BECK UP PEKERJAAN STRUKTUR

PROYEK PEMBANGUNAN GEDUNG G RUMAH SAKIT SOSODORO DJATIKOESOEMA BOJONEGORO

Diameter Dimensi
No. Sket Item Pekerjaan Ket As/Grid Sat
D P L T
1 Kolom K1 40/40 Lt.1 Beton
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

K3 K3 Kolom K1 40/40 0.40 m3 4.65 0.40 0.40


K1 K1 K1 K1 K1 K1
H
0.40 m3 2.95 0.40 0.40
G

K1 K1 K1 K1 K1
E'

D'
K1 K1 K1 K1 K1
Begisting m2 4.650 0.40
K3 K3 K3

m2 2.950 0.40
D

K3 K3 K3
C

K4 K4
B

A'

K1 K1

Pembesian
Besi Ulir Kg 15.70 5.890
Besi Ulir Kg 15.70 3.550

Besi Polos Kg 11.70 1.50


Kg 11.70 1.50

Mengetahui Diperiksa
PETUGAS TIM MONITORING KONSULTAN PENGAWAS
DINAS PEKERJAAN UMUM PT. ARYATAMA DUTA CIPTA
KAB. BOJONEGORO

MUKHLISIN, ST BAMBANG JOELIANTO


BECK UP PEKERJAAN STRUKTUR
PROYEK PEMBANGUNAN GEDUNG G RUMAH SAKIT SOSODORO DJATIKOESOEMA BOJONEGORO

Diameter Dimensi
No. Sket Item Pekerjaan Ket As/Grid Sat
D P L T
NIP.19781220 200112 1 003 Koordinator Pengawas
PEKERJAAN STRUKTUR
AH SAKIT SOSODORO DJATIKOESOEMA BOJONEGORO

Dimensi Volume
Keterangan
Tebal Plat Berat/m' Jumlah Volume CCO-1

10.00 7.44 8.38


2.00 0.94

4.00 10.00 74.40 83.84


4.00 2.00 9.44

1.52 120.00 1,074.06 1,203.53


1.52 24.00 129.47

33.00 0.84 10.00 417.74 481.04


25.00 0.84 2.00 63.29

Bojonegoro, Oktober 2015


Diperiksa Dibuat oleh
KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
PT. ARYATAMA DUTA CIPTA PT. SARANA MULTI USAHA

BAMBANG JOELIANTO EKO SATRIYO


PEKERJAAN STRUKTUR
AH SAKIT SOSODORO DJATIKOESOEMA BOJONEGORO

Dimensi Volume
Keterangan
Tebal Plat Berat/m' Jumlah Volume CCO-1
Koordinator Pengawas Project Manager