1000 kg/m3
kebutuhan air
overdesign
2000
0.2
2400 m3/jam
2400000 kg/jam
1 Bak Sedimentasi
waktu tinggal
Volume bak
4
9600
13.38866
26.77732
26.77732
0.32
652.8
1387.2
2399347
2399.347
2 Tangki Mixer
flowrate air masuk tangki
jumlah tangki
waktu tinggal
volume total tangki
volume tiap tangki
2399.3472 m3/jam
10
5 menit
0.0833333333 jam
199.9456 m3/jam
19.99456 m3/jam
overdesign
volume tiap tangki
diinginkan L/D tangki
V = phi/4 * D^2 *L
V = phi* D^3
D
L
0.2
23.993472 m3/jam
4
1.9693114604 m
7.8772458416 m
kebutuhan alum
kebutuhan soda abu
4 Tangki Alum
keutuhan alum
77.41893632 lb/jam
35.1869065574 kg/jam
larutan alum
densitas larutan alum
flowrate larutan alum
waktu tinggal
volume tangki
703.738131149 kg/jam
1160 kg/m3
0.6066708027 m3/jam
24 jam
14.5600992651 m3
overdesign
volume tangki
0.2
17.4721191182 m3
L/D
V = (phi/4)*D6^2*2D
V= (phi/2)*D^3
D = (2*V/phi)^(1/3)
L
2.2322452198 m
4.4644904395 m
15.0966925824 lb/jam
6.8614467787 kg/jam
137.228935574 kg/jam
1065.12 kg/m3
0.1288389436 m3/jam
24 jam
3.0921346457 m3
overdesign
volume tangki
0.2
3.7105615748 m3
D
H
1.3318027949 m
2.6636055897 m
2399389.24835 kg/jam
2399.38924835 m3/jam
6 Clarifier
waktu tinggal
overdesign
volume clarifier
h
y
volume kerucut besar
1/3*phi/4*D1^2*(h+y)
2.0465*D1^2
volume kerucut kecil
1/3*phi/4*D2^2*y
0.464*D1^2
sehingga
60 menit
0.1
2639.32817319 m3
10 ft
3.048 m
4.77 m
D1
D2
total solid
solid pada hasil atas
1429.24835334
142.924835334
1286.323518
2572.64703601
flowrate atas
2395530.2778
40.85
24.9185
m3/jam
jam
m3
m
m
m
14 m
27 m
27 m
2040 kg/jam
kg/jam
kg/jam
kg/jam
m3/jam
untuk 5%
m
m