No ITEM PEKERJAAN

1 Komponen Pylon Vertikal P1 Beton fc' = 40 Mpa termasuk bekisting & pengecoran & curing 2 Komponen Pylon Vertikal P2 Beton fc' = 40 Mpa termasuk bekisting & pengecoran & curing 3 Balok melintang Tumpangan Gelagar (P1 & P2) Beton fc' = 40 Mpa termasuk bekisting & pengecoran & curing

RENCANA PEKERJAAN PADA PYLON 1 DAN 2 SESUAI KURVA S EKSTERNAL


BULAN ADD 1 S/D DESEMBER VOLUME (M3) BOBOT (%) VOLUME (M3) BOBOT (%) KET VOLUME JANUARI BOBOT (%)

2,901.47 2,901.47 456.66

4.6051 4.6051 0.7259

320.23 323.32

0.1104 Lift 1;2 0.5132 Lift 1;2

215.16 214.85

0.3415 0.3410

KURVA S EKSTERNAL
BULAN JANUARI KET VOLUME FEBRUARI BOBOT (%) KET VOLUME MARET BOBOT (%) KET

Lift 3; LIFT 4, 1 SISI Lift 3; LIFT 4, 1 SISI

215.10 214.85

0.3414 0.3410

Lift 4, 1 SISI; Lift 5 Lift 4, 1 SISI; Lift 5

215.10 214.79 228.30

0.3414 Lift 6; Lift 7 0.3409 Lift 6; Lift 7 0.3629 Pylon 1