URAIAN
SEBELUM PERUBAHAN
VOLUME
3
HARGA SATUAN
4
SETELAH
JUMLAH
VOLUME
PENDAPATAN
Dana Desa
267,456,364
137,748,775
Pendapatan Transfer
2
2
JUMLAH PENDAPATAN
405,205,139
BELANJA
405,205,139
209,715,659
90,600,000
1 Belanja Pegawai
a.
b.
90,600,000
61,800,000
- Kepala Desa
12
bln
18,000,000
- Sekretaris Desa
bln
- Bendahara Desa
12
bln
500,000
6,000,000
- Kepala Urusan
12
bln
550,000
19,800,000
- Kepala Dusun
12
bln
500,000
18,000,000
1,500,000
13,500,000
- Kepala Desa
bln
300,000
2,400,000
- Koordinator PTPKD
bln
250,000
2,000,000
- Pelaksana Kegiatan
bln
200,000
4,800,000
- Bendahara Desa
bln
200,000
1,600,000
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
- Insentif Ketua RT
c.
3
12
bln
HARGA SATUAN
4
75,000
Tunjangan BPD
SETELAH
JUMLAH
5
2,700,000
6
3
15,300,000
- Ketua
12
bln
300,000
3,600,000
- Wakil Ketua
12
bln
275,000
3,300,000
- Sekretaris
12
bln
250,000
3,000,000
- Anggota
12
bln
225,000
5,400,000
Operasional Perkantoran
22,356,925
22,356,925
a.
VOLUME
3,515,925
- Kertas HVS F4 70 gr
rim
45,000
270,000
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
HARGA SATUAN
SETELAH
JUMLAH
VOLUME
- Kertas HVS A4 70 gr
3
4
rim
4
42,000
- Amplop
pak
19,500
58,500
- Buku Agenda
bh
20,000
120,000
- Pena Pilot
kotak
12,000
24,000
kotak
65,000
130,000
- Gunting
bh
20,000
20,000
- Tinta Printer
Btl
60,000
240,000
- Kwitansi Biasa
Blok
10,000
30,000
- Buku Ekspedisi
bh
10,000
10,000
bh
1,500,000
1,500,000
kotak
2,250
11,250
kotak
4,500
22,500
set
8,000
40,000
- Hacter (staples)
bh
22,500
45,000
- Bantal Stempel
bh
12,850
12,850
- Tinta Stempel
bh
10,225
10,225
kotak
2,400
4,800
botol
3,200
9,600
- Pensil 2B
buah
2,400
9,600
- Stempel
bh
130,000
130,000
- Pelobang Kertas
bh
15,000
30,000
- Penghapus Pensil 2B
buah
2,400
9,600
10
bh
1,000
10,000
bh
4,000
20,000
- Map Snelhecter
10
bh
1,000
10,000
- Map Ordinier
10
bh
35,000
350,000
168,000
- SSP Pajak
Blok
25,000
150,000
bh
35,000
70,000
KODE
REKENING
URAIAN
2
b.
c.
SEBELUM PERUBAHAN
VOLUME
3
JUMLAH
VOLUME
6
180,000
- Materai 6000
20
Lbr
6,000
120,000
- Materai 3000
20
Lbr
3,000
60,000
325,000
- Foto copy
d.
HARGA SATUAN
SETELAH
Eksp
1000 lbr
25,000
125,000
200
200,000
1,250,000
50
OK
18,000
900,000
- Snack Kotak
50
OK
7,000
350,000
KODE
REKENING
SEBELUM PERUBAHAN
URAIAN
1
e
f.
VOLUME
2
Pengadaan Pakaian Dinas dan Atributnya
HARGA SATUAN
4
500,000
1,500,000
bh
250,000
1,750,000
Pejalanan Dinas
10,808,500
1
ls
10,808,500
Sapu Plastik
bh
37,000
74,000
Kain Pel
bh
27,000
54,000
Pembersih Lantai
btl
7,500
22,500
Tong Sampah
bh
19,000
38,000
Gayung Air
bh
12,500
50,000
Pembersih WC
Btl
13,000
26,000
Sikat WC
bh
6,500
13,000
450,000
Tagihan PDAM
kali
50,000
150,000
Listrik
bln
50,000
300,000
2,300,000
bh
250,000
500,000
btl
450,000
1,800,000
Operasional BPD
8,604,617
10,808,500
277,500
5
3,250,000
Stel
VOLUME
JUMLAH
- Pakaian Dinas
SETELAH
5,604,617
949,617
- Kertas HVS F4 70 gr
rim
45,000
270,000
- Kertas HVS A4 70 gr
rim
40,000
160,000
- Amplop
pak
19,500
58,500
- Buku Agenda
bh
20,000
80,000
kotak
66,400
132,800
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
HARGA SATUAN
SETELAH
JUMLAH
VOLUME
- Kwitansi Biasa
3
7
Blok
4
10,000
kotak
2,250
11,250
- Hacter (staples)
bh
22,500
45,000
- Bantal Stempel
bh
16,067
16,067
- Tinta Stempel
bh
16,000
32,000
botol
6,000
24,000
70,000
20
bh
1,000
20,000
Map Snelhecter
20
bh
1,500
30,000
KODE
REKENING
URAIAN
2
b.
c.
SEBELUM PERUBAHAN
VOLUME
3
6,000
120,000
- Materai 3000
20
Lbr
3,000
60,000
600,000
5
Eksp
1500 lbr
50
lbr
35,000
175,000
200
300,000
2,500
125,000
1,875,000
- Nasi Bungkus
75
OK
18,000
1,350,000
- Snack Kotak
75
OK
7,000
525,000
2,000,000
5
bh
400,000
2,000,000
3,000,000
bh
550,000
550,000
Papan Struktur
bh
550,000
550,000
bh
950,000
1,900,000
5,125,000
5,125,000
b.
Lbr
2 Belanja Modal
a.
20
VOLUME
- Materai 6000
- Dokumentasi
JUMLAH
180,000
- Foto copy
e.
- Cetak
d.
HARGA SATUAN
SETELAH
3,050,000
Pembina
TA
400,000
400,000
Ketua
TA
350,000
350,000
Sekretaris
TA
300,000
300,000
Anggota
TA
250,000
2,000,000
2,075,000
Pembina
TA
250,000
250,000
Ketua
TA
225,000
225,000
Sekretaris
TA
200,000
200,000
Anggota
TA
175,000
1,400,000
KODE
REKENING
1
2
SEBELUM PERUBAHAN
URAIAN
VOLUME
2
Kegiatan Tim Pengelola Kegiatan (TPK)
HARGA SATUAN
4
SETELAH
JUMLAH
VOLUME
5
2,800,000
2,800,000
2,800,000
Ketua
TA
700,000
700,000
Sekretaris
TA
600,000
600,000
Anggota
TA
500,000
1,500,000
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
3
3 Belanja Modal
2
Unit
8,500,000
17,000,000
- Komputer
Unit
5,500,000
5,500,000
bh
535,117
535,117
Unit
2,500,000
5,000,000
Unit
6,340,000
6,340,000
- Infocus
Unit
9,000,000
9,000,000
- TV
Unit
2,500,000
2,500,000
- Parabola Digital
Unit
2,500,000
2,500,000
- Bendera Ruangan
lbr
100,000
300,000
roll
95,000
95,000
- Lemari arsip
bh
3,200,000
3,200,000
bh
1,000,000
2,000,000
bh
4,500,000
4,500,000
- Umbul-umbul
100
lbr
45,000
4,500,000
- Filling Cabinet
Unit
3,200,000
3,200,000
- Kipas Angin
bh
650,000
650,000
- Dispenser
bh
300,000
300,000
- Galon
bh
56,500
113,000
- Jam Dinding
bh
150,000
150,000
- Pot Bunga
bh
350,000
700,000
bh
150,000
300,000
kali
3,500,000
3,500,000
bh
20,000
20,000
20
12,500
250,000
Terminal Listrik
- Kabel Listrik
2
5
72,153,117
- Laptop
Kamera Digital
JUMLAH
72,153,117
- Printer Epson
Meja Komputer
HARGA SATUAN
SETELAH
3,562,000
3,562,000
VOLUME
6
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
JUMLAH
VOLUME
3
3
oh
4
85,000
Bola Lampu
bh
75,000
300,000
bh
25,000
100,000
klg
1,200,000
2,400,000
Kuas Roll
bh
50,000
200,000
ktk
13,000
52,000
Upah Tukang
HARGA SATUAN
SETELAH
510,000
4,514,000
1,360,000
oh
85,000
1,360,000
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
3
Pintu WC
bh
Semen
Pasir
zak
70,000
490,000
m3
333,000
666,000
Kerikil
m3
333,000
333,000
btg
85,000
425,000
bh
25,000
50,000
Kabel Listrik
8,000
40,000
Bola Lampu
bh
75,000
150,000
133,796,980
3,697,000
720,000
oh
120,000
720,000
2,977,000
3 Belanja Modal
5
bh
150,000
750,000
16
btg
65,000
1,040,000
Kawat Beton
kg
13,000
13,000
Koral
M3
250,000
500,000
Semen
zak
70,000
350,000
Papan Mal
lbr
40,000
200,000
kg
12,000
24,000
Kayu 4 x 6
btg
20,000
100,000
VOLUME
5
3,154,000
1,000,000
JUMLAH
500,000
Gorong-Gorong
3 Belanja Modal
Upah Tukang
2
HARGA SATUAN
SETELAH
10,782,500
2,395,000
oh
85,000
2,125,000
Upah Tukang
oh
120,000
120,000
oh
150,000
150,000
8,387,500
3 Belanja Modal
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
HARGA SATUAN
JUMLAH
Kayu 4 x 6
3
1
M3
Kayu Perpil
225
bh
17,500
3,937,500
Cat Pernis
15
kg
35,000
525,000
10
bh
60,000
600,000
10
ktk
20,000
200,000
Paku 1 inch
kg
20,000
100,000
kg
5,000
25,000
bh
100,000
400,000
bh
150,000
600,000
4
2,000,000
SETELAH
5
2,000,000
VOLUME
6
KODE
REKENING
1
2
SEBELUM PERUBAHAN
URAIAN
VOLUME
2
Kegiatan Pembangunan Jalan A Rt. 02 Dusun Bawah
JUMLAH
VOLUME
5
6,657,200
780,000
Upah Pekerja
oh
85,000
510,000
Upah Tukang
oh
120,000
120,000
Kepala Tukang
oh
150,000
150,000
5,877,200
3 Belanja Modal
29
sak
70,000
2,030,000
Pasir Beton
M3
333,000
2,331,000
Kerikil
M3
216,600
1,516,200
5,967,600
780,000
oh
85,000
510,000
Upah Tukang
oh
120,000
120,000
Kepala Tukang
oh
150,000
150,000
5,187,600
3 Belanja Modal
Semen Portland
Semen Portland
HARGA SATUAN
SETELAH
27
sak
70,000
1,890,000
Pasir Beton
M3
333,000
1,998,000
Kerikil
M3
216,600
1,299,600
2,169,200
440,000
oh
85,000
170,000
Upah Tukang
oh
120,000
120,000
Kepala Tukang
oh
150,000
150,000
1,729,200
3 Belanja Modal
Semen Portland
sak
70,000
630,000
Pasir Beton
M3
333,000
666,000
Kerikil
M3
216,600
433,200
2,409,700
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
3
HARGA SATUAN
4
SETELAH
JUMLAH
VOLUME
6
780,000
oh
85,000
510,000
Upah Tukang
oh
120,000
120,000
Kepala Tukang
oh
150,000
150,000
1,629,700
3 Belanja Modal
Semen Portland
sak
70,000
420,000
Pasir Beton
M3
333,000
666,000
Kerikil
M3
216,600
433,200
Tanah Urug
M3
110,500
110,500
KODE
REKENING
1
2
SEBELUM PERUBAHAN
URAIAN
VOLUME
2
Kegiatan Pembangunan Cor Plat Rt. 02 Dusun Bawah
oh
85,000
1,785,000
Upah Tukang
oh
120,000
480,000
Kepala Tukang
oh
150,000
150,000
4,657,820
3 Belanja Modal
2
kg
18,000
36,000
22
btg
96,940
2,132,680
M3
19,600
78,400
12
M3
70,000
840,000
- Pasir Beton
kg
333,000
333,000
- Kerikil
M3
216,600
433,200
0.3
m3
2,681,800
804,540
9,657,600
2,820,000
oh
85,000
2,040,000
Upah Tukang
oh
120,000
480,000
Kepala Tukang
oh
150,000
300,000
6,837,600
3 Belanja Modal
- Sirtu
M3
165,000
165,000
M3
296,000
592,000
35
M3
70,000
2,450,000
- Pasir Pasang
M3
333,000
666,000
- Pasir Beton
M3
333,000
1,665,000
- Kerikil
M3
216,600
1,299,600
- Semen Portland
- Balok Bekisting
2
5
7,072,820
- Semen Portland
VOLUME
Upah Pekerja
- Kawat Beton
JUMLAH
2,415,000
- Paku
HARGA SATUAN
SETELAH
9,202,200
3,325,000
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
Upah Pekerja
3
5
Upah Tukang
oh
oh
HARGA SATUAN
4
85,000
120,000
SETELAH
JUMLAH
5
2,125,000
1,200,000
5,877,200
3 Belanja Modal
- Semen Portland
29
sak
70,000
2,030,000
- Pasir Beton
M3
333,000
2,331,000
- Kerikil
M3
216,600
1,516,200
VOLUME
6
KODE
REKENING
URAIAN
10
10
SEBELUM PERUBAHAN
VOLUME
3
11
11
12
12
bln
50,000
3,000,000
Bh
15,000
30,000
12
bln
50,000
1,800,000
Bh
15,000
30,000
Kegiatan Posyandu
12
13
13
4,380,000
4,380,000
Ketua
12
bln
80,000
960,000
Anggota
12
bln
70,000
3,360,000
Bh
15,000
60,000
3 Belanja Modal
1,050,000
bh
750,000
750,000
bh
300,000
300,000
1,596,000
510,000
13
14
14
2x
14
oh
85,000
510,000
1,086,000
3 Belanja Modal
Semen
zak
70,000
420,000
Pasir
M3
333,000
666,000
1,596,000
510,000
5,430,000
- Buku Agenda
2
1,830,000
1,830,000
- Buku Agenda
2
VOLUME
5
3,030,000
12
JUMLAH
3,030,000
- Buku Agenda
2
Kegiatan Perpustakaan
- Insentif Pengurus
HARGA SATUAN
SETELAH
2x
oh
85,000
510,000
1,086,000
3 Belanja Modal
KODE
REKENING
URAIAN
14
14
SEBELUM PERUBAHAN
VOLUME
Semen
3
6
zak
Pasir
M3
HARGA SATUAN
4
70,000
333,000
3 Belanja Modal
4x
JUMLAH
VOLUME
6
420,000
666,000
9,900,000
SETELAH
12
unit
9,900,000
9,900,000
9,900,000
9,900,000
KODE
REKENING
1
2
15
15
15
SEBELUM PERUBAHAN
URAIAN
VOLUME
2
Pembangunan Tembok Penahan Tebing Kantor Kepala Desa 6x2 M, Tebal :
30 cm
2 Belanja Barang dan Jasa
HARGA SATUAN
SETELAH
JUMLAH
VOLUME
4,754,000
1,970,000
Upah Pekerja
4x
oh
85,000
1,700,000
Upah Tukang
1x
oh
120,000
120,000
1x
oh
150,000
150,000
2,784,000
3 Belanja Modal
Batu Kali
M3
Rp
333,000
1,998,000
Kerikil
M3
Rp
333,000
666,000
Semen
zak
Rp
60,000
120,000
Pasir
M3
Rp
333,000
1,998,000
16
Pembangunan Gudang
48,045,160
16
22,375,000
16
kali
1,000,000
1,000,000
kali
75,000
75,000
Upah Pekerja
10 x
12
oh
85,000
10,200,000
10
Upah Tukang
9x
10
oh
120,000
10,800,000
2x
oh
150,000
300,000
25,670,160
3 Belanja Modal
Pasir Urug
M3
165,000
165,000
M3
296,000
2,368,000
56
zak
72,500
4,060,000
Pasir Pasang
M3
333,000
1,998,000
Tanah Urug
M3
66,000
462,000
Pasir Beton
M3
333,000
999,000
Kerikil
M3
216,000
432,000
Papan
20
lbr
25,000
500,000
Paku
11
kg
18,000
198,000
Semen Portland
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
HARGA SATUAN
SETELAH
JUMLAH
3
24
btg
4
96,940
20
btg
35,000
700,000
Kawat Beton
kg
19,600
58,800
Kayu 4 x 6
btg
25,000
200,000
3295 bh
1,200
3,954,000
Bata merah
Cat Tembok Metrolite isi 25 kg
Flamour
5
2,326,560
klg
375,000
375,000
14
kg
28,500
399,000
VOLUME
6
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
HARGA SATUAN
JUMLAH
3
1
M3
11
lbr
104,000
1,144,000
Paku Triplek
kg
25,400
25,400
klg
75,000
75,000
Paku seng
kg
25,500
51,000
32
lbr
56,000
1,792,000
Cat minyak 1 kg
kg
57,200
114,400
Amplas
lbr
4,800
19,200
Minyak cat
kg
21,000
21,000
lbr
55,000
385,000
Dokumentasi
ls
166,000
166,000
Kaso-kaso 5x7 cm
Triplek
4
2,681,800
SETELAH
VOLUME
5
2,681,800
59,067,500
29,357,500
b.
20,882,500
2,400,000
- Ketua
TA
700,000
700,000
TA
650,000
650,000
- Sekretaris
TA
550,000
550,000
- Bendahara
TA
500,000
500,000
Belanja ATK
532,500
- Kertas HVS 70 gr
rim
45,000
135,000
- Amplop
pak
15,000
15,000
- Bolpoint Pilot
12
bh
4,000
48,000
20
bh
750
15,000
- Snelhecter
20
bh
1,000
20,000
botol
2,500
10,000
- Buku Agenda
Eksp
15,000
60,000
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
HARGA SATUAN
SETELAH
JUMLAH
VOLUME
- Bantal Stempel
3
1
bh
4
15,000
- Tinta Stempel
bh
9,500
9,500
- Stempel PKK
bh
130,000
130,000
- Spidol Snowman
bh
12,500
75,000
15,000
16,500,000
55
stel
300,000
16,500,000
KODE
REKENING
SEBELUM PERUBAHAN
URAIAN
1
d.
VOLUME
2
Belanja Penggandaan/Photo Copy
1000 Lbr
200
VOLUME
6
200,000
1,250,000
Nasi Bungkus
50
OK
18,000
900,000
Snack Kotak
50
OK
7,000
350,000
3 Belanja Modal
8,475,000
JUMLAH
200,000
Photo Copy
e.
HARGA SATUAN
SETELAH
10
bh
300,000
3,000,000
- Sendok Gulai
Lusin
100,000
300,000
Lusin
60,000
180,000
- Piring
Lusin
60,000
180,000
- Gelas
Lusin
55,000
165,000
- periuk besar
bh
200,000
800,000
bh
100,000
600,000
- Saringan Santan
Lusin
250,000
250,000
- Gayung
Lusin
150,000
150,000
- Tikar Plastik
bh
1,800,000
1,800,000
- Alas Meja
bh
150,000
300,000
bh
750,000
750,000
3,730,000
3,730,000
ls
1,000,000
1,000,000
10
bln
100,000
1,000,000
bh
500,000
500,000
30
bh
41,000
1,230,000
Kegiatan Kepemudaan
11,070,000
11,070,000
- Baju Bola
Club
- Papan Pentas
lbr
2,500,000
2,500,000
160,000
320,000
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
HARGA SATUAN
JUMLAH
- Bola Kaki
3
2
bh
- Atap Tarup
bh
3,500,000
3,500,000
- Speaker
bh
3,250,000
3,250,000
- Mesin DVD
bh
500,000
500,000
4
500,000
SETELAH
5
1,000,000
VOLUME
6
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
3
12
bln
20,000
1,920,000
50
ok
18,000
900,000
500
lbr
200
100,000
bh
400,000
3,200,000
2,160,000
Kegiatan TPQ
2,160,000
TA
600,000
1,800,000
30
bh
12,000
360,000
3,300,000
2,100,000
Ketua
TA
100,000
700,000
Sekretaris
TA
100,000
700,000
Bendahara
TA
100,000
700,000
1,200,000
Ketua
TA
100,000
400,000
Sekretaris
TA
100,000
400,000
Bendahara
TA
100,000
400,000
2,100,000
3 Belanja Modal
7
bh
300,000
2,100,000
1,230,000
1,230,000
5,400,000
Kegiatan Dasawisma
b Insentif Pokja
5
6,120,000
VOLUME
- Pengadaan Iqro'
3
JUMLAH
6,120,000
Kegiatan Adat
HARGA SATUAN
SETELAH
30
bh
41,000
1,230,000
2,625,000
2,625,000
2,625,000
KODE
REKENING
URAIAN
2
a.
SEBELUM PERUBAHAN
VOLUME
3
HARGA SATUAN
4
SETELAH
JUMLAH
VOLUME
6
525,000
1x
ok
150,000
150,000
1x
ok
125,000
125,000
Sekretaris
1x
ok
100,000
100,000
Anggota
2x
ok
75,000
150,000
KODE
REKENING
URAIAN
2
b.
SEBELUM PERUBAHAN
VOLUME
3
d.
JUMLAH
VOLUME
6
900,000
HARGA SATUAN
SETELAH
oh
300,000
900,000
750,000
Transpor Peserta
15 x
oh
15,000
225,000 15
15 x
oh
35,000
525,000 15
450,000
Nasi Bungkus
18
oh
18,000
324,000
Snack Kotak
18
oh
7,000
126,000
405,205,139
JUMLAH BELANJA
405,205,139
-
SISA
3
PEMBIAYAAN
SILPA
405,205,139
Penerimaan Pembiayaan
JUMLAH (Rp)
3
405,205,139
Pengeluaran Pembiayaan
405,205,139
JUMLAH (Rp)
Mengesahkan,
KODE
REKENING
URAIAN
SEBELUM PERUBAHAN
VOLUME
SETELAH
HARGA SATUAN
JUMLAH
Kepala Desa
5
Sekretaris Desa
PERI RUSMANDI, SE
VOLUME
6
PUNG
ESA
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
1,500,000
JUMLAH
BERTAMBAH/
(BERKURANG)
267,456,364
137,748,775
405,205,139
405,205,139
209,715,659
90,600,000
90,600,000
61,800,000
18,000,000
12
bln
bln
12
bln
500,000
6,000,000
12
bln
550,000
19,800,000
12
bln
500,000
18,000,000
13,500,000
bln
300,000
2,400,000
bln
250,000
2,000,000
bln
200,000
4,800,000
bln
200,000
1,600,000
SETELAH PERUBAHAN
VOLUME
x
6
12
bln
HARGA SATUAN
7
75,000
JUMLAH
8
2,700,000
BERTAMBAH/
(BERKURANG)
9
-
15,300,000
x
12
bln
300,000
3,600,000
12
bln
275,000
3,300,000
12
bln
250,000
3,000,000
12
bln
225,000
5,400,000
22,356,925
22,356,925
3,515,925
270,000
rim
45,000
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
6
4
rim
7
42,000
pak
JUMLAH
BERTAMBAH/
(BERKURANG)
9
168,000
19,500
58,500
bh
20,000
120,000
kotak
12,000
24,000
kotak
65,000
130,000
bh
20,000
20,000
Btl
60,000
240,000
Blok
10,000
30,000
bh
10,000
10,000
bh
1,500,000
1,500,000
kotak
2,250
11,250
kotak
4,500
22,500
set
8,000
40,000
bh
22,500
45,000
bh
12,850
12,850
bh
10,225
10,225
kotak
2,400
4,800
botol
3,200
9,600
buah
2,400
9,600
bh
130,000
130,000
bh
15,000
30,000
buah
2,400
9,600
10
bh
1,000
10,000
bh
4,000
20,000
10
bh
1,000
10,000
10
bh
35,000
350,000
Blok
25,000
150,000
bh
35,000
70,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
BERTAMBAH/
(BERKURANG)
9
180,000
20
Lbr
6,000
120,000
20
Lbr
3,000
60,000
325,000
25,000
125,000
200
200,000
1,250,000
Eksp
1000 lbr
50
OK
18,000
900,000
50
OK
7,000
350,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
BERTAMBAH/
(BERKURANG)
JUMLAH
8
3,250,000
9
-
Stel
500,000
1,500,000
bh
250,000
1,750,000
10,808,500
ls
10,808,500
10,808,500
277,500
bh
37,000
74,000
bh
27,000
54,000
btl
7,500
22,500
bh
19,000
38,000
bh
12,500
50,000
Btl
13,000
26,000
bh
6,500
13,000
450,000
kali
50,000
150,000
bln
50,000
300,000
2,300,000
bh
250,000
500,000
btl
450,000
1,800,000
8,604,617
5,604,617
949,617
rim
45,000
270,000
rim
40,000
160,000
pak
19,500
58,500
bh
20,000
80,000
kotak
66,400
132,800
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
6
7
Blok
7
10,000
kotak
JUMLAH
BERTAMBAH/
(BERKURANG)
9
70,000
2,250
11,250
bh
22,500
45,000
bh
16,067
16,067
bh
16,000
32,000
botol
6,000
24,000
20
bh
1,000
20,000
20
bh
1,500
30,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
BERTAMBAH/
(BERKURANG)
9
180,000
20
Lbr
6,000
120,000
20
Lbr
3,000
60,000
600,000
35,000
175,000
200
300,000
2,500
125,000
1,875,000
Eksp
1500 lbr
50
lbr
75
OK
18,000
1,350,000
75
OK
7,000
525,000
2,000,000
2,000,000
3,000,000
bh
400,000
bh
550,000
550,000
bh
550,000
550,000
bh
950,000
1,900,000
5,125,000
5,125,000
3,050,000
TA
400,000
400,000
TA
350,000
350,000
TA
300,000
300,000
TA
250,000
2,000,000
2,075,000
TA
250,000
250,000
TA
225,000
225,000
TA
200,000
200,000
TA
175,000
1,400,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
8
2,800,000
BERTAMBAH/
(BERKURANG)
9
-
2,800,000
2,800,000
TA
700,000
700,000
TA
600,000
600,000
TA
500,000
1,500,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
8
72,153,117
BERTAMBAH/
(BERKURANG)
9
-
72,153,117
Unit
8,500,000
17,000,000
Unit
5,500,000
5,500,000
bh
535,117
535,117
Unit
2,500,000
5,000,000
Unit
6,340,000
6,340,000
Unit
9,000,000
9,000,000
Unit
2,500,000
2,500,000
Unit
2,500,000
2,500,000
lbr
100,000
300,000
roll
95,000
95,000
bh
3,200,000
3,200,000
bh
1,000,000
2,000,000
bh
4,500,000
4,500,000
100
lbr
45,000
4,500,000
3,200,000
3,200,000
Unit
bh
650,000
650,000
bh
300,000
300,000
bh
56,500
113,000
bh
150,000
150,000
bh
350,000
700,000
bh
150,000
300,000
kali
3,500,000
3,500,000
bh
20,000
20,000
20
12,500
250,000
3,562,000
3,562,000
SETELAH PERUBAHAN
VOLUME
x
HARGA SATUAN
6
3
oh
7
85,000
bh
JUMLAH
BERTAMBAH/
(BERKURANG)
9
510,000
75,000
300,000
bh
25,000
100,000
klg
1,200,000
2,400,000
bh
50,000
200,000
ktk
13,000
52,000
4,514,000
1,360,000
1,360,000
oh
85,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
bh
JUMLAH
8
3,154,000
BERTAMBAH/
(BERKURANG)
9
-
500,000
1,000,000
zak
70,000
490,000
m3
333,000
666,000
m3
333,000
333,000
btg
85,000
425,000
bh
25,000
50,000
8,000
40,000
bh
75,000
150,000
135,544,100
3,697,000
720,000
720,000
2,977,000
oh
120,000
bh
150,000
750,000
16
btg
65,000
1,040,000
kg
13,000
13,000
M3
250,000
500,000
zak
70,000
350,000
lbr
40,000
200,000
kg
12,000
24,000
btg
20,000
100,000
10,782,500
2,395,000
oh
85,000
2,125,000
oh
120,000
120,000
oh
150,000
150,000
8,387,500
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
7
2,000,000
JUMLAH
8
2,000,000
BERTAMBAH/
(BERKURANG)
6
1
M3
225
bh
17,500
3,937,500
15
kg
35,000
525,000
10
bh
60,000
600,000
10
ktk
20,000
200,000
kg
20,000
100,000
kg
5,000
25,000
bh
100,000
400,000
bh
150,000
600,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
BERTAMBAH/
(BERKURANG)
9
- -
510,000
- -
120,000
- -
150,000
- -
2,030,000
- -
2,331,000
- -
1,516,200
6,307,600
1,120,000
x
oh
85,000
850,000
340,000
oh
120,000
120,000
oh
150,000
150,000
5,187,600
27
sak
70,000
1,890,000
M3
333,000
1,998,000
M3
216,600
1,299,600
4,058,800
1,700,000
1,290,000
850,000
oh
85,000
1,020,000
850,000
oh
120,000
120,000
oh
150,000
150,000
2,768,800
823,000
16
sak
70,000
1,120,000
490,000
M3
333,000
999,000
333,000
M3
216,600
649,800
216,600
4,279,800
1,020,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
8
1,290,000
BERTAMBAH/
(BERKURANG)
9
510,000
oh
85,000
1,020,000
510,000
oh
120,000
120,000
oh
150,000
150,000
2,989,800
1,033,000
16
sak
70,000
1,120,000
700,000
M3
333,000
999,000
333,000
M3
216,600
649,800
216,600
M3
110,500
221,000
110,500
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
8
7,282,820
BERTAMBAH/
(BERKURANG)
9
-
2,415,000
oh
85,000
1,785,000
oh
120,000
480,000
oh
150,000
150,000
4,867,820
kg
18,000
36,000
22
btg
96,940
2,132,680
M3
19,600
78,400
15
M3
70,000
1,050,000
210,000
kg
333,000
333,000
M3
216,600
433,200
0.3
m3
2,681,800
804,540
9,657,600
2,820,000
oh
85,000
2,040,000
oh
120,000
480,000
oh
150,000
300,000
6,837,600
M3
165,000
165,000
M3
296,000
592,000
35
M3
70,000
2,450,000
M3
333,000
666,000
M3
333,000
1,665,000
M3
216,600
1,299,600
9,202,200
3,325,000
SETELAH PERUBAHAN
VOLUME
x
6
5
oh
oh
HARGA SATUAN
7
85,000
120,000
JUMLAH
8
2,125,000
BERTAMBAH/
(BERKURANG)
9
-
1,200,000
5,877,200
29
sak
70,000
2,030,000
M3
333,000
2,331,000
M3
216,600
1,516,200
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
8
3,030,000
BERTAMBAH/
(BERKURANG)
9
-
3,030,000
12
bln
50,000
3,000,000
Bh
15,000
30,000
1,830,000
1,830,000
12
bln
50,000
1,800,000
Bh
15,000
30,000
5,430,000
4,380,000
4,380,000
12
bln
80,000
960,000
12
bln
70,000
3,360,000
Bh
15,000
60,000
1,050,000
bh
750,000
750,000
bh
300,000
300,000
2,386,000
1,300,000
1,020,000
790,000
1,020,000
510,000
1,366,000
280,000
oh
85,000
10
zak
70,000
700,000
280,000
M3
333,000
666,000
2,549,000
1,293,000
850,000
953,000
850,000
340,000
1,699,000
613,000
oh
85,000
SETELAH PERUBAHAN
VOLUME
6
10
zak
M3
1
x
12
unit
HARGA SATUAN
7
70,000
JUMLAH
BERTAMBAH/
(BERKURANG)
9
700,000
280,000
999,000
333,000
9,900,000
9,900,000
9,900,000
9,900,000
9,900,000
333,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
BERTAMBAH/
(BERKURANG)
5,882,000
1,970,000
oh
85,000
1,700,000
oh
120,000
120,000
oh
150,000
150,000
3,912,000
198,000
M3
333,000
1,998,000
M3
216,000
864,000
198,000
15
zak
70,000
1,050,000
930,000
M3
333,000
1,998,000
49,268,780
19,595,000
kali
1,000,000
1,000,000
kali
75,000
75,000
10
oh
85,000
8,500,000 -
1,700,000
oh
120,000
9,720,000 -
1,080,000
oh
150,000
300,000
29,673,780 -
296,000
M3
165,000
165,000
M3
296,000
2,072,000 -
296,000
50
zak
72,500
3,625,000 -
435,000
M3
333,000
1,998,000
M3
66,000
462,000
M3
333,000
999,000
M3
216,000
432,000
20
lbr
25,000
500,000
11
kg
18,000
198,000
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
JUMLAH
8
2,326,560
BERTAMBAH/
(BERKURANG)
6
24
btg
7
96,940
20
btg
35,000
700,000
kg
19,600
58,800
btg
25,000
200,000
3295 bh
1,200
3,954,000
klg
375,000
375,000
14
kg
28,500
399,000
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
7
2,681,800
JUMLAH
8
2,681,800
BERTAMBAH/
(BERKURANG)
6
1
M3
10
lbr
104,000
kg
25,400
25,400
klg
75,000
75,000
kg
25,500
51,000
32
lbr
56,000
1,792,000
4,838,620
4,838,620
1,040,000 -
9
104,000
kg
57,200
114,400
lbr
4,800
19,200
kg
21,000
21,000
lbr
55,000
385,000
ls
166,000
166,000
57,320,380
27,610,380
20,882,500
2,400,000
TA
700,000
700,000
TA
650,000
650,000
TA
550,000
550,000
TA
500,000
500,000
532,500
rim
45,000
135,000
pak
15,000
15,000
12
bh
4,000
48,000
20
bh
750
15,000
20
bh
1,000
20,000
botol
2,500
10,000
Eksp
15,000
60,000
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
6
1
bh
7
15,000
bh
1
6
55
JUMLAH
BERTAMBAH/
(BERKURANG)
9
15,000
9,500
9,500
bh
130,000
130,000
bh
12,500
75,000
16,500,000
16,500,000
stel
300,000
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
1000 Lbr
200
JUMLAH
BERTAMBAH/
(BERKURANG)
9
200,000
200,000
1,250,000
50
OK
18,000
900,000
50
OK
7,000
350,000
6,727,880 -
1,747,120
10
bh
300,000
3,000,000
Lusin
100,000
300,000
Lusin
60,000
180,000
Lusin
60,000
180,000
Lusin
55,000
165,000
bh
213,220
852,880
52,880
bh
100,000
600,000
Lusin
250,000
250,000
Lusin
150,000
150,000
bh
- -
1,800,000
bh
150,000
300,000
bh
750,000
750,000
3,730,000
3,730,000
1,000,000
1,000,000
ls
10
bln
100,000
1,000,000
bh
500,000
500,000
30
bh
41,000
1,230,000
11,070,000
11,070,000
2,500,000
2,500,000
160,000
320,000
Club
lbr
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
7
500,000
JUMLAH
8
1,000,000
BERTAMBAH/
(BERKURANG)
6
2
bh
bh
3,500,000
3,500,000
bh
3,250,000
3,250,000
bh
500,000
500,000
SETELAH PERUBAHAN
VOLUME
HARGA SATUAN
JUMLAH
8
6,120,000
BERTAMBAH/
(BERKURANG)
9
-
6,120,000
12
bln
20,000
1,920,000
50
ok
18,000
900,000
500
lbr
200
100,000
bh
400,000
3,200,000
2,160,000
2,160,000
TA
600,000
1,800,000
30
bh
12,000
360,000
5,400,000
3,300,000
2,100,000
TA
100,000
700,000
TA
100,000
700,000
TA
100,000
700,000
1,200,000
TA
100,000
400,000
TA
100,000
400,000
TA
100,000
400,000
2,100,000
2,100,000
1,230,000
1,230,000
1,230,000
2,625,000
2,625,000
2,625,000
30
bh
bh
300,000
41,000
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
BERTAMBAH/
(BERKURANG)
9
525,000
ok
150,000
150,000
ok
125,000
125,000
ok
100,000
100,000
ok
75,000
150,000
SETELAH PERUBAHAN
VOLUME
6
x
HARGA SATUAN
7
oh
300,000
JUMLAH
BERTAMBAH/
(BERKURANG)
9
900,000
900,000
750,000
oh
15,000
225,000
oh
35,000
525,000
450,000
18
oh
18,000
324,000
18
oh
7,000
126,000
405,205,139
405,205,139
405,205,139
405,205,139
405,205,139
ember 2015
SETELAH PERUBAHAN
VOLUME
6
HARGA SATUAN
7
JUMLAH
BERTAMBAH/
(BERKURANG)
1
1
1
1
1
2
3
2
PENDAPATAN
Pendapatan Asli Desa
Hasil Usaha
Swadaya, Partisipasi dan Gotong Royong
Lain-lain Pendapatan Asli Desa yang sah
1
1
1
1
1
1
1
2
2
2
2
2
2
2
1
2
3
4
4
4
Pendapatan Transfer
Dana Desa
Bagian dari hasil pajak & retribusi daerah kabupaten/kota
Alokasi Dana Desa
Bantuan Keuangan
Bantuan Provinsi
Bantuan Kabupaten/Kota
1
1
1
3
3
3
1
2
1
2
VOL
UME
6
Pendapatan Lain-lain
Hibah dan Sumbangan dari pihak ke-3 yang tidak mengikat
Lain-lain pendapatan desa yang sah
JUMLAH PENDAPATAN
BELANJA
2
2
1
1
2
2
1
1
2
2
1
0
1
3
3
x
x
x
x
x
12
0
12
12
12
bln
bln
bln
bln
bln
x
x
x
x
x
1
1
3
1
3
x
x
x
x
x
8
8
8
8
12
bln
bln
bln
bln
bln
x
x
x
x
x
1
1
1
2
x
x
x
x
12
12
12
12
bln
bln
bln
bln
x
x
x
x
6
4
3
6
2
2
1
4
3
1
1
5
5
5
2
1
1
2
3
4
1
2
4
10
5
10
10
rim
rim
pak
bh
kotak
kotak
bh
Btl
Blok
bh
bh
kotak
kotak
set
bh
bh
bh
kotak
botol
buah
bh
bh
buah
bh
bh
bh
bh
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Halaman 57
KO
DE
REK
ENI
NG
1
URAIAN
2
28 SSP Pajak
29 Gambar Presiden dan wakil Presiden
b.
Materai dan Benda Pos
- Materai 6000
- Materai 3000
c.
Cetak dan Penggandaan
- Cetak
VOL
UME
6
6
2
Blok
bh
x
x
20
20
Lbr
Lbr
x
x
Eksp
Halaman 58
KO
DE
REK
ENI
NG
URAIAN
2
- Foto copy
d.
Makan dan Minum Rapat
- Nasi Bungkus
- Snack Kotak
e
Pengadaan Pakaian Dinas dan Atributnya
- Pakaian Dinas
- Pakaian Batik Perangkat Desa
f.
Pejalanan Dinas
Perjalanan Dinas Dalam Daerah
Perjalanan Dinas Luar Daerah
VOL
UME
6
1000
lbr
50
50
OK
OK
x
x
3
7
Stel
bh
x
x
ls
2
2
3
2
4
2
2
bh
bh
btl
bh
bh
Btl
bh
x
x
x
x
x
x
x
3
6
kali
bln
x
x
2
4
bh
btl
x
x
6
4
3
4
2
7
5
2
1
2
4
20
20
rim
rim
pak
bh
kotak
Blok
kotak
bh
bh
bh
botol
bh
bh
x
x
x
x
x
x
x
x
x
x
x
x
x
20
20
Lbr
Lbr
x
x
Eksp
lbr
lbr
x
x
x
75
75
OK
OK
x
x
bh
1
1
2
bh
bh
bh
x
x
x
2
2
1
1
3
3
2
2
1
1
5
1500
50
6
6
1
1
1
8
x
x
x
x
1
1
1
1
TA
TA
TA
TA
x
x
x
x
1
1
1
8
x
x
x
x
1
1
1
1
TA
TA
TA
TA
x
x
x
x
1
1
3
x
x
x
1
1
1
TA
TA
TA
x
x
x
Halaman 59
KO
DE
REK
ENI
NG
1
URAIAN
2
- Laptop
- Komputer
Meja Komputer
- Printer Epson
Kamera Digital
VOL
UME
6
2
1
1
2
1
Unit
Unit
bh
Unit
Unit
x
x
x
x
x
Halaman 60
KO
DE
REK
ENI
NG
URAIAN
2
2
1
1
7
7
2
2
1
1
8
8
2
2
2
2
2
2
1
1
2
2
2
2
2
2
2
- Infocus
- TV
- Parabola Digital
- Bendera Ruangan
- Tali Tiang Bendera
- Lemari arsip
- Meja 1/2 biro
- Kursi Kerja Putar
- Umbul-umbul
- Filling Cabinet
- Kipas Angin
- Dispenser
- Galon
- Jam Dinding
- Pot Bunga
- Bendera Luar Ruangan
- Pamasangan Rekening PDAM
Terminal Listrik
- Kabel Listrik
Rehab Kantor Kepala Desa/Perawatan
Belanja Barang dan Jasa
Upah Tukang
Bola Lampu
Sarang Bola Lampu
Cat Tembok isi 25 Kg
Kuas Roll
Paku Beton 3 inch
Rehab WC Kantor Kepala Desa
Belanja Barang dan Jasa
Upah Tukang
Belanja Modal
Pintu WC
Semen
Pasir
Kerikil
pipa PVC SNI Dia 3"
Sarang Bola Lampu
Kabel Listrik
Bola Lampu
Bidang Pelaksanaan Pembangunan Desa
Pemasangan Gorong-Gorong Rt. 02
Belanja Barang dan Jasa
Upah Tukang
Belanja Modal
Gorong-Gorong
Besi Beton Polos Diar 10
Kawat Beton
Koral
Semen
Papan Mal
Paku 2,5 inch
Kayu 4 x 6
Pembuatan DEK / Loteng Perpustakaan
Belanja Barang dan Jasa
Upah Pekerja
Upah Tukang
Upah Kepala Tukang
Belanja Modal
1 Kayu 4 x 6
2 Kayu Perpil
3 Cat Pernis
4 Cat Kayu lis luar
5 Paku Beton 3 inch
6 Paku 1 inch
7 Paku 2,5 inch
8 Sarang Bola Lampu Kayu
9 Bola Lampu Philips
VOL
UME
6
1
1
1
3
1
1
2
1
100
1
1
1
2
1
2
2
1
1
20
Unit
Unit
Unit
lbr
roll
bh
bh
bh
lbr
Unit
bh
bh
bh
bh
bh
bh
kali
bh
m
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
3
4
4
2
4
4
oh
bh
bh
klg
bh
ktk
x
x
x
x
x
x
oh
2
7
2
1
5
2
5
2
bh
zak
m3
m3
btg
bh
m
bh
x
x
x
x
x
x
x
x
oh
5
16
1
2
5
5
2
5
bh
btg
kg
M3
zak
lbr
kg
btg
x
x
x
x
x
x
x
x
5
1
1
oh
oh
oh
x
x
x
1
225
15
10
10
5
5
4
4
M3
bh
kg
bh
ktk
kg
kg
bh
bh
x
x
x
x
x
x
x
x
x
5
1
1
x
x
x
Halaman 61
KO
DE
REK
ENI
NG
1
2
URAIAN
2
Belanja Barang dan Jasa
VOL
UME
6
Halaman 62
KO
DE
REK
ENI
NG
URAIAN
2
2
2
2
2
2
2
2
2
2
2
2
10
10
11
11
12
12
12
Upah Pekerja
Upah Tukang
Kepala Tukang
Belanja Modal
Semen Portland
Pasir Beton
Kerikil
VOL
UME
6
2
1
1
x
x
x
5
1
1
oh
oh
oh
x
x
x
27
6
6
sak
M3
M3
x
x
x
4
1
1
oh
oh
oh
x
x
x
16
3
3
sak
M3
M3
x
x
x
4
1
1
oh
oh
oh
x
x
x
16
3
3
2
sak
M3
M3
M3
x
x
x
x
7
2
1
oh
oh
oh
x
x
x
2
22
4
15
1
2
0.3
kg
btg
M3
M3
kg
M3
m3
x
x
x
x
x
x
x
6
2
2
oh
oh
oh
x
x
x
1
2
35
2
5
6
M3
M3
M3
M3
M3
M3
x
x
x
x
x
x
5
5
oh
oh
x
x
29
7
7
sak
M3
M3
x
x
x
3
1
1
x
x
x
3
1
1
x
x
x
3
2
1
x
x
x
4
2
1
x
x
x
5
2
x
x
12
2
bln
Bh
x
x
12
2
bln
Bh
x
x
1
4
x
x
12
12
4
bln
bln
Bh
x
x
x
Halaman 63
KO
DE
REK
ENI
NG
URAIAN
2
- Papan nama posyandu
- Papan struktur posyandu
2
2
2
2
13
13
13
2
2
2
2
14
14
VOL
UME
6
2x
2x
1
1
bh
bh
x
x
oh
10
2
zak
M3
x
x
oh
Halaman 64
KO
DE
REK
ENI
NG
1
2
URAIAN
14
2
2
2
2
14
14
15
15
2
2
2
2
2
2
2
3
3
3
15
16
16
16
1
1
VOL
UME
2
6
Belanja Modal
Semen
Pasir
Kegiatan Pembangunan Pendopo Tempat Pemakaman Umum (TPU)
Belanja Modal
Kerangka Pendopo (Baja Ringan)
4x
10
3
zak
M3
x
x
1
12
unit
5
1
1
oh
oh
oh
x
x
x
6
4
15
6
M3
M3
zak
M3
x
x
x
x
1
1
10
9
1
kali
kali
oh
oh
oh
x
x
x
x
x
1
7
50
6
7
3
2
20
11
24
20
3
8
3295
1
14
1
10
1
1
2
32
M3
M3
zak
M3
M3
M3
M3
lbr
kg
btg
btg
kg
btg
bh
klg
kg
M3
lbr
kg
klg
kg
lbr
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
2
4
1
7
1
kg
lbr
kg
lbr
ls
x
x
x
x
x
4x
1x
1x
10 x
9x
2x
1
1
1
1
x
x
x
x
1
1
1
1
3
1
12
20
20
4
4
1
1
1
6
55
TA
TA
TA
TA
rim
pak
bh
bh
bh
botol
Eksp
bh
bh
bh
bh
stel
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Halaman 65
KO
DE
REK
ENI
NG
URAIAN
Photo Copy
e.
Belanja Makanan dan Minum Rapat
Nasi Bungkus
Snack Kotak
Belanja Modal
- Tempat gulai Peresmanan
- Sendok Gulai
- Tempat cuci tangan
- Piring
- Gelas
- periuk besar
- tungku periuk besar
VOL
UME
6
1000
Lbr
50
50
OK
OK
x
x
10
3
3
3
3
4
6
bh
Lusin
Lusin
Lusin
Lusin
bh
bh
x
x
x
x
x
x
x
Halaman 66
KO
DE
REK
ENI
NG
URAIAN
2
2
2
2
2
2
2
2
2
2
2
- Saringan Santan
- Gayung
- Tikar Plastik
- Alas Meja
- Papan 10 Program Pokok PKK
3
3
3
3
3
3
3
3
3
3
2
2
3
3
4
4
5
5
6
6
2
2
2
4
4
4
2
2
2
5
5
5
1
1
1
1
VOL
UME
6
1
1
Lusin
Lusin
bh
bh
bh
2
1
1
10
1
30
1
2
2
1
1
1
ls
bln
bh
bh
x
x
x
x
Club
lbr
bh
bh
bh
bh
x
x
x
x
x
x
x
x
x
x
8
1
1
x
x
x
12
50
500
8
bln
ok
lbr
bh
1
30
TA
bh
7
7
7
x
x
x
1
1
1
TA
TA
TA
4
4
4
x
x
x
1
1
1
TA
TA
TA
bh
Belanja Modal
- Papan Nama Dasa Wisma
x
x
x
x
x
1x
1x
1x
2x
30
bh
1
1
1
1
ok
ok
ok
ok
x
x
x
x
oh
15
15
x
x
1
1
oh
oh
x
x
18
18
oh
oh
x
x
2
JUMLAH PENDAPATAN
JUMLAH BELANJA
SURPLUS / (DEFISIT)
SISA / (LEBIH) PERHITUNGAN ANGGARAN
Halaman 67
KO
DE
REK
ENI
NG
1
URAIAN
VOL
UME
6
Halaman 68
HARGA SATUAN
SETELAH
7
267456364
137748775
405205139
405205139
209715659
1500000
500000
550000
500000
300000
250000
200000
200000
75000
300000
275000
250000
225000
45000
42000
19500
20000
12000
65000
20,000
60000
10000
10000
1500000
2250
4500
8000
22500
12850
10225
2400
3200
2400
130000
15000
2400
1000
4000
1000
35000
90600000
90600000
61800000
18000000
0
6000000
19800000
18000000
13500000
2400000
2000000
4800000
1600000
2700000
15300000
3600000
3300000
3000000
5400000
22356925
22356925
3515925
270000
168000
58500
120000
24000
130000
20000
240000
30000
10000
1500000
11250
22500
40000
45000
12850
10225
4800
9600
9600
130000
30000
9600
10000
20000
10000
350000
Halaman 69
HARGA SATUAN
7
25000
35000
6000
3000
25000
SETELAH
4
150000
70000
180000
120000
60000
325000
125000
Halaman 70
HARGA SATUAN
7
200
18000
7000
500000
250000
10808500
37000
27000
7500
19000
12500
13000
6500
50000
50000
250000
450000
45000
40000
19500
20000
66400
10000
2250
22500
16067
16000
6000
1000
1500
6000
3000
35000
200
2500
18000
7000
400000
550000
550000
950000
400000
350000
300000
250000
250000
225000
200000
175000
700000
600000
500000
SETELAH
4
200000
1250000
900000
350000
3250000
1500000
1750000
10808500
0
10808500
277500
74000
54000
22500
38000
50000
26000
13000
450000
150000
300000
2300000
500000
1800000
8604617
5604617
949617
270000
160000
58500
80000
132800
70000
11250
45000
16067
32000
24000
20000
30000
180000
120000
60000
600000
175000
300000
125000
1875000
1350000
525000
2000000
2000000
3000000
550000
550000
1900000
5125000
5125000
3050000
400000
350000
300000
2000000
2075000
250000
225000
200000
1400000
2800000
2800000
2800000
700000
600000
1500000
72153117
72153117
Halaman 71
HARGA SATUAN
7
8500000
5500000
535117
2500000
6340000
SETELAH
4
17000000
5500000
535117
5000000
6340000
Halaman 72
HARGA SATUAN
7
9000000
2500000
2500000
100000
95000
3200000
1000000
4500000
45000
3200000
650000
300000
56500
150000
350000
150000
3500000
20000
12500
85000
75000
25000
1200000
50000
13000
85000
500000
70000
333000
333000
85000
25000
8000
75000
120000
150000
65000
13000
250000
70000
40000
12000
20000
85000
120000
150000
2000000
17500
35000
60000
20000
20000
5000
100000
150000
SETELAH
4
9000000
2500000
2500000
300000
95000
3200000
2000000
4500000
4500000
3200000
650000
300000
113000
150000
700000
300000
3500000
20000
250000
3562000
3562000
510000
300000
100000
2400000
200000
52000
4514000
1360000
1360000
3154000
1000000
490000
666000
333000
425000
50000
40000
150000
135544100
3697000
720000
720000
2977000
750000
1040000
13000
500000
350000
200000
24000
100000
10782500
2395000
2125000
120000
150000
8387500
2000000
3937500
525000
600000
200000
100000
25000
400000
600000
0
0
0
0
0
0
0
0
0
6307600
Halaman 73
HARGA SATUAN
SETELAH
7
4
1120000
Halaman 74
HARGA SATUAN
7
85000
120000
150000
70000
333000
216600
85000
120000
150000
70000
333000
216600
85000
120000
150000
70000
333000
216600
110500
85000
120000
150000
18000
96940
19600
70000
333000
216600
2681800
85000
120000
150000
165000
296000
70000
333000
333000
216600
85000
120000
70000
333000
216600
50000
15000
50000
15000
80000
70000
15000
SETELAH
4
850000
120000
150000
5187600
1890000
1998000
1299600
4058800
1290000
1020000
120000
150000
2768800
1120000
999000
649800
4279800
1290000
1020000
120000
150000
2989800
1120000
999000
649800
221000
7282820
2415000
1785000
480000
150000
4867820
36000
2132680
78400
1050000
333000
433200
804540
9657600
2820000
2040000
480000
300000
6837600
165000
592000
2450000
666000
1665000
1299600
9202200
3325000
2125000
1200000
5877200
2030000
2331000
1516200
3030000
3030000
3000000
30000
1830000
1830000
1800000
30000
5430000
4380000
4380000
960000
3360000
60000
1050000
Halaman 75
HARGA SATUAN
7
750000
300000
85000
70000
333000
85000
SETELAH
4
750000
300000
2386000
1020000
1020000
1366000
700000
666000
2549000
850000
850000
Halaman 76
HARGA SATUAN
SETELAH
7
70000
333000
9900000
9900000
4
1699000
700000
999000
9900000
9900000
9900000
5882000
85000
120000
150000
333000
216000
70000
333000
1000000
75000
85000
120000
150000
165000
296000
72500
333000
66000
333000
216000
25000
18000
96940
35000
19600
25000
1200
375000
28500
2681800
104000
25400
75000
25500
56000
4838620
57200
4800
21000
55000
166000
700000
650000
550000
500000
45000
15000
4000
750
1000
2500
15000
15000
9500
130000
12500
300000
1970000
1700000
120000
150000
3912000
1998000
864000
1050000
1998000
49268780
19595000
1000000
75000
8500000
9720000
300000
29673780
165000
2072000
3625000
1998000
462000
999000
432000
500000
198000
2326560
700000
58800
200000
3954000
375000
399000
2681800
1040000
25400
75000
51000
1792000
4838620
114400
19200
21000
385000
166000
57320380
27610380
20882500
2400000
700000
650000
550000
500000
532500
135000
15000
48000
15000
20000
10000
60000
15000
9500
130000
75000
16500000
16500000
200000
Halaman 77
HARGA SATUAN
7
200
18000
7000
300000
100000
60000
60000
55000
213220
100000
SETELAH
4
200000
1250000
900000
350000
6727880
3000000
300000
180000
180000
165000
852880
600000
Halaman 78
HARGA SATUAN
7
250000
150000
150000
750000
1000000
100000
500000
41000
2500000
160000
500000
3500000
3250000
500000
20000
18000
200
400000
600000
12000
100000
100000
100000
100000
100000
100000
300000
41000
150000
125000
100000
75000
300000
15000
35000
18000
7000
SETELAH
4
250000
150000
0
300000
750000
3730000
3730000
1000000
1000000
500000
1230000
11070000
11070000
2500000
320000
1000000
3500000
3250000
500000
6120000
6120000
1920000
900000
100000
3200000
2160000
2160000
1800000
360000
5400000
3300000
2100000
700000
700000
700000
1200000
400000
400000
400000
2100000
2100000
1230000
1230000
1230000
2625000
2625000
2625000
525000
150000
125000
100000
150000
900000
900000
750000
225000
525000
450000
324000
126000
405205139
405205139
0
PERI RUSMANDI, SE
Halaman 79
HARGA SATUAN
SETELAH
7
Halaman 80
KODE REKENING
URAIAN
PENDAPATAN
1
1
2
2
Pendapatan Transfer
1
3
Dana Desa
Alokasi Dana Desa
Penerimaan PTAPD (ADD)
JUMLAH PENDAPATAN
BELANJA
Tunjangan BPD
Ketua
Wakil Ketua
Sekretaris
Anggota
Kegiatan Operasional Perkantoran
KODE REKENING
URAIAN
Isi Pisau Cutter Merk NT
Hacter (staples)
Bantal Stempel
Tinta Stempel
Klip Merk See Gull
lem Cair Botol Merk Duklon
Pensil 2B
Stempel
Pelobang Kertas
Penghapus Pensil 2B
Stop map biasa
Map Lubang Plastik
Map Snelhecter
Map Ordinier
SSP Pajak
Gambar Presiden dan wakil Presiden
Materai 3000
Cetak dan Penggandaan
Cetak
Foto copy
Makan dan Minum Rapat
Nasi Bungkus
Snack Kotak
KODE REKENING
URAIAN
Kertas HVS A4 70 gr
Amplop
Buku Agenda
Bolpoint Boxy Hitam
Kwitansi Biasa
Isi Staples No. 10 (Kecil)
Hacter (staples)
Bantal Stempel
Tinta Stempel
lem Cair Botol Merk Duklon
Stop map biasa
Map Snelhecter
Materai 3000
Cetak dan Penggandaan
Cetak
Foto copy
Dokumentasi
Makan dan Minum Rapat
Nasi Bungkus
2
2
1
1
3
3
2
2
5
6
Snack Kotak
Pakaian Dinas dan Atributnya
Pakaian Batik BPD
Belanja Modal
Papan Merk BPD
Papan Struktur
Anggota
Kegiatan Tim Pengelola Kegiatan (TPK)
Anggota
Pengadaan Sarana Kantor Desa
3
Belanja Modal
Laptop
KODE REKENING
URAIAN
Komputer
Meja Komputer
Printer Epson
Kamera Digital
Infocus
TV
Parabola Digital
Bendera Ruangan
Tali Tiang Bendera
Lemari arsip
Meja 1/2 biro
Kursi Kerja Putar
Umbul-umbul
Filling Cabinet
Kipas Angin
Dispenser
Galon
Jam Dinding
Pot Bunga
Bendera Luar Ruangan
Pamasangan Rekening PDAM
Terminal Listrik
Kabel Listrik
Rehab Kantor Kepala Desa/Perawatan
2
KODE REKENING
URAIAN
Gorong-Gorong
Besi Beton Polos Diar 10
Kawat Beton
Koral
Semen
Papan Mal
Paku 2,5 inch
Kayu 4 x 6
Pembuatan DEK / Loteng Perpustakaan
2
Kepala Tukang
Belanja Modal
Semen Portland
Pasir Beton
Kerikil
Kegiatan Pembangunan Jalan B Rt. 02 Dusun Bawah
2
Kepala Tukang
Belanja Modal
Semen Portland
Pasir Beton
Kerikil
Kegiatan Pembangunan Jalan C RT. 01 Dusun Atas
2
Kepala Tukang
Belanja Modal
Semen Portland
Pasir Beton
KODE REKENING
URAIAN
Kerikil
Kegiatan Pembangunan Jalan D RT. 02 Dusun Bawah
Kepala Tukang
Belanja Modal
Semen Portland
Pasir Beton
Kerikil
Tanah Urug
Kegiatan Pembangunan Cor Plat Rt. 02 Dusun Bawah
2
Kepala Tukang
Belanja Modal
Paku
Besi Beton Polos Diameter 10
Kawat Beton
Semen Portland
Pasir Beton
Kerikil
Balok Bekisting
Kegiatan Pembangunan Saluran RT. 02 Dusun Bawah
2
Kepala Tukang
Belanja Modal
- Sirtu
- Batu belah 15/20
- Semen Portland
- Pasir Pasang
- Pasir Beton
- Kerikil
Upah Tukang
Belanja Modal
- Semen Portland
- Pasir Beton
- Kerikil
10
10
Kegiatan Perpustakaan
2
KODE REKENING
2
11
11
URAIAN
Kegiatan Pendidikan Anak Usia Dini (PAUD)
12
12
Kegiatan Posyandu
2
12
Belanja Modal
- Papan nama posyandu
- Papan struktur posyandu
13
13
13
14
14
14
Pasir
Rehab Lantai Drainase (75 M) Rt. 02
2
3
14
14
Pasir
Kegiatan Pembangunan Pendopo Tempat Pemakaman Umum (TPU) /
Kuburan
3
Belanja Modal
Kerangka Pendopo (Baja Ringan)
15
15
15
16
16
Pasir
Pembangunan Gudang
2
KODE REKENING
2
16
URAIAN
Belanja Modal
Pasir Urug
Batu Belah 15/20
Semen Portland
Pasir Pasang
Tanah Urug
Pasir Beton
Kerikil
Papan
Paku
Besi Beton Polos Diameter 10
Besi Cincin Diameter 6
Kawat Beton
Kayu 4 x 6
Bata merah
Cat Tembok Metrolite isi 25 kg
Flamour
Kaso-kaso 5x7 cm
Triplek
Paku Triplek
Cat tembok isi 5 kg
Paku seng
Seng gelombang BJLS 20
Cat minyak 1 kg
Amplas
Minyak cat
Seng Plat BJLS 20
Dokumentasi
KODE REKENING
URAIAN
Pengadaan Baju PKK
Baju PKK Desa
Belanja Penggandaan/Photo Copy
Photo Copy
Belanja Makanan dan Minum Rapat
Nasi Bungkus
Snack Kotak
Belanja Modal
Tempat gulai Peresmanan
Sendok Gulai
Tempat cuci tangan
Piring
Gelas
periuk besar
tungku periuk besar
Saringan Santan
Gayung
Alas Meja
Papan 10 Program Pokok PKK
Kegiatan Kepemudaan
2
Kegiatan Adat
2
Kegiatan TPQ
2
Kegiatan Dasawisma
2
KODE REKENING
URAIAN
Bendahara
b Transport/Insentif Pokja
Ketua
Sekretaris
Bendahara
Belanja Modal
- Papan Nama Dasa Wisma
b.
c.
d.
REALISASI
LEBIH/KURANG
6
###
405,205,139
267,456,364
75,948,775
61,800,000
187,887,042
79,423,476
56,963,566
51,500,000
46%
30%
75%
83%
217,318,097
188,032,888
18,985,209
10,300,000
405,205,139
187,887,042
46%
217,318,097
405,205,139
187,887,042
46%
217,318,097
209,715,659
134,155,042
64%
75,560,617
90,600,000
74,750,000
83%
15,850,000
90,600,000
74,750,000
83%
15,850,000
61,800,000
51,500,000
83%
10,300,000
18,000,000
15,000,000
83%
3,000,000
6,000,000
5,000,000
83%
1,000,000
19,800,000
16,500,000
83%
3,300,000
18,000,000
15,000,000
83%
3,000,000
13,500,000
13,050,000
97%
450,000
2,400,000
2,400,000 100%
2,000,000
2,000,000 100%
4,800,000
4,800,000 100%
1,600,000
1,600,000 100%
2,700,000
2,250,000
83%
450,000
15,300,000
10,200,000
67%
5,100,000
3,600,000
2,400,000
67%
1,200,000
3,300,000
2,200,000
67%
1,100,000
3,000,000
2,000,000
67%
1,000,000
5,400,000
3,600,000
67%
1,800,000
22,356,925
10,798,425
48%
11,558,500
22,356,925
10,798,425
48%
11,558,500
3,515,925
3,515,925 100%
270,000
270,000 100%
168,000
168,000 100%
58,500
58,500 100%
120,000
120,000 100%
24,000
24,000 100%
130,000
130,000 100%
20,000
20,000 100%
240,000
240,000 100%
30,000
30,000 100%
10,000
10,000 100%
1,500,000
1,500,000 100%
11,250
11,250 100%
22,500
22,500 100%
REALISASI
LEBIH/KURANG
40,000
40,000 100%
45,000
45,000 100%
12,850
12,850 100%
10,225
10,225 100%
4,800
4,800 100%
9,600
9,600 100%
9,600
9,600 100%
130,000
130,000 100%
30,000
30,000 100%
9,600
9,600 100%
10,000
10,000 100%
20,000
20,000 100%
10,000
10,000 100%
350,000
350,000 100%
150,000
150,000 100%
70,000
70,000 100%
180,000
180,000 100%
120,000
120,000 100%
60,000
60,000 100%
325,000
325,000 100%
125,000
125,000 100%
200,000
200,000 100%
1,250,000
1,250,000 100%
900,000
900,000 100%
350,000
350,000 100%
91%
3,250,000
2,950,000
1,500,000
1,500,000 100%
1,750,000
1,450,000
10,808,500
10,808,500
83%
0%
300,000
0
300,000
10,808,500
0
0%
10,808,500
277,500
277,500 100%
74,000
74,000 100%
54,000
54,000 100%
22,500
22,500 100%
38,000
38,000 100%
50,000
50,000 100%
26,000
26,000 100%
13,000
13,000 100%
450,000
0%
450,000
150,000
0%
150,000
300,000
0%
300,000
2,300,000
2,300,000 100%
500,000
500,000 100%
1,800,000
1,800,000 100%
8,604,617
8,604,617 100%
5,604,617
5,604,617 100%
949,617
949,617 100%
270,000
270,000 100%
REALISASI
LEBIH/KURANG
160,000
160,000 100%
58,500
58,500 100%
80,000
80,000 100%
132,800
132,800 100%
70,000
70,000 100%
11,250
11,250 100%
45,000
45,000 100%
16,067
16,067 100%
32,000
32,000 100%
24,000
24,000 100%
20,000
20,000 100%
30,000
30,000 100%
180,000
180,000 100%
120,000
120,000 100%
60,000
60,000 100%
600,000
600,000 100%
175,000
175,000 100%
300,000
300,000 100%
125,000
125,000 100%
1,875,000
1,875,000 100%
1,350,000
1,350,000 100%
525,000
525,000 100%
2,000,000
2,000,000 100%
2,000,000
2,000,000 100%
3,000,000
3,000,000 100%
550,000
550,000 100%
550,000
550,000 100%
1,900,000
1,900,000 100%
5,125,000
5,125,000 100%
5,125,000
5,125,000 100%
3,050,000
3,050,000 100%
400,000
400,000 100%
350,000
350,000 100%
300,000
300,000 100%
2,000,000
2,000,000 100%
2,075,000
2,075,000 100%
250,000
250,000 100%
225,000
225,000 100%
200,000
200,000 100%
1,400,000
1,400,000 100%
2,800,000
2,800,000 100%
2,800,000
2,800,000 100%
2,800,000
2,800,000 100%
700,000
700,000 100%
600,000
600,000 100%
1,500,000
1,500,000 100%
72,153,117
28,515,000
40%
43,638,117
72,153,117
28,515,000
40%
43,638,117
17,000,000
17,000,000 100%
REALISASI
5,500,000 100%
0
0%
LEBIH/KURANG
0
535,117
5,000,000
5,000,000 100%
6,340,000
0%
6,340,000
9,000,000
0%
9,000,000
2,500,000
0%
2,500,000
2,500,000
0%
2,500,000
300,000
0%
300,000
95,000
95,000 100%
3,200,000
0%
3,200,000
2,000,000
0%
2,000,000
4,500,000
0%
4,500,000
4,500,000
0%
4,500,000
3,200,000
0%
3,200,000
650,000
650,000 100%
300,000
0%
300,000
113,000
0%
113,000
150,000
0%
150,000
700,000
0%
700,000
300,000
0%
300,000
3,500,000
0%
3,500,000
20,000
20,000 100%
250,000
250,000 100%
3,562,000
3,562,000 100%
3,562,000
3,562,000 100%
510,000
510,000 100%
300,000
300,000 100%
100,000
100,000 100%
2,400,000
2,400,000 100%
200,000
200,000 100%
52,000
52,000 100%
4,514,000
0%
4,514,000
1,360,000
0%
1,360,000
1,360,000
0%
1,360,000
3,154,000
0%
3,154,000
1,000,000
0%
1,000,000
490,000
0%
490,000
666,000
0%
666,000
333,000
0%
333,000
425,000
0%
425,000
50,000
0%
50,000
40,000
0%
40,000
150,000
0%
150,000
0
133,796,980
21,739,500
16%
112,057,480
3,697,000
3,697,000 100%
720,000
720,000 100%
720,000
720,000 100%
2,977,000
2,977,000 100%
REALISASI
LEBIH/KURANG
750,000
750,000 100%
1,040,000
1,040,000 100%
13,000
13,000 100%
500,000
500,000 100%
350,000
350,000 100%
200,000
200,000 100%
24,000
24,000 100%
100,000
100,000 100%
10,782,500
10,782,500 100%
2,395,000
2,395,000 100%
2,125,000
2,125,000 100%
120,000
120,000 100%
150,000
150,000 100%
8,387,500
8,387,500 100%
2,000,000
2,000,000 100%
3,937,500
3,937,500 100%
525,000
525,000 100%
600,000
600,000 100%
200,000
200,000 100%
100,000
100,000 100%
25,000
25,000 100%
400,000
400,000 100%
600,000
600,000 100%
6,657,200
0%
6,657,200
780,000
0%
780,000
510,000
0%
510,000
120,000
0%
120,000
150,000
0%
150,000
5,877,200
0%
5,877,200
2,030,000
0%
2,030,000
2,331,000
0%
2,331,000
1,516,200
0%
1,516,200
5,967,600
0%
5,967,600
780,000
0%
780,000
510,000
0%
510,000
120,000
0%
120,000
150,000
0%
150,000
5,187,600
0%
5,187,600
1,890,000
0%
1,890,000
1,998,000
0%
1,998,000
1,299,600
0%
1,299,600
2,169,200
0%
2,169,200
440,000
0%
440,000
170,000
0%
170,000
120,000
0%
120,000
150,000
0%
150,000
1,729,200
0%
1,729,200
630,000
0%
630,000
666,000
0%
666,000
REALISASI
LEBIH/KURANG
433,200
0%
433,200
2,409,700
0%
2,409,700
780,000
0%
780,000
510,000
0%
510,000
120,000
0%
120,000
150,000
0%
150,000
1,629,700
0%
1,629,700
420,000
0%
420,000
666,000
0%
666,000
433,200
0%
433,200
110,500
0%
110,500
7,072,820
0%
7,072,820
2,415,000
0%
2,415,000
1,785,000
0%
1,785,000
480,000
0%
480,000
150,000
0%
150,000
4,657,820
0%
4,657,820
36,000
0%
36,000
2,132,680
0%
2,132,680
78,400
0%
78,400
840,000
0%
840,000
333,000
0%
333,000
433,200
0%
433,200
804,540
0%
804,540
9,657,600
0%
9,657,600
2,820,000
0%
2,820,000
2,040,000
0%
2,040,000
480,000
0%
480,000
300,000
0%
300,000
6,837,600
0%
6,837,600
165,000
0%
165,000
592,000
0%
592,000
2,450,000
0%
2,450,000
666,000
0%
666,000
1,665,000
0%
1,665,000
1,299,600
0%
1,299,600
9,202,200
0%
9,202,200
3,325,000
0%
3,325,000
2,125,000
0%
2,125,000
1,200,000
0%
1,200,000
5,877,200
0%
5,877,200
2,030,000
0%
2,030,000
2,331,000
0%
2,331,000
1,516,200
0%
1,516,200
3,030,000
0%
3,030,000
3,030,000
0%
3,030,000
3,000,000
0%
3,000,000
30,000
0%
30,000
REALISASI
LEBIH/KURANG
1,830,000
1,830,000 100%
1,830,000
1,830,000 100%
1,800,000
1,800,000 100%
30,000
30,000 100%
5,430,000
5,430,000 100%
4,380,000
4,380,000 100%
4,380,000
4,380,000 100%
960,000
960,000 100%
3,360,000
3,360,000 100%
60,000
60,000 100%
1,050,000
1,050,000 100%
750,000
750,000 100%
300,000
300,000 100%
1,596,000
0%
1,596,000
510,000
0%
510,000
510,000
0%
510,000
1,086,000
0%
1,086,000
420,000
0%
420,000
666,000
0%
666,000
1,596,000
0%
1,596,000
510,000
0%
510,000
510,000
0%
510,000
1,086,000
0%
1,086,000
420,000
0%
420,000
666,000
0%
666,000
9,900,000
0%
9,900,000
9,900,000
0%
9,900,000
9,900,000
0%
9,900,000
0
4,754,000
0%
4,754,000
1,970,000
0%
1,970,000
1,700,000
0%
1,700,000
120,000
0%
120,000
150,000
0%
150,000
2,784,000
0%
2,784,000
1,998,000
0%
1,998,000
666,000
0%
666,000
120,000
0%
120,000
1,998,000
0%
1,998,000
48,045,160
0%
48,045,160
22,375,000
0%
22,375,000
1,000,000
0%
1,000,000
75,000
0%
75,000
10,200,000
0%
10,200,000
10,800,000
0%
10,800,000
300,000
0%
300,000
REALISASI
LEBIH/KURANG
25,670,160
0%
25,670,160
165,000
0%
165,000
2,368,000
0%
2,368,000
4,060,000
0%
4,060,000
1,998,000
0%
1,998,000
462,000
0%
462,000
999,000
0%
999,000
432,000
0%
432,000
500,000
0%
500,000
198,000
0%
198,000
2,326,560
0%
2,326,560
700,000
0%
700,000
58,800
0%
58,800
200,000
0%
200,000
3,954,000
0%
3,954,000
375,000
0%
375,000
399,000
0%
399,000
2,681,800
0%
2,681,800
1,144,000
0%
1,144,000
25,400
0%
25,400
75,000
0%
75,000
51,000
0%
51,000
1,792,000
0%
1,792,000
114,400
0%
114,400
19,200
0%
19,200
21,000
0%
21,000
385,000
0%
385,000
166,000
0%
166,000
59,067,500
31,992,500
54%
27,075,000
29,357,500
4,382,500
15%
24,975,000
20,882,500
4,382,500
21%
16,500,000
2,400,000
2,400,000 100%
700,000
700,000 100%
650,000
650,000 100%
550,000
550,000 100%
500,000
500,000 100%
532,500
532,500 100%
135,000
135,000 100%
15,000
15,000 100%
48,000
48,000 100%
15,000
15,000 100%
20,000
20,000 100%
10,000
10,000 100%
60,000
60,000 100%
15,000
15,000 100%
9,500
9,500 100%
130,000
130,000 100%
75,000
75,000 100%
REALISASI
LEBIH/KURANG
16,500,000
0%
16,500,000
16,500,000
0%
16,500,000
200,000
200,000 100%
200,000
200,000 100%
1,250,000
1,250,000 100%
900,000
900,000 100%
350,000
350,000 100%
8,475,000
0%
8,475,000
3,000,000
0%
3,000,000
300,000
0%
300,000
180,000
0%
180,000
180,000
0%
180,000
165,000
0%
165,000
800,000
0%
800,000
600,000
0%
600,000
250,000
0%
250,000
150,000
0%
150,000
300,000
0%
300,000
750,000
0%
750,000
3,730,000
3,730,000 100%
3,730,000
3,730,000 100%
1,000,000
1,000,000 100%
1,000,000
1,000,000 100%
500,000
500,000 100%
1,230,000
1,230,000 100%
11,070,000
11,070,000 100%
11,070,000
11,070,000 100%
2,500,000
2,500,000 100%
320,000
320,000 100%
1,000,000
1,000,000 100%
3,500,000
3,500,000 100%
3,250,000
3,250,000 100%
500,000
500,000 100%
6,120,000
6,120,000 100%
6,120,000
6,120,000 100%
1,920,000
1,920,000 100%
900,000
900,000 100%
100,000
100,000 100%
3,200,000
3,200,000 100%
2,160,000
2,160,000 100%
2,160,000
2,160,000 100%
1,800,000
1,800,000 100%
360,000
360,000 100%
61%
5,400,000
3,300,000
2,100,000
3,300,000
3,300,000 100%
2,100,000
2,100,000 100%
700,000
700,000 100%
700,000
700,000 100%
REALISASI
LEBIH/KURANG
700,000
700,000 100%
1,200,000
1,200,000 100%
400,000
400,000 100%
400,000
400,000 100%
400,000
400,000 100%
2,100,000
0%
2,100,000
2,100,000
0%
2,100,000
1,230,000
1,230,000 100%
1,230,000
1,230,000 100%
1,230,000
1,230,000 100%
2,625,000
0%
2,625,000
2,625,000
0%
2,625,000
2,625,000
0%
2,625,000
525,000
0%
525,000
150,000
0%
150,000
125,000
0%
125,000
100,000
0%
100,000
150,000
0%
150,000
900,000
0%
900,000
900,000
0%
900,000
750,000
0%
750,000
225,000
0%
225,000
525,000
0%
525,000
450,000
0%
450,000
324,000
0%
324,000
126,000
0%
126,000
405,205,139
187,887,042
46%
217,318,097
PERI RUSMANDI, SE
No.
TGL
KODE REKENING
URAIAN
28/10/2015
2
3
4
5
6
28/10/2015
30/10/2015
31/10/2015
31/10/2015
02/11/2015
7
8
9
10
11
12
13
14
15
02/11/2015
02/11/2015
03/11/2015
04/11/2015
05/11/2015
05/11/2015
2
2
2
2
2
2
2
2
2
05/11/2015
2
05/11/2015
1
06/11/2015 2
1
1
1
1
1
1
1
1
1
1
2
2
7.1.1.01
1
2
2
7.1.1.01
1
1
1
1
2
2
2
2
2
2
7.1.1.06
2
7.1.1.01
7.1.1.03
1
2
2
1
2
2
1
3
2
1
2
2
1
1
2
3
4
4
PENERIMAAN
PENGELUARAN
(Rp.)
(Rp.)
Rp
136,387,042
Rp
51,500,000
Rp
188,593
Rp
150,000
Rp
Rp
Rp
Rp
Rp
Rp
Rp
51,500,000
13,050,000
10,200,000
1,885,925
0001
0002
0003
0004
Rp
1,500,000
0005
Rp
Rp
Rp
Rp
130,000
180,000
325,000
1,250,000
0006
0007
0008
0009
Rp
2,950,000
0010
Rp
Rp
Rp
277,500
2,300,000
949,617
0011
0012
0013
125,000
Potongan PPN
Potongan PPh Pasal 22
7
Belanja/Biaya Kebersihan Kantor Desa
9
Biaya Perawatan Kendaraan Dinas Roda Dua
1
Belanja Alat Tulis Kantor BPD
NO BUKTI
268,182
40,227
Halaman 101
No.
TGL
KODE REKENING
URAIAN
16
17
18
19
06/11/2015 2
06/11/2015 2
06/11/2015 2
1
1
1
3
2
3
2
3
2
7.1.1.06
22
23
24
08/11/2015 2
08/11/2015 2
08/11/2015 2
25
09/11/2015 2
21
07/11/2015 2
07/11/2015 2
PENGELUARAN
(Rp.)
(Rp.)
2
3
4
07/11/2015
7.1.1.01
1
3
2
7.1.1.01
1
3
2
7.1.1.01
1
4
1
1
4
2
1
5
1
20
PENERIMAAN
7.1.1.01
7.1.1.03
Rp
187,500
Rp
200,000
Rp
110,000
Rp
190,000
Rp
Rp
NO BUKTI
7
Rp
Rp
Rp
180,000
600,000
1,875,000
0014
0015
0016
Rp
2,000,000
0017
Rp
1,100,000
0018
Rp
1,900,000
0019
Rp
Rp
Rp
3,050,000
2,075,000
2,800,000
0020
0021
0022
Rp
27,500,000
0023
2,500,000
375,000
26
09/11/2015 2
Rp
95,000
0024
27
09/11/2015 2
Rp
650,000
0025
28
09/11/2015 2
Rp
270,000
0026
29
30
10/11/2015 2
10/11/2015 2
1
1
Rp
Rp
510,000
3,052,000
0027
0028
Rp
720,000
0029
2,477,000
0030
500,000
0031
7
2
7
2
7.1.1.01
7.1.1.03
31
11/11/2015
32
11/11/2015
2
1
3
7.1.1.01
7.1.1.03
2
1
3
Rp
Rp
277,455
41,618
Rp
Rp
Rp
225,182
33,777
Rp
Halaman 102
No.
TGL
KODE REKENING
URAIAN
33
12/11/2015
7.1.1.06
2
2
2
34
13/11/2015
35
36
37
14/11/2015 2
14/11/2015 2
14/11/2015 2
7.1.1.01
7.1.1.03
2
2 11
2
2 11
2
2 12
Rp
PENERIMAAN
PENGELUARAN
(Rp.)
(Rp.)
Rp
Rp
30,000
NO BUKTI
Rp
2,395,000
0032
Rp
8,387,500
0033
Rp
Rp
Rp
1,800,000
30,000
4,320,000
0034
0035
0036
762,500
114,375
Halaman 103
No.
TGL
KODE REKENING
URAIAN
PENERIMAAN
PENGELUARAN
(Rp.)
(Rp.)
NO BUKTI
7
38
14/11/2015 2
12
Rp
60,000
0037
39
14/11/2015 2
12
Rp
1,050,000
0038
Rp
2,400,000
0039
Rp
Rp
Rp
532,500
200,000
1,250,000
0040
0041
0042
Rp
Rp
Rp
Rp
1,000,000
1,000,000
500,000
1,230,000
0043
0044
0045
0046
Rp
3,500,000
0047
Rp
Rp
320,000
3,500,000
0048
0049
Rp
3,750,000
0050
Rp
Rp
1,920,000
900,000
0051
0052
Rp
Rp
100,000
3,200,000
0053
0054
7.1.1.01
40
15/11/2015 2
41
42
43
16/11/2015 2
16/11/2015 2
17/11/2015 2
3
3
3
44
45
46
47
48
49
50
51
52
53
54
55
18/11/2015
18/11/2015
19/11/2015
19/11/2015
2
2
2
2
Potongan PPN
2
1
2
1
2
1
2
7.1.1.06
3
2
2
3
2
2
3
2
2
3
2
2
7.1.1.01
19/11/2015 2
19/11/2015 2
19/11/2015 2
7.1.1.01
7.1.1.03
3
3
2
3
3
2
7.1.1.01
7.1.1.03
20/11/2015 2
20/11/2015 2
20/11/2015 2
21/11/2015 2
21/11/2015 2
7.1.1.01
7.1.1.03
3
4
2
3
4
2
7.1.1.06
3
4
2
3
4
2
Rp
105,000
Rp
Rp
Rp
Rp
Rp
Rp
125,000
123,000
318,182
47,727
318,182
47,727
Rp
Rp
Rp
340,909
51,136
90,000
Halaman 104
No.
TGL
KODE REKENING
URAIAN
56
57
21/11/2015 2
21/11/2015 2
7.1.1.01
7.1.1.03
3
5
2
3
5
2
Potongan PPN
Potongan PPh Pasal 22
Honor Guru TPQ
Pengadaan Iqro'
Rp
Rp
PENERIMAAN
PENGELUARAN
(Rp.)
(Rp.)
NO BUKTI
7
290,909
43,636
Rp
Rp
1,800,000
360,000
0056
0057
Halaman 105
No.
TGL
KODE REKENING
URAIAN
PENERIMAAN
PENGELUARAN
(Rp.)
(Rp.)
NO BUKTI
7
58
21/11/2015 2
Rp
2,100,000
0058
59
21/11/2015 2
Rp
1,200,000
0059
60
21/11/2015 2
Rp
1,230,000
0060
Rp
123,000
Rp
187,887,042 Rp
187,887,042
Rp
187,887,042 Rp
187,887,042
Rp
7.1.1.01
Potongan PPN
JUMLAH
187,887,042 Rp
Sisa Kas
Rp
:
:
Rp
Rp
187,887,042
-
Mengetahui
Kuasa Pengguana Anggaran
Kepala Desa
PERI RUSMANDI, SE
Halaman 106
UNG
BULAN
BANK CABANG
: November 2015
: BRI Cabang Sungai Penuh
REK. NO.
: 0117-01-001610-30-8
NO BUKTI
JUMLAH
PENGELUARAN
KUMULATIF
SALDO
Rp
136,387,042
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
51,500,000
13,050,000
23,250,000
25,135,925
25,135,925
26,635,925
26,635,925
26,765,925
26,945,925
27,270,925
28,520,925
28,520,925
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
187,887,042
136,387,042
123,337,042
113,137,042
111,251,117
111,251,117
109,751,117
109,751,117
109,621,117
109,441,117
109,116,117
107,866,117
107,866,117
/KWT/2015
Rp
31,470,925 Rp
104,916,117
/KWT/2015
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Rp
31,470,925
31,470,925
31,748,425
34,048,425
34,998,042
104,916,117
104,916,117
104,638,617
102,338,617
101,389,000
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Rp
Halaman 107
NO BUKTI
JUMLAH
PENGELUARAN
KUMULATIF
SALDO
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
35,178,042
35,778,042
37,653,042
37,653,042
39,653,042
39,653,042
40,753,042
40,753,042
42,653,042
42,653,042
45,703,042
47,778,042
50,578,042
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
101,209,000
100,609,000
98,734,000
98,734,000
96,734,000
96,734,000
95,634,000
95,634,000
93,734,000
93,734,000
90,684,000
88,609,000
85,809,000
/KWT/2015
Rp
78,078,042 Rp
58,309,000
Rp
Rp
78,078,042 Rp
78,078,042 Rp
58,309,000
58,309,000
/KWT/2015
Rp
78,173,042 Rp
58,214,000
/KWT/2015
Rp
78,823,042 Rp
57,564,000
/KWT/2015
Rp
79,093,042 Rp
57,294,000
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
79,603,042
82,655,042
82,655,042
82,655,042
Rp
Rp
Rp
Rp
56,784,000
53,732,000
53,732,000
53,732,000
/KWT/2015
Rp
83,375,042 Rp
53,012,000
/KWT/2015
Rp
Rp
Rp
Rp
85,852,042
85,852,042
85,852,042
86,352,042
50,535,000
50,535,000
50,535,000
50,035,000
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Halaman 108
NO BUKTI
JUMLAH
PENGELUARAN
KUMULATIF
SALDO
/KWT/2015
Rp
Rp
86,352,042 Rp
88,747,042 Rp
50,035,000
47,640,000
/KWT/2015
Rp
97,134,542 Rp
39,252,500
/KWT/2015
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Rp
97,134,542
97,134,542
98,934,542
98,964,542
103,284,542
Rp
Rp
Rp
Rp
Rp
39,252,500
39,252,500
37,452,500
37,422,500
33,102,500
Halaman 109
NO BUKTI
JUMLAH
PENGELUARAN
KUMULATIF
SALDO
/KWT/2015
Rp
103,344,542 Rp
33,042,500
/KWT/2015
Rp
104,394,542 Rp
31,992,500
Rp
104,394,542 Rp
31,992,500
/KWT/2015
Rp
106,794,542 Rp
29,592,500
/KWT/2015
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
107,327,042
107,527,042
108,777,042
108,777,042
109,777,042
110,777,042
111,277,042
112,507,042
112,507,042
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
29,060,000
28,860,000
27,610,000
27,610,000
26,610,000
25,610,000
25,110,000
23,880,000
23,880,000
/KWT/2015
Rp
116,007,042 Rp
20,380,000
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Rp
Rp
116,007,042
116,007,042
116,327,042
119,827,042
119,827,042
119,827,042
Rp
Rp
Rp
Rp
Rp
Rp
20,380,000
20,380,000
20,060,000
16,560,000
16,560,000
16,560,000
/KWT/2015
Rp
123,577,042 Rp
12,810,000
Rp
Rp
Rp
Rp
Rp
Rp
Rp
123,577,042
123,577,042
125,497,042
126,397,042
126,397,042
126,497,042
129,697,042
12,810,000
12,810,000
10,890,000
9,990,000
9,990,000
9,890,000
6,690,000
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Halaman 110
NO BUKTI
JUMLAH
PENGELUARAN
KUMULATIF
SALDO
/KWT/2015
/KWT/2015
Rp
Rp
Rp
Rp
129,697,042
129,697,042
131,497,042
131,857,042
Rp
Rp
Rp
Rp
6,690,000
6,690,000
4,890,000
4,530,000
Halaman 111
NO BUKTI
JUMLAH
PENGELUARAN
KUMULATIF
SALDO
/KWT/2015
Rp
133,957,042 Rp
2,430,000
/KWT/2015
Rp
135,157,042 Rp
1,230,000
/KWT/2015
Rp
136,387,042 Rp
Rp
136,387,042 Rp
Rp
Halaman 112
URAIAN
VOLUME
PENDAPATAN
Hasil Usaha
Dana Desa
Bantuan Keuangan
1 Bantuan Provinsi
2 Bantuan Kabupaten/Kota
Pendapatan Transfer
Pendapatan Lain-lain
JUMLAH PENDAPATAN
2
BELANJA
Operasional Perkantoran
Operasional BPD
KODE REKENING
URAIAN
VOLUME
10
Kegiatan Perpustakaan
11
12
Kegiatan Posyandu
13
14
14
15
16
Pembangunan Gudang
Kegiatan Kepemudaan
Kegiatan Adat
Kegiatan TPQ
KODE REKENING
URAIAN
VOLUME
Kegiatan Dasawisma
PEMBIAYAAN
Penerimaan Pembiayaan
SILPA
Pengeluaran Pembiayaan
Pembentukan Dana Cadangan
____________________________
ANGGARAN
KET
Rp
267,456,364
APBN
Rp
137,748,775
APBD II
Rp
405,205,139
Rp
405,205,139
Rp
209,715,659
Rp
90,600,000
Rp
22,356,925
Rp
8,604,617
ANGGARAN
Rp
5,125,000
Rp
2,800,000
Rp
72,153,117
Rp
3,562,000
Rp
4,514,000
Rp
133,796,980
Rp
3,697,000
Rp
10,782,500
Rp
6,657,200
Rp
5,967,600
Rp
2,169,200
Rp
2,409,700
Rp
7,072,820
Rp
9,657,600
Rp
9,202,200
Rp
3,030,000
Rp
1,830,000
Rp
5,430,000
Rp
1,596,000
Rp
1,596,000
Rp
9,900,000
Rp
4,754,000
Rp
48,045,160
Rp
59,067,500
Rp
29,357,500
Rp
3,730,000
Rp
11,070,000
Rp
6,120,000
Rp
2,160,000
KET
Rp
10,782,500
46,260,120 jalan rt 2
46260120
Rp
3,765,200 rt 1
3765200
ANGGARAN
KET
Rp
5,400,000
Rp
1,230,000
Rp
2,625,000
Rp
2,625,000
Rp
Rp
Rp
405,205,139
Rp
405,205,139
Rp
Rp
405,205,139
Rp
Rp
405,205,139
Rp
KEPALA DESA,
____________________________
URAIAN
VOLUME
PENDAPATAN
Hasil Usaha
Dana Desa
Bantuan Keuangan
1 Bantuan Provinsi
2 Bantuan Kabupaten/Kota
Pendapatan Transfer
Pendapatan Lain-lain
JUMLAH PENDAPATAN
2
BELANJA
KODE REKENING
a.
VOLUME
Kepala Desa
10
bln
Sekretaris Desa
bln
Bendahara Desa
10
bln
Kepala Urusan
10
Kepala Dusun
- Kepala Desa
- Koordinator PTPKD
Rp
1,500,000
Rp
500,000
bln
Rp
550,000
10
bln
Rp
500,000
bln
Rp
300,000
bln
Rp
250,000
- Pelaksana Kegiatan
bln
Rp
200,000
- Bendahara Desa
bln
Rp
200,000
- Insentif Ketua RT
10
bln
Rp
75,000
- Ketua
12
bln
Rp
300,000
- Wakil Ketua
12
bln
Rp
275,000
- Sekretaris
12
bln
Rp
250,000
- Anggota
12
bln
Rp
225,000
1 Kertas HVS F4 70 gr
rim
x Rp
45,000
2 Kertas HVS A4 70 gr
rim
x Rp
42,000
3 Amplop
pak
x Rp
19,500
4 Buku Agenda
bh
x Rp
20,000
5 Pena Pilot
kotak
x Rp
12,000
kotak
x Rp
65,000
7 Gunting
bh
x Rp
20,000
8 Tinta Printer
Btl
x Rp
60,000
9 Kwitansi Biasa
Blok
x Rp
10,000
10 Buku Ekspedisi
bh
x Rp
10,000
b.
c.
Tunjangan BPD
Operasional Perkantoran
KODE REKENING
bhVOLUME
x Rp
1,500,000
kotak
x Rp
2,250
kotak
x Rp
4,500
set
x Rp
8,000
15 Hacter (staples)
bh
x Rp
22,500
16 Bantal Stempel
bh
x Rp
12,850
17 Tinta Stempel
bh
x Rp
10,225
kotak
x Rp
2,400
botol
x Rp
3,200
20 Pensil 2B
buah
x Rp
2,400
21 Stempel
bh
x Rp
130,000
22 Pelobang Kertas
bh
x Rp
15,000
23 Penghapus Pensil 2B
buah
x Rp
2,400
10
bh
x Rp
1,000
bh
x Rp
4,000
26 Map Snelhecter
10
bh
x Rp
1,000
27 Map Ordinier
10
bh
x Rp
35,000
28 SSP Pajak
Blok
x Rp
25,000
bh
x Rp
35,000
- Materai 6000
20
Lbr
x Rp
6,000
- Materai 3000
20
Lbr
x Rp
3,000
Eksp
x Rp
25,000
1000
lbr
x Rp
200
- Nasi Bungkus
50
OK
x Rp
18,000
- Snack Kotak
50
OK
x Rp
7,000
Stel
x Rp
500,000
b.
c.
URAIAN
d.
KODE REKENING
URAIAN
- Pakaian Batik Perangkat Desa
f.
bhVOLUME
x Rp
ls
x Rp
10,808,500
Sapu Plastik
bh
x Rp
37,000
Kain Pel
bh
x Rp
27,000
Pembersih Lantai
btl
x Rp
7,500
Tong Sampah
bh
x Rp
19,000
Gayung Air
bh
x Rp
12,500
Pembersih WC
Btl
x Rp
13,000
Sikat WC
bh
x Rp
6,500
Tagihan PDAM
kali
x Rp
50,000
Listrik
bln
x Rp
50,000
bh
x Rp
250,000
btl
x Rp
450,000
- Kertas HVS F4 70 gr
rim
x Rp
45,000
- Kertas HVS A4 70 gr
rim
x Rp
40,000
- Amplop
pak
x Rp
19,500
- Buku Agenda
bh
x Rp
20,000
kotak
x Rp
66,400
- Kwitansi Biasa
Blok
x Rp
10,000
kotak
x Rp
2,250
- Hacter (staples)
bh
x Rp
22,500
250,000
Pejalanan Dinas
Perjalanan Dinas Dalam Daerah
Perjalanan Dinas Luar Daerah
g. Belanja/Biaya Kebersihan Kantor Desa
Operasional BPD
2 Belanja Barang dan Jasa
a.
KODE REKENING
bhVOLUME
x Rp
16,067
- Tinta Stempel
bh
x Rp
16,000
botol
x Rp
6,000
20
bh
x Rp
1,000
Map Snelhecter
20
bh
x Rp
1,500
- Materai 6000
20
Lbr
Rp
6,000
- Materai 3000
20
Lbr
Rp
3,000
Eksp
x Rp
35,000
1500
lbr
x Rp
200
50
lbr
x Rp
2,500
- Nasi Bungkus
75
OK
Rp
18,000
- Snack Kotak
75
OK
Rp
7,000
bh
Rp
400,000
bh
x Rp
550,000
Papan Struktur
bh
x Rp
550,000
bh
x Rp
950,000
- Bantal Stempel
b.
c.
URAIAN
d.
e.
2 Belanja Modal
b.
TA
Rp
400,000
Ketua
TA
Rp
350,000
Sekretaris
TA
Rp
300,000
Anggota
TA
Rp
250,000
KODE REKENING
TAVOLUME
x Rp
250,000
Ketua
TA
Rp
225,000
Sekretaris
TA
Rp
200,000
Anggota
TA
Rp
175,000
Ketua
TA
Rp
700,000
Sekretaris
TA
Rp
600,000
Anggota
TA
Rp
500,000
- Laptop
Unit
x Rp
8,500,000
- Komputer
Unit
x Rp
5,500,000
bh
Rp
535,117
Unit
x Rp
2,500,000
Unit
x Rp
6,340,000
- Infocus
Unit
x Rp
9,000,000
- TV
Unit
x Rp
2,500,000
- Parabola Digital
Unit
x Rp
2,500,000
- Bendera Ruangan
lbr
x Rp
100,000
roll
x Rp
95,000
- Lemari arsip
bh
x Rp
3,200,000
bh
x Rp
1,000,000
bh
x Rp
4,500,000
- Umbul-umbul
100
lbr
x Rp
45,000
- Filling Cabinet
Unit
x Rp
3,200,000
- Kipas Angin
bh
x Rp
650,000
- Dispenser
bh
x Rp
300,000
- Galon
bh
x Rp
56,500
Pembina
URAIAN
Meja Komputer
- Printer Epson
Kamera Digital
KODE REKENING
bhVOLUME
x Rp
150,000
- Pot Bunga
bh
x Rp
350,000
bh
x Rp
150,000
kali
x Rp
3,500,000
bh
x Rp
20,000
20
x Rp
12,500
oh
x Rp
85,000
Bola Lampu
bh
x Rp
75,000
bh
x Rp
25,000
klg
x Rp
1,200,000
Kuas Roll
bh
x Rp
50,000
ktk
x Rp
13,000
oh
x Rp
85,000
Pintu WC
bh
x Rp
500,000
Semen
zak
x Rp
70,000
Pasir
m3
x Rp
333,000
Kerikil
m3
x Rp
333,000
btg
x Rp
85,000
bh
x Rp
25,000
Kabel Listrik
x Rp
8,000
Bola Lampu
bh
x Rp
75,000
- Jam Dinding
URAIAN
Terminal Listrik
- Kabel Listrik
2
Upah Tukang
Upah Tukang
2
3 Belanja Modal
KODE REKENING
2
ohVOLUME
x Rp
120,000
Gorong-Gorong
bh
x Rp
150,000
16
btg
x Rp
65,000
Kawat Beton
kg
x Rp
13,000
Koral
M3
x Rp
250,000
Semen
zak
x Rp
70,000
Papan Mal
lbr
x Rp
40,000
kg
x Rp
12,000
Kayu 4 x 6
btg
x Rp
20,000
Upah Tukang
URAIAN
3 Belanja Modal
oh
x Rp
85,000
Upah Tukang
oh
x Rp
120,000
oh
x Rp
150,000
Kayu 4 x 6
M3
x Rp
2,000,000
Kayu Perpil
225
bh
x Rp
17,500
Cat Pernis
15
kg
x Rp
35,000
10
bh
x Rp
60,000
10
ktk
x Rp
20,000
Paku 1 inch
kg
x Rp
20,000
kg
x Rp
5,000
bh
x Rp
100,000
bh
x Rp
150,000
3 Belanja Modal
oh
x Rp
85,000
Upah Tukang
oh
x Rp
120,000
Kepala Tukang
oh
x Rp
150,000
KODE
2
2REKENING
3
3 Belanja Modal
URAIAN
VOLUME
Semen Portland
29
sak
x Rp
70,000
Pasir Beton
M3
x Rp
333,000
Kerikil
M3
x Rp
216,600
oh
x Rp
85,000
Upah Tukang
oh
x Rp
120,000
Kepala Tukang
oh
x Rp
150,000
Semen Portland
27
sak
x Rp
70,000
Pasir Beton
M3
x Rp
333,000
Kerikil
M3
x Rp
216,600
3 Belanja Modal
oh
x Rp
85,000
Upah Tukang
oh
x Rp
120,000
Kepala Tukang
oh
x Rp
150,000
Semen Portland
sak
x Rp
70,000
Pasir Beton
M3
x Rp
333,000
Kerikil
M3
x Rp
216,600
3 Belanja Modal
oh
x Rp
85,000
Upah Tukang
oh
x Rp
120,000
Kepala Tukang
oh
x Rp
150,000
Semen Portland
sak
x Rp
70,000
Pasir Beton
M3
x Rp
333,000
3 Belanja Modal
KODE REKENING
Kerikil
URAIAN
Tanah Urug
2
M3
Rp
110,500
oh
x Rp
85,000
Upah Tukang
oh
x Rp
120,000
Kepala Tukang
oh
x Rp
150,000
- Paku
kg
x Rp
18,000
22
btg
x Rp
96,940
- Kawat Beton
M3
x Rp
19,600
- Semen Portland
12
M3
x Rp
70,000
1
2
0.3
kg
M3
m3
x Rp
x Rp
x Rp
333,000
216,600
2,681,800
3 Belanja Modal
oh
x Rp
85,000
Upah Tukang
oh
x Rp
120,000
Kepala Tukang
oh
x Rp
150,000
- Sirtu
M3
x Rp
165,000
M3
x Rp
296,000
- Semen Portland
35
M3
x Rp
70,000
- Pasir Pasang
M3
x Rp
333,000
- Pasir Beton
5
6
kg
M3
x Rp
x Rp
333,000
216,600
oh
x Rp
85,000
3 Belanja Modal
- Kerikil
2
Upah Pekerja
- Balok Bekisting
8
216,600
- Kerikil
2
M3VOLUME
x Rp
- Pasir Beton
Upah Pekerja
KODE REKENING
2
10
10
ohVOLUME
x Rp
- Semen Portland
29
sak
x Rp
70,000
- Pasir Beton
M3
x Rp
333,000
- Kerikil
M3
x Rp
216,600
12
bln
x Rp
50,000
Bh
x Rp
15,000
12
bln
x Rp
50,000
Bh
x Rp
15,000
Upah Tukang
URAIAN
3 Belanja Modal
Kegiatan Perpustakaan
2 Belanja Barang dan Jasa
- Insentif Pengurus
- Buku Agenda
2
11
11
- Buku Agenda
2
12
12
120,000
Kegiatan Posyandu
2 Belanja Barang dan Jasa
- Isentiv Kader Posyandu
Ketua
12
bln
x Rp
40,000
Anggota
12
bln
x Rp
35,000
Bh
Rp
15,000
bh
Rp
750,000
bh
Rp
300,000
oh
Rp
85,000
Semen
zak
Rp
70,000
Pasir
M3
Rp
333,000
- Buku Agenda
2
12
13
13
3 Belanja Modal
13
14
2x
3 Belanja Modal
KODE
2
2REKENING
14
2 Belanja Barang dan Jasa
URAIAN
VOLUME
Upah Pekerja
2
14
14
14
2x
oh
Rp
85,000
Semen
zak
Rp
70,000
Pasir
M3
Rp
333,000
unit
Rp
9,900,000
Rp
9,900,000
3 Belanja Modal
15
15
15
4x
oh
Rp
85,000
Upah Tukang
1x
oh
Rp
120,000
1x
oh
Rp
150,000
Batu Kali
M3
Rp
333,000
Kerikil
M3
Rp
333,000
Semen
zak
Rp
60,000
Pasir
M3
Rp
333,000
kali
Rp
1,000,000
kali
Rp
75,000
3 Belanja Modal
16
Pembangunan Gudang
16
16
12
4x
Upah Pekerja
10 x
12
oh
Rp
85,000
Upah Tukang
9x
10
oh
Rp
120,000
2x
oh
Rp
150,000
Pasir Urug
M3
Rp
165,000
M3
Rp
296,000
56
zak
Rp
72,500
3 Belanja Modal
Semen Portland
KODE REKENING
M3VOLUME
x Rp
Tanah Urug
M3
Rp
66,000
Pasir Beton
M3
Rp
333,000
Kerikil
M3
Rp
216,000
Papan
20
lbr
Rp
25,000
Paku
11
kg
Rp
18,000
24
btg
Rp
96,940
20
btg
Rp
35,000
Kawat Beton
kg
Rp
19,600
Kayu 4 x 6
btg
Rp
25,000
Bata merah
3295
bh
Rp
1,200
klg
Rp
375,000
14
kg
Rp
28,500
M3
Rp
2,681,800
11
lbr
Rp
104,000
Paku Triplek
kg
Rp
25,400
klg
Rp
75,000
Paku seng
kg
Rp
25,500
32
lbr
Rp
56,000
Cat minyak 1 kg
kg
Rp
57,200
Amplas
lbr
Rp
4,800
Minyak cat
kg
Rp
21,000
lbr
Rp
55,000
Dokumentasi
ls
Rp
166,000
x Rp
700,000
Pasir Pasang
URAIAN
333,000
TA
KODE REKENING
b.
URAIAN
VOLUME
TA
x Rp
650,000
- Sekretaris
TA
x Rp
550,000
- Bendahara
TA
x Rp
500,000
Belanja ATK
- Kertas HVS 70 gr
rim
x Rp
45,000
- Amplop
pak
x Rp
15,000
- Bolpoint Pilot
12
bh
x Rp
4,000
20
bh
x Rp
750
- Snelhecter
20
bh
x Rp
1,000
botol
x Rp
2,500
- Buku Agenda
Eksp
x Rp
15,000
- Bantal Stempel
bh
x Rp
15,000
- Tinta Stempel
bh
x Rp
9,500
- Stempel PKK
bh
x Rp
130,000
- Spidol Snowman
bh
x Rp
12,500
x Rp
300,000
55
e.
stel
1000
Lbr
x Rp
200
Nasi Bungkus
50
OK
x Rp
18,000
Snack Kotak
50
OK
x Rp
7,000
3 Belanja Modal
- Tempat gulai Peresmanan
10
bh
x Rp
300,000
- Sendok Gulai
Lusin
x Rp
100,000
Lusin
x Rp
60,000
- Piring
Lusin
x Rp
60,000
- Gelas
Lusin
x Rp
55,000
- periuk besar
bh
x Rp
200,000
bh
x Rp
100,000
KODE REKENING
VOLUME
Lusin
x Rp
250,000
- Gayung
Lusin
x Rp
150,000
- Tikar Plastik
bh
x Rp
900,000
- Alas Meja
bh
x Rp
150,000
bh
x Rp
750,000
- Saringan Santan
URAIAN
ls
x Rp
1,000,000
10
bln
x Rp
100,000
bh
x Rp
500,000
- Alqur'an
30
bh
x Rp
41,000
- Baju Bola
Club
x Rp
2,500,000
- Papan Pentas
lbr
x Rp
160,000
- Bola Kaki
bh
x Rp
500,000
- Atap Tarup
bh
x Rp
3,500,000
- Speaker
bh
x Rp
3,250,000
- Mesin DVD
bh
x Rp
500,000
Kegiatan Kepemudaan
2 Belanja Barang dan Jasa
Kegiatan Adat
2 Belanja Barang dan Jasa
- Insetif Pengurus dan Anggota Adat
12
bln
x Rp
20,000
50
ok
x Rp
18,000
500
lbr
x Rp
200
bh
x Rp
400,000
TA
Rp
600,000
30
bh
Rp
12,000
Kegiatan TPQ
2 Belanja Barang dan Jasa
- Honor Guru TPQ
- Pengadaan Iqro'
KODE
2
3REKENING
6
Kegiatan Dasawisma
2
URAIAN
VOLUME
TA
Rp
100,000
Sekretaris
TA
Rp
100,000
Bendahara
TA
Rp
100,000
Ketua
TA
Rp
100,000
Sekretaris
TA
Rp
100,000
Bendahara
TA
Rp
100,000
bh
Rp
300,000
Rp
41,000
b Insentif Pokja
3 Belanja Modal
- Papan Nama Dasa Wisma
30
bh
b.
1x
ok
Rp
150,000
1x
ok
Rp
125,000
Sekretaris
1x
ok
Rp
100,000
Anggota
2x
ok
Rp
75,000
c.
d.
oh
Rp
300,000
Transpor Peserta
15
oh
Rp
15,000
15
oh
Rp
35,000
KODE REKENING
Nasi Bungkus
URAIAN
Snack Kotak
2
18
ohVOLUME
x Rp
18
oh
Rp
18,000
7,000
PEMBIAYAAN
Penerimaan Pembiayaan
SILPA
Pengeluaran Pembiayaan
____________________________
ANGGARAN
Rp
267,456,364
Rp
137,748,775
KETERANGAN
SUMBER DANA
ADD
137,748,775
Rp
405,205,139 Rp
137,748,775
Rp
394,455,139 Rp
126,998,775
Rp
198,965,659 Rp
126,998,775
Rp
79,850,000 Rp
79,850,000
Rp
79,850,000 Rp
79,850,000
Rp
ANGGARAN
51,500,000 Rp
KETERANGAN
51,500,000
Rp
15,000,000
Rp
15,000,000
Rp
Rp
Rp
5,000,000
Rp
5,000,000
Rp
16,500,000
Rp
16,500,000
Rp
15,000,000
Rp
15,000,000
13,050,000 Rp
13,050,000
Rp
Rp
2,400,000
Rp
2,400,000
Rp
2,000,000
Rp
2,000,000
Rp
4,800,000
Rp
4,800,000
Rp
1,600,000
Rp
1,600,000
Rp
2,250,000
Rp
2,250,000
15,300,000 Rp
15,300,000
Rp
Rp
3,600,000
Rp
3,600,000
Rp
3,300,000
Rp
3,300,000
Rp
3,000,000
Rp
3,000,000
Rp
5,400,000
Rp
5,400,000
Rp
22,356,925 Rp
22,356,925
Rp
22,356,925 Rp
22,356,925
Rp
3,515,925 Rp
3,515,925
Rp
270,000 Rp
270,000
Rp
168,000 Rp
168,000
Rp
58,500 Rp
58,500
Rp
120,000 Rp
120,000
Rp
24,000 Rp
24,000
Rp
130,000 Rp
130,000
Rp
20,000 Rp
20,000
Rp
240,000 Rp
240,000
Rp
30,000 Rp
30,000
Rp
10,000 Rp
10,000
Rp
ANGGARAN
1,500,000 Rp
KETERANGAN
1,500,000
Rp
11,250
Rp
11,250
Rp
22,500 Rp
22,500
Rp
40,000 Rp
40,000
Rp
45,000 Rp
45,000
Rp
12,850 Rp
12,850
Rp
10,225 Rp
10,225
Rp
4,800 Rp
4,800
Rp
9,600 Rp
9,600
Rp
9,600 Rp
9,600
Rp
130,000 Rp
130,000
Rp
30,000 Rp
30,000
Rp
9,600 Rp
9,600
Rp
10,000 Rp
10,000
Rp
20,000 Rp
20,000
Rp
10,000 Rp
10,000
Rp
350,000 Rp
350,000
Rp
150,000 Rp
150,000
Rp
70,000 Rp
70,000
Rp
180,000 Rp
180,000
Rp
120,000 Rp
120,000
Rp
60,000 Rp
60,000
Rp
325,000 Rp
325,000
Rp
125,000 Rp
125,000
Rp
200,000 Rp
200,000
Rp
1,250,000 Rp
1,250,000
Rp
900,000 Rp
900,000
Rp
350,000 Rp
350,000
Rp
3,250,000 Rp
3,250,000
Rp
1,500,000 Rp
1,500,000
Rp
ANGGARAN
1,750,000 Rp
KETERANGAN
1,750,000
Rp
10,808,500 Rp
10,808,500
Rp
Rp
Rp
10,808,500 Rp
10,808,500
Rp
277,500 Rp
277,500
Rp
74,000 Rp
74,000
Rp
54,000 Rp
54,000
Rp
22,500 Rp
22,500
Rp
38,000 Rp
38,000
Rp
50,000 Rp
50,000
Rp
26,000 Rp
26,000
Rp
13,000 Rp
13,000
Rp
450,000 Rp
450,000
Rp
150,000 Rp
150,000
Rp
300,000 Rp
300,000
Rp
2,300,000 Rp
2,300,000
Rp
500,000 Rp
500,000
Rp
1,800,000 Rp
1,800,000
Rp
35,406,925 Rp
35,406,925
Rp
8,604,617 Rp
8,604,617
Rp
5,604,617 Rp
5,604,617
Rp
949,617 Rp
949,617
Rp
270,000
Rp
270,000
Rp
160,000
Rp
160,000
Rp
58,500 Rp
58,500
Rp
80,000 Rp
80,000
Rp
132,800
Rp
132,800
Rp
70,000 Rp
70,000
Rp
11,250 Rp
11,250
Rp
45,000 Rp
45,000
KETERANGAN
Rp
ANGGARAN 16,067 Rp
Rp
32,000 Rp
32,000
Rp
24,000 Rp
24,000
Rp
20,000 Rp
20,000
Rp
30,000 Rp
30,000
Rp
180,000 Rp
180,000
Rp
120,000
Rp
120,000
Rp
60,000 Rp
60,000
Rp
600,000 Rp
600,000
Rp
175,000
Rp
175,000
Rp
300,000
Rp
300,000
Rp
125,000
Rp
125,000
1,875,000 Rp
1,875,000
Rp
16,067
Rp
1,350,000
Rp
1,350,000
Rp
525,000
Rp
525,000
2,000,000 Rp
2,000,000
Rp
Rp
Rp
2,000,000
Rp
2,000,000
3,000,000 Rp
3,000,000
Rp
550,000
Rp
550,000
Rp
550,000
Rp
550,000
Rp
1,900,000
Rp
1,900,000
Rp
23,904,617 Rp
23,904,617
Rp
5,125,000 Rp
5,125,000
Rp
5,125,000 Rp
5,125,000
Rp
3,050,000 Rp
3,050,000
Rp
400,000
Rp
400,000
Rp
350,000
Rp
350,000
Rp
300,000
Rp
300,000
Rp
2,000,000
Rp
2,000,000
2,075,000 Rp
2,075,000
Rp
KETERANGAN
Rp
ANGGARAN250,000
Rp
250,000
Rp
225,000
Rp
225,000
Rp
200,000
Rp
200,000
Rp
1,400,000
Rp
1,400,000
Rp
2,800,000 Rp
2,800,000
Rp
2,800,000 Rp
2,800,000
Rp
2,800,000 Rp
2,800,000
Rp
700,000
Rp
700,000
Rp
600,000
Rp
600,000
Rp
1,500,000
Rp
1,500,000
Rp
72,153,117 Rp
8,262,233
Rp
72,153,117 Rp
8,262,233
Rp
Rp
17,000,000
5,500,000 Rp
5,500,000
Rp
535,117
Rp
535,117
Rp
5,000,000
Rp
2,227,116
Rp
6,340,000
Rp
9,000,000
Rp
2,500,000
Rp
2,500,000
Rp
300,000
Rp
95,000
Rp
3,200,000
Rp
2,000,000
Rp
4,500,000
Rp
4,500,000
Rp
3,200,000
Rp
650,000
Rp
300,000
Rp
113,000
Rp
ANGGARAN 150,000
Rp
700,000
Rp
300,000
Rp
3,500,000
Rp
20,000
Rp
250,000
KETERANGAN
Rp
3,562,000 Rp
Rp
3,562,000 Rp
Rp
510,000
Rp
300,000
Rp
100,000
Rp
2,400,000
Rp
200,000
Rp
52,000
Rp
4,514,000 Rp
Rp
1,360,000 Rp
Rp
1,360,000
Rp
3,154,000 Rp
Rp
1,000,000
Rp
490,000
Rp
666,000
Rp
333,000
Rp
425,000
Rp
50,000
Rp
40,000
Rp
150,000
Rp
133,796,980
Rp
Rp
3,697,000 Rp
Rp
720,000 Rp
Rp
Rp
ANGGARAN 720,000
2,977,000 Rp
Rp
750,000
Rp
1,040,000
Rp
13,000
Rp
500,000
Rp
350,000
Rp
200,000
Rp
24,000
Rp
100,000
KETERANGAN
-
Rp
10,782,500 Rp
Rp
2,395,000 Rp
Rp
2,125,000
Rp
120,000
Rp
150,000
Rp
8,387,500 Rp
Rp
2,000,000
Rp
3,937,500
Rp
525,000
Rp
600,000
Rp
200,000
Rp
100,000
Rp
25,000
Rp
400,000
Rp
600,000
Rp
6,657,200 Rp
Rp
780,000 Rp
Rp
510,000
Rp
120,000
Rp
150,000
Rp
ANGGARAN
5,877,200 Rp
KETERANGAN
-
Rp
2,030,000
Rp
2,331,000
Rp
1,516,200
Rp
5,967,600 Rp
Rp
780,000 Rp
Rp
510,000
Rp
120,000
Rp
150,000
Rp
5,187,600 Rp
Rp
1,890,000
Rp
1,998,000
Rp
1,299,600
Rp
2,169,200 Rp
Rp
440,000 Rp
Rp
170,000
Rp
120,000
Rp
150,000
Rp
1,729,200 Rp
Rp
630,000
Rp
666,000
Rp
433,200
Rp
2,409,700 Rp
Rp
780,000 Rp
Rp
510,000
Rp
120,000
Rp
150,000
Rp
1,629,700 Rp
Rp
420,000
Rp
666,000
Rp
ANGGARAN 433,200
Rp
110,500
KETERANGAN
Rp
7,072,820 Rp
Rp
2,415,000 Rp
Rp
1,785,000
Rp
480,000
Rp
150,000
Rp
4,657,820 Rp
Rp
36,000
Rp
2,132,680
Rp
78,400
Rp
840,000
Rp
333,000
Rp
433,200
Rp
804,540
Rp
9,657,600 Rp
Rp
2,820,000 Rp
Rp
2,040,000
Rp
480,000
Rp
300,000
Rp
6,837,600 Rp
Rp
165,000
Rp
592,000
Rp
2,450,000
Rp
666,000
Rp
1,665,000
Rp
1,299,600
Rp
9,202,200 Rp
Rp
3,325,000 Rp
Rp
2,125,000
Rp
KETERANGAN
ANGGARAN
1,200,000
Rp
5,877,200 Rp
Rp
2,030,000
Rp
2,331,000
Rp
1,516,200
Rp
3,030,000
Rp
Rp
3,030,000
Rp
Rp
3,000,000
Rp
30,000
Rp
1,830,000
Rp
Rp
1,830,000
Rp
Rp
1,800,000
Rp
30,000
Rp
5,430,000
Rp
Rp
4,380,000
Rp
Rp
2,190,000
Rp
480,000
Rp
1,680,000
Rp
30,000
Rp
1,050,000
Rp
Rp
750,000
Rp
300,000
Rp
1,596,000
Rp
Rp
510,000
Rp
Rp
510,000
Rp
1,086,000
Rp
Rp
420,000
Rp
666,000
Rp
1,596,000
Rp
Rp
ANGGARAN
510,000
Rp
510,000
Rp
1,086,000
Rp
420,000
Rp
666,000
Rp
9,900,000
Rp
9,900,000
Rp
9,900,000
Rp
KETERANGAN
Rp
Rp
Rp
4,754,000
Rp
Rp
1,970,000
Rp
Rp
1,700,000
Rp
120,000
Rp
150,000
Rp
2,784,000
Rp
Rp
1,998,000
Rp
666,000
Rp
120,000
Rp
1,998,000
Rp
48,045,160
Rp
Rp
22,375,000
Rp
Rp
1,000,000
Rp
75,000
Rp
10,200,000
Rp
10,800,000
Rp
300,000
Rp
25,670,160
Rp
Rp
165,000
Rp
2,368,000
Rp
4,060,000
KETERANGAN
Rp
ANGGARAN
1,998,000
Rp
462,000
Rp
999,000
Rp
432,000
Rp
500,000
Rp
198,000
Rp
2,326,560
Rp
700,000
Rp
58,800
Rp
200,000
Rp
3,954,000
Rp
375,000
Rp
399,000
Rp
2,681,800
Rp
1,144,000
Rp
25,400
Rp
75,000
Rp
51,000
Rp
1,792,000
Rp
114,400
Rp
19,200
Rp
21,000
Rp
385,000
Rp
166,000
Rp
59,067,500
Rp
Rp
29,357,500
Rp
Rp
20,882,500
Rp
Rp
2,400,000
Rp
Rp
700,000
Rp
ANGGARAN 650,000
Rp
550,000
Rp
500,000
Rp
532,500
Rp
135,000
Rp
15,000
Rp
48,000
Rp
15,000
Rp
20,000
Rp
10,000
Rp
60,000
Rp
15,000
Rp
9,500
Rp
130,000
Rp
75,000
Rp
16,500,000
Rp
16,500,000
Rp
200,000
Rp
200,000
Rp
KETERANGAN
Rp
Rp
Rp
1,250,000 Rp
Rp
900,000
Rp
350,000
Rp
8,475,000
Rp
3,000,000
Rp
300,000
Rp
180,000
Rp
180,000
Rp
165,000
Rp
800,000
Rp
600,000
Rp
KETERANGAN
Rp
ANGGARAN 250,000
Rp
150,000
Rp
1,800,000
Rp
300,000
Rp
750,000
Rp
3,730,000
Rp
Rp
3,730,000
Rp
Rp
1,000,000
Rp
1,000,000
Rp
500,000
Rp
1,230,000
Rp
11,070,000
Rp
Rp
11,070,000
Rp
Rp
2,500,000
Rp
320,000
Rp
1,000,000
Rp
3,500,000
Rp
3,250,000
Rp
500,000
Rp
6,120,000
Rp
Rp
6,120,000
Rp
Rp
1,920,000
Rp
900,000
Rp
100,000
Rp
3,200,000
Rp
2,160,000
Rp
Rp
2,160,000
Rp
Rp
1,800,000
Rp
360,000
KETERANGAN
Rp
ANGGARAN
5,400,000
Rp
Rp
3,300,000
Rp
Rp
2,100,000
Rp
Rp
700,000
Rp
700,000
Rp
700,000
Rp
1,200,000
Rp
Rp
400,000
Rp
400,000
Rp
400,000
Rp
2,100,000
Rp
Rp
2,100,000
Rp
1,230,000
Rp
Rp
1,230,000
Rp
Rp
1,230,000
Rp
2,625,000
Rp
Rp
2,625,000
Rp
Rp
2,625,000
Rp
Rp
525,000
Rp
Rp
150,000
Rp
125,000
Rp
100,000
Rp
150,000
Rp
900,000
Rp
Rp
900,000
Rp
750,000
Rp
Rp
225,000
Rp
525,000
Rp
450,000
Rp
KETERANGAN
Rp
ANGGARAN324,000
Rp
126,000
Rp
405,205,139 Rp
137,748,775
Rp
394,455,139 Rp
126,998,775
Rp
10,750,000 Rp
10,750,000
Rp
405,205,139
Rp
137,748,775
Rp
Rp
Rp
405,205,139
Rp
137,748,775
Rp
Rp
KEPALA DESA,
____________________________
KODE REKENING
1
1
URAIAN
VOLUME
PENDAPATAN
2
Pendapatan Transfer
PTAPD
JUMLAH PENDAPATAN
BELANJA
b.
c.
12
bln
Bendahara Desa
12
bln
Kepala Urusan
12
bln
Kepala Dusun
12
bln
- Kepala Desa
bln
- Koordinator PTPKD
bln
- Pelaksana Kegiatan
bln
- Bendahara Desa
bln
- Insentif Ketua RT
10
bln
- Ketua
bln
- Wakil Ketua
bln
- Sekretaris
bln
- Anggota
bln
- Kertas HVS F4 70 gr
rim
- Kertas HVS A4 70 gr
rim
- Amplop
pak
- Buku Agenda
bh
- Pena Pilot
kotak
kotak
- Gunting
bh
- Tinta Printer
Btl
- Kwitansi Biasa
Blok
- Buku Ekspedisi
bh
bh
kotak
kotak
set
- Hacter (staples)
bh
- Bantal Stempel
bh
- Tinta Stempel
bh
Tunjangan BPD
Operasional Perkantoran
KODE REKENING
URAIAN
- Klip Merk See Gull
kotak
botol
- Pensil 2B
buah
Stempel
bh
Pelobang Kertas
bh
buah
10
bh
bh
- Map Snelhecter
10
bh
- Map Ordinier
10
bh
- Penghapus Pensil 2B
- Stop map biasa
- Map Lubang Plastik
b.
VOLUME
- SSP Pajak
Blok
bh
- Materai 6000
20
Lbr
- Materai 3000
20
Lbr
KODE REKENING
URAIAN
c.
- Foto copy
d.
VOLUME
Eksp
1000 lbr
x
x
50
OK
- Snack Kotak
50
OK
- Pakaian Dinas
Stel
bh
Sapu Plastik
bh
Kain Pel
bh
Pembersih Lantai
btl
Tong Sampah
bh
Gayung Air
bh
Pembersih WC
Btl
Sikat WC
bh
bh
btl
- Kertas HVS F4 70 gr
rim
- Kertas HVS A4 70 gr
rim
- Amplop
pak
- Buku Agenda
bh
kotak
- Kwitansi Biasa
Blok
kotak
- Hacter (staples)
bh
- Bantal Stempel
bh
- Tinta Stempel
bh
botol
Operasional BPD
2 Belanja Barang dan Jasa
a.
b.
c.
20
bh
Map Snelhecter
20
bh
- Materai 6000
20
Lbr
- Materai 3000
20
Lbr
Eksp
- Foto copy
1500 lbr
- Dokumentasi
d.
50
lbr
- Nasi Bungkus
75
OK
- Snack Kotak
75
OK
KODE REKENING
URAIAN
e.
VOLUME
bh
bh
Papan Struktur
bh
bh
2 Belanja Modal
TA
Ketua
TA
Sekretaris
TA
Anggota
TA
KODE REKENING
URAIAN
b.
VOLUME
TA
Ketua
TA
Sekretaris
TA
Anggota
TA
Ketua
TA
Sekretaris
TA
Anggota
TA
- Laptop
Unit
- Komputer
Unit
- Printer Epson
Unit
roll
- Kipas Angin
bh
bh
20
oh
Bola Lampu
bh
bh
klg
Kuas Roll
bh
ktk
oh
bh
16
btg
Kawat Beton
kg
Koral
M3
Semen
zak
Papan Mal
lbr
kg
Kayu 4 x 6
btg
Terminal Listrik
- Kabel Listrik
2
3 Belanja Modal
Gorong-Gorong
Besi Beton Polos Diar 10
oh
Upah Tukang
oh
oh
Kayu 4 x 6
M3
Kayu Perpil
225
bh
3 Belanja Modal
KODE REKENING
11
11
URAIAN
VOLUME
Cat Pernis
15
kg
10
bh
10
ktk
Paku 1 inch
kg
kg
bh
bh
12
bln
Bh
- Buku Agenda
2
12
12
Kegiatan Posyandu
2 Belanja Barang dan Jasa
- Isentiv Kader Posyandu
Ketua
12
bln
Anggota
12
bln
Bh
- Buku Agenda
KODE REKENING
2
12
URAIAN
VOLUME
3 Belanja Modal
- Papan nama posyandu
bh
bh
b.
d.
TA
TA
- Sekretaris
TA
- Bendahara
TA
Belanja ATK
- Kertas HVS 70 gr
rim
- Amplop
pak
- Bolpoint Pilot
12
bh
20
bh
- Snelhecter
20
bh
botol
- Buku Agenda
Eksp
- Bantal Stempel
bh
- Tinta Stempel
bh
- Stempel PKK
bh
- Spidol Snowman
bh
e.
1000 Lbr
50
OK
Snack Kotak
50
OK
ls
10
bln
bh
30
bh
- Baju Bola
psg
- Papan Pentas
lbr
- Bola Kaki
bh
- Atap Tarup
bh
- Speaker
bh
- Mesin DVD
bh
Kegiatan Kepemudaan
Kegiatan Adat
2 Belanja Barang dan Jasa
- Insetif Pengurus dan Anggota Adat
12
bln
50
ok
500
lbr
bh
KODE REKENING
2
URAIAN
VOLUME
Kegiatan TPQ
2 Belanja Barang dan Jasa
- Honor Guru TPQ
- Pengadaan Iqro'
2
Kegiatan Dasawisma
TA
30
bh
TA
Sekretaris
TA
Bendahara
TA
Ketua
TA
Sekretaris
TA
Bendahara
TA
b Insentif Pokja
KODE REKENING
2
URAIAN
PEMBIAYAAN
3
3
3
3
1
1
1
1
3
3
3
2
2
2
VOLUME
1
2
3
Penerimaan Pembiayaan
SILPA
Pencaiaran Dana Cadangan
Hasil Kekayaan Desa Yang Dipisahkan
1
2
JUMLAH (Rp)
Pengeluaran Pembiayaan
Pembentukan Dana Cadangan
Penyertaan Modal Desa
JUMLAH (Rp)
30
bh
UME
PAGU ANGGARAN
Rp
136,389,027
Rp
136,389,027
Rp
51,500,000
Rp
51,500,000
Rp
187,889,027 Rp
187,889,027
Rp
198,187,042 Rp
198,187,042
Rp
144,455,042 Rp
144,455,042
Rp
85,050,000 Rp
85,050,000
Rp
85,050,000 Rp
85,050,000
Rp
61,800,000 Rp
61,800,000
Rp
1,500,000
Rp
Rp
500,000
Rp
6,000,000
Rp
6,000,000
Rp
550,000
Rp
19,800,000
Rp
19,800,000
Rp
500,000
Rp
18,000,000
Rp
18,000,000
13,050,000 Rp
13,050,000
Rp
18,000,000
Rp
18,000,000
Rp
300,000
Rp
2,400,000
Rp
2,400,000
Rp
250,000
Rp
2,000,000
Rp
2,000,000
Rp
200,000
Rp
4,800,000
Rp
4,800,000
Rp
200,000
Rp
1,600,000
Rp
1,600,000
Rp
75,000
Rp
2,250,000
Rp
2,250,000
10,200,000 Rp
10,200,000
Rp
Rp
300,000
Rp
2,400,000
Rp
2,400,000
Rp
275,000
Rp
2,200,000
Rp
2,200,000
Rp
250,000
Rp
2,000,000
Rp
2,000,000
Rp
225,000
Rp
3,600,000
Rp
3,600,000
Rp
10,798,425 Rp
10,798,425
Rp
10,798,425 Rp
10,798,425
Rp
3,515,925 Rp
3,515,925
Rp
45,000
Rp
270,000
Rp
270,000
Rp
42,000
Rp
168,000
Rp
168,000
Rp
19,500
Rp
58,500
Rp
58,500
Rp
20,000
Rp
120,000
Rp
120,000
Rp
12,000
Rp
24,000
Rp
24,000
Rp
65,000
Rp
130,000
Rp
130,000
Rp
20,000
Rp
20,000
Rp
20,000
Rp
60,000
Rp
240,000
Rp
240,000
Rp
10,000
Rp
30,000
Rp
30,000
Rp
10,000
Rp
10,000
Rp
10,000
Rp
1,500,000
Rp
1,500,000
Rp
1,500,000
Rp
2,250
Rp
11,250
Rp
11,250
Rp
4,500
Rp
22,500
Rp
22,500
Rp
8,000
Rp
40,000
Rp
40,000
Rp
22,500
Rp
45,000
Rp
45,000
Rp
12,850
Rp
12,850
Rp
12,850
Rp
10,225
Rp
10,225
Rp
10,225
LEBIH/KURANG (Rp.)
Rp
136,387,042
UME
PAGU ANGGARAN
Rp
2,400 Rp
4,800
Rp
4,800
Rp
3,200 Rp
9,600
Rp
9,600
Rp
2,400 Rp
9,600
Rp
9,600
Rp
130,000
Rp
130,000
Rp
130,000
Rp
15,000
Rp
30,000
Rp
30,000
Rp
2,400 Rp
9,600
Rp
9,600
Rp
1,000
Rp
10,000
Rp
10,000
Rp
4,000
Rp
20,000
Rp
20,000
Rp
1,000
Rp
10,000
Rp
10,000
Rp
35,000
Rp
350,000
Rp
350,000
Rp
25,000
Rp
150,000
Rp
150,000
Rp
35,000
Rp
70,000
Rp
70,000
Rp
180,000 Rp
180,000
Rp
6,000
Rp
120,000
Rp
120,000
Rp
3,000
Rp
60,000
Rp
60,000
LEBIH/KURANG (Rp.)
UME
PAGU ANGGARAN
Rp
325,000 Rp
325,000
Rp
25,000
Rp
125,000
Rp
125,000
Rp
200
Rp
200,000
Rp
200,000
1,250,000 Rp
1,250,000
Rp
Rp
18,000
Rp
900,000
Rp
900,000
Rp
7,000
Rp
350,000
Rp
350,000
Rp
2,750,000 Rp
2,950,000 Rp
2,950,000
Rp
500,000
Rp
1,500,000
Rp
1,500,000
Rp
250,000
Rp
1,250,000
Rp
1,250,000
277,500 Rp
277,500
Rp
Rp
37,000
Rp
74,000
Rp
74,000
Rp
27,000
Rp
54,000
Rp
54,000
Rp
7,500
Rp
22,500
Rp
22,500
Rp
19,000
Rp
38,000
Rp
38,000
Rp
12,500
Rp
50,000
Rp
50,000
Rp
13,000
Rp
26,000
Rp
26,000
Rp
6,500
Rp
13,000
Rp
13,000
Rp
Rp
Rp
Rp
Rp
Rp
2,300,000 Rp
2,300,000
Rp
Rp
250,000
Rp
500,000
Rp
500,000
Rp
450,000
Rp
1,800,000
Rp
1,800,000
Rp
8,604,617 Rp
8,604,617
Rp
5,604,617 Rp
5,604,617
Rp
949,617 Rp
949,617
Rp
45,000
Rp
270,000
Rp
270,000
Rp
40,000
Rp
160,000
Rp
160,000
Rp
19,500
Rp
58,500
Rp
58,500
Rp
20,000
Rp
80,000
Rp
80,000
Rp
66,400
Rp
132,800
Rp
132,800
Rp
10,000
Rp
70,000
Rp
70,000
Rp
2,250
Rp
11,250
Rp
11,250
Rp
22,500
Rp
45,000
Rp
45,000
Rp
16,067
Rp
16,067
Rp
16,067
Rp
16,000
Rp
32,000
Rp
32,000
Rp
6,000
Rp
24,000
Rp
24,000
Rp
1,000
Rp
20,000
Rp
20,000
Rp
1,500
Rp
30,000
Rp
30,000
Rp
180,000 Rp
180,000
Rp
6,000
Rp
120,000
Rp
120,000
Rp
3,000
Rp
60,000
Rp
60,000
Rp
600,000 Rp
600,000
175,000
Rp
35,000
Rp
175,000
Rp
Rp
200
Rp
300,000
Rp
300,000
Rp
2,500
Rp
125,000
Rp
125,000
1,875,000 Rp
1,875,000
Rp
Rp
18,000
Rp
1,350,000
Rp
1,350,000
Rp
7,000
Rp
525,000
Rp
525,000
LEBIH/KURANG (Rp.)
UME
PAGU ANGGARAN
Rp
Rp
400,000
Rp
Rp
2,000,000 Rp
2,000,000
Rp
2,000,000
3,000,000 Rp
3,000,000
2,000,000
Rp
550,000
Rp
550,000
Rp
550,000
Rp
550,000
Rp
550,000
Rp
550,000
Rp
950,000
Rp
1,900,000
Rp
1,900,000
Rp
18,804,617
Rp
18,804,617
Rp
5,125,000 Rp
5,125,000
Rp
5,125,000 Rp
5,125,000
Rp
3,050,000 Rp
3,050,000
Rp
400,000
Rp
400,000
Rp
400,000
Rp
350,000
Rp
350,000
Rp
350,000
Rp
300,000
Rp
300,000
Rp
300,000
Rp
250,000
Rp
2,000,000
Rp
2,000,000
LEBIH/KURANG (Rp.)
UME
PAGU ANGGARAN
Rp
2,075,000 Rp
2,075,000
Rp
250,000
Rp
250,000
Rp
250,000
Rp
225,000
Rp
225,000
Rp
225,000
Rp
200,000
Rp
200,000
Rp
200,000
Rp
175,000
Rp
1,400,000
Rp
1,400,000
Rp
2,800,000 Rp
2,800,000
Rp
2,800,000 Rp
2,800,000
Rp
2,800,000 Rp
2,800,000
Rp
700,000
Rp
700,000
Rp
700,000
Rp
600,000
Rp
600,000
Rp
600,000
Rp
500,000
Rp
1,500,000
Rp
1,500,000
Rp
28,515,000 Rp
28,515,000
Rp
28,515,000 Rp
28,515,000
Rp
8,500,000
Rp
17,000,000
Rp
17,000,000
Rp
5,500,000
Rp
5,500,000
Rp
5,500,000
Rp
2,500,000
Rp
5,000,000
Rp
5,000,000
Rp
95,000
Rp
95,000
Rp
95,000
Rp
650,000
Rp
650,000
Rp
650,000
Rp
20,000
Rp
20,000
Rp
20,000
Rp
12,500
Rp
250,000
Rp
250,000
Rp
3,562,000 Rp
3,562,000
Rp
3,562,000 Rp
3,562,000
Rp
85,000
Rp
510,000
Rp
510,000
Rp
75,000
Rp
300,000
Rp
300,000
Rp
25,000
Rp
100,000
Rp
100,000
Rp
1,200,000
Rp
2,400,000
Rp
2,400,000
Rp
50,000
Rp
200,000
Rp
200,000
Rp
13,000
Rp
52,000
Rp
52,000
Rp
Rp
21,739,500 Rp
21,739,500
Rp
3,697,000 Rp
3,697,000
Rp
120,000
Rp
720,000
Rp
720,000
Rp
720,000
Rp
720,000
2,977,000 Rp
2,977,000
Rp
Rp
150,000
Rp
750,000
Rp
750,000
Rp
65,000
Rp
1,040,000
Rp
1,040,000
Rp
13,000
Rp
13,000
Rp
13,000
Rp
250,000
Rp
500,000
Rp
500,000
Rp
70,000
Rp
350,000
Rp
350,000
Rp
40,000
Rp
200,000
Rp
200,000
Rp
12,000
Rp
24,000
Rp
24,000
Rp
20,000
Rp
100,000
Rp
100,000
Rp
10,782,500 Rp
10,782,500
Rp
2,395,000
Rp
2,395,000
Rp
85,000
Rp
2,125,000
Rp
2,125,000
Rp
120,000
Rp
120,000
Rp
120,000
Rp
150,000
Rp
150,000
Rp
150,000
8,387,500 Rp
8,387,500
Rp
Rp
2,000,000
Rp
2,000,000
Rp
2,000,000
Rp
17,500
Rp
3,937,500
Rp
3,937,500
LEBIH/KURANG (Rp.)
UME
PAGU ANGGARAN
Rp
35,000
Rp
525,000
Rp
525,000
Rp
60,000
Rp
600,000
Rp
600,000
Rp
20,000
Rp
200,000
Rp
200,000
Rp
20,000
Rp
100,000
Rp
100,000
Rp
5,000
Rp
25,000
Rp
25,000
Rp
100,000
Rp
400,000
Rp
400,000
Rp
150,000
Rp
600,000
Rp
600,000
Rp
1,830,000
Rp
1,830,000
Rp
1,830,000
Rp
1,830,000
Rp
50,000
Rp
1,800,000
Rp
1,800,000
Rp
15,000
Rp
30,000
Rp
30,000
Rp
5,430,000 Rp
5,430,000
Rp
4,380,000 Rp
4,380,000
Rp
80,000
Rp
960,000
Rp
960,000
Rp
70,000
Rp
3,360,000
Rp
3,360,000
Rp
15,000
Rp
60,000
Rp
60,000
LEBIH/KURANG (Rp.)
UME
PAGU ANGGARAN
Rp
1,050,000 Rp
1,050,000
Rp
750,000
Rp
750,000
Rp
750,000
Rp
300,000
Rp
300,000
Rp
300,000
Rp
31,992,500 Rp
31,992,500
Rp
4,382,500 Rp
4,382,500
Rp
4,382,500 Rp
4,382,500
Rp
2,400,000 Rp
2,400,000
Rp
700,000
Rp
700,000
Rp
700,000
Rp
650,000
Rp
650,000
Rp
650,000
Rp
550,000
Rp
550,000
Rp
550,000
Rp
500,000
Rp
500,000
Rp
500,000
Rp
532,500 Rp
532,500
Rp
45,000
Rp
135,000
Rp
135,000
Rp
15,000
Rp
15,000
Rp
15,000
Rp
4,000
Rp
48,000
Rp
48,000
Rp
750
Rp
15,000
Rp
15,000
Rp
1,000
Rp
20,000
Rp
20,000
Rp
2,500
Rp
10,000
Rp
10,000
Rp
15,000
Rp
60,000
Rp
60,000
Rp
15,000
Rp
15,000
Rp
15,000
9,500 Rp
9,500
Rp
9,500
Rp
Rp
130,000
Rp
130,000
Rp
130,000
Rp
12,500
Rp
75,000
Rp
75,000
Rp
200,000 Rp
200,000
Rp
200,000
Rp
200,000
1,250,000 Rp
1,250,000
Rp
200
Rp
Rp
18,000
Rp
900,000
Rp
900,000
Rp
7,000
Rp
350,000
Rp
350,000
Rp
3,730,000 Rp
3,730,000
Rp
3,730,000 Rp
3,730,000
Rp
1,000,000
Rp
1,000,000
Rp
1,000,000
Rp
100,000
Rp
1,000,000
Rp
1,000,000
Rp
500,000
Rp
500,000
Rp
500,000
Rp
41,000
Rp
1,230,000
Rp
1,230,000
Rp
11,070,000 Rp
11,070,000
Rp
11,070,000 Rp
11,070,000
Rp
2,500,000
Rp
2,500,000
Rp
2,500,000
Rp
160,000
Rp
320,000
Rp
320,000
Rp
500,000
Rp
1,000,000
Rp
1,000,000
Rp
3,500,000
Rp
3,500,000
Rp
3,500,000
Rp
3,250,000
Rp
3,250,000
Rp
3,250,000
Rp
500,000
Rp
500,000
Rp
500,000
Rp
6,120,000 Rp
6,120,000
Rp
6,120,000 Rp
6,120,000
Rp
20,000
Rp
1,920,000
Rp
1,920,000
Rp
18,000
Rp
900,000
Rp
900,000
Rp
200
Rp
100,000
Rp
100,000
Rp
400,000
Rp
3,200,000
Rp
3,200,000
LEBIH/KURANG (Rp.)
UME
PAGU ANGGARAN
Rp
2,160,000 Rp
2,160,000
Rp
2,160,000 Rp
2,160,000
Rp
600,000
Rp
1,800,000
Rp
1,800,000
Rp
12,000
Rp
360,000
Rp
360,000
Rp
3,300,000 Rp
3,300,000
Rp
3,300,000 Rp
3,300,000
Rp
2,100,000 Rp
2,100,000
Rp
100,000
Rp
700,000
Rp
700,000
Rp
100,000
Rp
700,000
Rp
700,000
Rp
100,000
Rp
700,000
Rp
700,000
1,200,000 Rp
1,200,000
Rp
Rp
100,000
Rp
400,000
Rp
400,000
Rp
100,000
Rp
400,000
Rp
400,000
Rp
100,000
Rp
400,000
Rp
400,000
1,230,000 Rp
1,230,000
Rp
LEBIH/KURANG (Rp.)
UME
PAGU ANGGARAN
Rp
Rp
41,000
1,230,000 Rp
1,230,000
Rp
1,230,000
Rp
1,230,000
Rp
187,889,027
Rp
187,889,027
Rp
198,187,042
Rp
198,187,042
Rp
(10,298,015) Rp
Rp
187,889,027
Rp
Rp
Rp
Rp
Rp
187,889,027 Rp
LEBIH/KURANG (Rp.)
(10,298,015)
187,889,027
(10,298,015)
187,889,027
Rp
DISETUJUI OLEH
KEPALA DESA
PERI RUSMANDI, SE
KET
KET
KET
KET
KET
KET
KET
KET
KET
Bidang
Kegiatan
No.
Tanggal
Uraian
Swadaya Masyarakat
Nomor Bukti
6
10/30/2015
10/30/2015
0001
/KWT/2015
3
4
10/31/2015
10/31/2015
0002
0003
/KWT/2015
/KWT/2015
Jumlah
Total Penerimaan
Rp
Dari Bendahara
Rp
Rp
38,700,000.00
38,700,000.00
38,700,000.00
Total Pengeluaran
Halaman 180
Bidang
Kegiatan
No.
1
Tanggal
Uraian
2
11/2/2015
11/2/2015
11/2/2015
11/2/2015
11/3/2015
11/4/2015
11/5/2015
3
Pembayaran Operasional Perkantoran
Belanja Alat Tulis Kantor Kepala Desa
Belanja Hard Disk Eksternal
Belanja Stempel Kepala Desa
Materai dan Benda Pos
Cetak dan Penggandaan
Makan dan Minum Rapat
11/5/2015
Dari Bendahara
Rp
4
10,798,425.00
Nomor Bukti
Swadaya Masyarakat
5
6
0004
0005
0006
0007
0008
0009
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
0010
/KWT/2015
11/5/2015
0011
/KWT/2015
11/5/2015
0012
/KWT/2015
Jumlah
Total Penerimaan
Rp
10,798,425.00
10,798,425
Total Pengeluaran
Halaman 181
Bidang
Kegiatan
No.
1
Tanggal
Uraian
2
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/7/2015
3
Pembayaran Operasional BPD
Belanja Alat Tulis Kantor BPD
Belanja Materai dan Benda Pos BPD
Belanja Cetak dan Penggandaan BPD
Belanja Makan dan Minum Rapat BPD
Belanja Pakaian Batik BPD
11/7/2015
11/7/2015
Dari Bendahara
Rp
4
8,604,617.00
Nomor Bukti
Swadaya Masyarakat
5
6
0013
0014
0015
0016
0017
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
/KWT/2015
0018
/KWT/2015
0019
/KWT/2015
Jumlah
Total Penerimaan
Rp
8,604,621.00
8,604,621
Total Pengeluaran
Halaman 182
Bidang
Kegiatan
No.
Tanggal
2
11/8/2015
11/8/2015
11/8/2015
Uraian
3
Penerimaan Kegiatan Musyawarah dan Perencanaan
Rp
Desa
Honor Tim Penyusun RPJMDes
Honor Tim Penyusun RKPDes
Jumlah
Total Penerimaan
Rp
Dari Bendahara
Swadaya Masyarakat
Nomor Bukti
6
5,125,000.00
0020
0021
/KWT/2015
/KWT/2015
5,125,004.00
Rp
5,125,004.00
Total Pengeluaran
Halaman 183
Bidang
Kegiatan
No.
Tanggal
Uraian
11/8/2015
11/8/2015
Jumlah
Total Penerimaan
Rp
Dari Bendahara
Swadaya Masyarakat
Nomor Bukti
6
2,800,000.00
0022
Rp
/KWT/2015
2,800,000.00
Rp
2,800,000.00
Total Pengeluaran
Halaman 184
Bidang
Kegiatan
No.
Tanggal
Uraian
Swadaya Masyarakat
Nomor Bukti
6
11/9/2015
11/9/2015
0023
/KWT/2015
11/9/2015
0024
/KWT/2015
Rp
Dari Bendahara
28,515,000.00
Halaman 185
11/9/2015
0025
/KWT/2015
11/9/2015
0026
/KWT/2015
Jumlah
Total Penerimaan
Rp
28,515,000.00
Rp
28,515,000.00
Total Pengeluaran
Halaman 186
AN
KAMPUNG
BKK. 211
Pengeluaran(Rp.)
Belanja Barang dan Jasa
Belanja Modal
Jumlah Pengembalian ke
Bendahara
38,700,000.00
Rp
51,500,000.00
Rp
(12,800,000.00)
Rp
Rp
13,050,000.00
10,200,000.00
Rp
Rp
(25,850,000.00)
(36,050,000.00)
Rp
74,750,000.00
Total Pengeluaran
Rp
Rp
74,750,000.00
Halaman 187
AN
KAMPUNG
BKK.212
Pengeluaran(Rp.)
Belanja Barang dan Jasa
Belanja Modal
Jumlah Pengembalian ke
Bendahara
Rp
Rp
Rp
Rp
Rp
Rp
1,885,925.00
1,500,000.00
130,000.00
180,000.00
325,000.00
1,250,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10
10,798,425.00
8,912,500.00
7,412,500.00
7,282,500.00
7,102,500.00
6,777,500.00
5,527,500.00
Rp
2,950,000.00
Rp
2,577,500.00
Rp
277,500.00
Rp
2,300,000.00
Rp
2,300,000.00
Rp
Rp
Rp
10,798,425.00
Total Pengeluaran
Rp
10,798,425.00
Halaman 188
AN
KAMPUNG
BKK. 213
Pengeluaran(Rp.)
Belanja Barang dan Jasa
Belanja Modal
Jumlah Pengembalian ke
Bendahara
Rp
Rp
Rp
Rp
Rp
949,617.00
180,000.00
600,000.00
1,875,000.00
2,000,000.00
Rp
Rp
Rp
Rp
Rp
Rp
10
8,604,617.00
7,655,000.00
7,475,000.00
6,875,000.00
5,000,000.00
3,000,000.00
1,900,000.00
Rp
1,100,000.00
Rp
Rp
1,900,000.00
Rp
Rp
5,604,624.00 Rp
Total Pengeluaran
Rp
3,000,000.00
8,604,624.00
Rp
Halaman 189
AN
KAMPUNG
BKK. 214
Pengeluaran(Rp.)
Belanja Barang dan Jasa
Belanja Modal
Jumlah Pengembalian ke
Bendahara
Rp
Rp
3,050,000.00
2,075,000.00
Rp
5,125,007.00
Total Pengeluaran
Rp
5,125,000.00
Rp
Rp
2,075,000.00
-
Rp
5,125,007.00
Halaman 190
AN
KAMPUNG
BKK. 215
Pengeluaran(Rp.)
Belanja Barang dan Jasa
Belanja Modal
Jumlah Pengembalian ke
Bendahara
10
Rp
Rp
2,800,000.00
Rp
2,800,000.00
Total Pengeluaran
Rp
2,800,000.00
Rp
Rp
2,800,000.00
Halaman 191
AN
KAMPUNG
BKK. 216
Pengeluaran(Rp.)
Belanja Barang dan Jasa
Belanja Modal
Jumlah Pengembalian ke
Bendahara
28,515,000.00
Rp
27,500,000.00
Rp
1,015,000.00
Rp
95,000.00
Rp
1,110,000.00
Halaman 192
Rp
Total Pengeluaran
Rp
650,000.00
Rp
1,760,000.00
Rp
270,000.00
Rp
2,030,000.00
Rp
Rp
28,515,000.00
28,515,000.00
Rp
Halaman 193
Bidang
Kegiatan
No.
Tanggal
Uraian
11 November 2015
11 November 2015
Upah Tukang
Gorong Rt. 02
11 November 2015
Jumlah
Total Penerimaan
Rp
Dari Bendahara
Swadaya Masyarakat
3,697,000
Pemasangan Gorong-
Rp
Rp
Nomor Bukti
Pengeluaran(Rp.)
Belanja Barang dan
Jasa
7
3,697,004
3,697,004
0030
/KWT/2015
0031
/KWT/2015
Rp
Total Pengeluaran
Bidang
Kegiatan
No.
Tanggal
Nomor Bukti
6
###
###
0032 /KWT/2015
0033 /KWT/2015
Jumlah
Total Penerimaan
Rp
Rp
Rp
Pengeluaran(Rp.)
Belanja Barang dan
Jasa
7
10,782,500
10,782,504
Rp
2,395,000
Rp
2,395,000
Bidang
Kegiatan
No.
Tanggal
Uraian
3
###
Rp
Dari Bendahara
Swadaya Masyarakat
Nomor Bukti
6
Pengeluaran(Rp.)
Belanja Barang dan
Jasa
7
1,830,000
0034 /KWT/2015
0035 /KWT/2015
Rp
Rp
1,800,000
30,000
Jumlah
Total Penerimaan
Rp
Rp
1,830,000
Rp
1,830,000
Bidang
Kegiatan
No.
Tanggal
Uraian
3
### Pembayaran Kegiatan POSYANDU
### Insentif KADER POSYANDU
Rp
Dari Bendahara
Swadaya Masyarakat
Nomor Bukti
6
Pengeluaran(Rp.)
Belanja Barang dan
Jasa
7
5,430,000
0034 /KWT/2015
Rp
4,320,000
Halaman 197 of 308
0035 /KWT/2015
0036 /KWT/2015
Jumlah
Total Penerimaan
Rp
Rp
5,430,000
Rp
60,000
Rp
4,380,000
Pengeluaran(Rp.)
Belanja Modal
Jumlah Pengembalian
ke Bendahara
10
Rp
3,697,000
Rp
720,000
Rp
2,977,000
Rp
2,977,000
Rp
Rp
Rp
3,697,000
3,697,000
Rp
Pengeluaran(Rp.)
Belanja Modal
Jumlah Pengembalian
ke Bendahara
10
Rp
10,782,500
Rp
8,387,500
Rp
8,387,500
Rp
Rp
Rp
8,387,500
10,782,500
Rp
Pengeluaran(Rp.)
Belanja Modal
Jumlah Pengembalian
ke Bendahara
10
Rp
1,830,000
Rp
Rp
30,000
-
Rp
Rp
1,830,000
Rp
Pengeluaran(Rp.)
Belanja Modal
Jumlah Pengembalian
ke Bendahara
10
Rp
5,430,000
Rp
1,110,000
Halaman 202 of 308
Rp
Rp
1,050,000
Rp
Rp
1,050,000
5,430,000
1,050,000
Rp
Rp
Bidang
Kegiatan
: Pembinaan Kemasyarakatan
: Pembinaan PKK
Penerimaan (Rp.)
No.
1
Tanggal
Uraian
Dari Bendahara
1/1/1900
11/15/2015
3
Pembayaran Kegiatan Pembinaan PKK
11/15/2015
0039
/KWT/2015
11/16/2015
11/16/2015
11/17/2015
Belanja ATK
Belanja Penggandaan dan Foto Copy
Makan Minum Rapat PKK
0040
0041
0042
/KWT/2015
/KWT/2015
/KWT/2015
Jumlah
Total Penerimaan
Rp
Rp
Rp
4
4,382,500.00
Nomor Bukti
Swadaya Masyarakat
5
4,382,500
4,382,500
Total Pengeluaran
Bidang
Kegiatan
: Pembinaan Kemasyarakatan
: Pembinaan BKMT
Penerimaan (Rp.)
No.
1
Tanggal
1/1/1900
11/18/2015
11/18/2015
11/18/2015
11/19/2015
11/19/2015
Uraian
3
Pembayaran Pembinaan BKMT
Biaya Transport Kegiatan BKMT
Biaya Transport Nara Sumber/Penceramah
Belanja Papan Nama BKMT
Belanja Alqur'an BKMT
Jumlah
Total Penerimaan
Dari Bendahara
Rp
4
3,730,000.00
Swadaya Masyarakat
5
Nomor Bukti
6
0043 /KWT/2015
0044 /KWT/2015
0045 /KWT/2015
0046 /KWT/2015
Rp
Rp
3,730,000.00
3,730,000.00
Total Pengeluaran
Bidang
Kegiatan
: Pembinaan Kemasyarakatan
: Kepemudaan
Penerimaan (Rp.)
No.
Tanggal
1/1/1900
11/19/2015
11/19/2015
11/19/2015
11/19/2015
11/20/2015
Uraian
Dari Bendahara
3
Pembayaran Kegiatan Kepemudaan
Jumlah
Total Penerimaan
4
11,070,000
Nomor Bukti
Swadaya Masyarakat
5
6
0047
/KWT/2015
0048
0049
/KWT/2015
/KWT/2015
0050
/KWT/2015
11,070,004
11,070,004
Total Pengeluaran
Bidang
Kegiatan
: Pemberdayaan Kemasyarakatan
: ADAT
Penerimaan (Rp.)
No.
1
Tanggal
Uraian
Dari Bendahara
Nomor Bukti
Swadaya Masyarakat
1/1/1900
11/20/2015
3
Pembayaran Kegiatan ADAT
11/20/2015
0051
/KWT/2015
11/20/2015
11/21/2015
11/21/2015
0052
0053
0054
/KWT/2015
/KWT/2015
/KWT/2015
Jumlah
Total Penerimaan
Rp
Rp
4
6,120,000.00
6,120,004.00
Rp
6,120,004.00
Total Pengeluaran
Bidang
Kegiatan
: Pembinaan Kemasyarakatan
: TPQ
Penerimaan (Rp.)
No.
1
Tanggal
1/1/1900
11/21/2015
11/21/2015
11/21/2015
Uraian
3
Pembayaran Pembinaan TPQ
Honor Guru TPQ
Pengadaan Iqro'
Dari Bendahara
Swadaya Masyarakat
Nomor Bukti
6
2,160,000
0056
0057
/KWT/2015
/KWT/2015
Jumlah
Total Penerimaan
2,160,000
2,160,000
Total Pengeluaran
Bidang
Kegiatan
: Pembinaan Kemasyarakatan
: DASAWISMA
Penerimaan (Rp.)
No.
1
Tanggal
1/1/1900
11/21/2015
11/21/2015
11/21/2015
Uraian
3
Pembayaran Pembinaan Dasawisma
Transport/Insetif
Pengurus
Organisasi
(Dasawisma)
Sosial
Dari Bendahara
Swadaya Masyarakat
Nomor Bukti
6
3,300,000
0058
/KWT/2015
0059
/KWT/2015
Jumlah
Total Penerimaan
3,300,000
3,300,000
Total Pengeluaran
Bidang
Kegiatan
: Pembinaan Kemasyarakatan
: Pembinaan Kerukunan Umat Beragama
Penerimaan (Rp.)
No.
Tanggal
Uraian
1/1/1900
Dari Bendahara
Swadaya Masyarakat
Nomor Bukti
6
Halaman 211 of 308
11/21/2015
11/21/2015
Jumlah
Total Penerimaan
1,230,000
0060
/KWT/2015
1,230,000
1,230,000
Total Pengeluaran
N
AMPUNG
BKK. 231
Pengeluaran(Rp.)
Belanja Barang dan
Belanja Modal
Jasa
7
8
Jumlah Pengembalian
ke Bendahara
10
Rp
4,382,500
Rp
2,400,000
Rp
1,982,500
Rp
Rp
Rp
532,500
200,000
1,250,000
Rp
Rp
Rp
1,450,000
1,250,000
-
4,382,500
Rp
Rp
Total Pengeluaran
Rp
4,382,500
N
AMPUNG
BKK.232
Pengeluaran(Rp.)
Belanja Barang dan
Belanja Modal
Jasa
7
8
Rp
Rp
Rp
Rp
Jumlah Pengembalian
ke Bendahara
9
Rp
Rp
Rp
Rp
Rp
1,000,000.00
1,000,000.00
500,000.00
1,230,000.00
Rp
3,730,000.00
Total Pengeluaran
Rp
Rp
10
3,730,000.00
2,730,000.00
1,730,000.00
1,230,000.00
-
3,730,000.00
N
AMPUNG
BKK. 233
Pengeluaran(Rp.)
Belanja Barang dan
Belanja Modal
Jasa
7
8
Jumlah Pengembalian
ke Bendahara
10
11,070,000
3,500,000
7,570,000
320,000
3,500,000
7,250,000
3,750,000
3,750,000
Total Pengeluaran
11,070,007
11,070,007
N
AMPUNG
BKK. 234
Pengeluaran(Rp.)
Belanja Barang dan
Belanja Modal
Jasa
7
8
Rp
Rp
Rp
Jumlah Pengembalian
ke Bendahara
10
6,120,000
1,920,000
4,200,000
900,000.00
100,000.00
3,200,000.00
3,300,000
3,200,000
-
Rp
6,120,000.00
Total Pengeluaran
Rp
6,120,000.00
N
AMPUNG
BKK. 235
Pengeluaran(Rp.)
Belanja Barang dan
Belanja Modal
Jasa
7
8
1,800,000
360,000
Jumlah Pengembalian
ke Bendahara
10
2,160,000
360,000
-
Total Pengeluaran
2,160,000
2,160,000
N
AMPUNG
BKK. 236
Pengeluaran(Rp.)
Belanja Barang dan
Belanja Modal
Jasa
7
8
Jumlah Pengembalian
ke Bendahara
10
3,300,000
2,100,000
1,200,000
1,200,000
Total Pengeluaran
3,300,000
3,300,000
N
AMPUNG
BKK. 237
Pengeluaran(Rp.)
Belanja Barang dan
Belanja Modal
Jasa
7
8
Bidang : Pembinaan Kemasyarakatan
Jumlah Pengembalian
ke Bendahara
10
Halaman 220 of 308
Total Pengeluaran
1,230,000
1,230,000
1,230,000
1,230,000
TGL
KODE
REKENING
11/4/2015
7.1.1.01
11/4/2015
7.1.1.01
11/5/2015
7.1.1.06
11/5/2015
7.1.1.01
7.1.1.03
URAIAN
4
Penerimaan dan Penyetoran PPN Belanja ATK Operasional
Perkantoran
Penerimaan dan Penyetoran PPN Belanja Hard Disk Eksternal
Operasional Perkantoran
11/6/2015
7.1.1.06
11/7/2015
7.1.1.01
11/7/2015
7.1.1.01
11/7/2015
7.1.1.01
10
11/9/2015
7.1.1.01
11
7.1.1.03
12
7.1.1.01
13
7.1.1.03
14
7.1.1.01
15
7.1.1.03
16
7.1.1.06
17
7.1.1.01
18
7.1.1.03
19
11/14/2015
7.1.1.01
20
11/17/2015
7.1.1.06
21
11/19/2015
7.1.1.01
22
11/19/2015
7.1.1.01
7.1.1.03
7.1.1.01
23
24
11/19/2015
Halaman 222
No.
TGL
KODE
REKENING
URAIAN
25
26
11/20/2015
27
7.1.1.03
7.1.1.01
7.1.1.03
28
11/20/2015
7.1.1.06
29
11/21/2015
7.1.1.01
7.1.1.03
7.1.1.01
30
31
11/21/2015
JUMLAH
Jumlah Periode ini
Jumlah s/d Periode Lalu
Jumlah Semua s/d Periode ini
Sisa Kas
Pada hari ini tanggal 30 November 2015
Oleh kami didapat dalam kas Rp. 0
Mengetahui
Kuasa Pengguana Anggaran
Kepala Desa
PERI RUSMANDI, SE
Halaman 223
PENYETORAN
(Rp.)
5
(Rp.)
6
NO BUKTI
SALDO
Rp
188,592.50 Rp
188,592.50 0004
/KWT/2015
Rp
Rp
150,000.00 Rp
150,000.00 0005
/KWT/2015
Rp
Rp
125,000.00 Rp
125,000.00 0009
/KWT/2015
Rp
Rp
268,181.82 Rp
268,181.82 0010
/KWT/2015
Rp
Rp
40,227.27 Rp
Rp
Rp
187,500.00 Rp
187,500.00 0016
/KWT/2015
Rp
Rp
200,000.00 Rp
200,000.00 0017
/KWT/2015
Rp
Rp
110,000.00
Rp
110,000.00 0018
/KWT/2015
Rp
Rp
190,000.00 Rp
190,000.00 0019
/KWT/2015
Rp
Rp
2,500,000.00 Rp
2,500,000.00 0023
/KWT/2015
Rp
Rp
375,000.00 Rp
375,000.00
Rp
Rp
277,454.55 Rp
277,454.55 0028
Rp
Rp
41,618.18 Rp
Rp
Rp
225,181.82 Rp
225,181.82 0030
/KWT/2015
Rp
Rp
33,777.27 Rp
33,777.27 0031
/KWT/2015
Rp
Rp
30,000.00 Rp
30,000.00 0035
/KWT/2015
Rp
Rp
762,500.00 Rp
762,500.00
Rp
Rp
114,375.00
114,375.00
Rp
Rp
105,000.00 Rp
105,000.00 0040
/KWT/2015
Rp
Rp
125,000.00 Rp
125,000.00 0004
/KWT/2015
Rp
Rp
123,000.00 Rp
123,000.00 0048
/KWT/2015
Rp
Rp
318,181.82 Rp
318,181.82 0049
/KWT/2015
Rp
Rp
47,727.27 Rp
Rp
Rp
318,181.82 Rp
Rp
Rp
40,227.27
/KWT/2015
41,618.18
47,727.27
318,181.82 0051
/KWT/2015
Halaman 224
PEMOTONGAN
PENYETORAN
(Rp.)
5
(Rp.)
6
Rp
47,727.27 Rp
Rp
340,909.09 Rp
Rp
51,136.36 Rp
51,136.36
Rp
90,000.00 Rp
90,000.00 0054
Rp
290,909.09 Rp
290,909.09 0056
Rp
43,636.36 Rp
Rp
123,000.00 Rp
340,909.09 0052
123,000.00 0061
Rp
7,843,817.50
Rp
7,843,817.50
Rp
7,843,817.50
7,843,817.50 Rp
7,843,817.50
Rp
9
Rp
Rp
Rp
/KWT/2015
Rp
/KWT/2015
Rp
Rp
Rp
Rp
/KWT/2015
43,636.36
7,843,817.50
Rp
SALDO
47,727.27
Rp
Rp
NO BUKTI
/KWT/2015
Bendahara Desa
Halaman 225
TANGGAL
URAIAN
PEMOTONGAN
(Rp.)
4
JUMLAH
MENGETAHUI
KEPALA DESA,
PERI RUSMANDI, SE
Cara Pengisian :
Kolom 1diisi dengan nomor urut penerimaan atau pengeluaran kas pengeluaran
Kolom 2 diisi dengan tanggal penerimaan atau pengeluaran kas pengeluaran
Kolom 3 diisi dengan uraian penerimaan kas atau pengeluaran kas
Kolom 4 diisi dengan jumlah rupiah penerimaan kas.
Kolom 5 diisi dengan jumlah rupiah pengeluaran kas.
Kolom 6 diisi dengan saldo buku kas bendahara.
PAJAK
TANAH KAMPUNG
2015
PENYETORAN
(Rp.)
SALDO
(Rp.)
5
PEMERINTAHAN
KEPALA DESA
BENDAHARAWAN
NO
1
1
2
3
4
5
6
7
8
9
ditutup, dan oleh Kami didapati Kas Sebesar Rp. 1.631.588,- ( Satu juta ena
puluh delapan rupiah
Terdiri dari :
a. Uang Tunai
b. Saldo Bank
URAIAN
16
17
2
13-07-12
13-07-12
4
Diterima PPN atas pengadaan Kipas angin
Diterima PPh 22 atas pengadaan kipas angin
18
19
13-07-12
13-07-12
22
23
13-07-12
13-07-12
35
36
24-04-12
24-04-12
38
25-07-12
Pada Hari
ini Selasa
Tanggal
Dua Tiga
puluh Satu
Bulan Juli
Tahun Dua
Ribu Dua
belas Buku
Kas Pajak
Desa Kayu
Aro
588,- ( Satu juta enam ratus tiga puluh satu ribu lima ratus delapan
h delapan rupiah
Terdiri dari :
a. Uang Tunai
Rp. 1.631.588,b. Saldo Bank
Rp
Mengetahui/
menyetujui :
ATASAN
LANSUNG
BENDAHARA
GUNAWAN
Halaman
PENERIMAAN (DEBET)
5
PENGELUARAN (KREDITA)
6
218,181
32,727
109,090
16,363
868,181
130,227
136,364
20,455
100,000
1631588
0
1631588
BENDAHARA DESA
0
0
0
S. PRAMONO
No.
TANGGAL TRANSAKSI
URAIAN TRANSAKSI
BUKTI TRANSAKSI
28 Oktober 2015
28 Oktober 2015
28 Oktober 2015
Penerimaan PTAPD
28 Oktober 2015
Penarikan PTAPD
MENGETAHUI
KEPALA DESA,
PEMASUKAN
SETORAN
BUNGA BANK
Alokasi
(Rp.)
(Rp.)
Rp
136,387,042.00
Rp
51,500,000.00
Rp
Rp
187,887,042.00
187,887,042.00
PERI RUSMANDI, SE
NK
NAH KAMPUNG
015
BULAN
BANK CABANG
REK. NO.
PENARIKAN
: Oktober 2015
: BRI Cabang Sungai Penuh
: 0117-01-001610-30-8
PENGELUARAN
PAJAK
(Rp.)
(Rp.)
BIAYA ADMINISTRASI
(Rp.)
Rp
Rp
136,387,042.00
Rp
Rp
SALDO
10
136,387,042.00
51,500,000.00
Rp
51,500,000.00
Rp
Rp
Rp
187,887,042.00
187,887,042.00
Rp
Rp
URAIAN
2
PENDAPATAN
Pendapatan Asli Desa
Hasil Usaha
Swadaya, Partisipasi dan Gotong
Royong
Lain-lain Pendapatan Asli Desa
yang sah
1
1
2
2
1
1
1
2
2
2
3
4
4
Pendapatan Transfer
Dana Desa
Bagian dari hasil pajak &retribusi
daerah kabupaten/ kota
JUMLAH PENDAPATAN
2
BELANJA
Bidang Penyelenggaraan
Pemerintahan Desa
1
JUMLAH
JUMLAH
ANGGARAN (Rp.) REALISASI (Rp.)
3
1 Belanja Pegawai:
- Penghasilan Tetap Kepala Desa
dan Perangkat
2
2
1
1
2
2
3 Belanja Modal
- Komputer
- Meja dan Kursi
- Mesin TIK
- dst..
Operasional BPD
2 Belanja Barang dan Jasa
-
2
2
1
1
4
4
Perjalanan Dinas
Pemeliharaan
Air, Listrik, dan Telepon
Honor
dst..
ATK
Penggandaan
Konsumsi Rapat
dst .
Operasional RT/ RW
2 Belanja Barang dan Jasa
- ATK
- Penggadaan
- Komsumsi Rapat
- dst
Bidang Pelaksanaan
Pembangunan Desa
Perbaikan Saluran Irigasi
2 Belanja Barang dan jasa
- Upah Kerja
- Honor
- dst..
3 Belanja Modal
- Semen
- Material
- dst
2
2
2
2
1
1
Kegiatan
Bidang Pembinaan
Kemasyarakatan
Kegiatan Pembinaan Ketentraman
dan Ketertiban
2 Belanja Barang dan Jasa:
- Honor Pelatih
- Konsumsi
- Bahan Pelatihan
- dst
Kegiatan
Bidang Pemberdayaan Masyarakat
Kegiatan
Bidang Tak Terduga
Kegiatan Kejadian Luar Biasa
2 Belanja Barang dan Jasa:
- Honor tim
- Konsumsi
- Obat-obatan
- dst
Kegiatan
JUMLAH BELANJA
SURPLUS / DEFISIT
PEMBIAYAAN
Penerimaan Pembiayaan
SILPA
DISETUJUI OLEH
KEPALA DESA
.....................................................
TTD
(
AMPUNG
LEBIH/KUR
ANG (Rp.)
KET.
4
DISETUJUI OLEH
KEPALA DESA
..................................................
TTD
.)
I PELAKSANAAN APBDesa
URAIAN
2
PINDAHAN SALDO (TAHAP
PERTAMA )
PENDAPATAN
Pendapatan Asli Desa
Hasil Usaha
Swadaya, Partisipasi dan Gotong
Royong
Lain-lain Pendapatan Asli Desa
yang sah
1
1
1
1
1 1
1 2
1 3
1
1
2
2 1
Pendapatan Transfer
Dana Desa
2 2
1
1
1
2 3
2 4
2 4
2 4
3 1
3 2
2
2
BELANJA
1
Bidang Penyelenggaraan
Pemerintahan Desa
JUMLAH
ANGGARAN
(Rp.)
3
JUMLAH
REALISASI (Rp.)
1 1
1 1
2
2
1 2
1 2
1 2
1 3
1 3
2
2
1 4
1 4
3 Belanja Modal
- Komputer
- Meja dan Kursi
- Mesin TIK
- dst..
Operasional BPD
2 Belanja Barang dan Jasa
- ATK
- Penggandaan
- Konsumsi Rapat
- dst .
Operasional RT/ RW
2 Belanja Barang dan Jasa
- ATK
- Penggadaan
- Konsumsi Rapat
- dst .
Bidang Pelaksanaan
Pembangunan Desa
Perbaikan Saluran Irigasi
2 Belanja Barang dan jasa
- Upah Kerja
- Honor
- dst..
3 Belanja Modal
- Semen
- Material
- dst
2
2
2 1
2 1
2 1
2 2
2 2
2 2
3 Belanja Modal:
- Aspal
- Pasir
- dst
2 3
Kegiatan
Bidang Pembinaan
Kemasyarakatan
3 1
3 1
3 2
Kegiatan.
4 1
4 1
4 2
Kegiatan..
5 1
5 1
5 2
Kegiatan
JUMLAH BELANJA
SURPLUS / DEFISIT
PEMBIAYAAN
Penerimaan Pembiayaan
1 1
SILPA
1 2
1 3
Pengeluaran Pembiayaan
2 1
2 2
DISETUJUI OLEH
KEPALA DESA
TTD
(.)
LEBIH/
KURANG
(Rp.)
KET.
4
DISETUJUI OLEH
EPALA DESA
TTD
.)
URAIAN
ANGGARAN
(Rp.)
REALISASI
(Rp.)
1
1
1
PENDAPATAN
Pendapatan Asli Desa
Hasil Usaha
Swadaya, Partisipasi dan
Gotong Royong
Lain-lain Pendapatan Asli Desa
yang sah
1
1 1
1 2
1 3
1
1
2
2 1
Pendapatan Transfer
Dana Desa
2 2
1
1
1
2 3
2 4
2 4
2 4
3 1
3 2
BELANJA
1 1
1 1
Bidang Penyelenggaraan
Pemerintahan Desa
Penghasilan Tetap dan
Tunjangan
1 Belanja Pegawai:
- Penghasilan Tetap
Desa dan Perangkat
Kepala
1 2
Operasional Perkantoran
1 2
1 2
3 Belanja Modal
- Komputer
- Meja dan Kursi
- Mesin TIK
- dst..
1 3
1 3
Operasional BPD
2 Belanja Barang dan Jasa
- ATK
- Penggandaan
- Konsumsi Rapat
- dst .
2
1 4
1 4
Operasional RT/ RW
2 Belanja Barang dan Jasa
- ATK
- Penggadaan
- Komsumsi Rapat
- dst .
Bidang Pelaksanaan
Pembangunan Desa
2 1
2 1
2 1
- Upah Kerja
- Honor
- dst..
3 Belanja Modal
- Semen
- Material
- dst
2 2
2 2
2 2
2 3
3 Belanja Modal:
- Aspal
- Pasir
- dst
Kegiatan
Bidang Pembinaan
Kemasyarakatan
3 1
Kegiatan Pembinaan
Ketentraman dan Ketertiban
3 1
3 2
Kegiatan.
Bidang Pemberdayaan
Masyarakat
4 1
4 1
4 2
Kegiatan.
5 1
5 1
5 2
Kegiatan
JUMLAH BELANJA
SURPLUS / DEFISIT
3
PEMBIAYAAN
Penerimaan Pembiayaan
1 1
SILPA
1 2
1 3
Pengeluaran Pembiayaan
2 1
2 2
- Pembiayaan Netto
(PENERIMAAN PEMBIAYAAN
PENGELUARAN
PEMBIAYAAN )
- SILPA tahun berjalan (SELISIH
ANTARA PEMBIAYAAN NETTO
DENGAN HASIL
SURPLUS/DEFISIT)
TANGGAL ..............................
TTD
(KEPALA DESA ..............)
ggungjawaban
PBDes Pelaksanaan
2015
SANAAN APBDesa
LEBIH/
KURANG
(Rp.)
5
KET.
6
ANGGAL ..............................
TTD
(KEPALA DESA ..............)
URAIAN
ASET
Aset Lancar
Kas dan Bank
Kas di Bendahara Desa
Rekening Kas Desa
Piutang
Piutang Sewa Tanah
Piutang Sewa Gedung
Piutang Sewa Peralatan
Piutang Bagi Hasil Pajak
Piutang Bagi Hasil Retribusi
Piutang Alokasi Dana Desa
Piutang Panjar Kegiatan
Piutang Lain-lain
Persediaan
Persediaan Benda Pos dan Materai
Persediaan Alat Tulis Kantor
Persediaan Blangko dan Barang Cetakan
Persediaan Alat-Alat Listrik/Lampu/Batterai
Persediaan Bahan/Material
Persediaan Alat-alat Kebersihan/Bahan Pembersih
Persediaan Bibit Hewan/Tanaman
Persediaan Barang Untuk Dihibahkan kepada
Masyarakat
Investasi
Penyertaan Modal Pemerintah Desa
Penyertaan Modal Pemerintah Desa
Aset Tetap
Tanah
Tanah Bangunan Kantor
Tanah Rumah Dinas
Tanah Pertanian dan Perkebunan
Tanah Sarana Kesehatan
Tanah Sarana Pendidikan
Tanah Sarana Umum
TAHUN 2015
1.3.1.07.
1.3.1.08.
1.3.2.
1.3.2.01.
1.3.2.02.
1.3.2.03.
1.3.2.04.
1.3.2.05.
1.3.2.06.
1.3.2.07.
1.3.2.08.
1.3.2.09.
1.3.2.10.
1.3.2.11.
1.3.3.
1.3.3.01.
1.3.3.02.
1.3.3.03.
1.3.3.04.
1.3.3.05.
1.3.3.06.
1.3.3.07.
1.3.4.
1.3.4.01.
1.3.4.02.
1.3.4.03.
1.3.4.04.
1.3.4.05.
1.3.4.06.
1.3.5.
1.3.5.01.
1.3.5.02.
1.3.5.03.
1.3.5.04.
1.3.6.
1.3.6.01.
1.3.9.
1.3.9.01.
1.3.9.02.
1.3.9.03.
1.3.9.04.
1.4.
1.4.1.
1.4.1.01.
1.5.
1.5.1.
1.5.1.01.
1.5.1.02.
1.5.1.03.
1.5.2.
1.5.2.01.
1.5.3.
2.1.6.04.
2.1.6.05.
2.1.6.06.
3
3.1.
3.1.1.
3.1.1.01.
3.1.2.
3.1.2.01.
3.1.3.
3.1.3.01.
3.1.4.
3.1.4.01.
3.1.5.
3.1.5.01.
3.2.
3.2.1.
3.2.1.01.
3.2.2.
3.2.2.01.
3.2.3.
3.2.3.01.
3.3.
3.3.1.
3.3.1.01.
4
4.1.
4.1.1.
4.1.1.01.
4.1.1.02.
4.1.1.03.
4.1.1.04.
4.1.1.05.
4.1.2.
4.1.2.01.
4.1.2.02.
4.1.3.
4.1.3.01.
4.1.3.02.
4.1.3.03.
4.1.4.
4.1.4.01.
4.1.4.03.
4.1.4.04.
4.1.4.05.
4.1.4.06.
4.1.4.07.
4.1.4.08.
4.1.4.09.
4.2.
4.2.1.
4.2.1.01.
4.2.2.
4.2.2.01.
4.2.3.
4.2.3.01.
4.2.4.
4.2.4.01.
4.2.5.
4.2.5.01.
4.3.
4.3.1.
4.3.1.01.
4.3.1.02.
4.3.1.03.
4.3.1.04.
4.1.4.02.
4.3.1.05.
4.3.1.06.
4.3.1.07.
4.3.2.
4.3.2.01.
5
5.1.
5.1.1.
5.1.1.01.
5.1.1.02.
5.1.1.03.
5.1.1.04.
5.1.1.05.
5.1.1.06.
5.1.1.07.
5.1.1.08.
5.1.1.09.
5.1.1.10.
5.1.1.11.
5.1.2.
5.1.2.01.
5.1.2.02.
5.1.2.03.
5.1.2.04.
5.1.2.05.
5.1.2.06.
5.1.2.07.
5.1.2.08.
5.1.2.09.
5.1.2.10.
5.1.2.11.
5.1.2.12.
5.1.2.13.
5.1.2.14.
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
5.1.2.15.
5.1.2.16.
5.1.2.17.
5.1.2.18.
5.1.2.19.
5.1.2.20.
5.1.2.21.
5.1.2.22.
5.1.2.23.
5.1.2.24.
5.1.2.25.
5.1.2.26.
5.1.3.
5.1.3.01.
5.1.3.02.
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
Belanja
5.1.3.03.
5.1.3.04.
5.1.3.05.
5.1.3.06.
5.1.3.07.
5.1.3.08.
5.1.3.09.
5.1.3.10.
5.1.3.11.
5.1.3.12.
5.1.3.13.
5.1.3.14.
5.1.3.15.
5.1.3.16.
5.1.3.17.
5.1.3.18.
5.1.3.19.
5.1.3.20.
5.1.3.21.
5.1.3.22.
5.1.3.23.
5.1.3.24.
5.1.3.25.
5.1.3.26.
5.1.3.27.
5.1.3.28.
5.1.3.29.
5.1.3.30.
Gedung Rumah
Bangunan Gudang
Bangunan Bersejarah
Bangunan Monumen
Tugu Peringatan
Bangunan Lainnya
Jalan Desa
Jembatan Desa
Jaringan Air
Penerangan Jalan, Taman
5.1.3.31.
5.1.3.32.
5.1.3.33.
5.1.3.34.
5.1.3.35.
5.1.3.36.
6
6.1.
6.1.1.
6.1.1.01.
6.1.2.
6.1.2.01.
6.1.3.
6.1.3.01.
6.2.
6.2.1.
6.2.1.01.
6.2.2.
6.2.2.01.
6.3.
6.3.1.
6.3.1.01.
7
NON ANGGARAN
7.1.
Perhitungan Fiskal Pihak Ketiga
7.1.1.
Perhitungan PFK - Potongan Pajak
7.1.1.01.
Potongan Pajak PPN Pusat
7.1.1.02.21 Potongan Pajak PPh Pasal
7.1.1.03.22 Potongan Pajak PPh Pasal
7.1.1.04.23 Potongan Pajak PPh Pasal
7.1.1.05.
Potongan Pajak PPh Lainnya
7.1.1.06.1 Potongan Pajak PBN
7.1.1.07.
Potongan Pajak Galian C
7.1.2.
Perhitungan PFK - Uang Muka dan Jaminan
7.1.2.01. Uang Muka dan Jaminan
TANGGAL
TTD
(KEPALA DESA)
Penjelasan tabel:
1. Aset desa adalah barang milik desa yang berasal dari kekayaan asli desa, dibeli atau diper
2. Uang kas adalah uang milik Pemerintah Desa, baik yang disimpan di Bendahara Desa mau
3. Piutang Desa adalah tagihan uang desa kepada pihak yang mengelola kekayaan desa, an
4. Persediaan adalah suatu kekayaan berupa barang milik pemerintah desa yang dinilai deng
5. Aset Desa tidak lancar meliputi penyertaan modal pemerintah desa dan aset tetap milik des
6. Dana cadangan adalah dana yang disisikan untuk menampung kebutuhan yang memerluk
7. Kewajiban adalah utang yang timbul karena adanya pinjaman oleh Pemerintah.
8. Kekayaan bersih adalah selisih antara aset dan kewajiban pemerintah desa.
Catatan :
Terkait dengan angka 7, bahwa dalam APBDesa khususnya pada pembiayaan tidak dibuka p
aturan Desa
15
TAHUN 2014
ANGGAL
TTD
(KEPALA DESA)
sa, dibeli atau diperoleh atas beban Anggaran Pendapatan dan Belanja Desa atau perolehan hak lainnya yang sah.
endahara Desa maupun di rekening kas desa.
kekayaan desa, antara lain berupa tanah, gedung yang diharapkan akan dilunasi dalam waktu paling lama 1 (satu)
sa yang dinilai dengan uang baik berupa uang kertas maupun surat berharga dalam periode normal, antara lain ker
n aset tetap milik desa antara lain tanah, peralatan dan mesin, gedung dan bangunan, jalan, jaringan dan instalasi.
han yang memerlukan dana yang relatif besar yang tidak dapat dipenuhi dalam satu tahun anggaran.
emerintah.
:
:
:
:
Rincian
Kegiatan
Volume
Satuan
Sumber
Dana
DESA
Jumlah
(Rp)
Rp.
Rp.
Rp.
Rp.
Rp.
, ....................
ala Desa
...................)
DALAM NEGERI
K INDONESIA,
YO KUMOLO
KUITANSI PENGELUARAN
PEMERINTAH DESA KT BARU TANAH KAMPUNG
Sudah diterima dari
Uang sejumlah
Untuk pembayaran
Nama Kegiatan
Kode Rek. Belanja
Potongan Pajak :
Bendahara Desa
NOMOR : 00002/KWT/04.12/2015
Rp. 3.515.925,00
Kegiatan Operasional Kantor Desa
5.1.2.02. Belanja Alat Tulis Kantor
Nilai
Pot Pajak PPN
Pot Pajak PPh
Dibayarkan
Terbilang
== Tiga Juta Lima Ratus Limabelas Ribu Sembilan Ratus Dua Puluh Lima Rupiah
==
:
:
:
:
:
: Rp.
: Rp.
: Rp.
: Rp. 3.148.351,00
###
###
47,944.00
Koto Baru, 02 November 2015
Mahlim
Yang Menerima,
Pembayaran Belanja Alat tulis Kantor
01.02.
Sumber : ADD
Printed by Simd@ Desa 29/11/2015 12:00:39