OUTLINE

INTRODUCTION HOISTING ROTATING CIRCULATING BOP SYSTEM POWER SYSTEM PROBLEM


SYSTEM SYSTEM SYSTEM
INTRODUCTION
• STRUKTUR INI TERLETAK ± 7 KM SEBELAH TENGGARA
STRUKTUR GANTAR DAN ± 8 KM KE ARAH BARAT LAUT
LAPANGAN PASIR CATANG DAN TUGU BARAT.
• JENIS PEMBORAN SUMUR ADALAH BERARAH
(DIRECTIONAL) DENGAN RENCANA KEDALAMAN AKHIR
2399 MMD/ 1900 MBPL DAN DIHARAPKAN MENEMBUS
TOP LAYER-L DI DI KEDALAMAN SEKITAR 1735 MBPL DAN
KOLOM MINYAK PADA 1816 MBPL/2285 MMD.
• PEMBORAN SUMUR “X2” BERTUJUAN UNTUK
MENAMBAH TITIP SERAP HIDROKARBON PADA LAPISAN
RESERVOIR DARI BATUGAMPING LAYER-L PADA FORMASI
CIBULAKAN ATAS (CBA).
5 SYSTEM PEMBORAN

HOISTING
SYSYTEM

POWER ROTATING
SYSTEM SYSTEM

BOP SYSTEM CIRCULATING


SYSTEM
HOISTING SYSTEM

STRUKTUR PENDUKUNG (SUPPORTING STRUCTURE)


- DRILLING TOWER - SUBSTRUCTURE
- RIG FLOOR
PERALATAN ANGKAT (HOISTING EQUIPMENT)

• DRAWWORK • DRILLING LINE


• ELEVATOR
• TRAVELING BLOCK
• CROWN BLOCK
ROTATING SYSTEM
• TOP DRIVE
CIRCULATING SYSTEM
• LUMPUR PENGEBORAN (DRILLING FLUID) • PREPARATION AREA
• CONDITIONING AREA/SOLID CONTROL
EQUIPMENT
1. SHALE SHAKER 2. DEGASSER
• DESANDER • DESILTER
• MUD CLEANER
BOP SYSTEM
• ANNULAR • RAM PREVENTER
• DRILLING SPOOLS • ACCUMULATOR UNIT
• CHOKE MANIFOLD
POWER SYSTEM

• GENERATOR
PROBLEM
• PACK OFF