POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TAHUN 2017
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
SERVICE KENDARAAN
M. Service Kendaraan .. ............................................................................ 198
Service Ringan Truk Besar .. ................................................................... 198
Service Sedang Truk Besar . .............................................................................. 198
Service Berat Truk Besar . .............................................................................. 198
Service Ringan Buldozer ..................................................................... 199
Service Ringan Escavator .................................................................... 199
Service Ringan Wheel Loader .. ................................................................... 199
Lampiran HSPK Non Fisik
BIAYA OPERASIONAL KEGIATAN ........................................................................... 200
Alat Tulis Kantor (ATK) Peserta . .............................................................................. 201
ATK Administrasi Kegiatan . .............................................................................. 201
Jilid dan Penggandaan (Modul) .............................................................................. 201
Biaya Dokumentasi ..... .............................................................................. 202
Perlengkapan Dekorasi dan Sound System ................................................................. 202
Publikasi . . .............................................................................. 202
Hadiah / Penghargaan Kegiatan Lomba ...................................................................... 203
PERATURAN WALIKOTA MOJOKERTO
TENTANG
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TAHUN 2017
WALIKOTA MOJOKERTO
TENTANG
WALIKOTA MOJOKERTO,
MEMUTUSKAN :
Pasal 1
Pasal 2
(2) Untuk Uraian lain yang belum termasuk dalam ayat (1) berpedoman
pada Petunjuk Teknis dan/atau ketentuan yang berlaku lainnya.
Pasal 3
Pasal 4
Pasal 5
(1) Dalam hal harga satuan upah dan bahan yang dipakai dalam analisa
pekerjaan lebih rendah dari harga yang ada di pasaran, maka yang
dipakai adalah harga satuan upah dan bahan yang berlaku di
pasaran, berdasarkan hasil survey dan ditetapkan oleh dinas/
instansi yang membidangi barang/ jasa tersebut.
(2) Dalam hal harga satuan upah dan bahan yang dicantunkan dalam
buku Standar Harga Satuan Pokok Kegiatan (HSPK) ini lebih tinggi
dari harga yang ada di pasaran, maka harga yang digunakan dalam
pelaksanaan anggaran/ kegiatan adalah harga satuan upah dan
bahan yang berlaku di pasaran.
Pasal 6
Ditetapkan di Mojokerto
pada tanggal 13 Desember 2016
WALIKOTA MOJOKERTO
ttd.
MASUD YUNUS
BERITA DAERAH
Diundangkan KOTA MOJOKERTO TAHUN 2015 NOMOR 33
di Mojokerto
pada tanggal 1 Juli 2015
SEKRETARIS DAERAH KOTA MOJOKERTO
STANDAR BIAYA UMUM
(SBU)
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
1 1.10.28.01.01.002.001 Honorarium Pengguna Anggaran / Nilai pagu dana sd. Rp. 100 OB 625,000.00
Pengguna Barang ( PA / PB ) juta
2 1.10.28.01.01.002.002 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 762,500.00
Pengguna Barang ( PA / PB ) 100 juta sd. Rp. 250 juta
3 1.10.28.01.01.002.003 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 900,000.00
Pengguna Barang ( PA / PB ) 250 juta sd. Rp. 500 juta
4 1.10.28.01.01.002.004 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 1,037,500.00
Pengguna Barang ( PA / PB ) 500 juta sd. Rp. 1 miliar
5 1.10.28.01.01.002.005 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 1 OB 1,212,500.00
Pengguna Barang ( PA / PB ) miliar sd. Rp. 2,5 miliar
6 1.10.28.01.01.002.006 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 1,387,500.00
Pengguna Barang ( PA / PB ) 2,5 miliar sd. Rp. 5 miliar
7 1.10.28.01.01.002.007 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 5 OB 1,562,500.00
Pengguna Barang ( PA / PB ) miliar sd. Rp. 10 miliar
8 1.10.28.01.01.002.008 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 1,975,000.00
Pengguna Barang ( PA / PB ) 10 miliar sd. Rp. 25 miliar
9 1.10.28.01.01.002.009 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 2,387,500.00
Pengguna Barang ( PA / PB ) 25 miliar sd. Rp. 50 miliar
10 1.10.28.01.01.002.010 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 2,812,500.00
Pengguna Barang ( PA / PB ) 50 miliar sd. Rp.75 miliar
11 1.10.28.01.01.002.011 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp.75 OB 3,225,000.00
Pengguna Barang ( PA / PB ) miliar sd. Rp.100 miliar
14 1.10.28.01.01.002.014 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. OB 5,100,000.00
Pengguna Barang ( PA / PB ) 500 miliar sd. Rp. 750 miliar
16 1.10.28.01.01.002.016 Honorarium Pengguna Anggaran / Nilai pagu dana di atas Rp. 1 OB 6,975,000.00
Pengguna Barang ( PA / PB ) triliun
1 1.10.28.01.01.005.001 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana sd. Rp. 100 OB 600,000.00
juta
2 1.10.28.01.01.005.002 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 737,500.00
100 juta sd. Rp. 250 juta
3 1.10.28.01.01.005.003 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 875,000.00
250 juta sd. Rp. 500 juta
4 1.10.28.01.01.005.004 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 1,000,000.00
500 juta sd. Rp. 1 miliar
5 1.10.28.01.01.005.005 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. 1 OB 1,175,000.00
miliar sd. Rp. 2,5 miliar
6 1.10.28.01.01.005.006 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 1,337,500.00
2,5 miliar sd. Rp. 5 miliar
7 1.10.28.01.01.005.007 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. 5 OB 1,387,500.00
miliar sd. Rp. 10 miliar
8 1.10.28.01.01.005.008 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 1,912,500.00
10 miliar sd. Rp. 25 miliar
9 1.10.28.01.01.005.009 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 2,312,500.00
25 miliar sd. Rp. 50 miliar
10 1.10.28.01.01.005.010 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 2,712,500.00
50 miliar sd. Rp.75 miliar
11 1.10.28.01.01.005.011 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp.75 OB 3,112,500.00
miliar sd. Rp. 100 miliar
12 1.10.28.01.01.005.012 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas OB 3,725,000.00
Rp.100 miliar sd. Rp. 250
miliar
13 1.10.28.01.01.005.013 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 4,325,000.00
250 miliar sd. Rp. 500 miliar
14 1.10.28.01.01.005.014 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 4,925,000.00
500 miliar sd. Rp. 750 miliar
15 1.10.28.01.01.005.015 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. OB 5,537,500.00
750 miliar sd. Rp. 1 triliun
16 1.10.28.01.01.005.016 Pejabat Pembuat Komitmen (PPK) Nilai pagu dana di atas Rp. 1 OB 6,737,500.00
triliun
1 1.10.28.01.01.006.001 Direksi Lapangan / Pengawas Nilai pagu dana sd. Rp. 100 OB 312,500.00
Lapangan juta
2 1.10.28.01.01.006.002 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 437,500.00
Lapangan 100 juta sd. Rp. 250 juta
3 1.10.28.01.01.006.003 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 562,500.00
Lapangan 250 juta sd. Rp. 500 juta
4 1.10.28.01.01.006.004 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 687,500.00
Lapangan 500 juta sd. Rp. 1 miliar
5 1.10.28.01.01.006.005 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. 1 OB 750,000.00
Lapangan miliar sd. Rp. 2,5 miliar
6 1.10.28.01.01.006.006 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 875,000.00
Lapangan 2,5 miliar sd. Rp. 5 miliar
7 1.10.28.01.01.006.007 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. 5 OB 1,000,000.00
Lapangan miliar sd. Rp. 10 miliar
8 1.10.28.01.01.006.008 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 1,125,000.00
Lapangan 10 miliar sd. Rp. 25 miliar
9 1.10.28.01.01.006.009 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 1,250,000.00
Lapangan 25 miliar sd. Rp. 50 miliar
10 1.10.28.01.01.006.010 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 1,750,000.00
Lapangan 50 miliar sd. Rp.75 miliar
11 1.10.28.01.01.006.011 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp.75 OB 2,000,000.00
Lapangan miliar sd. Rp. 100 miliar
12 1.10.28.01.01.006.012 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 2,500,000.00
Lapangan 100 miliar sd. Rp. 250 miliar
13 1.10.28.01.01.006.013 Direksi Lapangan / Pengawas Nilai pagu dana di atas Rp. OB 3,125,000.00
Lapangan 250 miliar sd. Rp. 500 miliar
1 1.10.28.01.01.007.001 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana sd. Rp. 100 OB 462,500.00
(PPTK) juta
2 1.10.28.01.01.007.002 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 575,000.00
(PPTK) 100 juta sd. Rp. 250 juta
3 1.10.28.01.01.007.003 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 700,000.00
(PPTK) 250 juta sd. Rp. 500 juta
5 1.10.28.01.01.007.005 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. 1 OB 900,000.00
(PPTK) miliar sd. Rp. 2,5 miliar
6 1.10.28.01.01.007.006 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 1,037,500.00
(PPTK) 2,5 miliar sd. Rp. 5 miliar
7 1.10.28.01.01.007.007 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. 5 OB 1,187,500.00
(PPTK) miliar sd. Rp. 10 miliar
8 1.10.28.01.01.007.008 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 1,487,500.00
(PPTK) 10 miliar sd. Rp. 25 miliar
9 1.10.28.01.01.007.009 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 1,887,500.00
(PPTK) 25 miliar sd. Rp. 50 miliar
10 1.10.28.01.01.007.010 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 2,237,500.00
(PPTK) 50 miliar sd. Rp.75 miliar
11 1.10.28.01.01.007.011 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp.75 OB 2,587,500.00
(PPTK) miliar sd. Rp. 100 miliar
12 1.10.28.01.01.007.012 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 3,112,500.00
(PPTK) 100 miliar sd. Rp. 250 miliar
13 1.10.28.01.01.007.013 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 3,637,500.00
(PPTK) 250 miliar sd. Rp. 500 miliar
14 1.10.28.01.01.007.014 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 4,162,500.00
(PPTK) 500 miliar sd. Rp. 750 miliar
15 1.10.28.01.01.007.015 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. OB 4,625,000.00
(PPTK) 750 miliar sd. Rp. 1 triliun
16 1.10.28.01.01.007.016 Pejabat Pelaksana Teknis Kegiatan Nilai pagu dana di atas Rp. 1 OB 5,675,000.00
(PPTK) triliun
1 1.10.28.01.01.008.001 Pejabat Penatausahaan Keuangan Nilai pagu dana sd. Rp. 100 OB 500,000.00
(PPK-SKPD/PPK-PPKD) juta
2 1.10.28.01.01.008.002 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 600,000.00
(PPK-SKPD/PPK-PPKD) 100 juta sd. Rp. 250 juta
3 1.10.28.01.01.008.003 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 712,500.00
(PPK-SKPD/PPK-PPKD) 250 juta sd. Rp. 500 juta
4 1.10.28.01.01.008.004 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 825,000.00
(PPK-SKPD/PPK-PPKD) 500 juta sd. Rp. 1 miliar
5 1.10.28.01.01.008.005 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. 1 OB 962,500.00
(PPK-SKPD/PPK-PPKD) miliar sd. Rp. 2,5 miliar
6 1.10.28.01.01.008.006 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 1,100,000.00
(PPK-SKPD/PPK-PPKD) 2,5 miliar sd. Rp. 5 miliar
8 1.10.28.01.01.008.008 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 1,562,500.00
(PPK-SKPD/PPK-PPKD) 10 miliar sd. Rp. 25 miliar
9 1.10.28.01.01.008.009 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 1,900,000.00
(PPK-SKPD/PPK-PPKD) 25 miliar sd. Rp. 50 miliar
10 1.10.28.01.01.008.010 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 2,225,000.00
(PPK-SKPD/PPK-PPKD) 50 miliar sd. Rp.75 miliar
11 1.10.28.01.01.008.011 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp.75 OB 2,550,000.00
(PPK-SKPD/PPK-PPKD) miliar sd. Rp. 100 miliar
12 1.10.28.01.01.008.012 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 3,050,000.00
(PPK-SKPD/PPK-PPKD) 100 miliar sd. Rp. 250 miliar
13 1.10.28.01.01.008.013 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 3,537,500.00
(PPK-SKPD/PPK-PPKD) 250 miliar sd. Rp. 500 miliar
14 1.10.28.01.01.008.014 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 3,987,500.00
(PPK-SKPD/PPK-PPKD) 500 miliar sd. Rp. 750 miliar
15 1.10.28.01.01.008.015 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. OB 4,525,000.00
(PPK-SKPD/PPK-PPKD) 750 miliar sd. Rp. 1 triliun
16 1.10.28.01.01.008.016 Pejabat Penatausahaan Keuangan Nilai pagu dana di atas Rp. 1 OB 5,525,000.00
(PPK-SKPD/PPK-PPKD) triliun
1 1.10.28.01.01.009.001 Bendahara Pengeluaran Nilai pagu dana sd. Rp. 100 OB 425,000.00
juta
2 1.10.28.01.01.009.002 Bendahara Pengeluaran Nilai pagu dana di atas Rp. OB 525,000.00
100 juta sd. Rp. 250 juta
3 1.10.28.01.01.010.003 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 462,500.00
250 juta sd. Rp. 500 juta
4 1.10.28.01.01.010.004 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 537,500.00
500 juta sd. Rp. 1 miliar
5 1.10.28.01.01.010.005 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. 1 OB 625,000.00
miliar sd. Rp. 2,5 miliar
6 1.10.28.01.01.010.006 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 712,500.00
2,5 miliar sd. Rp. 5 miliar
7 1.10.28.01.01.010.007 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. 5 OB 800,000.00
miliar sd. Rp. 10 miliar
8 1.10.28.01.01.010.008 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 1,012,500.00
10 miliar sd. Rp. 25 miliar
9 1.10.28.01.01.010.009 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 1,225,000.00
25 miliar sd. Rp. 50 miliar
10 1.10.28.01.01.010.010 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 1,437,500.00
50 miliar sd. Rp.75 miliar
11 1.10.28.01.01.010.011 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp.75 OB 1,662,500.00
miliar sd. Rp. 100 miliar
12 1.10.28.01.01.010.012 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 1,975,000.00
100 miliar sd. Rp. 250 miliar
13 1.10.28.01.01.010.013 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 2,300,000.00
250 miliar sd. Rp. 500 miliar
14 1.10.28.01.01.010.014 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. OB 2,612,500.00
500 miliar sd. Rp. 750 miliar
16 1.10.28.01.01.010.016 Bendahara Pengeluaran Pembantu Nilai pagu dana di atas Rp. 1 OB 3,575,000.00
triliun
1 1.10.28.01.01.011.001 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana sd. Rp. 100 OB 250,000.00
Pembantu Bendahara Pengeluaran juta
2 1.10.28.01.01.011.002 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 300,000.00
Pembantu Bendahara Pengeluaran 100 juta sd. Rp. 250 juta
3 1.10.28.01.01.011.003 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 362,500.00
Pembantu Bendahara Pengeluaran 250 juta sd. Rp. 500 juta
4 1.10.28.01.01.011.004 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 425,000.00
Pembantu Bendahara Pengeluaran 500 juta sd. Rp. 1 miliar
5 1.10.28.01.01.011.005 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. 1 OB 500,000.00
Pembantu Bendahara Pengeluaran miliar sd. Rp. 2,5 miliar
6 1.10.28.01.01.011.006 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 562,500.00
Pembantu Bendahara Pengeluaran 2,5 miliar sd. Rp. 5 miliar
7 1.10.28.01.01.011.007 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. 5 OB 637,500.00
Pembantu Bendahara Pengeluaran miliar sd. Rp. 10 miliar
8 1.10.28.01.01.011.008 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 800,000.00
Pembantu Bendahara Pengeluaran 10 miliar sd. Rp. 25 miliar
9 1.10.28.01.01.011.009 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 975,000.00
Pembantu Bendahara Pengeluaran 25 miliar sd. Rp. 50 miliar
10 1.10.28.01.01.011.010 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 1,150,000.00
Pembantu Bendahara Pengeluaran 50 miliar sd. Rp.75 miliar
11 1.10.28.01.01.011.011 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp.75 OB 1,325,000.00
Pembantu Bendahara Pengeluaran miliar sd. Rp. 100 miliar
12 1.10.28.01.01.011.012 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 1,575,000.00
Pembantu Bendahara Pengeluaran 100 miliar sd. Rp. 250 miliar
13 1.10.28.01.01.011.013 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 1,837,500.00
Pembantu Bendahara Pengeluaran 250 miliar sd. Rp. 500 miliar
14 1.10.28.01.01.011.014 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 2,087,500.00
Pembantu Bendahara Pengeluaran 500 miliar sd. Rp. 750 miliar
15 1.10.28.01.01.011.015 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. OB 2,350,000.00
Pembantu Bendahara Pengeluaran 750 miliar sd. Rp. 1 triliun
16 1.10.28.01.01.011.016 Staf Pengelola / Pembuat Dokumen / Nilai pagu dana di atas Rp. 1 OB 2,850,000.00
Pembantu Bendahara Pengeluaran triliun
2 1.10.28.01.02.005.002 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 850,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 200 juta sd. Rp. 500 juta
3 1.10.28.01.02.005.003 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 1,020,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 500 juta sd. Rp. 1 miliar
4 1.10.28.01.02.005.004 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 1,270,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 1 milyar sd. Rp. 2,5 miliar
5 1.10.28.01.02.005.005 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 1,520,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 2,5 miliar sd. Rp. 5 miliar
6 1.10.28.01.02.005.006 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 1,780,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 5 miliar sd. Rp. 10 miliar
7 1.10.28.01.02.005.007 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 2,120,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 10 miliar sd. Rp. 25 miliar
8 1.10.28.01.02.005.008 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 2,450,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 25 miliar sd. Rp. 50 miliar
9 1.10.28.01.02.005.009 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 2,790,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 50 miliar sd. Rp. 75 miliar
10 1.10.28.01.02.005.010 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 3,130,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 75 miliar sd. Rp. 100
miliar
11 1.10.28.01.02.005.011 Honorarium Kelompok Kerja Unit Nilai pagu pengadaan di atas OP 3,580,000.00
Layanan Pengadaan (Ulp) - Konstruksi Rp. 100 miliar sd Rp. 250
miliar
1 1.10.28.01.02.007.001 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 450,000.00
lainnya dan Konsultansi Unit Layanan konsultansi di atas Rp. 50
Pengadaan (Ulp) Non Konstruksi juta sd. Rp. 200 juta
2 1.10.28.01.02.007.002 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 480,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp. 200 juta sd. Rp.250
juta
3 1.10.28.01.02.007.003 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 600,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp.250 juta sd.
Rp.500juta
4 1.10.28.01.02.007.004 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 720,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp.500 juta sd. Rp. 1
miliar
5 1.10.28.01.02.007.005 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 910,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp. 1 milyar sd. Rp.2,5
miliar
6 1.10.28.01.02.007.006 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 1,090,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp.2,5 miliar sd. Rp.5
miliar
7 1.10.28.01.02.007.007 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 1,270,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp. 5 miliar sd. Rp. 10
miliar
8 1.10.28.01.02.007.008 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 1,510,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp. 10 miliar sd. Rp.25
miliar
9 1.10.28.01.02.007.009 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 1,750,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp.25 miliar sd. Rp.50
miliar
10 1.10.28.01.02.007.010 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 1,990,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp.50 miliar sd. Rp.75
miliar
11 1.10.28.01.02.007.011 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 2,230,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp.75 miliar sd. Rp100
miliar
12 1.10.28.01.02.007.012 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 2,560,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp100 miliar sd Rp250
miliar
13 1.10.28.01.02.007.013 Honorarium Kelompok Kerja Jasa Nilai pagu pengadaan jasa OP 2,880,000.00
lainnya dan Konsultansi Unit Layanan konsultansi/ jasa lainnya di
Pengadaan (Ulp) Non Konstruksi atas Rp250 miliar sd. Rp. 500
milyar
1 1.10.28.01.22.001.001 Satuan Biaya Latihan Prajabatan Golongan I dan Golongan II Peserta/ 8,000,000.00
Angkatan
2 1.10.28.01.22.001.002 Satuan Biaya Latihan Prajabatan Golongan III Peserta/ 9,500,000.00
Angkatan
1 1.10.28.01.24.001.001 Dari Bahasa Asing Ke Indonesia Bahasa Inggris ke Bahasa Halaman 152,000.00
Indonesia Jadi
2 1.10.28.01.24.001.002 Dari Bahasa Asing Ke Indonesia Dari Bahasa Jepang Halaman 238,000.00
Jadi
3 1.10.28.01.24.001.003 Dari Bahasa Asing Ke Indonesia Dari Bahasa Mandarin, Halaman 238,000.00
Belanda Jadi
4 1.10.28.01.24.001.004 Dari Bahasa Asing Ke Indonesia Dari Bahasa Prancis, Jerman Halaman 173,000.00
Jadi
5 1.10.28.01.24.001.005 Dari Bahasa Asing Ke Indonesia Dari Bahasa Asing Lainnya Halaman 173,000.00
Jadi
1 1.10.28.01.25.002.001 Dari Bahasa Indonesia Ke Asing Dari Bahasa Indonesia Halaman 152,000.00
Jadi
2 1.10.28.01.25.002.002 Dari Bahasa Indonesia Ke Asing Ke Bahasa Jepang Halaman 238,000.00
Jadi
3 1.10.28.01.25.002.003 Dari Bahasa Indonesia Ke Asing Ke Bahasa Mandarin, Halaman 238,000.00
Belanda Jadi
4 1.10.28.01.25.002.004 Dari Bahasa Indonesia Ke Asing Ke Bahasa Prancis, Jerman Halaman 173,000.00
Jadi
5 1.10.28.01.25.002.005 Dari Bahasa Indonesia Ke Asing Ke Bahasa Asing Lainnya Halaman 173,000.00
Jadi
2 1.10.28.01.26.001.002 Biaya Hidup dan Biaya Operasional Diploma IV dan Strata I OT 17,010,000.00
4 1.10.28.01.26.001.004 Uang Buku dan Referensi per tahun Diploma III OT 1,590,000.00
5 1.10.28.01.26.001.005 Uang Buku dan Referensi per tahun Diploma IV dan Strata I OT 1,850,000.00
2 1.10.28.01.26.002.002 Biaya Hidup dan Biaya Operasional Strata 3 dan Spesialis 2 OT 21,320,000.00
3 1.10.28.01.26.002.003 Uang Buku dan Referensi per tahun Strata 2 dan Spesialis 1 OT 2,120,000.00
4 1.10.28.01.26.002.004 Uang Buku dan Referensi per tahun Strata 3 dan Spesialis 2 OT 2,380,000.00
3 1.10.28.01.31.008.003 Moda Transportasi (Pesawat Udara) Sekretaris Daerah/ Eselon Orang Bisnis
II/A
4 1.10.28.01.31.008.004 Moda Transportasi (Pesawat Udara) Eselon II/ B Orang Ekonomi
7 1.10.28.01.31.008.007 Moda Transportasi (Pesawat Udara) Golongan III dan IV Orang Ekonomi
9 1.10.28.01.31.008.009 Moda Transportasi (Pesawat Udara) Personil Non PNSD Orang Ekonomi
11 1.10.28.01.31.008.011 Moda Transportasi (Pesawat Udara) Wakil Ketua DPRD Orang Bisnis
26 1.10.28.01.31.008.026 Moda Transportasi (Kereta Api / Bus) Wakil Walikota Orang Eksekutif
27 1.10.28.01.31.008.027 Moda Transportasi (Kereta Api / Bus) Sekretaris Daerah/ Eselon Orang Eksekutif
II/A
28 1.10.28.01.31.008.028 Moda Transportasi (Kereta Api / Bus) Eselon II/ B Orang Eksekutif
29 1.10.28.01.31.008.029 Moda Transportasi (Kereta Api / Bus) Eselon III Orang Eksekutif
31 1.10.28.01.31.008.031 Moda Transportasi (Kereta Api / Bus) Golongan III dan IV Orang Eksekutif
32 1.10.28.01.31.008.032 Moda Transportasi (Kereta Api / Bus) Golongan II dan I Orang Eksekutif
33 1.10.28.01.31.008.033 Moda Transportasi (Kereta Api / Bus) Personil Non PNSD Orang Eksekutif
34 1.10.28.01.31.008.034 Moda Transportasi (Kereta Api / Bus) Ketua DPRD Orang Eksekutif
35 1.10.28.01.31.008.035 Moda Transportasi (Kereta Api / Bus) Wakil Ketua DPRD Orang Eksekutif
36 1.10.28.01.31.008.036 Moda Transportasi (Kereta Api / Bus) Anggota DPRD Orang Eksekutif
1.9.BENDAHARA PENGELUARAN
a. Bendahara Pengeluaran dapat diberikan honorarium setiap bulan sesuai dengan pagu
anggaran yang dikelola
b. Dalam hal bendahara pengeluaran bertindak sebagai anggota tim pelaksana kegiatan tetap
dapat diberikan honorarium tim tersebut
Catatan :
Dalam hal pejabat / pengadaan barang / jasa dan kelompok kerja ULP telah ditetapkan sebagai
jabatan fungsional dan telah diberikan tunjangan jabatan fungsionalnya, maka pemberian
honorarium untuk Pejabat Pengadaan Barang/Jasa dan Kelompok Kerja ULP dinyatakan tidak
berlaku.
5 PENGURUS GAJI
Membantu tugas perbendaharaan pada bendahara pengeluaran dalam pengurusan gaji.
6 BENDAHARA PENERIMAAN
Pegawai Negeri Sipil yang ditetapkan oleh Walikota untuk Menerima, menyimpan,
menyetorkan, menatausahakan, dan mempertanggungjawabkan uang pendapatan daerah.
Satuan biaya honorarium diperuntukkan bagi non pegawai negeri yang ditunjuk untuk
melakukan kegiatan sesuai dengan tugas dan fungsinya, berdasarkan surat keputusan pejabat
yang berwenang/kontrak kerja. Untuk satpam, pengemudi, Petugas Kebersihan, dan
pramubakti dengan melalui jasa pihak ketiga/diborongkan, alokasi honorarium dapat ditambah
paling banyak sebesar 15% (lima belas persen) dari satuan biaya, besaran tersebut tidak
termasuk seragam dan perlengkapan.
Satuan biaya bantuan beasiswa program gelar/non gelar dalam negeri merupakan satuan
biaya yang digunakan untuk perencanaan kebutuhan biaya bantuan mahasiswa program gelar
/ non gelar dalam negeri bagi pegawai negeri yang ditugaskan untuk melanjutkan pendidikan
Diploma I, Diploma III, Diploma IV, atau Strata I (satu), dan pendidikan Pasca Sarjana ( Strata 2
(dua) atau Strata 3 (tiga) ) yang terdiri dari biaya hidup dan biaya operasional, uang buku dan
referensi per tahun. Biaya untuk pendidikan ditanggung oleh pemerintah secara at cost
sedangkan untuk biaya riset program dapat dialokasikan bantuan biaya riset sesuai
kemampuan keuangan Kota Mojokerto masing-masing, yang dalam pengusulannya dilampiri
dengan Terms of Reference (TOR), Rincian Anggaran Biaya (RAB), dan Surat Pernyataan
Tanggung Jawab Mutlak (SPTJM).
Khusus tenaga pengajar biasa pada perguruan tinggi yang ditugaskan mengikuti pendidikan
fakultas pasca sarjana, besaran tunjangan tugas belajar merujuk Keputusan Presiden Nomor
57 tahun 1986 tentang Tunjangan Belajar Bagi Tenaga Pengajar Biasa Pada Perguruan Tinggi
Yang Ditugaskan Mengikuti Pendidikan Pada Fakultas Pasca Sarjana.
B. Zona B meliputi: Kabupaten Lamongan, Kabupaten Nganjuk, Kabupaten Kediri, Kota Kediri,
Kabupaten Pasuruan, Kota Pasuruan, Kabupaten Malang, Kota Malang, Kota Batu, Kabupaten
Madiun, Kota Madiun.
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
6 1.11.29.01.04.009.006 Jasa Pengecetan Tower Triangle beton Upah dan Bahan Per Meter 125,000.00
ulir 13 SII
7 1.11.29.01.04.009.007 Jasa Penggantian Kawat Seling Tower Upah dan Bahan Per Meter 175,000.00
Monopole
8 1.11.29.01.04.009.008 Jasa Penggantian Kawat Seling Tower Upah dan Bahan Per Meter 250,000.00
Triangle
6 1.11.29.01.06.003.006 Iklan Advetorial Corporate 4 kol x 260 mm, Full Colour, Per Tayang 54,519,000.00
Image/Liputan Event Nasional Jawa Pos
7 1.11.29.01.06.003.007 Iklan Advetorial Corporate 1/2 Halaman (7 kol x 260 Per Tayang 113,231,700.00
Image/Liputan Event mm) Full Colour. Nasional.
Jawa Pos
8 1.11.29.01.06.003.008 Iklan Advetorial Corporate 1 Halaman (7 kol x 520 mm) Per Tayang 204,296,400.00
Image/Liputan Event Full Colour. Nasional. Jawa
Pos
9 1.11.29.01.06.003.009 Iklan Advetorial Corporate 3 kol x 260 mm, Full Colour, Per Tayang 29,955,500.00
Image/Liputan Event Jawa Timur, Jawa Pos
10 1.11.29.01.06.003.010 Iklan Advetorial Corporate 4 kol x 260 mm, Full Colour, Per Tayang 43,735,000.00
Image/Liputan Event Jawa Timur, Jawa Pos
11 1.11.29.01.06.003.011 Iklan Advetorial Corporate 1/2 Halaman (7 kol x 260 Per Tayang 86,870,900.00
Image/Liputan Event mm) Full Colour. Jawa Timur.
Jawa Pos
12 1.11.29.01.06.003.012 Iklan Advetorial Corporate 1 Halaman (7 kol x 520 mm) Per Tayang 156,367,600.00
Image/Liputan Event Full Colour. Jawa Timur. Jawa
Pos
14 1.11.29.01.06.003.014 Iklan Advetorial Politik dan 4 kol x 260 mm, Full Colour, Per Tayang 54,519,000.00
Pemerintahan Nasional Jawa Pos
15 1.11.29.01.06.003.015 Iklan Advetorial Politik dan 1/2 Halaman (7 kol x 260 Per Tayang 113,231,700.00
Pemerintahan mm) Full Colour. Nasional.
Jawa Pos
16 1.11.29.01.06.003.016 Iklan Advetorial Politik dan 1 Halaman (7 kol x 520 mm) Per Tayang 204,296,400.00
Pemerintahan Full Colour. Nasional. Jawa
Pos
17 1.11.29.01.06.003.017 Iklan Advetorial Politik dan 3 kol x 260 mm, Full Colour, Per Tayang 29,955,500.00
Pemerintahan Jawa Timur, Jawa Pos
18 1.11.29.01.06.003.018 Iklan Advetorial Politik dan 4 kol x 260 mm, Full Colour, Per Tayang 43,735,000.00
Pemerintahan Jawa Timur, Jawa Pos
19 1.11.29.01.06.003.019 Iklan Advetorial Politik dan 1/2 Halaman (7 kol x 260 Per Tayang 86,870,900.00
Pemerintahan mm) Full Colour. Jawa Timur.
Jawa Pos
20 1.11.29.01.06.003.020 Iklan Advetorial Politik dan 1 Halaman (7 kol x 520 mm) Per Tayang 156,367,600.00
Pemerintahan Full Colour. Jawa Timur. Jawa
Pos
21 1.11.29.01.06.003.021 Display BW, Min. 40 mmk, Kompas mmk 176,200.00
25 1.11.29.01.06.003.025 Iklan Cetak Untuk Pengumuman Jawa Pos, Terbit Minggu, Per Tayang 445,852,300.00
Nasional, Full Halaman
26 1.11.29.01.06.003.026 Iklan Cetak Untuk Pengumuman Jawa Pos, Terbit Senin - Per Tayang 494,559,500.00
Sabtu, Nasional, Full
Halaman
27 1.11.29.01.06.003.027 Iklan Cetak Untuk Pengumuman Surya, Full Halaman Per Tayang 86,173,300.00
28 1.11.29.01.06.003.028 Iklan Cetak Untuk Pengumuman Birawa, Berwarna, Full Per Tayang 16,219,400.00
Halaman
29 1.11.29.01.06.003.029 Iklan Cetak Untuk Pengumuman Birawa, Hitam Putih, Full Per Tayang 12,014,400.00
Halaman
30 1.11.29.01.06.003.030 Iklan Cetak Untuk Pengumuman Jawa Pos, Terbit Minggu, Per Tayang 222,925,600.00
Nasional, 1/2 Halaman
31 1.11.29.01.06.003.031 Iklan Cetak Untuk Pengumuman Jawa Pos, Terbit Senin - Per Tayang 247,279,800.00
Sabtu, Nasional, 1/2 Halaman
32 1.11.29.01.06.003.032 Iklan Cetak Untuk Pengumuman Surya, 1/2 Halaman Per Tayang 43,086,700.00
33 1.11.29.01.06.003.033 Iklan Cetak Untuk Pengumuman Birawa, Berwarna, 1/2 Per Tayang 8,410,100.00
Halaman
34 1.11.29.01.06.003.034 Iklan Cetak Untuk Pengumuman Birawa, Hitam Putih, 1/2 Per Tayang 6,607,900.00
Halaman
35 1.11.29.01.06.003.035 Biaya Produksi Iklan Layanan Biaya Produksi Iklan Layanan Menit 2,979,050.00
Masyarakat di Radio Masyarakat di Radio
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
2.01.01.01.01.003 1 m' Pembuatan Pagar Sementara Kawat Duri Tinggi 1,8 M m' 141,800.00
2.01.01.01.01.004 1 m' Pengukuran Dan Pemasangan Bowplank m' 82,600.00
2.01.01.01.01.005 1 m2 Pekerjaan Pembuatan Kantor Sementara Dengan Lantai m2 1,873,300.00
Plesteran
2.01.01.01.01.006 1 m2 Pekerjaan Pembuatan Gudang Semen Dan Peralatan m2 1,764,300.00
2.01.01.01.01.007 1 m2 Pekerjaan Pembuatan Bedeng Kerja m2 1,788,200.00
2.01.01.01.01.008 1 m2 Pekerjaan Pembersihan Lapangan Dan Perataan m2 15,500.00
2.01.01.01.01.009 1 m2 Pembuatan Stegger dari Bambu m2 60,300.00
2.01.01.01.01.010 1 m2 Pekerjaan Pembuatan Jalan Sementara m2 144,200.00
2.01.01.01.01.011 1 m3 Pekerjaan Pembongkaran Beton (Manual) m3 643,300.00
2.01.01.01.01.012 1 m3 Pembongkaran Beton (Menggunakan Alat) m3 449,200.00
2.01.01.01.01.013 1 m3 Pembongkaran Pasangan Batu Kali (Manual) m3 211,000.00
2.01.01.01.01.014 1 M3 Pembongkaran Pasangan Batu Kali (Menggunakan Alat) m3 187,000.00
2.01.01.01.01.015 1 m3 Pekerjaan Pembongkaran Tembok Batu Bata m3 482,500.00
2.01.01.01.01.016 1 m2 Pekerjaan Pembongkaran Penutup Atap Tidak Dipakai Kembali m2 11,600.00
2.01.01.02.01.012 1 m' Pekerjaan Pembuatan Lubang Strouss Pile Diameter 30 cm Titik 50,600.00
2.01.01.03.01.023 1 m' Membuat Kolom Praktis Beton Bertulang (11 X 11) Cm m' 83,400.00
2.01.01.03.01.024 1 m' Membuat Ring Balok Beton Bertulang (10 X 15) Cm m' 123,100.00
2.01.01.03.02 Pekerjaan Cetakan Beton (Bekisting)
2.01.01.03.02.001 1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi m2 322,200.00
2.01.01.03.02.002 1 m2 Pekerjaan Pasang Bekisting Untuk Sloof m2 351,300.00
2.01.01.03.02.003 1 m2 Pekerjaan Pasang Bekisting Untuk Kolom m2 558,000.00
2.01.01.03.02.004 1 m2 Pekerjaan Pasang Bekisting Untuk Balok m2 578,300.00
2.01.01.03.02.005 1 m2 Pekerjaan Pasang Bekisting Untuk Lantai m2 653,600.00
2.01.01.03.02.006 1 m2 Pekerjaan Pasang Bekisting Untuk Dinding m2 557,600.00
2.01.01.03.02.007 1 m2 Pekerjaan Pasang Bekisting Untuk Tangga m2 499,100.00
2.01.01.03.02.008 1 m2 Pekerjaan Pasang Bekisting Untuk Pondasi (2 Kali Pakai) m2 161,100.00
2.01.01.04.01.002 1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1/2 Bata (1 Pc : 2 Ps) m2 153,700.00
2.01.01.04.01.004 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 3 Ps) m2 145,300.00
2.01.01.04.01.006 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 4 Ps) m2 140,500.00
2.01.01.04.01.008 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 5 Ps) m2 137,400.00
2.01.01.04.01.010 1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Bata (1 Pc : 6 Ps) m2 135,800.00
2.01.01.06.01.019 1 m2 Pekerjaan Pasang Pintu Teakwood Rangkap, Rangka Kayu Jati m2 1,054,400.00
2.01.01.06.01.023 1 m2 Pekerjaan Pasang Pintu Tripleks Rangkap, Rangka Kayu Kruing m2 713,200.00
2.01.01.06.03.002 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (50x100) m2 282,500.00
2.01.01.06.03.003 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Jati (60x60) m2 292,300.00
2.01.01.06.03.006 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kamper (60x60) m2 208,500.00
2.01.01.06.03.007 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (100x100) m2 140,900.00
2.01.01.06.03.008 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (50x100) m2 173,200.00
2.01.01.06.03.009 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Kruing (60x60) m2 176,600.00
2.01.01.06.03.012 1 m2 Pekerjaan Pasang Rangka Langit - Langit Kayu Meranti (60x60) m2 154,700.00
2.01.01.06.03.013 1 m' Pekerjaan Pasang Listplank Kayu Jati 3/20 m' 266,000.00
2.01.01.06.03.014 1 m' Pekerjaan Pasang Listplank Kayu Kamper 3/20 m' 161,400.00
2.01.01.06.03.015 1 m' Pekerjaan Pasang Listplank Kayu Jati 3/30 m' 269,200.00
2.01.01.06.03.016 1 m' Pekerjaan Pasang Listplank Kayu Kamper 3/30 m' 162,600.00
2.01.01.06.03.017 1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X 3/20 Cm (Double) m' 223,100.00
2.01.01.06.03.018 1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X 2/20 Cm (Double) m' 128,700.00
2.01.01.06.03.019 1 m' Pekerjaan Pasang Listplank Kayu Borneo 2 X 2/20 Cm (Double) m' 100,300.00
2.01.01.07.01.002 1 m2 Pekerjaan Pasang Atap Genteng Karang Pilang Ex. Wisma m2 131,200.00
2.01.01.07.01.022 1 m' Pekerjaan Pasang Bubungan Genteng Keramik/ Glazzur m' 211,500.00
2.01.01.07.01.023 1 m' Pekerjaan Pasang Nok Genteng Beton m' 138,000.00
2.01.01.07.01.024 1 m' Pemasangan Nok Genteng Metal m' 78,900.00
2.01.01.07.01.025 1 m' Pasang Nok Sirap m2 87,500.00
2.01.01.07.01.026 1 m' Pasang Nok Atap Seng m2 55,800.00
2.01.01.07.01.027 1 m' Pekerjaan Pasang Nok Stel Rata 0.92 M m' 68,500.00
2.01.01.07.01.028 1 m' Pekerjaan Pasang Nok Stel Rata 1.05 M m' 75,800.00
2.01.01.07.01.029 1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 0.92 M m' 132,400.00
2.01.01.07.01.030 1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 1.05 M m' 146,300.00
2.01.01.07.01.031 1 m' Pekerjaan Pemasangan Wuwung Stel Gelombang Kecil 1.08 M m' 157,200.00
2.01.01.07.01.042 1 m' Pekerjaan List Langit - Langit Kayu Profil m' 18,300.00
2.01.01.07.01.043 1 m' Pekerjaan List Langit - Langit Gypsum m' 42,800.00
2.01.01.07.02.009 Pekerjaan Pemasangan 1 Buah Bak Cuci Piring Stainless Steel Dan Buah 424,300.00
Accessories
2.01.01.07.02.010 Pekerjaan Pemasangan 1 Buah Floor Drain Buah 32,600.00
2.01.01.07.02.011 Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk 30 Buah 477,600.00
X 30 Cm, Tinggi 35 Cm
2.01.01.07.02.012 Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk. Buah 727,400.00
45 X 45 Cm, Tinggi 50 Cm
2.01.01.07.02.013 Pekerjaan Pemasangan 1 Buah Bak Kontrol Pasangan Batu Bata Uk. Buah 903,000.00
60 X 60 Cm, Tinggi 65 Cm
2.01.01.07.02.014 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1/2" m' 63,900.00
2.01.01.07.02.015 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 3/4" m' 74,400.00
2.01.01.07.02.016 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1" m' 103,700.00
2.01.01.07.02.017 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1 1/2" m' 161,600.00
2.01.01.07.02.018 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 3" m' 335,500.00
2.01.01.07.02.019 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 4" m' 479,100.00
2.01.01.07.02.020 Pekerjaan Pemasangan 1 Buah Kran Air 3/4" Atau 1/2" Buah 52,800.00
2.01.01.07.02.021 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 1/2" m' 25,000.00
2.01.01.07.02.022 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 3/4" m' 28,000.00
2.01.01.07.02.023 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 1" m' 32,300.00
2.01.01.07.02.024 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 1 1/2" m' 49,900.00
2.01.01.07.02.025 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 2" m' 74,100.00
2.01.01.07.02.026 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 2 1/2" m' 84,600.00
2.01.01.07.02.027 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 3" m' 129,100.00
2.01.01.07.02.028 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 4" m' 177,400.00
2.01.01.07.02.029 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 2" m' 44,100.00
2.01.01.07.02.030 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 3" m' 83,500.00
2.01.01.07.02.031 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 4" m' 107,200.00
2.01.01.07.03 Pekerjaan Besi & Allumunium
2.01.01.07.03.001 1 Kg Pemasangan Besi Profil IWF Kg 28,600.00
2.01.01.07.03.002 1 Kg Pemasangan Besi Siku Kg 27,000.00
2.01.01.07.03.003 1 Kg Pemasangan Besi Profil C Kg 28,600.00
2.01.01.07.03.004 100 Kg Pekerjaan Perakitan Besi Profil Kg 40,300.00
2.01.01.07.03.005 1 Cm Pekerjaan Pengelasan Dengan Las Listrik Kg 5,200.00
2.01.01.07.03.006 1 m2 Pemasangan Rangka Besi Hollow 1.40.40.2 Mm, Modul 60.120 m2 194,800.00
Dinding Partisi Penutup Kalsiboard
2.01.01.07.03.007 1 m' Pekerjaan Kusen Alluminium 4" m' 133,200.00
2.01.01.07.03.008 1 m' Pekerjaan Kusen Alluminium 3" m' 119,000.00
2.01.01.07.03.009 1 m2 Pasang Rangka Atap Galvalume Untuk Genteng Asbes/Spandex m2 235,200.00
2.01.01.07.03.020 1 m' Pekerjaan Pasang Talang Miring Seng Bjls 28 m' 205,900.00
2.01.01.07.03.021 1 m' Pekerjaan Pasang Talang 1/2 Lingkaran D-15 Cm Seng Bjls 30 m' 111,400.00
Lebar 45 Cm
2.01.01.07.03.022 1 m2 Pekerjaan Pemasangan Fitrase Ex. Corais & Aquirlda m2 151,200.00
2.01.01.07.03.023 1 m2 Pekerjaan Pemasangan Sun Screen m2 417,300.00
2.01.01.07.03.024 1 m2 Pekerjaan Pemasangan Vertical Blind Dan Venetions Blind m2 221,000.00
2.01.01.07.05.013 1 m2 Pekerjaan Pengecatan Tembok Baru 1 Lapis Plamur, 1 Lapis Cat m2 22,000.00
Dasar, 2 Lapis Cat Penutup Interior
2.01.01.07.05.014 1 m2 Pekerjaan Pengecatan Tembok Lama 1 Lapis Plamur, 1 Lapis Cat m2 16,800.00
Dasar, 2 Lapis Cat Penutup Interior
2.01.01.07.05.015 1 M2 Pengecatan Tembok Exterior m2 72,200.00
2.01.01.07.05.016 1 m2 Pekerjaan Pengerokan Karat Pada Permukaan Baja Secara m2 14,700.00
Manual
2.01.01.07.05.017 1 m2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi m2 32,100.00
2.01.01.07.05.018 1 m2 Pekerjaan Pengecatan Permukaan Baja Dengan Meni Besi Dan m2 64,900.00
Perancah
2.01.01.07.05.019 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual m2 66,700.00
4 Lapis
2.01.01.07.05.020 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual m2 152,500.00
3 Lapis
2.01.01.07.05.021 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Manual m2 35,700.00
1 Lapis Mutakhir
2.01.01.07.05.022 1 m2 Pekerjaan Pengecatan Permukaan Baja Galvanis Secara Semprot m2 184,500.00
Dengan Sistem 3 Lapis Cat Mutakhir
2.01.01.07.05.023 1 m2 Pekerjaan Pengecatan Plafond m2 27,000.00
2.01.01.07.06 Instalasi Listrik
2.01.01.07.06.001 Pemasangan 1 Titik Stop Kontak Titik 159,300.00
2.01.01.07.06.002 Pemasangan 1 Titik Lampu (Menggunakan Kabel Nya) Titik 213,800.00
2.01.01.07.06.003 Pemasangan 1 Titik Lampu (Menggunakan Kabel Nym) Titik 265,100.00
2.01.01.07.06.004 Pekerjaan Pemasangan Saklar Tunggal Per Titik Titik 42,500.00
2.01.01.07.06.005 Pekerjaan Pemasangan Saklar Ganda Per Titik Titik 48,100.00
2.01.01.07.06.006 1 Unit Pemasangan Lampu 1 x 18 Watt (Lengkap) Buah 210,300.00
2.01.01.07.06.007 1 Unit Pemasangan Lampu 1 x 36 Watt (Lengkap) Buah 326,300.00
2.01.01.07.06.008 1 Buah Pemasangan Lampu Sl 18 Watt Buah 47,900.00
2.01.01.07.06.009 1 Buah Pemasangan Lampu Sl 23 Watt Buah 55,100.00
2.01.01.07.06.010 1 Buah Pemasangan Lampu Pijar 25 Watt Buah 15,200.00
2.01.01.07.06.011 1 Buah Pemasangan Lampu Down Light + Fitting Buah 120,400.00
2.01.01.07.06.012 1 Titik Pemasangan Box Panel Titik 1,031,400.00
2.01.01.07.06.013 1 Titik Pasangan Instalasi antena TV Titik 282,400.00
2.01.02.01 H. PAVING & PERKERASAN JALAN
2.01.02.01.01 Perkerasan Paving
2.01.02.01.01.001 1 m2 Pemasangan Tegel Trotoar m2 347,900.00
2.01.02.01.01.002 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Abu-Abu Segi m2 197,700.00
Enam (K-300)
2.01.02.01.01.003 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Bewarna Segi m2 186,900.00
Enam (K-300)
2.01.02.01.01.004 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Abu - Abu m2 175,200.00
Persegi Panjang (K - 300)
2.01.02.01.01.005 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 8 Cm Bewarna m2 186,900.00
Persegi Panjang (K-300)
2.01.02.01.01.006 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu-Abu Segi m2 163,400.00
Enam (K-300)
2.01.02.01.01.007 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Bewarna Segi m2 175,200.00
Enam (K-300)
2.01.02.01.01.008 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu m2 163,400.00
Persegi Panjang (K-300)
2.01.02.01.01.009 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Bewarna m2 175,200.00
Persegi Panjang (K-300)
2.01.02.01.01.010 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu m2 136,500.00
Persegi Panjang (K-175) Untuk Jalan Lingkungan Hidup
2.01.02.01.01.011 1 m2 Pekerjaan Pemasangan Paving Stone Tebal 6 Cm Abu - Abu m2 146,700.00
Persegi Panjang (K-200) Untuk Jalan Lingkungan Hidup
2.01.02.01.01.012 1 m' Pekerjaan Pemasangan Kanstin Uk. 15.35.50 (K-300) m' 142,700.00
2.01.02.01.01.013 1 m' Pekerjaan Pemasangan Kanstin Uk. 15.25.40 (K-300) m' 129,900.00
2.01.02.01.03.004 1 M' Gorong-Gorong Pipa Beton Bertulang, Diameter 55-65 Cm m' 1,132,200.00
2.01.02.01.03.005 1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 75-85 Cm m' 2,326,600.00
2.01.02.01.03.006 1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. Dalam 95-105 Cm m' 2,925,400.00
2.01.02.01.03.007 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 20 Cm m' 273,800.00
2.01.02.01.03.008 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 25 Cm m' 300,000.00
2.01.02.01.03.009 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan Dia. Dalam 30 Cm m' 326,600.00
2.01.02.01.06.008 1 m3 Lapis Pondasi Bawah (Cement Treated Sub Base) (Ctsb) m3 835,300.00
2.01.02.01.06.009 1 m3 Lapis Pondasi Agregat Tanpa Penutup Aspal m3 538,400.00
2.01.02.01.07 Pekerjaan Pekerasan Aspal (Divisi 6)
2.01.02.01.07.001 1 Liter Lapis Resap Pengikat-Aspal Cair Liter 13,800.00
2.01.02.01.07.002 1 Liter Lapis Perekat-Aspal Cair Liter 13,500.00
2.01.02.01.07.003 1 m2 Agregat Penutup Burtu m2 23,100.00
2.01.02.01.07.004 1 m2 Agregat Penutup Burda m2 36,800.00
2.01.02.01.07.005 1 Ton Latasir Kelas A (Ss-A) Ton 1,714,100.00
2.01.02.01.07.006 1 Ton Latasir Kelas B (Ss-B) Ton 1,441,200.00
2.01.02.01.07.007 1 Ton Lataston Lapis Aus (Hrs-Wc) (Gradasi Senjang/Semi Senjang) Ton 1,584,200.00
2.01.02.01.07.008 1 Ton Lataston Lapis Aus Perata (Hrs-Wc(L)) (Gradasi Senjang/Semi Ton 1,584,200.00
Senjang)
2.01.02.01.07.009 1 Ton Lataston Lapis Pondasi (Hrs-Base) (Gradasi Senjang/Semi Ton 1,401,600.00
Senjang)
2.01.02.01.07.010 1 Ton Lataston Lapis Pondasi Perata (Hrs-Base(L)) (Gradasi Ton 1,401,600.00
Senjang/Semi Senjang)
2.01.02.01.07.011 1 Ton Laston Lapis Aus (Ac-Wc) Ton 1,375,000.00
2.01.02.01.07.012 1 Ton Laston Lapis Aus Perata (Ac-Wc(L)) Ton 1,412,100.00
2.01.02.01.07.013 1 Ton Laston Lapis Antara (Ac-Bc) Ton 1,347,000.00
2.01.02.01.07.014 1 Ton Laston Lapis Antara Perata (Ac-Bc(L)) Ton 1,347,000.00
2.01.02.01.07.015 1 Ton Laston Lapis Pondasi (Ac-Base) Ton 1,245,200.00
2.01.02.01.07.016 1 Ton Laston Lapis Pondasi Perata (Ac-Base(L)) Ton 1,245,200.00
2.01.02.01.07.017 1 m3 Campuran Aspal Dingin Untuk Pelapisan m3 2,753,700.00
2.01.02.01.07.018 1 m3 Lapis Permukaan Penetrasi Macadam m3 1,819,300.00
2.01.02.01.07.019 1 m3 Lapis Pondasi/Perata Penetrasi Macadam m3 1,925,700.00
2.01.02.01.07.020 1 Liter Lapis Resap Pengikat-Aspal Emulsi Liter 14,800.00
2.01.02.01.07.021 1 Liter Lapis Perekat-Aspal Emulsi Liter 8,800.00
2.01.02.01.07.022 1 Liter Bahan Aspal Untuk Pekerjaan Pelaburan Liter 12,900.00
2.01.02.01.07.023 1 Liter Aspal Cair Emulsi Untuk Precoated Liter 30,100.00
2.01.02.01.07.024 1 Liter Aspal Emulsi Untuk Precoated Liter 48,400.00
2.01.02.01.08 Pekerjaan Struktur (Divisi 7)
2.01.02.01.08.001 1 m3 Beton Mutu Tinggi Fc=45 Mpa m3 3,515,700.00
2.01.02.01.08.002 1 m3 Beton Mutu Tinggi Fc=35 Mpa m3 3,333,600.00
2.01.02.01.08.003 1 m3 Beton Mutu Sedang Fc=30 Mpa m3 3,324,900.00
2.01.02.01.08.004 1 m3 Beton Mutu Sedang Fc= 25 Mpa m3 2,403,000.00
2.01.02.01.08.005 1 m3 Beton Mutu Sedang Fc= 20 Mpa m3 2,319,300.00
2.01.02.01.08.006 1 m3 Beton Mutu Rendah Fc= 15 Mpa m3 1,619,800.00
2.01.02.01.08.007 1 m3 Beton Siklop Fc=15 Mpa m3 1,135,800.00
2.01.02.01.08.008 1 m3 Beton Mutu Rendah Fc= 10 Mpa m3 1,379,100.00
2.01.02.01.08.009 1 Kg Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 19,700.00
2.01.02.01.08.010 1 Kg Pemasangan Jembatan Rangka Baja Kg 1,800.00
2.01.02.01.09 Pekerjaan Pengembalian Kondisi Dan Pekerjaan Minor (Divisi 8)
2.01.02.02.04.002 Pekerjaan pemancangan 1 m panjang cerucuk bambu dia. 810 cm m' 43,400.00
2.01.02.02.04.003 Pekerjaan pemancangan 1 m pancang beton bertulang dia. 25/25 cm m' 207,200.00
2.01.02.02.04.004 Pekerjaan pemancangan 1 m pancang beton bertulang dia. 30/30 cm m' 291,300.00
2.01.02.02.04.005 Pekerjaan pemancangan 1 m pancang beton bertulang dia. 40/40 cm m' 264,700.00
2.01.02.02.04.006 1 m' Pekerjaan Pemasangan Turap Bambu tinggi 1,5 m m' 67,600.00
2.01.02.02.04.007 1 m' Pekerjaan Pemasangan Turap Bambu tinggi 2,75 m m' 124,000.00
2.01.02.02.04.008 Pengeringan/pemompaan Air per 1 jam Jam 17,900.00
2.01.02.02.04.009 1 m2 Pekerjaan Pemasangan Turap Papan tebal 3 cm m2 283,700.00
2.01.02.02.04.010 1 m3 Pekerjaan Timbunan Pasir dalam Karung m3 253,800.00
2.01.02.02.05 Pekerjaan Drainase
2.01.02.02.05.001 1 m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan m' 769,400.00
Kebocoran Pipa PVC Dia 12"
2.01.02.02.05.002 1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan m' 421,400.00
Kebocoran Pipa PVC Dia 8 "
2.01.02.02.05.003 1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan m' 301,100.00
Kebocoran Pipa PVC Dia 6 "
2.01.02.02.05.004 1m' Pekerjaan Pemasangan, Penyambungan dan Pengetesan m' 496,200.00
Kebocoran Pipa Galvanis Dia 6" untuk saluran
2.01.02.02.05.005 1 Unit Pemasangan U Ditch ukuran 400.400.1200, 60 mm dengan Unit 542,000.00
beban gandar 5 Ton
2.01.02.02.05.006 1 Unit Pemasangan U Ditch ukuran 400.500.1200, 60 mm dengan Unit 641,100.00
beban gandar 5 Ton
2.01.02.02.05.007 1 Unit Pemasangan U Ditch ukuran 400.600.1200, 60 mm dengan Unit 685,900.00
beban gandar 5 Ton
2.01.02.02.05.008 1 Unit Pemasangan U Ditch ukuran 500.500.1200, 60 mm dengan Unit 636,500.00
beban gandar 5 Ton
2.01.02.02.05.009 1 Unit Pemasangan U Ditch ukuran 500.600.1200, 60 mm dengan Unit 696,800.00
beban gandar 5 Ton
2.01.02.02.05.010 1 Unit Pemasangan U Ditch ukuran 500.700.1200, 60 mm dengan Unit 825,600.00
beban gandar 5 Ton
2.01.02.02.05.011 1 Unit Pemasangan U Ditch ukuran 600.600.1200, 60 mm dengan Unit 777,800.00
beban gandar 5 Ton
2.01.02.02.05.012 1 Unit Pemasangan U Ditch ukuran 600.700.1200, 60 mm dengan Unit 863,000.00
beban gandar 5 Ton
2.01.02.02.05.013 1 Unit Pemasangan U Ditch ukuran 600.800.1200, 60 mm dengan Unit 1,096,800.00
beban gandar 5 Ton
2.01.02.02.05.014 1 Unit Pemasangan U Ditch ukuran 800.800.1200, 80 mm dengan Unit 1,389,600.00
beban gandar 5 Ton
2.01.02.02.05.015 1 Unit Pemasangan U Ditch ukuran 800.900.1200, 100 mm dengan Unit 1,799,100.00
beban gandar 5 Ton
2.01.02.02.05.016 1 Unit Pemasangan U Ditch ukuran 800.1000.1200, 100 mm dengan Unit 2,017,500.00
beban gandar 5 Ton
2.01.02.02.05.017 1 Unit Pemasangan U Ditch ukuran 1000.1000.1200, 100 mm dengan Unit 1,986,300.00
beban gandar 5 Ton
2.01.02.02.05.018 1 Unit Pemasangan U Ditch ukuran 1000.1200.1200, 100 mm dengan Unit 2,694,600.00
beban gandar 5 Ton
2.01.02.02.05.019 1 Unit Pemasangan U Ditch ukuran 1200.1000.1200, 100 mm dengan Unit 2,692,700.00
beban gandar 5 Ton
2.01.02.02.05.020 1 Unit Pemasangan U Ditch ukuran 1200.1200.1200, 120 mm dengan Unit 3,590,400.00
beban gandar 5 Ton
2.01.02.02.05.021 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.3 m (K-175) Tebal m' 545,300.00
= 5 cm
2.01.02.02.05.022 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = 0.4 m (K-175) Tebal m' 700,900.00
= 5 cm
2.02.03.01.03.026 1 Unit Pemasangan Lampu HPS 70W/220V Lengkap Armateur, Balast Unit 1,969,800.00
& Capasitor
2.02.03.01.03.027 1 Unit Pemasangan Lampu HPS 150W/220V Lengkap Armateur, Unit 2,801,800.00
Balast, Ignitor & Capasitor
2.02.03.01.03.028 1 Unit Pemasangan Lampu HPS 250W/220V Lengkap Armateur, Unit 5,569,200.00
Balast, Ignitor & Capasitor
2.02.03.01.03.029 1 Unit Pemasangan Lampu HPS 400W/220V Lengkap Armateur, Unit 5,992,900.00
Balast, Ignitor & Capasitor
2.02.03.01.03.036 1 Unit Pemasangan Lampu Sorot HPIT MNF-300 250 W/220 V Unit 8,430,000.00
Lengkap Armateur, Ignitor, Capasitor
2.02.03.01.03.037 1 Unit Pemasangan Lampu SL 23 W Unit 253,200.00
2.02.03.01.03.038 1 Unit Pemasangan Lampu SL 18 Watt Unit 246,000.00
2.02.03.02 K. SARANA LALU LINTAS
2.02.03.02.01 Rambu - Rambu Lalu Lintas
2.02.03.02.01.001 1 m3 Pekerjaan Bekisting Pondasi Rambu Lalu Lintas m3 73,500.00
2.02.03.02.01.002 1 Unit Pekerjaan Pemotongan dan Pengeboran untuk Rambu-Rambu Unit 9,100.00
Lalu Lintas
2.02.03.02.01.003 1 Unit Pekerjaan Perakitan dan Penyetelan untuk Rambu-Rambu Lalu Unit 45,600.00
Lintas
2.02.03.02.01.004 1 Unit pengadaan angkur untuk dudukan box control Unit 599,400.00
2.02.03.02.01.005 1 Unit Ongkos Angkut ke Lokasi (Rambu, Delineator, RPPJ) Unit 18,300.00
2.02.03.02.01.006 1 Unit Ongkos Angkut ke Lokasi (Pagar Pengaman Jalan) Unit 64,200.00
2.02.03.02.01.007 1 Unit Ongkos Angkut ke Lokasi (Warning Light, Alat Pemberi Isyarat Unit 1,495,700.00
Lalu Lintas, Marka)
2.02.03.02.01.008 1 Unit Ongkos Angkut ke Lokasi (Paku Jalan) Unit 3,200.00
2.02.03.02.01.009 1 unit Pekerjaan Pengeboran dan Pemasangan Paku Jalan m' 36,000.00
2.02.03.02.01.010 1 unit Pekerjaan Pengeboran dan Pemasangan Paku Jalan Bulat Unit 50,400.00
(Tempered)
2.02.03.02.01.011 1 m' Penggelaran Kabel m' 5,000.00
2.02.03.02.01.012 1 m Pemasangan Pipa PVC untuk Alat Pemberi Isyarat Lalu Lintas m' 3,800.00
2.02.03.02.01.027 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 60 x 60 cm Unit 1,168,200.00
2.02.03.02.01.028 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 75 x 75 cm Unit 1,662,700.00
2.02.03.02.01.030 1 Unit Pengadaan dan Pemasangan Pagar Pengaman Jalan 4 m Unit 8,081,300.00
(Terminal End Masuk Kedalam Tanah)
2.02.03.02.01.031 1 Unit Pengadaan dan Pemasangan Pagar Pengaman Jalan 4 m Unit 6,344,700.00
(Terminal End Lengkung)
2.02.03.02.01.032 1 Unit Pengadaan dan Pemasangan Paku Jalan Ukuran 10 x 10 x 2 cm Unit 312,700.00
2.02.03.02.01.033 1 Unit Pengadaan dan Pemasangan Paku Jalan Ukuran 10 x 12 x 2 cm Unit 347,800.00
2.02.03.02.01.034 1 Unit Pengadaan dan Pemasangan Paku Jalan Bulat (Tempered) Unit 364,500.00
2.02.03.02.01.035 1 Unit Pengadaan dan Pemasangan Patok Tikungan Pipa Plastik Unit 823,200.00
2.02.03.02.01.036 1 Unit Pengadaan dan Pemasangan Patok Tikungan Pipa Besi Unit 685,000.00
2.02.03.02.01.037 1 Unit Pengadaan dan Pemasangan Cermin Tikungan Unit 5,769,400.00
2.02.03.02.01.038 1 Unit Pengadaan dan Pemasangan RPPJ 120 x 180 (Overhead) Unit 16,649,900.00
2.02.03.02.01.039 1 Unit Pengadaan dan Pemasangan RPPJ 120 x 240 (Overhead) Unit 17,307,200.00
2.02.03.02.01.040 1 Unit Pengadaan dan Pemasangan RPPJ Portal Bentang 9 m' s/d 11 Unit 51,634,800.00
m'
2.02.03.02.01.041 1 Unit Pengadaan dan Pemasangan RPPJ Portal Bentang 18 m' Unit 146,484,200.00
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
1 2 3 4
2.03 HSPK NON FISIK
2.03.01 Harga Satuan Pokok Pekerjaan Non Fisik
2.03.01.01.05.001 Perlengkapan Dekorasi dan Sound System Tipe I Per Hari 7,932,300.00
2.03.01.01.05.002 Perlengkapan Dekorasi dan Sound System Tipe II Per Hari 21,136,800.00
2.03.01.01.05.003 Perlengkapan Dekorasi dan Sound System Tipe III Per Hari 28,539,400.00
2.03.01.01.05.004 Perlengkapan Dekorasi dan Sound System Tipe IV Per Hari 37,020,800.00
2.03.01.01.06 Publikasi
2.03.01.01.06.001 Publikasi Tipe I Per Keg 1,245,278.00
2.03.01.01.06.002 Publikasi Tipe II Per Keg 4,133,430.00
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
2.01.01.01.01.002 1 m' Pembuatan Pagar Sementara Seng m' Nilai HSPK 638,900.00
Gelombang Tinggi 2 M (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.4000 O.H 110,000.00 44,000.00
1.11.29.01.01.002.014 Pekerja 0.2000 O.H 90,000.00 18,000.00
1.08.23.01.05.002.049 Dolken Kayu Gelam 8-10/400 Cm 1.2500 Batang 23,900.00 29,875.00
1.08.23.01.01.002.001 Semen Portland 0.0625 Zak 77,500.00 4,843.75
1.08.23.01.01.007.004 Seng Gelombang 1.2000 Lembar 78,950.00 94,740.00
1.08.23.01.01.004.001 Pasir Beton 0.0050 m3 257,650.00 1,288.25
1.08.23.01.01.005.009 Kerikil Beton 0.0090 m3 245,400.00 2,208.60
1.08.23.01.05.002.035 Kayu Meranti 5/7 0.0720 m3 5,740,300.00 413,301.60
1.08.23.01.01.026.017 Paku Biasa 2" - 5" 0.0600 Kg 21,000.00 1,260.00
1.08.23.01.01.006.006 Meni Besi 0.4500 Kg 54,250.00 24,412.50
2.01.01.01.01.003 1 m' Pembuatan Pagar Sementara Kawat Duri m' Nilai HSPK 141,800.00
Tinggi 1,8 M (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.3000 O.H 110,000.00 33,000.00
1.11.29.01.01.002.014 Pekerja 0.2000 O.H 90,000.00 18,000.00
1.08.23.01.05.002.049 Dolken Kayu Gelam 8-10/400 Cm 1.0000 Batang 23,900.00 23,900.00
1.08.23.01.01.002.001 Semen Portland 0.0500 Zak 77,500.00 3,875.00
1.08.23.01.01.019.014 Kawat Berduri 50 M 0.5000 Roll 106,600.00 53,300.00
1.08.23.01.01.004.001 Pasir Beton 0.0050 m3 257,650.00 1,288.25
1.08.23.01.01.005.009 Koral Beton 0.0090 m3 245,400.00 2,208.60
1.08.23.01.01.026.017 Paku Biasa 2" - 5" 0.0600 Kg 21,000.00 1,260.00
2.01.01.01.01.004 1 m' Pengukuran Dan Pemasangan Bowplank m' Nilai HSPK 82,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.003 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.002 Tukang Kayu 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.05.002.046 Kayu Sengon Papan 0.0070 m3 3,174,050.00 22,218.35
1.08.23.01.05.002.046 Kayu Sengon 5/7 0.0120 m3 3,174,050.00 38,088.60
1.08.23.01.01.026.017 Paku Biasa 2" - 5" 0.0200 Kg 21,000.00 420.00
2.01.01.02.01.011 1 m' Pekerjaan Pembuatan Lubang Strouss Pile Titik Nilai HSPK 42,900.00
Diameter 20 cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.014 Pekerja 0.4000 O.H 90,000.00 36,000.00
1.09.27.01.01.999.001 Sewa Alat Bantu Strouss Pile 0.4000 jam 10,650.00 4,260.00
2.01.01.02.01.012 1 m' Pekerjaan Pembuatan Lubang Strouss Pile Titik Nilai HSPK 50,600.00
Diameter 30 cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0240 O.H 130,000.00 3,120.00
1.11.29.01.01.002.014 Pekerja 0.4800 O.H 90,000.00 43,200.00
1.09.27.01.01.999.001 Sewa Alat Bantu Strouss Pile 0.4000 jam 10,650.00 4,260.00
2.01.01.03.01.023 1 m' Membuat Kolom Praktis Beton Bertulang m' Nilai HSPK 83,400.00
(11 X 11) Cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0030 O.H 130,000.00 390.00
1.11.29.01.01.001.005 Kepala Tukang 0.0060 O.H 120,000.00 720.00
1.11.29.01.01.002.007 Tukang Besi 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.002 Tukang Kayu 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.004 Tukang Batu 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.014 Pekerja 0.0600 O.H 90,000.00 5,400.00
1.08.23.01.05.002.045 Kayu Bekisting Meranti 0.0020 m3 5,811,950.00 11,623.90
1.08.23.01.01.026.017 Paku Biasa 2" - 5" 0.0100 Kg 21,000.00 210.00
1.08.23.01.01.012.006 Besi Beton Polos 3.0000 Kg 13,050.00 39,150.00
1.08.23.01.01.019.017 Kawat Beton 0.0180 Roll 432,250.00 7,780.50
1.08.23.01.01.002.001 Semen Portland 0.1000 Zak 77,500.00 7,750.00
1.08.23.01.01.004.001 Pasir Beton 0.0060 m3 257,650.00 1,545.90
1.08.23.01.01.005.009 Kerikil 0.0090 m3 245,400.00 2,208.60
2.01.01.03.01.024 1 m' Membuat Ring Balok Beton Bertulang (10 X m' Nilai HSPK 123,100.00
15) Cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0150 O.H 130,000.00 1,950.00
1.11.29.01.01.001.005 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.002 Tukang Kayu 0.0330 O.H 110,000.00 3,630.00
1.11.29.01.01.002.004 Tukang Batu 0.0330 O.H 110,000.00 3,630.00
1.11.29.01.01.002.007 Tukang Besi 0.0330 O.H 110,000.00 3,630.00
1.11.29.01.01.002.014 Pekerja 0.2970 O.H 90,000.00 26,730.00
1.08.23.01.05.002.045 Kayu Bekisting Meranti 0.0030 m3 5,811,950.00 17,435.85
1.08.23.01.01.026.017 Paku Biasa 2" - 5" 0.0200 Kg 21,000.00 420.00
1.08.23.01.01.012.006 Besi Beton Polos 3.6000 Kg 13,050.00 46,980.00
1.08.23.01.01.019.017 Kawat Beton 0.0020 Roll 432,250.00 864.50
1.08.23.01.01.002.001 Semen Portland 0.1375 Zak 77,500.00 10,656.25
1.08.23.01.01.004.001 Pasir Beton 0.0090 m3 257,650.00 2,318.85
1.08.23.01.01.005.009 Kerikil 0.0150 m3 245,400.00 3,681.00
2.01.01.04.01.002 1 m2 Pekerjaan Pemasangan Batu Merah Tbl 1/2 m2 Nilai HSPK 153,700.00
Bata (1 Pc : 2 Ps) (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0150 O.H 130,000.00 1,950.00
1.11.29.01.01.001.005 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.004 Tukang Batu 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja 0.3000 O.H 90,000.00 27,000.00
1.08.23.01.01.002.001 Semen Portland 0.4738 Zak 77,500.00 36,719.50
1.08.23.01.01.004.002 Pasir Pasang 0.0380 m3 244,750.00 9,300.50
1.08.23.01.01.005.010 Bata Merah Uk.5 X 11 X 22 70.0000 buah 950.00 66,500.00
2.01.01.04.02.014 1 m' Pekerjaan Plesteran Skoning 1Pc : 3Ps Lebar m' Nilai HSPK 60,700.00
10 Cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0040 O.H 130,000.00 520.00
1.11.29.01.01.001.005 Kepala Tukang 0.0400 O.H 120,000.00 4,800.00
1.11.29.01.01.002.004 Tukang Batu 0.4000 O.H 110,000.00 44,000.00
1.11.29.01.01.002.014 Pekerja 0.0800 O.H 90,000.00 7,200.00
1.08.23.01.01.002.001 Semen Portland 0.0125 Zak 77,500.00 968.75
1.08.23.01.01.004.002 Pasir Pasang 0.0130 m3 244,750.00 3,181.75
2.01.01.04.02.019 1 m2 Pekerjaan Finishing Siar Pasangan Batu Kali m2 Nilai HSPK 62,500.00
Adukan 1 Pc : 2 Ps (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0150 O.H 130,000.00 1,950.00
1.11.29.01.01.001.005 Kepala Tukang 0.0150 O.H 120,000.00 1,800.00
1.11.29.01.01.002.004 Tukang Batu 0.1500 O.H 110,000.00 16,500.00
1.11.29.01.01.002.014 Pekerja 0.3000 O.H 90,000.00 27,000.00
1.08.23.01.01.002.001 Semen Portland 0.1585 Zak 77,500.00 12,283.75
1.08.23.01.01.004.002 Pasir Pasang 0.0120 m3 244,750.00 2,937.00
2.01.01.05.02.007 1 m' Pekerjaan Pasangan Plint Keramik 7X20 Cm m' Nilai HSPK 50,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.005 Kepala Tukang 0.0090 Kg 120,000.00 1,080.00
1.11.29.01.01.002.004 Tukang Batu 0.0900 O.H 110,000.00 9,900.00
1.11.29.01.01.002.014 Pekerja 0.0900 O.H 90,000.00 8,100.00
1.08.23.01.01.002.001 Semen Portland 0.0285 Zak 77,500.00 2,208.75
1.08.23.01.01.002.007 Semen Warna 0.0250 Kg 14,900.00 372.50
1.08.23.01.01.004.002 Pasir Pasang 0.0030 m3 244,750.00 734.25
1.08.23.01.01.013.028 Plint Keramik 7X20 Cm 5.3000 buah 5,200.00 27,560.00
2.01.01.05.02.008 1 m' Pekerjaan Pasangan Plint Keramik 10X10 Cm m' Nilai HSPK 38,800.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.005 Kepala Tukang 0.0090 Kg 120,000.00 1,080.00
1.11.29.01.01.002.004 Tukang Batu 0.0900 O.H 110,000.00 9,900.00
1.11.29.01.01.002.014 Pekerja 0.0900 O.H 90,000.00 8,100.00
1.08.23.01.01.002.001 Semen Portland 0.0285 Zak 77,500.00 2,208.75
1.08.23.01.01.002.007 Semen Warna 0.0500 Kg 14,900.00 745.00
1.08.23.01.01.004.002 Pasir Pasang 0.0030 m3 244,750.00 734.25
1.08.23.01.01.013.032 Plint Keramik 10X10 Cm 10.6000 buah 1,450.00 15,370.00
2.01.01.05.02.009 1 m' Pekerjaan Pasangan Plint Keramik 5X20 Cm m' Nilai HSPK 64,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.005 Kepala Tukang 0.0090 Kg 120,000.00 1,080.00
1.11.29.01.01.002.004 Tukang Batu 0.0900 O.H 110,000.00 9,900.00
1.11.29.01.01.002.014 Pekerja 0.0900 O.H 90,000.00 8,100.00
1.08.23.01.01.013.025 Plint Keramik 5X20 Cm 5.3000 buah 8,150.00 43,195.00
1.08.23.01.01.002.001 Semen Portland 0.0143 Zak 77,500.00 1,108.25
1.08.23.01.01.004.002 Pasir Pasang 0.0015 m3 244,750.00 367.13
1.08.23.01.01.002.007 Semen Warna 0.0130 Kg 14,900.00 193.70
2.01.01.05.02.010 1 m' Pekerjaan Pasangan Plint Marmer Tinggi 10 m' Nilai HSPK 218,700.00
Cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0420 O.H 130,000.00 5,460.00
1.11.29.01.01.001.005 Kepala Tukang 0.0420 Kg 120,000.00 5,040.00
1.11.29.01.01.002.004 Tukang Batu 0.4200 O.H 110,000.00 46,200.00
1.11.29.01.01.002.014 Pekerja 0.8400 O.H 90,000.00 75,600.00
1.08.23.01.01.002.001 Semen Portland 0.4213 Zak 77,500.00 32,650.75
1.08.23.01.01.004.002 Pasir Pasang 0.0320 m3 244,750.00 7,832.00
1.08.23.01.01.002.007 Semen Warna 1.3000 Kg 14,900.00 19,370.00
1.08.23.01.01.013.046 Plint Marmer 0.1100 m2 241,550.00 26,570.50
2.01.01.06.01.003 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Kruing m3 Nilai HSPK 12,576,800.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.3500 O.H 130,000.00 45,500.00
1.11.29.01.01.001.003 Kepala Tukang 2.1000 O.H 120,000.00 252,000.00
1.11.29.01.01.002.002 Tukang Kayu 21.0000 O.H 110,000.00 2,310,000.00
1.11.29.01.01.002.014 Pekerja 7.0000 O.H 90,000.00 630,000.00
1.08.23.01.05.002.020 Kayu Kruing Balok 1.1000 m3 8,437,000.00 9,280,700.00
1.08.23.01.01.026.017 Paku Biasa 1.2500 kg 21,000.00 26,250.00
1.08.23.01.01.043.013 Lem Kayu 1.0000 kg 32,300.00 32,300.00
2.01.01.06.01.004 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Jati m2 Nilai HSPK 1,014,100.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0180 O.H 130,000.00 2,340.00
1.11.29.01.01.001.003 Kepala Tukang 0.1050 O.H 120,000.00 12,600.00
1.11.29.01.01.002.002 Tukang Kayu 1.0500 O.H 110,000.00 115,500.00
1.11.29.01.01.002.014 Pekerja 0.3500 O.H 90,000.00 31,500.00
1.08.23.01.05.002.001 Kayu Jati Papan 0.0400 m3 21,278,100.00 851,124.00
1.08.23.01.01.026.017 Paku Biasa 0.0500 kg 21,000.00 1,050.00
2.01.01.06.01.006 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Kruing m2 Nilai HSPK 549,400.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0180 O.H 130,000.00 2,340.00
1.11.29.01.01.001.003 Kepala Tukang 0.1050 O.H 120,000.00 12,600.00
1.11.29.01.01.002.002 Tukang Kayu 1.0500 O.H 110,000.00 115,500.00
1.11.29.01.01.002.014 Pekerja 0.3500 O.H 90,000.00 31,500.00
1.08.23.01.05.002.022 Kayu Kruing Papan 0.0400 m3 9,660,650.00 386,426.00
1.08.23.01.01.026.017 Paku Biasa 0.0500 kg 21,000.00 1,050.00
2.01.01.06.01.007 1 m2 Pekerjaan Pasang Daun Pintu Panil Kayu m2 Nilai HSPK 1,329,800.00
Jati (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0500 O.H 130,000.00 6,500.00
1.11.29.01.01.001.003 Kepala Tukang 0.3000 O.H 120,000.00 36,000.00
1.11.29.01.01.002.002 Tukang Kayu 3.0000 O.H 110,000.00 330,000.00
1.11.29.01.01.002.014 Pekerja 1.0000 O.H 90,000.00 90,000.00
1.08.23.01.05.002.001 Kayu Jati Papan 0.0400 m3 21,278,100.00 851,124.00
1.08.23.01.01.043.013 Lem Kayu 0.5000 kg 32,300.00 16,150.00
2.01.01.06.01.009 1 m2 Pekerjaan Pasang Pintu Panil Kayu Kruing m2 Nilai HSPK 865,100.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0500 O.H 130,000.00 6,500.00
1.11.29.01.01.001.003 Kepala Tukang 0.3000 O.H 120,000.00 36,000.00
1.11.29.01.01.002.002 Tukang Kayu 3.0000 O.H 110,000.00 330,000.00
1.11.29.01.01.002.014 Pekerja 1.0000 O.H 90,000.00 90,000.00
1.08.23.01.05.002.022 Kayu Kruing Papan 0.0400 m3 9,660,650.00 386,426.00
1.08.23.01.01.043.013 Lem Kayu 0.5000 kg 32,300.00 16,150.00
2.01.01.06.01.010 1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu m2 Nilai HSPK 890,400.00
Jati (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0400 O.H 130,000.00 5,200.00
1.11.29.01.01.001.003 Kepala Tukang 0.2400 O.H 120,000.00 28,800.00
1.11.29.01.01.002.002 Tukang Kayu 2.4000 O.H 110,000.00 264,000.00
1.11.29.01.01.002.014 Pekerja 0.8000 O.H 90,000.00 72,000.00
1.08.23.01.05.002.001 Kayu Jati Papan 0.0240 m3 21,278,100.00 510,674.40
1.08.23.01.01.043.013 Lem Kayu 0.3000 kg 32,300.00 9,690.00
2.01.01.06.01.011 1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu m2 Nilai HSPK 657,900.00
Kamper (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0400 O.H 130,000.00 5,200.00
1.11.29.01.01.001.003 Kepala Tukang 0.2400 O.H 120,000.00 28,800.00
1.11.29.01.01.002.002 Tukang Kayu 2.4000 O.H 110,000.00 264,000.00
1.11.29.01.01.002.014 Pekerja 0.8000 O.H 90,000.00 72,000.00
1.08.23.01.05.002.011 Kayu Kamper Papan 0.0240 m3 11,592,800.00 278,227.20
1.08.23.01.01.043.013 Lem Kayu 0.3000 kg 32,300.00 9,690.00
2.01.01.06.01.012 1 m2 Pekerjaan Pasang Pintu/ Jendela Kaca Kayu m2 Nilai HSPK 611,500.00
Kruing (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0400 O.H 130,000.00 5,200.00
1.11.29.01.01.001.003 Kepala Tukang 0.2400 O.H 120,000.00 28,800.00
1.11.29.01.01.002.002 Tukang Kayu 2.4000 O.H 110,000.00 264,000.00
1.11.29.01.01.002.014 Pekerja 0.8000 O.H 90,000.00 72,000.00
1.08.23.01.05.002.022 Kayu Kruing Papan 0.0240 m3 9,660,650.00 231,855.60
1.08.23.01.01.043.013 Lem Kayu 0.3000 kg 32,300.00 9,690.00
2.01.01.06.03.013 1 m' Pekerjaan Pasang Listplank Kayu Jati 3/20 m' Nilai HSPK 266,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.05.002.001 Kayu Jati Papan 0.0108 m3 21,278,100.00 229,803.48
1.08.23.01.01.026.017 Paku Biasa 0.1000 Kg 21,000.00 2,100.00
2.01.01.06.03.014 1 m' Pekerjaan Pasang Listplank Kayu Kamper m' Nilai HSPK 161,400.00
3/20 (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.05.002.011 Kayu Kamper Papan 0.0108 m3 11,592,800.00 125,202.24
1.08.23.01.01.026.017 Paku Biasa 0.1000 Kg 21,000.00 2,100.00
2.01.01.06.03.015 1 m' Pekerjaan Pasang Listplank Kayu Jati 3/30 m' Nilai HSPK 269,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.05.002.001 Kayu Jati Papan 0.0110 m3 21,278,100.00 234,059.10
1.08.23.01.01.026.017 Paku Biasa 0.0500 Kg 21,000.00 1,050.00
2.01.01.06.03.016 1 m' Pekerjaan Pasang Listplank Kayu Kamper m' Nilai HSPK 162,600.00
3/30 (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.05.002.011 Kayu Kamper Papan 0.0110 m3 11,592,800.00 127,520.80
1.08.23.01.01.026.017 Paku Biasa 0.0500 Kg 21,000.00 1,050.00
2.01.01.06.03.017 1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X m' Nilai HSPK 223,100.00
3/20 Cm (Double) (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0750 O.H 130,000.00 9,750.00
1.11.29.01.01.001.003 Kepala Tukang 0.0250 O.H 120,000.00 3,000.00
1.11.29.01.01.002.002 Tukang Kayu 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja 0.1500 O.H 90,000.00 13,500.00
1.08.23.01.05.002.011 Kayu Kamper Papan 0.0145 m3 11,592,800.00 168,095.60
1.08.23.01.01.026.017 Paku Biasa 0.0600 Kg 21,000.00 1,260.00
2.01.01.06.03.018 1 m' Pekerjaan Pasang Listplank Kayu Kamper 2 X m' Nilai HSPK 128,700.00
2/20 Cm (Double) (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0500 O.H 130,000.00 6,500.00
1.11.29.01.01.001.003 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.002 Tukang Kayu 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.05.002.011 Kayu Kamper Papan 0.0086 m3 11,592,800.00 99,698.08
1.08.23.01.01.026.017 Paku Biasa 0.0600 Kg 21,000.00 1,260.00
2.01.01.07.01.003 1 m2 Pekerjaan Pasang Atap Genteng Kodok Ex. m2 Nilai HSPK 97,500.00
Trenggalek (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0080 O.H 130,000.00 1,040.00
1.11.29.01.01.001.003 Kepala Tukang 0.0080 O.H 120,000.00 960.00
1.11.29.01.01.002.002 Tukang Kayu 0.0750 O.H 110,000.00 8,250.00
1.11.29.01.01.002.014 Pekerja 0.1500 O.H 90,000.00 13,500.00
1.08.23.01.01.014.021 Genteng Kodok Ex. Trenggalek 25.0000 Buah 2,950.00 73,750.00
2.01.01.07.01.004 1 m2 Pekerjaan Pasang Atap Genteng Kodok Ex. m2 Nilai HSPK 102,500.00
Nglayur (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0080 O.H 130,000.00 1,040.00
1.11.29.01.01.001.003 Kepala Tukang 0.0080 O.H 120,000.00 960.00
1.11.29.01.01.002.002 Tukang Kayu 0.0750 O.H 110,000.00 8,250.00
1.11.29.01.01.002.014 Pekerja 0.1500 O.H 90,000.00 13,500.00
1.08.23.01.01.014.023 Genteng Kodok Ex. Nglayur 25.0000 Buah 3,150.00 78,750.00
2.01.01.07.01.010 1 m2 Pekerjaan Pasang Atap Roof Light Fiber m2 Nilai HSPK 63,300.00
Glass (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0070 O.H 130,000.00 910.00
1.11.29.01.01.001.003 Kepala Tukang 0.0070 O.H 120,000.00 840.00
1.11.29.01.01.002.002 Tukang Kayu 0.0670 O.H 110,000.00 7,370.00
1.11.29.01.01.002.014 Pekerja 0.1400 O.H 90,000.00 12,600.00
1.08.23.01.01.025.004 Roof Light Fiber Glass 0.6000 Lembar 67,550.00 40,530.00
1.08.23.01.01.026.017 Paku Biasa 0.0500 Kg 21,000.00 1,050.00
2.01.01.07.01.019 1 m' Pekerjaan Pasang Wuwung Genteng m' Nilai HSPK 168,000.00
Palentong (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0020 O.H 130,000.00 260.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.4000 O.H 90,000.00 36,000.00
1.08.23.01.01.002.001 Semen Portland 0.2000 Zak 77,500.00 15,500.00
1.08.23.01.01.004.002 Pasir Pasang 0.0320 m3 244,750.00 7,832.00
1.08.23.01.01.014.003 Wuwung Genteng Palentong 5.0000 Buah 16,800.00 84,000.00
2.01.01.07.01.020 1 m' Pekerjaan Pasang Wuwung Genteng Kodok m' Nilai HSPK 167,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0020 O.H 130,000.00 260.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.4000 O.H 90,000.00 36,000.00
1.08.23.01.01.002.001 Semen Portland 0.2000 Zak 77,500.00 15,500.00
1.08.23.01.01.004.002 Pasir Pasang 0.0320 m3 244,750.00 7,832.00
1.08.23.01.01.014.001 Wuwung Kodok Genteng 5.0000 Buah 16,600.00 83,000.00
2.01.01.07.01.021 1 m' Pekerjaan Pasang Wuwung Genteng Karang m' Nilai HSPK 124,700.00
Pilang Ex. Nglayur (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0020 O.H 130,000.00 260.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.4000 O.H 90,000.00 36,000.00
1.08.23.01.01.002.001 Semen Portland 0.2000 Zak 77,500.00 15,500.00
1.08.23.01.01.004.002 Pasir Pasang 0.0320 m3 244,750.00 7,832.00
1.08.23.01.01.014.004 Wuwung Karang Pilang Ex. Nglayur 5.0000 Buah 8,150.00 40,750.00
2.01.01.07.01.023 1 m' Pekerjaan Pasang Nok Genteng Beton m' Nilai HSPK 138,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.4000 O.H 90,000.00 36,000.00
1.08.23.01.01.014.009 Nok Genteng Beton 3.5000 Buah 8,650.00 30,275.00
1.08.23.01.01.026.017 Paku Biasa 0.0500 Kg 21,000.00 1,050.00
1.08.23.01.01.002.001 Semen Portland 0.2700 Zak 77,500.00 20,925.00
1.08.23.01.01.004.002 Pasir Pasang 0.0320 m3 244,750.00 7,832.00
1.08.23.01.01.002.007 Semen Warna 1.0000 Kg 14,900.00 14,900.00
2.01.01.07.01.024 1 m' Pemasangan Nok Genteng Metal m' Nilai HSPK 78,900.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0130 O.H 130,000.00 1,690.00
1.11.29.01.01.001.003 Kepala Tukang 0.0150 O.H 120,000.00 1,800.00
1.11.29.01.01.002.002 Tukang Kayu 0.1500 O.H 110,000.00 16,500.00
1.11.29.01.01.002.014 Pekerja 0.2500 O.H 90,000.00 22,500.00
1.08.23.01.01.014.039 Nok Genteng Metal 1.1000 Buah 32,100.00 35,310.00
1.08.23.01.01.026.017 Paku Biasa 0.0500 kg 21,000.00 1,050.00
2.01.01.07.01.027 1 m' Pekerjaan Pasang Nok Stel Rata 0.92 M m' Nilai HSPK 68,500.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0040 O.H 130,000.00 520.00
1.11.29.01.01.001.003 Kepala Tukang 0.0130 O.H 120,000.00 1,560.00
1.11.29.01.01.002.002 Tukang Kayu 0.1500 O.H 110,000.00 16,500.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.01.022.027 Nok Stel Seng 92 Cm 1.1000 Lembar 36,500.00 40,150.00
1.08.23.01.01.026.021 Paku Skrup 0.0240 Buah 32,300.00 775.20
2.01.01.07.01.028 1 m' Pekerjaan Pasang Nok Stel Rata 1.05 M m' Nilai HSPK 75,800.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0040 O.H 130,000.00 520.00
1.11.29.01.01.001.003 Kepala Tukang 0.0130 O.H 120,000.00 1,560.00
1.11.29.01.01.002.002 Tukang Kayu 0.1250 O.H 110,000.00 13,750.00
1.11.29.01.01.002.014 Pekerja 0.0840 O.H 90,000.00 7,560.00
1.08.23.01.01.022.028 Nok Stel Seng 105 Cm 1.1000 Lembar 46,950.00 51,645.00
1.08.23.01.01.026.021 Paku Skrup 0.0240 Buah 32,300.00 775.20
2.01.01.07.01.030 1 m' Pekerjaan Pemasangan Wuwung Stel m' Nilai HSPK 146,300.00
Gelombang Kecil 1.05 M (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0040 O.H 130,000.00 520.00
1.11.29.01.01.001.003 Kepala Tukang 0.0130 O.H 120,000.00 1,560.00
1.11.29.01.01.002.002 Tukang Kayu 0.1250 O.H 110,000.00 13,750.00
1.11.29.01.01.002.014 Pekerja 0.0840 O.H 90,000.00 7,560.00
1.08.23.01.01.022.030 Wuwung Stel Gelombang 1.05 2.1000 Lembar 58,150.00 122,115.00
1.08.23.01.01.026.021 Paku Skrup 0.0240 Buah 32,300.00 775.20
2.01.01.07.01.031 1 m' Pekerjaan Pemasangan Wuwung Stel m' Nilai HSPK 157,200.00
Gelombang Kecil 1.08 M (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0040 O.H 130,000.00 520.00
1.11.29.01.01.001.003 Kepala Tukang 0.0130 O.H 120,000.00 1,560.00
1.11.29.01.01.002.002 Tukang Kayu 0.1250 O.H 110,000.00 13,750.00
1.11.29.01.01.002.014 Pekerja 0.0840 O.H 90,000.00 7,560.00
1.08.23.01.01.022.031 Wuwung Stel Gelombang 1.08 2.0500 Lembar 64,900.00 133,045.00
1.08.23.01.01.026.021 Paku Skrup 0.0240 Buah 32,300.00 775.20
2.01.01.07.01.042 1 m' Pekerjaan List Langit - Langit Kayu Profil m' Nilai HSPK 18,300.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0030 O.H 130,000.00 390.00
1.11.29.01.01.001.003 Kepala Tukang 0.0050 O.H 120,000.00 600.00
1.11.29.01.01.002.002 Tukang Kayu 0.0500 O.H 110,000.00 5,500.00
1.11.29.01.01.002.014 Pekerja 0.0500 O.H 90,000.00 4,500.00
1.08.23.01.05.002.055 List Kayu Profil 0.5250 Lonjor 13,550.00 7,113.75
1.08.23.01.01.026.017 Paku Biasa 0.0100 Kg 21,000.00 210.00
2.01.01.07.02 Sanitair
2.01.01.07.02.001 Pekerjaan Pemasangan 1 Buah Kloset Duduk Buah Nilai HSPK 2,150,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1600 O.H 130,000.00 20,800.00
1.11.29.01.01.001.005 Kepala Tukang 0.0010 O.H 120,000.00 120.00
1.11.29.01.01.002.004 Tukang Batu 1.1000 O.H 110,000.00 121,000.00
1.11.29.01.01.002.014 Pekerja 3.3000 O.H 90,000.00 297,000.00
1.08.23.01.01.028.003 Kloset Duduk Setara Ina Komplit 1.0000 Buah 1,614,450.00 1,614,450.00
1.08.23.01.01.028.003 Peralatan (6% Dari Harga Bahan) 0.0600 Set 1,614,450.00 96,867.00
2.01.01.07.02.002 Pekerjaan Pemasangan 1 Buah Kloset Jongkok Buah Nilai HSPK 663,600.00
Porselen (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1600 O.H 130,000.00 20,800.00
1.11.29.01.01.001.005 Kepala Tukang 1.5000 O.H 120,000.00 180,000.00
1.11.29.01.01.002.004 Tukang Batu 1.5000 O.H 110,000.00 165,000.00
1.11.29.01.01.002.014 Pekerja 1.0000 O.H 90,000.00 90,000.00
1.08.23.01.01.028.010 Kloset Jongkok Porselen 1.0000 Buah 193,750.00 193,750.00
1.08.23.01.01.002.001 Semen Portland 0.1500 Zak 77,500.00 11,625.00
1.08.23.01.01.004.002 Pasir Pasang 0.0100 m3 244,750.00 2,447.50
2.01.01.07.02.003 Pekerjaan Pemasangan 1 Buah Kloset Jongkok Buah Nilai HSPK 474,600.00
Teraso (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1100 O.H 130,000.00 14,300.00
1.11.29.01.01.001.005 Kepala Tukang 0.3000 O.H 120,000.00 36,000.00
1.11.29.01.01.002.004 Tukang Batu 1.5000 O.H 110,000.00 165,000.00
1.11.29.01.01.002.014 Pekerja 1.0000 O.H 90,000.00 90,000.00
1.08.23.01.01.028.011 Kloset Jongkok Teraso 1.0000 Buah 148,550.00 148,550.00
1.08.23.01.01.005.010 Batu Bata 7.0000 Buah 950.00 6,650.00
1.08.23.01.01.002.001 Semen Portland 0.1500 Zak 77,500.00 11,625.00
1.08.23.01.01.004.002 Pasir Pasang 0.0100 m3 244,750.00 2,447.50
2.01.01.07.02.007 Pekerjaan Pemasangan 1 Buah Bak Mandi Teraso Buah Nilai HSPK 608,300.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1100 O.H 130,000.00 14,300.00
1.11.29.01.01.001.005 Kepala Tukang 0.0700 O.H 120,000.00 8,400.00
1.11.29.01.01.002.004 Tukang Batu 0.7500 O.H 110,000.00 82,500.00
1.11.29.01.01.002.014 Pekerja 2.1000 O.H 90,000.00 189,000.00
1.08.23.01.01.999.007 Bak Teraso 1.0000 buah 300,000.00 300,000.00
1.08.23.01.01.002.001 Semen Portland 0.1500 Zak 77,500.00 11,625.00
1.08.23.01.01.004.002 Pasir Pasang 0.0100 m3 244,750.00 2,447.50
2.01.01.07.02.008 Pekerjaan Pemasangan 1 Buah Bak Mandi Batu Buah Nilai HSPK 2,004,800.00
Bata Volume 0.3 m3 (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.3000 O.H 130,000.00 39,000.00
1.11.29.01.01.001.005 Kepala Tukang 0.3000 O.H 120,000.00 36,000.00
1.11.29.01.01.002.004 Tukang Batu 3.0000 O.H 110,000.00 330,000.00
1.11.29.01.01.002.014 Pekerja 6.0000 O.H 90,000.00 540,000.00
1.08.23.01.01.005.010 Batu Bata 150.0000 buah 950.00 142,500.00
1.08.23.01.01.002.001 Semen Portland 3.0000 Zak 77,500.00 232,500.00
1.08.23.01.01.004.002 Pasir Pasang 0.3000 m3 244,750.00 73,425.00
1.08.23.01.01.013.032 Keramik Porselen 360.0000 Buah 1,450.00 522,000.00
1.08.23.01.01.002.007 Semen Warna 6.0000 kg 14,900.00 89,400.00
2.01.01.07.02.009 Pekerjaan Pemasangan 1 Buah Bak Cuci Piring Buah Nilai HSPK 424,300.00
Stainless Steel Dan Accessories (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0150 O.H 130,000.00 1,950.00
1.11.29.01.01.001.005 Kepala Tukang 0.0300 O.H 120,000.00 3,600.00
1.11.29.01.01.002.004 Tukang Batu 0.3000 O.H 110,000.00 33,000.00
1.11.29.01.01.002.014 Pekerja 0.0300 O.H 90,000.00 2,700.00
1.08.23.01.01.028.030 Bak Cuci Stainless Steel + Accessories 1.0000 Buah 364,250.00 364,250.00
1.08.23.01.01.028.034 Water Drain + Asesories 1.0000 set 18,800.00 18,800.00
2.01.01.07.02.010 Pekerjaan Pemasangan 1 Buah Floor Drain Buah Nilai HSPK 32,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.005 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.004 Tukang Batu 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.01.01.028.035 Floor Drain + Accessories 1.0000 buah 18,800.00 18,800.00
2.01.01.07.02.011 Pekerjaan Pemasangan 1 Buah Bak Kontrol Buah Nilai HSPK 477,600.00
Pasangan Batu Bata Uk 30 X 30 Cm, Tinggi 35 Cm (Dibulatkan):
2.01.01.07.02.013 Pekerjaan Pemasangan 1 Buah Bak Kontrol Buah Nilai HSPK 903,000.00
Pasangan Batu Bata Uk. 60 X 60 Cm, Tinggi 65 Cm (Dibulatkan):
2.01.01.07.02.014 1 m' Pekerjaan Pasang Pipa Galvanis Diameter m' Nilai HSPK 63,900.00
1/2" (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0270 O.H 130,000.00 3,510.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0090 O.H 120,000.00 1,080.00
1.11.29.01.01.002.008 Tukang Pipa 0.0900 O.H 110,000.00 9,900.00
1.11.29.01.01.002.014 Pekerja 0.0540 O.H 90,000.00 4,860.00
1.08.24.02.07.001.024 Pipa Galvanis 1/2" (Medium B) 0.2000 Batang 172,450.00 34,490.00
1.08.24.02.07.001.024 Perlengkapan 0.0584 Set 172,450.00 10,071.08
2.01.01.07.02.015 1 m' Pekerjaan Pasang Pipa Galvanis Diameter m' Nilai HSPK 74,400.00
3/4" (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0270 O.H 130,000.00 3,510.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0090 O.H 120,000.00 1,080.00
1.11.29.01.01.002.008 Tukang Pipa 0.0900 O.H 110,000.00 9,900.00
1.11.29.01.01.002.014 Pekerja 0.0540 O.H 90,000.00 4,860.00
1.08.24.02.07.001.025 Pipa Galvanis 3/4" (Medium B) 0.2000 Batang 212,950.00 42,590.00
1.08.24.02.07.001.025 Perlengkapan 0.0584 Set 212,950.00 12,436.28
2.01.01.07.02.016 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1" m' Nilai HSPK 103,700.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0270 O.H 130,000.00 3,510.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0090 O.H 120,000.00 1,080.00
1.11.29.01.01.002.008 Tukang Pipa 0.0900 O.H 110,000.00 9,900.00
1.11.29.01.01.002.014 Pekerja 0.0540 O.H 90,000.00 4,860.00
1.08.24.02.07.001.026 Pipa Galvanis 1" (Medium B) 0.2000 Batang 326,550.00 65,310.00
1.08.24.02.07.001.026 Perlengkapan 0.0584 Set 326,550.00 19,070.52
2.01.01.07.02.017 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 1 m' Nilai HSPK 161,600.00
1/2" (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0054 O.H 130,000.00 702.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0180 O.H 120,000.00 2,160.00
1.11.29.01.01.002.008 Tukang Pipa 0.1800 O.H 110,000.00 19,800.00
1.11.29.01.01.002.014 Pekerja 0.1080 O.H 90,000.00 9,720.00
1.08.24.02.07.001.028 Pipa Galvanis 1 1/2" (Medium B) 0.2000 Batang 500,050.00 100,010.00
1.08.24.02.07.001.028 Perlengkapan 0.0584 Set 500,050.00 29,202.92
2.01.01.07.02.019 1 m' Pekerjaan Pasang Pipa Galvanis Diameter 4" m' Nilai HSPK 479,100.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0068 O.H 130,000.00 884.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0225 O.H 120,000.00 2,700.00
1.11.29.01.01.002.008 Tukang Pipa 0.2250 O.H 110,000.00 24,750.00
1.11.29.01.01.002.014 Pekerja 0.1350 O.H 90,000.00 12,150.00
1.08.24.02.07.001.032 Pipa Galvanis 4" (Medium B) 0.2000 Batang 1,697,300.00 339,460.00
1.08.24.02.07.001.032 Perlengkapan 0.0584 Set 1,697,300.00 99,122.32
2.01.01.07.02.020 Pekerjaan Pemasangan 1 Buah Kran Air 3/4" Buah Nilai HSPK 52,800.00
Atau 1/2" (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.008 Tukang Pipa 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.01.01.062.002 Kran Air Ex. Omco 1.0000 Buah 32,250.00 32,250.00
1.08.23.01.01.999.010 Seal Tape 1.0000 roll 6,800.00 6,800.00
2.01.01.07.02.021 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 1/2" m' Nilai HSPK 25,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0018 O.H 130,000.00 234.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0060 O.H 120,000.00 720.00
1.11.29.01.01.002.008 Tukang Pipa 0.0600 O.H 110,000.00 6,600.00
1.11.29.01.01.002.014 Pekerja 0.0360 O.H 90,000.00 3,240.00
1.08.24.02.06.001.017 Pipa Pvc Aw 1/2" Pjg 6 Meter 0.2000 Batang 54,900.00 10,980.00
1.08.24.02.06.001.017 Perlengkapan 0.0584 Set 54,900.00 3,206.16
2.01.01.07.02.022 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 3/4" m' Nilai HSPK 28,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0018 O.H 130,000.00 234.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0060 O.H 120,000.00 720.00
1.11.29.01.01.002.008 Tukang Pipa 0.0600 O.H 110,000.00 6,600.00
1.11.29.01.01.002.014 Pekerja 0.0360 O.H 90,000.00 3,240.00
1.08.24.02.06.001.018 Pipa Pvc Aw 3/4" Pjg 6 Meter 0.2000 Batang 66,600.00 13,320.00
1.08.24.02.06.001.018 Perlengkapan 0.0584 Set 66,600.00 3,889.44
2.01.01.07.02.023 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 1" m' Nilai HSPK 32,300.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0018 O.H 130,000.00 234.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0060 O.H 120,000.00 720.00
1.11.29.01.01.002.008 Tukang Pipa 0.0600 O.H 110,000.00 6,600.00
1.11.29.01.01.002.014 Pekerja 0.0360 O.H 90,000.00 3,240.00
1.08.24.02.06.001.019 Pipa Pvc Aw 1" Pjg 6 Meter 0.2000 Batang 83,400.00 16,680.00
1.08.24.02.06.001.019 Perlengkapan 0.0584 Set 83,400.00 4,870.56
2.01.01.07.02.024 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 1 1/2" m' Nilai HSPK 49,900.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0018 O.H 130,000.00 234.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0060 O.H 120,000.00 720.00
1.11.29.01.01.002.008 Tukang Pipa 0.0600 O.H 110,000.00 6,600.00
1.11.29.01.01.002.014 Pekerja 0.0360 O.H 90,000.00 3,240.00
1.08.24.02.06.001.021 Pipa Pvc Aw 1 1/2" Pjg 6 Meter 0.2000 Batang 151,200.00 30,240.00
1.08.24.02.06.001.021 Perlengkapan 0.0584 Set 151,200.00 8,830.08
2.01.01.07.02.026 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 2 1/2" m' Nilai HSPK 84,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0018 O.H 130,000.00 234.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0060 O.H 120,000.00 720.00
1.11.29.01.01.002.008 Tukang Pipa 0.0600 O.H 110,000.00 6,600.00
1.11.29.01.01.002.014 Pekerja 0.0360 O.H 90,000.00 3,240.00
1.08.24.02.06.001.023 Pipa Pvc Aw 2 1/2" 0.2000 Batang 285,500.00 57,100.00
1.08.24.02.06.001.023 Perlengkapan 0.0584 Set 285,500.00 16,673.20
2.01.01.07.02.027 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 3" m' Nilai HSPK 129,100.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0041 O.H 130,000.00 533.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0135 O.H 120,000.00 1,620.00
1.11.29.01.01.002.008 Tukang Pipa 0.1350 O.H 110,000.00 14,850.00
1.11.29.01.01.002.014 Pekerja 0.0810 O.H 90,000.00 7,290.00
1.08.24.02.06.001.024 Pipa Pvc Aw 3" 0.2000 Batang 405,600.00 81,120.00
1.08.24.02.06.001.024 Perlengkapan 0.0584 Set 405,600.00 23,687.04
2.01.01.07.02.028 1 m' Pekerjaan Pasang Pipa Pvc Type Aw 4" m' Nilai HSPK 177,400.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0041 O.H 130,000.00 533.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0135 O.H 120,000.00 1,620.00
1.11.29.01.01.002.008 Tukang Pipa 0.1350 O.H 110,000.00 14,850.00
1.11.29.01.01.002.014 Pekerja 0.0810 O.H 90,000.00 7,290.00
1.08.24.02.06.001.025 Pipa Pvc Aw 4" 0.2000 Batang 592,600.00 118,520.00
1.08.24.02.06.001.025 Perlengkapan 0.0584 Set 592,600.00 34,607.84
2.01.01.07.02.029 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 2" m' Nilai HSPK 44,100.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0027 O.H 130,000.00 351.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0090 O.H 120,000.00 1,080.00
1.11.29.01.01.002.008 Tukang Pipa 0.0900 O.H 110,000.00 9,900.00
1.11.29.01.01.002.014 Pekerja 0.0540 O.H 90,000.00 4,860.00
1.08.24.02.06.001.049 Pipa Pvc Class D Dia. 2" 0.2000 Batang 107,900.00 21,580.00
1.08.24.02.06.001.049 Perlengkapan 0.0584 Set 107,900.00 6,301.36
2.01.01.07.02.030 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 3" m' Nilai HSPK 83,500.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0041 O.H 130,000.00 533.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0135 O.H 120,000.00 1,620.00
1.11.29.01.01.002.008 Tukang Pipa 0.1350 O.H 110,000.00 14,850.00
1.11.29.01.01.002.014 Pekerja 0.0810 O.H 90,000.00 7,290.00
1.08.24.02.06.001.051 Pipa Pvc Class D Dia. 3" 0.2000 Batang 229,300.00 45,860.00
1.08.24.02.06.001.051 Perlengkapan 0.0584 Set 229,300.00 13,391.12
2.01.01.07.02.031 1 m' Pekerjaan Pasang Pipa Pvc Class D Dia. 4" m' Nilai HSPK 107,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0041 O.H 130,000.00 533.00
1.11.29.01.01.001.007 Kepala Tukang Pipa 0.0135 O.H 120,000.00 1,620.00
1.11.29.01.01.002.008 Tukang Pipa 0.1350 O.H 110,000.00 14,850.00
1.11.29.01.01.002.014 Pekerja 0.0810 O.H 90,000.00 7,290.00
1.08.24.02.06.001.052 Pipa Pvc Class D Dia. 4" 0.2000 Batang 321,000.00 64,200.00
1.08.24.02.06.001.052 Perlengkapan 0.0584 Set 321,000.00 18,746.40
2.01.01.07.03.007 1 m' Pekerjaan Kusen Alluminium 4" m' Nilai HSPK 133,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0021 O.H 130,000.00 273.00
1.11.29.01.01.001.003 Kepala Tukang 0.0043 O.H 120,000.00 516.00
1.11.29.01.01.002.002 Tukang Kayu 0.0430 O.H 110,000.00 4,730.00
1.11.29.01.01.002.014 Pekerja 0.0430 O.H 90,000.00 3,870.00
1.08.23.01.01.024.024 Profil Alluminium 4" 1.1000 m 111,450.00 122,595.00
1.08.23.01.01.026.021 Skrup Fixer 0.0080 Buah 32,300.00 258.40
1.08.23.01.01.043.007 Sealant 0.0600 Tube 15,500.00 930.00
2.01.01.07.03.017 1 m2 Pekerjaan Pasang Jendela Nako Dan Teralis m2 Nilai HSPK 390,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0010 O.H 130,000.00 130.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.2000 O.H 90,000.00 18,000.00
1.08.23.01.01.003.010 Jendela Nako 15 X 70 (Rangka + Kaca 5 Mm) 7.7000 Daun 25,850.00 199,045.00
1.08.23.01.01.026.021 Paku Skrup 0.0400 Buah 32,300.00 1,292.00
1.08.23.01.01.008.011 Besi Strip 1.1667 Batang 126,250.00 147,295.88
2.01.01.07.03.019 1 m' Pekerjaan Pasang Talang Datar/Jurai Seng m' Nilai HSPK 309,400.00
Bjls 28 Lebar 90 (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0010 O.H 130,000.00 130.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.2000 O.H 90,000.00 18,000.00
1.08.23.01.01.007.016 Seng Plat 3" X 6" Bjls 28 1.0500 m' 107,200.00 112,560.00
1.08.23.01.01.026.017 Paku Biasa 0.0150 Kg 21,000.00 315.00
1.08.23.01.05.002.037 Kayu Borneo Papan 0.0190 m3 8,103,950.00 153,975.05
2.01.01.07.03.020 1 m' Pekerjaan Pasang Talang Miring Seng Bjls 28 m' Nilai HSPK 205,900.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0013 O.H 130,000.00 169.00
1.11.29.01.01.001.003 Kepala Tukang 0.0250 O.H 120,000.00 3,000.00
1.11.29.01.01.002.002 Tukang Kayu 0.4000 O.H 110,000.00 44,000.00
1.11.29.01.01.002.014 Pekerja 0.1500 O.H 90,000.00 13,500.00
1.08.23.01.01.007.016 Seng Plat 3" X 6" Bjls 28 0.5000 Lembar 107,200.00 53,600.00
1.08.23.01.01.026.017 Paku Biasa 0.0150 Kg 21,000.00 315.00
1.08.23.01.05.002.037 Kayu Borneo Papan 0.0096 m3 8,103,950.00 77,797.92
1.08.23.01.01.006.006 Meni Besi 0.2500 Kg 54,250.00 13,562.50
2.01.01.07.03.022 1 m2 Pekerjaan Pemasangan Fitrase Ex. Corais & m2 Nilai HSPK 151,200.00
Aquirlda (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0400 O.H 130,000.00 5,200.00
1.11.29.01.01.002.002 Tukang Kayu 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja 0.1300 O.H 90,000.00 11,700.00
1.08.23.01.01.003.015 Fitrase 2.0000 m2 53,400.00 106,800.00
2.01.01.07.03.027 Pekerjaan Pemasangan Pasang Tiang Pagar Unit Nilai HSPK 432,900.00
Model Pmg 2" Tinggi 1,5 M (Dibulatkan):
1.11.29.01.01.002.002 Tukang Besi 0.5000 O.H 110,000.00 55,000.00
1.11.29.01.01.002.014 Pekerja 0.5000 O.H 90,000.00 45,000.00
1.08.24.02.07.003.001 Pipa Besi 2" (Steinnless) 1.0000 Batang 332,850.00 332,850.00
2.01.01.07.03.028 Pekerjaan Pasang 1 Unit Daun Pintu Swing Ganda Unit Nilai HSPK 1,572,500.00
Type Brc/Pmg Uk. (1,2M X 3M) (Dibulatkan):
1.11.29.01.01.002.002 Tukang Besi 1.0500 O.H 110,000.00 115,500.00
1.11.29.01.01.002.014 Pekerja 1.0500 O.H 90,000.00 94,500.00
1.08.23.01.01.024.008 Pintu Swing Ganda Brc/Pmg Ukuran 1.20 X 3.00 1.0000 unit 1,362,450.00 1,362,450.00
2.01.01.07.03.030 1 m2 Kanopi rangka besi hollow & Penutup atap m2 Nilai HSPK 558,300.00
Polycarbonate (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0080 O.H 130,000.00 1,040.00
1.11.29.01.01.001.006 Kepala Tukang 0.0080 O.H 120,000.00 960.00
1.11.29.01.01.002.007 Tukang Besi 0.0750 O.H 110,000.00 8,250.00
1.11.29.01.01.002.014 Pekerja 0.1500 O.H 90,000.00 13,500.00
1.08.23.01.01.008.059 Besi Hollow 40.40 1.7242 Btg 209,000.00 360,357.80
1.08.23.01.01.054.004 Polycarbonate t. 8 mm 0.0404 m2 4,132,950.00 166,971.18
1.08.23.01.01.026.001 Paku payung 6.0000 bh 1,200.00 7,200.00
2.01.01.07.04.002 Pekerjaan Pemasangan 1 Buah Kunci Tanam Buah Nilai HSPK 172,100.00
Biasa (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.001.003 Kepala Tukang 0.0500 O.H 120,000.00 6,000.00
1.11.29.01.01.002.002 Tukang Kayu 0.5000 O.H 110,000.00 55,000.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.01.01.063.010 Kunci Tanam Biasa 2X Putar 1.0000 Buah 109,500.00 109,500.00
2.01.01.07.04.003 Pekerjaan Pemasangan 1 Buah Kunci Tanam Buah Nilai HSPK 142,900.00
Kamar Mandi (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0030 O.H 130,000.00 390.00
1.11.29.01.01.001.003 Kepala Tukang 0.0500 O.H 120,000.00 6,000.00
1.11.29.01.01.002.002 Tukang Kayu 0.5000 O.H 110,000.00 55,000.00
1.11.29.01.01.002.014 Pekerja 0.0050 O.H 90,000.00 450.00
1.08.23.01.01.063.009 Kunci Tanam Kamar Mandi 1.0000 Buah 81,100.00 81,100.00
2.01.01.07.04.005 Pekerjaan Pemasangan 1 Buah Engsel Pintu Buah Nilai HSPK 65,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0008 O.H 130,000.00 104.00
1.11.29.01.01.001.003 Kepala Tukang 0.0150 O.H 120,000.00 1,800.00
1.11.29.01.01.002.002 Tukang Kayu 0.1500 O.H 110,000.00 16,500.00
1.11.29.01.01.002.014 Pekerja 0.0150 O.H 90,000.00 1,350.00
1.08.23.01.01.059.006 Engsel Pintu Kuningan 3" 1.0000 Stel 45,400.00 45,400.00
2.01.01.07.04.006 Pekerjaan Pemasangan 1 Buah Engsel Jendela Buah Nilai HSPK 45,600.00
Kupu-Kupu (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0005 O.H 130,000.00 65.00
1.11.29.01.01.001.003 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.002 Tukang Kayu 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.01.01.059.010 Engsel Jendela Kupu-Kupu Kuningan 2.5" 1.0000 Stel 32,450.00 32,450.00
2.01.01.07.04.007 Pekerjaan Pemasangan 1 Buah Engsel Angin Buah Nilai HSPK 47,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0005 O.H 130,000.00 65.00
1.11.29.01.01.001.003 Kepala Tukang 0.0200 O.H 120,000.00 2,400.00
1.11.29.01.01.002.002 Tukang Kayu 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.1000 O.H 90,000.00 9,000.00
1.08.23.01.01.059.017 Engsel Angin Kuningan 2" 1.0000 Stel 13,550.00 13,550.00
2.01.01.07.04.008 Pekerjaan Pemasangan 1 Buah Engsel Hidrolis Buah Nilai HSPK 281,500.00
Pintu Almunium (Dibulatkan):
1.11.29.01.01.001.003 Kepala Tukang 0.0130 O.H 120,000.00 1,560.00
1.11.29.01.01.002.002 Tukang Kayu 0.1250 O.H 110,000.00 13,750.00
1.08.23.01.01.059.011 Engsel Hidrolis Pintu Alluminium 1.0000 Stel 266,150.00 266,150.00
2.01.01.07.04.015 Pekerjaan Pemasangan 1 Buah Rel Pintu Dorong Buah Nilai HSPK 505,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0030 O.H 130,000.00 390.00
1.11.29.01.01.001.003 Kepala Tukang 0.0600 O.H 120,000.00 7,200.00
1.11.29.01.01.002.002 Tukang Kayu 0.6000 O.H 110,000.00 66,000.00
1.11.29.01.01.002.014 Pekerja 0.0600 O.H 90,000.00 5,400.00
1.08.23.01.01.065.013 Rel Pintu Dorong 1.0000 buah 426,250.00 426,250.00
2.01.01.07.04.019 1 Buah Pemasangan Grendel Biasa (Besar) Buah Nilai HSPK 41,800.00
(Dibulatkan):
1.11.29.01.01.002.002 Tukang Kayu 0.1200 O.H 110,000.00 13,200.00
1.11.29.01.01.002.014 Pekerja 0.0600 O.H 90,000.00 5,400.00
1.08.23.01.01.061.002 Grendel Biasa (Besar) 1.0000 Buah 23,200.00 23,200.00
2.01.01.07.06.002 Pemasangan 1 Titik Lampu (Menggunakan Kabel Titik Nilai HSPK 213,800.00
Nya) (Dibulatkan):
1.11.29.01.01.001.002 Kepala Tukang 0.0500 O.H 120,000.00 6,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 O.H 110,000.00 55,000.00
1.11.29.01.01.002.014 Pekerja 0.3000 O.H 90,000.00 27,000.00
1.08.23.03.06.001.005 Kabel Nya 1 X 2,5 Ex. Supreme 15.0000 m' 4,950.00 74,250.00
1.08.24.02.06.001.061 Pipa Pralon 5/8 1.0000 Batang 10,200.00 10,200.00
1.08.23.03.06.004.001 Saklar Ex. Broco 1.0000 Buah 14,450.00 14,450.00
1.08.23.03.06.008.002 Fiting Plafond Ex. Broco 1.0000 Buah 21,700.00 21,700.00
1.08.23.03.06.999.005 T Doos Pvc 1.0000 Buah 5,150.00 5,150.00
2.01.01.07.06.003 Pemasangan 1 Titik Lampu (Menggunakan Kabel Titik Nilai HSPK 265,100.00
Nym) (Dibulatkan):
1.11.29.01.01.001.002 Kepala Tukang 0.0500 O.H 120,000.00 6,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 O.H 110,000.00 55,000.00
1.11.29.01.01.002.014 Pekerja 0.3000 O.H 90,000.00 27,000.00
1.08.23.03.06.004.001 Saklar Ex. Broco 1.0000 Buah 14,450.00 14,450.00
1.08.23.03.06.001.024 Kabel Nym 2 X 2,5 Ex. Supreme 7.5000 m' 16,750.00 125,625.00
1.08.24.02.06.001.061 Pipa Pralon 5/8 1.0000 Batang 10,200.00 10,200.00
1.08.23.03.06.999.005 T Doos Pvc 1.0000 Buah 5,150.00 5,150.00
1.08.23.03.06.008.002 Fiting Plafon 1.0000 Buah 21,700.00 21,700.00
2.01.01.07.06.005 Pekerjaan Pemasangan Saklar Ganda Per Titik Titik Nilai HSPK 48,100.00
(Dibulatkan):
1.11.29.01.01.001.002 Kepala Tukang 0.0500 O.H 120,000.00 6,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja 0.0010 O.H 90,000.00 90.00
1.08.23.03.06.004.002 Saklar Ganda Ex. Broco 1.0000 Buah 20,000.00 20,000.00
2.01.01.07.06.006 1 Unit Pemasangan Lampu 1 x 18 Watt (Lengkap) Buah Nilai HSPK 210,300.00
(Dibulatkan):
1.11.29.01.01.001.002 Kepala Tukang 0.0050 O.H 120,000.00 600.00
1.11.29.01.01.002.001 Tukang Listrik 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.03.06.002.040 Lampu Tl 1 x 18 Watt 1.0000 Set 206,550.00 206,550.00
2.01.01.07.06.007 1 Unit Pemasangan Lampu 1 x 36 Watt (Lengkap) Buah Nilai HSPK 326,300.00
(Dibulatkan):
1.11.29.01.01.001.002 Kepala Tukang 0.0050 O.H 120,000.00 600.00
1.11.29.01.01.002.001 Tukang Listrik 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.03.06.002.042 Lampu Tl 1 x 36 Watt 1.0000 Set 322,550.00 322,550.00
2.01.01.07.06.010 1 Buah Pemasangan Lampu Pijar 25 Watt Buah Nilai HSPK 15,200.00
(Dibulatkan):
1.11.29.01.01.001.002 Kepala Tukang 0.0050 O.H 120,000.00 600.00
1.11.29.01.01.002.001 Tukang Listrik 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.03.06.002.028 Lampu Pijar 25 Watt 1.0000 Buah 11,500.00 11,500.00
2.01.01.07.06.011 1 Buah Pemasangan Lampu Down Light + Fitting Buah Nilai HSPK 120,400.00
(Dibulatkan):
1.11.29.01.01.001.002 Kepala Tukang 0.0050 O.H 120,000.00 600.00
1.11.29.01.01.002.001 Tukang Listrik 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.014 Pekerja 0.0100 O.H 90,000.00 900.00
1.08.23.03.06.002.093 Lampu Down Light + Fitting 1.0000 Buah 116,700.00 116,700.00
2.01.02.01.01.012 1 m' Pekerjaan Pemasangan Kanstin Uk. 15.35.50 m' Nilai HSPK 142,700.00
(K-300) (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0010 O.H 130,000.00 130.00
1.11.29.01.01.001.005 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.004 Tukang Batu 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja/Buruh Terampil 0.2000 O.H 90,000.00 18,000.00
1.08.23.01.01.002.001 Portland Cement 0.4500 Zak 77,500.00 34,875.00
1.08.23.01.01.004.002 Pasir Pasang 0.0010 m3 244,750.00 244.75
1.08.23.01.01.055.014 Kanstin Uk. 15.35.50 2.0000 Buah 38,650.00 77,300.00
2.01.02.01.01.014 1 m' Pekerjaan Pemasangan Stopper/ Uskup (K- m' Nilai HSPK 45,600.00
300) (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0010 O.H 130,000.00 130.00
1.11.29.01.01.001.005 Kepala Tukang 0.0100 O.H 120,000.00 1,200.00
1.11.29.01.01.002.004 Tukang Batu 0.1000 O.H 110,000.00 11,000.00
1.11.29.01.01.002.014 Pekerja/Buruh Terampil 0.2000 O.H 90,000.00 18,000.00
1.08.23.01.01.004.002 Pasir Pasang 0.0010 m3 244,750.00 244.75
1.08.23.01.01.055.011 Stopper/Uskup 0.1670 m2 90,200.00 15,063.40
2.01.02.01.02.004 1 m3 Pengadaan Lapis Pondasi Agregat (Cbr 60%) m3 Nilai HSPK 286,600.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0090 OH 90,000.00 810.00
1.11.29.01.01.001.001 Mandor 0.0045 OH 130,000.00 585.00
HSAB Agregat Pecah Kasar 0.2520 m3 261,684.24 65,944.43
Hs4 Agregat Lolos # 1 " 0.2231 m3 224,256.44 50,031.61
Hs5 Fraksi Lolos Scalping 0-37,5 Mm (Screen 0-37,5 0.5750 m3 231,883.05 133,332.76
Mm)
E15 Wheel Loader 0.0315 jam 579,263.86 18,246.81
E52 Blending Equipment 0.0482 jam 365,846.01 17,633.78
2.01.02.01.03.003 1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. m' Nilai HSPK 808,800.00
Dalam 35-45 Cm (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.3334 OH 90,000.00 30,006.00
1.11.29.01.01.002.004 Tukang 0.1334 OH 110,000.00 14,674.00
1.11.29.01.01.001.001 Mandor 0.0667 OH 130,000.00 8,671.00
2.01.02.01.08.004 Beton K-300 0.1052 m3 2,403,000.00 252,795.60
1.08.23.01.01.012.007 Baja Tulangan 11.5682 Kg 13,550.00 156,749.11
2.01.02.01.03.010 Urugan Porus 0.1239 m3 335,200.00 41,531.28
1.08.23.01.01.004.004 Mat. Pilihan 0.8128 m3 193,750.00 157,480.00
E25 Tamper 1.0092 jam 47,508.36 47,945.44
E11 Flat Bed Truck 0.1540 jam 642,709.22 98,977.22
2.01.02.01.03.005 1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. m' Nilai HSPK 2,326,600.00
Dalam 75-85 Cm (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 2.0000 OH 90,000.00 180,000.00
1.11.29.01.01.002.004 Tukang 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.001.001 Mandor 0.2500 OH 130,000.00 32,500.00
2.01.02.01.08.004 Beton K-300 0.2898 m3 2,403,000.00 696,389.40
1.08.23.01.01.012.007 Baja Tulangan 31.8707 Kg 13,550.00 431,847.99
2.01.02.01.03.010 Urugan Porus 0.3103 m3 335,200.00 104,012.56
1.08.23.01.01.004.004 Mat. Pilihan 1.9114 m3 193,750.00 370,333.75
E25 Tamper 2.3776 Jam 47,508.36 112,955.88
E11 Flat Bed Truck 0.5774 Jam 642,709.22 371,100.30
2.01.02.01.03.006 1 M' Gorong-Gorong Pipa Beton Bertulang, Dia. m' Nilai HSPK 2,925,400.00
Dalam 95-105 Cm (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 2.0000 OH 90,000.00 180,000.00
1.11.29.01.01.002.004 Tukang 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.001.001 Mandor 0.2500 OH 130,000.00 32,500.00
2.01.02.01.08.004 Beton K-300 0.4085 m3 2,403,000.00 981,625.50
1.08.23.01.01.012.007 Baja Tulangan 44.9248 Kg 13,550.00 608,731.04
2.01.02.01.03.010 Urugan Porus 0.4158 m3 335,200.00 139,376.16
1.08.23.01.01.004.004 Mat. Pilihan 2.3100 m3 193,750.00 447,562.50
E25 Tamper 2.8834 Jam 47,508.36 136,985.61
E11 Flat Bed Truck 0.5774 Jam 642,709.22 371,100.30
2.01.02.01.03.007 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan m' Nilai HSPK 273,800.00
Dia. Dalam 20 Cm (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.001.001 Mandor 0.0500 OH 130,000.00 6,500.00
2.01.02.01.08.006 Beton K-175 0.0542 m3 1,619,800.00 87,793.16
2.01.02.01.03.010 Urugan Porus 0.0662 m3 335,200.00 22,190.24
1.08.23.01.01.004.004 Mat. Pilihan 0.2277 m3 193,750.00 44,116.88
E25 Tamper 0.0037 jam 47,508.36 175.78
E25 Tamper 0.2744 jam 47,508.36 13,036.29
E11 Flat Bed Truck 0.1205 jam 642,709.22 77,446.46
2.01.02.01.03.008 1 M' Gorong-Gorong Pipa Beton Tanpa Tulangan m' Nilai HSPK 300,000.00
Dia. Dalam 25 Cm (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.001.001 Mandor 0.0500 OH 130,000.00 6,500.00
2.01.02.01.08.006 Beton K-175 0.0644 m3 1,619,800.00 104,315.12
2.01.02.01.03.010 Urugan Porus 0.0714 m3 335,200.00 23,933.28
1.08.23.01.01.004.004 Mat. Pilihan 0.2593 m3 193,750.00 50,239.38
E25 Tamper 0.0045 jam 47,508.36 213.79
E25 Tamper 0.3124 jam 47,508.36 14,841.61
E11 Flat Bed Truck 0.1205 jam 642,709.22 77,446.46
2.01.02.01.04.010 1 Buah Pemotongan Pohon Pilihan Diameter 15 Buah Nilai HSPK 164,900.00
30 Cm (Termasuk Pembuangan Dengan Dump (Dibulatkan):
Truck)
1.11.29.01.01.002.014 Pekerja 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.001.001 Mandor 0.0500 OH 130,000.00 6,500.00
E08 Dump Truck 0.1988 Jam 336,248.16 66,846.14
1.09.27.01.02.999.003 Chainsaw 1.0000 Jam 46,600.00 46,600.00
2.01.02.01.04.011 1 Buah Pemotongan Pohon Pilihan Diameter 30 Buah Nilai HSPK 198,400.00
50 Cm (Termasuk Pembuangan Dengan Dump (Dibulatkan):
Truck)
1.11.29.01.01.002.014 Pekerja 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.001.001 Mandor 0.0500 OH 130,000.00 6,500.00
E08 Dump Truck 0.2982 Jam 336,248.16 100,269.20
1.09.27.01.02.999.003 Chainsaw 1.0000 Jam 46,600.00 46,600.00
2.01.02.01.04.012 1 Buah Pemotongan Pohon Pilihan Diameter 50 Buah Nilai HSPK 265,200.00
75 Cm (Termasuk Pembuangan Dengan Dump (Dibulatkan):
Truck)
1.11.29.01.01.002.014 Pekerja 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.001.001 Mandor 0.0500 OH 130,000.00 6,500.00
E08 Dump Truck 0.4970 Jam 336,248.16 167,115.34
1.09.27.01.02.999.003 Chainsaw 1.0000 Jam 46,600.00 46,600.00
2.01.02.01.04.013 1 Buah Pemotongan Pohon Pilihan Diameter > 75 Buah Nilai HSPK 483,800.00
Cm (Termasuk Pembuangan Dengan Dump (Dibulatkan):
Truck)
1.11.29.01.01.002.014 Pekerja 0.6667 OH 90,000.00 60,003.00
1.11.29.01.01.001.001 Mandor 0.0667 OH 130,000.00 8,671.00
E08 Dump Truck 1.0844 Jam 336,248.16 364,627.51
1.09.27.01.02.999.003 Chainsaw 1.0844 Jam 46,600.00 50,533.04
2.01.02.01.05.003 1 Ton Semen Untuk Lapis Pondasi Semen Tanah Ton Nilai HSPK 2,352,400.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.3473 OH 90,000.00 31,257.00
1.11.29.01.01.001.001 Mandor 0.0232 OH 130,000.00 3,016.00
1.08.23.01.01.002.001 Semen 26.2500 Zak 77,500.00 2,034,375.00
E08 Dump Truck 0.8438 Jam 336,248.16 283,726.20
2.01.02.01.06.005 1 Ton Semen Untuk Lapis Pondasi Semen Tanah Ton Nilai HSPK 2,415,400.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.3473 OH 90,000.00 31,257.00
1.11.29.01.01.001.001 Mandor 0.0232 OH 130,000.00 3,016.00
1.08.23.01.01.002.001 Semen 26.2500 Zak 77,500.00 2,034,375.00
E08 Dump Truck 1.0313 Jam 336,248.16 346,772.73
2.01.02.01.06.009 1 m3 Lapis Pondasi Agregat Tanpa Penutup Aspal m3 Nilai HSPK 538,400.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0085 OH 90,000.00 765.00
1.11.29.01.01.001.001 Mandor 0.0013 OH 130,000.00 169.00
2.01.02.01.02.004 Lps Pondasi Agr 1.2587 m3 286,600.00 360,743.42
E15 Wheel Loader 0.0085 jam 579,263.86 4,923.74
E08 Dump Truck 0.4864 jam 336,248.16 163,551.11
E13 Motor Grader 0.0032 Jam 716,346.34 2,292.31
E17 Tandem Vibro Roller 0.0031 jam 372,124.41 1,153.59
E23 Water Tanker 0.0141 jam 343,415.25 4,842.16
2.01.02.01.07.007 1 Ton Lataston Lapis Aus (Hrs-Wc) (Gradasi Ton Nilai HSPK 1,584,200.00
Senjang/Semi Senjang) (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0191 OH 90,000.00 1,719.00
1.11.29.01.01.001.001 Mandor 0.0028 OH 130,000.00 364.00
Hs4 Agregat 5-10 & 10-15 0.2441 m3 224,256.44 54,741.00
Hs2 Lolos Screen2 Ukuran (0-5) 0.1539 m3 270,016.11 41,555.48
1.08.23.01.01.004.001 Pasir Halus 0.2482 m3 257,650.00 63,948.73
1.08.23.01.01.002.001 Semen 0.5775 Zak 77,500.00 44,756.25
1.08.23.01.01.001.003 Aspal 75.1900 Kg 12,000.00 902,280.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asphalt Finisher 0.0191 Jam 593,098.82 11,328.19
E17 Tandem Roller 0.0157 Jam 372,124.41 5,842.35
E18 P. Tyre Roller 0.0044 Jam 603,287.59 2,654.47
2.01.02.01.07.008 1 Ton Lataston Lapis Aus Perata (Hrs-Wc(L)) Ton Nilai HSPK 1,584,200.00
(Gradasi Senjang/Semi Senjang) (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0191 OH 90,000.00 1,719.00
1.11.29.01.01.001.001 Mandor 0.0028 OH 130,000.00 364.00
Hs4 Agregat 5-10 & 10-15 0.2441 m3 224,256.44 54,741.00
Hs2 Lolos Screen2 Ukuran (0-5) 0.1539 m3 270,016.11 41,555.48
1.08.23.01.01.004.001 Pasir Halus 0.2482 m3 257,650.00 63,948.73
1.08.23.01.01.002.001 Semen 0.5775 Zak 77,500.00 44,756.25
1.08.23.01.01.001.003 Aspal 75.1900 Kg 12,000.00 902,280.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asphalt Finisher 0.0191 Jam 593,098.82 11,328.19
E17 Tandem Roller 0.0157 Jam 372,124.41 5,842.35
E18 P. Tyre Roller 0.0044 Jam 603,287.59 2,654.47
2.01.02.01.07.009 1 Ton Lataston Lapis Pondasi (Hrs-Base) (Gradasi Ton Nilai HSPK 1,401,600.00
Senjang/Semi Senjang) (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0041 OH 90,000.00 369.00
1.11.29.01.01.001.001 Mandor 0.0006 OH 130,000.00 78.00
Hs4 Agregat 5-10 & 10-15 0.2958 m3 224,256.44 66,335.06
Hs2 Lolos Screen2 Ukuran (0-5) 0.1405 m3 270,016.11 37,937.26
1.08.23.01.01.004.001 Pasir Halus 0.2266 m3 257,650.00 58,383.49
1.08.23.01.01.002.001 Semen 0.3938 Zak 77,500.00 30,519.50
1.08.23.01.01.001.003 Aspal 61.8000 Kg 12,000.00 741,600.00
2.01.02.01.07.010 1 Ton Lataston Lapis Pondasi Perata (Hrs-Base(L)) Ton Nilai HSPK 1,401,600.00
(Gradasi Senjang/Semi Senjang) (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0041 OH 90,000.00 369.00
1.11.29.01.01.001.001 Mandor 0.0006 OH 130,000.00 78.00
Hs4 Agregat 5-10 & 10-15 0.2958 m3 224,256.44 66,335.06
Hs2 Lolos Screen2 Ukuran (0-5) 0.1405 m3 270,016.11 37,937.26
1.08.23.01.01.004.001 Pasir Halus 0.2266 m3 257,650.00 58,383.49
1.08.23.01.01.002.001 Semen 0.3938 Zak 77,500.00 30,519.50
1.08.23.01.01.001.003 Aspal 61.8000 Kg 12,000.00 741,600.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asphalt Finisher 0.0041 Jam 593,098.82 2,431.71
E17 Tandem Roller 0.0158 Jam 372,124.41 5,879.57
E18 P. Tyre Roller 0.0050 Jam 603,287.59 3,016.44
2.01.02.01.07.011 1 Ton Laston Lapis Aus (Ac-Wc) Ton Nilai HSPK 1,375,000.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0287 OH 90,000.00 2,583.00
1.11.29.01.01.001.001 Mandor 0.0029 OH 130,000.00 377.00
Hs5 Lolos Screen2 Ukuran (9.5-19,0) 0.2979 m3 231,883.05 69,077.96
Hs2 Lolos Screen2 Ukuran (0-5) 0.3524 m3 270,016.11 95,153.68
1.08.23.01.01.002.001 Semen 0.2468 Zak 77,500.00 19,127.00
1.08.23.01.01.001.003 Aspal 59.7400 Kg 12,000.00 716,880.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asp. Finisher 0.0138 Jam 593,098.82 8,184.76
E17 Tandem Roller 0.0136 Jam 372,124.41 5,060.89
E18 P. Tyre Roller 0.0059 Jam 603,287.59 3,559.40
2.01.02.01.07.012 1 Ton Laston Lapis Aus Perata (Ac-Wc(L)) Ton Nilai HSPK 1,412,100.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0287 OH 90,000.00 2,583.00
1.11.29.01.01.001.001 Mandor 0.0029 OH 130,000.00 377.00
Hs5 Lolos Screen2 Ukuran (9.5-19,0) 0.2979 m3 231,883.05 69,077.96
Hs2 Lolos Screen2 Ukuran (0-5) 0.3524 m3 270,016.11 95,153.68
1.08.23.01.01.002.001 Semen 0.2468 Zak 77,500.00 19,127.00
1.08.23.01.01.001.003 Aspal 62.8300 Kg 12,000.00 753,960.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asp. Finisher 0.0138 Jam 593,098.82 8,184.76
E17 Tandem Roller 0.0136 Jam 372,124.41 5,060.89
E18 P. Tyre Roller 0.0059 Jam 603,287.59 3,559.40
2.01.02.01.07.013 1 Ton Laston Lapis Antara (Ac-Bc) Ton Nilai HSPK 1,347,000.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0287 OH 90,000.00 2,583.00
1.11.29.01.01.001.001 Mandor 0.0029 OH 130,000.00 377.00
Hs5 Lolos Screen2 Ukuran (9.5-19,0) 0.3482 m3 231,883.05 80,741.68
Hs2 Lolos Screen2 Ukuran (0-5) 0.3127 m3 270,016.11 84,434.04
1.08.23.01.01.002.001 Semen 0.2363 Zak 77,500.00 18,313.25
1.08.23.01.01.001.003 Aspal 57.6800 Kg 12,000.00 692,160.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
2.01.02.01.07.014 1 Ton Laston Lapis Antara Perata (Ac-Bc(L)) Ton Nilai HSPK 1,347,000.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0287 OH 90,000.00 2,583.00
1.11.29.01.01.001.001 Mandor 0.0029 OH 130,000.00 377.00
Hs5 Lolos Screen2 Ukuran (9.5-19,0) 0.3482 m3 231,883.05 80,741.68
Hs2 Lolos Screen2 Ukuran (0-5) 0.3127 m3 270,016.11 84,434.04
1.08.23.01.01.002.001 Semen 0.2363 Zak 77,500.00 18,313.25
1.08.23.01.01.001.003 Aspal 57.6800 Kg 12,000.00 692,160.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asphalt Finisher 0.0110 Jam 593,098.82 6,524.09
E17 Tandem Roller 0.0109 Jam 372,124.41 4,056.16
E18 P. Tyre Roller 0.0047 Jam 603,287.59 2,835.45
2.01.02.01.07.015 1 Ton Laston Lapis Pondasi (Ac-Base) Ton Nilai HSPK 1,245,200.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0287 OH 90,000.00 2,583.00
1.11.29.01.01.001.001 Mandor 0.0029 OH 130,000.00 377.00
Hs5 Lolos Screen2 Ukuran (9.5-19,0) 0.1317 m3 231,883.05 30,539.00
Hs4 Lolos Screen2 Ukuran (5-9,5) 0.2982 m3 224,256.44 66,873.27
Hs2 Lolos Screen2 Ukuran (0-5) 0.2417 m3 270,016.11 65,262.89
1.08.23.01.01.002.001 Semen 0.2494 Zak 77,500.00 19,328.50
1.08.23.01.01.001.003 Aspal 49.4400 Kg 12,000.00 593,280.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asphalt Finisher 0.0092 Jam 593,098.82 5,456.51
E17 Tandem Roller 0.0091 Jam 372,124.41 3,386.33
E18 P. Tyre Roller 0.0052 Jam 603,287.59 3,137.10
2.01.02.01.07.016 1 Ton Laston Lapis Pondasi Perata (Ac-Base(L)) Ton Nilai HSPK 1,245,200.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0287 OH 90,000.00 2,583.00
1.11.29.01.01.001.001 Mandor 0.0029 OH 130,000.00 377.00
Hs5 Lolos Screen2 Ukuran (9.5-19,0) 0.1317 m3 231,883.05 30,539.00
Hs4 Lolos Screen2 Ukuran (5-9,5) 0.2982 m3 224,256.44 66,873.27
Hs2 Lolos Screen2 Ukuran (0-5) 0.2417 m3 270,016.11 65,262.89
1.08.23.01.01.002.001 Semen 0.2494 Zak 77,500.00 19,328.50
1.08.23.01.01.001.003 Aspal 49.4400 Kg 12,000.00 593,280.00
E15 Wheel Loader 0.0096 Jam 579,263.86 5,560.93
E01 Amp 0.0201 Jam 9,960,399.88 200,204.04
E12 Genset 0.0201 Jam 599,929.53 12,058.58
E08 Dump Truck 0.7054 Jam 336,248.16 237,189.46
E02 Asphalt Finisher 0.0092 Jam 593,098.82 5,456.51
E17 Tandem Roller 0.0091 Jam 372,124.41 3,386.33
E18 P. Tyre Roller 0.0052 Jam 603,287.59 3,137.10
2.01.02.01.07.020 1 Liter Lapis Resap Pengikat-Aspal Emulsi Liter Nilai HSPK 14,800.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0003 OH 90,000.00 27.00
1.11.29.01.01.001.001 Mandor 0.0001 OH 130,000.00 13.00
1.08.23.01.01.001.004 Aspal Emulsi 1.0403 Kg 14,000.00 14,564.20
E41 Asp. Distributor 0.0003 Jam 469,327.93 140.80
E05 Compressor 0.0003 Jam 224,642.53 67.39
2.01.02.01.07.022 1 Liter Bahan Aspal Untuk Pekerjaan Pelaburan Liter Nilai HSPK 12,900.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0003 OH 90,000.00 27.00
1.11.29.01.01.001.001 Mandor 0.0001 OH 130,000.00 13.00
1.08.23.01.01.001.003 Aspal 0.9761 Kg 12,000.00 11,713.20
1.08.23.01.01.001.015 Kerosene 0.0660 Ltr 14,650.00 966.90
E41 Asp. Distributor 0.0003 Jam 469,327.93 140.80
E05 Compresor 0.0003 Jam 224,642.53 67.39
2.01.02.01.07.023 1 Liter Aspal Cair Emulsi Untuk Precoated Liter Nilai HSPK 30,100.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.1429 OH 90,000.00 12,861.00
1.11.29.01.01.001.001 Mandor 0.0286 OH 130,000.00 3,718.00
1.08.23.01.01.001.003 Aspal 0.9761 Kg 12,000.00 11,713.20
1.08.23.01.01.001.015 Kerosene 0.0660 liter 14,650.00 966.90
E43 Pan Mixer 0.0010 Jam 846,746.59 846.75
2.01.02.01.07.024 1 Liter Aspal Emulsi Untuk Precoated Liter Nilai HSPK 48,400.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.2858 OH 90,000.00 25,722.00
1.11.29.01.01.001.001 Mandor 0.0572 OH 130,000.00 7,436.00
1.08.23.01.01.001.004 Aspal Emulsi 0.9779 Kg 14,000.00 13,690.60
1.08.23.01.01.001.015 Kerosene 0.0495 Liter 14,650.00 725.18
E43 Pan Mixer 0.0010 Jam 846,746.59 846.75
2.01.02.01.08.009 1 Kg Anyaman Kawat Yang Dilas (Welded Wire Kg Nilai HSPK 19,700.00
Mesh) (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0300 OH 90,000.00 2,700.00
1.11.29.01.01.002.004 Tukang 0.0100 OH 110,000.00 1,100.00
1.11.29.01.01.001.001 Mandor 0.0050 OH 130,000.00 650.00
1.08.23.01.01.012.007 Baja Tulangan 1.1000 Kg 13,550.00 14,905.00
1.08.23.01.01.019.017 Kawat Beton 0.0008 Roll 432,250.00 345.80
2.01.02.01.09.008 1 m3 Camp. Aspal Dingin Utk. Pek. Minor m3 Nilai HSPK 2,554,600.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.1653 OH 90,000.00 14,877.00
1.11.29.01.01.001.001 Mandor 0.0276 OH 130,000.00 3,588.00
Hs2 Agregat Halus 1.1684 m3 270,016.11 315,486.82
1.08.23.01.01.001.004 Aspal Emulsi 140.7000 Kg 14,000.00 1,969,800.00
E06 Conc. Mixer 0.0964 jam 193,324.87 18,636.52
E24 Pedestrian Roller 0.1976 jam 70,747.94 13,979.79
E08 Dump Truck 0.6489 jam 336,248.16 218,191.43
2.01.02.01.09.009 1 Liter Residu Bitumen Untuk Pek.Minor Liter Nilai HSPK 14,200.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.0005 OH 90,000.00 45.00
1.11.29.01.01.001.001 Mandor 0.0001 OH 130,000.00 13.00
1.08.23.01.01.001.003 Aspal 0.9858 Kg 12,000.00 11,829.60
1.08.23.01.01.001.015 Kerosene 0.1430 Liter 14,650.00 2,094.95
E03 Asphalt Sprayer 0.0004 Jam 63,258.38 25.30
E05 Compresor 0.0004 Jam 224,642.53 89.86
E08 Dump Truck 0.0004 Jam 336,248.16 134.50
2.01.02.01.10.005 1 Jam Pemakaian Compressor 4000-6500 L\M Jam Nilai HSPK 224,600.00
(Dibulatkan):
E05 Compressor 4000-6500 L\M 1.0000 Jam 224,642.53 224,642.53
2.01.02.01.10.006 1 Jam Pemakaian Concrete Mixer 0.3-0.6 m3 Jam Nilai HSPK 193,300.00
(Dibulatkan):
E06 Concrete Mixer 0.3-0.6 m3 1.0000 Jam 193,324.87 193,324.87
2.01.02.01.10.007 1 Jam Pemakaian Crane 10-15 Ton Jam Nilai HSPK 599,600.00
(Dibulatkan):
E07 Crane 10-15 Ton 1.0000 Jam 599,629.55 599,629.55
2.01.02.01.10.008 1 Jam Pemakaian Dump Truck 3.5 Ton Jam Nilai HSPK 336,200.00
(Dibulatkan):
E08 Dump Truck 3.5 Ton 1.0000 Jam 336,248.16 336,248.16
2.01.02.01.10.009 1 Jam Pemakaian Dump Truck 10 Ton Jam Nilai HSPK 636,200.00
(Dibulatkan):
E09 Dump Truck 10 Ton 1.0000 Jam 636,189.67 636,189.67
2.01.02.01.10.011 1 Jam Pemakaian Flat Bed Truck 3-4 m3 Jam Nilai HSPK 642,700.00
(Dibulatkan):
E11 Flat Bed Truck 3-4 m3 1.0000 Jam 642,709.22 642,709.22
2.01.02.01.10.014 1 Jam Pemakaian Track Loader 75-100 Hp Jam Nilai HSPK 629,700.00
(Dibulatkan):
E14 Track Loader 75-100 Hp 1.0000 Jam 629,742.82 629,742.82
2.01.02.01.10.015 1 Jam Pemakaian Wheel Loader 1.0-1.6 m3 Jam Nilai HSPK 579,300.00
(Dibulatkan):
E15 Wheel Loader 1.0-1.6 m3 1.0000 Jam 579,263.86 579,263.86
2.01.02.01.10.016 1 Jam Pemakaian Three Wheel Roller 6-8 T Jam Nilai HSPK 275,800.00
(Dibulatkan):
E16 Three Wheel Roller 6-8 T 1.0000 Jam 275,762.18 275,762.18
2.01.02.01.10.017 1 Jam Pemakaian Tandem Roller 6-8 T. Jam Nilai HSPK 372,100.00
(Dibulatkan):
E17 Tandem Roller 6-8 T. 1.0000 Jam 372,124.41 372,124.41
2.01.02.01.10.018 1 Jam Pemakaian Tire Roller 8-10 T. Jam Nilai HSPK 603,300.00
(Dibulatkan):
E18 Tire Roller 8-10 T. 1.0000 Jam 603,287.59 603,287.59
2.01.02.01.10.019 1 Jam Pemakaian Vibratory Roller 5-8 T. Jam Nilai HSPK 442,900.00
(Dibulatkan):
E19 Vibratory Roller 5-8 T. 1.0000 Jam 442,904.36 442,904.36
2.01.02.01.10.022 1 Jam Pemakaian Water Pump 70-100 Mm Jam Nilai HSPK 44,800.00
(Dibulatkan):
E22 Water Pump 70-100 Mm 1.0000 Jam 44,775.19 44,775.19
2.01.02.01.10.023 1 Jam Pemakaian Water Tanker 3000-4500 L. Jam Nilai HSPK 343,400.00
(Dibulatkan):
E23 Water Tanker 3000-4500 L. 1.0000 Jam 343,415.25 343,415.25
2.01.02.01.10.031 1 Jam Pemakaian Crane On Track 35 Ton Jam Nilai HSPK 782,400.00
(Dibulatkan):
E31 Crane On Track 35 Ton 1.0000 Jam 782,416.52 782,416.52
2.01.02.01.10.033 1 Jam Pemakaian Bore Pile Machine Jam Nilai HSPK 1,096,300.00
(Dibulatkan):
E33 Bore Pile Machine 1.0000 Jam 1,096,336.92 1,096,336.92
2.01.02.01.10.034 1 Jam Pemakaian Asphalt Liquid Mixer Jam Nilai HSPK 43,500.00
(Dibulatkan):
E34 Asphalt Liquid Mixer 1.000 Liter 1.0000 Jam 43,530.07 43,530.07
2.01.02.01.10.037 1 Jam Pemakaian Rock Drill Breaker Jam Nilai HSPK 357,000.00
(Dibulatkan):
E37 Rock Drill Breaker 1.0000 Jam 356,979.81 356,979.81
2.01.02.01.10.040 1 Jam Pemakaian Aggregat (Chip) Spreader Jam Nilai HSPK 664,900.00
(Dibulatkan):
E40 Aggregat (Chip) Spreader 1.0000 Jam 664,945.73 664,945.73
2.01.02.01.10.042 1 Jam Pemakaian Slip Form Paver Jam Nilai HSPK 637,800.00
(Dibulatkan):
E42 Slip Form Paver 1.0000 Jam 637,808.89 637,808.89
2.01.02.01.10.043 1 Jam Pemakaian Concrete Pan Mixer Jam Nilai HSPK 846,700.00
(Dibulatkan):
E43 Concrete Pan Mixer 1.0000 Jam 846,746.59 846,746.59
2.01.02.01.10.049 1 Jam Pemakaian Truk Mixer (Agitator) Jam Nilai HSPK 824,700.00
(Dibulatkan):
E49 Truk Mixer (Agitator) 1.0000 Jam 824,650.57 824,650.57
2.01.02.01.10.050 1 Jam Pemakaian Bore Pile Machine Jam Nilai HSPK 1,265,900.00
(Dibulatkan):
E50 Bore Pile Machine 1.0000 Jam 1,265,933.96 1,265,933.96
2.01.02.01.10.051 1 Jam Pemakaian Crane On Track 75-100 Ton Jam Nilai HSPK 837,300.00
(Dibulatkan):
E51 Crane On Track 75-100 Ton 1.0000 Jam 837,331.66 837,331.66
2.01.02.01.10.053 1 Jam Pemakaian Asphalt Liquid Mixer Jam Nilai HSPK 141,400.00
(Dibulatkan):
E34a Asphalt Liquid Mixer 20.000 Liter 1.0000 Jam 141,438.66 141,438.66
2.01.02.02.01.002 1m2 tebas tebang berupa dan membersihkan m2 Nilai HSPK 7,900.00
lokasi dari tanaman/tumbuhan diameter < 15 cm (Dibulatkan):
2.01.02.02.01.003 Mencabut 1 tunggul pohon tanaman keras dia. Buah Nilai HSPK 25,300.00
>15 cm dan membuang sisa tunggul kayu dan (Dibulatkan):
akar-akarnya
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.014 Pekerja 0.2000 O.H 90,000.00 18,000.00
1.09.27.01.02.999.003 Chainsaw 0.1000 Unit/ hari 46,600.00 4,660.00
2.01.02.02.01.007 Pasang 1 m' profil melintang galian tanah m' Nilai HSPK 37,900.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0060 O.H 130,000.00 780.00
1.11.29.01.01.002.002 Tukang Kayu 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.01.002.014 Pekerja 0.0600 O.H 90,000.00 5,400.00
1.11.29.01.02.001.005 Juru Ukur 0.0200 O.H 110,000.00 2,200.00
1.11.29.01.02.001.006 Pembantu Juru Ukur 0.0200 O.H 90,000.00 1,800.00
1.08.23.01.05.002.046 Kaso 0.0025 m3 3,174,050.00 7,935.13
1.08.23.01.05.002.046 Papan 0.0042 m3 3,174,050.00 13,331.01
1.08.23.01.01.026.017 Paku Biasa 0.2000 Kg 21,000.00 4,200.00
1.09.27.01.02.003.003 Waterpass 0.0040 Unit/hari 6,250.00 25.00
2.01.02.02.04.006 1 m' Pekerjaan Pemasangan Turap Bambu tinggi m' Nilai HSPK 67,600.00
1,5 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0070 O.H 130,000.00 910.00
1.11.29.01.01.001.003 Kepala Tukang 0.0020 O.H 120,000.00 240.00
1.11.29.01.01.002.002 Tukang Kayu 0.0220 O.H 110,000.00 2,420.00
1.11.29.01.01.002.014 Pekerja 0.2730 O.H 90,000.00 24,570.00
1.08.23.01.05.002.106 Bambu Bongkotan 0.5450 Batang 21,650.00 11,799.25
1.08.23.01.05.002.111 Gedeg Guling 0.2725 Lembar 94,600.00 25,778.50
1.08.23.01.01.019.017 Kawat 0.0044 Roll 432,250.00 1,901.90
2.01.02.02.04.007 1 m' Pekerjaan Pemasangan Turap Bambu tinggi m' Nilai HSPK 124,000.00
2,75 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0130 O.H 130,000.00 1,690.00
1.11.29.01.01.001.003 Kepala Tukang 0.0040 O.H 120,000.00 480.00
1.11.29.01.01.002.002 Tukang Kayu 0.0400 O.H 110,000.00 4,400.00
1.11.29.01.01.002.014 Pekerja 0.5000 O.H 90,000.00 45,000.00
1.08.23.01.05.002.106 Bambu Bongkotan 1.0000 btg 21,650.00 21,650.00
1.08.23.01.05.002.111 Gedeg Guling 0.5000 Lembar 94,600.00 47,300.00
1.08.23.01.01.019.017 Kawat 0.0080 Roll 432,250.00 3,458.00
2.01.02.02.05.003 1m' Pekerjaan Pemasangan, Penyambungan dan m' Nilai HSPK 301,100.00
Pengetesan Kebocoran Pipa PVC Dia 6 " (Dibulatkan):
2.01.02.02.05.004 1m' Pekerjaan Pemasangan, Penyambungan dan m' Nilai HSPK 496,200.00
Pengetesan Kebocoran Pipa Galvanis Dia 6" (Dibulatkan):
untuk saluran
1.11.29.01.01.001.001 Mandor 0.0100 O.H 130,000.00 1,300.00
1.11.29.01.01.002.008 Tukang Pipa 0.2400 O.H 110,000.00 26,400.00
1.11.29.01.01.002.014 Pekerja 0.0400 O.H 90,000.00 3,600.00
1.08.24.02.07.001.034 Pipa Galvanis Dia 6" Medium B 0.1750 Batang 2,654,100.00 464,467.50
1.09.27.01.02.999.010 Gergaji Besi 0.0100 Buah 39,150.00 391.50
2.01.02.02.05.005 1 Unit Pemasangan U Ditch ukuran 400.400.1200, Unit Nilai HSPK 542,000.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.006 1 Unit Pemasangan U Ditch ukuran 400.500.1200, Unit Nilai HSPK 641,100.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.007 1 Unit Pemasangan U Ditch ukuran 400.600.1200, Unit Nilai HSPK 685,900.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.008 1 Unit Pemasangan U Ditch ukuran 500.500.1200, Unit Nilai HSPK 636,500.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.010 1 Unit Pemasangan U Ditch ukuran 500.700.1200, Unit Nilai HSPK 825,600.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.011 1 Unit Pemasangan U Ditch ukuran 600.600.1200, Unit Nilai HSPK 777,800.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.012 1 Unit Pemasangan U Ditch ukuran 600.700.1200, Unit Nilai HSPK 863,000.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.013 1 Unit Pemasangan U Ditch ukuran 600.800.1200, Unit Nilai HSPK 1,096,800.00
60 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.014 1 Unit Pemasangan U Ditch ukuran 800.800.1200, Unit Nilai HSPK 1,389,600.00
80 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.015 1 Unit Pemasangan U Ditch ukuran 800.900.1200, Unit Nilai HSPK 1,799,100.00
100 mm dengan beban gandar 5 Ton (Dibulatkan):
2.01.02.02.05.021 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = m' Nilai HSPK 545,300.00
0.3 m (K-175) Tebal = 5 cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0290 O.H 130,000.00 3,770.00
1.11.29.01.01.001.005 Kepala Tukang 0.0120 O.H 120,000.00 1,440.00
1.11.29.01.01.002.004 Tukang Batu 0.1160 O.H 110,000.00 12,760.00
1.11.29.01.01.002.014 Pekerja 0.5810 O.H 90,000.00 52,290.00
2.01.01.03.01.005 Beton K - 175 0.0550 m3 1,183,700.00 65,103.50
2.01.01.03.02.020 Bekisting 2.1980 m2 186,100.00 409,047.80
1.09.27.01.02.999.007 Linggis 0.0500 Buah 6,100.00 305.00
1.09.27.01.02.999.013 Kayu Pemikul dan Tampar 0.0500 Unit 12,450.00 622.50
2.01.02.02.05.022 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = m' Nilai HSPK 700,900.00
0.4 m (K-175) Tebal = 5 cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0370 O.H 130,000.00 4,810.00
1.11.29.01.01.001.005 Kepala Tukang 0.0150 O.H 120,000.00 1,800.00
1.11.29.01.01.002.004 Tukang Batu 0.1490 O.H 110,000.00 16,390.00
1.11.29.01.01.002.014 Pekerja 0.7440 O.H 90,000.00 66,960.00
2.01.01.03.01.005 Beton K - 175 0.0710 m3 1,183,700.00 84,042.70
2.01.01.03.02.020 Bekisting 2.8260 m2 186,100.00 525,918.60
1.09.27.01.02.999.007 Linggis 0.0530 Buah 6,100.00 323.30
1.09.27.01.02.999.013 Kayu Pemikul dan Tampar 0.0530 Unit 12,450.00 659.85
2.01.02.02.05.024 1 m' Pekerjaan Gorong - Gorong Buis Beton dia = m' Nilai HSPK 1,078,200.00
0.6 m (K-175) Tebal = 6 cm (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0660 O.H 130,000.00 8,580.00
1.11.29.01.01.001.005 Kepala Tukang 0.0260 O.H 120,000.00 3,120.00
1.11.29.01.01.002.004 Tukang Batu 0.2630 O.H 110,000.00 28,930.00
1.11.29.01.01.002.014 Pekerja 1.3150 O.H 90,000.00 118,350.00
2.01.01.03.01.005 Beton K - 175 0.1240 m3 1,183,700.00 146,778.80
2.01.01.03.02.020 Bekisting 4.1450 m2 186,100.00 771,384.50
1.09.27.01.02.999.007 Linggis 0.0590 Buah 6,100.00 359.90
1.09.27.01.02.999.013 Kayu Pemikul dan Tampar 0.0590 Unit 12,450.00 734.55
2.01.02.02.05.025 1 m' Pekerjaan Gorong-Gorong Buis Beton m' Nilai HSPK 1,773,900.00
Bertulang diameter = 0.8 m (K-225) tebal = 8 cm (Dibulatkan):
2.01.02.02.05.026 1 m' Pekerjaan Gorong - Gorong Buis Beton m' Nilai HSPK 2,449,400.00
Bertulang Diameter = 1.00 m (K-225) tebal = 10 (Dibulatkan):
cm
1.11.29.01.01.001.001 Mandor 0.1860 O.H 130,000.00 24,180.00
1.11.29.01.01.001.005 Kepala Tukang 0.0750 O.H 120,000.00 9,000.00
1.11.29.01.01.002.004 Tukang Batu 0.7460 O.H 110,000.00 82,060.00
1.11.29.01.01.002.014 Pekerja 3.7300 O.H 90,000.00 335,700.00
2.01.01.03.01.007 Buis Beton K - 225 0.3450 m3 1,262,700.00 435,631.50
2.01.01.03.01.014 Besi Tulangan 17.2500 Kg 16,000.00 276,000.00
2.01.01.03.02.020 Bekisting (0.2 x VI. D) 6.9080 m2 186,100.00 1,285,578.80
1.09.27.01.02.999.007 Linggis 0.0670 Buah 6,100.00 408.70
1.09.27.01.02.999.013 Kayu Pemikul dan Tampar 0.0670 Unit 12,450.00 834.15
2.02.03.01.01.002 1 Unit Pembuatan Rambu Lalu Lintas Untuk PJU Unit Nilai HSPK 179,700.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1250 OH 130,000.00 16,250.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.2500 OH 90,000.00 22,500.00
1.08.23.01.05.002.029 Kayu Usuk Meranti 1.0000 Batang 58,150.00 58,150.00
1.08.23.01.05.002.028 Kayu Papan Meranti 0.5000 Batang 155,000.00 77,500.00
1.08.23.01.01.026.017 Paku Usuk 0.2500 Kg 21,000.00 5,250.00
2.02.03.01.01.003 1 Lokasi Pengukuran Titik lampu PJU Lokasi Nilai HSPK 380,000.00
(Dibulatkan):
1.11.29.01.02.001.005 Juru Ukur 1.0000 OH 110,000.00 110,000.00
1.11.29.01.02.001.011 Pembantu Juru Ukur 3.0000 OH 90,000.00 270,000.00
2.02.03.01.01.008 1 m Pemasangan PVC untuk Kabel Tanam m' Nilai HSPK 78,500.00
(Dibulatkan):
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.2500 O.H 90,000.00 22,500.00
1.08.24.02.06.001.022 Pipa PVC 2" AW 0.2500 lonjor 224,100.00 56,025.00
2.02.03.01.01.009 1 m Pemasangan Kabel dalam Pipa Pekerjaan m' Nilai HSPK 4,000.00
Instalasi Jaringan Bawah Tanah (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0100 OH 130,000.00 1,300.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.0300 OH 90,000.00 2,700.00
2.02.03.01.01.010 1 Unit Pembuatan dan Pemasangan Terminal Unit Nilai HSPK 316,100.00
Dalam Tiang (Dibulatkan):
1.11.29.01.01.002.012 Tukang Las 0.1250 OH 110,000.00 13,750.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.2500 OH 90,000.00 22,500.00
1.08.24.03.01.016.001 Terminal Kabel 4 jalur 1.0000 Buah 67,300.00 67,300.00
1.08.23.03.06.016.002 Sekering MCB Thermis 4 - 10 Amp 1.0000 Buah 159,400.00 159,400.00
1.08.23.01.01.008.003 Plat Baja 1.2 mm 0.1680 Lembar 316,450.00 53,163.60
2.02.03.01.01.012 1 Unit Pemasangan Panel Lampu PJU Unit Nilai HSPK 168,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.4000 OH 130,000.00 52,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.4000 OH 110,000.00 44,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.8000 OH 90,000.00 72,000.00
2.02.03.01.01.013 1 Unit Pemasangan Panel Tempat Ballast Unit Nilai HSPK 126,000.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.3000 OH 130,000.00 39,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.3000 OH 110,000.00 33,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.6000 OH 90,000.00 54,000.00
2.02.03.01.01.014 1 Buah Panel Tempat Ballast untuk Lampu Sorot Buah Nilai HSPK 348,900.00
(Dibulatkan):
2.02.03.01.01.013 Pemasangan Panel Tempat Ballast 1.0000 Unit 126,000.00 126,000.00
1.08.24.03.01.014.005 Panel ballast ukuran 25 x 15 x 10 cm 1.0000 Unit 222,900.00 222,900.00
2.02.03.01.01.015 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) m' Nilai HSPK 53,100.00
2,5 m (Dibulatkan):
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 2.5000 m 4,500.00 11,250.00
1.08.23.03.06.001.024 Kabel NYM 2x2.5 mm 2.5000 m1 16,750.00 41,875.00
2.02.03.01.01.016 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 3 m' Nilai HSPK 63,800.00
m (Dibulatkan):
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 3.0000 m 4,500.00 13,500.00
1.08.23.03.06.001.024 Kabel NYM 2x2.5 mm 3.0000 m1 16,750.00 50,250.00
2.02.03.01.01.017 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 4 m' Nilai HSPK 85,000.00
m (Dibulatkan):
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 4.0000 m 4,500.00 18,000.00
1.08.23.03.06.001.024 Kabel NYM 2x2.5 mm 4.0000 m1 16,750.00 67,000.00
2.02.03.01.01.018 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) 7 m' Nilai HSPK 148,800.00
m (Dibulatkan):
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 7.0000 m 4,500.00 31,500.00
1.08.23.03.06.001.024 Kabel NYM 2x2.5 mm 7.0000 m1 16,750.00 117,250.00
2.02.03.01.01.019 1 m Instalasi 1 Titik Lampu PJU (Tarikan Udara) m' Nilai HSPK 180,600.00
8.5 m (Dibulatkan):
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 8.5000 m 4,500.00 38,250.00
1.08.23.03.06.001.024 Kabel NYM 2x2.5 mm 8.5000 m1 16,750.00 142,375.00
2.02.03.01.01.024 1 Buah Pemasangan Ornamen Lampu PJU Buah Nilai HSPK 725,600.00
panjang 1,5 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1250 O.H 130,000.00 16,250.00
1.11.29.01.01.002.001 Tukang Listrik 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.6000 O.H 90,000.00 54,000.00
1.08.24.02.07.001.040 Pipa Galvanis 2'' Medium A 0.2500 Btg 853,750.00 213,437.50
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 2.0000 Pasang 79,150.00 158,300.00
2.02.03.01.01.021 Roll Pipa 2" 1.0000 Unit 113,000.00 113,000.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 2.0000 Jam 74,300.00 148,600.00
2.02.03.01.01.025 1 Buah Pemasangan Ornamen Lampu PJU Buah Nilai HSPK 796,800.00
panjang 2 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1250 O.H 130,000.00 16,250.00
1.11.29.01.01.002.001 Tukang Listrik 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.6000 O.H 90,000.00 54,000.00
1.08.24.02.07.001.040 Pipa Galvanish Dim. 2'' Kelas A 0.3334 Btg 853,750.00 284,640.25
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 2.0000 Pasang 79,150.00 158,300.00
2.02.03.01.01.021 Roll Pipa 2" 1.0000 Unit 113,000.00 113,000.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 2.0000 Jam 74,300.00 148,600.00
2.02.03.01.01.026 1 Buah Pemasangan Ornamen Lampu PJU Buah Nilai HSPK 1,006,500.00
panjang 3 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1250 O.H 130,000.00 16,250.00
1.11.29.01.01.002.001 Tukang Listrik 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.6000 O.H 90,000.00 54,000.00
1.08.24.02.07.001.040 Pipa Galvanish Dim. 2'' 0.5000 Btg 853,750.00 426,875.00
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 2.0000 Pasang 79,150.00 158,300.00
1.08.23.01.01.008.007 Plat Baja tebal 5 mm 5.0000 Kg 13,500.00 67,500.00
2.02.03.01.01.021 Roll Pipa 2" 1.0000 Unit 113,000.00 113,000.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 2.0000 Jam 74,300.00 148,600.00
2.02.03.01.01.027 1 Buah Pemasangan Ornamen Lampu PJU Buah Nilai HSPK 1,481,800.00
Panjang 6 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1250 O.H 130,000.00 16,250.00
1.11.29.01.01.002.001 Tukang Listrik 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.6000 O.H 90,000.00 54,000.00
1.08.24.02.07.001.040 Pipa Galvanish Dim. 2'' 1.0000 Btg 853,750.00 853,750.00
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 3.0000 Pasang 79,150.00 237,450.00
1.08.23.01.01.012.002 Besi Beton 12 mm 0.3300 Ljr 111,300.00 36,729.00
2.02.03.01.01.021 Roll Pipa 2" 1.0000 Unit 113,000.00 113,000.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 2.0000 Jam 74,300.00 148,600.00
2.02.03.01.01.028 1 Unit Pemasangan Panel Lampu PJU 1 Phase Unit Nilai HSPK 4,936,500.00
(Dibulatkan):
2.02.03.01.01.011 Perakitan Panel PJU 1.0000 Unit 165,000.00 165,000.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.0000 Unit 168,000.00 168,000.00
1.08.24.03.01.999.022 Panel PJU 1.0000 Buah 1,872,300.00 1,872,300.00
1.08.23.03.06.999.006 Time Switch 1.0000 Buah 502,000.00 502,000.00
1.08.24.03.01.017.022 MCB 63 A -1 Phase 1.0000 Buah 240,300.00 240,300.00
1.08.24.03.01.017.014 MCB 6 A -1 Phase 1.0000 Buah 107,200.00 107,200.00
1.08.24.03.01.017.020 MCB 40 A -1 Phase 4.0000 Buah 142,100.00 568,400.00
1.08.23.03.06.012.007 Magnet Kontaktor ex. Mitsubishi SN 50 1.0000 Buah 779,600.00 779,600.00
1.08.24.03.01.999.023 Grounding Roud 1.0000 Unit 454,500.00 454,500.00
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 1.0000 Pasang 79,150.00 79,150.00
2.02.03.01.01.029 1 Unit Pemasangan Panel Lampu PJU 3 Phase Unit Nilai HSPK 5,802,100.00
6600VA (Dibulatkan):
2.02.03.01.01.011 Perakitan Panel PJU 1.0000 Unit 165,000.00 165,000.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.0000 Unit 168,000.00 168,000.00
1.08.24.03.01.999.022 Panel PJU 1.0000 Buah 1,872,300.00 1,872,300.00
1.08.23.03.06.002.094 Pilot Lamp 3.0000 Buah 96,100.00 288,300.00
1.08.24.03.01.017.034 MCB 16 A - 3 Phase 2.0000 Buah 425,000.00 850,000.00
2.02.03.01.01.030 1 Unit Pemasangan Panel Lampu PJU 3 Phase Unit Nilai HSPK 5,851,100.00
10600VA (Dibulatkan):
2.02.03.01.01.011 Perakitan Panel PJU 1.0000 Unit 165,000.00 165,000.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.0000 Unit 168,000.00 168,000.00
1.08.24.03.01.999.022 Panel PJU 1.0000 Buah 1,872,300.00 1,872,300.00
1.08.23.03.06.002.094 Pilot Lamp 3.0000 Buah 96,100.00 288,300.00
1.08.24.03.01.017.035 MCB 20 A - 3 Phase 2.0000 Buah 449,500.00 899,000.00
1.08.24.03.01.017.015 MCB 10 A - 1 Phase 6.0000 Buah 107,200.00 643,200.00
1.08.23.03.06.012.007 Magnet Kontaktor SN 50 1.0000 Buah 779,600.00 779,600.00
1.08.23.03.06.999.006 Time Switch 1.0000 Buah 502,000.00 502,000.00
1.08.24.03.01.999.023 Grounding roud 1.0000 Unit 454,500.00 454,500.00
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 1.0000 Pasang 79,150.00 79,150.00
2.02.03.01.01.031 1 Unit Pemasangan Panel Lampu PJU 3 Phase Unit Nilai HSPK 5,864,100.00
13200VA (Dibulatkan):
2.02.03.01.01.011 Perakitan Panel PJU 1.0000 Unit 165,000.00 165,000.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.0000 Unit 168,000.00 168,000.00
1.08.24.03.01.999.022 Panel PJU 1.0000 Buah 1,872,300.00 1,872,300.00
1.08.23.03.06.002.094 Pilot Lamp 3.0000 Buah 96,100.00 288,300.00
1.08.24.03.01.017.036 MCB 25 A - 3 Phase 2.0000 Buah 456,000.00 912,000.00
1.08.24.03.01.017.016 MCB 16 A - 1 Phase 6.0000 Buah 107,200.00 643,200.00
1.08.23.03.06.012.007 Magnet Kontaktor SN 50 1.0000 Buah 779,600.00 779,600.00
1.08.23.03.06.999.006 Time Switch 1.0000 Buah 502,000.00 502,000.00
1.08.24.03.01.999.023 Grounding roud 1.0000 Unit 454,500.00 454,500.00
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 1.0000 Pasang 79,150.00 79,150.00
2.02.03.01.01.032 1 Unit Pemasangan Panel Lampu PJU 3 Phase Unit Nilai HSPK 5,879,500.00
16500VA (Dibulatkan):
2.02.03.01.01.011 Perakitan Panel PJU 1.0000 Unit 165,000.00 165,000.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.0000 Unit 168,000.00 168,000.00
1.08.24.03.01.999.022 Panel PJU 1.0000 Buah 1,872,300.00 1,872,300.00
1.08.23.03.06.002.094 Pilot Lamp 3.0000 Buah 96,100.00 288,300.00
1.08.24.03.01.017.037 MCB 35 A - 3 Phase 2.0000 Buah 463,700.00 927,400.00
1.08.24.03.01.017.016 MCB 16 A - 1 Phase 6.0000 Buah 107,200.00 643,200.00
1.08.23.03.06.012.007 Magnet Kontaktor SN 50 1.0000 Buah 779,600.00 779,600.00
1.08.23.03.06.999.006 Time Switch 1.0000 Buah 502,000.00 502,000.00
1.08.24.03.01.999.023 Grounding roud 1.0000 Unit 454,500.00 454,500.00
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 1.0000 Pasang 79,150.00 79,150.00
2.02.03.01.01.033 1 Unit Pemasangan Panel Lampu PJU 3 Phase Unit Nilai HSPK 6,001,300.00
23000VA (Dibulatkan):
2.02.03.01.01.011 Perakitan Panel PJU 1.0000 Unit 165,000.00 165,000.00
2.02.03.01.01.012 Pemasangan Panel PJU 1.0000 Unit 168,000.00 168,000.00
1.08.24.03.01.999.022 Panel PJU 1.0000 Buah 1,872,300.00 1,872,300.00
1.08.23.03.06.002.094 Pilot Lamp 3.0000 Buah 96,100.00 288,300.00
1.08.24.03.01.017.038 MCB 40 A - 3 Phase 2.0000 Buah 497,300.00 994,600.00
1.08.24.03.01.017.017 MCB 20 A - 1 Phase 6.0000 Buah 116,300.00 697,800.00
1.08.23.03.06.012.007 Magnet Kontaktor SN 50 1.0000 Buah 779,600.00 779,600.00
1.08.23.03.06.999.006 Time Switch 1.0000 Buah 502,000.00 502,000.00
1.08.24.03.01.999.023 Grounding roud 1.0000 Unit 454,500.00 454,500.00
1.08.23.01.01.008.055 Besi Beugel/Baut (Ornamen) 1.0000 Pasang 79,150.00 79,150.00
2.02.03.01.02 Elektrikal
2.02.03.01.02.001 1 Unit Pembongkaran Instalasi Kabel Unit Nilai HSPK 60,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.001 Tukang Listrik 0.2000 O.H 110,000.00 22,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.4000 O.H 90,000.00 36,000.00
2.02.03.01.02.003 1 Unit Bongkar Kap Lampu Taman Unit Nilai HSPK 287,300.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1000 O.H 130,000.00 13,000.00
1.11.29.01.01.002.001 Tukang Listrik 1.0000 O.H 110,000.00 110,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 1.0000 O.H 90,000.00 90,000.00
1.09.27.01.02.999.025 Sewa Alat Penerangan Jalan Umum (PJU) 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.02.004 1 Unit Bongkar Tiang Lampu Tanam Unit Nilai HSPK 383,300.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.3000 O.H 130,000.00 39,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 3.0000 O.H 90,000.00 270,000.00
1.09.27.01.02.999.025 Sewa Alat Penerangan Jalan Umum (PJU) 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.02.021 1 m Pemasangan / Penarikan Kabel Twisted 4x16 m' Nilai HSPK 47,000.00
mm (Dibulatkan):
2.02.03.01.01.005 Pemasangan dan Penarikan Kabel 1.0000 m 4,500.00 4,500.00
1.08.23.03.06.001.212 Kabel Twisted 4x16 mm 1.0000 m' 42,500.00 42,500.00
2.02.03.01.02.022 1 m Memasang Dan Merangkai Lampu Hias Non m' Nilai HSPK 60,300.00
Neon (Dibulatkan):
1.11.29.01.01.002.001 Tukang Listrik 0.0100 O.H 110,000.00 1,100.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.1000 O.H 90,000.00 9,000.00
1.08.23.03.06.002.005 Lampu Hias Non Neon 1.0000 Buah 50,150.00 50,150.00
2.02.03.01.02.023 1 m Memasang Dan Merangkai Lampu Hias Circle m' Nilai HSPK 61,700.00
Light (Dibulatkan):
1.11.29.01.01.002.001 Tukang Listrik 0.0100 O.H 110,000.00 1,100.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.1000 O.H 90,000.00 9,000.00
1.08.23.03.06.002.050 Lampu Circle Light (Twicle Light) 1.0000 Roll 51,600.00 51,600.00
2.02.03.01.03.002 1 Unit Pemasangan Tiang Cabang 1 Biasa 5 m Unit Nilai HSPK 1,867,800.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1300 OH 130,000.00 16,900.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 OH 90,000.00 67,500.00
1.08.24.03.01.020.001 Tiang Cabang Biasa 1-5 m 1.0000 Unit 1,433,550.00 1,433,550.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
2.02.03.01.03.003 1 Unit Pemasangan Tiang Cabang 1 Biasa 7 m Unit Nilai HSPK 2,376,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1300 OH 130,000.00 16,900.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 OH 90,000.00 67,500.00
1.08.24.03.01.020.002 Tiang Cabang Biasa 1-7 m 1.0000 Unit 1,942,400.00 1,942,400.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
2.02.03.01.03.004 1 Unit Pemasangan Tiang Cabang 1 Biasa 9 m Unit Nilai HSPK 2,993,200.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1300 OH 130,000.00 16,900.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 OH 90,000.00 67,500.00
1.08.24.03.01.020.003 Tiang Cabang Biasa 1-9 m 1.0000 Unit 2,559,000.00 2,559,000.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
2.02.03.01.03.005 1 Unit Pemasangan Tiang Cabang 2 Biasa 7 m Unit Nilai HSPK 2,525,100.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1300 OH 130,000.00 16,900.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 OH 90,000.00 67,500.00
1.08.24.03.01.020.004 Tiang Cabang Biasa 2-7 m 1.0000 Unit 2,090,850.00 2,090,850.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
2.02.03.01.03.006 1 unit Pemasangan Tiang Cabang 2 Biasa 9 m Unit Nilai HSPK 3,392,800.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1300 OH 130,000.00 16,900.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 OH 90,000.00 67,500.00
1.08.24.03.01.020.005 Tiang Cabang Biasa 2-9 m 1.0000 Unit 2,958,550.00 2,958,550.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
2.02.03.01.03.007 1 Unit Pemasangan Tiang Cabang 4 Biasa 9 m Unit Nilai HSPK 3,653,600.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.1300 OH 130,000.00 16,900.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.2500 OH 90,000.00 22,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 OH 90,000.00 67,500.00
1.08.24.03.01.020.016 Tiang Cabang Biasa 4-9 m 1.0000 Unit 3,219,350.00 3,219,350.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
2.02.03.01.03.012 1 Unit Pemasangan Tiang Oktagonal 5m Double Unit Nilai HSPK 4,243,800.00
Hot Dipped Galvanized dengan Flenders (Dibulatkan):
2.02.03.01.03.013 1 Unit Pemasangan Tiang Oktagonal 7m Single Unit Nilai HSPK 4,654,300.00
Hot Dipped Galvanized dengan Flenders (Dibulatkan):
2.02.03.01.03.014 1 Unit Pemasangan Tiang Oktagonal 7m Double Unit Nilai HSPK 5,633,100.00
Hot Dipped Galvanized dengan Flenders (Dibulatkan):
2.02.03.01.03.015 1 Unit Pemasangan Tiang Oktagonal 9m Single Unit Nilai HSPK 5,633,100.00
Hot Dipped Galvanized dengan Flenders (Dibulatkan):
2.02.03.01.03.016 1 Unit Pemasangan Tiang Oktagonal 9m Double Unit Nilai HSPK 6,888,100.00
Hot Dipped Galvanized dengan Flenders (Dibulatkan):
2.02.03.01.03.018 1 Unit Pemasangan Tiang Oktagonal 12m Double Unit Nilai HSPK 9,442,600.00
Hot Dipped Galvanized dengan Flenders (Dibulatkan):
2.02.03.01.03.019 1 Unit Pembuatan & Pemasangan Tiang Unit Nilai HSPK 2,717,900.00
Lengkung Galvanish 5 m Cabang 1, Sistem (Dibulatkan):
Flenders
1.11.29.01.01.001.001 Mandor 0.5000 OH 130,000.00 65,000.00
1.11.29.01.01.002.012 Tukang Las 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.003 Tukang Cat 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 2.0000 OH 90,000.00 180,000.00
2.02.03.01.01.010 Pembuatan dan Pemasangan Terminal Dalam 1.0000 Unit 316,100.00 316,100.00
Tiang
1.08.24.02.07.001.029 Pipa Galvanis 2" Medium B 0.3334 Btg 734,450.00 244,865.63
1.08.24.02.07.001.031 Pipa Galvanis 3" Medium B 0.3334 Batang 1,172,950.00 391,061.53
1.08.24.02.07.001.032 Pipa Galvanis 4" Medium B 0.3334 Batang 1,697,300.00 565,879.82
1.08.23.01.01.008.075 Plat Besi 1,5 cm, Uk. 30 x 30 cm 13.0000 Kg 13,500.00 175,500.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
1.09.27.01.02.999.025 Sewa Alat Bantu 4.0000 Jam 74,300.00 297,200.00
2.02.03.01.03.020 1 Unit Pembuatan & Pemasangan Tiang Unit Nilai HSPK 3,196,100.00
Lengkung Galvanish 7 m Cabang 1, Sistem (Dibulatkan):
Flenders
1.11.29.01.01.001.001 Mandor 0.5000 OH 130,000.00 65,000.00
1.11.29.01.01.002.012 Tukang Las 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.003 Tukang Cat 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 2.0000 OH 90,000.00 180,000.00
2.02.03.01.01.010 Pembuatan dan Pemasangan Terminal Dalam 1.0000 Unit 316,100.00 316,100.00
Tiang
1.08.24.02.07.001.029 Pipa Galvanish 2" Medium B 0.3334 Btg 734,450.00 244,865.63
1.08.24.02.07.001.031 Pipa Galvanish 3" Medium B 0.5000 Batang 1,172,950.00 586,475.00
1.08.24.02.07.001.032 Pipa Galvanish 4" Medium B 0.5000 Batang 1,697,300.00 848,650.00
1.08.23.01.01.008.075 Plat Besi 1,5 cm, Uk. 30 x 30 cm 13.0000 Kg 13,500.00 175,500.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
1.09.27.01.02.999.025 Sewa Alat Bantu 4.0000 Jam 74,300.00 297,200.00
2.02.03.01.03.021 1 Unit Pembuatan & Pemasangan Tiang Unit Nilai HSPK 3,440,900.00
Lengkung Galvanish 7 m Cabang 2, Sistem (Dibulatkan):
Flenders
1.11.29.01.01.001.001 Mandor 0.5000 OH 130,000.00 65,000.00
1.11.29.01.01.002.012 Tukang Las 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.003 Tukang Cat 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 2.0000 OH 90,000.00 180,000.00
2.02.03.01.03.022 1 Unit Pembuatan & Pemasangan Tiang Unit Nilai HSPK 4,098,900.00
Lengkung Galvanish 9 m Cabang 1, Sistem (Dibulatkan):
Flenders
1.11.29.01.01.001.001 Mandor 0.5000 OH 130,000.00 65,000.00
1.11.29.01.01.002.012 Tukang Las 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.003 Tukang Cat 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 2.0000 OH 90,000.00 180,000.00
2.02.03.01.01.010 Pembuatan dan Pemasangan Terminal Dalam 1.0000 Unit 316,100.00 316,100.00
Tiang
1.08.24.02.07.001.029 Pipa Galvanish 2" Medium B 0.3334 Btg 734,450.00 244,865.63
1.08.24.02.07.001.031 Pipa Galvanish 3" Medium B 0.3334 Batang 1,172,950.00 391,061.53
1.08.24.02.07.001.032 Pipa Galvanish 4" Medium B 0.5000 Batang 1,697,300.00 848,650.00
1.08.24.02.07.001.033 Pipa Galvanish 5" Medium B 0.5000 Btg 2,196,400.00 1,098,200.00
1.08.23.01.01.008.075 Plat Besi 1,5 cm, Uk. 30 x 30 cm 13.0000 Kg 13,500.00 175,500.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
1.09.27.01.02.999.025 Sewa Alat Bantu 4.0000 Jam 74,300.00 297,200.00
2.02.03.01.03.023 1 Unit Pembuatan & Pemasangan Tiang Unit Nilai HSPK 4,708,200.00
Lengkung Galvanish 9 m Cabang 2, Sistem (Dibulatkan):
Flenders
1.11.29.01.01.001.001 Mandor 0.5000 OH 130,000.00 65,000.00
1.11.29.01.01.002.012 Tukang Las 0.7500 OH 110,000.00 82,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.003 Tukang Cat 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 2.0000 OH 90,000.00 180,000.00
2.02.03.01.01.010 Pembuatan dan Pemasangan Terminal Dalam 1.0000 Unit 316,100.00 316,100.00
Tiang
1.08.24.02.07.001.029 Pipa Galvanish 2" Medium B 0.6667 Btg 734,450.00 489,657.82
1.08.24.02.07.001.031 Pipa Galvanish 3" Medium B 0.5000 Batang 1,172,950.00 586,475.00
1.08.24.02.07.001.032 Pipa Galvanish 4" Medium B 0.5834 Batang 1,697,300.00 990,204.82
1.08.24.02.07.001.033 Pipa Galvanish 5" Medium B 0.5000 Btg 2,196,400.00 1,098,200.00
1.08.23.01.01.008.075 Plat Besi 1,5 cm, Uk. 30 x 30 cm 13.0000 Kg 13,500.00 175,500.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
1.09.27.01.02.999.025 Sewa Alat Bantu 4.0000 Jam 74,300.00 297,200.00
2.02.03.01.03.024 1 Unit Pembuatan & Pemasangan Tiang Unit Nilai HSPK 5,197,800.00
Lengkung Galvanish 9 m Cabang 4, Sistem (Dibulatkan):
Flenders
1.11.29.01.01.001.001 Mandor 0.5000 OH 130,000.00 65,000.00
1.11.29.01.01.002.012 Tukang Las 0.7500 OH 110,000.00 82,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.5000 OH 110,000.00 55,000.00
1.11.29.01.01.002.003 Tukang Cat 0.2500 OH 110,000.00 27,500.00
1.11.29.01.01.002.014 Tenaga Terampil 0.5000 OH 90,000.00 45,000.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 2.0000 OH 90,000.00 180,000.00
2.02.03.01.01.010 Pembuatan dan Pemasangan Terminal Dalam 1.0000 Unit 316,100.00 316,100.00
Tiang
1.08.24.02.07.001.029 Pipa Galvanish 2" Medium B 1.3334 Btg 734,450.00 979,315.63
1.08.24.02.07.001.031 Pipa Galvanish 3" Medium B 0.5000 Batang 1,172,950.00 586,475.00
1.08.24.02.07.001.032 Pipa Galvanish 4" Medium B 0.5834 Batang 1,697,300.00 990,204.82
1.08.24.02.07.001.033 Pipa Galvanish 5" Medium B 0.5000 Btg 2,196,400.00 1,098,200.00
1.08.23.01.01.008.075 Plat Besi 1,5 cm, Uk. 30 x 30 cm 13.0000 Kg 13,500.00 175,500.00
E07 Sewa Crane 0.5000 Jam 599,629.55 299,814.78
1.09.27.01.02.999.025 Sewa Alat Bantu 4.0000 Jam 74,300.00 297,200.00
2.02.03.01.03.026 1 Unit Pemasangan Lampu HPS 70W/220V Unit Nilai HSPK 1,969,800.00
Lengkap Armateur, Balast & Capasitor (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.2500 O.H 130,000.00 32,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 O.H 90,000.00 67,500.00
1.08.23.03.06.002.095 Lampu HPS 70 W/220 V Lengkap Armateur, Balast 1.0000 Buah 1,768,000.00 1,768,000.00
& Capasitor
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.03.027 1 Unit Pemasangan Lampu HPS 150W/220V Unit Nilai HSPK 2,801,800.00
Lengkap Armateur, Balast, Ignitor & Capasitor (Dibulatkan):
2.02.03.01.03.028 1 Unit Pemasangan Lampu HPS 250W/220V Unit Nilai HSPK 5,569,200.00
Lengkap Armateur, Balast, Ignitor & Capasitor (Dibulatkan):
2.02.03.01.03.029 1 Unit Pemasangan Lampu HPS 400W/220V Unit Nilai HSPK 5,992,900.00
Lengkap Armateur, Balast, Ignitor & Capasitor (Dibulatkan):
2.02.03.01.03.031 1 Unit Pemasangan Lampu Sorot 150 W Lengkap Unit Nilai HSPK 2,229,600.00
Armateur, Ignitor, Capasitor (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.2500 O.H 130,000.00 32,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 O.H 90,000.00 67,500.00
1.08.23.03.06.002.099 Lampu MNF 100 / HPIT 150 W 1.0000 Buah 2,027,800.00 2,027,800.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.03.032 1 Unit Pemasangan Lampu Sorot 250 W Lengkap Unit Nilai HSPK 2,411,300.00
Armateur, Ignitor, Capasitor (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.2500 O.H 130,000.00 32,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 O.H 90,000.00 67,500.00
1.08.23.03.06.002.100 Lampu MNF 100 / HPIT 250 W 1.0000 Buah 2,209,500.00 2,209,500.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.03.033 1 Unit Pemasangan Lampu Mercury HPLN 80 W Unit Nilai HSPK 422,300.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.2500 O.H 130,000.00 32,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 O.H 90,000.00 67,500.00
1.08.23.03.06.002.101 Bola Lampu Mercury HPLN 80 Watt/220 V 1.0000 Buah 32,700.00 32,700.00
1.08.23.03.06.002.102 Ballast BHL 80 watt 1.0000 Buah 148,900.00 148,900.00
1.08.23.03.06.015.006 Kap Lampu Hijau 1.0000 Buah 38,900.00 38,900.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.03.034 1 Unit Pemasangan Lampu Mercury HPLN 125 Unit Nilai HSPK 494,000.00
watt/220 V (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.2500 O.H 130,000.00 32,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 O.H 90,000.00 67,500.00
1.08.23.03.06.002.103 Bola Lampu HPLN 125 Watt/220 V 1.0000 Buah 73,300.00 73,300.00
1.08.23.03.06.002.104 Ballast BHL 125 watt 1.0000 Buah 180,000.00 180,000.00
1.08.23.03.06.015.006 Kap Lampu Hijau 125 watt 1.0000 Buah 38,900.00 38,900.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.03.035 1 Unit Pemasangan Lampu Mercury HPLN Unit Nilai HSPK 606,000.00
250w/220v Dengan Ballast (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.2500 O.H 130,000.00 32,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 O.H 90,000.00 67,500.00
1.08.23.03.06.002.105 Lampu HPLN 250w/220v 1.0000 Buah 70,800.00 70,800.00
1.08.23.03.06.002.106 Ballast BHL 250 watt 1.0000 Buah 294,500.00 294,500.00
1.08.23.03.06.015.006 Kap Lampu Hijau 250 watt 1.0000 Buah 38,900.00 38,900.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 1.0000 Jam 74,300.00 74,300.00
2.02.03.01.03.036 1 Unit Pemasangan Lampu Sorot HPIT MNF-300 Unit Nilai HSPK 8,430,000.00
250 W/220 V Lengkap Armateur, Ignitor, (Dibulatkan):
Capasitor
1.11.29.01.01.001.001 Mandor 0.2500 O.H 130,000.00 32,500.00
1.11.29.01.01.002.001 Tukang Listrik 0.2500 O.H 110,000.00 27,500.00
1.11.29.01.01.002.014 Pekerja (Buruh Tak Terampil) 0.7500 O.H 90,000.00 67,500.00
1.08.23.03.06.002.107 Lampu HPIT MNF-300, 250 W / 220 V 1.0000 Buah 2,209,500.00 2,209,500.00
1.08.23.03.06.002.106 Ballast BHL 250 watt 1.0000 Buah 294,500.00 294,500.00
1.08.23.03.06.002.108 Armature 250 watt 1.0000 Buah 5,649,900.00 5,649,900.00
1.09.27.01.02.999.025 Sewa Alat Bantu Penerangan Jalan Umum 2.0000 Jam 74,300.00 148,600.00
2.02.03.02.01.002 1 Unit Pekerjaan Pemotongan dan Pengeboran Unit Nilai HSPK 9,100.00
untuk Rambu-Rambu Lalu Lintas (Dibulatkan):
2.02.03.02.01.003 1 Unit Pekerjaan Perakitan dan Penyetelan untuk Unit Nilai HSPK 45,600.00
Rambu-Rambu Lalu Lintas (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0750 O.H 130,000.00 9,750.00
1.11.29.01.01.002.014 Pekerja 0.3750 O.H 90,000.00 33,750.00
1.08.23.01.01.999.014 Alat Bantu Penyetelan 0.2500 Ls 8,500.00 2,125.00
2.02.03.02.01.004 1 Unit pengadaan angkur untuk dudukan box Unit Nilai HSPK 599,400.00
control (Dibulatkan):
2.01.01.03.01.005 Beton Cor 0.3800 m3 1,183,700.00 449,806.00
1.08.23.01.01.008.068 Angkur Dia. 25 mm 4.0000 Buah 37,400.00 149,600.00
2.02.03.02.01.005 1 Unit Ongkos Angkut ke Lokasi (Rambu, Unit Nilai HSPK 18,300.00
Delineator, RPPJ) (Dibulatkan):
1.11.29.01.02.001.001 Sopir Terampil 0.0095 O.H 120,000.00 1,140.00
1.11.29.01.01.002.014 Pekerja 0.0381 O.H 90,000.00 3,429.00
1.08.23.01.04.001.006 Solar 0.6667 Liter 15,300.00 10,200.51
1.09.27.02.01.001.010 Sewa Kendaraan 0.0095 Unit/Hari 372,450.00 3,538.28
2.02.03.02.01.006 1 Unit Ongkos Angkut ke Lokasi (Pagar Unit Nilai HSPK 64,200.00
Pengaman Jalan) (Dibulatkan):
1.11.29.01.02.001.001 Sopir Terampil 0.0334 O.H 120,000.00 4,008.00
1.11.29.01.01.002.014 Pekerja 0.1334 O.H 90,000.00 12,006.00
1.08.23.01.04.001.006 Solar 2.3334 Liter 15,300.00 35,701.02
1.09.27.02.01.001.010 Sewa Kendaraan 0.0334 Unit/Hari 372,450.00 12,439.83
2.02.03.02.01.007 1 Unit Ongkos Angkut ke Lokasi (Warning Light, Unit Nilai HSPK 1,495,700.00
Alat Pemberi Isyarat Lalu Lintas, Marka) (Dibulatkan):
2.02.03.02.01.008 1 Unit Ongkos Angkut ke Lokasi (Paku Jalan) Unit Nilai HSPK 3,200.00
(Dibulatkan):
1.11.29.01.02.001.001 Sopir Terampil 0.0017 O.H 120,000.00 204.00
1.11.29.01.01.002.014 Pekerja 0.0067 O.H 90,000.00 603.00
1.08.23.01.04.001.006 Solar 0.1167 Liter 15,300.00 1,785.51
1.09.27.02.01.001.010 Sewa Kendaraan 0.0017 Unit/Hari 372,450.00 633.17
2.02.03.02.01.010 1 unit Pekerjaan Pengeboran dan Pemasangan Unit Nilai HSPK 50,400.00
Paku Jalan Bulat (Tempered) (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.5600 O.H 90,000.00 50,400.00
2.02.03.02.01.012 1 m Pemasangan Pipa PVC untuk Alat Pemberi m' Nilai HSPK 3,800.00
Isyarat Lalu Lintas (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0050 O.H 130,000.00 650.00
1.11.29.01.01.002.014 Pekerja 0.0270 O.H 90,000.00 2,430.00
1.08.23.01.01.999.014 Alat Bantu 0.0850 Ls 8,500.00 722.50
2.02.03.02.01.015 1 Unit Pekerjaan Pengecatan Tiang dan Patok Unit Nilai HSPK 39,000.00
Pengaman (Dibulatkan):
2.02.03.02.01.014 Pekerjaan Cat Besi 0.3439 m2 113,400.00 38,998.26
2.02.03.02.01.016 1 m' Ongkos Pekerjaan Pengecatan Zebra Cross / m' Nilai HSPK 9,200.00
Marka Jalan (Dibulatkan):
1.11.29.01.01.002.014 Pekerja 0.1025 O.H 90,000.00 9,225.00
2.02.03.02.01.017 1 m' Pengadaan dan Pemasangan Marka Jalan m' Nilai HSPK 40,000.00
ukuran 3 x 120 mm (Thermoplastic) (Dibulatkan):
1.08.24.03.01.052.003 Thermoplastic 0.9000 Kg 31,000.00 27,900.00
1.08.24.03.01.052.002 Glassbeads 0.1000 Kg 28,500.00 2,850.00
2.02.03.02.01.016 Ongkos Pengecatan 1.0000 m' 9,200.00 9,200.00
2.02.03.02.01.018 1 m' Pengadaan dan Pemasangan Marka Jalan m' Nilai HSPK 48,700.00
ukuran 3 x 120 mm (Coldplastic) (Dibulatkan):
1.08.24.03.01.052.001 Coldplastic 0.9000 Kg 40,700.00 36,630.00
1.08.24.03.01.052.002 Glassbeads 0.1000 Kg 28,500.00 2,850.00
2.02.03.02.01.016 Ongkos Pengecatan 1.0000 m2 9,200.00 9,200.00
2.02.03.02.01.019 1 m' Pengadaan dan Pemasangan Marka Jalan m' Nilai HSPK 28,000.00
ukuran 2 x 120 mm (Thermoplastic) (Dibulatkan):
1.08.24.03.01.052.003 Thermoplastic 0.5400 Kg 31,000.00 16,740.00
1.08.24.03.01.052.002 Glassbeads 0.0720 Kg 28,500.00 2,052.00
2.02.03.02.01.016 Ongkos Pengecatan 1.0000 m' 9,200.00 9,200.00
2.02.03.02.01.021 1 Unit Pengadaan dan Pemasangan Warning Unit Nilai HSPK 74,046,900.00
Light (Lampu Peringatan) (Dibulatkan):
1.08.24.02.06.001.017 Pipa Pengaman PVC 40.0000 Batang 54,900.00 2,196,000.00
1.08.24.03.01.999.024 Armatur Box Lampu 8.0000 Buah 120,200.00 961,600.00
1.08.24.03.01.999.025 Kontrol WL dengan Konfigurasi (Double Flasher) 1.0000 Buah 8,301,300.00 8,301,300.00
1.08.23.03.06.001.090 Kabel NYY 4 x 2.5 mm ex. Supreme 300.0000 m' 28,600.00 8,580,000.00
1.08.24.03.01.048.003 Set Terminal Kabel 3.0000 Buah 23,200.00 69,600.00
1.08.24.03.01.048.004 Terminal Kabel 3.0000 Buah 26,700.00 80,100.00
1.08.24.03.01.002.015 Box Lampu 2 Aspek Diameter 30 cm (Pijar) 4.0000 Buah 4,637,200.00 18,548,800.00
1.08.24.03.01.999.014 Pasang dan Stel Box Lampu 22.0000 Buah 61,500.00 1,353,000.00
1.08.24.03.01.999.004 Patok Pengaman dengan Delineator 3.0000 Buah 401,900.00 1,205,700.00
1.08.24.03.01.020.015 Tiang Lengkung 2.0000 Buah 5,812,000.00 11,624,000.00
2.02.03.02.01.011 Penggelaran kabel 460.0000 m' 5,000.00 2,300,000.00
2.02.03.02.01.012 Penanaman Pipa Pelindung 160.0000 m' 3,800.00 608,000.00
2.02.03.02.01.013 Gali dan Tutup Aspal 2.5000 m3 204,300.00 510,750.00
2.01.01.01.02.004 Gali dan Tutup Tanah Keras 100.0000 m3 94,200.00 9,420,000.00
2.01.01.03.01.005 Pengecoran Tiang Lengkung (4 buah) 1.8700 m3 1,183,700.00 2,213,519.00
2.01.01.03.01.005 Pengecoran Patok Pengaman (3 buah) 0.3100 m3 1,183,700.00 366,947.00
2.02.03.02.01.004 Pengadaan angkur untuk dudukan box control 1.0000 Buah 599,400.00 599,400.00
2.02.03.02.01.022 Pengadaan dan Pemasangan Lampu Peringatan Unit Nilai HSPK 44,073,200.00
Tenaga Surya (Warning Light Solar Cell) Tiang (Dibulatkan):
Lengkung
1.08.24.03.01.999.011 Baterai VRLA Deep Cyle PV 1.0000 pcs 3,284,700.00 3,284,700.00
1.08.24.03.01.002.015 Lampu 2 Aspek dia. 30 cm (Pijar) 2.0000 Unit 4,637,200.00 9,274,400.00
1.08.24.03.01.999.001 Controller 1.0000 Unit 9,403,100.00 9,403,100.00
1.08.24.03.01.056.003 Solar Cell 50 WP 1.0000 Unit 8,437,000.00 8,437,000.00
1.08.24.03.01.999.004 Patok Pengaman 3.0000 pcs 401,900.00 1,205,700.00
1.08.24.03.01.020.015 Tiang Lengkung 1.0000 Unit 5,812,000.00 5,812,000.00
2.01.01.01.02.004 Galian Tanah 2.4000 m3 94,200.00 226,080.00
2.01.01.03.01.005 Pengecoran 0.6000 m3 1,183,700.00 710,220.00
1.09.26.01.99.003.002 Pemasangan dan Akomodasi 1.0000 Ls 5,720,000.00 5,720,000.00
2.02.03.02.01.023 Pengadaan dan Pemasangan Lampu Peringatan Unit Nilai HSPK 38,531,900.00
Tenaga Surya (Warning Light Solar Cell) Tiang (Dibulatkan):
Lurus
1.08.24.03.01.999.011 Baterai VRLA Deep Cyle PV 1.0000 pcs 3,284,700.00 3,284,700.00
1.08.24.03.01.002.015 Lampu 2 Aspek dia. 30 cm (Pijar) 1.0000 Unit 4,637,200.00 4,637,200.00
1.08.24.03.01.999.001 Controller 1.0000 Unit 9,403,100.00 9,403,100.00
1.08.24.03.01.056.003 Solar Cell 50 WP 1.0000 Unit 8,437,000.00 8,437,000.00
1.08.24.03.01.999.004 Patok Pengaman 3.0000 pcs 401,900.00 1,205,700.00
1.08.24.03.01.020.014 Tiang Lurus 1.0000 Unit 4,907,900.00 4,907,900.00
2.01.01.01.02.004 Galian Tanah 2.4000 m3 94,200.00 226,080.00
2.01.01.03.01.005 Pengecoran 0.6000 m3 1,183,700.00 710,220.00
1.09.26.01.99.003.002 Pemasangan dan Akomodasi 1.0000 Ls 5,720,000.00 5,720,000.00
2.02.03.02.01.024 1 Unit Pengadaan dan Pemasangan Alat Unit Nilai HSPK 241,490,400.00
Pengendali Isyarat Lalu Lintas Persimpangan 3 (Dibulatkan):
Kaki
1.08.23.01.01.004.003 Pasir Urug 2.5000 m3 161,050.00 402,625.00
1.08.23.01.01.008.052 Besi Bulat 1" 2.0000 Batang 82,000.00 164,000.00
1.08.23.01.01.008.053 Besi Bulat 1.25" 2.0000 Batang 143,000.00 286,000.00
1.08.24.02.06.001.017 Pipa Pengaman PVC 40.0000 Batang 54,900.00 2,196,000.00
1.08.24.03.01.999.024 Armatur Box Lampu 15.0000 Buah 120,200.00 1,803,000.00
1.08.23.03.06.001.091 Kabel NYY 4 x 3 mm ex. Supreme 60.0000 m 37,350.00 2,241,000.00
1.08.23.03.06.001.090 Kabel NYY 4 x 2.5 mm ex. Supreme 400.0000 m 28,600.00 11,440,000.00
2.02.03.02.01.025 1 Unit Pengadaan dan Pemasangan Alat Unit Nilai HSPK 284,296,700.00
Pengendali Isyarat Lalu Lintas Persimpangan 4 (Dibulatkan):
Kaki
1.08.23.01.01.004.003 Pasir Urug 3.0000 m3 161,050.00 483,150.00
1.08.23.01.01.008.052 Besi Bulat 1" 2.0000 Batang 82,000.00 164,000.00
1.08.23.01.01.008.053 Besi Bulat 1.25" 2.0000 Batang 143,000.00 286,000.00
1.08.24.02.06.001.017 Pipa Pengaman PVC 50.0000 Batang 54,900.00 2,745,000.00
1.08.24.03.01.999.024 Armatur Box Lampu 20.0000 Buah 120,200.00 2,404,000.00
1.08.23.03.06.001.091 Kabel NYY 4 x 3 mm 60.0000 m 37,350.00 2,241,000.00
1.08.23.03.06.001.090 Kabel NYY 4 x 2.5 mm 500.0000 m 28,600.00 14,300,000.00
1.08.24.03.01.999.020 Pembatas Arus Listrik 1.0000 Buah 56,700.00 56,700.00
1.08.24.03.01.048.004 Terminal Kabel 10.0000 Buah 26,700.00 267,000.00
1.08.24.03.01.002.016 Box Lampu 2 Aspek Dia. 20 cm (Pijar) 8.0000 buah 3,259,550.00 26,076,400.00
1.08.24.03.01.002.013 Box Lampu 3 Aspek Dia. 30 cm (Pijar) 12.0000 buah 5,925,200.00 71,102,400.00
1.08.24.03.01.999.003 Kontroller 4 Phase 2 Pedestrian dan & Luar 1.0000 set 44,922,000.00 44,922,000.00
1.08.24.03.01.999.004 Patok Pengaman dengan Delineator 12.0000 Buah 401,900.00 4,822,800.00
1.08.24.03.01.999.026 Rambu Tabel no. 15 plus Pemasangan 4.0000 set 873,300.00 3,493,200.00
1.08.24.03.01.020.013 Tiang Lurus Octogonal 4.0000 Batang 5,975,750.00 23,903,000.00
1.08.24.03.01.020.012 Tiang Over Head Octogonal 4.0000 Batang 8,216,650.00 32,866,600.00
2.02.03.02.01.011 Penggelaran Kabel 560.0000 m 5,000.00 2,800,000.00
2.02.03.02.01.012 Pemasangan Pipa PVC 200.0000 m 3,800.00 760,000.00
2.02.03.02.01.013 Gali dan Tutup Aspal 100.0000 m3 204,300.00 20,430,000.00
2.01.01.01.02.004 Gali dan Tutup Tanah Keras 120.0000 m3 94,200.00 11,304,000.00
2.01.01.03.01.005 Pengecoran Tiang Over Head 1.8700 m3 1,183,700.00 2,213,519.00
2.01.01.03.01.005 Pengecoran Tiang Lurus 1.1000 m3 1,183,700.00 1,302,070.00
2.01.01.03.01.005 Pengecoran Tiang Patok Pengaman 2.7500 m3 1,183,700.00 3,255,175.00
1.08.24.03.01.048.003 Pasang dan Stel Terminal Kabel 10.0000 set 23,200.00 232,000.00
1.08.24.03.01.999.014 Pasang dan Stel Box Lampu 20.0000 Buah 61,500.00 1,230,000.00
1.11.29.01.01.005.008 Pasang dan Stel 1 Pesawat & Sekring 1.0000 set 247,800.00 247,800.00
2.02.03.02.01.004 Pembuatan Dudukan Box Kontrol 1.0000 Buah 599,400.00 599,400.00
2.02.03.02.01.015 Pengecatan Tiang dan Patok Pengaman 27.0000 Buah 39,000.00 1,053,000.00
2.02.03.02.01.017 Pengecatan Marka dan Zebra Cross 100.0000 m' 40,000.00 4,000,000.00
1.11.29.01.01.005.025 Biaya Penyambungan PLN 1.0000 Set 2,577,700.00 2,577,700.00
1.11.29.01.01.005.028 Biaya Programming 1.0000 Set 2,158,800.00 2,158,800.00
2.02.03.02.01.026 1 Unit Pengadaan & Pemasangan Rambu Lalu Unit Nilai HSPK 987,600.00
Lintas uk. 45 x 45 cm (Dibulatkan):
1.08.23.01.01.008.006 Plat Strip uk. 4 x 30 mm 0.6000 Kg 13,500.00 8,100.00
1.08.23.01.01.008.056 Angkur Besi Siku Ukuran 30 x 30 x 3 mm 0.6000 m 30,000.00 18,000.00
1.08.23.01.01.027.015 Mur Baut 10 cm 4.0000 Buah 6,150.00 24,600.00
1.08.24.02.07.001.039 Pipa Galvanis 1.5" Medium A 0.5000 Btg 625,800.00 312,900.00
1.08.24.03.01.050.001 Tutup Pipa Diameter 1.5" 1.0000 Buah 5,900.00 5,900.00
2.02.03.02.01.027 1 Unit Pengadaan & Pemasangan Rambu Lalu Unit Nilai HSPK 1,168,200.00
Lintas uk. 60 x 60 cm (Dibulatkan):
1.08.23.01.01.008.006 Plat Strip uk. 4 x 30 mm 0.6000 m 13,500.00 8,100.00
1.08.23.01.01.008.056 Angkur Besi Siku Ukuran 30 x 30 x 3 mm 0.6000 m 30,000.00 18,000.00
1.08.23.01.01.027.015 Mur Baut 10 cm 4.0000 Buah 6,150.00 24,600.00
1.08.24.02.07.001.039 Pipa Galvanis 1.5" Medium A 0.5000 Btg 625,800.00 312,900.00
1.08.24.03.01.050.001 Tutup Pipa Diameter 1.5" 1.0000 Buah 5,900.00 5,900.00
1.08.24.03.01.054.002 Daun Rambu Alluminium 1,8 mm dengan 0.3600 m2 1,015,200.00 365,472.00
reflektive sheeting
2.02.03.02.01.014 Cat Belakang Daun Rambu 0.3600 m2 113,400.00 40,824.00
2.02.03.02.01.002 Pemotongan dan Pengeboran 1.0000 Unit 9,100.00 9,100.00
2.01.01.07.03.005 Pengelasan 14.3100 cm 5,200.00 74,412.00
2.02.03.02.01.003 Perakitan dan Penyetelan 1.0000 Unit 45,600.00 45,600.00
2.01.01.03.01.005 Cor Pondasi Beton 0.1100 m3 1,183,700.00 130,207.00
2.01.01.01.02.001 Galian Tanah 0.2500 m3 70,800.00 17,700.00
2.01.01.01.02.009 Urugan Kembali Galian Tanah 0.2500 m3 23,600.00 5,900.00
2.01.01.01.02.019 Urugan Pasir di Bawah Pondasi 0.0400 m3 221,600.00 8,864.00
2.02.03.02.01.001 Bekisting Pondasi 1.1200 m3 73,500.00 82,320.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.0000 Buah 18,300.00 18,300.00
2.02.03.02.01.028 1 Unit Pengadaan & Pemasangan Rambu Lalu Unit Nilai HSPK 1,662,700.00
Lintas uk. 75 x 75 cm (Dibulatkan):
1.08.23.01.01.008.031 Besi siku L 30.30.3 3.2640 kg 12,100.00 39,494.40
1.08.23.01.01.027.015 Mur Baut 10 cm 4.0000 Buah 6,150.00 24,600.00
1.08.24.02.07.001.040 Pipa Galvanis 2" Medium A 0.6667 Btg 853,750.00 569,195.13
1.08.24.03.01.054.002 Daun Rambu Alluminium 1,8 mm dengan 0.5625 m2 1,015,200.00 571,050.00
reflektive sheeting
1.08.24.03.01.999.027 Sticker perlengkapan jalan 1.0000 Buah 8,400.00 8,400.00
2.02.03.02.01.014 Cat Belakang Daun Rambu 0.5600 m2 113,400.00 63,504.00
2.02.03.02.01.002 Pemotongan dan Pengeboran 1.0000 Unit 9,100.00 9,100.00
2.01.01.07.03.005 Pengelasan 14.3100 cm 5,200.00 74,412.00
2.02.03.02.01.003 Perakitan dan Penyetelan 1.0000 Unit 45,600.00 45,600.00
2.01.01.03.01.005 Cor Pondasi Beton 0.1100 m3 1,183,700.00 130,207.00
2.01.01.01.02.001 Galian Tanah dan Urug Kembali 0.2500 m3 70,800.00 17,700.00
2.01.01.01.02.019 Urugan Pasir di Bawah Pondasi 0.0400 m3 221,600.00 8,864.00
2.02.03.02.01.001 Bekisting Pondasi 1.1200 m2 73,500.00 82,320.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.0000 Buah 18,300.00 18,300.00
2.02.03.02.01.030 1 Unit Pengadaan dan Pemasangan Pagar Unit Nilai HSPK 8,081,300.00
Pengaman Jalan 4 m (Terminal End Masuk (Dibulatkan):
Kedalam Tanah)
1.08.23.01.01.008.052 Besi Pengikat Baja Profil Desain 3.0000 Buah 82,000.00 246,000.00
1.08.23.01.01.008.056 Angkur Besi Siku Ukuran 30 x 30 x 3 mm 5.2500 m' 30,000.00 157,500.00
1.08.23.01.01.027.012 Mur Baut Beam 12 x 25 mm 10.0000 Buah 8,400.00 84,000.00
1.08.23.01.01.027.013 Mur Baut Blocking 16 x 30 mm 14.0000 Buah 9,050.00 126,700.00
1.08.23.01.01.027.014 Mur Baut Post 16 x 48 mm 3.0000 Buah 7,800.00 23,400.00
1.08.24.03.01.999.010 Lempengan Besi Baja Profil Desain Galvanis 1.0000 Batang 1,092,300.00 1,092,300.00
1.08.24.03.01.020.011 Tiang Penyangga Besi Struktur Pengendali 3.0000 Batang 847,200.00 2,541,600.00
1.08.24.03.01.048.002 Terminal End (Sleeve Beam) 2.0000 Buah 431,600.00 863,200.00
2.01.01.01.02.001 Galian Tanah 3.9200 m3 70,800.00 277,536.00
2.01.01.01.02.009 Urugan Kembali Galian Tanah 3.9200 m3 23,600.00 92,512.00
2.01.01.01.02.019 Urugan Pasir di Bawah Pondasi 0.4600 m3 221,600.00 101,936.00
2.02.03.02.01.001 Bekisting Pondasi 13.6300 m3 73,500.00 1,001,805.00
2.01.01.03.01.005 Cor Pondasi Beton 1.1900 m3 1,183,700.00 1,408,603.00
2.02.03.02.01.006 Ongkos Angkut ke Lokasi 1.0000 Buah 64,200.00 64,200.00
2.02.03.02.01.031 1 Unit Pengadaan dan Pemasangan Pagar Unit Nilai HSPK 6,344,700.00
Pengaman Jalan 4 m (Terminal End Lengkung) (Dibulatkan):
1.08.23.01.01.008.052 Besi Pengikat Baja Profil Desain 3.0000 Buah 82,000.00 246,000.00
1.08.23.01.01.008.056 Angkur Besi Siku Ukuran 30 x 30 x 3 mm 2.2500 m' 30,000.00 67,500.00
1.08.23.01.01.027.012 Mur Baut Beam 12 x 25 mm 10.0000 Buah 8,400.00 84,000.00
1.08.23.01.01.027.013 Mur Baut Blocking 16 x 30 mm 14.0000 Buah 9,050.00 126,700.00
1.08.23.01.01.027.014 Mur Baut Post 16 x 48 mm 3.0000 Buah 7,800.00 23,400.00
1.08.24.03.01.999.010 Lempengan Besi Baja Profil Desain Galvanis 1.0000 Batang 1,092,300.00 1,092,300.00
1.08.24.03.01.020.011 Tiang Penyangga Besi Struktur Pengendali 3.0000 Batang 847,200.00 2,541,600.00
1.08.24.03.01.048.002 Terminal End (Sleeve Beam) 2.0000 Buah 431,600.00 863,200.00
2.01.01.01.02.001 Galian Tanah 1.6800 m3 70,800.00 118,944.00
2.01.01.01.02.009 Urugan Kembali Galian Tanah 1.6800 m3 23,600.00 39,648.00
2.01.01.01.02.019 Urugan Pasir di Bawah Pondasi 0.2000 m3 221,600.00 44,320.00
2.02.03.02.01.001 Bekisting Pondasi 5.8400 m3 73,500.00 429,240.00
2.01.01.03.01.005 Cor Pondasi Beton 0.5100 m3 1,183,700.00 603,687.00
2.02.03.02.01.006 Ongkos Angkut ke Lokasi 1.0000 Buah 64,200.00 64,200.00
2.02.03.02.01.032 1 Unit Pengadaan dan Pemasangan Paku Jalan Unit Nilai HSPK 312,700.00
Ukuran 10 x 10 x 2 cm (Dibulatkan):
1.08.23.01.01.023.007 Alluminium Alloy (10 x 10 x 2 cm) 1.0000 Buah 63,669.00 63,669.00
1.08.24.03.01.999.028 Reflektor (mata Kucing) 2.0000 Buah 93,500.00 187,000.00
1.08.23.01.01.043.015 Lem mixed Epoxy Adhesive 0.1300 Kg 175,800.00 22,854.00
2.02.03.02.01.009 Pengeboran dan Pemasangan Paku Jalan 1.0000 ls 36,000.00 36,000.00
2.02.03.02.01.008 Ongkos Angkut ke Lokasi 1.0000 ls 3,200.00 3,200.00
2.02.03.02.01.034 1 Unit Pengadaan dan Pemasangan Paku Jalan Unit Nilai HSPK 364,500.00
Bulat (Tempered) (Dibulatkan):
1.08.24.03.01.999.006 Paku Jalan Bulat 1.0000 Buah 270,500.00 270,500.00
1.08.23.01.01.043.015 Lem mixed Epoxy Adhesive 0.2300 Kg 175,800.00 40,434.00
2.02.03.02.01.010 Pengeboran dan Pemasangan Paku Jalan Bulat 1.0000 Unit 50,400.00 50,400.00
(Tempered)
2.02.03.02.01.008 Ongkos Angkut ke Lokasi 1.0000 Unit 3,200.00 3,200.00
2.02.03.02.01.035 1 Unit Pengadaan dan Pemasangan Patok Unit Nilai HSPK 823,200.00
Tikungan Pipa Plastik (Dibulatkan):
1.08.24.03.01.055.002 Delineator Pipa Plastik 1.0000 Buah 383,600.00 383,600.00
1.08.24.03.01.999.029 Reflektor High Intensity Grade uk. 10 x 20 cm 2.0000 Buah 97,000.00 194,000.00
2.02.03.02.01.036 1 Unit Pengadaan dan Pemasangan Patok Unit Nilai HSPK 685,000.00
Tikungan Pipa Besi (Dibulatkan):
1.08.24.03.01.055.001 Delineator Pipa Besi 1.0000 Buah 245,400.00 245,400.00
1.08.24.03.01.999.029 Reflektor High Intensity Grade 10 x 20 cm 2.0000 Buah 97,000.00 194,000.00
1.08.23.01.01.006.001 Cat 0.3400 Kg 71,500.00 24,310.00
2.01.01.03.01.005 Cor Pondasi Beton 0.1000 m3 1,183,700.00 118,370.00
2.01.01.01.02.001 Galian Tanah 0.1800 m3 70,800.00 12,744.00
2.01.01.01.02.009 Urugan Kembali Galian Tanah 0.1800 m3 23,600.00 4,248.00
2.01.01.01.02.019 Urugan Pasir di Bawah Pondasi 0.0400 m3 221,600.00 8,864.00
2.02.03.02.01.001 Bekisting Beton Patok Tikungan 0.8000 m3 73,500.00 58,800.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.0000 Buah 18,300.00 18,300.00
2.02.03.02.01.037 1 Unit Pengadaan dan Pemasangan Cermin Unit Nilai HSPK 5,769,400.00
Tikungan (Dibulatkan):
1.08.23.01.01.008.052 Besi Pengikat Galvanis 1.0000 Buah 82,000.00 82,000.00
1.08.23.01.01.008.056 Angkur Besi Siku Ukuran 30 x 30 x 3 mm 0.6000 m 30,000.00 18,000.00
1.08.23.01.01.027.015 Mur Baut 10 cm 4.0000 Buah 6,150.00 24,600.00
1.08.24.02.07.001.040 Pipa Galvanis 2" Medium A 0.7334 Btg 853,750.00 626,140.25
1.08.24.03.01.050.002 Tutup Pipa Diameter 2 " 1.0000 Buah 13,000.00 13,000.00
1.08.24.03.01.053.003 Cermin Arcyclic Cembung Diameter 90 cm s/d 100 1.0000 Unit 4,508,300.00 4,508,300.00
cm
2.02.03.02.01.002 Pemotongan 1.0000 Batang 9,100.00 9,100.00
2.01.01.07.03.005 Pengelasan 4.0000 cm 5,200.00 20,800.00
2.02.03.02.01.003 Perakitan dan Penyetelan 1.0000 Unit 45,600.00 45,600.00
2.01.01.03.01.005 Cor Pondasi Beton 0.2400 m3 1,183,700.00 284,088.00
2.01.01.01.02.001 Galian Tanah 0.3000 m3 70,800.00 21,240.00
2.01.01.01.02.009 Urugan Kembali Galian Tanah 0.3000 m3 23,600.00 7,080.00
2.01.01.01.02.019 Urugan pasir di Bawah Pondasi 0.0300 m3 221,600.00 6,648.00
2.02.03.02.01.001 Bekisting Pondasi 1.1500 m3 73,500.00 84,525.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.0000 Buah 18,300.00 18,300.00
2.02.03.02.01.038 1 Unit Pengadaan dan Pemasangan RPPJ 120 x Unit Nilai HSPK 16,649,900.00
180 (Overhead) (Dibulatkan):
1.08.23.01.01.008.031 Besi Siku L30x30x3 12.9200 Kg 12,100.00 156,332.00
1.08.23.01.01.008.080 Angkur dia 19 mm panjang 60 cm 4.0000 Buah 92,400.00 369,600.00
1.08.23.01.01.027.017 Mur/baut klem 16.0000 Buah 4,300.00 68,800.00
1.08.23.01.01.008.081 Tutup Baut Angkur 4.0000 Buah 20,600.00 82,400.00
1.08.24.03.01.999.030 Rivet / Panel 22.0000 Buah 8,500.00 187,000.00
1.08.23.01.01.999.013 Klem 3x40x450 mm 16.0000 Buah 13,400.00 214,400.00
2.02.03.02.01.039 1 Unit Pengadaan dan Pemasangan RPPJ 120 x Unit Nilai HSPK 17,307,200.00
240 (Overhead) (Dibulatkan):
1.08.23.01.01.008.031 Besi Siku L30x30x3 14.3800 Kg 12,100.00 173,998.00
1.08.23.01.01.008.080 Angkur dia 19 mm panjang 60 cm 4.0000 Buah 92,400.00 369,600.00
1.08.23.01.01.027.017 Mur/baut klem 16.0000 Buah 4,300.00 68,800.00
1.08.23.01.01.008.081 Tutup Baut Angkur 4.0000 Buah 20,600.00 82,400.00
1.08.24.03.01.999.030 Rivet / Panel 22.0000 Buah 8,500.00 187,000.00
1.08.23.01.01.999.013 Klem 3x40x450 mm 16.0000 Buah 13,400.00 214,400.00
1.08.24.02.07.999.001 Baut/Mur dia. 14 mm untuk flange 8.0000 Buah 12,900.00 103,200.00
1.08.24.02.07.999.002 Flange Pipa dia. 3" t=10 mm 4.0000 Buah 161,100.00 644,400.00
1.08.24.02.07.001.040 Pipa Galvanis Dia. 2" Medium A 1.0000 Btg 853,750.00 853,750.00
1.08.24.02.07.001.045 Pipa Galvanis Dia. 6" Medium A 1.0000 Btg 3,263,000.00 3,263,000.00
1.08.24.02.07.002.022 Pipa Hitam dia. 1.5" 0.2667 Btg 391,600.00 104,439.72
1.08.24.02.07.999.003 Rib Base Plate t=10mm 4.0000 Buah 146,800.00 587,200.00
1.08.24.02.07.999.004 Rib Plate Flange Pipa dia 3" t=10 mm 24.0000 Buah 19,000.00 456,000.00
1.08.24.03.01.050.004 Tutup Pipa dia. 3" 4.0000 Buah 16,800.00 67,200.00
1.08.24.03.01.050.007 Tutup Pipa dia. 6" 1.0000 Buah 23,300.00 23,300.00
1.08.24.02.07.999.005 Base Plate (400x400x12 mm) 1.0000 Buah 428,500.00 428,500.00
1.08.24.03.01.051.002 Daun RPPJ 120 x 240 cm dengan reflektif Sheeting 1.0000 Lembar 2,933,600.00 2,933,600.00
tebal 2 mm
1.08.23.03.07.999.070 Logo Kementerian 1.0000 Buah 19,300.00 19,300.00
2.01.01.01.02.004 Galian Tanah Keras 0.5600 m3 94,200.00 52,752.00
2.01.01.03.01.005 Pekerjaan Pengecoran 0.4300 m3 1,183,700.00 508,991.00
2.01.01.03.01.014 Pekerjaan Pembesian 36.0000 kg 16,000.00 576,000.00
2.01.01.01.02.020 Urugan Sirtu di bawah Pondasi 0.0500 m3 258,300.00 12,915.00
2.02.03.02.01.001 Bekisting Pondasi 2.8800 m3 73,500.00 211,680.00
2.01.01.07.03.001 Biaya pembuatan/ pengelasan 293.4000 Kg 13,110.00 3,846,474.00
1.09.27.01.01.008.001 Sewa Crane Kapasitas 5 ton 0.5000 Unit-Hari 3,000,000.00 1,500,000.00
2.02.03.02.01.005 Ongkos Angkut ke Lokasi 1.0000 Unit 18,300.00 18,300.00
2.02.03.02.01.041 1 Unit Pengadaan dan Pemasangan RPPJ Portal Unit Nilai HSPK 146,484,200.00
Bentang 18 m' (Dibulatkan):
1.08.23.01.01.008.031 Besi Siku L30x30x3 60.8000 Kg 12,100.00 735,680.00
1.08.23.01.01.008.084 Angkur dia 22 mm panjang 100 cm 12.0000 Buah 105,800.00 1,269,600.00
1.08.23.01.01.027.017 Mur/baut klem 36.0000 Buah 4,300.00 154,800.00
1.08.23.01.01.008.081 Tutup Baut Angkur 12.0000 Buah 20,600.00 247,200.00
1.08.24.03.01.999.030 Rivet / Panel 18.0000 Buah 8,500.00 153,000.00
1.08.23.01.01.999.013 Klem 3x40x450 mm 6.0000 Buah 13,400.00 80,400.00
1.08.23.01.01.999.013 Klem 3x40x600 mm 6.0000 Buah 13,400.00 80,400.00
1.08.24.02.07.999.001 Baut/Mur dia. 22 mm untuk flange 96.0000 Buah 12,900.00 1,238,400.00
1.08.23.01.01.027.017 Mur Baut Klem dia. 16" 8.0000 Buah 4,300.00 34,400.00
1.08.24.02.07.999.002 Flange Pipa dia. 3" t=10 mm 8.0000 Buah 161,100.00 1,288,800.00
1.08.24.02.07.001.032 Pipa Galvanis Dia. 4" 6.5830 Ljr 1,697,300.00 11,173,325.90
1.08.24.02.07.001.034 Pipa Galvanis Dia. 6" 3.1667 Batang 2,654,100.00 8,404,738.47
1.08.24.02.07.999.006 Pipa Galvanis Dia. 12" 14.0000 m' 1,356,800.00 18,995,200.00
1.08.24.02.07.999.007 Pipa Galvanis Dia. 8" 19.0000 m' 812,500.00 15,437,500.00
1.08.24.02.07.999.003 Rib Base Plate t=10mm 12.0000 Buah 146,800.00 1,761,600.00
1.08.24.02.07.999.008 Rib Plate Flange Pipa dia 6" t=6 mm 54.0000 Buah 146,800.00 7,927,200.00
1.08.24.02.07.999.009 Rib Plate Flange Pipa dia 8" t=6 mm 54.0000 Buah 43,400.00 2,343,600.00
1.08.24.02.07.999.010 Tutup Pipa dia. 12" 2.0000 Buah 39,000.00 78,000.00
1.08.24.03.01.050.007 Tutup Pipa dia. 6" 2.0000 Buah 23,300.00 46,600.00
1.08.24.02.07.999.011 Tutup Pipa dia. 8" 2.0000 Buah 27,300.00 54,600.00
1.08.24.02.07.999.012 Base Plate (650x650x22 mm) 2.0000 Buah 1,092,000.00 2,184,000.00
1.08.24.03.01.051.001 Daun RPPJ 120 x 240 cm dengan reflektif Sheeting 6.6667 Lembar 2,241,000.00 14,940,074.70
tebal 2 mm
1.08.23.03.07.999.070 Logo Kementerian 4.0000 Buah 19,300.00 77,200.00
1.08.24.03.01.999.004 Patok Pengaman (Delineator) 6.0000 Buah 401,900.00 2,411,400.00
2.01.01.01.02.001 Galian Tanah 1.1200 m3 70,800.00 79,296.00
2.01.01.03.01.005 Cor Beton Pondasi ( 80 x 80 x 200 cm ) 1.2800 m3 1,183,700.00 1,515,136.00
2.01.01.03.01.005 Cor Tiang Pancang Beton dia. 20 mm 0.2400 m3 1,183,700.00 284,088.00
2.01.01.03.01.014 Pembesian 141.6000 Kg 16,000.00 2,265,600.00
2.01.01.01.02.020 Urugan Sirtu di bawah Pondasi 0.1900 m3 258,300.00 49,077.00
2.02.03.02.01.001 Bekisting Pondasi 12.8000 m3 73,500.00 940,800.00
2.01.01.07.03.001 Biaya pembuatan/ pengelasan 3,602.7800 Kg 13,110.00 47,232,445.80
1.09.27.01.01.008.001 Sewa Crane Kapasitas 5 ton 1.0000 Unit-Hari 3,000,000.00 3,000,000.00
2.02.03.03.01.003 Pengapuran dan Pengecatan 1 Batang Pohon Batang Nilai HSPK 18,700.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0020 O.H 130,000.00 260.00
1.11.29.01.01.001.004 Kepala Tukang Cat 0.0059 O.H 120,000.00 708.00
1.11.29.01.01.002.003 Tukang Cat 0.0585 O.H 110,000.00 6,435.00
1.08.23.01.01.006.026 Cat Tembok 0.0500 Galon 141,700.00 7,085.00
1.08.23.01.01.006.016 Cat Kayu 0.0500 Kg 77,500.00 3,875.00
1.08.23.01.01.006.031 Minyak Cat / Afduner 0.0150 Liter 24,500.00 367.50
2.02.03.03.01.012 1 Batang Penanaman Pohon Pelindung Mahoni t Batang Nilai HSPK 201,900.00
= 1.5 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.03.004.004 Mahoni Tinggi 1.5 m 1.0000 Batang 141,600.00 141,600.00
1.08.23.01.01.999.002 Ajir 0.0600 Batang 181,450.00 10,887.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.013 1 m2 Ongkos Menanam Semak Hias (15 Batang) m2 Nilai HSPK 38,900.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.3300 O.H 110,000.00 36,300.00
2.02.03.03.01.014 1 Batang Pemijahan Bibit Taman (Batang Pohon) Batang Nilai HSPK 11,600.00
(Dibulatkan):
1.11.29.01.01.002.013 Tukang Taman 0.0400 O.H 110,000.00 4,400.00
1.11.29.01.01.002.014 Pekerja Terampil 0.0400 O.H 90,000.00 3,600.00
1.08.23.01.01.004.009 Tanah Taman 0.0003 Rit 729,750.00 218.93
1.05.19.02.07.002.020 Pupuk Kandang 0.0010 m3 101,150.00 101.15
1.08.23.01.01.020.001 Kantong Plastik 15 x 22 cm 1.0000 Lembar 3,250.00 3,250.00
2.02.03.03.01.015 1 Batang Penanaman Pohon Pelindung Tanjung t Batang Nilai HSPK 202,400.00
= 1.5 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.04.015.002 Tanjung Tinggi 1.5 m 1.0000 Batang 142,100.00 142,100.00
1.08.23.01.01.999.002 Ajir 0.0600 Batang 181,450.00 10,887.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.017 1 Batang Penanaman Pohon Pelindung Sono t = Batang Nilai HSPK 293,900.00
1.5 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.03.006.002 Pohon Sono Tinggi 1.5 m 1.0000 Batang 233,600.00 233,600.00
1.08.23.01.01.999.002 Ajir 0.0600 Batang 181,450.00 10,887.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.018 1 Batang Penanaman Pohon Pelindung Bintaro t Batang Nilai HSPK 184,700.00
= 1.5 m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.04.999.090 Pohon Bintaro Tinggi 2 - 3 m 1.0000 Batang 124,400.00 124,400.00
1.08.23.01.01.999.002 Ajir 0.0600 Batang 181,450.00 10,887.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.022 Perawatan 1 Batang Mangrove (Batang Pohon) Batang Nilai HSPK 19,300.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0003 O.H 130,000.00 39.00
1.11.29.01.01.002.014 Pekerja Terampil 0.0030 O.H 90,000.00 270.00
1.08.23.03.06.010.002 Batteray kecil 0.0160 Buah 15,450.00 247.20
1.08.23.01.01.999.002 Bambu (Ajir) 0.1000 Batang 181,450.00 18,145.00
1.05.19.02.07.002.024 Pupuk daun 0.0120 Kg 7,050.00 84.60
1.09.27.02.01.001.010 Sewa Mobil Pick up 0.0010 Buah 372,450.00 372.45
1.09.27.01.02.999.026 Sewa Rakit 0.0010 Buah 36,400.00 36.40
1.09.27.01.02.999.027 Sewa Sprayer 0.0030 Buah 11,800.00 35.40
1.09.27.01.02.999.026 Sewa Perahu 0.0010 Hari 36,400.00 36.40
2.02.03.03.01.023 1 Batang Penanaman Pohon Semak ex. Agave T = Pohon Nilai HSPK 151,400.00
1m (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.04.001.001 Agave Hijau T = 1 m 1.0000 Batang 102,000.00 102,000.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.024 1 Batang Penanaman Pohon Semak ex. Pohon Nilai HSPK 135,600.00
Anglonema (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.04.024.003 Anglonema Sumatera 1.0000 Batang 86,150.00 86,150.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.026 1 Batang Penanaman Pohon Semak ex. Pohon Nilai HSPK 68,800.00
Cendrawasih (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.04.035.001 Cendrawasih 1.0000 Batang 19,400.00 19,400.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.027 1 Batang Penanaman Pohon Semak ex. Drasena Pohon Nilai HSPK 84,100.00
(Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.04.036.001 Drasena 1.0000 Pot 34,650.00 34,650.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.03.03.01.028 1 Batang Penanaman Pohon Semak ex. Elfak Pohon Nilai HSPK 97,900.00
Merah (Dibulatkan):
1.11.29.01.01.001.001 Mandor 0.0200 O.H 130,000.00 2,600.00
1.11.29.01.01.002.013 Tukang Taman 0.4000 O.H 110,000.00 44,000.00
1.05.19.02.04.037.001 Elfak Merah 1.0000 Pot 48,450.00 48,450.00
1.08.23.01.01.004.009 Tanah taman 0.0025 Rit 729,750.00 1,824.38
1.05.19.02.07.002.020 Pupuk Kandang 0.0100 m3 101,150.00 1,011.50
2.02.04.01.02.002 Overhoul Master Kopling dan Ganti Kampas Unit Nilai HSPK 1,815,000.00
Kopling (Tahun) (Dibulatkan):
1.11.29.01.02.001.002 Mekanik 16.5000 O.H 110,000.00 1,815,000.00
2.02.04.01.02.003 Ganti Bearing Roda Lengkap Depan & Belakang Unit Nilai HSPK 3,520,000.00
(Dibulatkan):
1.11.29.01.02.001.002 Mekanik 32.0000 O.H 110,000.00 3,520,000.00
2.02.04.01.04.002 Service tiap 1000 HM (Hour Machine) set Nilai HSPK 2,090,000.00
(Dibulatkan):
1.11.29.01.02.001.002 Mekanik 19.0000 O.H 110,000.00 2,090,000.00
2.02.04.01.05.002 Service tiap 500 HM (Hour Machine) set Nilai HSPK 1,870,000.00
(Dibulatkan):
1.11.29.01.02.001.002 Mekanik 17.0000 O.H 110,000.00 1,870,000.00
2.02.04.01.05.003 Service tiap 1000 HM (Hour Machine) set Nilai HSPK 2,090,000.00
(Dibulatkan):
1.11.29.01.02.001.002 Mekanik 19.0000 O.H 110,000.00 2,090,000.00
2.02.04.01.05.004 Service tiap 2000 HM (Hour Machine) set Nilai HSPK 2,640,000.00
(Dibulatkan):
1.11.29.01.02.001.002 Mekanik 24.0000 O.H 110,000.00 2,640,000.00
2.02.04.01.06.002 Service tiap 1000 HM (Hour Machine) set Nilai HSPK 2,090,000.00
(Dibulatkan):
1.11.29.01.02.001.002 Mekanik 19.0000 O.H 110,000.00 2,090,000.00
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
LAMPIRAN I
ANALISA HARGA PENGADAAN AGREGAT KASAR DAN HALUS
I ASUMSI
1 Bahan dasar Sirtu (material Batu bercampur pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
4 Berat Isi Bahan : - Batu / Gravel D1 1.04 Ton/M3 Berongga
- Pasir D2 1.37 Ton/M3 Berongga
- Batu Pecah D3 1.23 Ton/M3 Berongga
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1 193,250.00 Rp./M3
- Sirtu Rp2 193,750.00 Rp./M3
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) E21 904,696.53 Rp./Jam
- Wheel Loader E15 579,263.86 Rp./Jam
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1 60.00 Ton/Jam
- Wheel Loader Cp2 1.50 M3 Kap. Bucket
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1 0.70 -
- Wheel Loader Fa2 0.83 -
9 Faktor Kehilangan Material Fh 1.10 -
II METHODE PELAKSANAAN
1 Wheel Loader mengangkut Sirtu dari tumpukan
dan menuangkannya ke Alat Pemecah Batu.
2 Bahan dasar yang digunakan Sirtu (material Batu bercampur kerikil dan pasir)
3 Dilokasi hooper/Feeder dipasang penyiram air (water sprayer)
berfungsi sebagai pencucian bahan dari kotoran (lumpur)
4 Setelah disemprot air Sirtu dimasukkan kedalam pemecah pertama
(primary crusher) kapasitas 60 ton/jam (bukaan Jaw 10 cm s.d 20 cm tergantung
ukuran boulder)
6 Hasil Primary Crusher disaring memakai Scalping Screen(screen 1) dengan
ukuran ayakan #1,5 inch (3,75 cm) atau #2,0 inch (5,00 cm)
yg menghasilkan lolos ayakan agregat ukuran (0 - 50) dan tdk lolos agg.(50 - 200)
Asumsi material yang lolos saringan (screen1) 20.00 %
Asumsi keseluruhannya menghasilkan ukuran (0 - 50) 8.74 m3
7 Hasil yang lolos saringan(screen1) sebagai fraksi halus tidak boleh dipakai
langsung untuk bahan campuran lapisan perkerasan aspal, tetapi dapat digunakan
untuk bahan campuran Agregat kelas B dan S, khusus untuk Agregat A yang
digunakan hanya ukuran (0 - 5)
8 Hasil yang tidak lolos screen1 dimasukan ke pemecah kedua (Secondary Crusher) 80.00 %
kemudian dipisahkan mempergunakan Screen2 yang menghasilkan ukuran 38.96 m3
(0 - 5), (5 - 3/8"=9,50mm) dan (3/8" - 3/4"=19mm atau 1"=2,54mm))
yang dapat langsung digunakan untuk kebutuhan Agregat Kasar Lapis pondasi
Agregat A (ukuran 5 - 1") dan Agg.Kasar dan Agg.Halus lapisan perkerasan Aspal
Asumsi proporsi hasil pemisahan saringan (screen2)
- menghasilkan ukuran (0 - 5) 20.00 %
- menghasilkan ukuran (5 - 3/8"=9,5mm) 30.00 %
- menghasilkan ukuran (3/8" - 3/4"=19mm) 50.00 %
9 Hasil yang tidak lolos dimasukan kedalam pemecah ketiga (Tertiary crusher)
atau (secondary Crusher) dan hasilnya dimasukan kembali ke saringan screen2
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 200
NO URAIAN KODE KOEF SAT KET
1.c. Biaya Produksi Batu Pecah stone crusher 1 set dgn wheel loader
= {(Tst x Rp3) + (Tw x Rp4)} Bp 1,531,024.46 Rp./Jam
IV PERHITUNGAN
1 Primary Crusher
Produksi Primary Crusher + scalping Screen 1 Prod 60.00 Ton/Jam
Lolos scalping screen (sreen1) LSc 1 20.00 %
Tidak lolos scalping screen(screen1) ( 100 - LSc 1 ) TLSc1 80.00 %
Asumsi % Biaya proses scalping screen ukuran # 2"=50 mm thdp biaya produksi LSc2 20.00 %
Biaya Produksi scalping Screen BPSc 306,204.89 Rp.
Volume (0 - 50) = ((Prod x LSc 1) x LSc2))/D1 V1 8.74 m3
2 Secondary Crusher
Produksi Secondary Crusher + scalping Screen 2 Prod 48.00 Ton/Jam
Asumsi % Biaya proses produksi Batu Pecah thdp BOP S.Crusher 1 set LSc3 80.00 %
Biaya Produksi = LSc3 : 100 x BP + BPSc : 2 Bprod 1,377,922.01 Rp.
kapasitas yang diproduksi = Prod x TLSc1/100 : D3 CpSC1 38.96 m3
Lolos screen2 ukuran ( 0 - 5) LSc4 20.00 %
Volume ukuran ( 0 - 5) = (CpSC1 x LSc4/100) V2 7.79 m3
Lolos screen2 ukuran ( 5 - 9,5) LSc5 30.00 %
Volume ukuran ( 5 - 9,5) = (CpSC1 x LSc5/100) V3 11.69 m3
Lolos screen2 ukuran ( 9.5 - 19,0) LSc6 50.00 %
Volume ukuran ( 9,5 - 19.0) = (CpSC1 x LSc6/100) V4 19.48 m3
Secondary Crusher
Asumsi %Biaya produksi per fraksi (untuk tiap lengan conveyor 1/3 biaya produksi) LSc2 33.33 %
Biaya Produksi per Fraksi = Hs 1 : 3 PF 594,281.36 Rp.
Agregat pecah mesin (0 - 5) = PF : V2 + Rp2 Hs2 270,016.11 Rp./M3
Agregat pecah mesin (5 - 9.5) = PF : V3 + Rp2 Hs3 244,594.07 Rp./M3
Agregat pecah mesin (9.5 - 19) = PF : V4 + Rp2 Hs4 224,256.44 Rp./M3
Agregat pecah kasar = PF x 2/(V3 + V4) + Rp2 Hs5 231,883.05 Rp./M3
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 201
NO URAIAN KODE KOEF SAT KET
LAMPIRAN II
ANALISA HARGA PENGADAAN AGREGAT KELAS C
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %
II METHODE PELAKSANAAN
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 202
ANALISA HARGA SATUAN POKOK KEGIATAN (HSPK)
PEMERINTAH KOTA MOJOKERTO 2017
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PALANT E01
2. Tenaga Pw 294.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,574,308,300.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Rp./liter
5. Bahan Bakar Solar Ms 14,800.00 Rp./liter
6. Minyak Pelumas Mp 42,300.00 Rp./liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8. Bahan bakar Batubara 857.58 Rp/kg
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 203
URAIAN ANALISA ALAT ASPHALT FINISHER
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E02
2. Tenaga Pw 72.4 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,400.0 Jam
c. Harga Alat B 981,052,550 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 204
URAIAN ANALISA ALAT ASPHALT SPRAYER
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 4.0 HP
3. Kapasitas Cp 850.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 66,643,400 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 205
URAIAN ANALISA ALAT BULLDOZER
A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP E04
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 3,130,688,900 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 206
URAIAN ANALISA ALAT COMPRESSOR
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E05
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 5,000.0 CPM/(L/m)
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 134,302,400 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 207
URAIAN ANALISA ALAT CONCRETE MIXER 0.3 - 0.6 M3
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 190,134,300 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 208
URAIAN ANALISA ALAT CRANE 10 - 15 TON
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON E07
2. Tenaga Pw 138.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 799,921,750 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 209
URAIAN ANALISA ALAT DUMP TRUCK 3.5 TON
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 110,821,150 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 210
URAIAN ANALISA ALAT DUMP TRUCK 10 TON
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON E09
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 309,647,200 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 211
URAIAN ANALISA ALAT EXCAVATOR 80-140 HP
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E10
2. Tenaga Pw 133.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,343,716,500 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 212
URAIAN ANALISA ALAT FLAT BED TRUCK 3-4 M3
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E11
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 338,500,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 213
URAIAN ANALISA ALAT GENERATOR SET
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E12
2. Tenaga Pw 180.0 HP
3. Kapasitas Cp 135.0 KVA
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 274,573,800 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 214
URAIAN ANALISA ALAT MOTOR GRADER >100 HP
A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP E13
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 10,800.0 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,354,081,400 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 215
URAIAN ANALISA ALAT TRACK LOADER 75-100 HP
A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP E14
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 0.8 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,785,903,250 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 216
URAIAN ANALISA ALAT WHEEL LOADER 1.0 - 1.6 M3
A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,236,467,150 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 217
URAIAN ANALISA ALAT THREE WHEEL ROLLER 6-8 T
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 407,430,500 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 218
URAIAN ANALISA ALAT TANDEM ROLLER 6 - 8 T
A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E17
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 495,312,550 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 219
URAIAN ANALISA ALAT TIRE ROLLER 8-10 T
A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER 8-10 T. E18
2. Tenaga Pw 100.5 HP
3. Kapasitas Cp 9.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,286,356,700 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 220
URAIAN ANALISA ALAT VIBRATORY ROLLER 5-8 T
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 808,555,200 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 221
URAIAN ANALISA ALAT CONCRETE VIBRATOR
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR E20
2. Tenaga Pw 5.5 HP
3. Kapasitas Cp 25.0 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 15,618,250 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 222
URAIAN ANALISA ALAT STONE CRUSHER
A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER E21
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,068,010,900 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 223
URAIAN ANALISA ALAT WATER PUMP 70 - 100 mm
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E22
2. Tenaga Pw 6.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 12,104,300 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 224
URAIAN ANALISA ALAT WATER TANKER 3000-4500 L
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 142,539,700 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 225
URAIAN ANALISA ALAT PEDESTRIAN ROLLER
A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER E24
2. Tenaga Pw 8.8 HP
3. Kapasitas Cp 835.000 Ton
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 74,695,700 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 226
URAIAN ANALISA ALAT TAMPER
A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER E25
2. Tenaga Pw 4.7 HP
3. Kapasitas Cp 121.000 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 13,037,900 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 227
URAIAN ANALISA ALAT JACK HAMMER
A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER E26
2. Tenaga Pw 0.0 HP
3. Kapasitas Cp 1,330.000 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 41,783,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 228
URAIAN ANALISA ALAT FULVI MIXER
A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER E27
2. Tenaga Pw 345.0 HP
3. Kapasitas Cp 2,005 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 1,074,419,100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 229
URAIAN ANALISA ALAT CONCRETE PUMP
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP E28
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 M3
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 190,134,300 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 230
URAIAN ANALISA ALAT TRAILER 20 TON
A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON E29
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 20.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 716,279,400 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 231
URAIAN ANALISA ALAT PILE DRIVER + HAMMER
A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER E30
2. Tenaga Pw 25.0 HP
3. Kapasitas Cp 2.50 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 950,671,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 232
URAIAN ANALISA ALAT CRANE ON TRUCK 35 TON
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRUCK 35 TON E31
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 35.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,901,341,900 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 233
URAIAN ANALISA ALAT WELDING SET
A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET E32
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 250.00 Amp
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 20,891,500 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 234
URAIAN ANALISA ALAT BORE PILE MACHINE
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E33
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 2,000.00 Meter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 3,055,727,900 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 235
URAIAN ANALISA ALAT ASPHALT LIQUID MIXER
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 20,371,650 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 236
URAIAN ANALISA ALAT TRONTON
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON E35
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 460,500,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 237
URAIAN ANALISA ALAT COLD MILLING MACHINE
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE E37
2. Tenaga Pw 248.0 HP
3. Kapasitas Cp 1,000 m
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 5,903,336,100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 238
URAIAN ANALISA ALAT ROCK DRILL BREAKER
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER E36
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,074,419,100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 239
URAIAN ANALISA ALAT COLD RECYCLER
A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER E38
2. Tenaga Pw 900.0 HP
3. Kapasitas Cp 2,200 M
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 23,279,080,500 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 240
URAIAN ANALISA ALAT HOT RECYCLER
A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER E39
2. Tenaga Pw 400.0 HP
3. Kapasitas Cp 3 M
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 34,918,620,800 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 241
URAIAN ANALISA ALAT AGGREGAT (CHIP) SPREADER
A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER E40
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 M
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 404,200,000.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 242
URAIAN ANALISA ALAT ASPHALT DISTRIBUTOR
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR E41
2. Tenaga Pw 115 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 404,200,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 243
URAIAN ANALISA ALAT SLIP FORM PAVER
A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER E42
2. Tenaga Pw 105 HP
3. Kapasitas Cp 2.50 M
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,368,400,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 244
URAIAN ANALISA ALAT CONCRETE PAN MIXER
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER E43
2. Tenaga Pw 134 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,193,799,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 245
URAIAN ANALISA ALAT CONCRETE BREAKER
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER E44
2. Tenaga Pw 290 HP
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,074,419,100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 246
URAIAN ANALISA ALAT ASPAHLT TANKER
A. URAIAN PERALATAN
1. Jenis Peralatan ASPAHLT TANKER E45
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 511,700,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 247
URAIAN ANALISA ALAT CEMENT TANKER
A. URAIAN PERALATAN
1. Jenis Peralatan CEMENT TANKER E46
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 511,700,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 248
URAIAN ANALISA ALAT CONCRETE MIXER (350)
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER (350) E47
2. Tenaga Pw 20 HP
3. Kapasitas Cp 350.00 liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 35,800,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 249
URAIAN ANALISA ALAT VIBRATING RAMMER
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER E48
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 23,876,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 250
URAIAN ANALISA ALAT TRUK MIXER (AGITATOR)
A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR) E49
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 767,500,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 251
URAIAN ANALISA ALAT BORE PILE MACHINE
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E50
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 2,927,039,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 252
URAIAN ANALISA ALAT CRANE ON TRUCK 75-100 TON
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRUCK 75-100 TON E51
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,074,419,100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 253
URAIAN ANALISA ALAT BLENDING EQUIPMENT
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E52
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 596,899,500 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 15,714.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 254
URAIAN ANALISA ALAT ASPHALT LIQUID MIXER
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34a
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 20,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 15,300,000 Rupiah
Kapasitas 20.000
Khusus digunakan
untuk Asphalt
B. BIAYA PASTI PER JAM KERJA Modifikasi
1. Nilai Sisa Alat = 10 % x B C 1,530,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 12,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 8,800.00 Liter
5. Bahan Bakar Solar Ms 14,800.00 Liter
6. Minyak Pelumas Mp 42,300.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Lampiran Harga Satuan Pokok Kegiatan Pemerintah Kota Mojokerto 2017 255
ANALISA
HSPK NON FISIK
STANDAR
HARGA SATUAN POKOK KEGIATAN
(HSPK)
PEMERINTAH KOTA MOJOKERTO
TA 2017
Catatan:
a. untuk kegiatan yang bersifat Pelaksanaan (Pelatihan/Forum/Dialog dan Sejenisnya)
b. kegiatan berdurasi (> 4 Jam) per hari
2.03.01.01.01.003 Alat Tulis Kantor (ATK) Peserta Tipe III Nilai HSPK 197,900.00
1.08.23.03.01.005.004 Buku Block Note 1 Pcs 2,550.00 2,550.00
1.08.23.03.01.001.003 Ball point 1 Pcs 4,250.00 4,250.00
1.08.23.03.07.999.040 Tas 1 Pcs 75,000.00 75,000.00
1.08.23.03.01.014.00102 Cetak ID Card 1 Pcs 5,100.00 5,100.00
2.03.01.01.03.003 Jilid dan Penggandaan Tipe III (Laporan) Nilai HSPK 29,150.00
1.08.23.03.01.014.0060 Jilid Soft Cover (buku) 1 Buku 4,150.00 4,150.00
1.08.23.03.01.014.0053 Fotocopy (lbr) 100 Lembar 250.00 25,000.00
Catatan:
a. Laporan Kegiatan (dengan tebal cetakan 1 Buku: 50 s/d 100 Lembar); Dicetak 1 Buku
1.05.18.01.05.001.0042 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 467,500.00 467,500.00
empat, 100cm)
1.05.18.01.05.001.0045 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 424,200.00 424,200.00
empat, 80cm)
1.05.18.01.05.001.0047 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 395,400.00 395,400.00
empat, 70cm)
1.08.23.03.01.014.0095 Sertifkat 6 Lmbr 2,600.00 15,600.00
Catatan:
Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Olahraga (Perorangan)
1.05.18.01.05.001.0038 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 576,400.00 576,400.00
empat, 140 cm)
1.05.18.01.05.001.0041 Trofi Pemenang Lomba untuk Juara 2 (kaki 1 Buah 481,900.00 481,900.00
empat, 110 cm)
1.05.18.01.05.001.0042 Trofi Pemenang Lomba untuk Juara 3 (kaki 1 Buah 467,500.00 467,500.00
empat, 100 cm)
1.08.23.03.01.014.0095 Sertifkat 33 Lmbr 2,600.00 85,800.00
Catatan:
Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Olahraga (Kelompok)
1.05.18.01.05.001.0042 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 467,500.00 467,500.00
empat, 100cm)
1.05.18.01.05.001.0045 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 424,200.00 424,200.00
empat, 80cm)
1.05.18.01.05.001.0047 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 395,400.00 395,400.00
empat, 70cm)
1.08.23.03.01.014.0095 Sertifkat 6 Lmbr 2,600.00 15,600.00
Catatan:
Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Seni Budaya (Perorangan)
1.05.18.01.05.001.0038 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 576,400.00 576,400.00
empat, 140 cm)
1.05.18.01.05.001.0041 Trofi Pemenang Lomba untuk Juara 2 (kaki 1 Buah 481,900.00 481,900.00
empat, 110 cm)
1.05.18.01.05.001.0042 Trofi Pemenang Lomba untuk Juara 3 (kaki 1 Buah 467,500.00 467,500.00
empat, 100 cm)
1.08.23.03.01.014.0095 Sertifkat 60 Lmbr 2,600.00 156,000.00
Catatan:
Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Seni Budaya (Kelompok)
1.05.18.01.05.001.0042 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Orang 467,500.00 467,500.00
empat, 100cm)
1.05.18.01.05.001.0045 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 424,200.00 424,200.00
empat, 80cm)
1.05.18.01.05.001.0047 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 395,400.00 395,400.00
empat, 70cm)
1.08.23.03.01.014.0095 Sertifkat 6 Lmbr 2,600.00 15,600.00
Catatan:
Hadiah / Penghargaan Kegiatan Lomba Tk. Kota Bidang Umum (Perorangan)
1.05.18.01.05.001.0038 Trofi Pemenang Lomba untuk Juara 1 (kaki 1 Buah 576,400.00 576,400.00
empat, 140 cm)
1.05.18.01.05.001.0041 Trofi Pemenang Lomba untuk Juara 2 (kaki 1 Buah 481,900.00 481,900.00
empat, 110 cm)
1.05.18.01.05.001.0042 Trofi Pemenang Lomba untuk Juara 3 (kaki 1 Buah 467,500.00 467,500.00
empat, 100 cm)
1.08.23.03.01.014.0095 Sertifkat 60 Lmbr 2,600.00 156,000.00
Catatan:
Hadiah / Penghargaan Kegiatan Lomba Tk.Kota Bidang Umum (Kelompok)
WALIKOTA MOJOKERTO
MASUD YUNUS