TUGAS EKONOMI TEKNIK KIMIA

DISUSUN OLEH: NAMA : AZIZ TANTOWI CARINA EKA PUSPITA M. AMIRULLAH LUBIS WIRDAWATI OVIA YULIANI YULIANTI PERMATASARI RACHMAD ARRIZKI NIKEN PUTERI GUMAY RANNY ANGGRAINI EKA STATISTIKA NIM: 03091403033 03101403019 03101403030 03101403041 03101403044 03101403045 03101403047 03101403049 03101403051 03101403057

JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK UNIVERSITAS SRIWIJAYA 2013

Produksi Para-xylene dari methylation benzene dan toluene 1. Flowsheet dan Alat yang digunakan

Keterangan Flow sheet : 13 dan 14 Heater 15 dan 42 Fluidized bed reactor 18 dan 43 Separator cyclone 19 Heat Exchanger 44 Recovery unit 23 queinch coloumn 27 Solid Concentration Unit 32 Detoluenizer coloumn 26 Pump

2.

Perhitungan Total Capital Investment Perhitungan Harga Peralatan Nilai tukar uang pada 4 Mei 2013 untuk US $ 1.00 adalah sebesar Rp

9.890,00. No. 1 2 3 4 5 6 7 8 9 Nama Alat Heater ( 2 buah ) Reactor (1 buah) Separator Cyclone (2 buah) Heat Exchanger (1 buah) Recovery Unit (buah) Quench Column (1 buah) Solid Concentration Unit (1 buah) Detoluenizer Column (1 buah) Fluidized Bed catalyst (1 buah) Total Harga Satuan US $ 159.468,74 488.600 140.744,84 179.800 104.874,90 95.092,18 106.137,18 190.184,36 193.550,46 1.317.367,43

3.

Reaksi yang terjadi : Produksi para-xylene dari toluen yang direaksikan dengan methanol dibawah kondisi alkilasi. CH3OH(aq) + CH3C6H5(aq) CH3 - C6H4 - CH3 + H2O Methanol + Toluen Paraxylen + air

4. Perhitungan Biaya 4.1. Bahan Baku dan Katalis

Methanol Harga (US $/ kg) = 0,6 Kebutuhan /hari (kg) Biaya / hari (US$) Toluen Harga (US $/ liter) Kebutuhan /tahun (kg) Biaya / tahun (US$) Zeolit (katalis) Harga (US $/ kg) Kebutuhan /tahun (kg) Biaya / tahun (US$) Total Biaya Bahan Baku (US$) 4.2. Perhitungan Harga Tanah Harga tanah /m2 Luas tanah Total Biaya tanah = Rp 25.000,000 = 2000 Ha = Rp 500.125.000.000,00 = US$ 47.630.952,38 4.3. Perhitungan Harga Bangunan Harga bangunan/m2 Luas bangunan Biaya bangunan = Rp.2.500.000,00 = 30.000 m2 = 3 Ha = Rp 75.000.000.000,00 = US$ 7.142.857,14 4.4. Operating Labour Daftar gaji karyawan per bulan dapat dilihat dalam tabel 4.3. berikut ini = 33,33 = 70.000 kg/hari = 2.333.100 = US$ 3.068.100 = 1,5 = 350.000 kg/hari = 525.000 = 350.000 kg/hari = 210.000

Tabel 4.5. Daftar Gaji Karyawan Per Bulan No. 1 2 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 jabatan Dewan Komisaris Direktur Sekretaris Direktur Manager Sekretaris Manager Kepala Bagian Kepala Seksi Supervisor Foreman Operator Kontrol Operator Lapangan Karyawan Dokter Perawat Tukang Pekerja Gudang Pengemudi Security Total jumlah 1 1 1 3 3 7 17 2 16 60 168 31 2 5 8 5 6 16 352 gaji/bulan (Rp) 50.000.000 40.000.000 4.000.000 25.000.000 3.000.000 17.000.000 10.000.000 7.000.000 5.000.000 3.750.000 3.000.000 3.500.000 6.000.000 3.500.000 2.800.000 2.500.000 2.000.000 2.000.000 Total gaji/bulan (Rp) 50.000.000 40.000.000 4.000.000 75.000.000 9.000.000 119.000.000 170.000.000 14.000.000 80.000.000 225.000.000 504.000.000 108.500.000 12.000.000 17.500.000 22.400.000 12.500.000 12.000.000 12.000.000 1.486.900.000

Jumlah gaji karyawan per bulan

= Rp. 1.486.900.000

Jumlah gaji karyawan per tahun + Tunjangan hari raya (13 bulan) Jumlah gaji karyawan pertahun = Rp. 1.486.900.000,00/bulan x 13 bulan/tahun = Rp. 19.329.700.000,00 = US$ 1.840.923,80 4.5. Perhitungan Total Capital Investment (TCI) 1. Total Direct Cost (DC) a. Equipment, Installation dan Investment Purchased Equipment-Delivered (PEC) = US$ 1.317.367,43

Installation, insulation and painting (25% PEC) = US$ Instrumentation and Control (9% PEC) Piping and installed (20% PEC) Electrical and installed (12% PEC) = US$ = US$

329.341,85 118.563,06 263.473.486

= US$ 158.084.091

b. Building d. Land Total Direct Cost (DC) = US$ 57.224.402,92

= US$ 7.142.857,14 263.763.486 = US$ 47.630.952,38

c. Service Facilities & yard improvement (20% PEC) = US$

2. Indirect Cost (IDC) a. Engineering and supervision (30 % PEC) b. Contruction expense (10 % DC) c. Contractors fee (3 % DC) d. Contigency (8 % FCI) Total Indirect Cost (IDC) = US$ 395.210,229 = US$ 5.722.440,292 = US$ 1.716.732,088 = US$ 4.487.774,172 = US$ 12.322.156,78

3. Fixed capital Investement (FCI) FCI = (DC + IDC) = US$ 57.224.402,92 + US$ 12.322.156,78 = US$ 69.546.559,7 4. Working Capital (15 % TCI) WC = 15 % TCI = US$ 12.272.922,3

TOTAL CAPITAL INVESTMENT (TCI) TCI = FCI + WC

= FCI + 0,15 TCI = = FCI/(1- 0,15) US$ 81.819.482

4.6 Perhitungan Total Production Cost (TPC) 1. Manufacturing Cost (MC) a. Direct Production Cost Raw material Operating Labor (OL) Direct supervisory & Clerical Labor(11% OL) Utilities (20% TPC) Maintenance & repair / MR (6% FCI) Labortory charge (10% OL) Patent & royalties (2 % TPC) = US$ = US$ = US$ = US$ = US$ = US$ = US$ 3.068.100,00 1.840.923,80 276.138,57 38.113.062,86 4.172.793,582 184.092,38 3.814.345,85+

US$ 51.469.457,04 Total Direct Production Cost = US$ 51.469.457,04

b. Fixed Charge Depreciation (11% FCI) Local taxes (2% FCI) Insurance (1% FCI) Total Fixed Charge Plant Overhead Cost (55% MR + OL + DSCL) Total Manufacturing Cost 2. General Expenses (GE) = US$ = US$ = US$ 119.760,6809 1.390.931,194 695.465,597

= US$ 2.2206.157,472 = US$ 4.412.098,84 = US$ 53.675.614, 51

a. Administrative cost (20% OL) b. Distribution & selling price (5% TPC) c. Research & Development cost (3% TPC) d. Financing (4% TCI) Total General Expenses TOTAL PRODUCTION COST (TPC) TPC = MC + GE = US$ 96.179.030,94 ANALISA KELAYAKAN

=US$

368.184,76

=US$ 9.535.864,62 =US$ 5.721.518,77 =US$ 26.877.848,27 = US$ 42.503.416,43

Parameter yang diambil dalam menentukan layak tidaknya pendirian pabrik Pembuatan paraxylene adalah : 1. Profitabilitas a. Net Profit Before Tax (NPBT) b. Net Profit After Tax (NPAT) 2. Kemampuan Waktu Pengembalian a. Kemampuan pengangsuran hutang b. Pay Back Periode (PBP) 3. Total Modal Akhir a. Net Profit Over Total Life Time of Project (NPOLTP) b. Total Capital Sink (TCS) 4. Laju Pengembalian Modal a. Rate of Return Investment (ROR) b. Discounted Cash Flow Rate of Return (DCF-ROR) c. Net Return

5. 1)

Break Even Point (BEP)

Keuntungan (Profitabilitas) Suatu pabrik yang akan didirikan harus mempertimbangkan keuntungannya. Keuntungan secara ekonomi akan diperoleh setelah pabrik beroperasi dalam jangka waktu tertentu. Sebelum investasi, perkiraan keuntungan sudah harus ditentukan. Keuntungan merupakan selisih antara penjualan dengan modal investasi produksi.

1.1.

Perhitungan Annual Cash Flow Annual cash Flow adalah uang tunai yang tersedia setiap tahunnya dan hitung dengan cara sebagai berikut : Penjualan Produk a. Produk Utama Produksi Paraxylene Harga jual paraxylene Total Harga jual paraxylene Total Harga Penjualan Produk Total Production Cost (TPC) Net Profit Before Tax (NPBT) Income Tax (35 % NPBT) Net Profit After Tax (NPAT) Depreciation (11% FCI) Annual Cash Flow (ACF) 250.000.000 Ton/tahun US $ US $ US $ US $ US $ US $ US $ US $ 1.472 per ton 368.000.000.000 96.179.030,94 367.901.821.000 126.665.637.400 241.236.183.600 US $ 368.000.000.000

119.760,6809 + 241.236.303.400

Hasil perhitungan menunjukkkan bahwa pengoperasian pabrik paraxylene memberikan keuntungan. Keuntungan yang diperoleh pertahun setelah dipotong pajak adalah sebesar US$ 241.236.183.600. Uang tunai yang diperoleh setiap tahun sebesar US$ 241.236.303.400

1.2. Lama Waktu Pengembalian Modal 1.2.1. Lama Pengangsuran Pengembalian Modal. Untuk menetapkan lama pengangsuran dapat dilakukan perhitungan dengan cara sebagai berikut : Total Capital Investment (TCI) Annual Cash Flow (ACF) Lama angsuran Pinjaman (P) (50% TPC) = US $ 81.819.482 = US $ 241.236.303.400 = 5 tahun = US $ 40.909.741

Bunga Modal (Merujuk pada bunga bank Indonesia )= 25 %

Tabel 1.1 Angsuran Pengembalian Modal Tahun ke1 2 3 4 5 Pinjaman 40.909.741 40.909.741 40.909.741 40.909.741 40.909.741 Bunga 0.25 0.25 0.25 0.25 0.25 Angsuran 10.227.435,25 10.227.435,25 10.227.435,25 10.227.435,25 51.137.176,25 92.046.917,25