KEGIATAN
PEKERJAAN
LOKASI
BIAYA
TAHUN ANGGARAN
NO
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
JENIS
PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN PASIR
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN BETON
PEKERJAAN KAYU DAN ATAP
PEKERJAAN KUNCI DAN KACA
PEKERJAAN LANTAI
PEKERJAAN PENGECATAN
PEKERJAAN INSTALASI LISTRIK
JUMLAH TOTAL PEKERJAAN
PPN 10%
JUMLAH TOTAL
JUMLAH DIBULATKAN
TERBILANG :
SUDARYO
Direktur
JUMLAH TOTAL
( Rp. )
1,980,040.00
37,736.22
10,554,500.48
20,346,490.95
126,100,867.50
3,074,472.00
25,077,645.10
13,463,430.42
3,044,500.00
203,679,682.66
20,367,968.27
224,047,650.93
224,047,000.00
NO JENIS PEKERJAAN
I.
ANALISA
1
2
3
4
5
PEKERJAAN PERSIAPAN
Pengukuran dan pemasangan bouwplank k.y tahun
Membersihkan lapangan
Pembuatan bak adukan uk. ( 40x50x20 ) cm ky. tahun
Pembuatan steger dari bambu
Pengadaan air kerja
DP
DP
SNI - A.6.10
SNI - A.6.11
DP
1
2
3
SNI - B.6.1
SNI - B.6.9
SNI - B.6.11
III.
1
2
3
4
SNI - C.6.7
SNI - D.6.13
SNI - E.6.3
SNI - E.6.10a
IV.
1
2
3
4
PEKERJAAN BETON
Membuat beton cor 1 PC : 2 Ps : 3 Kr
Pembesian dengan besi beton polos
Cetakan kayu tahun
Kolom praktis beton bertulang (11 x 11) cm
SNI G.6.13
SNI G.6.25
1/2.BOW - F.8
SNI - G.6.35
V.
1
2
3
4
5
7
8
9
10
11
12
VI.
1
2
3
4
5
6
7
8
VII.
1
II.
KUANTITAS
1.000
1.000
1.000
20.000
1.000
HARGA SATUAN
( Rp. )
JML. HARGA
( Rp. )
unit
500,000.00
500,000.00
unit
450,000.00
450,000.00
bh
112,190.00
112,190.00
M
30,892.50
617,850.00
unit
300,000.00
300,000.00
SUB TOTAL PEKERJAAN PERSIAPAN
0.720 M
31,500.00
22,680.00
0.390 M
10,498.00
4,094.22
0.070 M
156,600.00
10,962.00
SUB TOTAL PEKERJAAN TANAH DAN PASIR
0.260 M
478,055.00
124,294.30
72.090 M
77,850.00
5,612,206.50
35.500 M
36,981.40
1,312,839.70
144.180 M
24,311.00
3,505,159.98
SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN
4.858
577.310
90.310
21.000
M
kg
M
M'
1.173
9.000
6.720
1.051
1.272
M
M
M
M
M
9,660,000.00
403,950.00
584,675.00
8,884,500.00
8,444,500.00
11,331,180.00
3,635,550.00
3,929,016.00
9,337,609.50
10,741,404.00
SNI - F.6.18b
300.560 M
97,490.00
29,301,594.40
SNI - F.6.29c
SNI - H.6.1
SNI - H.6.4
BOW - F.36l
SNI - I.6.20c
SNI - I.6.19a
71.400 M'
75,050.00
5,358,570.00
300.560 M
61,500.00
18,484,440.00
22.100 M'
64,600.00
1,427,660.00
7.560 M
536,660.00
4,057,149.60
244.300 M
104,195.00
25,454,838.50
209.350 M'
14,530.00
3,041,855.50
SUB TOTAL PEKERJAAN KAYU DAN ATAP
SNI - K.6.5
SNI - K.6.6
SNI - K.6.9
SNI - K.6.11
SNI - K.6.17
Ls
Ls
Ls
15.000 bh
20,620.00
309,300.00
38.000 bh
19,120.00
726,560.00
38.000 bh
19,120.00
726,560.00
3.000 bh
129,160.00
387,480.00
5.600 M
131,620.00
737,072.00
5.000 bh
9,000.00
45,000.00
15.000 bh
7,500.00
112,500.00
15.000 bh
2,000.00
30,000.00
SUB TOTAL PEKERJAAN KUNCI DAN KACA
PEKERJAAN LANTAI
Pas. lantai keramik uk. ( 30 x 30 ) cm (Klas A)
SNI - L.6.47e
SNI - F.6.2b
BOW - F.36p
SNI - F.6.8c
SNI - F.6.14c
SNI - F.6.16b
161.380 M
863,175.00
4,193,304.15
14,269.50
8,237,925.05
72,925.00
6,585,856.75
63,305.00
1,329,405.00
SUB TOTAL PEKERJAAN BETON
155,395.00
25,077,645.10
SUB TOTAL PEKERJAAN LANTAI
NO JENIS PEKERJAAN
ANALISA
KUANTITAS
H. SATUAN
( Rp. )
JML. HARGA
( Rp. )
112.000 M
27,510.00
3,081,120.00
SNI - M.6.14c
71.540 M
11,439.50
818,381.83
SNI - M.6.15c
436.720 M
8,563.00
3,739,633.36
BOW - K.6+23a
244.300 M
23,840.75
5,824,295.23
SUB TOTAL PEKERJAAN PENGECATAN
SNI - M.6.8
Ls
Ls
Ls
Ls
Ls
Ls
Ls
13.000 ttk
135,000.00
1,755,000.00
4.000 ttk
135,000.00
540,000.00
4.000 bh
25,000.00
100,000.00
3.000 bh
18,500.00
55,500.00
4.000 bh
18,500.00
74,000.00
10.000 bh
50,000.00
500,000.00
3.000 bh
8,500.00
20,000.00
SUB TOTAL PEKERJAAN INSTALASI LISTRIK
JUMLAH TOTAL PEKERJAAN
PPN 10%
JUMLAH TOTAL
JUMLAH DIBULATKAN
Purwokerto, 19 September 2012
CV. WAHANA
SUDARYO
Direktur
JML. TOTAL
( Rp. )
1,980,040.00
37,736.22
10,554,500.48
20,346,490.95
bata
pp
pb
besi
kusen
kuda
gording
kaso 5/7
reng 2/3
1.173
1.051
1.272
300.560
300.560
1.2000
1.1000
1.1000
0.0090
0.0036
669.170
1.408
1.156
1.399
2.705
1.082
9,100.00
6,000,000.00
6,000,000.00
6,000,000.00
5,750,000.00
5,400,000.00
48,049,636.00
4,804,963.60
52,854,599.60
5,046.300
126,100,867.50
pc
pasir pasang
pasir beton
batu 2/3
bata
besi
kayu kruing
kaso 5/7
reng 2/3
50.000
6.500
2.750
4.000
5,000.000
666.581
3.963
1.930
0.000
63,000.00
90,000.00
95,000.00
153,000.00
500.00
9,100.00
6,000,000.00
5,750,000.00
5,400,000.00
48,049,636.00
3.963
3,074,472.00
25,077,645.10
(1.10)
(8,272.73)
(0.00)
JML. TOTAL
( Rp. )
13,463,430.42
3,044,500.00
203,679,682.66
20,367,968.27
224,047,650.93
224,047,000.00
6,089,447.00
8,445,600.00
6,936,600.00
8,395,200.00
15,553,980.00
5,842,886.40
51,263,713.40
5,126,371.34
56,390,084.74
3,150,000.00
585,000.00
261,250.00
612,000.00
2,500,000.00
6,065,887.10
23,778,000.00
11,097,500.00
0.00
48,049,637.10
4,804,963.71
52,854,600.81
PEKERJAAN
LOKASI
: KECAMATAN KEMBARAN
BIAYA
: Rp.
TAHUN ANGGARAN
: 2012
ANALISA
KOEF.
SAT.
HRG SAT(Rp)
SNI - A.6.10
SNI - A.6.11
SNI - B.6.1
SNI - B.6.9
SNI - B.6.11
SNI - C.6.7
SNI - D.6.13
SNI - E.6.3
0.0360
0.0800
1.0000
0.3000
0.0015
1.0000
0.2500
0.2500
0.0170
0.0020
0.0130
0.7500
0.0250
0.2500
0.0083
1.2000
0.3000
0.0100
1.2000
61.0000
0.1470
0.4920
1.5000
0.7500
0.0750
0.0750
70.0000
4.5000
0.0500
0.0150
0.3000
0.1000
0.0100
0.0150
7.7760
0.0230
0.3000
0.1500
0.0150
0.0150
BH
M3
Kg
Btg
OH
OH
M2
Btg
Kg
OH
OH
OH
OH
M3
OH
OH
M3
OH
OH
M3
M3
OH
OH
M3
M3
Kg
M3
M3
OH
OH
OH
OH
M2
Bh
Kg
M3
M3
OH
OH
OH
OH
M2
Kg
M3
OH
OH
OH
OH
2,000,000.00
20,000.00
20,500.00
60,000.00
60,000.00
17,500.00
5,850.00
40,000.00
60,000.00
65,000.00
60,000.00
40,000.00
60,000.00
40,000.00
60,000.00
120,000.00
40,000.00
60,000.00
150,000.00
1,400.00
200,000.00
140,000.00
40,000.00
60,000.00
65,000.00
60,000.00
600.00
1,400.00
140,000.00
200,000.00
40,000.00
60,000.00
65,000.00
60,000.00
1,400.00
140,000.00
40,000.00
60,000.00
65,000.00
60,000.00
ANALISA
KOEF.
SAT.
HRG SAT(Rp)
SNI - E.6.10a
SNI - F.6.2b
SNI - F.6.8c
SNI - F.6.14c
SNI - F.6.16b
SNI - F.6.18b
SNI - F.6.29c
SNI - G.6.13
M2
Kg
M3
M3
OH
OH
OH
OH
M3
M3
Kg
Kg
OH
OH
OH
OH
M2
M3
kg
OH
OH
OH
OH
M3
M3
kg
Kg
OH
OH
OH
OH
M3
M3
kg
Kg
OH
OH
OH
OH
1,400.00
200,000.00
140,000.00
40,000.00
60,000.00
65,000.00
60,000.00
6,800,000.00
20,000.00
20,000.00
40,000.00
60,000.00
65,000.00
60,000.00
7,000,000.00
22,500.00
40,000.00
60,000.00
65,000.00
60,000.00
6,800,000.00
21,500.00
20,000.00
40,000.00
60,000.00
65,000.00
60,000.00
6,800,000.00
21,500.00
20,000.00
40,000.00
60,000.00
65,000.00
60,000.00
M2
M3
M3
Kg
OH
OH
OH
OH
M'
M3
Kg
OH
OH
OH
OH
M3
Kg
M3
M3
OH
OH
OH
6,500,000.00
6,400,000.00
20,000.00
40,000.00
60,000.00
65,000.00
60,000.00
7,000,000.00
20,000.00
40,000.00
60,000.00
65,000.00
60,000.00
1,400.00
150,000.00
250,000.00
40,000.00
60,000.00
65,000.00
Mandor
0.1000
OH
60,000.00
ANALISA
KOEF.
SAT.
HRG SAT(Rp)
SNI - G.6.25
SNI - G.6.35
SNI - H.6.1
SNI - H.6.4
SNI - I.6.19a
SNI - I.6.20c
SNI - K.6.5
SNI - K.6.6
Kg
Kg
Kg
OH
OH
OH
OH
M'
M3
Kg
Kg
Kg
Kg
M3
M3
OH
OH
OH
OH
OH
OH
M2
Bh
OH
OH
OH
OH
M'
Bh
Kg
M3
OH
OH
OH
OH
M'
M'
Kg
OH
OH
OH
OH
M2
M3
Kg
Kg
Lbr
OH
OH
OH
OH
BH
Bh
OH
OH
OH
OH
BH
Bh
OH
OH
12,500.00
25,000.00
40,000.00
60,000.00
65,000.00
60,000.00
2,000,000.00
20,000.00
12,500.00
25,000.00
1,400.00
150,000.00
250,000.00
40,000.00
60,000.00
60,000.00
60,000.00
65,000.00
60,000.00
2,000.00
40,000.00
60,000.00
65,000.00
60,000.00
3,900.00
1,400.00
140,000.00
40,000.00
60,000.00
65,000.00
60,000.00
8,000.00
22,500.00
40,000.00
60,000.00
65,000.00
60,000.00
5,000,000.00
20,000.00
22,500.00
12,500.00
40,000.00
60,000.00
65,000.00
60,000.00
10,000.00
40,000.00
60,000.00
65,000.00
60,000.00
8,500.00
40,000.00
60,000.00
Kepala Tukang
Mandor
0.0150
0.0008
OH
OH
65,000.00
60,000.00
ANALISA
KOEF.
SAT.
HRG SAT(Rp)
SNI - K.6.9
SNI - K.6.11
SNI - K.6.17
SNI - L.6.47e
SNI - M.6.8
SNI - M.6.14c
SNI - M.6.15c
BH
Bh
OH
OH
OH
OH
BH
Bh
OH
OH
OH
OH
M2
M2
OH
OH
OH
OH
M2
Bh
Kg
M3
Kg
OH
OH
OH
OH
8,500.00
40,000.00
60,000.00
65,000.00
60,000.00
115,000.00
40,000.00
60,000.00
65,000.00
60,000.00
110,000.00
40,000.00
60,000.00
65,000.00
60,000.00
6,000.00
1,400.00
140,000.00
7,000.00
40,000.00
60,000.00
65,000.00
60,000.00
M2
Kg
Kg
Kg
Kg
OH
OH
OH
OH
21,500.00
18,500.00
38,500.00
38,500.00
40,000.00
60,000.00
65,000.00
60,000.00
M2
Kg
Kg
Kg
OH
OH
OH
OH
9,000.00
15,000.00
15,000.00
40,000.00
60,000.00
65,000.00
60,000.00
M2
Kg
Kg
OH
OH
OH
OH
15,000.00
15,000.00
40,000.00
60,000.00
65,000.00
60,000.00
ANALISA
KOEF.
SAT.
HRG SAT(Rp)
M2
M3
M2
OH
OH
OH
OH
M2
M3
M2
Kg
OH
OH
OH
OH
M2
Kg
OH
OH
OH
OH
M2
M3
Kg
OH
OH
OH
OH
OH
7,000,000.00
125,000.00
60,000.00
65,000.00
40,000.00
60,000.00
7,000,000.00
110,000.00
22,500.00
60,000.00
65,000.00
40,000.00
60,000.00
15,000.00
60,000.00
65,000.00
40,000.00
60,000.00
2,000,000.00
20,000.00
60,000.00
65,000.00
40,000.00
60,000.00
40,000.00
SUDARYO
Direktur
HARGA (Rp)
6=3X5
112,190.00
72,000.00
1,600.00
20,500.00
18,000.00
90.00
30,892.50
17,500.00
1,462.50
10,000.00
1,020.00
130.00
780.00
31,500.00
30,000.00
1,500.00
10,498.00
10,000.00
498.00
156,600.00
144,000.00
12,000.00
600.00
478,055.00
180,000.00
85,400.00
29,400.00
68,880.00
60,000.00
45,000.00
4,875.00
4,500.00
77,850.00
42,000.00
6,300.00
7,000.00
3,000.00
12,000.00
6,000.00
650.00
900.00
36,981.40
10,886.40
3,220.00
12,000.00
9,000.00
975.00
900.00
HARGA (Rp)
6=3X5
24,311.00
2,576.00
1,200.00
1,960.00
8,000.00
9,000.00
975.00
600.00
9,660,000.00
8,160,000.00
25,000.00
20,000.00
240,000.00
1,080,000.00
117,000.00
18,000.00
584,675.00
420,000.00
3,375.00
26,800.00
120,000.00
13,000.00
1,500.00
8,884,500.00
7,480,000.00
322,500.00
112,000.00
160,000.00
720,000.00
78,000.00
12,000.00
8,444,500.00
7,480,000.00
322,500.00
60,000.00
96,000.00
432,000.00
46,800.00
7,200.00
97,490.00
58,500.00
23,040.00
5,000.00
4,000.00
6,000.00
650.00
300.00
75,050.00
60,200.00
1,200.00
4,000.00
6,000.00
650.00
3,000.00
863,175.00
470,400.00
81,000.00
202,500.00
80,000.00
21,000.00
2,275.00
6,000.00
HARGA (Rp)
6=3X5
14,269.50
13,125.00
375.00
280.00
420.00
45.50
24.00
63,305.00
4,000.00
200.00
37,500.00
1,125.00
5,600.00
900.00
2,250.00
7,200.00
1,200.00
1,200.00
1,200.00
390.00
540.00
61,500.00
50,000.00
6,000.00
4,500.00
520.00
480.00
64,600.00
19,500.00
11,200.00
4,480.00
16,000.00
12,000.00
1,300.00
120.00
14,530.00
8,800.00
225.00
2,000.00
3,000.00
325.00
180.00
104,195.00
60,000.00
1,200.00
225.00
13,750.00
7,200.00
19,200.00
2,080.00
540.00
20,620.00
10,000.00
600.00
9,000.00
975.00
45.00
19,120.00
8,500.00
600.00
9,000.00
975.00
45.00
HARGA (Rp)
6=3X5
19,120.00
8,500.00
600.00
9,000.00
975.00
45.00
129,160.00
115,000.00
800.00
12,000.00
1,300.00
60.00
131,620.00
121,000.00
600.00
9,000.00
975.00
45.00
155,395.00
71,220.00
14,000.00
6,300.00
10,500.00
28,000.00
21,000.00
2,275.00
2,100.00
27,510.00
4,300.00
2,775.00
6,545.00
10,010.00
2,800.00
540.00
390.00
150.00
11,439.50
900.00
1,500.00
3,900.00
800.00
3,780.00
409.50
150.00
8,563.00
1,800.00
2,700.00
1,120.00
2,520.00
273.00
150.00
HARGA (Rp)
6=3X5
536,660.00
126,000.00
87,500.00
240,000.00
26,000.00
53,200.00
3,960.00
403,950.00
84,000.00
77,000.00
450.00
180,000.00
19,500.00
40,000.00
3,000.00
23,840.75
6,000.00
11,250.00
1,218.75
5,000.00
372.00
72,925.00
80,000.00
8,000.00
30,000.00
3,250.00
8,000.00
600.00
16,000.00
ANALISA
URAIAN PEKERJAAN
1
2
SNI - A.6.10
SNI - A.6.11
BH
M2
SNI - B.6.1
M3
SNI - B.6.9
M3
Urugan Kembali
SNI - B.6.11
M3
Urugan Pasir
SNI - C.6.7
M3
SNI - D.6.13
M2
SNI - E.6.3
M2
SNI - E.6.10a
M2
10 SNI - F.6.2b
M3
11 SNI - F.6.8c
M2
12 SNI - F.6.14c
M3
13 SNI - F.6.16b
M3
14 SNI - F.6.18b
M2
Pas. Kaso dan Reng genteng (kodok, plentong, vlams dan sejenisnya) Kayu Kruing
15 SNI - F.6.29c
M'
16 SNI - G.6.13
M3
17 SNI - G.6.25
Kg
18 SNI - G.6.35
M'
19 SNI - H.6.1
M2
20 SNI - H.6.4
M'
21 SNI - I.6.19a
M'
22 SNI - I.6.20c
M2
23 SNI - K.6.5
BH
24 SNI - K.6.6
BH
25 SNI - K.6.9
BH
26 SNI - K.6.11
BH
27 SNI - K.6.17
M2
28 SNI - L.6.47e
M2
29 SNI - M.6.8
M2
Pengecatan Bidang Kayu Baru( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Avian
30 SNI - M.6.14c
M2
Pengecatan Tembok Baru( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith
31 SNI - M.6.15c
M2
Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith
32 BOW - F.36l
M2
33 BOW - F.36p
M2
34 BOW - K.6+23a
M2
35 BOW - F.8
M2
SUDARYO
Direktur
September 2012
HARGA
( Rp. )
112,190.00
30,892.50
31,500.00
10,498.00
156,600.00
478,055.00
77,850.00
36,981.40
24,311.00
9,660,000.00
584,675.00
8,884,500.00
8,444,500.00
97,490.00
75,050.00
863,175.00
14,269.50
63,305.00
61,500.00
64,600.00
14,530.00
104,195.00
20,620.00
19,120.00
19,120.00
129,160.00
131,620.00
155,395.00
27,510.00
11,439.50
8,563.00
536,660.00
403,950.00
23,840.75
72,925.00
PEKERJAAN
LOKASI
: KECAMATAN KEMBARAN
BIAYA
: Rp.
TAHUN ANGGARAN
: 2012
NO.
SATUAN
1
2
3
4
7
8
9
10
OH
OH
OH
OH
OH
OH
OH
OH
No.
SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
M3
M3
M3
M3
M3
M3
Bh
Kg
Zak
Kg
Kg
Kg
Kg
Kg
Bh
M3
M3
M3
M3
M3
M'
Btg
M3
Kg
Kg
Btg
Lbr
M2
Lbr
Bj
JENIS UPAH
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Kepala Tukang
Pekerja
Pekerja Bongkar / Siram
Mandor
JENIS MATERIAL/BAHAN
Pasir Beton
Pasir Pasang
Pasir Urug
Kapur Pasang/Padam
Batu Kali Belah
Batu Pecah Mesin 2/3 cm
Batu Merah (5x11x22cm)
Tali Ijuk
Portland Cement
Portland Cement
Pc Warna
Besi Beton Polos
Bindrat
Besi strip tebal 5 mm
Keramik Lantai 30 x 30 cm Klas A
Kayu Albasia
Kayu Kruing Balok
Usuk Meranti 5/7
Usuk Kruing 5/7
Papan Kruing
Lis Kayu Kruing
Usuk 5/7 Kayu Tahun P=3 m
Reng 2/3 Kayu Kruing
Paku Biasa 2'' - 5''
Paku Eternit, Lis
Bambu
Eternit Kerang Super
Kaca Bening 5 mm
Multiplek 9 mm 1,20 x 2,40 m
Genteng Pres Plentong
No.
SATUAN
31
32
33
34
35
36
37
38
39
40
41
Bj
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Bh
Bh
JENIS MATERIAL/BAHAN
SUDARYO
Direktur
pagu
176,311,000.00
Tawar
224,047,000.00
Turun
(47,736,000.00)
3,900.00
38,500.00
15,000.00
21,500.00
9,000.00
18,500.00
20,000.00
10,000.00
8,500.00
8,500.00
115,000.00
15,000.00
JENIS PEKERJAAN
BULAN I
NILAI
BOBOT
PEKERJAAN ( Rp )
(%)
Mg. 1
Mg. 2
Mg. 3
BULAN II
Mg. 4
Mg. 1
Mg. 2
Mg. 3
BULAN III
Mg. 4
Mg. 1
Mg. 2
PEKERJAAN PERSIAPAN
II.
%
100
500,000.00
0.245
0.312
2 Membersihkan lapangan
450,000.00
0.221
0.140
112,190.00
0.055
617,850.00
0.303
300,000.00
0.147
0.187
22,680.00
0.011
0.009
4,094.22
0.002
0.002
10,962.00
0.005
0.004
124,294.30
0.061
5,612,206.50
2.755
1,312,839.70
0.645
3,505,159.98
1.721
PEKERJAAN BETON
1 Membuat beton cor 1 PC : 2 Ps : 3 Kr
4,193,304.15
2.059
0.677
0.677
0.677
8,237,925.05
4.045
1.232
1.232
1.233
6,585,856.75
3.233
0.999
0.999
1.000
1,329,405.00
0.653
0.054
0.243
III.
IV.
V.
11,331,180.00
5.563
3,635,550.00
1.785
3,929,016.00
1.929
9,337,609.50
4.584
10,741,404.00
5.274
29,301,594.40
14.386
5,358,570.00
2.631
18,484,440.00
9.075
1,427,660.00
0.701
4,057,149.60
1.992
25,454,838.50
12.497
3,041,855.50
1.493
1.000
0.584
1.447
0.601
309,300.00
0.152
726,560.00
0.357
726,560.00
0.357
387,480.00
0.190
737,072.00
0.362
6.008
2.059
50
45,000.00
0.022
112,500.00
0.055
30,000.00
0.015
25,077,645.10
12.312
3,081,120.00
1.513
1.698
VI.
0.054
818,381.83
0.402
3,739,633.36
1.836
5,824,295.23
2.860
1,755,000.00
0.862
540,000.00
0.265
3 Saklar ganda
100,000.00
0.049
4 Saklar tunggal
55,500.00
0.027
5 Stop kontak
74,000.00
0.036
500,000.00
0.245
20,000.00
0.010
203,679,682.66
MINGGUAN
100.000
KOMULATIF
0.65
3.02
5.45
10.50
0.65
3.67
9.12
19.62
3.51
0.00
23.13 #REF!
0.00
0.00
MINGGUAN
KOMULATIF
DEVIASI (POSITIF/NEGATIF)
Keterangan :
* Jangka Waktu Pelaksanaan 120 Hari Kalender
* Jangka Waktu Pemeliharaan 180 Hari Kalender
Direktur
Direktur
0.00
0.00