Deskripsi
Estimasi / Perhitungan
Volume
= (
1.50 m
2.00 btg x
15.00 set ) =
45.00 m1 x
15.10 kg/m1
679.50 kg
= (
0.90 m
2.00 btg x
15.00 set ) =
27.00 m1 x
15.10 kg/m1
407.70 kg
SIKU 60 X 60
= (
1.62 m
2.00 btg x
15.00 set ) =
48.60 m1 x
5.42 kg/m1
263.41 kg
SIKU 60 X 60
= (
1.02 m
2.00 btg x
15.00 set ) =
30.60 m1 x
5.42 kg/m1
165.85 kg
= 1516.46 kg
Keterangan
Cost centre
No.Tracking
Schedule ( SPK )
Jenis kontrak
:TENDER
Durasi
No. kontrak
Schedule ( Aktual ) :
Tgl Klaim
Durasi kontrak
Durasi
Tgl Revisi
Volume Proyek
No
Item Pekerjaan
Unit
Q'ty (a)
m2
Nilai proyek
HargaSatuan (Rp.)
Upah (b)
1516.46
Bahan
6,190
Total ( Rp.)
13,412
19,602
(e=axd)
29,725,727
Keterangan
Q'ty ( f )
1516.46
9,386,912
20,338,815
29,725,727
Pembayaran Ke
TOTAL
9,386,912
20,338,815
29,725,727
Realisasi
DIBULATKAN
9,386,000
20,338,000
29,724,000
Retensi
9,386,000
20,338,000
29,724,000
Catatan
9,386,000
20,338,000
29,724,000
Diajukan oleh ;
9,386,000
20,338,000
29,724,000
f. Nilai bersih klaim setelah pembulatan untuk periode ini ( Belum Termasuk PPN 10%)
9,386,000
20,338,000
29,724,000
PT.MARTAPURA MAKMUR
ite Engineer
e. Nilai bersih klaim untuk periode ini ( belum termasuk PPN 10%)
Project Manager
Site supervisor
Coordinator
Manager / Ka.Si
Nama :
Nama :
Nama :
Nama :
Nama :
Nama :
Tgl
Tgl
Tgl
Tgl
Tgl
Tgl