xls
REKAPITULASI
RENCANA ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
:
LOKASI
:
TA
:
SUB PEKERJAA :
NO.
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
URAIAN PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PERSIAPAN
PASANGAN DINDING
FINISHING DINDING
PINTU DAN JENDELA
PASANGAN PLAFOND
FINISHING LANTAI
SANITARY
AIR BERSIH
AIR KOTOR DAN AIR BEKAS (SEP
PANEL
FEEDER
GROUNDING
LAMPU, STOP KONTAK DAN TITI
AIR CONDITIONING
PENGADAAN INTRERIOR RUAN
REAL COST
PPN 10 %
JUMLAH
DIBULATKAN
HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
11,079,647.41
4,013,346.01
6,320,491.35
6,606,600.00
4,272,229.50
7,537,037.04
6,391,853.40
19,035,969.00
15,932,256.40
824,800.00
244,200.00
2,540,600.00
385,220.00
12,969,360.00
24,800,000.00
Rp
Rp
Rp
Rp
122,953,610.10
12,295,361.01
135,248,971.11
135,300,000.00
Dengan huruf :
Sembilan Puluh Dua Milyar Sembilan Ratus Empat Juta Enam Ratus Ribu Rupiah
Bandung,
2016
Konsultan Perencana,
Page 1
PROJECT :
URAIAN KEGIATAN
I
1
2
3
4
5
6
2
PEKERJAAN PERSIAPAN
Mobilisasi Pengangkutan Kontainer dengan
Menggunakan Flat Bed Truk
HARGA SATUAN
(RP)
VOLUME
4,063,125.00
###
30.00 m2
9.21 m2
1.00 ls
1.00 ls
1.00 ls
19,360.00
286,180.50
300,000.00
1,500,000.00
2,000,000.00
580,800.00
2,635,722.41
###
###
###
36.25 m2
54.00 m1
83,892.05
18,004.80
3,041,086.81
972,259.20
203.00 m2
7.25 m2
30,061.79
30,061.79
6,102,543.37
217,947.98
m2
m2
m2
m2
677,600.00
677,600.00
677,600.00
677,600.00
1,778,700.00
1,372,140.00
853,776.00
2,601,984.00
30.00 m2
97.50 m'
83,892.05
18,004.80
2,516,761.50
1,755,468.00
26.25 m2
3.75 m2
1.60 m2
247,270.65
246,244.35
76,728.85
6,490,854.56
923,416.31
122,766.16
1.00
ls
TOTAL HARGA
(RP)
4
1
5
1
6
1
7
1
8
1
PEKERJAAN SANITARY
Pekerjaan Sanitary
Closet Duduk Ex. Toto Type CW421J/SW420JP
Wastafel Ex. Toto LW220J
Bak Mandi Fiber Kotak Ukuran 55 x 55 x 60 cm
Shower Kloset
Floor Drain Ex. Toto 4"
Kran air DCOTA DT 01
3,134,188.20
1,355,148.30
1,400,458.40
350,000.00
46,629.00
105,429.50
###
###
###
###
###
###
1.00 Unit
2,189,800.00
###
1.00 Unit
8,000,000.00
42,218.00
84,436.00
18,000.00
321,502.00
Underground Tank
Kapasitas : 1000 Lt
Brand : Penguin TP 110
2.63
2.03
1.26
3.84
1.00
1.00
1.00
1.00
1.00
1.00
bh
bh
bh
bh
bh
bh
8,000,000.00
84,436.00
168,872.00
###
###
KETERANGAN
1.00 pcs
1.00 lot
250,000.00
70,000.00
###
###
84,436.00
321,502.00
70,000.00
675,488.00
2,572,016.00
###
42,218.00
84,436.00
79,050.00
321,502.00
311,050.00
70,000.00
84,436.00
168,872.00
###
###
###
###
Instalasi Air Bersih dari Roof Tank ke Header Pipa Instalasi Air Bersih
150,600.00
Header Lengkap, PVC AW 3"
1.00 pcs
84,436.00
Pipa PVC AW Ex. Rucika 1"
2.00 m1
321,502.00
Gate Valve Ex. KIT Z AG. FH 1"
1.00 pcs
311,050.00
Faucet Ex. Toto T23B13 1/2"
1.00 pcs
70,000.00
Asesoris Pipa Elbow, dan lain-lain
1.00 lot
###
168,872.00
###
###
###
Instalasi Air Bersih dari Header Pipa Instalasi Air Bersih ke Ruangan
42,218.00
Pipa PVC AW Ex. Rucika 1/2"
8.00 m1
105,429.50
Pipa PVC AW Ex. Rucika 3/4"
8.00 m1
84,436.00
Pipa PVC AW Ex. Rucika 1"
8.00 m1
160,751.00
Gate Valve Ex. KIT Z AG. FH 1/2"
1.00 pcs
321,502.00
Gate Valve Ex. KIT Z AG. FH 1"
1.00 pcs
70,000.00
Faucet Ex. Toto T23B13 1/2"
1.00 pcs
150,000.00
Asesoris Pipa Elbow, dan lain-lain
1.00 lot
337,744.00
843,436.00
675,488.00
###
###
###
###
9
1
11
m1
m1
pcs
pcs
pcs
lot
2.00
2.00
1.00
1.00
1.00
1.00
5,250,000.00
###
1.00 unit
151,800.00
###
8.00 m1
8.00 m1
1.00 lot
485,095.05
492,022.00
100,000.00
3,880,760.40
3,936,176.00
###
8.00 m1
8.00 m1
1.00 Lot
42,218.00
168,872.00
100,000.00
337,744.00
1,350,976.00
###
PEKERJAAN PANEL
MCB Box Lantai 1 (MB.1)
MCB Box 12 Group Ex. HAGER VF112TM
MCB 63A 1 Phase Ex. SCHNEIDER
MCB 16A 1 Phase Ex. SCHNEIDER
MCB 10A 1 Phase Ex. SCHNEIDER
MCB 6A 1 Phase Ex. SCHNEIDER
MCB 4A 1 Phase Ex. SCHNEIDER
1.00
1.00
1.00
1.00
1.00
1.00
unit
pcs
pcs
pcs
pcs
pcs
115,700.00
289,900.00
78,000.00
70,200.00
58,500.00
58,500.00
###
###
###
###
###
###
1.00 unit
1.00 pcs
95,000.00
59,000.00
###
###
12.00 m1
11,100.00
PEKERJAAN FEEDER
Dari PLN ke NYY 3x16 mm2 + BC mm2 Ex. Supreme
133,200.00
12
15
8.00 m1
11,100.00
88,800.00
2.00 m1
11,100.00
22,200.00
PEKERJAAN GROUNDING
Peekerjaan dan pemasangan instalasi grounding
pertanahan 12 m Tahanan maks x 2 Ohm lengkap
terpasang asesoris dan peralatan bantu lainnya.
Gounding Bangunan (GB BLD)
Grounding MCB BOX Lantai 1 (MB.1)
13
14
2,500,000
40,600.00
2,500,000.00
###
49,280.00
37,620.00
37,620.00
98,560.00
###
75,240.00
1.00 pcs
1.00 pcs
49,280.00
37,620.00
###
###
Teras
Down Light LED Bulb 9 Watt + Fitting E-27 Ex. Philip
Saklar Tunggal Ex.Clipsal Type Standar
1.00 pcs
1.00 pcs
49,280.00
37,620.00
###
###
1.00
1.00
lot
lot
Rp
5,000,000.00
2.00 Unit
termasuk isolasi
100,000.00
8.00 m1
150,000.00
8.00 m1
8.00 m1
8.00 m1
1.00 Lot
10,000,000.00
800,000.00
1,200,000.00
42,218.00
63,327.00
125,000.00
337,744.00
506,616.00
###
4,200,000.00
3,000,000.00
###
###
2.00
2.00
1.00
1.00
pcs
pcs
pcs
pcs
2,100,000.00
1,500,000.00
3,000,000.00
2,000,000.00
Ruang Kerja
Meja Kerja
Kursi Kerja
3.00 pcs
3.00 pcs
3,400,000.00
800,000.00
10,200,000.00
2,400,000.00