LAMPIRAN A.9
DAFTAR HARGA SATUAN DASAR TENAGA KERJA,
BAHAN DAN ALAT, KOTA SERANG, BANTEN TAHUN 2016
a.
b.
c.
Kec. Curug
0
100
HSD
SK_Bupati
( Rp. )
HSD
Lokasi Pekerjaan Ket.
( Rp. )
5
6
No
Uraian
Satuan
Kode
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
L.01
L.01
L.02
L.03
L.04
L.05
L.06
L.07
L.08
L.09
L.10
L.11
L.12
L.13
L.14
L.15
L.16
70.500,00
70.500,00
84.600,00
91.650,00
98.700,00
66.250,00
66.250,00
269.416,67
269.416,67
437.250,00
91.560,00
98.700,00
70.500,00
70.500,00
66.250,00
66.250,00
44.166,67
70.500,00
70.500,00
84.600,00
91.650,00
98.700,00
66.250,00
66.250,00
269.416,67
269.416,67
437.250,00
91.560,00
98.700,00
70.500,00
70.500,00
66.250,00
66.250,00
44.166,67
M.05
M.12
M.14.a
M.14.b
M.15
211.500,00
165.187,00
183.543,00
146.833,00
76.140,00
211.500,00
165.187,00
183.543,00
146.833,00
76.140,00
m
lbr
M.37.b
M.42.a
70.000,00
78.146,00
70.000,00
78.146,00
kg
kg
M.65.b
M.66.c
22.260,00
21.150,00
22.260,00
21.150,00
Sewa-hari
E.41
500.000,00
500.000,00
Sewa-hari
To.06
50.000,00
50.000,00
lbr
lbr
bh
bh
lbr
bh
sewa-bulan
sewa-bulan
m
M.110.a
M.110.b
M.117
M.119a
M.119d
M.123.a
M.139.a
M.139.b
M.141
106.809,00
78.327,00
124.080,00
75.000,00
1.500,00
2.500,00
2.947.500,00
3.602.500,00
2.500,00
106.809,00
78.327,00
124.080,00
75.000,00
1.500,00
2.500,00
2.947.500,00
3.602.500,00
2.500,00
Deskripsi
( Rp. )
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Pekerja Galian
Pekerja
Tukang
Kepala Tukang
Mandor
Juru ukur, operator/mekanik alat berat/Teknisi
Pembantu Juru ukur & operator/mekanik alat berat
Akhli muda
Akhli madya
Akhli utama
Supir truck
Supir kendaraan < 2 ton (termasuk sedan)
Kenek
Penjaga malam/Satpam
Drafter CAD/manual
Desain Engineer
Operator komputer/printer/ploter
II
BAHAN / MATERIAL
1
2
3
4
5
KELOMPOK KAYU
1
2
KELOMPOK LOGAM
1
2
Paku biasa 4 cm - 7 cm
Paku Asbes
III
KELOMPOK PERALATAN
Theodolit
IV
Kode
m
3
m
3
m
3
m
zak
LAIN-LAIN
a.
1
b.
1
Asbes gelombang besar uk. 80 x 180, 5mm
2
Asbes gelombang kecil uk. 80 x 180, 4mm
3 USB Flasdisk 16 GB (soft file)
4
Foto Album
5
Foto printing
6
Karung plastik / bagor
7
Sewa Laptop for Design
8
Sewa Printer Multifungsi
9
Tali pengikat/Tambang Nylon
Keterangan: * item tambahan
HSD.Pus Air.2
Uraian
Kode
Satuan
Koefisien
1
A
1
2
3
Tenaga Kerja
Pekerja
Pembantu Juru Ukur
Juru Ukur
L.01
L.06
L.05
OH
OH
OH
0,012
0,004
0,004
Bahan
C
1
Peralatan
Theodolith
D
E
F
Harga Satuan
(Rp)
Jumlah
(Rp)
7
70.500,00
66.250,00
66.250,00
Jumlah Harga Tenaga Kerja
846,00
265,00
265,00
1.376,00
A.1.1
T.01
E.41
Sewa-hari
0,004
500.000,00
Jumlah Harga Peralatan
2.000,00
2.400,00
3.776,00
566,40
4.342,40
15% x D
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
Harga Satuan
(Rp)
Jumlah
0,060
0,006
(Rp)
7
70.500,00
98.700,00
Jumlah Harga Tenaga Kerja
4.230,00
592,20
4.822,20
LA.03
4.822,20
723,33
5.545,53
15% x D
Uraian
Kode
Satuan
Koefisien
1
A.
1
2
3
4
Harga Satuan
(Rp)
Jumlah
Tenaga Kerja
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1,00
1,00
0,10
0,1
70.500,00
84.600,00
91.650,00
98.700,00
Jumlah Harga Tenaga Kerja
70.500,00
84.600,00
9.165,00
9.870,00
174.135,00
B.
1
2
3
Bahan
Triplek 3 mm (120 x 240)
Kayu usuk/kaso klas 3 (Albasia)
Paku campuran 4 - 7cm
M.42.a
M.33.d
M.70.a
Lbr
m3
kg
1,00
0,077
1,25
78.146,00
70.000,00
21.150,00
Jumlah Harga Bahan
78.146,00
5.390,00
26.437,50
109.973,50
Peralatan
D
E
F
(Rp)
7
LA.02
284.108,50
42.616,28
326.724,78
15% x D
Uraian
Kode
Satuan
Koefisien
1
A.
1
2
3
4
Tenaga Kerja
Pekerja
Tukang Tembok/batu
Kepala tukang batu
Mandor
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1,20
0,40
0,04
0,12
70.500,00
84.600,00
91.650,00
98.700,00
Jumlah Harga Tenaga Kerja
84.600,00
33.840,00
3.666,00
11.844,00
133.950,00
B.
1
2
3
4
5
6
7
Bahan
Kayu usuk/kaso klas 3 (Albasia)
Triplek 3 mm (120 x 240)
Paku Asbes
Asbes gelombang
Paku campuran 4 - 7cm
Plesteran Lantai tebal 1,5 cm 1 PC:3 PP + Acian
Pintu double teakwood rangka kayu
M.33.d
M.42.a
M.66.c
M.110.a
M.54.f
P.04e
M.40.a
m3
lbr
kg
lbr
kg
m3
lbr
0,35
1,00
0,75
0,30
0,10
1,35
0,10
70.000,00
78.146,00
21.150,00
78.327,00
21.150,00
63.178,13
112.205,00
Jumlah Harga Bahan
24.500,00
78.146,00
15.862,50
23.498,10
2.115,00
85.290,48
11.220,50
240.632,58
Peralatan
Jumlah Harga Peralatan
D
E
F
0
374.582,58
56.187,39
430.769,97
15% x D
Harga Satuan
(Rp)
Jumlah
(Rp)
7
HSD.Pus Air.3
LA.04
LA.04a
Mobilisasi
Investigasi Lapangan
Lokasi tempat peralatan mempunyai tingkat kesulitan sedang dengan tersedianya akses jalan kecil
No
Uraian
Kode
Satuan
Koefisien
1
A.
1
2
Harga Satuan
Tenaga Kerja
Pelaksana kegiatan (pemberi tugas)
Staf (Kontraktor)
L.08
L.07
OH
OH
3
2
B.
Bahan
Peralatan
D
E
F
(Rp)
Jumlah
(Rp)
7
350.000,00
150.000,00
Jumlah Harga Tenaga Kerja
1.050.000,00
300.000,00
1.350.000,00
T.06
Pekerjaan Galian Tanah Biasa
T.06a 1 m3 Galian tanah biasa sedalam < 1 m
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja Galian
Mandor
L.01
L.04
OH
OH
Bahan
Peralatan
D
E
F
Harga Satuan
(Rp)
Jumlah
0,5630
0,0563
(Rp)
7
70.500,00
98.700,00
Jumlah Harga Tenaga Kerja
39.691,50
5.556,81
45.248,31
45.248,31
6.787,25
52.035,56
15% x D
Uraian
Kode
Satuan
Koefisien
L.01
L.04
OH
OH
1
A
1
2
Tenaga Kerja
Pekerja Galian
Mandor
Bahan
Peralatan
D
E
F
Harga Satuan
(Rp)
Jumlah
0,2480
0,0124
(Rp)
7
70.500,00
98.700,00
Jumlah Harga Tenaga Kerja
17.484,00
1.223,88
18.707,88
P.01c
18.707,88
2.806,18
21.514,06
15% x D
Uraian
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang
Kepala Tukang
Mandor
B
1
2
3
Kode
Satuan
Koefisien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
2,700
0,900
0,090
0,270
Bahan
Batu kali
Pasir Pasang
Portland Cement
M.05
M.14.b
M.15
m3
m3
kg
1,200
0,520
163
C
1
Peralatan
Molen
E.28.b
Sewa-hari
0,167
D
E
F
Harga Satuan
15%
(Rp)
Jumlah
(Rp)
7
70.500,00
84.600,00
91.650,00
98.700,00
Jumlah Harga Tenaga Kerja
190.350,00
76.140,00
8.248,50
26.649,00
301.387,50
211.500,00
146.833,00
1.522,80
Jumlah Harga Bahan
253.800,00
76.353,16
248.216,40
578.369,56
879.757,06
131.963,56
1.011.720,62
xD
HSD.Pus Air.4
P.04b
Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan campuran 1 PC:3 PP)
No
D.01
D.01a
Uraian
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0,300
0,150
0,015
0,030
70.500,00
84.600,00
91.650,00
98.700,00
Jumlah Harga Tenaga Kerja
21.150,00
12.690,00
1.374,75
2.961,00
38.175,75
M.14.b
M.15
m3
kg
0,016
5,840
146.833,00
1.522,80
Jumlah Harga Bahan
2.349,33
8.893,15
11.242,48
49.418,23
7.412,73
1
A
1
2
3
4
Tenaga Kerja
Pekerja
Tukang batu
Kepala Tukang
Mandor
B
1
2
Bahan
Pasir Pasang
Portland Cement
Peralatan
D
E
Koefisien
Harga Satuan
15%
(Rp)
Jumlah
(Rp)
7
xD
56.830,96
Kistdam pasir/tanah
1 bh Kistdam pasir/tanah dibungkus karung plastik bagor (sebesar karung beras 25 kg ) uk. 43 x 65 cm
No
Uraian
Kode
Satuan
Koefisien
1
A
1
2
Tenaga Kerja
Pekerja
Mandor
L.01
L.04
OH
OH
0,040
0,004
B
1
2
Bahan
Karung plastik / bagor
Tali rapia / plastik
M.123.a
M.141
1,000
2,000
pasir *
M.14.a
bh
m
m3
Peralatan
D
E
Harga Satuan
(Rp)
Jumlah
(Rp)
7
70.500,00
98.700,00
Jumlah Harga Tenaga Kerja
2.820,00
394,80
3.214,80
2.500,00
2.500,00
0,120
2.500,00
5.000,00
91.771,50
Jumlah Harga Bahan
11.012,58
18.512,58
21.727,38
3.259,11
15% x D
24.986,49
LA.07 Penggambaran
Peta situasi atau peta steak out bangunan
1)
LA.07a Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan banyak bentuk-bentuk duplikasi
No
Uraian
Kode
Satuan
Koefisien
1
A.
1
2
Tenaga Kerja
Drafter CAD
Desain engineer
L.14
L.15
OH
OH
1,00
0,50
B.
Bahan
C
1
2
Peralatan
Sewa Laptop for Design
Sewa Printer Multifungsi
M.139.a
M.139.b
sewa-bulan
sewa-bulan
0,04
0,03
D
E
F
Harga Satuan
(Rp)
6
66.250,00
66.250,00
Jumlah Harga Tenaga Kerja
Jumlah
(Rp)
7
66.250,00
33.125,00
99.375,00
15% x D
2.947.500,00
3.602.500,00
Jumlah Harga Peralatan
117.900,00
90.062,50
207.962,50
307.337,50
46.100,63
353.438,13
HSD.Pus Air.5
Uraian
Kode
Satuan
Koefisien
1
A.
1
Harga Satuan
6
(Rp)
Jumlah
(Rp)
Tenaga Kerja
Tukang foto
M.16
OH
25.000,00
Jumlah Harga Tenaga Kerja
25.000,00
25.000,00
B.
1
2
3
Bahan
USB Flasdisk 16 GB (soft file)
Foto printing
Foto Album
M.117
M.119d
M.119a
unit
lbr
bh
3
90
3
124.080,00
1.500,00
75.000,00
Jumlah Harga Bahan
372.240,00
135.000,00
225.000,00
732.240,00
C
1
Peralatan
Kamera Digital
To.06
Sewa-hari
50.000,00
Jumlah Harga Peralatan
50.000,00
50.000,00
D
E
F
807.240,00
121.086,00
928.326,00
15% x D
No
Uraian
Kode
Satuan
Koefisien
5*
E.38.b
To.04
halaman
buah
A
B
C
Lain-lain
Fotocopy kertas A4
Menjilid
Jumlah
Overhead & profit (Contoh 15%)
Harga satuan pekerjaan ( D + E )
15% x D
200,00
1,00
Harga Satuan
(Rp)
Jumlah
(Rp)
7
250,00
13.500,00
50.000,00
13.500,00
63.500,00
9.525,00
73.025,00
HSD.Pus Air.6
No.
Uraian Pekerjaan
Kode
Volume
Satuan
I.
Harga Satuan
Jumlah Harga
(Rp)
(Rp)
Pekerjaan Persiapan
1 Pengukuran kembali/Uitzet
T.04
180,50
4.342,40
783.803,20
T.01
361,00
5.545,53
2.001.936,33
LA.03
1,00
bh
326.724,78
326.724,78
LA.02
9,00
430.769,97
3.876.929,70
LA.04a
1,00
paket
1.552.500,00
1.552.500,00
LA.07a
2,00
Set
353.438,13
706.876,25
7 Dokumentasi
LA.05b
2,00
Set
121.086,00
242.172,00
8 Penggandaan buku/laporan
LA.08a
2,00
Set
31.050,00
Jumlah I
II.
62.100,00
9.553.042,25
Pekerjaan Saluran
1 Galian tanah biasa sedalam < 1 m
T.06a
115,50
52.035,56
6.010.106,78
T.15a.1
28,85
21.514,06
620.680,69
P.01c
209,19
1.011.720,62
211.641.836,29
P.04b
541,50
56.830,96
30.773.967,28
D.01a
20,00
bh
24.986,49
5 Dewatering:
- kistdam
Jumlah II
499.729,74
249.546.320,77
HSD.Pus Air.7
NO
JUMLAH
1 PEKERJAAN PERSIAPAN
Rp.
9.553.042,25
2 PEKERJAAN SALURAN
Rp.
249.546.320,77
Jumlah
Rp.
259.099.363,02
PPN 10%
Rp.
25.909.936,30
Jumlah Total
Rp.
285.009.299,32
Dibulatkan
Rp.
285.000.000,00
Serang,
2016
Memeriksa
Kepala Bidang Sumber Daya Air
Dinas Pekerjaan Umum
Kota Serang
Dibuat Oleh
Pejabat Pelaksana Teknis Kegiatan
(PPTK)
TARSONO, SP. MM
NIP. 19620911 199703 1 001
Mengetahui
Kepala Dinas Pekerjaan Umum
Kota Serang
Ir.H.HIDAYAT.MM
NIP. 19590425 199003 1 001