Backup Data Tentena - Korobono Saluran
Backup Data Tentena - Korobono Saluran
90
Galian Tanah Drainase
60
V= 0,9*0,6*120 64.8 m3
JUMLAH A 64.80 m3
SAMPAI DENGAN SAAT INI 64.80 m3
20 50 20
Pek. Pasangan Batu Dengan Mortar
Drainase
50
60 V = 0,2*0,6*90*2 bh 21.6 m3 Dinding
V =0,3*0,1*90 2.7 m3 Lantai
10
30
66
Detail Drainase
JUMLAH A 24.30 m3
SAMPAI DENGAN SAAT INI 24.30 m3