KONTRAKTOR PELAKSANA :
KONSULTAN SUPERVISI :
Banyak
Lebar Tinggi Total Banyak Total
Sisi
0.55 1 2.53 2 5.060
1 0.55 1 0.55 2 1.100
0.4 1 1.20 1 1.200
0.55 1 2.53 2 5.060
1 0.55 1 0.55 2 1.100
0.4 1 1.20 1 1.200
0.4 1 3.2 1 3.200
2.4 1 12 1 12.000
2.4 1 7.2 1 7.200
0.138 1 1.104 1 1.104
0.138 1 0.966 1 0.966
0.4 1 3.2 1 3.200
0.138 1 1.104 1 1.104
0.138 1 1.242 1 1.242
0.138 1 0.69 1 0.690
0.4 1 3.6 1 3.600
2.65 0.6 1 43.3215 1.5 64.982
2.65 0.6 1 43.3215 1.5 64.982
2.65 0.6 1 43.3215 2 86.643
2.65 0.6 1 43.3215 2 86.643
2.65 0.6 1 43.3215 1.5 64.982
2.65 0.6 1 43.3215 1.5 64.982
0.6 1 6 1 6.000
uk Pembongkarannya)
2 Lantai
Lantai Bawah 50.000 2.400
3 CCSP
Penutup Samping CCSP
Pile Luar 53.000 1.350
pile Dalam 53.000 1.200
Pengurang balok melintang 0.550 0.700
Di sisi CCSP 53.000 0.550
Di atas CCSP(luas trapesium)
Luas 1 dan 2 0.275 0.170 0.200
Luas 3 0.540 0.450 0.200
Lantai Kuping CCSP 53.000 0.138
4 Balok Melintang 0.220 0.550
1.150 0.550
0.180 0.550
7 Penutup Segmen
Balok capping beam 0.600 0.550
0.138 0.550
Balok Memanjang 0.350 0.550
Parafet 0.150 1.500
Lantai 3.000 0.150
TOTAL VOL
PERHITUNGAN
(M2).
Dibuat Oleh,
KONTRAKTOR
CV. SATRIA BAGUS
KONTRAKTOR PELAKSANA :
KONSULTAN SUPERVISI :
Banyak
Lebar Tinggi Total Banyak Total
Sisi
2.4 1 7.2 1 7.200
2.4 1 12 1 12.000
2.4 1 19.2 1 19.200
2.4 1 9.6 1 9.600
2.4 1 12 1 12.000
0.138 1 0.69 1 0.690
0.138 1 1.104 1 1.104
2.4 1 12 1 12.000
2.4 1 7.2 1 7.200
0.138 1 1.104 1 1.104
0.138 1 0.966 1 0.966
2.4 1 19.2 1 19.200
0.138 1 1.104 1 1.104
0.138 1 1.242 1 1.242
0.138 1 0.69 1 0.690
2.4 1 21.6 1 21.600
2.65 0.6 1 43.3215 1.5 64.982
2.65 0.6 1 43.3215 1.5 64.982
2.65 0.6 1 43.3215 2 86.643
2.65 0.6 1 43.3215 2 86.643
2.65 0.6 1 43.3215 1.5 64.982
2.65 0.6 1 43.3215 1.5 64.982
0.6 1 6 1 6.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
uk Pembongkarannya)
1 Saturday, September 28, 2019 Pemasangan Tulangan Pokok Capping Beam (8D19)
2 Sunday, September 29, 2019 Pemasangan Tulangan Sengkang Bawah Capping Beam
3 Monday, September 30, 2019 Pemasangan Tulangan Kuping Capping Beam (12D13)
4 Tuesday, October 01, 2019 Pemasangan Tulangan Pokok Capping Beam (8D19)
5 Wednesday, October 02, 2019 Pemasangan Tulangan Sengkang Atas Capping Beam
Thursday, October 03, 2019 Pemasangan Tulangan Pokok Capping Beam (8D19)
Pemasangan Tulangan Pokok Balok (4D13)
6 Friday, October 04, 2019 Pemasangan Tulangan isian Tiang Pancang
7 Saturday, October 05, 2019 Pemasangan Tulangan Pokok Capping Beam (8D19)
Pemasangan Tulangan Isian Tiang Pancang
8 Sunday, October 06, 2019 Pemasangan Tulangan
9 Monday, October 07, 2019
10 Tuesday, October 08, 2019
11 Wednesday, October 09, 2019
12 Thursday, October 10, 2019
13 Friday, October 11, 2019
14 Saturday, October 12, 2019
15 Sunday, October 13, 2019
16 Monday, October 14, 2019
17 Tuesday, October 15, 2019
18 Wednesday, October 16, 2019 lembur
PERHITUNGAN VOLUME PEKERJAAN
gunan Pengendali Erosi dan Proteksi S. Martapura kota Banjarmasin (lanjutan)
elayan, Kota Banjarmasin
dan Pantai I
naan Jaringan Sumber Air WS. Barito Provinsi Kalimantan Selatan
3/ PJSA WS.BARITO-SP.I/073
77.936.515,00,-
KONTRAKTOR PELAKSA
Keterangan
Capping Beam
No Tulangan Berat
Capping Beam
1 Sengkang Atas 1.808
2 Sengkang Bawah 1.052
3 Tulangan Pokok Balok (8D19) 26.760
4 Tulangan Pokok Balok (4D13) 12.480
5 Tulangan Pokok Kuping (12 D13) 12.480
6 Tulangan Isian Tiang Pancang 26.81
13.38
13.43
CCSp 1711.39 30 meter
Tiang Pancang 570.1432 6 Btitik
796.0303 6 buah balok besar
422.3214 20 meter
776.319 30 meter
4276.204
No Nama Pembesian
Cappinh Beam