10.

8 cm 600 m
1 cm 55.556 m 0.9

TABEL KELANDAIAN ALINYEMEN HORIZONTAL

Kontur Elevasi Beda tinggi (m) Jarak (i) (cm) Jarak Aktual (m) Kelandaian (gi) %
A 905
5 7.5 416.66667 1.20000
B 900
B 900
5 5 277.77778 1.80000
B1 895
B1 895
5 3 166.66667 3.00000
C 890
C 890
5 3.6 200.00000 2.50000
C1 885
C1 885
5 2.4 133.33333 3.75000
D 879
D 879
5 1.2 66.66667 7.50000
D1 880
D1 880
0 1.4 77.77778 0.00000
D2 885
D2 885
5 2.6 144.44444 3.46154
D3 885
D3 885
0 5.5 305.55556 0.00000
E 890
E 890
5 6.8 377.77778 1.32353
F 890
F 890
0 3.2 177.77778 0.00000
F1 895
F1 895
0 2.5 138.88889 0.00000
G 895
RATA - RATA KELANDAIAN 2.04459
2483.33333

644.44444 2.43333
277.77778 3.75000
827.77778 1.59502

2.1 9.3 17.2 22.6 26.7

22.3 20.1 21.3 18.4 8.5

2.1 22.3 po 2.1,22.3


9.3 20.1 po 9.3,20.1
17.2 21.3 po 17.2,21.3
22.6 18.4 po 22.6,18.4
26.7 8.5 po 26.7,8.5
31.4 3.3 po 31.4,3.3
37.3 2.4 po 37.3,2.4
TABEL KOORDINAT TIKUNGAN

Kelas Daerah
19.1 Titik A B C
Datar
X 2.1 9.3 17.2
Datar
Y 22.3 20.1 21.3
Perbukitan
X 0 7.2 7.9
Datar
5 Y 0 -2.2 1.2
Perbukitan
Arc tan x/y 0 -73.01 81.36
Perbukitan
Azimut - 106.99 261.36
Datar
14.9 ∆ - 25.63 36.87
Perbukitan

Datar
1 Titik A B C

Datar X 2.1 9.3 17.2


5.7
Datar Y 22.3 20.1 21.3

Datar X 0 7.2 7.9

Datar Y 0 -2.2 1.2

Arc tan x/y 0 -73.01 81.36


0
Azimut - 106.99 261.36

∆ - 25.63 -

3 Titik C D E

X 17.2 22.6 26.7

Y 21.3 18.4 8.5

X 0 5.4 4.1
X 0 5.4 4.1
0
Y 0 -2.9 -9.9

Arc tan x/y 0 -61.76 -22.50

Azimut - 118.24 157.50

∆ - 39.27 -

5 Titik E F

X 26.7 31.4

Y 8.5 3.3

X 0 4.7

31.4 37.3 Y 0 -5.2

3.3 2.4 Arc tan x/y 0 -42.11

Azimut - 137.89

∆ - 39.22
37.8 2.4

KOORDINAT TIKUNGAN Perhitungan Alinyemen Horizontal

Data-data :
D E F G Lebar Pelaksanaan :
Klasifikasi Jalan :
22.6 26.7 31.4 37.3
Kelas Jalan :

18.4 8.5 3.3 2.4


Fungsi
5.4 4.1 4.7 5.9
Arteri
Kolektor
-2.9 -9.9 -5.2 -0.9
Lokal
-61.76 -22.50 -42.11 -81.33
Dipilih VR
e maks
118.24 157.50 137.89 98.67
en
39.27 19.61 39.22 -
VR (km/jam)
R min (m)

2 Titik B C D

X 9.3 17.2 22.6

Y 20.1 21.3 18.4


X
2.1
X 0 7.9 5.4
9.3
17.2
Y 0 1.2 -2.9
22.6
26.7
Arc tan x/y 0 81.36 -61.76
31.4
37.3
Azimut - 261.36 118.24

∆ - 36.87 -

4 Titik D E F

X 22.6 26.7 31.4

Y 18.4 8.5 3.3

X 0 4.1 4.7
X 0 4.1 4.7

Y 0 -9.9 -5.2

Arc tan x/y 0 -22.50 -42.11

Azimut - 157.50 137.89

∆ - 19.61 -

37.3

2.4

5.9

-0.9

-81.33

98.67

-
ngan Alinyemen Horizontal

2 x 3.75 m 3.75
ARTERI
I

kecepatan Rencana (VR) km/jam


Datar Bukit Pegunungan
70-120 60-80 40-70
60-90 50-60 30-50
40-70 30-50 20-30

120 km/jam 70
10% 0.1
2% 0.02

120 100 80 60 50 40 30 20
600 370 210 110 80 50 30 15
70
157
m 137.5

Y KOORDINAT
22.3 2.1,22.3
20.1 9.3,20.1
21.3 17.2,21.3
18.4 22.6,18.4
8.5 26.7,8.5
3.3 31.4,3.3
2.4 37.3,2.4
Tikungan E
DATA PERENCANAAN Kontrol
VR 70 θs 9.61
e maks 0.1 θc 6.41
f maks 0.1465 Lc 20.02 SCS
∆ 25.63
en 0.02
B 3.75
m 137.5
R 179
e 0.098 Cek Ls dengan 4 Metode
Ls Tabel (SCS) 60 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 58.33 t=
Rmin 156.52 2. Berdasarkan landai relatif
1/2 ∆ 12.81398 Ls : 60.84
3. Berdasarkan rumus modifikasi shortt
Keamanan Ls : 58.62 c=
55.56 4. Berdasarkan tingkat pencapaian perubahan kelandaian
1.29 Ls : 44.44

Kesimpulan
Digunakan Ls terbesar : 60.84
L: 141.7
Parameter
p 0.94 0.01685264487
k 30.79 0.55427407064
Ts 71.72 1.29094842561
E 5.53 0.09957490130
Xs 60.67 1.09201536198
Ys 3.45 0.06204355808
3.22197422421
Landai relatif
0.0072727273 > 0.0072727 …OK!
g peralihan
3

0.4
ahan kelandaian
55.556
Tikungan E
DATA PERENCANAAN Kontrol
VR 70 θs 9.61
e maks 0.1 θc 17.66
f maks 0.1465 Lc 55.14 SCS
∆ 36.87
en 0.02
B 3.75
m 137.5
R 179
e 0.098 Cek Ls dengan 4 Metode
Ls Tabel (SS) 60 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 58.33 t=
Rmin 156.52 2. Berdasarkan landai relatif
1/2 ∆ 18.43729 Ls : 60.84
3. Berdasarkan rumus modifikasi shortt
Keamanan Ls : 58.62 c=
55.56 4. Berdasarkan tingkat pencapaian perubahan kelandaian
1.63 Ls : 44.44

Kesimpulan
Digunakan Ls terbesar : 60.84
L: 121.7
Parameter
p 0.94 0.01685264487
k 30.79 0.55427407064
Ts 90.78 1.63402998055
E 10.67 0.19209553384
Xs 60.67 1.09201536198
Ys 3.45 0.06204355808
3.22197422421
Landai relatif
0.007273 > 0.007273 …OK!
ung peralihan
3

0.4
ubahan kelandaian
55.556
Tikungan E
DATA PERENCANAAN Kontrol
VR 70 θs 9.61
e maks 0.1 θc 20.05
f maks 0.1465 Lc 62.61 SCS
∆ 39.27
en 0.02
B 3.75
m 137.5
R 179
e 0.098 Cek Ls dengan 4 Metode
Ls Tabel (SS) 60 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 58.33 t= 3
Rmin 156.52 2. Berdasarkan landai relatif
1/2 ∆ 19.63304 Ls : 60.84
3. Berdasarkan rumus modifikasi shortt
Keamanan Ls : 58.62 c= 0.4
55.56 4. Berdasarkan tingkat pencapaian perubahan kelandaian
1.71 Ls : 44.44

Kesimpulan
Digunakan Ls terbesar : 60.84
L: 184.3
Parameter
p 0.94 0.01685264487 55.556
k 30.79 0.55427407064
Ts 94.98 1.70967347530
E 12.04 0.21676788188
Xs 60.67 1.09201536198
Ys 3.45 0.06204355808
3.22197422421
Landai relatif
0.007273 > 0.007273 …OK!
Tikungan E
DATA PERENCANAAN Kontrol
VR 70 θs 9.61
e maks 0.1 θc 0.40
f maks 0.1465 Lc 1.24 SS
∆ 19.61
en 0.02 Perhitungan dengan SS Panjang Perjalanan selama 3 detik
B 3.75 θs 9.81
m 137.5 Ls 61.24 58.33333 R ok
R 179
e 0.098 Cek Ls dengan 4 Metode
Ls Tabel (SS) 60 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 58.33 t=
Rmin 156.52 2. Berdasarkan landai relatif
1/2 ∆ 9.80612945177 Ls : 60.84
3. Berdasarkan rumus modifikasi shortt
Keamanan Ls : 58.62 c=
55.56 4. Berdasarkan tingkat pencapaian perubahan kelandaian
1.11 Ls : 44.44

Kesimpulan
Digunakan Ls terbesar : 61.24
L: 122.5
Parameter
p 0.88 0.01578101106
k 30.57 0.55034189182
Ts 61.66 1.10995604317
E 3.54 0.06378702121
g Perjalanan selama 3 detik Xs 61.06 1.09909216200
Ys 3.49 0.06285507267
3.22197422421
Landai relatif
0.00727272727 > 0.007226 …OK!
ung peralihan
3

0.4
ubahan kelandaian
55.556
Tikungan E
DATA PERENCANAAN Kontrol
VR 70 θs 9.61
e maks 0.1 θc 20.00
f maks 0.1465 Lc 62.46 SCS
∆ 39.22
en 0.02
B 3.75
m 137.5
R 179
e 0.098 Cek Ls dengan 4 Metode
Ls Tabel (SS) 60 1. Berdasarkan waktu tempuh di lengkung peralihan
re 0.035 Ls : 58.33 t= 3
Rmin 156.52 2. Berdasarkan landai relatif
1/2 ∆ 19.60905 Ls : 60.84
3. Berdasarkan rumus modifikasi shortt
Keamanan Ls : 58.62 c= 0.4
55.56 4. Berdasarkan tingkat pencapaian perubahan kelandaian
1.71 Ls : 44.44

Kesimpulan
Digunakan Ls terbesar : 60.84
L: 184.1
Parameter
p 0.94 0.01685264487 55.556
k 30.79 0.55427407064
Ts 94.90 1.70814477855
E 12.01 0.21625454922
Xs 60.67 1.09201536198
Ys 3.45 0.06204355808
3.22197422421
Landai relatif 0.06749946000
0.007273 > 0.007273 …OK!

l
TITIK A-B 30.00 OK 416.67 1 9.351946
TITIK B-C 120.78 OK 444.44 2 9.97862
TITIK C-D 120.78 OK 333.33 3 5.36506
TITIK D-E 91.66 OK 594.44 4 9.477685
TITIK E-F 91.66 OK 377.78 5 15.7744
TITIK F-G 30.00 OK 316.67 6 9.400067
7 0

KONTROL OVERLAPPING
VR*1000/3600*3 58.33333

TSB - STC 281.94 OK


TSC - STD 147.57 OK
TSD - STE 437.80 OK
TSE - STF 221.22 OK
Perhitungan STA TIKUNGAN B Tikungan C
skala 55.56 P-B S-C-S P-C S-S
Ls - B 60 m Ls - C 60.84
d Antar Tikungan Lc - B 20.025 m Lc - C 55.143
d A-B 7.5 416.67 Ts - B 71.72 m Ts - C 90.780
d B-C 8.0 444.44
d C-D 6.0 333.33
d D-E 10.7 594.44 Tikungan D Tikungan F
d E-F 6.8 377.78 P-D S-C-S P-F S-C-S
d F-G 5.7 316.67 Ls - D 60 m Ls - F 60
2483.33 Lc - G 62.611 m Lc - F 62.461
Ts - G 94.983 m Ts - F 94.898
sumbu
x y
A 2.1 22.3 Tikungan E
E 9.3 20.1 P-E S-S
F 17.2 21.3 Ls - E 61.24 m
G 22.6 18.4 Lc - E 1.240 m
H 26.7 8.5 Ts - E 61.665 m
I 31.4 3.3
B 37.3 2.4

2.1,22.3
9.3,20.1
17.2,21.3
22.6,18.4
26.7,8.5
31.4,3.3
37.3,2.4
Perhitungan Penyelesaian
sta A 0+ 0.0000
m 344.9467 SCS sta TS-B 0+ 344.9467
m 404.9467 sta CS-B 0+ 404.9467
m 424.9714 sta SC-B 0+ 424.9714
484.9714 sta ST-B 0+ 484.9714
766.9158 SCS sta TS-C 0+ 766.9158
827.7595 sta CS-C 0+ 827.7595
882.9025 sta SC-C 0+ 882.9025
m 943.7462 SCS sta ST-C 0+ 943.7462
m 1091.3168 sta TS-D 0+ 1091.3168
m 1151.3168 sta CS-D 0+ 1151.3168
1213.9273 sta SC-D 1+ 213.9273
1273.9273 SS sta ST-D 1+ 273.9273
1711.7244 sta TS-E 1+ 711.7244
1772.9648 sta S-S 1+ 772.9648
1834.2051 sta ST-E 1+ 834.2051
2055.4205 SCS sta TS-F 1+ 1055.4205
2115.4205 sta CS-F 1+ 1115.4205
2177.8812 sta SC-F 1+ 1177.8812
2237.8812 Ok sta CS-F 2+ 237.8812
2399.6501 Ok sta G 2+ 399.6501
Pelebaran Tikungan
Tikungan B,C,D,E,F
Data
Vr 70 Kecepatan Rencana
Rc 179 Jari jari rencana
n 2 Jumlah Lajur
C 1.25 Diketahui
b 2.5 Diketahui
p 6.5 Diketahui
A 1.5 Diketahui
Bn 7.5 Lebar Lajur

Perhitungan
Ri 177.571 Rumus 178.930
Rw 180.249 Rumus 32464.8878849
B 2.678 Rw-Ri 64
U 0.178 B-b 180.853028835
Z 0.549 Rumus
Bt 8.405 Rumus 100
ΔB 0.905 Tambahan Lebar Tikungan
Perlu Penghalang (m) 7.4643
R 179
Jh 102.27863
Kebebasan Tikungan Sudut pusat lengkung 16.3773916
Tikungan B,C,D,E,F Phi 3.14
Data
Vr 70 Ejh
Rc 179
B 7.5 Kelandaian
fm 0.35 Diket B C D E
L.p 15 Diket 0.015 0.0275 0.05625 0.00661765
Ls
Perhitungan B C D E
Eo 8.900 TABEL 141.712 121.688 184.298 122.481
Jh 103.726 Jh
Lt 223 Lt=Lc+2*Ls B C D E
r' 177.125 R'=Rc+0.25*B 102.279 100.501 96.826 103.541
Jh<Lt Maka: Sudut pusat lengkung
B C D E
16.544 16.256 15.662 16.748
1-COS
B C D E
0.041 0.040 0.037 0.042
E
B C D E
7.332 7.081 6.576 7.513

Aman Aman Aman Aman


Harus di beri rambu
R(1-cos 0)

Ejd

n D1
F B C D E F
0.006617647 65.21413 65.21413 65.21413 65.21413 65.21413
D2
F B C D E F
184.148 193.0432 193.043 193.043 193.043 193.043
D3
F B C D E F
103.541 30.000 30.000 30.000 30.000 30.000
gkung D4
F B C D E F
16.748 128.695 128.695 128.695 128.695 128.695
TOTAL
F 416.953
0.042
B C D E F
F 67.44219 67.44219 67.44219 67.44219 67.44219
7.513 1-COS
B C D E F
Aman 0.616 0.616 0.616 0.616 0.616
SIN
B C D E F
0.923493 0.923493 0.923493 0.923493 0.923493
Jd-Lt
B C D E F
137.620 147.633 116.327 147.236 116.402
E
B C D E F
236.268 245.515 216.605 245.149 216.674

Tidak Ama Tidak Ama Tidak Ama Tidak Ama Tidak Aman
Harus di beri rambu
T1 3.94
T2 9.92
a 2.304
ELEVASI ELEVASI
PENOMORAN STA JARAK ASLI (m) TANAN ASLI RENCANA AS C (m) S (m)
(m) JALAN (m)
0 0+ 0 0 905 905 0 0.000
1 0+ 100 100 903.8 903.8 0 0.000
2 0+ 200 200 902.6 902.6 0 0.000
3 0+ 300 300 901.3 901.3 0 0.000
4 0+ 400 400 900.1 900.1 0 0.000
5 0+ 416.6 416.6 900 900 0 0.000
6 0+ 500 500 898.4 898.4 0 0.000
7 0+ 600 600 896.6 896.6 0 0.000
8 0+ 694.4 694.4 894.8 894.8 0 0.000
9 0+ 700 700 893.8 893.8 0 0.000
10 0+ 800 800 891.8 891.8 0 0.000
11 0+ 861.1 861.1 890 890 0 0.000
12 0+ 900 900 889 889 0 0.000
13 1+ 0 1000 886.5 886.5 0 0.000
14 1+ 61.1 1061.1 885 885 0 0.000
15 1+ 100 1100 883.2 883.98 -0.78 1.282
16 1+ 194.4 1194.4 879 882.07 -3.07 0.326
17 1+ 200 1200 879.1 882.07 -2.97 0.337
18 1+ 261.1 1261.1 880 882.07 -2.07 0.483
19 1+ 300 1300 880 882.07 -2.07 0.483
20 1+ 338.9 1338.9 880 882.07 -2.07 0.483
21 1+ 400 1400 882.1 883.177 -1.077 0.929
22 1+ 483.3 1483.3 885 885 0 0.000
23 1+ 500 1500 885.2 885.2 0 0.000
24 1+ 600 1600 886.8 886.8 0 0.000
25 1+ 700 1700 888.5 888.5 0 0.000
26 1+ 788.8 1788.8 890 890 0 0.000
27 1+ 800 1800 890 890 0 0.000
28 1+ 900 1900 890 890 0 0.000
29 1+ 1000 2000 890 890 0 0.000
30 2+ 100 2100 890 890 0 0.000
31 2+ 166.6 2166.6 890 890 0 0.000
32 2+ 200 2200 890.9 890.1 0.8 1.250
33 2+ 300 2300 893.8 892.3 1.5 0.667
34 2+ 344.4 2344.4 895 893.28 1.72 0.581
35 2+ 400 2400 895 893.28 1.72 0.581
36 2+ 483.3 2483.3 895 893.28 1.72 0.581
LUAS, A VOLUME VOLUME
(m) GALIAN (m3) TIMBUNAN (m3)
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 3517.546
6.630 0.000 17998.750
26.095 0.000 30660.248
25.245 0.000 25704.000
17.595 0.000 22189.055
17.595 0.000 22873.500
17.595 0.000 17907.453
9.154 0.000 6408.150
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 0.000 0.000
0.000 7366.440 0.000
6.800 21505.000 0.000
12.750 31475.500 0.000
14.620 34275.128 0.000
14.620 35088.000 0.000
14.620 18152.923 0.000
Galian Timbunan
TOTAL 147862.991 147258.702
SELISIH 604.289
PV1
VR 70
Jd 450 G1 G2
Jh 92.5 X 416.67 277.78
g1 -1.1999904001 Y1 905 900
g2 -1.7999856001 Y2 900 895

Perhitungan Cembung
A 0.59999520004 0.5999952
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 58.333333333
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 30.0 -
4 L berdasarkan JPH Jh<Lv 10.8 tidak Ok
Jh>Lv -504.6 Ok
5 L berdasarkan JPM Jd<Lv 144.6 tidak Ok
Jd>Lv -500.0 Ok
Dipilih Lv yang Ok dan Terbesar 42.0
Ev 0.031499748
x 21
y 0.031499748

Data Stationing Data Elevasi


Sta PV1 416.67 Elevasi PLV1 900
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 395.67 Elevasi PLV1 900.252
Sta A1 406.17 Elevasi A1 900.126
Sta PPV1 416.67 Elevasi PPV1 899.9685
Sta B1 427.17 Elevasi B1 899.811
Sta PTV1 437.67 Elevasi PTV1 899.622

PV3
VR 70
Jd 450 G1 G2
Jh 92.5 X 166.67 200
g1 -2.9999400012 Y1 895 890
g2 -2.5 Y2 890 885

Perhitungan Cekung
A -0.4999400012 0.49994
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 6.281297451
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 25.0 -
4 L berdasarkan JPH Jh<Lv 9.0 tidak Ok
Jh>Lv -612.6 Ok
5 L berdasarkan JPM Jd<Lv 120.5 tidak Ok
Jd>Lv -780.2 Ok
Dipilih Lv yang Ok dan Terbesar 25.0
Ev 0.0156212503
x 12.49850003
y 0.0156212503

Data Stationing Data Elevasi


Sta PV1 861.12 Elevasi PLV1 890
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 848.62149997 Elevasi PLV1 890.37495
Sta A1 854.870749985 Elevasi A1 890.18747
Sta PPV1 861.12000 Elevasi PPV1 889.98438
Sta B1 867.369250015 Elevasi B1 889.84377
Sta PTV1 873.61850003 Elevasi PTV1 889.68754

PV5
VR 70
Jd 450 G1 G2
Jh 92.5 X 136 144.5
g1 -0.9852941176 Y1 883.12 881.78
g2 0 Y2 881.78 881.78

Perhitungan Cekung
A -0.9852941176 0.9852941
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 12.37933635
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 49.3 -
4 L berdasarkan JPH Jh<Lv 17.8 tidak Ok
Jh>Lv -295.8 Ok
5 L berdasarkan JPM Jd<Lv 237.5 tidak Ok
Jd>Lv 47.5 Ok
Dipilih Lv yang Ok dan Terbesar 49.3
Ev 0.06067528114
x 24.6323529412
y 0.06067528114

Data Stationing Data Elevasi


Sta PV1 1197.12 Elevasi PLV1 881.78
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 1172.48764706 Elevasi PLV1 882.0227
Sta A1 1184.80382353 Elevasi A1 881.90135
Sta PPV1 1197.12000 Elevasi PPV1 881.71932
Sta B1 1209.43617647 Elevasi B1 881.78
Sta PTV1 1221.75235294 Elevasi PTV1 881.78

PV7
VR 70
Jd 450 G1 G2
Jh 92.5 X 144.5 305.5
g1 0.92733564014 Y1 881.78 883.12
g2 2.25204582651 Y2 883.12 890

Perhitungan Cekung
A -1.3247101864 1.3247102
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 16.643794649
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 66.2 -
4 L berdasarkan JPH Jh<Lv 23.9 tidak Ok
Jh>Lv -172.6 Ok
5 L berdasarkan JPM Jd<Lv 319.3 tidak Ok
Jd>Lv 265.9 Ok
Dipilih Lv yang Ok dan Terbesar 42.0
Ev 0.06954728478
x 21
y 0.06954728478

Data Stationing Data Elevasi


Sta PV1 1486.12 Elevasi PLV1 883.12
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 1465.12 Elevasi PLV1 882.92526
Sta A1 1475.62 Elevasi A1 883.02263
Sta PPV1 1486.12000 Elevasi PPV1 883.05045
Sta B1 1496.62 Elevasi B1 883.35646
Sta PTV1 1507.12 Elevasi PTV1 883.59293

PV9
VR 70
Jd 450 G1 G2
Jh 92.5 X 378 178.77
g1 0 Y1 890 890
g2 1.82357218773 Y2 890 893.26
Perhitungan Cekung
A -1.8235721877 1.8235722
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 22.911548
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 91.2 -
4 L berdasarkan JPH Jh<Lv 32.9 tidak Ok
Jh>Lv -74.8 Ok
5 L berdasarkan JPM Jd<Lv 439.6 tidak Ok
Jd>Lv 439.4 Ok
Dipilih Lv yang Ok dan Terbesar 22.9
Ev 0.05222607714
x 11.4557739998
y 0.05222607714

Data Stationing Data Elevasi


Sta PV1 2169.62 Elevasi PLV1 890
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 2158.164226 Elevasi PLV1 890
Sta A1 2163.892113 Elevasi A1 890
Sta PPV1 2169.62000 Elevasi PPV1 889.94777
Sta B1 2175.347887 Elevasi B1 890.10445
Sta PTV1 2181.075774 Elevasi PTV1 890.2089
PV2
VR 70
Jd 450 G1 G2
Jh 92.5 X 277.78 166.67
g1 -1.7999856 Y1 900 895
g2 -2.99994 Y2 895 890

Perhitungan Cembung
A 1.199954401 1.199954
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 58.33333
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 60.0 -
4 L berdasarkan JPH Jh<Lv 21.7 tidak Ok
Jh>Lv -234.8 Ok
5 L berdasarkan JPM Jd<Lv 289.3 tidak Ok
Jd>Lv 200.0 Ok
Dipilih Lv yang Ok dan Terbesar 60.0
Ev 0.08999316
x 29.99886003
y 0.08999316

Data Stationing Data Elevasi


Sta PV1 694.45 Elevasi PLV1 895
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 664.45114 Elevasi PLV1 895.54
Sta A1 679.45057 Elevasi A1 895.27
Sta PPV1 694.45 Elevasi PPV1 894.91
Sta B1 709.44943 Elevasi B1 894.55
Sta PTV1 724.44886 Elevasi PTV1 894.1001

PV4
VR 70
Jd 450 G1 G2
Jh 92.5 X 200 136
g1 -2.5 Y1 890 885
g2 -2.36764706 Y2 885 881.78

Perhitungan Cekung
A -0.13235294 0.132353
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 1.662896
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 6.6 -
4 L berdasarkan JPH Jh<Lv 2.4 tidak Ok
Jh>Lv -3394.4 Ok
5 L berdasarkan JPM Jd<Lv 31.9 tidak Ok
Jd>Lv -5446.7 Ok
Dipilih Lv yang Ok dan Terbesar 42.0
Ev 0.006948529
x 21
y 0.006948529

Data Stationing Data Elevasi


Sta PV1 1061.12 Elevasi PLV1 885
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 1040.12 Elevasi PLV1 885.525
Sta A1 1050.62 Elevasi A1 885.2625
Sta PPV1 1061.12000 Elevasi PPV1 884.9931
Sta B1 1071.62 Elevasi B1 884.7514
Sta PTV1 1082.12 Elevasi PTV1 884.5028

PV6
VR 70
Jd 450 G1 G2
Jh 92.5 X 144.5 144.5
g1 0 Y1 881.78 881.78
g2 0.92733564 Y2 881.78 883.12

Perhitungan Cekung
A -0.92733564 0.927336
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 11.65114
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 46.4 -
4 L berdasarkan JPH Jh<Lv 16.7 tidak Ok
Jh>Lv -325.9 Ok
5 L berdasarkan JPM Jd<Lv 223.6 tidak Ok
Jd>Lv -5.8 Ok
Dipilih Lv yang Ok dan Terbesar 46.4
Ev 0.053746962
x 23.183391
y 0.053746962

Data Stationing Data Elevasi


Sta PV1 1341.62 Elevasi PLV1 881.78
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 1318.436609 Elevasi PLV1 881.78
Sta A1 1330.028304 Elevasi A1 881.78
Sta PPV1 1341.62000 Elevasi PPV1 881.7263
Sta B1 1353.211696 Elevasi B1 881.8875
Sta PTV1 1364.803391 Elevasi PTV1 881.995

PV8
VR 70
Jd 450 G1 G2
Jh 92.5 X 305.5 378
g1 2.252045827 Y1 883.12 890
g2 0 Y2 890 890

Perhitungan Cembung
A 2.252045827 2.252046
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 58.33333
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 112.6 -
4 L berdasarkan JPH Jh<Lv 40.7 tidak Ok
Jh>Lv -25.4 Ok
5 L berdasarkan JPM Jd<Lv 542.9 Ok
Jd>Lv 527.0 tidak Ok
Dipilih Lv yang Ok dan Terbesar 40.7
Ev 0.114498211
x 20.33674628
y 0.114498211

Data Stationing Data Elevasi


Sta PV1 1791.62 Elevasi PLV1 890
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 1771.283254 Elevasi PLV1 889.542
Sta A1 1781.451627 Elevasi A1 889.771
Sta PPV1 1791.62000 Elevasi PPV1 889.8855
Sta B1 1801.788373 Elevasi B1 890
Sta PTV1 1811.956746 Elevasi PTV1 890

PV10
VR 70
Jd 450 G1 G2
Jh 92.5 X 178.77 139
g1 1.823572188 Y1 890 893.26
g2 0 Y2 893.26 893.26
Perhitungan Cembung
A 1.823572188 1.823572
Lv Keterangan
1 L berdasarkan kenyamanan pengemudi 58.33333
2 L berdasarkan keluesan bentuk 42.0 -
3 L berdasarkan syarat drainase 91.1786 -
4 L berdasarkan JPH Jh<Lv 32.9350 tidak Ok
Jh>Lv -74.8 Ok
5 L berdasarkan JPM Jd<Lv 439.6112 tidak Ok
Jd>Lv 439.4 Ok
Dipilih Lv yang Ok dan Terbesar 58.3
Ev 0.132968805
x 29.16666667
y 0.132968805

Data Stationing Data Elevasi


Sta PV1 2348.39 Elevasi PLV1 893.26
Perhitungan Stationing Perhitungan Elevasi
Sta PLV1 2319.223333 Elevasi PLV1 892.7281
Sta A1 2333.806667 Elevasi A1 892.9941
Sta PPV1 2348.39000 Elevasi PPV1 893.127
Sta B1 2362.973333 Elevasi B1 893.26
Sta PTV1 2377.556667 Elevasi PTV1 893.26