Anda di halaman 1dari 9

PEMERINTAH KABUPATEN MOROWALI DAFTAR HADIR KONSULTAN

DINAS PEKERJAAN UMUM DAERAH (DPUD) KAB. MOROWALI


PEKERJAAN : Pengawasan Kegiatan Pembangunan Jalan Ulunambo - Terebino Kec. Menui Kepulauan
KONSULTAN KONTRAK NOMOR TANGGAL : : : CV. LOBO Eng. Consultant 047 /KONT-PWS/DPUD-BK/VII/2010 30 Juli 2010

NO.

NAMA

JABATAN 1 2 3 4 5 6 7 8 9

PERIODE 01 September 2010 S/D 30 September 2010 September 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

KETERANGAN 1 2

I. TENAGA AHLI 1 Muh. Gazali, ST Site Engineer DL= DINAS LUAR

II. TENAGA PENDUKUNG 1 Jerianto, A. Md Inspector

DISETUJUI : PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

DIBUAT OLEH : KONSULTAN PENGAWASAN CV. LOBO Eng. Consultant

LAODE MUH. YANI SAMU, ST, M. Si NIP: 19750930 200212 1 010

MUH. GAZALI, ST Site Engineer

PEMERINTAH KABUPATEN MOROWALI DAFTAR HADIR KONSULTAN


DINAS PEKERJAAN UMUM DAERAH (DPUD) KAB. MOROWALI
PEKERJAAN : KONSULTAN KONTRAK NOMOR TANGGAL : : : CV. LOBO Eng. Consultant 018 /KONT-PRC/DPUD-BK/III/2010 19 MARET 2010

--PerencanaanPengkrikilan Jalan Dalam Kota Mayumba Kec. Mori Atas

NO.

NAMA

JABATAN

PERIODE 19 MARET 2010 S/D 25 MARET 2010 MARET APRIL 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

KETERANGAN 18

I. TENAGA AHLI 1 Muh. Gazali, ST 2 #REF! Ketua Tim/Ahli Perencana Jalan Ahli Teknik Sipil H = HADIR DL= DINAS LUAR

II. TENAGA PENDUKUNG 1 Jerianto, A. Md 2 3 #REF! 0 Juru Gambar Surveyor 1 Surveyor 2

DISETUJUI PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) PERENCANAAN DAN PENGAWASAN

DIBUAT OLEH: KONSULTAN PERENCANA CV. LOBO Eng. Consultant

LAODE MUH. YANI SAMU, ST, MSi NIP: 19750930 200212 1 010

MUH. GAZALI, ST Team Leader

PEMERINTAH KABUPATEN MOROWALI TIME SHEET


DINAS PEKERJAAN UMUM DAERAH (DPUD) KAB. MOROWALI
PEKERJAAN : KONSULTAN KONTRAK NOMOR TANGGAL : : : CV. LOBO Eng. Consultant 047 /KONT-PWS/DPUD-BK/VII/2010 30 Juli 2010

Pengawasan Kegiatan Pembangunan Jalan Ulunambo - Terebino Kec. Menui Kepulauan

NO.

NAMA

JABATAN 1 2 3 4 5 6 7 8 9

PERIODE 01 September 2010 S/D 30 September 2010 September 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

TANDA TANGAN 1 2

I. TENAGA AHLI 1 Muh. Gazali, ST Site Engineer

II. TENAGA PENDUKUNG 1 Jerianto, A. Md Inspector

KETERANGAN : H = HADIR DL= DINAS LUAR

DISETUJUI PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

DIBUAT OLEH: KONSULTAN PENGAWAS CV. LOBO Eng. Consultant

LAODE MUH. YANI SAMU, ST, M. Si NIP: 19750930 200212 1 010

MUH. GAZALI, ST Site Engineer

PEMERINTAH KABUPATEN MOROWALI TIME SHEET


DINAS PEKERJAAN UMUM DAERAH (DPUD) KAB. MOROWALI
PEKERJAAN : KONSULTAN KONTRAK NOMOR TANGGAL : : : CV. LOBO Eng. Consultant 018 /KONT-PRC/DPUD-BK/III/2010 19 MARET 2010

--PerencanaanPengkrikilan Jalan Dalam Kota Mayumba Kec. Mori Atas

NO.

NAMA

JABATAN

PERIODE 19 MARET 2010 S/D 25 MARET 2010 MARET APRIL 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

KETERANGAN 18

I. TENAGA AHLI 1 Muh. Gazali, ST 2 #REF! Ketua Tim/Ahli Perencana Jalan Ahli Teknik Sipil

II. TENAGA PENDUKUNG 1 Jerianto, A. Md 2 3 #REF! 0 Juru Gambar Surveyor 1 Surveyor 2

DISETUJUI PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) PERENCANAAN DAN PENGAWASAN

DIBUAT OLEH: KONSULTAN PERENCANA CV. LOBO Eng. Consultant

LAODE MUH. YANI SAMU, ST, MSi NIP: 19750930 200212 1 010

MUH. GAZALI, ST Team Leader