edn] $5805 UOSUeL KOH = XSL eee ost £07 Sz “TeUpi] SS2AS UOISSAITUIOD “KE H] — XSI S20 i) +20 990 Turwey] ABOU PaLeySUeL, EH ~ XW 90T 89 6 a TWOIT BUOY VOISSANTIUCD KEW = XW mawey dang | RuMeY dag | SuMeY dag | —ToUTTEY ag UNUEH STU 6 v6 v6 v6 Tw] weueyey Buell buelueg v6 BG BG 96 Tw] 20sues yemeqip Buell buefued oor oor oor O'OT Tw] Bueil Buefued 101 08 09 09 09 Twu] Buell jee O0E O0E 00g O0E Twuy Buell yeweiq nds nds und und BURL SUSE zeretis0 zerenIS0 eeren/s0 eerenlso Tn jeboueL. TOs# Stee este ‘3% Buel]. JOWON “€ jegeL weep uexifesip dyMd¥2 UeP Yad Ueyesepiag |{nip BueA Buen Bunynp eAep ueeipad UeseyGury “Uexfesip quadas yneIS ueuegaquiad isejnws uep 6ueg Guefuedas yeue) Bunynp edep snquasip uexseyBuaw eBnl dyMdvD UeBbuep ynfue| YIqay sisyeUeIP BueA Od "SEH “(vouayy yeys) Ueyax6ual Uep (Guveag pua) bun{n ueueYe) Yep \fnip BueA Buedueg Guar, esye Bunynp eAep uexeupyedip yajquadip Bued A, uep 4, eruny ueesepag “,poyreW aSeD, UebUEP UeyNyeIIp Ju] BuedUed GueN jeIsxe GuNyNp edep UeEINIag wee a enescea wameniana 7S we sc ramesc a) ‘9s ui = arg Maer ng towanes 4 GANEEEA Wd i} 2 0G 1g ensayo Ueanweg BHF aassuibag Touryncu0) Suyia] (PIUG>a}OOD EI rn VISANOGNI HINA3LOSD ILINW “Ld PT. MULTI GEOTEKNIK INDONESIA Specialist Geotechnical Testing, Consultancy & Engineering ‘hs Late Sorgen, ao Vidor vor Ble 0O No. OT ed edng Kee reagan, Depot, Ja Baral Idoneni 16516 © err. rset 0819 1518 2908 mangrtind nner con 6. KESIMPULAN Hasil pengujian dinamis dengan menggunakan Pile Driving Analyzer (PDA) yang dlilaksanakan di Proyek Pekerjaan Pembangunan Fisik CWR-O1 PIU ADB UNRI LOAN ADB 3749-INO, IC (Integrated Classroom) Universitas Riau, Kampus Bina Widya, JI. Hr. Soebrantas Km 12,5, Kel. Simpang Baru, Kec. Tampan, Pekanbaru, Riau 28293 - Indonesia, memberikan daya dukung tiang seperti tersaji pada Tabel 3 di atas. Karena analisis CAPWAP lebih akurat, maka besarnya daya dukung yang direkomendasikan adalah daya dukung yang diperoleh dari hasil analisis CAPWAP. PT, MULTI GEOTEKNIK INDONESIA David Silitonga, S.T. Geotechnical Engineer ‘Specialist Geotechnical Testing, Consultancy & Engineering {Pte Tesirg | Oyramic: (POA Test PIT Test- CSL) Test | Stic: (Al Cargresie Tere - Later Test | Drop Ranrer| 1 Sod vestigation | Borg | Soret |COR Tes | Sand Core Test | 7 Specialist Geotechnal Testing, Consultancy & Engineering (al Seog ede Viera ro DOF OT HotKey ae Sheng, Dp Jv alse 1656 QO enr- vse ost 15 208 Eeuegerann nsorease yal con as MULTI GEOTEKNIK INDONESIA LAMPIRAN I FOTO TIANG YANG DIUJI Specialist Geotechnical Testing, Consultancy & Engineering {Pe Teng Ovrom: (POA Tet - Pr Tea - OSL) Tet State: (Al Comeressve- Teale - Later Tet | Orso Hare | | Sol tvesigaton | Borg | Sond | CBR Test | Sand Cove Tet 8 } ees MULTI GEOTEKNIK INDONESIA eotechnial Testing. Consultancy & Engineering pase toeereccranne pec tctare te sora Bot -rasene 88 © ex.s on 1508: BA ma potnn renga cn Mone) Co canccat tc) Gambar 1. Foto tiang yang diyji ‘Speciatst Geotechnical Testing, Consultancy & Engineering {Pie Tesrg Lymm: POA Tout - PT Tes CSL) Tot Sate: (Aal Congrentve Tana Laie eat] Ramer] {So irvstpaton Bog | Son CBR Tet Sand Cone Test 9 ea Rete * ad Qenrs 1348208 Barger denna com TD) RT, MULT GEOTEKNIK INDONESIA i a oa Yerba 01M OF LAMPIRAN II GRAFIK HASIL PENGUJIAN PDA & ANALISIS CAPWAP ‘Specialist Geotechnical Testing, Consultancy & Engineering {Pe eur [Dir OA Te oto Tea St (Corres Te -Latwa Ts Ove Horner So ventgaton | Brg | Sore | COR Test | Sand Cone Test] 10 PT. MULTI GEOTEKNIK INDONESIA Specialist Geotechnical Testing, Consultancy & Engineering Src asueeoentnee Cf Sievert nae we [Qa rsoese son sn 208 Galramppomenn rsresagat con PT. MULTI GEOTERNIK INDONESIA WIGH-STRAIN PILE DYNAMIC TESTING Jopr. Ds PDAR Version 1.5.8-2097 ‘Proj Name IC (INTEGRATED CLASSROOM) Pile Number #56 Test Date 2022-12-08, AHR ca! eco T 196m DAO me 1:25 Tmt DEN: 10 a WS: 400 me FMC -046 Tm We 4000 me (esx: 15 Ma ae Tt BIA: 100 % we:03 Rx :98 7 sus tor T 1947 MPa Lampiran II-1a. Hasil pengujian berdasarkan ‘Case Method’, Tiang #56 Specialist Geotechnical Testing, Consultancy & Engineering [TPs Yeatng [Oram (POA Test. PI Tea - CSL) Test | State (Aril Corrosive - Tenaie -Latr Yest] Oop Harmer {Sot nvestgaton | Soreg | Sonar | COR Tet | Sard Core Test un 2 Tase1 euop pure [sei 689 | 1B008 | Buvog | vomtisonn Fog {oun dc 891 (mane - n8L04 - AeFB!LOD HY) HME 160 (1S =A Lid OL VO) DUA | B01 O04 | Gunsoubug @ Aouexnsuoy Displacenent (ma) gs# towen otra [IPSS (ROONSSWID GELVUDTINI) OI isueN 399C0rg WISSNOGNI MINNILOED TLIO “1a jisauTbug % JoUeynsioy Bulysa] jeoiuysa}oe9 wieiseds | VISANOGNI MINY3LOID ILINW “Ld ‘| /PT. MULTI GEOTEKNIK « INDONESIA lalist Geotechnical Testing, Consultancy & Engincerin« Sas (0 Pf Sateen ic ge bos nat (© o2s-7509044 10013 1548 2008 ezhrurqrotenk ndonesin@ymat com Pr. wart onOfeRntR ooueatA MEAPHAP (H-8) ¥345.2007-12-12 Project Name: IC (INTEGRATED CLASSROOM) Test Date:2022-12-05 Pile Name: #56 opr. 05 TRCAPWAP RESULTS soit Retivated | am Tait Tate segment | Reatstance | Down Resistance | Resistance No. | ocr (Depth) | (Area) m (i/n) (ini) { San 0.75 t a6 Li] 80 “a3 16.9 [3:97 1 7-0 46-0 Seo [a6 Toe 36.0 34,0 | 36.0 | = L Total REARWAP Capacity + 8¥.0(T) Skin Friction + Se-0(T) Pile Base + 36.0(7) Pile Displacement Weasurenent_: 1.0m blow Count = 97107. Pile Displacenent Natcn + 0.01 Match Quality #0. 668 ‘Soil Model Paranetera (basic paransters] Syebol [sate [ee Case Damping Factor Is/at —] 0.38 [0.64 ‘Smith Damping Factoz(s/a} ‘ss/st_[0.18 10-00 uake tre) gs/or—[10.15 [14.66 | Unloading Guakelt of leading quake) esfer—[0.10 [0.30 Unloading Level (+ of Ru) i 100 [~ Soil mass (kg! Fo = 7-00 PILE MOORE Segnent ] Length | Area | Modulus | SpecWelght | Perimeter | tapedance |Z aon | tm | ten) [erm | crye (nm) | (fea/m) | change (3) T 7 sz [ono | 3745 Tas ro 100 T 3.60_| 452 -aooa000 | 245 0.9425 45 100) Foe] 9.60 [707.00 Wave Speed + 4000m/s Overall + 1000n/a Pile Danping 1 2.00% Tine Tactenent 1: 0.375n8 Specialist Geotechnical Testing, & Engineering | Pe Testog | Dynamic: (POA Test- PI Test - CSL) Tea | Sa: Poial Compresive Tena Later) Tes | Dep Haren | 1 So nvestgaton | Brey | Son | COR Test | San Core Test 13 (V))]PT, MULTI GEOTEKNIK INDONESIA Specialist Geotechnical Testing, Consultancy & Engineering CC) cattery Semen pr Bat-rree ves Qari savour ors 18.08 El mvegenint nde con PR. MULTI GEOTEKNIK INDONESIA I-STRAIN PILE DYNAMIC TESTING opr. ps PDAR Version 1.5.8-2007 roy Name IC (INTEGRATED CLASSROOM) Pile Number 158 Test Date 2022-12-08 ) ! ANS229em! rec T 196m Mx: 92 mm WS 4000 ms 90x 074 Ta We: 4000 ws (esx: 203 MPa sao Tt BTA: 10 % ve:03 pax Rsu:aT T9K:49 Mt Lampiran II-2a. Hasil pengujian berdasarkan ‘Case Method’, Tiang #158 ‘Specialist Geotechnical Testing, Consultancy & Engineering [Pe Testing | Oya: POA Test - Prt Test- CSL) Test | Sta: (sal Compressive Teade- Lateral Test] Orop Hammer | | Sol nvesigaton | Boring | Sand | CBR Test | Sand Core Test| 4 co Baise) poaypeyoeD wed visaNoa INH3LOIO LLINW “Ld A | )PT. MULTI GEOTEKNIK INDONESIA Specialist Geotechnical Testing, Consultancy & Engincering COP tanner Sng Bek eet ©eas.rsaneevo019 1548 2908 EZ) ratigeotnh rdonenngnat com PT. MOLT! GEOTERNIK INDONESIA RCAPHAP (M=S)_V3.5.2007=12-12 Project Name: IC (INTEGRATED CLASSROOM) Test Date:2022-12-05 Pile Name: #158 opr. 0s TREAPWAP RESULTS Depth] Retivated | Sum [Sum] Unie Tait Below | Resistance | Down | UP | Resistance | Resistance Grade R otk | of R | (epth) | (Area) om) ia (ny (t/n) (tnt) ty ia Lo 31.0 0.75 0.73 | To 268 Lo 30-0} 0.14} 0-79 rH 4.03 [2.0 79.0| 1.49 138. tH 3.37 5.0 77:0 3.73 3:96 [Tesi |6-71 1.0 72.0 821 | 8.71 8. 8.06 [16.0 io | 11.65 12.57 im 3:40 14-0 48.0] 10.48 1-09] [5.60 [9-40 31.0 <0} a.0] =] 43847 ‘Total RCAPWAP Capacity : @1.0(T) Skin Friction + 50.018) Pile Base 7 31.017) Pile Displacenent Measurenent + 1.1ém Blow Count = €620/m Pile Displacement Match : 0.0imy Blow Count = 100000b/m Match Quality ‘Soil Model Parameters (basic paraneters] Syabal_[ Shaft [Toe (Case Damping Factor 38/sT [0.00 0.85] Snith Damping Factor (s/ml - '35/st_[ 0.00 0.80 | Quake (mi ‘9s/or__] 15.65 [10.39 Unloading Guake(« of leading quake) ‘cs/er__[-0.10 [1.00 Unloading Level (¥ of Ru) OW 0.30 |= Soil maze (kg) PL. = 2.00) PILE MODEL ‘Segnent | Uength ] Area] Nodulus | Spec,Weight | Ferineter | Tepedance | i= eno.) cm | (emt) | er/mt) | rym) (™) (t-s/m) | change Gh T a a2 -aoooo0e | aa O.sazs as 700 7 3.60_| 432 | 4000000 | 2.45, 0.9425 S 100 Foe | 3.60 | 797.00 Wave Speed : 4000n/s Overall + €000a/s_Pile Damping + 2.00¥ Time Tncvenent 2 0.375ms Specialist Geotechnical Testing, Consultancy & Engineering | Pl Testing | Dyrami: (POA Tea - PIT Test CSL) Teat | St: (Ava! Compressive: Terie - Lala Test] Oro RarwnerT | Sol vestgaton | Baring | Sond | CBR Test | Sand Cane Tet $$ aa aaa ar ree Secor Font} 16 PT. MULTI GEOTEKNIK INDONESIA Specialt Geotechnial Testing. Consltancy & Engincring 6) Ree - [Qe rsnce oni sis ae ee pomnt rnagatcon Pr. MULTI GFOTERNIK INDONESIA opr. NIGH-STRAIN PILE DYNAMIC TESTING PDAR Version 007 pa PAR Yorsion 1.5.0°2007_ ‘roy Name CANTEGRATED CLASSROOM) Pile Number #336. Test Date 2022.12.05 Aue ec att L96m Du 69 vente DPN25 WS: somes E0037 Tm WC 400 (65x :150 MPa acne Tt BTA: 100 % wea Rac T Rsuom T TSx:00 Nira Lampiran 11-3a. Hasil pengujian berdasarkan ‘Case Method’, Tiang #336 Specialist Geotechnical Testing, Consultancy & Engineering Sa Reotechical Testing, Consultancy & Engineering _ | Pie Testrg | Orrari: (POA Tet- PI Test - CSL) Test | Sut (Aal Compressive Tena - Late) Tes | mp Parner] | Sot vestgatn | Borg | Soe | CBR Test | Sand Cone Tet $$$ armani 0 Tet Sar Cove Tee} 7 ar Tisex e029 pons [1 ¥8D [apes Beg | wow Bisons FOBT | ounsey dc no (Rie oF“ /EBILIOD MY) MG OL (ISD “HEL dL VO) PUEAG |B4504 od | ‘Bauosuibug 9 Aovexnsuoy ‘Bunsa] eauysen089 ISye!OdS SEE# Buel, “dVMdVO, SISHEUY SEH “GE-1I ueddwey (woousswId aazWuoRLNI ‘YISANOGNI ¥ ewig rag snawy orn ong whnayy te Sarasuibig oueynaiey Suis po/u423}095 Hye VISSNOGNI YINH3.LO39 LLINW *Ld| 4! wecreateancps natal waters meets 120) Win ros nag ae ag wats 29 toons va AED) (a) peor Displacenent (na) M ian MULT! GEOTEKNIK INDONESIA ialist Geotechnical Testing. Consultanc artmrpe neem a jai tee on (Oars Bane pton MOLT? GEOTERNIK INDONESTA RCAPWAP (M-S) ¥3.5.2007-12-12 Project Name: Ic (INTEGRATED CLASSROOM) Test Date12022-12-05 Pile Names 4396 ope. 0s REARAP RRR S01 Depth] arth | Retivatea Sue] anit Tare) Segment selow | Below [Resistance | own | UP | pesiatance | Pestatence Woo | Seger | Grade |e otk | of | tepen | tareay po “es | Sta [in (Pim) | tine) a 13t 1.0 0.75, 0.79 Pee ae ro Tae 137 [svar [ates #0 a7 386 srs Tio e077 Serer 20 TE 6 8.26 | 8.06 | 40.0, 10.37 — eo] 9.40 5050 Te Foo ee] s:40 «0-0 | 30:0} —~ Tota RAAF Capacity 00.01) Skin Frietion Y 50:01H) File ies 30.0(7) — Fille Displacenent Weasurenent”: 2,€7mm Blew Count = T7Sb/m "Match Guality Soil Wodel Parameters (basle parameters] Shaft [Toe Case Danping Factor 9.00 [0.68 [smith Damping Factor (a/al 9.00 {1:00 Quake esi 13.32] $67 Unloading Quake(t of leading gu 9.10 3-00} Unloading Level (Sof Fu) 0.20 1 Soil mass kg) = Cc PILE wor, Segment | Tength | Area] Modulus | Spec,wetghe | perimeter | Tapedance I> erony | tm | tend | erm | Panny tm] (ts/m) | change (sy T z 452 | qooome | as TEs a 100 + 5.0 _| 452 | 4000000 | — 3-45 09425 cH 300 Foe [9-60] 107.00 Wave Speed: 4000R/s Overall + 4000a7 File Damping 7 2.00) Time Tsrenene 2 0.375n8 ‘Specialist Geotechnical Testing, Consultancy & Engineering | Pie Tesing Oem: (POA Test. PIT Tea CS) Tot | State: (el Compressive Tera Later Yeu | Op Hanever] | Sol nvestgaton | Brg | Sra | COR Test | Sar Core Test 19 | PT. MULTI GEOTEKNIK INDONESIA. Speclilit Geotechnical Testing Conwutancy & Engineering 0 eeemonee gE: MOLTE GEOTEKNIK INDONESIA lope. ps roy Name IC (INTEGRATED CLASSROOM) Pile Number HOI Test Date 2022-12-08 Lampiran II-4a. Hasil pengujian berdasarkan ‘Case Method’, Tiang #501 Specialist Geotechnical Testing, Consultancy & Engineering | Pie Testrg | Oyramic: (PON Tat PIT Test- CSL) Test | Sue: (sil Compressive - Terai Laer Test] op Hanmer {Sol vestgaton [Borg | Sor | CBR Tat | Sand Coe Test 20 Tz Tivo] 0009 pars 191 Wa |4pI0G [BOG | wow FST Laue dog ie (wir - p80 - eN58:3u00 PY) HES |191 (150 OL Lid ~ 21 Ou) DUBG | Ber end ‘Baussuibug @ Aovernsu0) ‘Gunse] je3704291009 wsjepeds Tos# GueL. ‘“dVMdVO, SISHEUY SEH “Gp-II Ueudwey Displacement (nm) esr oor ” ee ° su oot 06 08 o_o: dyer 9z ¥zzz oz erat ytzt wee ad Pan a ate Tos# :owen otra DPBS (WOOUSSVID GaWWOSINT) D1 :9WeN ID9f02a WISaNOGNI wINWaLog9 rytox “za ELA eben mantel ent onsite rast) iss wens arg wa og wanes 29 12 oN sa 0 rg aay erin cue wanes jasouibi3 Foueynsioy Bury jouy>ayorD VISJNOGNI MINY3LO39 ILIN! PT. MULT! GEOTEKNI INDONESIA Specalt Geotechnical Testing, Consultancy & Engineering piaeen meen anne ot ed Kee Sowa, Dopo, dee Barth 16518 © 07175064 on 154 2808 EZ maps donning con RCAPWAP (M-S) V3.5.2007=12-12 PT. MOLTI GEOTERNIK INDONESIA Project Name: IC (INTEGRATED CLASSROOM) Test Date: 2022-12-05 Pile Name: #501 opr. DS RCAPWAP RESULTS [sant epee activated ate Tait Segrent Below Resistance Resistance | Resistance Ne. | “Woepen) | (Area) | (rim | tim) | ta 0 [a9 1.58 2 so 328 736 Cs o a7] [= 0 Ts = io 3.71 le 20 [8-22] 7 i 20 9.50 [Pre 5 35.0 | 99-0] 35.0 = 135.05 ‘Total RCAPWAP Capacity + €9,0(T) skin Friction + 54.0(T] Pile Base = 35.0(71, File Displacenent Measurement: 1.9imn Blow Count = Si8b/m Pile Displacement Match : 0.0imn Blow count = 100000b/m | Match Ouality 1.314 Soil Model Parameters Tbasic parancters) [sate] tee ‘ase Danping Factor smith bu = Guaketmen) 15.98 ‘Usioading Guake() of loading quake] 1.00 Unioading Level (+ of Rul = ‘Soil nase kg) = [9-00 PILE MODEL Seguent | Length Modulus | Spec.Weight | Perimeter | Impedance | 7 won | tm | tent) | ety) | erymy tm) | (r-s/m) | change wy) z 7 asi —| aop0000_ | ae 0. cH 100 7 ¥.60_| 452 [-4000000-| — 2.45 0.9475 as To Foe [9.60 | 107-00, Wave Speed 1 (000n/s Overall + 4000n/a Pile Damping + 2.00% Tine Increment + 0.375n5, ‘Specialist Geotechnical Testing, Consultancy & Engineering {Pie Tesirg|Dyramic (POA Tost PIT Teo -CSL) Text | Suc (Asal Compressive - Tensie - Later Test] Drop Harner | Sol oventpaton | Borg | Soc | COR Tes | Sar Core Tet 22 NI fT, MULTI GEOTEKNIK aiataledd alist Geotechnical Testing. Consultancy & Eng oe (Qs ren on 18208 EY evo nena gral oe LAMPIRAN III ASTM D4945 — 08 (Standard Test Method for High-Strain Dynamic Testing of Deep Foundations) DAFTAR ALAT / SENSOR Strain Transducer Fi: 3330 =3,1410 mv/V F2: 3290 3025 mV/V Accelerometer Al: 227340 116 mV/g RQ 227481 -=1,166 mV/g ‘Specialist Geotechnical Testing, Consultancy & Engineering | Pe Test | Oyramic: (POA Tes PIT Test - CSL) Test | Stat: (al Compressive. Toads - Lata Tat | rop Harmer] | Sal nvesigaton | Borg | Sone | COR Test | Sard Cone Fest 23 MI PT. MULTI GEOTEKNIK INDONESIA Specialist Geotechnical Testing. Consultancy & Engineering i] (Cra ate Semon, Pie Veta Arman Bek tHe et Ket, Ke. Sang Dep re Bar ares 658 Qearrsyerc rons. 148208 5 mgr ednevgal con ay Dengan: B 4948-08 Standard Test Method for High-Strain Dynamic Testing of Deep Foundations 1. Senet UL Ti dyna est media cone he pve fi (inwual vera st ed dep hema wt ‘nd x menu the wacom Kee and ch) foywee St Na hep foontaon emt Myh tin dyna tiny fiytes samy deep foumdan wn abe feed Bton Aye” sich fom tne aac sd a en leo am pice ple wanton ef Ue mata of nd heh cctkeim withthe mune mem ff et mee 12 Ts standard provid nema ropatanent Bd. rama tein of dep fovnltions Phim. seca m. oF estan we commuratns Bent) pefeed ty 2 aii ‘cpm muy pronde alditond fattened eect ss mould toads theedeatves ofa panned peyeim, ‘The cngimcr im requete shape tthe amine ge, tefard wo eran atthe “apnea” ahd oyrone an) devia tom. delaions of aati to the magnon of the Soon 1 Wiph-ttand fnarac teas teyures sal knowledge and eipetence A ‘quad emimer shold tly sapere the muon of Weld dats ant the tmeceetnen cf the eat sod a 8 [red the atud perkernnce sed equa of dey Kenly {tom wed i the comaatel founkatn A alia enpieet ‘tall aryene the appemtes nl aryting e met ece dove ayuronances tat eping. bee equ, See (ram, templaca al Let posed 1 Tews sn vem. ntich pode explanatey mated These nto nd fntnto, flag thet es an re) sal wa be conc ‘creguinmeet ef the suman The teed “chal infest 8 Imandacey prow, and the weed ould” indicate 8 recommended ot adviery paviion Inpeedive seems ‘hate munnasy pewninen 3 The suc acd tn SI wots ae 40 be repel = stantun. No cter uns of mente are chal In sian hich the daa can We ayn espn ce eet sce eth Hho cae app he Re eased une ie Sindad teed ie pe UN Tt salad diet mt parr 8 ans al of the sun comerm ft areca wth te we, Boothe respentiles of he wer oth wankard b eaablsh oppre rate natn and heh praienand detrede the op Klay of replay Lmatans per bre. We 4 ecic rrecatemay acrmm sce Nite 2 Reloremed Dacumets 20 ASTM Sandan? C40 Toe Maho be State Maus of Banteny and Poss Rao of Comme 48 Comprosion (D119 Test Medea Se Teed Lambert Strato ‘Sie D4SY Temimskgy Relating wo Soi Roch ad Comin That D IIAVD 1140 Tea Meds be Deep Foundations Un se Stak Ava Compressive Land Ds) Ten Matha Ke Dexp Foumlatows Ukr St [Asd Tonse Lond (DAT Pre for Minimum Requremens for Agencies Teagaged ia Tong andr Inject Sea ant ck at (edn Eapneeing Deven and Consrvctin Dede Pra for Using Sieiiate Dyes ‘al Daw A Termine AI Deftons Foe cern denincns of taro vse in ‘he sandal se Terminobigy D488 2 Tpnsaens of ome yous Yo Tis Sandon, ALL cow implate ple, wea dap fovndaen wna rae of cemeit pot of comnte aml coastnased in bal ation, Geveechne SSucartaatticnace sarc una abemcerey aot Specialist Geotechnical Testing, Consultancy & Engineering {Pie Testing |Oyraric (POA Tost PIT Test CSL) Tost | Sac (il Compressive Tera - Lateral Tost] Drop Hanmer] {Sod vestigation | Boring | Sor | COR Test | Sand Core Test 24 MM GI PT. MULTI GEOTEKNIK INDONESIA Specallst Geotechnical Testing, Consultancy &e Engineering alist Geotechnical Test (Cre ate Sonarge, ito Vio Aw Bk 001.07 el Kednrg Ke. Srwangm, Dep, Joa Barer 6516 ‘onsultancy & Enginceri © err. 7s806 0013 154.208 | Eeevtgesetnd ndnenQgna con Qh v4045-00 teat genraly ape well at» pila measement tatim!eventhogh the ta fave may ie Sinica tending. Twoenbedel win test me in Ce proximity he plea at he me ea, {jac ctot ote kan am pone coma) chesk ef cache Fr piles witha igh percentage of ed tenga of peste mie war the ple ead fy prone confirmation mrrement mar tel evo For at impact dvice every eae) ar imu the fc al veut Sern te er te of cesvuive imped evn shell he minely comic Content ant perth sipalh of (average fore est {ayer yey tes ple nga athe ea he retro taming ya he tn ‘ring. prceune. ant doin dat en ‘shot Wie tle ae mt coms et Troprtrahiy agement veges the cane ect a een. the cane ove or mila iarunention te cee the rem pret cong the ta te ‘uses deerme to te a tasdiermafencntst Be ‘ep ores orbth, eee fre ou fete ‘met dcermined nf rece, then the est Be ‘ejected. Perform section check of he apt sed for ening. pesing. an dglaying de eealy unog texting Ss recomend by the munfaturs and tec tefore fer wef fund tobe ot of mana tte tolerance. ST a TR scott tog eres meneame Oe mous oriental auoygtnteccont sane sider placing fou sain tansdocer equally spaced arund the [erimeier and a deseried in 8.27 The average force deter mined fom each diametrically opened pao tamale can then be compared togeter.and with the average velit) 2 ia (69; ase the data quality of ll foce messorement one 7—The ecg an pac me of tay be et Fete fans pn on Be uly ad age fos ed {an vaytomaely over be re son hap fe Ung fe ‘Septolatn Te manic mas fete) ea on ‘Stewed 13) hende ban ep sane sh ny er Ione mode he acy Mea fe ces fae ep (cetera ened oa tl ben et compas dewey ‘ewan ayumi mnie fear 1 Teeter aaa eset ara reser ie 1S emit Boies ieee Bilger torre ee seiner gata Sg agg {ech a appeprat for eve, mate ae an ype of Sho Tebartnnfnan tect Sees sear eo St SS eae Specialist Geotechnical Testing, Consultancy & Engineering | Pe Testing | Oram: POA Tet PIT Test- CSL) Tet | Satz: (al Compressive Terale- Later Test |Orp Harve] | Sot nvestgaton | Borg | Sorcr | CBR Test | Sand Care Tet $$$ rein err Derr Teeter Core Feat 25 92 Tees e120 peg we wa | ap | Gveg | woman [sony 010 |, use an = 8809 PY) IHG WO (16 - BOL Lid “B94 VE) Duvese | Bum ond | S3ipsyns2y wonwsqyy9 ~ emt renene wantin reentie mmseit fuin vos ent "ng taney oy Bese, Trovieawa ru ocr erg whaaeg va Sass big Tounyrtuy Baran, povuI>aPND vik VISZNOGNI HINN3LOI9 ILINW ‘Ld| 1) az Bupssuibug @ Aoueynsueg “Gunses jeaquyei099 weyeDeds ocwrzzez orewzz0z ocvertz0t :Goup soar oceozzor 2419p 39200 TART UTATE™ + ertooaz) moe w2e Gynneas TARE IET™ = etooo1y mapw2e dynes a ad Seer suey npery UopespIy wORPIGTES WOMESpRAIT wOwENTES Ghasuibu w Zoutrsto TT Sea VISANOGNI MINY3.LO3D LLINW ‘Ld| 2)

Anda mungkin juga menyukai