Pekerjaan Pengerukan
Kolam Pelabuhan Tanjung Perak
Surabaya 2023
DATA UMUM PROYEK
3,133%
1,34 % 76,546%
66,13 % 81,596%
64,28 % +5,050%
-1,85 %
2,712%
4,69 % 73,413%
61,27 % 79,746%
62,94 % +6,333%
1,68 %
KURVA S REALISASI
MINGGU KE- 12
KONTRAK ADDENDUM - I MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24
NO URAIAN PEKERJAAN KETERANGAN
BOBOT BOBOT 8/5/2023 8/12/2023 8/19/2023 8/26/2023 9/2/2023 9/9/2023 9/16/2023 9/23/2023 9/30/2023 10/7/2023 10/14/2023 10/21/2023 10/28/2023 11/4/2023 11/11/2023 11/18/2023 11/25/2023 12/2/2023 12/9/2023 12/16/2023 12/23/2023 12/30/2023 1/6/2024 1/13/2024
VOLUME SATUAN VOLUME SATUAN
(%) (%) 8/11/2023 8/18/2023 8/25/2023 9/1/2023 9/8/2023 9/15/2023 9/22/2023 9/29/2023 10/6/2023 10/13/2023 10/20/2023 10/27/2023 11/3/2023 11/10/2023 11/17/2023 11/24/2023 12/1/2023 12/8/2023 12/15/2023 12/22/2023 12/29/2023 1/5/2024 1/12/2024 1/19/2024
M
II PEKERJAAN SURVEI HIDROGRAFI
1 In Survey 1.00 Kali 0.03 1.00 Kali 0.03 0.032
2 Check Survey 2.00 Kali 0.06 2.00 Kali 0.06 0.032
- 0.027
3 Out Survey 1.00 Kali 0.03 1.00 Kali 0.03 0.029
1
III PEK.ADMINISTRASI DAN DOKUMENTASI
1 Administrasi dan Dokumentasi 1.00 Ls 0.005 1.00 Ls 0.01 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0%
JUMLAH 100.00 100.00
RENCANA PROGRES PER MINGGU %= 2.91 5.01 6.24 6.09 6.24 6.24 6.24 6.24 6.27 6.00 6.00 3.78 4.87 4.87 4.87 4.89 3.27 3.27 3.27 3.27 3.27 1.43 1.43 0.0002 0.03 RENCANA
KONTRAK+AD
RENCANA PROGRES KOMULATIF %= - 2.91 7.92 14.16 20.25 26.49 32.73 38.97 45.21 51.48 57.48 57.48 61.27 66.13 71.00 75.86 80.76 84.03 87.30 90.57 93.84 97.11 98.54 99.97 99.97 100.00 D1
AKTUAL PROGRES KERJA %= 3.86 6.70 2.59 7.71 7.42 11.95 6.44 5.16 4.18 3.11 3.11 4.69 1.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PROGRESS
REALISASI PROGRES KERJA KOMULATIF %= - 3.86 10.56 13.15 20.86 28.28 40.23 46.67 51.83 56.01 59.12 59.12 62.94 64.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SURVEY
SELISIH (DEVIASI) MINGGUAN %= 0.95 2.64 -1.01 0.61 1.79 7.50 7.71 6.62 4.53 1.64 1.64 1.68 -1.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
AKTUAL PROGRES KERJA ADDENDUM - I %= 0.00 4.69 1.34 PROGRESS
REALISASI PROGRES KERJA KOMULATIF ADDENDUM - I ADDENDUM - I %= - 0.00 62.94 64.28 SURVEY
SELISIH (DEVIASI) MINGGUAN ADDENDUM - I %= 0.00 1.68 -1.85 ADD - I
WEEKLY PROGRESS
MINGGU KE- 12
I PEKERJAAN KERUK
1 Alur masuk kolam Dermaga Berlian -11 mLWS 112,820.07 m3 15.16 126,888.85 m3 15.72 - - - - - -
2 Turning Basin & Area Keselamatan -11 mLWS 359,226.45 m3 48.27 440,264.66 m3 54.55 341,565.73 42.32 9,520.61 1.18 351,086.34 43.50
3 Kolam Dermaga Berlian Timur (Kade 40-783) -11 mLWS 236,737.71 m3 31.81 206,418.96 m3 25.58 153,915.63 19.07 1,012.88 0.13 154,928.51 19.20
4 Kolam Dermaga Berlian Barat (Kade 0-250) -10 mLWS 683.76 m3 0.09 7,122.61 m3 0.88 3,141.49 0.39 259.05 0.03 3,400.54 0.42
5 Kolam Dermaga Berlian Barat (Kade 250-550) -8 mLWS 4,786.54 m3 0.64 1,338.70 m3 0.17 79.31 0.01 - - 79.31 0.01
6 Kolam Dermaga Nilam Multipurpose -9 mLWS 21,939.17 m3 2.95 22,210.98 m3 2.75 8,818.59 1.09 - - 8,818.59 1.09
7 Kolam Dermaga Jamrud Utara -10 mLWS 7,080.59 m3 0.95 1,882.10 m3 0.23 - - - - - -
1 Alur masuk kolam Dermaga Berlian -11 mLWS 112,820.07 126,888.85 126,888.85 - - - 0.00%
2 Turning Basin & Area Keselamatan -11 mLWS 359,226.45 440,264.66 89,178.32 341,566 9,520.61 351,086.34 79.74%
3 Kolam Dermaga Berlian Timur (Kade 40-783) -11 mLWS 236,737.71 206,418.96 51,490.45 153,916 1,012.88 154,928.51 75.06%
4 Kolam Dermaga Berlian Barat (Kade 0-250) -10 mLWS 683.76 7,122.61 3,722.07 3,141 259.05 3,400.54 47.74%
5 Kolam Dermaga Berlian Barat (Kade 250-550) -8 mLWS 4,786.54 1,338.70 1,259.39 79 - 79.31 5.92%
6 Kolam Dermaga Nilam Multipurpose -9 mLWS 21,939.17 22,210.98 13,392.39 8,819 - 8,818.59 39.70%
7 Kolam Dermaga Jamrud Utara -10 mLWS 7,080.59 1,882.10 1,882.10 - - - 0.00%
MINGGU KE- 12
PIC/
Status
NO PERMASALAHAN TINDAK LANJUT Penanggung
Open/Closed
Jawab
Pengambilan sampel Jamrud telah Menunggu hasil tes lab ITS estimasi
1. APBS Open
dilakukan pada Jumat, 20 Oktober 2023 2 minggu
Koordinasi dengan pihak TPK Nilam
Penjadwalan Kegiatan Keruk di area
2. dan SPMT terkait penjadwalan PMO & APBS Open
Nilam Curah Cair
kegiatan keruk
Inspeksi diagendakan pada tanggal
3. Inspeksi Kapal TSHD Kalimantan II 10 November 2023 di area dock APBS Open
Rukindo Jakarta
Thank you for Performing the dredging and channel management service with quality of
standard.
Meet the expectation of stakeholders.
your attention Implementing the work quality based on safety and improvement.
Build the work culture based on professionality of employee.
KURVA S RENCANA
KONTRAK ADDENDUM - I MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24
NO URAIAN PEKERJAAN KETERANGAN
BOBOT BOBOT 8/5/2023 8/12/2023 8/19/2023 8/26/2023 9/2/2023 9/9/2023 9/16/2023 9/23/2023 9/30/2023 10/7/2023 10/14/2023 10/21/2023 10/28/2023 11/4/2023 11/11/2023 11/18/2023 11/25/2023 12/2/2023 12/9/2023 12/16/2023 12/23/2023 12/30/2023 1/6/2024 1/13/2024
VOLUME SATUAN VOLUME SATUAN
(%) (%) 8/11/2023 8/18/2023 8/25/2023 9/1/2023 9/8/2023 9/15/2023 9/22/2023 9/29/2023 10/6/2023 10/13/2023 10/20/2023 10/27/2023 11/3/2023 11/10/2023 11/17/2023 11/24/2023 12/1/2023 12/8/2023 12/15/2023 12/22/2023 12/29/2023 1/5/2024 1/12/2024 1/19/2024
M
II PEKERJAAN SURVEI HIDROGRAFI
1 In Survey 1.00 Kali 0.03 1.00 Kali 0.03 0.032
2 Check Survey 2.00 Kali 0.06 2.00 Kali 0.06 0.032
- 0.027
3 Out Survey 1.00 Kali 0.03 1.00 Kali 0.03 0.029
1
III PEK.ADMINISTRASI DAN DOKUMENTASI
1 Administrasi dan Dokumentasi 1.00 Ls 0.005 1.00 Ls 0.01 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0%
JUMLAH 100.00 100.00
RENCANA PROGRES PER MINGGU %= 2.91 5.01 6.24 6.09 6.24 6.24 6.24 6.24 6.27 6.00 6.00 3.78 4.87 4.87 4.87 4.89 3.27 3.27 3.27 3.27 3.27 1.43 1.43 0.0002 0.03 RENCANA
KONTRAK+AD
RENCANA PROGRES KOMULATIF %= - 2.91 7.92 14.16 20.25 26.49 32.73 38.97 45.21 51.48 57.48 57.48 61.27 66.13 71.00 75.86 80.76 84.03 87.30 90.57 93.84 97.11 98.54 99.97 99.97 100.00 D1