Durasi Ganti

Bahan Jam Jam Durasi pengisian Bobbin dan Perbaikan Hasil


Speed Putus
Baku Mulai Berhenti Bobbin (Menit) Welding mesin (Kg)
(Menit)
HD 1006 07:00 07:38 00:38 7 00:02 349
HD 1006 07:40 08:09 00:29 7 1 00:02 355
HD 1006 08:11 08:39 00:28 7 0 00:02 354
HD 1006 08:41 09:10 00:29 7 1 00:08 351
HD 1006 09:18 09:39 00:21 7,3 0 00:01 347
HD 1006 09:40 10:03 00:23 7,2 0 00:02 352
HD 1006 10:05 10:29 00:24 7,2 1 00:09 350
HD 1006 10:38 11:01 00:23 7,1 0 00:02 357
HD 1006 11:03 11:26 00:23 7,2 0 00:03 354
HD 1006 11:29 11:53 00:24 7,1 1 00:06 351
HD 1006 11:59 12:22 00:23 7,2 0 00:02 349
HD 1006 12:24 12:46 00:22 7,2 0 00:03 350
HD 1006 12:49 13:16 00:27 7,2 1 00:01 353
HD 1006 13:17 13:40 00:23 7,2 0 00:01 357
HD 1006 13:41 14:05 00:24 7,2 0 00:01 358
HD 1006 14:06 14:30 00:24 7,2 0 00:02 325
HD 1007 14:32 15:00 0 00:28
Total 06:45 5 00:47 00:28 5612

Rekapan Proses Uji Output Mesin Drawing PMX 098


06/02/2024

Rekap

Jam Kerja Efektif (Menit 06:45


Durasi Welding dan ganti bobbin 00:47
Perbaikan 00:28
Total 08:00
Hasil Record Mesin PMX 098

Keterangan:

1. Output Pada Point Pertama merupakan gabungan antara hasil Shift 3 dan
Shift 1
2. Awal Shift Mesin Mengalami 3 kali mati dengan sendirinya sehingga durasi
pengisian bobbin cukup panjang pada output pertama
3. Speed maksimum saat ini 7.2 m/s dengan formasi jumlah blok normal tanpa
dilakukan direct ke Port 2
4. Diameter Dies Kembali melebar ke 2.40 pada saat uji coba