Anda di halaman 1dari 12

ANGGARAN BIAYA

GEDUNG SD NEGERI BANJARSARI


Jl. Merdeka No.22 Bandung

JENIS PEKERJAAN SAT VOL

PEKERJAAN PERSIAPAN
Direksi Keet M2 21.0
Pagar Pengamanan M1 57.0

PEKERJAAN PEMBONGKARAN
Atap Genting M2 787.1
Kuda-Kuda dan Gording M3 4.0
Pondasi M3 24.1
Kusen Pintu Bh 10.0
Kusen Jendela Bh 10.0
Kusen Bouvenligh Bh 7.0
Dinding Tembok M2 138.0

PEKERJAAN TANAH
Galian Tanah M3 76.7
Urugan Tanah M3 484.5
Pemadatan Tanah M3 477.1

PASANGAN BOUWPLANK M1 85.0

PEKERJAAN PONDASI BATU KALI


Pondasi Setempat Batu Kali (1pc : 6ps) M3 20.3
Pasir Urug T = 5 M3 3.3

PASANGAN DINDING
Pasangan Bata Merah (1pc : 6ps) M2 488.9
Pasangan Bata Merah (1pc : 3ps) M2 12.5
Pek. Plesteran & Acian M2 1,209.5

PEKERJAAN BETON K-225


Pondasi Telapak 80 x 80 x 25 M3 4.8
Kolom Struktur 30/30 M3 17.1
Kolom Praktis 20/20 M3 3.3
Balok Induk 25/60 M3 30.6
Plat Lantai Pra Tegang Pracetak Type 1 M2 322.8
Ring Balk 15/20 M3 4.6
Tangga M3 5.6
PEKERJAAN LANTAI
Lantai Keramik 30/30 (1pc : 4ps) T = 3cm M2 528.9
Lantai Teras Keramik 30/30 (1pc : 4ps) M2 251.0
Lantai WC dan Dinding WC 20/20 M2 26.4
Lantai Tangga 30/30 M2 21.0
Lantai Rabat Beton M2 13.0

PEKERJAAN PENGECATAN
Pekerjaan Cat Tembok M2 1,613.8
Pekerjaan Cat Kayu M2 200.6
Residu M2 1,166.0
HARGA TOTAL SUB
SATUAN HARGA TOTAL
RP RP RP

17,750.0 372,750.0
17,490.0 996,930.0 1,369,680.0
-
-
1,375.0 1,082,262.5
60,000.0 240,000.0
4,000.0 96,400.0
15,000.0 150,000.0
15,000.0 150,000.0
8,000.0 56,000.0
1,000.0 138,000.0 1,912,662.5
-
-
3,825.0 293,377.5
9,050.0 4,384,725.0
1,200.0 572,520.0 5,250,622.5
-
2,145.0 182,325.0 182,325.0
-
-
49,000.0 994,700.0
13,000.0 42,900.0 1,037,600.0
-
-
10,800.0 5,280,120.0
11,000.0 137,500.0
4,850.0 5,866,075.0 11,283,695.0
-
-
385,000.0 1,848,000.0
320,000.0 5,472,000.0
270,000.0 891,000.0
320,000.0 9,792,000.0
77,000.0 24,855,600.0
245,000.0 1,127,000.0
270,000.0 1,512,000.0 45,497,600.0
-
-
18,500.0 9,784,650.0
18,500.0 4,643,500.0
20,000.0 528,000.0
18,500.0 388,500.0
6,000.0 78,000.0 15,422,650.0
-
-
2,150.0 3,469,670.0
2,700.0 541,620.0
375.0 437,250.0 4,448,540.0

86,405,375.0
HARGA
JENIS PEKERJAAN SAT VOL SATUAN
RP
Pindahan SUB TOTAL

PEKERJAAN KAYU DAN KACA


Pekerjaan Kusen Kayu Borneo M3 3.5 600,000.0
Lisplank 3/30 Borneo M1 191.4 6,160.0
Glass Block M2 10.0 102,010.0
Kaca 3 mm M2 46.9 12,700.0
Jalusi M3 0.2 605,000.0
Railing Tangga M1 16.8 8,500.0
Pintu Panel Buah 14.0 75,000.0
Pintu Triplek Rangka Dalam Buah 2.0 66,050.0
Daun Jendela Jalusi 1.85 x 1.15 Buah 36.0 55,000.0
Daun Jendela Kaca 0.85 x 1.15 Buah 54.0 20,000.0

PEKERJAAN BESI, PENGGANTUNG


DAN PENGUNCI
Engsel Nylon Pintu 4" Buah 48.0 2,149.0
Engsel Nylon Jendela 3" Buah 180.0 1,640.0
Grendel Jendela 2" Buah 90.0 1,390.0
Kunci WC Buah 2.0 8,600.0
Kunci Pintu Anchar Buah 16.0 10,400.0
Bak Angin Jendela Buah 90.0 2,060.0

PEKERJAAN ATAP
Kuda-kuda 8/15 Kayu Borneo M3 5.1 445,000.0
Pasang Gording 8/15 Kayu Borneo M1 339.6 5,750.0
Pasang Kaso 5/7 dan Reng 2/3 Kayu Borneo M2 669.4 6,500.0
Balok Bubungan 8/15 M1 69.1 7,200.0
penutup Atap Genteng Palentong M2 669.4 3,400.0
Nok Penutup Atap Genteng M1 69.1 3,500.0
Talang Datar M1 21.0 17,250.0
Konsol Buah 14.0 28,500.0

PEKERJAAN PLAFOND TRIPLEK 4MM


Rangka Plafond 60 x 60 M2 404.3 6,690.0
Triplek 4mm M2 404.3 5,300.0
Plafond Luar (konsol) M2 90.0 5,900.0

PEKERJAAN HALAMAN TAMBAHAN


Pek. Blum Blak M2 14.3 12,460.0
Pek. Batu Muka M2 10.1 20,785.0
Pasangan Rolagh Bata M3 14.1 84,585.0
Floor Semen M2 95.0 5,875.0
Saluran Air Hujan M1 45.0 33,510.0
TOTAL SUB
HARGA TOTAL
RP RP
86,405,375.0

2,100,000.0
1,179,024.0
1,020,100.0
595,630.0
121,000.0
142,800.0
1,050,000.0
132,100.0
1,980,000.0
1,080,000.0 9,400,654.0
-
-
-
103,152.0
295,200.0
125,100.0
17,200.0
166,400.0
185,400.0 892,452.0
-
-
2,269,500.0
1,952,700.0
4,351,100.0
497,520.0
2,275,960.0
241,850.0
362,250.0
399,000.0 12,349,880.0
-
-
2,704,767.0
2,142,790.0
531,000.0 5,378,557.0
-
-
178,178.0
209,928.5
1,192,648.5
558,125.0
1,507,950.0 3,646,830.0
118,073,748.0
HARGA
JENIS PEKERJAAN SAT VOL SATUAN
RP
Pindahan SUB TOTAL

PEKERJAAN SANITAIR
Saluran Air Bersih PVC 1/2 M1 21.0 2,050.0
Saluran Air Kotor PVC 2" Tipe D M1 19.0 4,000.0
Saluran Limbah PVC 3" Tipe D M1 26.0 5,050.0
Kloset Jongkok Keramik Buah 2.0 51,000.0
Bak Mandi Teraso 60 Liter Buah 2.0 50,500.0
Kustafel Buah 3.0 80,500.0
Stop Kran Buah 3.0 5,300.0
Floor Drain Buah 3.0 9,600.0
Pemindahan Tower Ls 1.0 100,000.0
Septictank M2 8.0 74,000.0
Bak Kontrol 60 x 60 Buah 4.0 17,520.0

PEKERJAAN ELEKTRIKAL
Lampu Tl 40 Watt Titik 20.0 28,500.0
Lampu Pijar 25 Watt Titik 14.0 15,500.0
Stop Kontak Titik 10.0 22,500.0
Sekering Kost Buah 2.0 170,000.0
Penangkal Petir M1 62.5 10,500.0
TOTAL
TOTAL SUB
HARGA TOTAL
RP RP
118,073,748.0

43,050.0
76,000.0
131,300.0
102,000.0
101,000.0
241,500.0
15,900.0
28,800.0
100,000.0
592,000.0
70,080.0 1,501,630.0
-
-
570,000.0
217,000.0
225,000.0
340,000.0
656,250.0 2,008,250.0
121,583,628.0
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG SD NEGERI BANJARSARI
Jl. Merdeka No.25 Bandung

JENIS PEKERJAAN

PEKERJAAN PERSIAPAN
PEKERJAAN PEMBONGKARAN
PEKERJAAN TANAH
PASANGAN BOUWPLANK
PEKERJAAN PONDASI BATU KALI
PEKERJAAN DINDING
PEKERJAAN BETON K - 225
PEKERJAAN LANTAI
PEKERJAAN PENGECATAN
PEKERJAAN KAYU DAN KACA
PEKERJAAN BESI, PENGGANTUNG DAN PENGUNCI
PEKERJAAN ATAP
PEKERJAAN PLAFOND TRIPLEK 4MM
PEKERJAAN HALAMAN TAMBAHAN
PEKERJAAN SANITAR
PEKERJAAN ELEKTRIKAL

TOTAL

Catatan :
Harga Bangunan Per Meter Persegi Rp
sembilan puluh tiga ribu sembilan ratus tiga belas koma dua delapan rupiah

Mengetahui:

Drs. Budi Kudwadi, MT


Luas Bangunan M2 : 627
BOBOT JUMLAH
KERJA HARGA
1.1 1,369,680.00
1.6 1,912,662.50
4.3 5,250,622.50
0.1 182,325.00
0.9 1,037,600.00
9.3 11,283,695.00
37.4 45,497,600.00
12.7 15,422,650.00
3.7 4,448,540.00
7.7 9,400,654.00
0.7 892,452.00
10.2 12,349,880.00
4.4 5,378,557.00
3.0 3,646,830.00
1.2 1,501,630.00
1.7 2,008,250.00
-
100.0 121,583,628.00

ga Bangunan Per Meter Persegi Rp 193,913.28