BAB IV

ANALISA DAN DESAIN

4.1.Hitungan Kapasitas Tiang Tunggal


4.1.1 Kapasitas Tiang Berdasarkan Data Laboratorium
a) Menghitng Nilai (Qu) berdasarkan cara (Poulus dan Davis)
1. Menghitng Nilai γsat,γb, γ’
 Pada kedalaman 1.5 m - 3 m
Diketahui :
w = 20.62%
Gs = 2.60
γw = 9.81 kN/m3

e = w x Gs
= 20.62% x 2,60
= 0.5361
( ) ( )
kN/m3

( )

γ’ = γsat - γw

Perhitungan Selanjutnya di tabelkan

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


108
Tabel 4.1 Nilai γsat,γb, γ’

Kedalaman γw γb γsat
(m) N w (%) Gs e (kN/m3) (kN/m3) (kN/m3) γ' (kN/m3)
0-1.5 8 20.62 2.60 0.5361 9.81
1.5-3 12 20.62 2.60 0.5361 9.81 20.0280
3-3.8 16 23.62 2.57 0.6070 9.81 19.3939
3.8-4.5 16 23.62 2.57 0.6070 9.81 19.3939 9.5839
4.5-6.5 18 24.52 2.54 0.6228 9.81 19.1194 9.3094
6.5-8.5 28 26.72 2.58 0.6894 9.81 18.9849 9.1749
8.5-10.5 14 26.62 2.53 0.6735 9.81 18.7789 8.9689
10.5-12 10 30.02 2.55 0.7655 9.81 18.4225 8.6125
12-14 11 31.42 2.59 0.8138 9.81 18.4097 8.5997
14-16 4 32.72 2.59 0.8474 9.81 18.2529 8.4429
16-18 3.5 30.82 2.60 0.8013 9.81 18.5236 8.7136
18-20 9 31.92 2.63 0.8395 9.81 18.5028 8.6928
20-22 21 33.52 2.55 0.8548 9.81 18.0081 8.1981
22-24 20 60.12 2.70 1.6232 9.81 16.1674 6.3574
24-26 11 31.62 2.66 0.8411 9.81 18.6551 8.8451
26-28 50 29.82 2.59 0.7723 9.81 18.6107 8.8007
28-30 50 35.82 2.66 0.9528 9.81 18.1491 8.3391

Tabel 4.2 Nilai Kd . tg.δ

Kedalaman ϕ = ϕ'
N-SPT ϕ' = 3/4.ϕ'+10° Kd.tg.δ
(m) (DATA II)
0-1.5 8
1.5-3 12 15.32 21.4900 1
3-4.5 16 25.92 29.4400 1.07
4.5-6.5 18 28.82 31.6150 1.17
6.5-8.5 28 22.22 26.6650 1
8.5-10.5 14 34.82 36.1150 1.51
10.5-12 10 24.42 28.3150 1.02
12-14 11 29.22 31.9150 1.19
14-16 4 28.42 31.3150 1.14
16-18 3.5 23.2 27.4000 1
18-20 9 13.52 20.1400 1
20-22 21 26.82 30.1150 1.1
22-24 20 12.32 19.2400 1
24-26 11 15.52 21.6400 1
26-28 50 25.92 29.4400 1.07
28-30 50 17.22 22.9150 1

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


109
Dari N yang telah diketahui, dapat di peroleh ϕ dari data II. Hitungan ϕ
untuk memperoleh Kd.tg.δ diperlihatkan dalam tabel. Dimisalkan dulu
kedalaman kritis Zc < 6 m, dengan φ’ = 21.490°,dari gambar grafik di
peroleh Zc/d = 5 atau Zc = 5 x 0.6 = 3 m < 6 m, sehingga asumsi adalah
benar.

Tekanan Overburden pada Zc ≥ 3m :


Po’ = γb . h
= (3)
= 60.0839 kN/m2
Nilai ini digunakan pada hitungan-hitungan tekanan gesek tiang pada Zc ≥ 3
m dan tahanan ujung tiang yaitu :
Pb’ = Po’ = 60.0839 kN/m2

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


110
2. Menghitung Tahanan Ujung Ultimit (Qb)
Qb dihitung dengan memperhatikan kenaikan φ’
φ’ = ½ (φ1’ + 40)
= ½ (22.915 + 40)
= 31.4575°
L = 30 m ; d = 0.6 m
L/d = 30/0.6 = 50
dari gambar grafik diperoleh :

Gambar 2.15 Hubungan Nq dan φ (Berezantsev, 1961)


Dari gambar 2.15 diperoleh:
φ’= 31.4575° = L/d 20 = 24.5
φ’= 31.4575° = L/d 70 = 15
φ’= 31.4575° = L/d 50 = 33

Ab = ¼ x π x d2
= ¼ x π x (0.6)2
= 0.2827 m2

Qb = Ab x Pb’ x Nq
= 0.2827 x 60.0839 x 33
= 560.5283 kN

cek terhadap Batasan tahanan ujung satuan maksimum (fb = Qb/Ab)


fb = < 15000 (OK!)

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


111
3. Menghitung Tahanan Gesek Ultimit (Qs)
Menghitung Nilai luas selimut tiang (As)
Diketahui : D (rencana) = 0.6 m ( tiang direncanakan berbentuk bulat)
Mencari keliling ( K ) :
𝐾 πd
= π.(0.6)
=1.8850 m
Mencari luas selimut tiang :
𝐴𝑠 𝐾𝑥𝑡

Dimana : K = keliling alas lingkaran


T = Tinggi tiang

Tabel 4.3 Nilai Luas Selimut setiap Lapisan (As)

Keliling
Kedalaman Tinggi Luas selimut
tiang πd
(m) tiang (m) tiang As (m²)
(m)
0-1.5 1.5 1.8850 2.8275
1.5-3 1.5 1.8850 2.8275
3-4.5 1.5 1.8850 2.8275
4.5-6.5 2 1.8850 3.7700
6.5-8.5 2 1.8850 3.7700
8.5-10.5 2 1.8850 3.7700
10.5-12 1.5 1.8850 2.8275
12-14 2 1.8850 3.7700
14-16 2 1.8850 3.7700
16-18 2 1.8850 3.7700
18-20 2 1.8850 3.7700
20-22 2 1.8850 3.7700
22-24 2 1.8850 3.7700
24-26 2 1.8850 3.7700
26-28 2 1.8850 3.7700
28-30 2 1.8850 3.7700

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


112
Tabel 4.4 Tahanan Gesek Ultimit (Qs)

Kedalaman, Po' rata-


Z Kd tg δ As =kel O rata Qs
(m) 2 (kN/m2)
(m ) (kN)
0-1.5 1 2.8275 30.0420 84.9436
1.5-3 1 2.8275 60.0839 169.8872
3-4.5 1.07 2.8275 60.0839 181.7793
4.5-6.5 1.17 3.7700 60.0839 265.0241
6.5-8.5 1 3.7700 60.0839 226.5163
8.5-10.5 1.51 3.7700 60.0839 342.0396
10.5-12 1.02 2.8275 60.0839 173.2850
12-14 1.19 3.7700 60.0839 269.5544
14-16 1.14 3.7700 60.0839 258.2286
16-18 1 3.7700 60.0839 226.5163
18-20 1 3.7700 60.0839 226.5163
20-22 1.1 3.7700 60.0839 249.1679
22-24 1 3.7700 60.0839 226.5163
24-26 1 3.7700 60.0839 226.5163
26-28 1.07 3.7700 60.0839 242.3724
28-30 1 3.7700 60.0839 226.5163
56.5500 Σ 3595.3800

Cek terhadap Batasan tahanan gesek satuan maksimum (fs < 107 kN/m2)
Fs = ( ) < 107 (ok)

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


113
4. Menghitung Kapasitas Ultimit Netto (Qu)

Wp = L x Wtiang
= 30 x (Ab x γbeton)
= 30 x (0.2827 x 24)
= 203.5440 kN

Qu = Qb + Qs - Wp
Qu = 560.5283 + 3595.3800 – 203.544
= 3592.3643 kN

b) Menghitng Nilai (Qu) berdasarkan (US Army cara Brom)


Menghitng Nilai γsat,γb, γ’
w = 20.62%
Gs = 2,60
γw = 9,81 kN/m3

e = w x Gs
= 20.62% x 2,60
= 0.5361
( ) ( )
kN/m3
( )

γ’ = γsat - γw
Perhitungan Selanjutnya di tabelkan

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


114
Tabel 4.5 Nilai γsat,γb, γ’

Kedalaman γw γb γsat
(m) N w (%) Gs e (kN/m3) (kN/m3) (kN/m3) γ' (kN/m3)
0-1.5 8 20.62 2.60 0.5361 9.81
1.5-3 12 20.62 2.60 0.5361 9.81 20.0280
3-3.8 16 23.62 2.57 0.6070 9.81 19.3939
3.8-4.5 16 23.62 2.57 0.6070 9.81 19.3939 9.5839
4.5-6.5 18 24.52 2.54 0.6228 9.81 19.1194 9.3094
6.5-8.5 28 26.72 2.58 0.6894 9.81 18.9849 9.1749
8.5-10.5 14 26.62 2.53 0.6735 9.81 18.7789 8.9689
10.5-12 10 30.02 2.55 0.7655 9.81 18.4225 8.6125
12-14 11 31.42 2.59 0.8138 9.81 18.4097 8.5997
14-16 4 32.72 2.59 0.8474 9.81 18.2529 8.4429
16-18 3.5 30.82 2.60 0.8013 9.81 18.5236 8.7136
18-20 9 31.92 2.63 0.8395 9.81 18.5028 8.6928
20-22 21 33.52 2.55 0.8548 9.81 18.0081 8.1981
22-24 20 60.12 2.70 1.6232 9.81 16.1674 6.3574
24-26 11 31.62 2.66 0.8411 9.81 18.6551 8.8451
26-28 50 29.82 2.59 0.7723 9.81 18.6107 8.8007
28-30 50 35.82 2.66 0.9528 9.81 18.1491 8.3391

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


115
Dengan memperhatikan kisaran nilai N SPT antara 5-27 (lihat tabel 4.5),
maka tanah di lapangan termasuk dalam pasir tidak padat, sehingga
kedalaman kritis Zc nya :
Zc = 15d = 15 x 0.6 = 9 m

 Tekanan overburden pada Z = 3 m


Po’ = γb.ℎ1
= x3
= 60.0839 kN/m2

 Tekanan overburden pada Z = 3,8 m


Po’ = γb.ℎ1 + γb.ℎ2
=( ).(3)+(19.3939).(0.8)
= 75.5990 kN/m2

 Tekanan overburden pada Z = 4,5 m

Po’ = γb.ℎ1 + γb.ℎ2 + γ’.h3

=( ).(3)+(19.3939).(0.8)+(9.5839).(0.7)

= 82.3077 kN/m2

 Tekanan overburden pada Z = 6,5 m

Po’ = γb.ℎ1 + γb.ℎ2 + γ’.h3+ γ’.h4

=( ).(3)+(19.3939).(0.8)+(9.5839).(0.7)+(9.3094).(2)

= 100.9266 kN/m2

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


116
 Tekanan overburden pada Z = 8,5 m

Po’ = γb.ℎ1 + γb.ℎ2 + γ’.h3+ γ’.h4 + γ’.h5

=( ).(3)+(19.3939).(0.8)+(9.5839).(0.7)+ (9.3094).(2) +
(9.1749).(2)

= 119.2763 kN/m2

 Tekanan overburden pada Z = 9 m

Po’ = γb.ℎ1 + γb.ℎ2 + γ’.h3+ γ’.h4 + γ’.h5 + γ’.h5

=( ).(3)+(19.3939).(0.8)+(9.5839)(.0.7)+(9.3094).(2) +
(9.1749).(2)+(8.9689).(0.5)

= 123.7608 kN/m2

1. Menghitung Tahanan Gesek Ultimit (Qs)


Metode US Army didasarkan pada nilai-nilai pada pendekatan dari δ dan Kd
yang diperoleh dari tabel-tabel berikut :
Tabel 4.6 Nilai-nilai δ (US Army Corps)
Bahan Tiang δ
Tiang Baja 0.67φ'-0.83φ'
Tiang Beton 0.90φ'-1.00φ'
Tiang Kayu 0.80φ'-1.00φ'
Tabel 4.7 Nilai Kd dan Kt (US Army Corps)
Tanah Kd (tiang tekan) Kt (tiang tarik)
Pasir 1.0-2.0 0.5-0.7
Lanau 1.0 0.5-0.7
Lempung 1.0 0.7-1.0
Tabel 4.8 Nilai Kd untuk tiang pancang pada tanah granuler (Mansur dan Hunter, 1970)
Bahan Tiang Kd
Tiang baja H 1.40-1.90
Tiang pipa baja 1.00-1.30
Tiang beton pracetak 1.45-1.60
Uji tarik tiang (8 tiang) untuk seluruh tipe tiang 0.40-0.90
 Untuk tiang beton, dari tabel 4.6
δ = 0.09 ϕ’ – 1.00 ϕ’ , diambil 0.95 ϕ’

Menurut Tabel 4.7, nilai Kd untuk pasir adalah 1.0 – 2.0 .


Dengan mempertimbangkan pula nilai Kd dalam table untuk tiang beton
dalam pasir , maka Kd antara 1.45-1.6 (tergantung kepadatan pasir),

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


117
Tabel 4.9 Nilai δ dan nilia Kd tg δ

Kedalaman φ' = φ Kd tg
N Kd δ
(m) (°) δ
0-1.5 8
1.5-3 12 15.32 1.4700 14.5540 0.3816
3-4.5 16 25.92 1.5407 24.6240 0.7062
4.5-6.5 18 28.82 1.5600 27.3790 0.8079
6.5-8.5 28 22.22 1.5160 21.1090 0.5852
8.5-10.5 14 34.82 1.6000 33.0790 1.0422
10.5-12 10 24.42 1.5307 23.1990 0.6560
12-14 11 29.22 1.5627 27.7590 0.8225
14-16 4 28.42 1.5573 26.9990 0.7935
16-18 3.5 23.20 1.5225 22.0400 0.6164
18-20 9 13.52 1.4580 12.8440 0.3324
20-22 21 26.82 1.5467 25.4790 0.7370
22-24 20 12.32 1.4500 11.7040 0.3004
24-26 11 15.52 1.4713 14.7440 0.3872
26-28 50 25.92 1.5407 24.6240 0.7062
28-30 50 17.22 1.4827 16.3590 0.4352

Qs = Σ As . (Kd tg δ) Po’

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


118
Tabel 4.10 Tahanan gesek ultimit tiang (Data Laboratorium)

Kedalaman Po' z As Qs
Kd tg δ 2 2
(m) (kN/m ) (m) (m ) (kN)
0-1.5 0.0000 30.042 1.5 2.8275 0.0000
1.5-3 0.3816 60.0839 1.5 2.8275 64.8368
3-3.8 0.7062 75.5990 0.8 1.5080 80.5038
3.8-4.5 0.7062 82.3077 0.7 1.3195 76.6918
4.5-6.5 0.8079 100.9266 2 3.7700 307.4012
6.5-8.5 0.5852 119.2763 2 3.7700 263.1701
8.5 - 9 1.0422 123.7608 0.5 0.9425 121.5659
9 -10.5 1.0422 123.7608 1.5 2.8275 364.6978
10.5-12 0.6560 123.7608 2 3.7700 306.0813
12-14 0.8225 123.7608 2 3.7700 383.7475
14-16 0.7935 123.7608 2 3.7700 370.2142
16-18 0.6164 123.7608 2 3.7700 287.5895
18-20 0.3324 123.7608 2 3.7700 155.1032
20-22 0.7370 123.7608 2 3.7700 343.8804
22-24 0.3004 123.7608 2 3.7700 140.1536
24-26 0.3872 123.7608 2 3.7700 180.6614
26-28 0.7062 123.7608 2 3.7700 329.4755
28-30 0.4352 123.7608 2 3.7700 203.0641
Σ 57.4925 3978.8378

Cek terhadap Batasan tahanan gesek maksimum (fs = Qs/As , dipilih nilai yang terbesar).
Tomlinson menyarankan tahanan gesek dibatasi maksimum 107 kN/m2

fs = < 107 (OK)

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


119
2. Menghitung Tahanan Ujung Ultimit (Qb)
Pada ujung tiang nilai sudut gesek dalam ϕ = 17.22°, maka dari grafik berikut
diperoleh nilai Nq = 6

Gambar 2.23 Hubungan ϕ dan Nq (Reese et al., 2006)


Ab = ¼ x π x d2
= ¼ x π x (0,6)2
= 0.2827 m2
Tekanan overburden pada ujung tiang (kedalaman 30 m) (Pb’) adalah
123.7608 kN/m2, sehingga
Qb = Ab x Pb’ x Nq
= 0.2827 x 123.7608 x 6
= 209.9230 kN
Cek tahanan ujung satuan maksimum (fb = Qb/Ab), dimana tahanan ujung
maksimum fmax = 15000 kN/m2
fb = < 15000 (OK)

3. Menghitung Kapasitas Ultimit Netto (Qu)

Wp = L x Wtiang
= 30 x (Ab x γbeton)
= 30 x (0.2827 x 24)
= 203.544 kN

Qu = Qb + Qs - Wp
Qu = 209.9230 + 3978.8378 – 203.544
= 3985.2168 kN

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


120
4.1.2 Kapasitas Tiang Berdasarkan Data Lapangan (Uji N-SPT)
1. Menghitung Tahanan Ujung Ultimit (Qb)
fb = 0,4 N60 (L/d) δr < 4 N60 δr
diketahui : N60 = 50 (diperoleh dari data N-SPT)
L = 30 m
d = 0,6 m
δr = 100 kN/m2 ( tegangan refrensi )
fb = 0,4 (50) (30/0,6) (100) < 4 (50) (100)
100000 > 20000
Digunakan yang terkecil, fb =20000 kN/m2
Qb = fb Ab
= (20000) (0.2827)
= 5654 kN

2. Menghitung Tahanan Gesek Dinding


fs = 1/50 N60 δr
Qs = ∑ fs As = ∑ (1/50 N60 δr ) As

Tabel 4.11 Perhitungan nilai Qs uji SPT

Kedalaman As Z Qs
No N δr
(m) (m2) (m) (kN)
1 0-1.5 8 100 1.8850 1.5 45.2400
2 1.5-3 12 100 1.8850 1.5 67.8600
3 3-4.5 16 100 1.8850 1.5 90.4800
4 4.5-6.5 18 100 1.8850 2 135.7200
5 6.5-8.5 28 100 1.8850 2 211.1200
6 8.5-10.5 14 100 1.8850 2 105.5600
7 10.5-12 10 100 1.8850 1.5 56.5500
8 12-14 11 100 1.8850 2 82.9400
9 14-16 4 100 1.8850 2 30.1600
10 16-18 3.5 100 1.8850 2 26.3900
11 18-20 9 100 1.8850 2 67.8600
12 20-22 21 100 1.8850 2 158.3400
13 22-24 20 100 1.8850 2 150.8000
14 24-26 11 100 1.8850 2 82.9400
15 26-28 50 100 1.8850 2 377.0000
16 28-30 50 100 1.8850 2 377.0000
TOTAL 2065.9600

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


121
3. Berat sendiri tiang
d = 0.6 m
L = 30 m
γbeton = 24 kN/m3
Wp = d2 L γbeton
= (0,6)2 (30) (24)
= 259.20 kN

4. Kapasitas dukung ultimit tiang (Qu)


Qu = Qb + Qs – Wp
= 5654 + 2065.9600 - 259.20
= 7460.76 kN
Kesimpulan :
Dari perhitungan kapasitas dukung ultimit tiang tunggal didapatkan:
a. Berdasarkan data Laboratorium
 Cara (Poulus dan Davis), Qu = 3592.3643 kN
 (US Army cara Brom), Qu = 3985.2168 kN
b. Berdasarkan data Lapangan (Metode SPT), Qu = 7460.76 kN
Dalam perhitungan selanjutnya digunakan nilai Qu yang terkecil dari data Lapangan yaitu
sebesar 3592.3643 kN.

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


122
4.2.Hitungan Kapasitas Tiang Kelompok
4.2.1 Kapasitas Kelompok dan Efisiensi Tiang
1. Menghitung kapasitas dukung ijin tiang
Qa = kN

2. Efisiensi tiang kelompok


Jumlah tiang = 25 tiang
Agar ekonomis, Terzaghi dan peck (1948) menyarankan jarak tiang
sebaiknya < 2.5d, sehingga digunakan jarak tiang sebesar
s = 2.5 (d) = 2.5 (0.6) = 1,5 m
Efisiensi :
( ) ( )
Eg = 1 - θ
θ = arc tg
= arc tg
=21,8014˚
m=5
n’ = 5
s = 1.5 m
d = 0.6 m

( ) ( )
Eg = 1- 21,8014 ( )( )
= 0.612
Qgroup = Eg n Qa
= 0.612 (25) ( )
= 27481.5877 kN

Cek beban V < Qgroup


15200 kN < 27481.5877 kN (Aman)

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


123
4.2.2 Hitungan Perancangan Kelompok Tiang
1. Analisis gaya-gaya bekerja pada tiang
Q= + +

 Menentukan titik pusat berat satuan kelompok tiang


Karena susunan tiang simetris, maka titik pusat berat susunan tiang :
X= = 3.60 m
Y= = 3.60 m

 Tinjauan terhadap gaya-gaya yang bekerja


Diketahui :
- Beban Vertikal (V) = 15200 kN
T poer : 1 m
Beban poer (P)
P =TxLxB
= 1 x (7.2) x (7.2) x (24)
= 1244.16 kN
Sehingga ;
∑V = V + P
= 15200 + 1244.16
= 16444.16 kN

- Momen
My = 6500 kNm
Momen akibat gaya horizontal (H) = 5500 kN
z=1m
My2 = H x h
= 5500 (1)
= 5500 kNm
∑My = My1 + My2
= 6500 + 5500
= 12000 kNm

Mx = 7000 kNm
Momen akibat gaya horizontal (H) = 5500 kN
z=1m
Mx2 = H x h
= 5500 (1)
= 5500 kNm
∑Mx = Mx1 + Mx2
= 7000 + 5500
= 12500 kNm

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


124
 Menentukan letak koordinat titik pusat tiang terhadap titik (0)

Tabel 4.12 Letak koordinat titik pusat setiap tiang terhadap titik O

xi yi
NO
(m) (m)
1 -3.0 3.0
2 -1.5 3.0
3 0 3.0
4 1.5 3.0
5 3.0 3.0
6 -3.0 1.5
7 -1.5 1.5
8 0 1.5
9 1.5 1.5
10 3.0 1.5
11 -3.0 0
12 -1.5 0
13 0 0
14 1.5 0
15 3.0 0
16 -3.0 -1.5
17 -1.5 -1.5
18 0 -1.5
19 1.5 -1.5
20 3.0 -1.5
21 -3.0 -3.0
22 -1.5 -3.0
23 0 -3.0
24 1.5 -3.0
25 3.0 -3.0

∑ X2 = 5(-3)2 + 5(-1.5)2 + 5(0)2 +5(1.5)2 + 5(3)2


= 112.5 m
∑ Y = 5(-3)2 + 5(-1.5)2 + 5(0)2 + 5(0)2 +5(1.5)2 + 5(3)2
2

= 112.5 m
 Mencari beban yang didukung setiap tiang
Q=

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


125
Tabel 4.13 Perhitungan beban yang didukung setiap tiang

xi yi ∑V ∑My ∑Mx Q
NO n ∑x² ∑y²
(m) (m) (kN.m) (kN.m) (kN)
1 -3.0 3.0 16444.16 25 12000 12500 112.5 112.5 671.0997
2 -1.5 3.0 16444.16 25 12000 12500 112.5 112.5 831.0997
3 0 3.0 16444.16 25 12000 12500 112.5 112.5 991.0997
4 1.5 3.0 16444.16 25 12000 12500 112.5 112.5 1151.1
5 3.0 3.0 16444.16 25 12000 12500 112.5 112.5 1311.1
6 -3.0 1.5 16444.16 25 12000 12500 112.5 112.5 504.4331
7 -1.5 1.5 16444.16 25 12000 12500 112.5 112.5 664.4331
8 0 1.5 16444.16 25 12000 12500 112.5 112.5 824.4331
9 1.5 1.5 16444.16 25 12000 12500 112.5 112.5 984.4331
10 3.0 1.5 16444.16 25 12000 12500 112.5 112.5 1144.433
11 -3.0 0 16444.16 25 12000 12500 112.5 112.5 337.7664
12 -1.5 0 16444.16 25 12000 12500 112.5 112.5 497.7664
13 0 0 16444.16 25 12000 12500 112.5 112.5 657.7664
14 1.5 0 16444.16 25 12000 12500 112.5 112.5 817.7664
15 3.0 0 16444.16 25 12000 12500 112.5 112.5 977.7664
16 -3.0 -1.5 16444.16 25 12000 12500 112.5 112.5 171.0997
17 -1.5 -1.5 16444.16 25 12000 12500 112.5 112.5 331.0997
18 0 -1.5 16444.16 25 12000 12500 112.5 112.5 491.0997
19 1.5 -1.5 16444.16 25 12000 12500 112.5 112.5 651.0997
20 3.0 -1.5 16444.16 25 12000 12500 112.5 112.5 811.0997
21 -3.0 -3.0 16444.16 25 12000 12500 112.5 112.5 4.433067
22 -1.5 -3.0 16444.16 25 12000 12500 112.5 112.5 164.4331
23 0 -3.0 16444.16 25 12000 12500 112.5 112.5 324.4331
24 1.5 -3.0 16444.16 25 12000 12500 112.5 112.5 484.4331
25 3.0 -3.0 16444.16 25 12000 12500 112.5 112.5 644.4331
Max 1311.1

Kontrol terhadap kapasitas dukung izin


Qmax < Qa
1311.1 kN < kN ( Aman )

4.3.Hitungan Defleksi dan Penurunan


4.3.1 Tiang Tunggal
 Analisa Defleksi
Diketahui :
f’c = 25 MPa
d= 0.6 m

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


126
Sehingga
Modulus elastisitas tiang beton (Ep)
Ep = 4700√
= 4700 √
= 23500 MPa
= 23500000 kN/m2
Momen inersia penampang ( Ip)
Ip =
( )( )
=
= 0,0108 m

Tabel 4.14 Nilai-nilai untuk tanah granuler (c=0)

Kerapatan Relatif (Dr) Tidak Padat Sedang Padat


Interval A 100-300 300-1000 1000-2000
Nilai A dipakai 200 600 1500
nh pasir kering atau lembab
2425 7275 19400
(Terzaghi) (kN/m3)
nh pasir terendam air (kN/m3)
1386 4850 11779
Terzaghi
Reese, dkk. 5300 16300 34000

Tabel 4.15 Hubungan kerapatan relatif (Dr) dan sudut geser dalam tanah pasir
dari
penyelidikan di lapangan (Mayerhof, 1956)

Nilai Sudut
Nilai SPT Tahanan gesek
Kerapatan
Kondisi kerucut statis, dalam
Relatif
sondir, CPT,
(N) (ϕ)
qc (kg/cm2)
Sangat
< 0.2 <4 < 0.4 < 30°
Tidak Padat
Tidak Padat 0.2-0.4 4-10 20-40 30°-50°
Agak Padat 0.4-0.6 10-30 40-120 35°-40°
Padat 0.6-0.8 30-50 120-200 40°-45°
Sangat
> 0.8 > 50 > 200 > 45°
Padat

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


127
Tabel 4.16 Nilai nh

Kedalaman
Z (m) N Kepadatan nh (kN/m3) nh x Z
(m)
0-1.5 1.5 8 Tidak Padat 2425 3637.5
1.5-3 1.5 12 Agak Padat 7275 10912.5
3-4.5 1.5 16 Agak Padat 4850 7275
4.5-6.5 2 18 Agak Padat 4850 9700
6.5-8.5 2 28 Agak Padat 4850 9700
8.5-10.5 2 14 Agak Padat 4850 9700
10.5-12 1.5 10 Agak Padat 4850 7275
12-14 2 11 Agak Padat 4850 9700
14-16 2 4 Tidak Padat 4850 9700
Sangat Tidak
2 3.5 1386 2772
16-18 Padat
18-20 2 9 Tidak Padat 1386 2772
20-22 2 21 Agak Padat 4850 9700
22-24 2 20 Agak Padat 4850 9700
24-26 2 11 Agak Padat 4850 9700
26-28 2 50 Padat 11779 23558
28-30 2 50 Padat 11779 23558
30 Σ 159360

̅̅̅̅ =
=
= 5312 kN/m3

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


128
 Cek terhadap tiang pendek atau tiang panjang
α =( ) 1/5

= (( )( )
)1/5
= 0.4615

αL = 0.4615 (30)
= 13.845 > 4 (Termasuk Tiang Pancang)

 Sehingga untuk tiang jepit yang termasuk tiang pancang, digunakan rumus
defleksi sebagai berikut :
Yo = ⁄ ( ) ⁄
( )
=( ) ⁄ )( )) ⁄
((
= 0.2051 < 1 (OK)

 Analisa Penurunan
Diketahui:
∑V = 16444.16 kN
n = 25 tiang
d = 0.6 m
Ep = kN/m2
h = 30 m
Beban pertiang (Q) =
=
= 657.7664 kN/tiang

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


129
Tabel 4.17 Jenis Tanah

Kedalaman
Jenis Tanah
(m)
0-1.5 Pasir berlanau
1.5-3 Pasir kerikilan
3-4.5 Pasir berlanau
4.5-6.5 Pasir berlanau
6.5-8.5 Pasir bergradasi buruk
8.5-10.5 Pasir bergradasi buruk
10.5-12 Pasir bergradasi buruk
12-14 Pasir bergradasi buruk
14-16 Pasir bergradasi buruk
16-18 Pasir kelanauan
18-20 lanau kepasiran
20-22 Pasir kelanauan
lempung kelanauan plastisitas
22-24 tinggi
24-26 Lanau berpasir plastisitas sedang
26-28 Pasir kelanauan
28-30 Lanau berpasir plastisitas rendah

 Lapisan II (1.5 m – 3 m) (pasir kerikilan)


h = 30 m
L = 30 m
d = 0.6 m
= 15.32˚
Untuk pasir berkerikil ( Bowless, 1977)
Es = 500 kg/cm2 = 49034.030 kN/m2
μ = 0.15
L/d = 30/0.6 = 50
db/d = 1
h/L = 1

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


130
FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)
131
 Dari grafik penurunan Io ( poulus & Davis, 1980 ) diperoleh :

Dengan nilai L/d = 50 dan db/d =1 didapatkan nilai Io = 0,045


K =
=
= 479.2590

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


132
 Dari grafik koreksi kompresi Rk ( Poulus & Davis, 1980 ) diperoleh :

Dengan nilai L/d = 50 dan K = 479.2590 diperoleh nilai Rk = 2.2

 Dari grafik koreksi angka poisson Rμ ( Poulus & Davis, 1980 ) diperoleh:

Dengan nilai μ = 0.15 dengan K= 479.2590, maka diperoleh Rμ dengan


interpolasi:
K Rμ
100 0.92
479.2581 Rμ
500 0.89
Rμ = ( ) ( )
= 0.8916

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


133
 Dari grafik koreksi kedalaman Rh ( Poulus & Davis, 1980 ) diperoleh

Dengan nilai h/L = 1 dan L/d = 50 , maka diperoleh nilai Rh = 0.43


sehingga :
I = Io.Rk.Rh.Rμ
= 0.045 (2.2) (0.43) (0.892)
= 0.0371
S =
( )( )
= ( )( )
= 8.2946 x 10-4 m
Perhitungan selanjutnya ditabelkan !

4.3.2 Tiang Kelompok

Penurunan :
( )
( )
( ( ) )
( )
0.006686 m
6.6867 mm

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


134
4.4. Desain dan Perancangan
Direncanakan tiang pancang pada kedalaman 30 m, diperoleh data sebagai berikut :

 Banyak tiang = 25 tiang


 Jarak antar tiang horizontal = 1.5 m
 Jarak antar tiang vertical = 1.5 m
 Jarak tepi ke tepi = 0.6 m
 Kapasitas dukung ultimate tiang tuggal (Qu) = 3592.3643 kN
 Kapasitas dukung ijin tiang tunggal (Qa) = kN
 Kapasitas dukung ultimit tiang grup (Qu) group = 27481.5877kN
 Kapasitas dukung ijin tiang grup (Qa) group = kN
 Efisensi tiang kelompok = 0.612
 Defleksi tiang = 0.2051 m
 Penurunan tiang tunggal (S) = m
 Penurunan kelompok tiang (Sg)= 0.006686 m

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


135
BAB V

PENUTUP

5.1. Kesimpulan
Dari hasil analisis data diperoleh kesimpulan bahwa :
1. Untuk pondasi telapak tunggal berbentuk lingkaran, diperoleh data :
 Untuk data laboratorium dengan menggunakan metode Poulus dan Davis (Qu) =
3592.3643 kN
 Untuk data laboratorium dengan menggunakan metode US Army (Qu) = 3985.2168
kN
 Untuk data lapangan dengan menggunakan uji SPT (Qu) = 7460.76 kN

Pada pondasi tiang berbentuk lingkaran dengan kedalaman 30 m dengan d = 0.6 m.


Pada tiang tunggal didapat kapasitas dukung ultimit adalah (Qu) adalah = 3592.3643
kN, Kapasitas dukung ijin tiang tunggal (Qa) adalah = kN. Sedangkan,
pada kapasitas dukung ultimit tiang kelompok (Qu group) adalah 18321.0584 kN.
Kapasitas dukung ijin tiang kelompok (Qa group) adalah kN dan
penurunan kelompok tiang (Sg) adalah 0.006686 m dan defleksi tiang 0.2051 m.

5.2. Saran
1. Pengolahan data baik laboratorium, SPT dan data sondir diperlukan ketelitian
2. Penggunaan rumus-rumus perhitungan sesuai dengan jenis tanah pada lebih
diperhatikan dan lebih teliti dalam penggunaannya.

FARAH DHIYAH ALFINI SARNYOTO (F1A 019 052)


136