Anda di halaman 1dari 25

PEMERINTAH KABUPATEN BERAU

DINAS PEKERJAAN UMUM


Jl. Gatot Subroto No. 123 Telp (0554) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN :
PEMBANGUNAN RUMAH DINAS TA. APBD-P 2015

PEKERJAAN
PEMBANGUNAN RUMAH STAF UPTD TALISAYAN 1KOPEL

GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

Roof Drain 2

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)
Roof Drain 2

LOKASI
Atap Dak Lapis Waterproof

Roof Drain 2

KECAMATAN TALISAYAN

Roof Drain 2

Roof Drain 2
Atap Dak Lapis Waterproof
Roof Drain 2

Roof Drain 2

Roof Drain 2

Roof Drain 2

Roof Drain 2

Atap Dak Lapis Waterproof


Atap Dak Lapis Waterproof

Atap Dak Lapis Waterproof

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Site Plan
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

0.

Story (25)

1:500

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Ilustrasi
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

1.200
600

300
200

600
PEMERINTAH KABUPATEN BERAU
DINAS PEKERJAAN UMUM

100

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

luas area

049
A: 61,75 cm2

Teras
- 0.05

180

300

Kamar Tidur
0.00

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

Teras
- 0.05

Dapur
0.00

PEKERJAAN

Kamar Tidur
0.00

Dapur
0.00

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

799

KM/WC
- 0.05

150

KM/WC
- 0.05

150

769

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI

280

Kamar Tidur
0.00

Rg. Tamu
0.00

Kamar Tidur
0.00

Rg. Tamu
0.00

280

PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

39

Teras
- 0.05

139

Teras
- 0.05

139

139

39

KONSULTAN PERENCANA

CV. M - PROJECT

PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

100

200

Denah

285

183

300

133
JUMLAH LEMBAR

300
600

600

24

1.200

GSPublisherEngine 0.0.100.100

0.

Story

LEMBAR

1:100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

TAMPAK DEPAN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

0.

Story (6)

1:100

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

413

JUDUL GAMBAR

Tampak
TAMPAK BELAKANG

JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

TAMPAK SAMPING KANAN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

0.

1:100

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Tampak
JUMLAH LEMBAR

TAMPAK SAMPING KIRI

GSPublisherEngine 0.0.100.100

0.

LEMBAR

24

1:100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015
Bubungan genteng metal

PEKERJAAN

ATAP +6.00
PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

Atap genteng metal

LOKASI
Kanal C

Kanal C

Kanal C

Kanal C

Kanal U (Reng)
Kanal C

Kanal C
Kanal C

Kanal C

Kanal C

KECAMATAN TALISAYAN

Kanal C

RINGBALK

+3.50
Listplank 2.5/25

LT. DAK

Plafond Lumbersiring

+2.90

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Kanopi beton T=5cm Camp 1:2:3


Balok latai 10/10 Camp 1:2:3
Psangan Dinding 1/2 Bata
Cor Rabat Camp 1:2:3

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA
Sloof 15/20 Camp 1:2:3

LT.01

0.00

CV. M - PROJECT
Pondasi Batu Gunung Camp 1:4
KAMAR TIDUR

PENANGGUNG JAWAB

TERAS

649

Khoiri Mahmud
Wakil Direktur

POTONGAN A-A
REVISI

JUDUL GAMBAR

Potongan
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

ATAP +6.00

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

LT. DAK

+2.90
Plafond gypsum dalam +2.70

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

LT.01

0.00

CV. M - PROJECT
PENANGGUNG JAWAB

KAMAR TIDUR

300

KM/WC

150

KAMAR TIDUR

280

Khoiri Mahmud
Wakil Direktur

730

POTONGAN B-B

REVISI

JUDUL GAMBAR

Potongan
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
Kolom Praktis

Kolom Praktis

Sloof
Pondasi Batu Gunung

Sloof
Pondasi Batu Gunung

Pas. Batu Kosong 1:4

Pas. Batu Kosong 1:4

PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Rencana Pondasi
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

300

300

300

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

300

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

300

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

BALOK LATAI 10/10, COR


BETON CAMP 1:2:3
+2.50

150

BALOK LATAI 10/10, COR


BETON CAMP 1:2:3
+2.50

KECAMATAN TALISAYAN

BALOK LATAI 10/10, COR BETON CAMP 1:2:3


+2.50

MENYETUJUI

280

PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

39

BALOK LATAI 10/10, COR BETON CAMP 1:2:3


+2.50
BALOK LATAI 10/10, COR BETON CAMP 1:2:3
+2.50

BALOK LATAI 10/10, COR BETON CAMP 1:2:3


+2.50

CV. M - PROJECT
PENANGGUNG JAWAB

100

200

300

RENC. BALOK LATAI

Khoiri Mahmud
Wakil Direktur

REVISI

SKALA 1 : 100

JUDUL GAMBAR

Rencana Pondasi
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

Menara Profil Tank 1100L

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

luas area

049
A: 61,75 cm2

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI

Septictank

Septictank

PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Rencana Sanitasi
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

J1

J1

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

luas area

049
A: 61,75 cm2

J1

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

J1

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

P1

P1

P1

P1

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

BV

BV
LOKASI

P2

P2
KECAMATAN TALISAYAN

P1

P1
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

PJ1

PJ1

J2

J2
Jimmy Arwi Siregar, ST, M.Eng
NIP. 19811107 200604 1 006

J3

J3

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Rencana Pintu Jendela


JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

luas area

049
A: 61,75 cm2

+ 1.50

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

+ 1.50

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU


+ 1.50

+ 1.50

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

+ 1.50

+ 1.50

PEKERJAAN
+ 1.50

+ 1.50

+ 1.50

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

+ 1.50
+ 1.50

+ 1.50

LOKASI
+ 1.50

+ 1.50

KECAMATAN TALISAYAN

MENYETUJUI
+ 1.50

+ 1.50

PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

KETERANGAN

CV. M - PROJECT

WATT METER BOX

2 BH

PANEL BOX MCB

2 BH

LAMPU DL 15 WATT

10 BH

LAMPU FITTING

6 BH

STOP KONTAK

14 BH

SAKLAR TUNGGAL

8 BH

SAKLAR GANDA

4 BH

PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Rencana Listrik
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

luas area

049
A: 61,75 cm2

Keramik
Tekstur 40/40
0,00

TANJUNG REDEB - BERAU

Keramik
Tekstur 40/40
0,00

KEGIATAN

Keramik 40/40
0,00

Keramik 40/40
0,00

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

Keramik
Tekstur 25/25
0,00

Keramik 40/40
0,00

Keramik 40/40
0,00

Keramik
Tekstur 25/25
0,00

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Keramik 40/40
0,00

Keramik 40/40
0,00

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

Keramik
Tekstur 40/40
0,00

Keramik
Tekstur 40/40
0,00

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Roof Drain 2

Roof Drain 2

Khoiri Mahmud
Wakil Direktur

Roof Drain 2

Roof Drain 2
Atap Dak Lapis Waterproof

Roof Drain 2

Roof Drain 2
Atap Dak Lapis Waterproof

REVISI

JUDUL GAMBAR

Rencana Atap
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Rencana Rangka Plafond


JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

Kolom praktis 10/10

PEKERJAAN

kran air
PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

Pas. dinding bata


Bak air fiberglass

LOKASI

Closet jongkok porselin


KECAMATAN TALISAYAN

Dinding Keramik 20/25

MENYETUJUI

Floor drain

200

PEJABAT PEMBUAT KOMITMEN

175

Lantai Keramik 20/20

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

A
CV. M - PROJECT

75

PENANGGUNG JAWAB

20

Khoiri Mahmud
Wakil Direktur

REVISI

150

DENAH KM / WC

150

POTONGAN A-A

JUDUL GAMBAR

Detail Kamar Mandi


JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

10

10
5

Kusen Almunium 5/10


Daun pintu Plywood lapis
HPL

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

Kusen Almunium 5/10

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

Daun pintu Plywood lapis


HPL

KEGIATAN

TANJUNG REDEB - BERAU

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

210

210

KECAMATAN TALISAYAN

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

79

69

81

71

Khoiri Mahmud
Wakil Direktur

REVISI

P1 / 3 Bh

P2 / 1 Bh

JUDUL GAMBAR

Detail Kamar Mandi


JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

60

10

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

60

60

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

Kusen Bening 5 mm

KEGIATAN

41

Kusen Almunium 5/10

PEKERJAAN

Kusen Almunium 5/10


42

Kusen Bening 5 mm

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

BV / 2 Bh

LOKASI

70

5
KECAMATAN TALISAYAN

Kusen Almunium 5/10

10
177

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

120

Kaca Bening 5 mm

50

Kusen Almunium 5/10

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

Kusen Almunium 5/10

KONSULTAN PERENCANA

Kaca Bening 5 mm
180

PENANGGUNG JAWAB

60

CV. M - PROJECT

Khoiri Mahmud
Wakil Direktur

J1 / 4 Bh

REVISI

JUDUL GAMBAR

50

Kaca Buram 5 mm

J2 / 2 Bh

Detail Jendela
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

0.

Story (19)

1:20

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

90

38

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

70
10

10

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

38

Kusen Almunium 5/10

KECAMATAN TALISAYAN

Kusen Almunium 5/10

Kusen Bening 5 mm

Kusen Bening 5 mm

MENYETUJUI

PEJABAT PEMBUAT KOMITMEN

155

Kusen Bening 5 mm

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

210

55

Kusen Almunium 5/10


KONSULTAN PERENCANA

CV. M - PROJECT

53

PENANGGUNG JAWAB

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

PJ1 / 1 Bh

Detail Jendela
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

62

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

Pas. Batu Bata


20

Sloof 15/20
cor beton 1:3:5 10cm

Pas. keramik 40/40


Spesi 4cm

0.00

cor beton 1:3:5 10cm


32

-0.12

25

Urugan pasir 5cm


Urugan tanah

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

70

KECAMATAN TALISAYAN

MENYETUJUI

Pas. pondasi batu gunung

PEJABAT PEMBUAT KOMITMEN

5 15

Batu kosong
Jimmy Arwi Siregar, ST, M.Eng
NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

Urugan pasir

sunduk ulin 5/10

Pancang ulin 10/10x133cm

kalang ulin 5/10

CV. M - PROJECT
PENANGGUNG JAWAB

10

30
60
80

10
Khoiri Mahmud
Wakil Direktur

REVISI

DETAIL PONDASI
SKALA 1 : 20

JUDUL GAMBAR

Detail Pondasi
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM

695

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

Bubungan genteng metal

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

Atap genteng metal

LOKASI

KECAMATAN TALISAYAN

Kanal C
7.5 X 3 T= 0.75
Kanal C

Kanal C
7.5 X 3 T= 0.75

Kanal C
7.5 X 3 T= 0.75

0.5 mm
Kanal C
7.5 X 3 T= 0.75

Kanal C
7.5 X 3 T= 0.75

Kanal C
7.5 X 3 T= 0.75

MENYETUJUI

Kanal U (Reng)

PEJABAT PEMBUAT KOMITMEN

Kanal C
Kanal C

7.5 X 3 T= 0.75

7.5 X 3 T= 0.75
Jimmy Arwi Siregar, ST, M.Eng
NIP. 19811107 200604 1 006

KONSULTAN PERENCANA

Plafond Gypsum
Rangka Plafond

CV. M - PROJECT
PENANGGUNG JAWAB

91

650
Atap Dak Teras
T= 10 cm Camp
1:2:3

Khoiri Mahmud
Wakil Direktur

REVISI

DETAIL KUDA-KUDA
SKALA 1 : 50

JUDUL GAMBAR

Detail Kuda-kuda
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

Ket.

Kolom Praktis

KP

Sloof

TYPE BALOK
TUMP

LAP

KEGIATAN

TUMP

15

11

UKURAN KOLOM

11X11

TULANGAN

410

SENGKANG

6-15

15

20

PEKERJAAN

15

UKURAN BALOK

15X20

15X20

15X20

TULANGAN ATAS

210

210

210

210

210

210

6-15

6-15

6-15

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

TULANGAN TENGAH
TULANGAN BAWAH

TYPE KOLOM
LANTAI

20

11

20

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

Kolom Teras

SENGKANG

LOKASI

KECAMATAN TALISAYAN

Balok Latai

TYPE BALOK
13

TUMP

LAP

TUMP

UKURAN KOLOM
TULANGAN POKOK

410

SENGKANG

6-15

PEJABAT PEMBUAT KOMITMEN

15

15

13x13

15

MENYETUJUI
13
10

10

10

UKURAN BALOK

10X15

10X15

10X15

TULANGAN ATAS

210

210

210
Jimmy Arwi Siregar, ST, M.Eng
NIP. 19811107 200604 1 006

TULANGAN TENGAH
TULANGAN BAWAH
SENGKANG

210

210

210

6-15

6-15

6-15

KONSULTAN PERENCANA

Ringbalk

TYPE BALOK
TUMP

LAP

TUMP

TABEL PEMBESIAN

15

15

20

20

20

CV. M - PROJECT
PENANGGUNG JAWAB

15

UKURAN BALOK

12X20

12X20

12X20

TULANGAN ATAS

210

210

210

Khoiri Mahmud
Wakil Direktur

TULANGAN TENGAH
TULANGAN BAWAH
SENGKANG

210

210

210

6-15

6-15

6-15

REVISI

JUDUL GAMBAR

Detail Pembesian
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

Pintu Almunium
PEMERINTAH KABUPATEN BERAU
DINAS PEKERJAAN UMUM
TANJUNG REDEB - BERAU

KEGIATAN

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

100

100

Keramik 30/30

JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

PEKERJAAN

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

KECAMATAN TALISAYAN

60

13

174

12

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

Kitchen Sink
Kran Wastafel

KONSULTAN PERENCANA

CV. M - PROJECT
PENANGGUNG JAWAB

Keramik 60/60
60

Khoiri Mahmud
Wakil Direktur

REVISI

JUDUL GAMBAR

Detail Meja Dapur


JUMLAH LEMBAR

200
GSPublisherEngine 0.0.100.100

LEMBAR

24

PEMERINTAH KABUPATEN BERAU


DINAS PEKERJAAN UMUM
JalanGatotSubroto No. 123 Telp. ( 0554 ) 21065 - 22797

TANJUNG REDEB - BERAU

KEGIATAN

Papan ulin 2/20

PEMBANGUNAN RUMAH DINAS


TA. P-APBD 2015

Balok ulin 5/10

PEKERJAAN
100

100

Balok ulin 5/10

Balok ulin 5/10

125

200

Tiang ulin 10/10 x 300cm

Skur ulin 5/10

PERENCANAAN PEMBANGUNAN
RUMAH STAF UPTD TALISAYAN
(1 KOPEL)

LOKASI

Skur ulin 5/10

KECAMATAN TALISAYAN

Tiang ulin 10/10 x 300cm

Tiang ulin 10/10 x 300cm

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

Ventilasi pipa PVC 2"

Sunduk ulin 5/10

40

Bak kontrol

Kalang ulin 5/10

Besi 10-15
Besi 10-15

Jimmy Arwi Siregar, ST, M.Eng


NIP. 19811107 200604 1 006

20

Pipa Pembuang PVC 2"

KONSULTAN PERENCANA

150

150

150

130

Pipa PVC 4"


Pas. batu bata 1 : 2
Tanah urug

185

Balok ulin 5/10

CV. M - PROJECT

Ijuk
Papan ulin 2/20

Cor beton 1 : 3 : 5

PENANGGUNG JAWAB

5 10

Papan ulin 2/20

Papan ulin 2/20

20

5 10

20

Pasir urug

150

Hamparan baru kerikil


Pasir urug

Balok ulin 5/10

100

100

Pondasi rolag batu bata 1 : 2

Khoiri Mahmud
Wakil Direktur

Balok ulin 5/10

REVISI

150

150
JUDUL GAMBAR

Detail Septictank

Detail Menara Profil Tank

Septic tank dan


Menara Tandon
JUMLAH LEMBAR

LEMBAR

24
GSPublisherEngine 0.0.100.100

Anda mungkin juga menyukai