OLEH : - FRANSISKUS ELFREN PANINGO (1501473) - REZA APRIANUS MALIA (1501328) PEMBIMBING LAPANGAN : - ANANG D. P. - BRIAN R. A. OUTLINE
INTRODUCTION HOISTING ROTATING CIRCULATING BOP SYSTEM POWER SYSTEM PROBLEM
SYSTEM SYSTEM SYSTEM INTRODUCTION • STRUKTUR INI TERLETAK ± 7 KM SEBELAH TENGGARA STRUKTUR GANTAR DAN ± 8 KM KE ARAH BARAT LAUT LAPANGAN PASIR CATANG DAN TUGU BARAT. • JENIS PEMBORAN SUMUR ADALAH BERARAH (DIRECTIONAL) DENGAN RENCANA KEDALAMAN AKHIR 2399 MMD/ 1900 MBPL DAN DIHARAPKAN MENEMBUS TOP LAYER-L DI DI KEDALAMAN SEKITAR 1735 MBPL DAN KOLOM MINYAK PADA 1816 MBPL/2285 MMD. • PEMBORAN SUMUR “X2” BERTUJUAN UNTUK MENAMBAH TITIP SERAP HIDROKARBON PADA LAPISAN RESERVOIR DARI BATUGAMPING LAYER-L PADA FORMASI CIBULAKAN ATAS (CBA). 5 SYSTEM PEMBORAN