PRODUCTION MONITORING REPOR

PT. BAKTI PERTIWI NUSANTARA


STOCK EFO PIT 1 KE ETO PIT 3 - ETO ETO KE EFO
RAIN /
DATE

SLIPPER BY TRUCK RIT SHIFT


BY SURVEY BCM TON BCM TON
Y COUNT (D/N)

1 0 7,316.00 0.00 0.00 423.00 0.00 0.00 77/118


2 120/180 9,080.00 0.00 630.00 216.00 0.00 0.00 63/84
3 0 10,928.00 0.00 1,260.00 0.00 0.00 0.00 59/95
4 120/600 11,732.00 0.00 0.00 207.00 0.00 0.00 67/0
5 0 11,732.00 0.00 1,005.00 144.00 0.00 0.00 0
6 120/0 5,831.00 0.00 0.00 225.00 0.00 0.00 0
7 60/0 3,985.00 0.00 0.00 0.00 0.00 0.00 0
8 0 3,985.00 5,792.00 0.00 0.00 0.00 0.00 0
9 0 5,377.00 7,183.00 0.00 0.00 0.00 0.00 0/116
10 0 7,921.00 9,108.83 0.00 0.00 0.00 0.00 91/121
11 0 8,389.00 0.00 0.00 0.00 0.00 0.00 39/0
12 0 4,528.50 0.00 0.00 0.00 0.00 0.00 0/90
13 0 2,798.50 0.00 0.00 450.00 0.00 0.00 58/119
14 0 2,281.50 2,509.77 0.00 0.00 0.00 0.00 104/0
15 0 3,017.32 WAITING FOR 0.00 288.00 0.00 0.00 76/38
SURVEY
16 180/0 1,793.32 1,514.08 0.00 342.00 0.00 0.00 0/50

17 0 3,185.32 WFS 0.00 0.00 0.00 151/51

18 0 2,322.32 2,568.66 0.00 378.00 57/0

19 30/0 0.00 0.00 0

Total 2,118.78 2,895.00 2,118.78 378.00


Note:
Pengukuran Oleh Tim Survey PT. Bakti Pertiwi Nusantara
HAULING ETO KE BARGE
HAULING EFO KE BARGE
1. Ore Getting pada PIT 1 ke ETO merupakan produksi ore dengan kualitas Ni ≥ 2.0 yang akan digunakan untuk Blending/Mark Up kua
memenuhi nilai kadar NI ≥ 1.6
2. Penurunan Ore dari Pit 3 sudah dimulai tanggal 17 November 2021. Ore yang diturunkan ke ETO adalah Ore pada dome Lama yang
3. Hauling/Loading tongkang dari tanggal 15 november 2021, untuk transit Ore dilakukan dengan 2 metode: a. dilakukan dari ETO ke Ba
pengisian tongkang
ON MONITORING REPORT
TI PERTIWI NUSANTARA
ETO KE EFO EFO - BARGE

RIT SHIFT RIT SHIFT REMARKS


MT WMT
(DAY) (NIGHT)
2,340.00 0 0 0.00
1,764.00 0 0 0.00
1,848.00 0 0 0.00
804.00 0 0 0.00
0.00 0 0 0.00
0.00 151 175 5,901.00 Total tonase by final draft tongkang 7.747, 672 WMT
0.00 102 0 1,846.00
0.00 0 0 0.00
1,392.00 0 0 0.00
2,544.00 0 0 0.00
468.00 0 0 0.00
1,080.00 135 106 4,940.50 Total tonase barge by final draft 10.576,113 WMT
2,124.00 76 106 3,854.00
1,246.00 86 0 1,763.00
1,368.00 0 20 2,737.00 Mulai simulasi Hauling ETO ke Barge
0 141 Total tonase barge by final draft 7.713,541 WMT
600.00 59 20 3,927.00
95 57
2,424.00 5 0 1,049.00
66 20 1,290.00
684.00 18 0 1,462.00
68 0
0.00 43 0 1,649.00
On Progress
52 0
gunakan untuk Blending/Mark Up kualitas Ni pada dome - dome yang memiliki nilai kadar Ni yang Rendah. Sehingga dapat

O adalah Ore pada dome Lama yang tertinggal di PIT 3


2 metode: a. dilakukan dari ETO ke Barge Langsung; b. dari EFO ke Barge. Hal ini dilakukan untuk mengejar percepatan
SHIPMENT MONITORING REPORT
PT. BAKTI PERTIWI NUSANTARA

MONTH IN COMMENCE LOADING COMPLETE LOADING


No. TUG BOAT/BARGE ID
2021 TIME DATE TIME
AUGUST 1 SANLE 23/MJP 32 8:00 AM 16/08/21 6:20 PM
2 PB 241/TGH 3306 1:55 PM 20/08/21 5:00 PM
3 SYUKUR 54/SYUKUR 07 9:20 PM 23/08/21 3:30 AM
4 BUMA MARINE/KALTARA NUSANTARA 7:40 PM 26/08/21 4:30 PM
5 SANLE 29/PB 3028 2:30 PM 31/08/21 5:50 AM
SEPTEMBER 1 NELLY 71/NELLY 80 3:15 AM 04/09/21 9:30 PM
2 BUMA CORAL/KALTARA PANDITO 10:20 PM 08/09/21 5:00 AM
OKTOBER 1 BERAU 21/PSPM 21 10:52 AM 25/10/21 11:15 AM
2 INTAN MEGAH 23/INTAN KELANA 27 8:00 PM 29/10/21 3:45 PM
NOVEMBER 1 NELLY 53/NELLY 78 11:25 AM 06/11/21 5:00 PM
2 WGM 202/3103 10:40 AM 12/11/21 4:00 PM
3 NELLY 53/NELLY 78 9:00 PM 15/11/21 12:00 AM
4 KELLY 03/GHIE 05 1:00 PM 18/11/21
5 ASLEIGH 06/ROSE 01
6 MIMI 02/GHI 05
7
8
9
DESEMBER 1 JHONI 101/SAMTIMAS 01
2 NELLY 53/NELLY 78
3
4
5
6
7
8
9
NITORING REPORT
TIWI NUSANTARA
COMPLETE LOADING FINAL QUANTITY CARGO MINE CONTR
CONTRACTOR Remarks
DATE WMT BY SURVEY (MT) RIT MT/DT
18/08/21 7,553.862 7076.12 367 19.28 ARGASOKA
22/08/21 10,503.045 9478.98 453 20.92 ARGASOKA
24/08/21 7,501.673 6535.82 352 18.57 ARGASOKA
28/08/21 10,073.322 8972.90 549 16.34 ARGASOKA
02/09/21 6,504.480 5947.79 349 17.04 ARGASOKA
06/09/21 8,564.245 6858.87 459 14.94 ARGASOKA
22/09/21 7,102.673 0.00 417 0.00 ARGASOKA
27/10/21 7,519.216 6809.68 435 15.65 ARGASOKA
31/10/21 7,587.179 6178.93 431 14.34 ARGASOKA
07/11/21 7,747.672 6530.55 428 15.26 ARGASOKA
14/11/21 10,576.113 10151.82 516 19.67 ARGASOKA
17/11/21 7,713.541 7469.95 483 15.97 ARGASOKA
#DIV/0! On Progress
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
DRILLING MONITORING REPORT
PT. BAKTI PERTIWI NUSANTARA
DH RID SAMPLE
No. DATE START END TD GEOS
CODE CODE CODE
BLOK 10
1 06/11/21 B10-DH-14 5/11/2021 6/11/2021 8.70 BPN-02 MSI DH-14 (1-9)
2 07/11/21 B10-DH-03 5/11/2021 7/11/2021 12.50 BPN-01 MSI DH-03 (1-14)
3 09/11/21 B10-DH-12 7/11/2021 9/11/2021 14.00 BPN-02 MSI DH-12 (1-16)
4 11/11/21 B10-DH-11 8/11/2021 11/11/2021 16.80 BPN-01 MSI DH-11 (1-18)
11/11/21 B-10-DH-21 10/11/2021 13/11/2021 11.50 BPN-02 MSI DH-21 (1-15)
5 12/11/21 -
6 13/11/21 B10-DH-10 13/11/21 8.80 BPN 01 MSI DH-10 (1-8)
13/11/21 B10-DH-21 10/11/2021 13/11/21 13.00 BPN 02 MSI DH-21 (1-15)
7 14/11/21 B10-DH-10 13/11/21 13/11/21 15.40 BPN 01 MSI DH-10 (1-15)
14/11/21 B10-DH-20 14/11/21 14/11/21 7.50 BPN 02 MSI DH-20 (1-7)
8 15/11/21 B-10-DH-10 13/11/21 13/11/21 19.5 BPN 01 MSI DH-10 (1-18)
15/11/21 B-10-DH-20 14/11/21 15/11/21 10.0 BPN 02 MSI DH-20 (1-11)
9 16/11/21 B-10-DH-10 15/11/21 22.5 BPN 01 MSI DH-10 (1-22)
B-10-DH-19 15/11/21 7.8 BPN 02 MSI DH-10 (1-7)
10 1711/21 B-10-DH-10 13/11/21 17/11/21 24.0 BPN-01 MSI DH-10 (1-24)
B-10-DH-19 16/11/21 9.0 BPN-02 MSI DH-10 (1-9)
11 18/11/21 B-10-DH-09 BPN-01 MSI
B-10-DH-19 16/11/21 13.5 BPN-02 MSI DH-10 (1-13)

21
22
23
24
25
26
27
28
29
30
T

REMARKS

FINISH - SAMPLE SUDAH DI LAB


FINISH - SAMPLE SUDAH DI LAB
FINISH - SAMPLE SUDAH DI LAB
FINISH
FINISH
PERBAIIKAN DRILLBIT
PROGRESS
FINISHB
ON PROGRESS
ON PROGRESS
ON PROGRESS
FINISH
FINISH
ON PROGRESS
FINISH
PROGRESS
MOVING
PROGRESS