Anda di halaman 1dari 9

TUGAS

HIDROGEOLOGI

Disusun Oleh:

M. Irzal Wisudawan (122.13.011)

EKSPLORASI TAMBANG

INSTITUT TEKNOLOGI DAN SAINS BANDUNG

KOTA DELTAMAS

2016
1). Rock Work

BOREHOLE

3-D PLOTING
MODEL LITHOLOGY

LITHOLOGY PROFIL
2).

ANSWER :
Diketahui Ditanyakan
jarak (r) = 90 m a. Nilai Transmissivitas dan
Storativitas dengan Metoda
Theis
ketebalan akuifer (d) = 30 m b. Nilai Transmissivitas dan
Storativitas dengan Metoda
Jacob
Debit pompa (Q) = 0,1 m3/s
W(u) = 1.0
U = 1.0
t = 60 s
h0-h = 0.14
(didapat dari grafik log-
log matching)
a) The Theis method of log-log matching.

Grafik W(u) Terhadap 1/u


10

W(u) 1
0.1 1 10

0.1

1/u
Grafik h0-h Terhadap t
The Theis Method
10

h0-h (m) 1
0.1 1 10

0.1

t (s)

The
Theis Method
Q .W (u) 0.1 x 1.0
T= = =0.0568
4. .(h 0h) 4. .0,14

4. u .T .t 4 x 1.0 x 0.0568 x 60
S= 2
= 2
=1.682 x 103
r 90

b) The Jacob method of semilog-plotting.


Grafik h0-h Terhadap t
The Jacob Method
2

h0-h (m) 1 f(x) = 0x + 0.49


R = 0.55
0
1 10 100 1000
t (s)

h0-h Linear (h0-h)

Grafik h0-h Terhadap t


The Jacob Method
1.2
1 f(x) = 0.14 ln(x) + 0.12
0.8 R = 1

h0-h (m) 0.6


0.4
0.2
0
1 10 100 1000

t (s)

h0-h Logarithmic (h0-h)

The Jacob Method


2,3.Q 2,3 x 0.1
T= = =22.878
4. . h 4 x x 0,0008
2,25.T .t 0 2,25 x 22.878 x 2(60)
S= = =0.7626
r2 902

Anda mungkin juga menyukai