Anda di halaman 1dari 5

PAKET : PEMBANGUNAN JEMBATAN KALI ISIM TAHAP II

KONSULTAN : CV. HARVEY MANDIRI


KONTRAKTOR : CV. CALVIN PUTRA
NO. KONTRAK : 076.A/KONTR/01.12-BM/600/2021
TANGGAL : 20 AGUSTUS 2021

REKAPITULASI PERHITUNGAN KUANTITAS PEKERJAAN


JEMBATAN KALI ISIM
FINAL QUANTITY (MC-100 )

MATA PEMBAYARAN : 7.3.(1)


ITEM PEKERJAAN : BAJA TULANGAN POLOS BJTP 280
SATUAN : KG

NO URAIAN VOLUME KETERANGAN

1 PEMBESIAN ABUTMEN
- LEMBAR 1 1,329.00 KG

2 PEMBESIAN WINGWALL
- LEMBAR 1 671.37 KG

3 PEMBESIAN OPRIT
- LEMBAR 1 657.63 KG

3 PEMBESIAN PLAT INJAK


- LEMBAR 1 1,337.75 KG

TOTAL VOLUME 3,995.74

DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. HARVEY MANDIRI CV. CALVIN PUTRA
BIDANG BINA MARGA 0
PROPINSI PAPUA BARAT

KADEK YADI MARYADI, ST EKO PUTRA, ST RIDWAN Z. Amd


NIP. 19850207 201104 1 001 Supervisor Engeneer Site Manajer
PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN KALI ISIM TAHAP II KONSULTAN SUPERVISI : CV. HARVEY MANDIRI

NO. KONTRAK : 076.A/KONTR/01.12-BM/600/2021 KONTRAKTOR PELAKSANA : CV. CALVIN PUTRA

TANGGAL KONTRAK : 20 AGUSTUS 2021 ITEM PEMBAYARAN : 7.3.(1) & 7.3.(3)

PEKERJAAN : BAJA TULANGAN SIRIP BJTS 280A & BAJA TULANGAN SIRIP BJTS 420A

SKETSA
POT. I POT. II POT. III
BACKUP BESI ABUTMEN

LEMBAR PERHITUNGAN
PANJANG TEKUKAN BERAT/ME BERAT PERMUTU TULANGAN
JUMLAH MUTU PANJANG KAIT JUMLAH BERAT TOTAL
TYPE DIAMETER TER
BATANG TULANGAN BATANG (M') (M) ABUTMEN
a (m) b (m) c (m) d (m) e (m) f (m) (m/kg) BjTP 280 BjTS 420A (Kg)

FOOTING
A7 21 16 BjTS 420A 11.04 11 0.04 1.58 1.00 - 365.90 365.90
A8 21 16 BjTS 420A 11.04 11 0.04 1.58 1.00 - 365.90 365.90
A9 75 16 BjTS 420A 4.04 4 0.04 1.58 1.00 - 478.21 478.21
A10 2 16 BjTS 420A 11.04 11 0.04 1.58 1.00 - 34.85 34.85
A11 603 10 BjTP280 0.95 0.91 0.04 0.62 1.00 353.16 - 353.16
C2 111 10 BjTP280 5.37 5.33 0.04 0.62 1.00 734.95 - 367.48
E 111 25 BjTS 420A 4.09 4.05 0.04 3.85 1.00 - 1749.28 1749.28
PILAR
A4 337 10 BjTP280 0.64 0.6 0.04 0.62 1.00 132.97 - 132.97
A6 16 16 BjTS 420A 11.04 11 0.04 1.58 1.00 - 278.78 278.78
B1 111 25 BjTS 420A 4.59 4.55 0.04 3.85 1.00 - 1963.13 1963.13
B1' 111 25 BjTS 420A 5.59 5.55 0.04 3.85 2.00 - 4781.65 4781.65
B2 38 25 BjTS 420A 5.59 5.55 0.04 3.85 1.00 - 818.48 818.48
KEPALA
A1 75 10 BjTP280 0.24 0.2 0.04 0.62 1.00 11.10 - 11.10
A1' 75 10 BjTP280 0.44 0.4 0.04 0.62 0.00 0.00 - 0.00
A2 151 10 BjTP280 1.04 1 0.04 0.62 1.00 96.82 - 96.82
A3 113 13 BjTS 420A 1.5 1.46 0.04 1.04 1.00 - 176.60 176.60
A5 38 16 BjTS 420A 11.04 11 0.04 1.58 1.00 - 662.10 662.10
B3 111 25 BjTS 420A 2.59 0.4 0.04 3.85 1.00 - 1107.73 1107.73
C1 56 16 BjTS 420A 4.44 4.4 0.04 1.58 1.00 - 392.41 392.41
D1 111 25 BjTS 420A 3.85 3.81 0.04 3.85 1.00 - 1646.63 1646.63
D2 111 25 BjTS 420A 3.41 3.37 0.04 3.85 1.00 - 1458.45 1458.45

SUB TOTAL 1329.00 16280.10 17241.62


TOTAL S/D HAL. 1 1329.00 16280.10 17241.62

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. HARVEY MANDIRI CV. CALVIN PUTRA
BIDANG BINA MARGA 0
PROPINSI PAPUA BARAT

KADEK YADI MARYADI, ST EKO PUTRA, ST RIDWAN Z. Amd


NIP. 19850207 201104 1 001 Supervisor Engineer Site Manager
PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN KALI ISIM TAHAP II KONSULTAN SUPERVISI : CV. HARVEY MANDIRI

NO. KONTRAK : 076.A/KONTR/01.12-BM/600/2021 KONTRAKTOR PELAKSANA : CV. CALVIN PUTRA

TANGGAL KONTRAK : 20 AGUSTUS 2021 ITEM PEMBAYARAN : 7.3.(1) & 7.3.(3)

PEKERJAAN : BAJA TULANGAN SIRIP BJTS 280A & BAJA TULANGAN SIRIP BJTS 420A

SKETSA
POT. I POT. II POT. III
BACKUP BESI WINGWALL

LEMBAR PERHITUNGAN
PANJANG TEKUKAN BERAT/ME BERAT PERMUTU TULANGAN
JUMLAH MUTU PANJANG KAIT JUMLAH BERAT TOTAL
TYPE DIAMETER TER
BATANG TULANGAN BATANG (M') (M) SAYAP
a (m) b (m) c (m) d (m) e (m) f (m) (m/kg) BjTP 280 BjTS 420A (Kg)

WINGWALL
A1 16 16 BjTS 420A 0.6 0.56 0.04 1.58 2.00 - 30.30 30.30
A2 6 19 BjTS 420A 2.55 2.51 0.04 2.23 2.00 - 68.10 68.10
A3 25 12 BjTP280 5.85 5.81 0.04 0.89 2.00 259.67 - 259.67
A4 144 16 BjTS 420A 2.9 2.86 0.04 1.58 2.00 - 1318.15 1318.15
A5 225 10 BjTP280 0.34 0.3 0.04 0.62 2.00 94.32 - 94.32
B 25 12 BjTP280 7.15 7.11 0.04 0.89 2.00 317.37 - 317.37
D 6 19 BjTS 420A 7.66 7.62 0.04 2.23 2.00 - 204.57 204.57

SUB TOTAL 671.37 1621.12 2292.49


TOTAL S/D HAL. 1 671.37 1621.12 2292.49

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. HARVEY MANDIRI CV. CALVIN PUTRA
BIDANG BINA MARGA 0
PROPINSI PAPUA BARAT

KADEK YADI MARYADI, ST EKO PUTRA, ST RIDWAN Z. Amd


NIP. 19850207 201104 1 001 Supervisor Engineer Site Manager
PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN KALI ISIM TAHAP II KONSULTAN SUPERVISI : CV. HARVEY MANDIRI

NO. KONTRAK : 076.A/KONTR/01.12-BM/600/2021 KONTRAKTOR PELAKSANA : CV. CALVIN PUTRA

TANGGAL KONTRAK : 20 AGUSTUS 2021 ITEM PEMBAYARAN : 7.3.(3)

PEKERJAAN : BAJA TULANGAN OPRIT

SKETSA
POT. I POT. II POT. III
2 Ø 12mm
2 Ø 12mm 2 Ø 12mm
200
200 200

200 BEUGEL Ø 8mm


200 BEUGEL Ø 8mm 200 BEUGEL Ø 8mm

2 Ø 12mm
2 Ø 12mm 2 Ø 12mm

DETAIL BALOK DETAIL KOLOM DETAIL SLOOF


Skala 1 : 10 Skala 1 : 10 Skala 1 : 10

LEMBAR PERHITUNGAN
PANJANG TEKUKAN BERAT/ME BERAT PERMUTU TULANGAN
JUMLAH MUTU PANJANG KAIT BERAT TOTAL
TYPE DIAMETER TER JUMLAH
BATANG TULANGAN BATANG (M') (M)
a (m) b (m) c (m) d (m) e (m) f (m) (m/kg) BjTP 280 BjTS 420A (Kg)

OPRIT ARAH BINTUNI ®


B1 4 12 BjTP280 47.275 47.28 0.06 0.89 167.88 - 0.00
K1 4 12 BjTP280 1.11 1.05 0.06 0.89 3.94 - 0.00
K2 4 12 BjTP280 1.24 1.18 0.06 0.89 4.40 - 0.00
K3 4 12 BjTP280 1.37 1.31 0.06 0.89 4.86 - 0.00
K4 4 12 BjTP280 1.5 1.44 0.06 0.89 5.33 - 0.00
K5 4 12 BjTP280 1.63 1.57 0.06 0.89 5.79 - 0.00
K6 4 12 BjTP280 1.76 1.7 0.06 0.89 6.25 - 0.00
K7 4 12 BjTP280 1.89 1.83 0.06 0.89 6.71 - 0.00
K8 4 12 BjTP280 2.02 1.96 0.06 0.89 7.17 - 0.00
K9 4 12 BjTP280 2.15 2.09 0.06 0.89 7.63 - 0.00
K10 4 12 BjTP280 2.28 2.22 0.06 0.89 8.10 - 0.00
K11 4 12 BjTP280 2.41 2.35 0.06 0.89 8.56 - 0.00
K12 4 12 BjTP280 2.54 2.48 0.06 0.89 9.02 - 0.00
K13 4 12 BjTP280 2.67 2.61 0.06 0.89 9.48 - 0.00
K14 4 12 BjTP280 2.8 2.74 0.06 0.89 9.94 - 0.00
K15 4 12 BjTP280 2.93 2.87 0.06 0.89 10.40 - 0.00
K16 4 12 BjTP280 3.06 3 0.06 0.89 10.87 - 0.00
K17 4 12 BjTP280 3.19 3.13 0.06 0.89 11.33 - 0.00
K18 4 12 BjTP280 3.32 3.26 0.06 0.89 11.79 - 0.00
SLOOF 4 12 BjTP280 47.335 47.28 0.06 0.89 168.09 - 0.00

BUEGEL 2 672.4 8 BjTP280 0.68 0.15 0.15 0.15 0.15 0.06 0.39 180.09 - 180.09

SUB TOTAL 657.63 0.00 180.09


TOTAL S/D HAL. 1 657.63 0.00 180.09

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. HARVEY MANDIRI CV. CALVIN PUTRA
BIDANG BINA MARGA 0
PROPINSI PAPUA BARAT

KADEK YADI MARYADI, ST EKO PUTRA, ST RIDWAN Z. Amd


NIP. 19850207 201104 1 001 Supervisor Engineer Site Manager
PAKET PEKERJAAN : PEMBANGUNAN JEMBATAN KALI ISIM TAHAP II KONSULTAN SUPERVISI : CV. HARVEY MANDIRI

NO. KONTRAK : 076.A/KONTR/01.12-BM/600/2021 KONTRAKTOR PELAKSANA : CV. CALVIN PUTRA

TANGGAL KONTRAK : 20 AGUSTUS 2021 ITEM PEMBAYARAN : 7.3.(1)

PEKERJAAN : BAJA TULANGAN SIRIP BJTS 280A

SKETSA
POT. I POT. II POT. III
BACKUP BESI PLAT INJAK

A12 B4 F

LEMBAR PERHITUNGAN
PANJANG TEKUKAN BERAT/ME BERAT PERMUTU TULANGAN
JUMLAH PANJANG KAIT BERAT TOTAL
TYPE DIAMETER MUTU TULANGAN TER JUMLAH
BATANG BATANG (M') (M)
a (m) b (m) c (m) d (m) e (m) f (m) (m/kg) BjTP 280 BjTS 420A (Kg)

PLAT INJAK ARAH BINTUNI


A12 52 12 BjTP280 7.04 7 0.04 0.89 1.00 324.99 - 324.99
B4 36 12 BjTP280 5.18 5.14 0.04 0.89 1.00 165.55 - 165.55
F 36 12 BjTP280 5.58 5.54 0.04 0.89 1.00 178.33 - 178.33

PLAT INJAK ARAH WONDAMA


A12 52 12 BjTP280 7.04 7 0.04 0.89 1.00 324.99 - 324.99
B4 36 12 BjTP280 5.18 5.14 0.04 0.89 1.00 165.55 - 165.55
F 36 12 BjTP280 5.58 5.54 0.04 0.89 1.00 178.33 - 178.33

SUB TOTAL 1337.75 0.00 1337.75


TOTAL S/D HAL. 1 1337.75 0.00 1337.75

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh


KOORDINATOR PENGAWAS LAPANGAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. HARVEY MANDIRI CV. CALVIN PUTRA
BIDANG BINA MARGA 0
PROPINSI PAPUA BARAT

KADEK YADI MARYADI, ST EKO PUTRA, ST RIDWAN Z. Amd


NIP. 19850207 201104 1 001 Supervisor Engineer Site Manager

Anda mungkin juga menyukai