Tujuan:
– untuk mengetahui Well Loss
– untuk mengetahui Produktifitas dan Efisiensi
Sumur
05/07/2020
Step Drawdown Test
• Sumur dipompa dengan debit yang kecil hingga
drawdown stabil, kemudian debit pompa dinaikkan
setahap demi setahap dengan prosedur yang sama.
• Penurunan dapat dihitung (Jacob, 1947):
sw BQ CQ 2
B = B1(rew,t) + B2
B1(rew,t) = koefisien linear aquifer
loss
B2 = koefisien linear well loss
C = koefisien non-linear well loss
rew = radius efektif sumur
rw = radius sumur
t = waktu pemompaan
05/07/2020
Produktivitas dan efisiensi dapat
dihitung :
Produktivitas sumur
dan akuifer: Q/sw
Efisiensi sumur :
B1Q
Ew P
x100%
( B1 B2 )Q CQ
05/07/2020
Metode Hantush-Bierschenk
Cara Kerja:
• Plot drawdown vs waktu (semilog scale)
• Catat drawdown equilibrium (s) pada setiap Q
05/07/2020
CONTOH
Step drawdown test data ‘well 1’ :
Time in minutes Step-2 Step-3 Step-4 Step-5 Step-6
Step-1
from beginning of Q = 1693 Q = 2423 Q = 3261 Q = 4094 Q = 5019
Q = 1306 m3/day
step m3/day m3/day m3/day m3/day m3/day
t (minutes) S (m) S (m) S (m) S (m) S (m) S (m)
1 - 5.458 8.17 10.881 15.318 20.036
2 - 5.529 8.24 11.797 15.494 20.248
3 - 5.564 8.346 11.902 15.598 20.389
4 - 5.599 8.451 12.008 15.74 20.529
5 1.303 5.634 8.486 12.078 15.846 20.6
6 2.289 5.669 8.557 12.149 15.881 20.66
7 3.117 5.669 8.557 12.149 15.952 20.741
8 3.345 5.705 8.592 12.184 16.022 20.811
9 3.486 5.74 8.672 12.219 16.022 20.882
10 3.521 5.74 8.672 12.325 16.093 20.917
12 3.592 5.81 8.663 12.36 16.198 20.952
14 3.627 5.81 8.698 12.395 16.268 21.022
16 3.733 5.824 8.733 12.43 16.304 21.128
18 3.768 5.845 8.839 12.43 16.374 21.163
20 3.836 5.81 8.874 12.501 16.409 21.198
25 3.873 5.824 8.874 12.508 16.586 21.304
30 4.014 5.824 8.979 12.606 16.621 21.375
35 3.803 5.881 8.979 12.712 16.691 21.48
40 4.043 5.591 8.994 12.747 16.726 21.551
45 4.261 5.591 9.05 12.783 16.776 21.619
50 4.261 6.092 9.05 12.818 16.797 21.656
55 4.19 6.092 9.12 12.853 16.902
60 4.12 6.176 9.12 12.853 16.938 21.663
70 4.12 6.162 9.155 12.888 16.973 21.691
80 4.226 6.176 9.191 12.923 17.079 21.762
90 4.226 6.169 9.191 12.994 17.079 21.832
100 4.226 6.169 9.226 12.994 17.114 21.903
120 4.402 6.176 9.261 13.099 17.219 22.008
150 4.402 6.374 9.367 13.205 17.325 22.184
180 4.683 6.514 9.578 13.24 17.395 22.325
05/07/2020
Plot drawdown (s) Vs waktu (t) pada kertas
semilog scale.
Graphic of Step Drawdown Pumping Test
25
20
s (meters)
15
10
0
1E+00 1E+01 1E+02 1E+03 1E+04
t (minutes)
drawdown (s) = Δh
05/07/2020
Catat drawdown equilibrium (s) pada setiap Q
Graphic of Step Drawdown Pumping Test
25
20 s6∆
s (meters)
15 s5 ∆
s4 ∆
10
s3∆
5 s2 ∆
s1 ∆
0
1E+00 1E+01 1E+02 1E+03 1E+04
t (minutes)
Graphic of Q Vs s/Q
s/Q (m day/m3)
0.0050
0.0045
0.0040
0.0035
0.0030
0.0025
0.0020
0.0015
0.0010
0.0005
0.0000
1000 1500 2000 2500 3000 3500 4000 4500 5000 5500
Q (m3/day)
Graphic of Q Vs s/Q
s/Q (m day/m3)
0.0050
0.0045
0.0040
0.0035
0.0030
0.0025
0.0020
0.0015 B = 0.003
0.0010
0.0005
0.0000
1000 1500 2000 2500 3000 3500 4000 4500 5000 5500
Q (m3/day)
Graphic of Q Vs s/Q
s/Q (m day/m3)
0.0050
0.0045
0.0040
0.0035
0.0030
0.0025 C = 0.0046 – 0.0040 / 5000 – 3250
0.0020 C = 3.42857 x 10-7
0.0015 B = 0.003
0.0010
0.0005
0.0000
1000 1500 2000 2500 3000 3500 4000 4500 5000 5500
Q (m3/day)
05/07/2020
Berdasarkan atas perhitungan tabel diatas, maka dapat diketahui karakteristik sumur
pada Well-1, yaitu :
05/07/2020