Anda di halaman 1dari 1

DAFTAR PERALATAN DAN PERLENGKAPAN PROYEK

Jumlah
No Uraian Sat Kondisi
Minimal
A PERALATAN UKUR
1 Insulating tester 5.000 V - 10.000 V bh 1 BAIK
2 Earthing tester bh 1 BAIK
3 Tang Ampere digital bh 1 BAIK
4 Phase sequence indikator bh 1 BAIK
5 Roll Meter ( Midband) 50 - 100 m bh 1 BAIK
6 GPS bh 1 BAIK
7 Thermo Gun bh 1 BAIK
B PERALATAN KERJA
Peralatan Kerja JTM, JTR, dan GD
1 Kunci Pas/Ring/Shok 6 s/d 32 mm set 2 BAIK
2 Kunci Inggris 12" bh 2 BAIK
3 Compression Hydraulic 25-300 mm (heksagonal) set 1 BAIK
4 Palu 5 kg bh 1 BAIK
5 Gergaji besi bh 1 BAIK
6 Tangga fiber / allumunium 11 meter bh 2 BAIK
7 Katrol 3 - 5 ton (rantai) bh 2 BAIK
Rachet & puller (takel + kodokan) 35-
8 set 2 BAIK
300 mm2
9 Tambang 20 meter roll 1 BAIK
10 Box Peralatan bh 1 BAIK
11 Rol meter roda bh 1 BAIK
12 Spanner / Treckbas bh 3 BAIK
13 Gunting Kabel bh 1 BAIK
Elektrikal
1 Gerinda tangan listrik bh 1 BAIK
2 Bor listrik bh 1 BAIK
3 Stick 20 KV min 11 meter set 1 BAIK
4 Grounding stick 20 KV 3 phasa set 2 BAIK
5 Voltage detector 20 kV bh 1 BAIK
Komunikasi
6 Alat komunikasi HP yang mendukung GPS bh 2 BAIK
C SARANA TRANSPORTASI
Kendaraan minimal Roda Empat pick up/bak untuk Pekerjaan
1 Unit 1 BAIK
Konstruksi
2 Kendaraan minimal Roda Dua untuk Pekerjaan Konstruksi Unit 1 BAIK

Anda mungkin juga menyukai