REKAPITULASI
RENCANA ANGGARAN BIAYA
KEGIATAN

PEKERJAAN
:
LOKASI
:
TA
:
SUB PEKERJAA :
NO.
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15

URAIAN PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

PERSIAPAN
PASANGAN DINDING
FINISHING DINDING
PINTU DAN JENDELA
PASANGAN PLAFOND
FINISHING LANTAI
SANITARY
AIR BERSIH
AIR KOTOR DAN AIR BEKAS (SEP
PANEL
FEEDER
GROUNDING
LAMPU, STOP KONTAK DAN TITI
AIR CONDITIONING
PENGADAAN INTRERIOR RUAN

REAL COST
PPN 10 %
JUMLAH
DIBULATKAN

HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,079,647.41
4,013,346.01
6,320,491.35
6,606,600.00
4,272,229.50
7,537,037.04
6,391,853.40
19,035,969.00
15,932,256.40
824,800.00
244,200.00
2,540,600.00
385,220.00
12,969,360.00
24,800,000.00

Rp
Rp
Rp
Rp

122,953,610.10
12,295,361.01
135,248,971.11
135,300,000.00

Dengan huruf :
Sembilan Puluh Dua Milyar Sembilan Ratus Empat Juta Enam Ratus Ribu Rupiah

Bandung,

2016

Konsultan Perencana,

Rekap RAB Total

Page 1

PROJECT :

RENCANA ANGGARAN BIAYA

PEMBANGUNAN GEDUNG JURUSAN UNTIRTA


NO

URAIAN KEGIATAN

I
1
2
3
4
5
6
2

PEKERJAAN PERSIAPAN
Mobilisasi Pengangkutan Kontainer dengan
Menggunakan Flat Bed Truk

HARGA SATUAN
(RP)

VOLUME

4,063,125.00

###

30.00 m2
9.21 m2
1.00 ls
1.00 ls
1.00 ls

19,360.00
286,180.50
300,000.00
1,500,000.00
2,000,000.00

580,800.00
2,635,722.41
###
###
###

36.25 m2
54.00 m1

83,892.05
18,004.80

3,041,086.81
972,259.20

203.00 m2
7.25 m2

30,061.79
30,061.79

6,102,543.37
217,947.98

m2
m2
m2
m2

677,600.00
677,600.00
677,600.00
677,600.00

1,778,700.00
1,372,140.00
853,776.00
2,601,984.00

PEKERJAAN PASANGAN PLAFOND


Pekerjaan Pasangan Plafond Lantai I
Pekerjaan Pasangan Plafond Gypsum 9mm
Kayu Profil

30.00 m2
97.50 m'

83,892.05
18,004.80

2,516,761.50
1,755,468.00

PEKERJAAN FINISHING LANTAI


Pekerjaan Finishing Lantai 1
Pekerjaan Keramik Arwana Putih Polos Uk. 30x30 cm
Pekerjaan Keramik Arwana Type 2251 Uk. 20x20 cm
Pekerjaan Skirting Keramik Arwana Type 2251 Uk. 1

26.25 m2
3.75 m2
1.60 m2

247,270.65
246,244.35
76,728.85

6,490,854.56
923,416.31
122,766.16

Land clearing / pembersihan lahan


Cutting Bangunan
Pekerjaan papan informasi proyek
Administrasi proyek
Air & listrik kerja

1.00

ls

TOTAL HARGA
(RP)

PEKERJAAN PASANGAN DINDING


Pekerjaan Dinding Partisi Gypsum Knauf 1 Sisi Rangk
Rangka Kayu

PEKERJAAN FINISHING DINDING


Pekerjaan Cat Dinding Deluxe White Swan
Pekerjaan Plint Dinding Dengan Cat Hitam Tinggi 20

4
1

5
1

6
1

7
1

8
1

PEKERJAAN PINTU DAN JENDELA


Pekerjaan Pintu dan Jendela
PJ1
P1
P2
J1

PEKERJAAN SANITARY
Pekerjaan Sanitary
Closet Duduk Ex. Toto Type CW421J/SW420JP
Wastafel Ex. Toto LW220J
Bak Mandi Fiber Kotak Ukuran 55 x 55 x 60 cm
Shower Kloset
Floor Drain Ex. Toto 4"
Kran air DCOTA DT 01

3,134,188.20
1,355,148.30
1,400,458.40
350,000.00
46,629.00
105,429.50

###
###
###
###
###
###

1.00 Unit

2,189,800.00

###

1.00 Unit

8,000,000.00

Instalasi Air Bersih dari Pusat Air Bersih ke Underground Tank


2.00 m1
Pipa PVC AW Ex. Rucika 1/2"
Pipa PVC AW Ex. Rucika 1"
2.00 m1
Floating Valve Ex. SAN EI VN44J 1"
1.00 pcs
Gate Valve Ex. KIT Z AG. FH 1"
1.00 pcs

42,218.00
84,436.00
18,000.00
321,502.00

PEKERJAAN AIR BERSIH


Peralatan Utama
Peekerjaan dan pemasangan instalasi utaman
instalasi air bersih lengkap terpasang sesuai gambar
dan spesifikasi termasuk asesoris dan peralatan
Transfer Pump (TP)
Kapasitas : 50 Lt/menit
Total Head : 32 M
Power : 700 Watt
Brand : Grundfos CM PT 3-5

Underground Tank
Kapasitas : 1000 Lt
Brand : Penguin TP 110

2.63
2.03
1.26
3.84

1.00
1.00
1.00
1.00
1.00
1.00

bh
bh
bh
bh
bh
bh

8,000,000.00

84,436.00
168,872.00
###
###

KETERANGAN

1.00 pcs
1.00 lot

250,000.00
70,000.00

###
###

Instalasi Air Bersih Underground Tank ke Transfer Pump (TP)


Pipa PVC AW Ex. Rucika 1"
8.00 m1
Gate Valve Ex. KIT Z AG. FH 1"
8.00 pcs
Asesoris Pipa Elbow, dan lain-lain
1.00 lot

84,436.00
321,502.00
70,000.00

675,488.00
2,572,016.00
###

Instalasi Air Bersih dari TP ke Roof Tank


Pipa PVC AW Ex. Rucika 1/2"
Pipa PVC AW Ex. Rucika 1"
Floating Valve Ex. SAN EI VN44J 1"
Gate Valve Ex. KIT Z AG. FH 1"
Faucet Ex. Toto T23B13 1/2"
Asesoris Pipa Elbow, dan lain-lain

42,218.00
84,436.00
79,050.00
321,502.00
311,050.00
70,000.00

84,436.00
168,872.00
###
###
###
###

Instalasi Air Bersih dari Roof Tank ke Header Pipa Instalasi Air Bersih
150,600.00
Header Lengkap, PVC AW 3"
1.00 pcs
84,436.00
Pipa PVC AW Ex. Rucika 1"
2.00 m1
321,502.00
Gate Valve Ex. KIT Z AG. FH 1"
1.00 pcs
311,050.00
Faucet Ex. Toto T23B13 1/2"
1.00 pcs
70,000.00
Asesoris Pipa Elbow, dan lain-lain
1.00 lot

###
168,872.00
###
###
###

Instalasi Air Bersih dari Header Pipa Instalasi Air Bersih ke Ruangan
42,218.00
Pipa PVC AW Ex. Rucika 1/2"
8.00 m1
105,429.50
Pipa PVC AW Ex. Rucika 3/4"
8.00 m1
84,436.00
Pipa PVC AW Ex. Rucika 1"
8.00 m1
160,751.00
Gate Valve Ex. KIT Z AG. FH 1/2"
1.00 pcs
321,502.00
Gate Valve Ex. KIT Z AG. FH 1"
1.00 pcs
70,000.00
Faucet Ex. Toto T23B13 1/2"
1.00 pcs
150,000.00
Asesoris Pipa Elbow, dan lain-lain
1.00 lot

337,744.00
843,436.00
675,488.00
###
###
###
###

Faucet Ex. Toto T23B13 1/2"


Asesoris Pipa Elbow, dan lain-lain
3

9
1

Instalasi Air Kotor Lantai 1


Pipa PVC AW Ex. Rucika 4"
Clean Out Ex. SEN EI Type HN58 4"
Asesoris Pipa Elbow, dan lain-lain

4 Pekerjaan Instalasi Vent


Pipa PVC AW ex. Rucika 1 1/2"
Pipa PVC AW ex. Rucika 2"
Asesoris Pipa Elbow, dan lain-lain
10
1

11

m1
m1
pcs
pcs
pcs
lot

PEKERJAAN AIR KOTOR DAN AIR BEKAS (SEPTIC TANK)


Peralatan Utama
Peekerjaan dan pemasangan instalasi utaman
instalasi air kotor dan air bekas lengkap terpasang
sesuai gambar dan spesifikasi termasuk asesoris
Bak Septic Tank
1.00 unit
Type : Bio Type
Kapasitas : 2 - 4 Orang
Volume : 1000 Lt
Brand : Biotech BT - 03
Bak Sumur Resapan
Diameter : 40 cm
Tinggi : 1.5 m

2.00
2.00
1.00
1.00
1.00
1.00

5,250,000.00

###

1.00 unit

151,800.00

###

8.00 m1
8.00 m1
1.00 lot

485,095.05
492,022.00
100,000.00

3,880,760.40
3,936,176.00
###

8.00 m1
8.00 m1
1.00 Lot

42,218.00
168,872.00
100,000.00

337,744.00
1,350,976.00
###

PEKERJAAN PANEL
MCB Box Lantai 1 (MB.1)
MCB Box 12 Group Ex. HAGER VF112TM
MCB 63A 1 Phase Ex. SCHNEIDER
MCB 16A 1 Phase Ex. SCHNEIDER
MCB 10A 1 Phase Ex. SCHNEIDER
MCB 6A 1 Phase Ex. SCHNEIDER
MCB 4A 1 Phase Ex. SCHNEIDER

1.00
1.00
1.00
1.00
1.00
1.00

unit
pcs
pcs
pcs
pcs
pcs

115,700.00
289,900.00
78,000.00
70,200.00
58,500.00
58,500.00

###
###
###
###
###
###

MCB Box Transfer Pump (MB.TP)


MCB Box 4 Group Ex. HAGER VF112TM
MCB 6A 1 Phase Ex. SCHNEIDER

1.00 unit
1.00 pcs

95,000.00
59,000.00

###
###

12.00 m1

11,100.00

PEKERJAAN FEEDER
Dari PLN ke NYY 3x16 mm2 + BC mm2 Ex. Supreme

133,200.00

12

15

8.00 m1

11,100.00

88,800.00

Dari MB.1 ke MB.TP NYY 3x10 mm2 + BC 6 mm2


Ex. Supreme dalam Pipa SHI 20 mm

2.00 m1

11,100.00

22,200.00

PEKERJAAN GROUNDING
Peekerjaan dan pemasangan instalasi grounding
pertanahan 12 m Tahanan maks x 2 Ohm lengkap
terpasang asesoris dan peralatan bantu lainnya.
Gounding Bangunan (GB BLD)
Grounding MCB BOX Lantai 1 (MB.1)

13

14

Dari MB.1 ke MB.TP NYY 3x2.5 mm2 + NYY 1x2.5


mm2 Ex. Supreme dalam Pipa SHI 20 mm

2,500,000
40,600.00

2,500,000.00
###

PEKERJAAN LAMPU, STOP KONTAK DAN TITIK NYALA


Lantai 1
Ruangan 1
Down Light LED Bulb 9 Watt + Fitting E-27 Ex. Philip
2.00 pcs
Saklar Ganda Ex. Clipsa Type Standar
1.00 pcs
Stop Kontak 1 Phase Ex. Clipsal Type Standar
2.00 pcs

49,280.00
37,620.00
37,620.00

98,560.00
###
75,240.00

Rg. Kamar Mandi / WC


Down Light LED Bulb 9 Watt + Fitting E-27 Ex. Philip
Saklar Tunggal Ex.Clipsal Type Standar

1.00 pcs
1.00 pcs

49,280.00
37,620.00

###
###

Teras
Down Light LED Bulb 9 Watt + Fitting E-27 Ex. Philip
Saklar Tunggal Ex.Clipsal Type Standar

1.00 pcs
1.00 pcs

49,280.00
37,620.00

###
###

PEKERJAAN AIR CONDITIONING


Pengadaan dan pemasangan peralatan AC &
Ventilasi lengkap beserta accessoriesnya sesuai
gambar dan spesifikasi sehingga system bisa
beroperasi dengan sempurna
1 PERALATAN UTAMA
berikut support. Pengadaan dan pemasangan pipa
drain dan pipa refrigerant, kabel power indooroutdoor dan accessories lainnya sesuai gambar
dan spesifikasi sehingga system bisa berfungsi
dengan sempurna
Ruangan 1
Pengadaan dan pemasangan AC Split ex. Daikin FT
Pengadaan dan pemasangan Pipa Refrigerant ex. HODA,
1/4"
3/8"
Pengadaan dan pemasangan Pipa Drain AC
Pipa PVC AW ex. Rucika 1/2"
Pipa PVC AW ex. Rucika 3/4"
Accessories

1.00
1.00

lot
lot

Rp

5,000,000.00
2.00 Unit
termasuk isolasi
100,000.00
8.00 m1
150,000.00
8.00 m1
8.00 m1
8.00 m1
1.00 Lot

10,000,000.00
800,000.00
1,200,000.00

42,218.00
63,327.00
125,000.00

337,744.00
506,616.00
###

4,200,000.00
3,000,000.00
###
###

PEKERJAAN PENGADAAN INTRERIOR RUANGAN


Ruangan 1
Kursi Sofa 1 Sheet
Kursi Sofa 2 Sheet
Kursi Sofa 3 Sheet
Meja Tamu Kayu + Kaca

2.00
2.00
1.00
1.00

pcs
pcs
pcs
pcs

2,100,000.00
1,500,000.00
3,000,000.00
2,000,000.00

Ruang Kerja
Meja Kerja
Kursi Kerja

3.00 pcs
3.00 pcs

3,400,000.00
800,000.00

10,200,000.00
2,400,000.00