RAB Waterboom
RAB Waterboom
( RAB )
1070 2490
± 1.00
1800
SELUNCURAN 1
KOLAM ORANG
DEWASA
± 2.00
WATER PARK
- 0.70
Caf'e
- 0.05
SELUNCURAN 2
Loket
± 0.00
PEKERJAAN : WATERBOOM
LOKASI : Jl. SOEKARNO- HATTA , KEL. KOTARAJA, KEC. ENDE UTARA, KAB. ENDE
PEMILIK : …………………….
PERENCANA
TAHUN 2023
Confidential 3/3/2023 Page 1
PEMBANGUNAN : WATERBOOM
LOKASI : Jl. SOEKARNO- HATTA , KEL. KOTARAJA, KEC. ENDE UTARA, KAB. ENDE
PEMILIK : ….........................
TAHUN ANGGARAN : 2023
A MATERIAL
Jumlah A 858,817,000.00
B PINTU JENDELA
Jumlah A 58,826,000.00
RAB W aterboom
Confidential 3/3/2023 Page 2
C LISTRIK
Jumlah D 35,540,000.00
D SANITAIR
Jumlah D 72,180,000.00
Jumlah 1,025,363,000.00
E TENAGA KERJA
RAB W aterboom
Confidential 3/3/2023 Page 1
PONDASI MENERUS
Panjang Pondasi = 164.50
Lebar Atas Pondasi = 0.30 Pondasi = 74.025 m3
Lebar Bawah Pondasi = 0.60
Tinggi Pondasi = 1.00
DINDING BATAKO
Panjang Dinding = 164.50
Tinggi Dinding = 3.00 Luas Dinding = 296.100 m2 12.00 3,500.00 Buah
Asumsi Dinding = 60%
Footplat FP1
Panjang Footplat = 1.00 SKETSA
Lebar Footplat = 1.00 Beton = 2.800
Tinggi Footplat = 0.20
Jumlah Footplat = 14.00 3.733
Jarak Tulangan Bawa = 0.12 1 Batang = 12.00 M1
Jarak Tulangan Atas = 0.12
Jarak Tulangan Tengah = 0.20
Jumlah Tulangan Dalam Footplat = 29.33
Panjang Tulangan = 1.40 = 0.888 Kg/m 1 Btg = 10.66 Kg
Total Tulangn 1 Footplat = 41.07
Tulangan Diameter 12 = 574.93 48.00 = 574.933 x 0.89 = 510.54 = 47.91 di bulatkan 48 Batang Dia 12
= 510.54 Kg
RAB Waterboom
Confidential 3/3/2023 Page 2
Kolom K2 15/15
Panjang Kolom = 0.15 SKETSA
Lebar Kolom = 0.12 Beton = 1.008 m3
Tinggi Kolom = 3.50
Jumlah Kolom = 16.00 Begisiting = 30.240 m2
Jumlah Tulangan Dalam Kolom = 4.00 1 Batang = 12.00 M1
= 0.888 Kg/m 1 Btg = 10.66 Kg
Panjang Sengkang + Sengkang Tengah = 0.50 24.00 Sengkang/1 Batang Besi = 0.222 Kg/m 1 Btg = 2.66 Kg
Jarak Sengkang = 0.12
Jumlah Sengkang = 31.67
Tulangan Diameter 12 = 32.00 Batang = 32.000 x 0.89 = 28.42 = 2.67 di bulatkan 32 Batang Dia 12
Tulangan Diameter 6 = 22.00 506.67 = 22.000 x 0.22 = 4.88 = 1.83 di bulatkan 22 Batang Dia 6
= 33.30 Kg
Kolom K1 30/30
Panjang Kolom = 0.30 SKETSA
Lebar Kolom = 0.30 Beton = 7.560 m3
Tinggi Kolom = 6.00
Jumlah Kolom = 14.00 Begisiting = 100.800 m2
Jumlah Tulangan Dalam Kolom = 8.00 1 Batang = 12.00 M1
= 1.579 Kg/m 1 Btg = 18.94 Kg
Panjang Sengkang + Sengkang Tengah = 1.05 15.00 Sengkang/1 Batang Besi = 0.395 Kg/m 1 Btg = 4.74 Kg
Jarak Sengkang = 0.12
Jumlah Sengkang = 46.00
Tulangan Diameter 16 = 56.00 Batang = 56.000 x 1.58 = 88.41 = 4.67 di bulatkan 56 Batang Dia 16
Tulangan Diameter 8 = 43.00 644.00 = 43.000 x 0.39 = 16.97 = 3.58 di bulatkan 43 Batang Dia 8
= 105.38 Kg
Sloof 2 15/20
Tinggi Sloof = 0.20 SKETSA
Lebar Sloof = 0.15 Beton = 3.270 m3
Panjang Sloof = 109.00
Jumlah Sloof = 1.00 Begisiting = 76.300 m2
Jumlah Tulangan Dalam Sloof = 4.00 1 Batang = 12.00 M1
Persambungan dan Engkolan = 4.00 = 0.888 Kg/m 1 Btg = 10.66 Kg
Panjang Sengkang + Sengkang Tengah = 0.60 20.00 Sengkang/1 Batang Besi = 0.222 Kg/m 1 Btg = 2.66 Kg
Jarak Sengkang = 0.12 10.00 Batang/Tulangan
Jumlah Sengkang = 908.33
Tulangan Diameter 12 = 40.00 Batang = 40.000 x 0.89 = 35.52 = 3.33 di bulatkan 40 Batang Dia 12
Tulangan Diameter 6 = 45.42 908.33 = 45.417 x 0.22 = 10.08 = 3.78 di bulatkan 45 Batang Dia 6
= 45.60 Kg
RAB Waterboom
Confidential 3/3/2023 Page 3
Sloof 1 20/25
Tinggi Sloof = 0.25 SKETSA
Lebar Sloof = 0.20 Beton = 2.775 m3
Panjang Sloof = 55.50
Jumlah Sloof = 1.00 Begisiting = 49.950 m2
Jumlah Tulangan Dalam Sloof = 6.00 1 Batang = 12.00 M1
Persambungan dan Engkolan = 4.00 = 0.888 Kg/m 1 Btg = 10.66 Kg
Panjang Sengkang + Sengkang Tengah = 0.88 13.00 Sengkang/1 Batang Besi = 0.222 Kg/m 1 Btg = 2.66 Kg
Jarak Sengkang = 0.12 5.00 Batang/Tulangan
Jumlah Sengkang = 462.50
Tulangan Diameter 12 = 30.00 Batang = 30.000 x 0.89 = 26.64 = 2.50 di bulatkan 30 Batang Dia 12
Tulangan Diameter 6 = 35.58 462.50 = 35.577 x 0.22 = 7.90 = 2.96 di bulatkan 36 Batang Dia 6
= 34.54 Kg
RAB Waterboom
Confidential 3/3/2023 Page 4
Slab 3
Panjang Slaab = 15.00 SKETSA
Lebar Slaab = 1.00 Beton = 1.500 m3
Tinggi Slaab = 0.10
Jumlah Slaab = 1.00 Begisting = 15.000 m2
Jarak Tulangan Bawa = 0.12 1 Batang = 12.00 M1
Jarak Tulangan Atas = -
Jarak Tulangan Tengah = -
Jumlah Tulangan Panjang = 125.00 Mtr 0.395 Kg/m 1 Btg = - Kg
Jumlah Tulangan Lebar = 125.00 Mtr
Sambungan dan engkolan = 72.00 Mtr
Total Tulangn Slaab = 322.00
Tulangan Diameter 8 = 644.00 2 lapis = 644.000 x 0.39 = 254.17 = 53.67 di bulatkan 54 Batang Dia 8
= 254.17 Kg
= 254.17 Kg
Slab 2
Panjang Slaab = 86.00 SKETSA
Lebar Slaab = 1.00 Beton = 12.900 m3
Tinggi Slaab = 0.15
Jumlah Slaab = 1.00 Begisting = 86.000 m2
Jarak Tulangan Bawa = 0.10 1 Batang = 12.00 M1
Jarak Tulangan Atas = -
Jarak Tulangan Tengah = -
Jumlah Tulangan Panjang = 860.00 Mtr 0.617 Kg/m 1 Btg = - Kg
Jumlah Tulangan Lebar = 860.00 Mtr
Sambungan dan engkolan = 72.00 Mtr
Total Tulangn Slaab = 1,792.00
Tulangan Diameter 10 = 3,584.00 2 lapis = 3,584.000 x 0.62 = 2,210.13 = 298.67 di bulatkan 299 Batang Dia 10
= 2,210.13 Kg
= 2,210.13 Kg
RAB Waterboom
Confidential 3/3/2023 Page 5
Slab 1
Panjang Slaab = 414.00 SKETSA
Lebar Slaab = 1.00 Beton = 62.100 m3
Tinggi Slaab = 0.15
Jumlah Slaab = 1.00 Begisting = 414.000 m2
Jarak Tulangan Bawa = 0.12 1 Batang = 12.00 M1
Jarak Tulangan Atas = -
Jarak Tulangan Tengah = -
Jumlah Tulangan Panjang = 3,450.00 Mtr 1.042 Kg/m 1 Btg = - Kg
Jumlah Tulangan Lebar = 3,450.00 Mtr
Sambungan dan engkolan = 72.00 Mtr
Total Tulangn Slaab = 6,972.00
Tulangan Diameter 13 = 13,944.00 2 lapis = 13,944.000 x 1.04 = 14,531.97 = ####### di bulatkan 1162 Batang Dia 13
= 14,531.97 Kg
= 14,531.97 Kg
TOTAL BACK UP
RAB Waterboom