NO.
1
I
VOLUME
Jumlah
Orang
3
Bobot
Waktu
4
HARGA SATUAN
JUMLAH HARGA
( Rp. )
8
VOL
SAT
( Rp. )
A
A.
1
2
3
4
5
6
7
8
9
JASA PERENCANAAN
TENAGA AHLI
Team Leader (Ahli Madya, S1 Teknik Arsitek/Interior/Sipil : 9 tahun)
Tenaga Ahli Sipil (Ahli Muda, S1 T. Sipil - 5 th)
Tenaga Ahli Interior (Ahli Muda, S1 T. Interior - 5 th)
Tenaga Ahli Mekanikal (Ahli Muda, S1 T. Mesin - 5 th)
Tenaga Ahli Elektrikal/Elektronika (Ahli Muda, S1 T. Listrik/Elektro - 5 th)
Ass Tenaga Ahli Sipil (Ahli Pratama, S1 T. Sipil - 3 th)
Ass Tenaga Ahli Interior (Ahli Pratama,S1 T. Interior - 3 th)
Ass Tenaga Ahli Mekanikal (Ahli Pratama, S1 T. Mesin/lingk - 3 th)
Ass Tenaga Ahli Elektrikal/Elektronika. (Ahli Pratama, S1 T. Listrik - 3 th)
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
2,00
2,00
2,00
2,00
2,00
1,00
2,00
1,00
1,00
2,00 org.bln
2,00 org.bln
2,00 org.bln
2,00 org.bln
2,00 org.bln
1,00 org.bln
2,00 org.bln
1,00 org.bln
1,00 org.bln
B.
1
2
3
TENAGA PENUNJANG
Estimator (Sipil-Interior & Mekanikal-Listrik-Elektronika, D3 - 5 th)
Drafter (Sipil-Interior & Mekanikal-Listrik-Elektronika, D3 - 5 th)
Tenaga Administrasi/Sekretaris (D3, 3 th)
1,00
1,00
1,00
2,00
2,00
2,00
2,00 org.bln
2,00 org.bln
2,00 org.bln
II
A
1
2
3
4
5
6
7
8
1,00
1,00
1,00
1,00
1,00
1,00
1,00
1,00
B
1
3
4
5
6
7
BIAYA PELAPORAN
Laporan Pendahuluan
Laporan Antara
Dokumen Detailed Engineering Design (DED)
Laporan Akhir
Gambar 3 Dimensi (hardcopy & softcopy)
Soft Copy (CD)
3,00
3,00
3,00
3,00
1,00
3,00
Jumlah A
II
A
Pekerjaan Penyesuaian dan perbaikan finishing publik area (koridor) akibat perubahan alur
sirkulasi lantai II
1 Perbaikan Plafon Lantai II
2 Pekerjaan Partisi dan Finishing Lantai II
1,00
2,00
2,00
2,00
2,00
2,00
2,00
1,00
Jumlah B
Jumlah B
Jumlah C
JUMLAH TOTAL
1,00
Ls
2,00 Bulan
2,00 Bulan
2,00 Unit/Bln
2,00 Unit/Bln
2,00 Unit/Bln
2,00 Bulan
1,00
Ls
buku
buku
set
buku
set
set
1,00
866,89
561,33
1.819,88
63,00
12,00
1.000,00
1.000,00
1.000,00
1.000,00
43,50
67,50
67,50
180,00
25,00
100,00
1,00
1,00
27,00
17,00
50,00
1.959,30
66,00
ls
Jumlah A
Jumlah B
Jumlah C
Jumlah D
Jumlah E
Jumlah F
Jumlah G
Jumlah H
Jumlah I
Jumlah J
m2
m2
m2
bh
bh
m2
m2
m2
m2
m3
m3
m3
m2
m3
m2
Ls
Ls
bh
bh
bh
m
titik
NO.
HARGA SATUAN
VOLUME
JUMLAH HARGA
JUMLAH I
III PEKERJAAN MEKANIKAL
A Pek. Pemindahan/Relokasi Escalator Kedatangan Domestik dll
1
Pek. Bongkar/Pasang Escalator existing
2
Pek. Modifikasi Instalasi Ducting Return AHU D-02b existing lkp. RAG
3
Pek. Modifikasi Instalasi Ducting Supply AHU D-02a existing lkp. SAD
4
Pek. Pemindahan SF existing lkp. Modifikasi Inst. Ducting dan Grille
5
Pek. Penggantian Instalasi Kabel Power Listrik
- NYY uk. 4 X 10 mm
1,00
1,00
1,00
1,00
unit
ls
ls
ls
50,00
Jumlah A
B
1,00
1,00
1,00
unit
ls
ls
50,00
Jumlah B
C
Pek. Pengetesan
IV PEKERJAAN LISTRIK
A Pekerjaan instalasi Listrik
1
Kabel uk 4 x 95mm nyy
2
Kabel uk 4 x 70mm nyy
3
Kabel uk 4 x 16mm nyy
4
Kabel uk 4 x 10mm nyy
5
Kabel uk 4 x 6mm nyy
6
Kabel uk 4 x 4mm nyy
7
Kabel uk 3 x 4mm nyhy
8
Kabel uk 3 x 4mm nyy
9
Kabel uk 3 x 2,5mm nyy
10 Kabel uk 1 x 50mm nyy
11 Kabel uk 1 x 35mm nyy
12 Kabel uk 1 x 16mm nyy
13 Kabel uk 1 x 10mm nyy
14 Konektor 95mm aeg
15 Konektor 70mm aeg
16 Konektor 50mm aeg
17 Konektor 16mm aeg
18 Konektor 10mm aeg
19 Konektor 6mm aeg
20 Kabel Scone 95mm aeg
21 Kabel Scone 70mm aeg
22 Kabel Scone 50mm aeg
23 Kabel Scone 16mm aeg
24 Kabel Scone 10mm aeg
25 Kabel Scone 6mm aeg
26 Gelar Kabel 4 x 95mm
27 Gelar Kabel 4 x 70mm
28 Gelar Kabel 4 x 16mm
29 Gelar Kabel 4 x 10mm
30 Gelar Kabel 4 x 6mm
31 Gelar Kabel 4 x 4mm
32 Gelar Kabel 3 x 4mm
33 Gelar Kabel 1 x 50mm
34 Gelar Kabel 1 x 35mm
35 Gelar Kabel 1 x 16mm
36 Gelar Kabel 1 x 10mm
Alat Bantu
2,00
2,00
2,00
2,00
100,00
4,00
3,00
170,00
1,00
1,00
1,00
1,00
100,00
100,00
100,00
150,00
200,00
350,00
1.000,00
325,00
500,00
100,00
100,00
100,00
100,00
30,00
40,00
30,00
40,00
50,00
70,00
30,00
30,00
30,00
40,00
50,00
70,00
125,00
125,00
125,00
150,00
200,00
350,00
1.000,00
100,00
100,00
100,00
100,00
1,00
1,00
unit
ls
ls
ls
m
Jumlah C
Jumlah D
Jumlah E
Jumlah F
Jumlah G
Jumlah H
JUMLAH I
JUMLAH II
Jumlah A
Jumlah B
Jumlah C
JUMLAH III
unit
unit
buah
ls
ls
ls
ls
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
lot
ls
,
V
A
PEKERJAAN ELBAN
Penyesuaian Instalasi Elektronika Bandara
1
Relokasi X-Ray
2
Relokasi Monitor FIDS Gate 1 s/d Gate 12, Concourse, dan FIDS Kedatangan Intl
3
Relokasi LED FIDS
4
Relokasi Fire Alarm
5
Relokasi Public Address System
6
Relokasi Jalur Telepon dan Intercome
7
Relokasi CCTV
14,00
31,00
1,00
1,00
1,00
1,00
1,00
unit
unit
unit
lot
lot
lot
lot
NO.
HARGA SATUAN
VOLUME
12,00
unit
Jumlah A
I
1
2
3
4
5
6
7
8
9
10
11
PENGADAAN
Switch Managed 12 Port 10/100/1000 GE SFP
Switch managed 48 Port 10/100/1000 + 2 SFP
Mini gbic SFP Module
FO Cable Patch Cord LC/LC Multimode 10m
UPS Rackmount 2200VA
UPS Switch 1100VA
wall mount rack 8U-450 MM
Wire Cable Management
Optical Termination Box (OTB) 12core
Rackmount 42u
Optical Termination Box (OTB) 48core
II
1
2
3
4
PEKERJAAN
Penarikan jaringan UTP
Penarikan jarinan FO
Setting Core Switch dan Acces Switch
Site Training
1,00
2,00
20,00
45,00
45,00
1,00
20,00
20,00
20,00
20,00
1,00
5,00
57,00
1,00
7,00
1,00
ls
JUMLAH HARGA
-
Unit
Unit
Unit
Unit
Unit
unit
unit
Unit
Unit
Unit
Unit
Jumlah I
Jumlah II
JUMLAH IV
Jumlah
Dibulatkan
PPN 10%
JUMLAH TOTAL
titik
lot
hari
lot
REKAPITULASI BIAYA
I
II
III
IV
V
JASA PERENCANA
PEKERJAAN SIPIL & ARSITEKTUR
PEKERJAAN MEKANIKAL
PEKERJAAN LISTRIK
PEKERJAAN ELBAN
Surabaya,
November 2016