Anda di halaman 1dari 35

DAFTAR ISI

BAB I URAIAN UMUM STRUKTUR


B. DATA-DATA PERENCANAAN
C. PEDOMAN PERENCANAAN
D. DATA PEMBEBANAN
BAB II PERENCANAAN PLAT
A. DATA PERENCANAAN PLAT
B. PERHITUNGAN PEMBEBANAN
C. DENAH RENCANA TIPE PLAT LT.2
D. PERHITUNGAN PENULANGAN
• CONTOH PERHITUNGAN PLAT LANTAI
• CONTOH PERHITUNGAN PLAT CANOPY
• TABEL HASIL PERHITUNGAN PLAT
BAB III ANALISA STRUKTUR
A. ANALISA DATA PEMBEBANAN
B. SKETSA MAIN STRUCTURE
C. INPUT DATA ANALISA STRUKTUR
BAB IV PERENCANAAN BALOK
A. DATA PERENCANAAN
B. DENAH PEMBALOKAN
C. TABEL HASIL PERHITUNGAN
BAB V PERENCANAAN KOLOM
A. DATA PERENCANAAN
B. TABEL HASIL ANALISA STRUKTUR
C. TABEL HASIL PERHITUNGAN PENULANGAN
D. GAMBAR PENDENAHAN DAN PENULANGAN KOLOM
BAB VI PERENCANAAN TANGGA
B. DATA PERENCANAAN
C. PERHITUNGAN PENULANGAN
BAB VII PERENCANAAN PONDASI
A. DATA PERENCANAAN
B. PERHITUNGAN PENULANGAN
C. TABEL HASIL PENULANGAN

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


BAB VIII PERENCANAAN SLOOF
A. DATA PERENCANAAN
B. PERHITUNGAN PENULANGAN
C. TABEL HASIL PENULANGAN
LAMPIRAN.

BAB I

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


URAIAN DATA STRUKTUTR

A. DATA – DATA PERENCANAAN


Untuk tahap awal perencanaan diperlukan data-data yang terkait
dengan bangunan yang akan dibangun. Adapun data yang diperlukan
antara lain:
1 Gambar rencana model bangunan.
2 Fungsi penggunaan bangunan.
3 Data mutu bahan untuk struktur.
4 Letak bangunan & kondisi tanah.
B. PEDOMAN PERENCANAAN
Referensi dan peraturan yang digunakan dalam perencanaan struktur
antara lain :
1. Tata Cara Perhitungan Struktur Beton Untuk Bangunan Gedung
SK SNI T–15–1991–03.

2. Peraturan Perencanaan Tahan Gempa Untuk Rumah Dan


Gedung.
3. Peraturan Pembebanan Indonesia Untuk Gedung 1983.
C. DATA PEMBEBANAN
Sesuai dengan peraturan pembebanan Indonesia untuk gedung 1983,
maka:
a. Beban Hidup.
• Ruang Perpustakaan, Pertemuan, Arsip dan Balkon sebesar 400
kg/m2.
• Struktur tudung ( canopy ) sebesar 100 kg/m2.
b. Beban Mati.
• Beton bertulang sebesar 2400 kg/m3.
• Berat kayu kelas II sebesar 700 kg/m3.
• Adukan dari semen per cm tebal sebesar 21 kg/m2.
• Dinding pasangan batu merah setengah batu 250 kg/m2.
• Dinding pasangan batu merah satu batu 450 kg/m2
• Asbes dan penggantung 18 kg/m2.
• Penutup atap genting dengan reng dan usuk 50 kg/m2.

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


• Penutup lantai per cm tebal 24 kg/m2.
c. Beban Angin.
• Beban angin untuk atap 25 kg/m2.

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


BAB II
PERENCANAAN PLAT

B. DATA PERENCANAAN PLAT.


Pengecoran plat direncanakan cor ditempat ( cast in site ) dengan
bantuan perancah dan bekisting.
• Mutu beton K 175 ( f’c = 17,5 Mpa ).
• Elastisitas beton sesuai SK SNI T–15–1991–03,pasal
3.1.5 yaitu:
Ec = 4700 f 'c = 19661,51062 Mpa.
• Mutu baja memakai U 24 : fy = 240 Mpa = 2,4 x 107
kg/m2
• Tebal plat lantai 12 cm.
• Tebal plat canopy 10 cm.
• Tebal selimut beton 20 mm
B. PERHITUNGAN PEMBEBANAN.
a. Plat lantai ( hf =120 mm ).
• Beban mati ( qd ).
Berat sendiri plat = 0,12 x 2400 = 288 kg/m2.
Penutup lantai =2 x 24 = 48 kg/m2.
Spesi lantai =3 x 21 = 63 kg/m2.
Plafound & penggantung = 18 kg/m2.
qd = 417 kg/m2.
• Beban hidup diasumsikan sama semua sebesar ( ql )
= 400 kg/m2.
• Beban terfaktor ( qu )
qu = 1,2 (417 ) + 1,6 ( 400 ) = 1140,4 kg/m2.
b. Plat canopy ( hf = 100 mm )
• Beban mati ( qd ).
Berat sendiri plat = 0,10 x 2400 = 240 kg/m2.
Berat spesi =3 x 21 = 63 kg/m2.
qd = 303 kg/m2.

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


• Beban hidup ( ql ) = 150 kg/m2.
• Beban terfaktor ( qu )
qu = 1,2 (303 ) + 1,6 ( 150 ) = 603,6 kg/m2.
C. DENAH RENCANA TIPE PLAT LT.2

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


D.

18.00 6.50

1 2 3 4 5 6 7 8 9 10 11
3.00 3.00 3.00 3.00 3.00 1.78 1.22 3.25 1.625 1.625

3.50
G G
Plat canopy, hf = 10 cm, L = 1,27 m

B B B B B 3.00

F F
C
1.50 15.50

Plat canopy, hf = 10 cm, L = 1,27 m


B B B B B D
1.50

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


D
E
E E
C C C C C C 1.65
Plat canopy, hf = 10 cm, L = 1,27 m

F 0.35
G

CONTOH PERHITUNGAN PLAT LANTAI.


2.00

H A A 4.00

2.00

PERHITUNGAN PENULANGAN.
H
2.00 J I I

1.60

2.00

24.50

Denah Rencana Tipe Plat Lantai 2


Pengadilan Negeri Pamekasan Gedung C
Plat lantai tipe “A” ( 4,0 m x 3,25 m ).

Ly / Lx = 1,231 ( plat 2 arah )


Ly = 4000 mm

Lx = 3250 mm

M = 0,001 . qu . Lx2 . x
Mlx = 0.001 . 1140,4 . 3,252 . 35,20 = 424,001 kgm
Mly = 0.001 . 1140,4 . 3,252 . 21,40 = 257,773 kgm
Mtx = -0.001 . 1140,4 . 3,252 . 64,35 = 775,126 kgm
Mty = -0.001 . 1140,4 . 3,252 . 54,15 = 562,262 kgm
Direncanakan tulangan pokok : Ø 10 mm
Direncanakan tulangan bagi : Ø 6 mm
dx = h – selimut beton – ½ Ø tulang pokok x
= 120 – 20 – ½ . 10
= 95 mm
dy = h – selimut beton – tulang pokok x - ½ Ø tulang pokok y
= 120 – 20 – 10 - ½ . 10
= 85 mm
PENULANGAN LAPANGAN ARAH X.
Mu = 424,001 kgm
Mu
Mn = = 5.300.009 Nmm
Ø
Mn
Rn = = 0,587
b . dx 2
fy
m = 0,85 . f' c = 22,588

ρ min = 0,002
0,85 β. f' c 600
ρb = .
fy 600 + fy

= 0,0269
ρ max = 0,75 . ρb

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


= 0,0202
1  2 . Rn . m 
ρo = 1 - 1- 
m  fy 

= 0,0025 > ρ min = 0,002 (dipakai ρo)


As prlu = 0,0025 . b . dx
= 239,262 mm2
As Ø10= 78,50 mm2
n = 3,048 ~ 4 batang
Dipakai tulangan Ø10 – 250 ( As ada = 314 mm2 > As prlu )
Untuk hasil perhitungan selanjutnya akan ditabelkan.

• PERHITUNGAN PLAT CANOPY


Plat canopy bentang melintang 1,65 meter.

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


Mu = ½.q.l2
qu = 603,6 kg/m2
= ½.603,6.1,652
= 821,651 kgm
1,65
M
direncanakan TP Ø 8 (As = 50,24
mm2)
direncanakan TB Ø6 (As = 28,30
mm2)
dx = 76 mm
Mu
Mn = = 10.270.631 Nmm
Ø
1,65
M Mn
Rn = = 1,138
b . dx 2
fy
m = 0,85 . f' c = 22,588
Ø10 - 20
ρ min = 0,002
0,85 β. f' c 600
ρb = .
fy 600 + fy

= 0,0269
ρ max = 0,75 . ρb
Ø6 - 30
= 0,0202

1,65 1  2 . Rn . m 
M ρo = 1 - 1- 
m  fy 

= 0,0050>ρ min=0,002(dipakai
ρo)
As prlu = 0,0050 . b . dx
= 478 mm2
n = 6,089 ≈ 7 batang
Dipakai tulangan Ø10 – 14 ( As ada = 549,5 mm2 > As prlu )
Tulang bagi
As TB = 0,2 . As prlu
= 95,6 mm2
n = 3,383 ≈ 4 batang
Dipakai tulangan Ø6 – 30 ( As ada = 113,04 mm2 > As TB )
Untuk hasil perhitungan selanjutnya akan ditabelkan.

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


BAB III
ANALISA STRUKTUR

B. ANALISA DATA PEMBEBANAN


Untuk pembebanan yang berlaku pada struktur utama gedung
Pengadilan Negeri Xxxx antara lain:
Sesuai dengan peraturan pembebanan Indonesia untuk gedung 1983,
maka:
• Beban mati
- Beton bertulang sebesar 2400 kg/m3.
- Berat kayu kelas II sebesar 700 kg/m3.
- Adukan dari semen per cm tebal sebesar 21 kg/m2.
- Dinding pasangan batu merah setengah batu 250 kg/m2.
- Dinding pasangan batu merah satu batu 450 kg/m2
- Asbes dan penggantung 18 kg/m2.
- Penutup atap genting dengan reng dan usuk 50 kg/m2.
- Penutup lantai per cm tebal 24 kg/m2.
• Beban hidup
- Ruang Perpustakaan, Pertemuan, Arsip dan Balkon sebesar
400 kg/m2.
- Struktur tudung ( canopy ) sebesar 100 kg/m2.
• Beban Angin.
- Beban angin untuk atap 25 kg/m2.
• Beban gempa (gempa kanan & gempa kiri) dan,
Untuk data analisa pembebanan gempa:
Koefisien reduksi beban hidup untuk perencanaan balok induk dan
portal dengan mengacu pada fungsi ruang pertemuan, dipakai : 0,9
Koefisien reduksi beban hidup untuk penijauan gempa : 0,5
- Beban massa bangunan W1 total = 164.622,000
kg
- Beban massa bangunan W2 total = 314.949,317
kg

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


- Beban massa bangunan W3 total = 118.350,920
kg
- Jumlah masa bangunan W total = 597.922,237 kg
- Waktu getar bangunan ( T ) = 0,06.H3/4 = 0,320
detik
- Koefisien gempa dasar ( C ) dari wilayah zona
gempa – 4 dengan jenis tanah keras = 0,03
- Faktor keutamaan ( I ) = 1,5
- Faktor jenis Struktur ( K ) = 1,0
- Gaya geser horisontal total akibat gempa
Vx = Vy = C.I.K.Wt = 26.906, kg
- Distribusi gaya geser horisontal total akibat
gempa
Arah X = 0,380 < 3
Arah Y = 0,600 < 3
Distribusi gaya geser dasar horizontal total akibat gempa ke sepanjang
tinggi bangunan dalam arah X dan Y
LE VEL hi wi wi x hi Fix = Fiy UNTUK TIAP PORTAL
m kg kgm total 1/ 4 Fix ( kg )1/ 9 Fiy ( kg )
w1 9.3 164,622.000 1,530,984.600 11,460.473 2,865.118 1,273.386
w2 5.8 314,949.317 1,826,706.039 13,674.151 3,418.538 1,519.350
w3 2 118,350.920 236,701.840 1,771.876 442.969 196.875
Σ 597,922.237 3,594,392.479 26,906.501 6,726.625 2,989.611

• Kombinasi pembebanan :
- Kombinasi beban mati + beban hidup
- Kombinasi beban mati + beban hidup + beban
gempa kiri
- Kombinasi beban mati + beban hidup + beban
gempa kanan
B. SKETSA MAIN STRUCTURE

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


C. INPUT DATA ANALISA STRUKTUR
STAAD SPACE STRUKTUR PN
START JOB INFORMATION
JOB NAME ANALISA STRUKTUR
JOB CLIENT PN
JOB NO 001
JOB PART 001
ENGINEER NAME DAW
CHECKER NAME WWN
ENGINEER DATE 08-Apr-06
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KG
JOINT COORDINATES
1 48.75 0 0; 2 52 0 3.5; 3 45.5 0 3.5; 4 52 0 8; 5 48.75 0 8; 6 45.5 0 8;
7 52 0 11.5; 8 48.75 0 11.5; 9 45.5 0 11.5; 10 52 0 15.5; 11 48.75 0 15.5;
12 45.5 0 15.5; 13 44.2 0 15.5; 14 42.5 0 3.5; 15 42.5 0 9.5; 16 39.5 0 9.5;
17 39.5 0 3.5; 18 36.5 0 3.5; 19 36.5 0 9.5; 20 33.5 0 9.5; 21 33.5 0 3.5;
22 30.5 0 3.5; 23 30.5 0 9.5; 24 27.5 0 9.5; 25 27.5 0 3.5; 26 27.5 0 11.15;
27 33.5 0 11.15; 28 39.5 0 11.15; 29 26 0 11.15; 30 26 0 9.5; 31 42.5 0 6.5;
32 27.5 0 6.5; 33 48.75 2 0; 34 52 2 3.5; 35 45.5 2 3.5; 36 45.5 2 8;
37 48.75 2 8; 38 52 2 8; 39 52 2 11.5; 40 48.75 2 11.5; 41 45.5 2 11.5;
42 45.5 2 15.5; 43 48.75 2 15.5; 44 52 2 15.5; 45 44.2 2 15.5; 46 42.5 2 3.5;
47 42.5 2 6.5; 48 42.5 2 9.5; 49 39.5 2 9.5; 50 39.5 2 6.5; 51 39.5 2 3.5;
52 36.5 2 3.5; 53 36.5 2 6.5; 54 36.5 2 9.5; 55 33.5 2 9.5; 56 33.5 2 6.5;
57 33.5 2 3.5; 58 30.5 2 3.5; 59 30.5 2 6.5; 60 30.5 2 9.5; 61 27.5 2 9.5;
62 27.5 2 6.5; 63 27.5 2 3.5; 64 39.5 2 11.15; 65 33.5 2 11.15;
66 27.5 2 11.15; 67 26 2 11.15; 68 26 2 9.5; 69 48.75 2 3.5; 70 42.5 2 8;
71 42.5 2 11.15; 72 44.2 2 11.15; 73 44.2 2 11.5; 74 48 2 8; 75 48 2 11.5;
76 49.5 2 8; 77 49.5 2 11.5; 78 48.75 5.8 0; 79 52 5.8 3.5; 80 45.5 5.8 3.5;
81 45.5 5.8 8; 82 48.75 5.8 8; 83 52 5.8 8; 84 52 5.8 11.5; 85 48.75 5.8 11.5;
86 45.5 5.8 11.5; 87 45.5 5.8 15.5; 88 48.75 5.8 15.5; 89 52 5.8 15.5;
90 44.2 5.8 15.5; 91 42.5 5.8 3.5; 92 42.5 5.8 6.5; 93 42.5 5.8 9.5;

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


94 39.5 5.8 9.5; 95 39.5 5.8 6.5; 96 39.5 5.8 3.5; 97 36.5 5.8 3.5;
98 36.5 5.8 6.5; 99 36.5 5.8 9.5; 100 33.5 5.8 9.5; 101 33.5 5.8 6.5;
102 33.5 5.8 3.5; 103 30.5 5.8 3.5; 104 30.5 5.8 6.5; 105 30.5 5.8 9.5;
106 27.5 5.8 9.5; 107 27.5 5.8 6.5; 108 27.5 5.8 3.5; 109 39.5 5.8 11.15;
110 33.5 5.8 11.15; 111 27.5 5.8 11.15; 112 48.75 9.3 0; 113 52 9.3 3.5;
114 45.5 9.3 3.5; 115 45.5 9.3 8; 116 52 9.3 8; 117 52 9.3 11.5;
118 48.75 9.3 11.5; 119 45.5 9.3 11.5; 120 45.5 9.3 15.5; 121 48.75 9.3 15.5;
122 52 9.3 15.5; 123 44.2 9.3 15.5; 124 42.5 9.3 3.5; 125 42.5 9.3 6.5;
126 42.5 9.3 9.5; 127 39.5 9.3 9.5; 128 39.5 9.3 3.5; 129 52 2 9.75;
130 49.5 2 9.75; 131 36.5 2 11.15; 132 32 2 3.5; 133 32 2 6.5; 134 32 2 9.5;
135 30.5 2 11.15; 136 26 5.8 11.15; 137 26 5.8 9.5; 138 48.75 5.8 3.5;
139 42.5 5.8 8; 140 42.5 5.8 11.15; 141 44.2 5.8 11.15; 142 44.2 5.8 11.5;
143 52 5.8 16.5; 144 48.75 5.8 16.5; 145 45.5 5.8 16.5; 146 44.2 5.8 16.5;
147 45.5 5.8 11.15; 148 50.375 5.8 11.5; 149 50.375 5.8 15.5; 150 52 5.8 14;
151 50.375 5.8 14; 152 48.75 5.8 14; 153 36.5 5.8 11.15; 154 30.5 5.8 11.15;
155 36.5 9.3 3.5; 156 36.5 9.3 6.5; 157 36.5 9.3 9.5; 158 33.5 9.3 9.5;
159 33.5 9.3 3.5; 160 30.5 9.3 3.5; 161 30.5 9.3 9.5; 162 27.5 9.3 9.5;
163 27.5 9.3 6.5; 164 27.5 9.3 3.5; 165 39.5 9.3 11.15; 166 33.5 9.3 11.15;
167 27.5 9.3 11.15; 168 26 9.3 11.15; 169 26 9.3 9.5; 170 42.5 9.3 8;
171 42.5 9.3 11.15; 172 44.2 9.3 11.15; 173 44.2 9.3 11.5; 174 52 2 3.3;
175 52 2 3.05; 176 51.95 2 2.65; 177 51.9 2 2.45; 178 51.85 2 2.25;
179 51.75 2 2; 180 51.55 2 1.6; 181 51.35 2 1.3; 182 51.1 2 1; 183 50.9 2 0.8;
184 50.55 2 0.55; 185 50.3 2 0.4; 186 50 2 0.25; 187 49.55 2 0.1;
188 49.3 2 0.05; 189 45.5 2 3.1; 190 45.55 2 2.65; 191 45.65 2 2.25;
192 45.75 2 2; 193 45.95 2 1.6; 194 46.15 2 1.3; 195 46.35 2 1.05;
196 46.5 2 0.9; 197 46.8 2 0.65; 198 46.95 2 0.55; 199 47.1 2 0.45;
200 47.2 2 0.4; 201 47.5 2 0.25; 202 47.65 2 0.2; 203 47.95 2 0.1;
204 48.2 2 0.05; 205 52 5.8 3.3; 206 52 5.8 3.05; 207 51.95 5.8 2.65;
208 51.9 5.8 2.45; 209 51.85 5.8 2.25; 210 51.75 5.8 2; 211 51.55 5.8 1.6;
212 51.35 5.8 1.3; 213 51.1 5.8 1; 214 50.9 5.8 0.8; 215 50.55 5.8 0.55;
216 50.3 5.8 0.4; 217 50 5.8 0.25; 218 49.55 5.8 0.1; 219 49.3 5.8 0.05;
220 45.5 5.8 3.1; 221 45.55 5.8 2.65; 222 45.65 5.8 2.25; 223 45.75 5.8 2;
224 45.95 5.8 1.6; 225 46.15 5.8 1.3; 226 46.35 5.8 1.05; 227 46.5 5.8 0.9;
228 46.8 5.8 0.65; 229 46.95 5.8 0.55; 230 47.1 5.8 0.45; 231 47.2 5.8 0.4;
232 47.5 5.8 0.25; 233 47.65 5.8 0.2; 234 47.95 5.8 0.1; 235 48.2 5.8 0.05;
236 52 9.3 3.3; 237 52 9.3 3.05; 238 51.95 9.3 2.65; 239 51.9 9.3 2.45;
240 51.85 9.3 2.25; 241 51.75 9.3 2; 242 51.55 9.3 1.6; 243 51.35 9.3 1.3;
244 51.1 9.3 1; 245 50.9 9.3 0.8; 246 50.55 9.3 0.55; 247 50.3 9.3 0.4;
248 50 9.3 0.25; 249 49.55 9.3 0.1; 250 49.3 9.3 0.05; 251 45.5 9.3 3.1;
252 45.55 9.3 2.65; 253 45.65 9.3 2.25; 254 45.75 9.3 2; 255 45.95 9.3 1.6;
256 46.15 9.3 1.3; 257 46.35 9.3 1.05; 258 46.5 9.3 0.9; 259 46.8 9.3 0.65;
260 46.95 9.3 0.55; 261 47.1 9.3 0.45; 262 47.2 9.3 0.4; 263 47.5 9.3 0.25;
264 47.65 9.3 0.2; 265 47.95 9.3 0.1; 266 48.2 9.3 0.05;
MEMBER INCIDENCES
1 1 33; 2 2 34; 3 3 35; 4 4 38; 5 7 39; 6 10 44; 7 5 37; 8 6 36; 9 8 40;
10 9 41; 11 11 43; 12 12 42; 13 13 45; 14 14 46; 15 15 48; 16 17 51; 17 16 49;
18 28 64; 19 18 52; 20 21 57; 21 19 54; 22 20 55; 23 27 65; 24 22 58; 25 23 60;
26 25 63; 27 24 61; 28 26 66; 29 30 68; 30 29 67; 31 79 34; 32 80 35; 33 78 33;
34 83 38; 35 84 39; 36 89 44; 37 34 69; 38 69 35; 39 33 69; 40 34 38;
41 38 129; 42 39 44; 43 44 43; 44 43 42; 45 42 45; 46 39 77; 47 40 75;
48 38 76; 49 37 74; 50 43 40; 51 37 69; 52 42 41; 53 41 36; 54 36 35; 55 35 46;
56 46 51; 57 51 52; 58 52 57; 59 57 132; 60 58 63; 61 47 50; 62 50 53;

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


63 53 56; 64 56 133; 65 59 62; 66 48 49; 67 49 54; 68 54 55; 69 55 134;
70 60 61; 71 61 68; 72 67 66; 73 66 135; 74 65 131; 75 68 67; 76 63 62;
77 62 61; 78 61 66; 79 58 59; 80 59 60; 81 57 56; 82 56 55; 83 55 65; 84 52 53;
85 53 54; 86 51 50; 87 50 49; 88 49 64; 89 46 47; 90 47 70; 91 70 48; 92 36 70;
93 48 71; 94 64 71; 95 71 72; 96 72 73; 97 73 45; 98 41 73; 99 79 138;
100 138 80; 101 78 138; 102 83 84; 103 84 150; 104 89 149; 105 88 87;
106 87 90; 107 84 148; 108 85 86; 109 83 82; 110 82 81; 111 88 152; 112 85 82;
113 87 86; 114 86 147; 115 80 91; 116 91 96; 117 96 97; 118 97 102;
119 102 103; 120 103 108; 121 92 95; 122 95 98; 123 98 101; 124 101 104;
125 104 107; 126 93 94; 127 94 99; 128 99 100; 129 100 105; 130 105 106;
131 106 137; 132 136 111; 133 111 154; 134 110 153; 135 137 136; 136 108 107;
137 107 106; 138 106 111; 139 103 104; 140 104 105; 141 102 101; 142 101 100;
143 100 110; 144 97 98; 145 98 99; 146 96 95; 147 95 94; 148 94 109; 149 91 92;
150 92 139; 151 139 93; 152 81 139; 153 93 140; 154 109 140; 155 140 141;
156 141 142; 157 142 90; 158 86 142; 159 113 116; 160 116 117; 161 117 122;
162 122 121; 163 121 120; 164 120 123; 165 117 118; 166 118 119; 167 121 118;
168 120 119; 169 119 115; 170 115 114; 171 114 124; 172 124 128; 173 128 155;
174 155 159; 175 159 160; 176 160 164; 177 126 127; 178 127 157; 179 157 158;
180 158 161; 181 161 162; 182 162 169; 183 168 167; 184 167 166; 185 166 165;
186 169 168; 187 164 163; 188 163 162; 189 162 167; 190 158 166; 191 155 156;
192 156 157; 193 127 165; 194 124 125; 195 125 170; 196 170 126; 197 115 170;
198 126 171; 199 165 171; 200 171 172; 201 172 173; 202 173 123; 203 119 173;
204 122 89; 205 121 88; 206 120 87; 207 123 90; 208 117 84; 209 118 85;
210 119 86; 211 112 78; 212 113 79; 213 114 80; 214 116 83; 215 115 81;
216 124 91; 217 88 43; 218 87 42; 219 91 46; 220 96 51; 221 97 52; 222 102 57;
223 103 58; 224 93 48; 225 94 49; 226 99 54; 227 100 55; 228 105 60;
229 108 63; 230 106 61; 231 86 41; 232 81 36; 233 82 37; 234 85 40; 235 111 66;
236 110 65; 237 109 64; 238 90 45; 239 137 68; 240 136 67; 241 128 96;
242 155 97; 243 159 102; 244 160 103; 245 164 108; 246 74 36; 247 75 41;
248 76 37; 249 77 40; 250 76 130; 251 74 75; 252 129 39; 253 130 77;
254 129 130; 255 131 64; 256 54 131; 257 132 58; 258 133 59; 259 134 60;
260 135 65; 261 132 133; 262 133 134; 263 60 135; 264 89 143; 265 88 144;
266 87 145; 267 143 144; 268 144 145; 269 145 146; 270 146 90; 271 147 81;
272 147 141; 273 148 85; 274 149 88; 275 148 151; 276 150 89; 277 151 149;
278 152 85; 279 150 151; 280 151 152; 281 153 109; 282 154 110; 283 99 153;
284 105 154; 285 113 114; 286 126 93; 287 127 94; 288 157 99; 289 156 98;
290 165 109; 291 158 100; 292 166 110; 293 161 105; 294 162 106; 295 167 111;
296 169 137; 297 168 136; 298 80 81; 299 138 82; 300 79 83; 301 163 107;
302 107 62; 303 125 92; 304 92 47; 305 31 47; 306 32 62; 307 34 174;
308 174 175; 309 175 176; 310 176 177; 311 177 178; 312 178 179; 313 179 180;
314 180 181; 315 181 182; 316 182 183; 317 183 184; 318 184 185; 319 185 186;
320 186 187; 321 187 188; 322 188 33; 323 35 189; 324 189 190; 325 190 191;
326 191 192; 327 192 193; 328 193 194; 329 194 195; 330 195 196; 331 196 197;
332 197 198; 333 198 199; 334 199 200; 335 200 201; 336 201 202; 337 202 203;
338 203 204; 339 204 33; 340 79 205; 341 205 206; 342 206 207; 343 207 208;
344 208 209; 345 209 210; 346 210 211; 347 211 212; 348 212 213; 349 213 214;
350 214 215; 351 215 216; 352 216 217; 353 217 218; 354 218 219; 355 219 78;
356 80 220; 357 220 221; 358 221 222; 359 222 223; 360 223 224; 361 224 225;
362 225 226; 363 226 227; 364 227 228; 365 228 229; 366 229 230; 367 230 231;
368 231 232; 369 232 233; 370 233 234; 371 234 235; 372 235 78; 373 113 236;
374 236 237; 375 237 238; 376 238 239; 377 239 240; 378 240 241; 379 241 242;
380 242 243; 381 243 244; 382 244 245; 383 245 246; 384 246 247; 385 247 248;

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


386 248 249; 387 249 250; 388 250 112; 389 114 251; 390 251 252; 391 252 253;
392 253 254; 393 254 255; 394 255 256; 395 256 257; 396 257 258; 397 258 259;
398 259 260; 399 260 261; 400 261 262; 401 262 263; 402 263 264; 403 264 265;
404 265 266; 405 266 112;
DEFINE MATERIAL START
ISOTROPIC MATERIAL1
E 1.96615e+009
POISSON 0.119501
DENSITY 2400
DAMP 2.8026e-044
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
1 TO 30 305 306 PRIS YD 0.3 ZD 0.25
31 TO 36 217 TO 240 302 304 PRIS YD 0.3 ZD 0.25
204 TO 216 241 TO 245 286 TO 297 301 303 PRIS YD 0.3 ZD 0.25
37 TO 98 246 TO 263 307 TO 339 PRIS YD 0.25 ZD 0.15
99 100 104 105 107 TO 110 136 137 139 TO 142 144 TO 147 149 TO 152 273 -
274 PRIS YD 0.5 ZD 0.25
115 TO 131 PRIS YD 0.3 ZD 0.15
106 135 138 143 148 153 158 264 TO 266 272 283 284 PRIS YD 0.3 ZD 0.15
132 TO 134 154 TO 157 267 TO 270 281 282 PRIS YD 0.3 ZD 0.1
101 TO 103 111 TO 114 271 276 278 298 TO 300 PRIS YD 0.4 ZD 0.25
340 TO 372 PRIS YD 0.5 ZD 0.25
275 277 279 280 PRIS YD 0.3 ZD 0.15
159 TO 203 285 373 TO 405 PRIS YD 0.25 ZD 0.15
CONSTANTS
BETA 90 MEMB 14 TO 30 216 219 TO 230 235 TO 237 239 TO 245 286 TO 297 301 -
302 TO 306
MATERIAL MATERIAL1 MEMB 1 TO 405
SUPPORTS
1 TO 32 FIXED
LOAD 1 `BEBAN MATI
SELFWEIGHT Y -1
FLOOR LOAD
YRANGE 5.8 5.8 FLOAD -417 XRANGE 26 42.5 ZRANGE 3.5 11.5
YRANGE 5.8 5.8 FLOAD -417 XRANGE 45.5 52 ZRANGE 0 16.5
YRANGE 5.8 5.8 FLOAD -417 XRANGE 42.5 45.5 ZRANGE 8 16.5
MEMBER LOAD
102 TO 105 113 TO 120 126 TO 130 136 137 149 TO 152 271 274 276 298 -
300 UNI GY -875
340 TO 372 UNI GY -1575
131 TO 134 154 TO 157 264 267 TO 270 281 282 UNI GY -200
102 103 115 TO 120 136 137 276 300 340 TO 372 UNI GY -484.8
40 TO 44 46 TO 50 52 54 TO 62 66 68 TO 70 76 77 84 85 87 89 TO 92 246 TO 254 -
257 259 261 262 UNI GY -950
307 TO 339 UNI GY -1710
159 TO 164 168 169 171 TO 181 187 188 373 TO 405 UNI GY -484.8
JOINT LOAD
113 TO 117 119 TO 122 124 126 TO 128 155 157 TO 164 FY -1200
LOAD 2 `BEBAN HIDUP
FLOOR LOAD
YRANGE 5.8 5.8 FLOAD -400 XRANGE 26 42.5 ZRANGE 3.5 11.5

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


YRANGE 5.8 5.8 FLOAD -400 XRANGE 45.5 52 ZRANGE 0 16.5
YRANGE 5.8 5.8 FLOAD -400 XRANGE 42.5 45.5 ZRANGE 8 16.5
MEMBER LOAD
102 103 115 TO 120 136 137 276 300 340 TO 372 UNI GY -240
152 UNI GY -495
JOINT LOAD
113 TO 122 124 TO 128 155 TO 164 170 FY -843.73
LOAD 3 BEBAN GEMPA KI
JOINT LOAD
113 114 118 124 128 155 159 160 164 FZ 1300
79 80 85 91 96 97 102 103 108 FZ 1519.35
34 35 40 46 51 52 57 58 63 FZ 196.875
112 120 162 164 FX 2865.12
78 87 106 108 FX 3418.54
33 42 61 63 FX 442.969
LOAD 4 BEBAN GEMPA KA
JOINT LOAD
117 TO 119 126 127 157 158 161 162 FZ -1273.39
112 113 122 126 FX -2865.12
84 TO 86 93 94 99 100 105 106 FZ -1519.35
78 79 84 89 FX -3418.54
39 TO 41 48 49 54 55 60 61 FZ -196.875
33 34 39 44 FX -442.969
PERFORM ANALYSIS
PERFORM ANALYSIS
FINISH

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


BAB IV
PERENCANAAN BALOK

A. DATA PERENCANAAN
- Mutu beton : K 175 (175 kg/cm2) / f’c = 17,5 Mpa.
- Mutu baja : U 32 (3200 kg/cm2) / fy = 320 Mpa.
U 24 (2400 kg/cm2) / fy = 240 Mpa.
- Dimensi balok / batang
• Lantai 1 ( sloof ) : /20, 20/30
15

• Lantai 2 ( Balok ) : /30 ,20/30, 20/35, 25/50,


15

• Balok ring : /25 ,


15

B. TABEL HASIL PERHITUNGAN PENULANGAN


• PERHITUNGAN PENULANGAN AKAN DITABELKAN

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


BAB V
PERENCANAAN KOLOM

A. DATA PERENCANAAN
- Mutu beton : K 175 (175 kg/cm2) / f’c = 17,5 Mpa.
- Mutu baja : U 32 (3200 kg/cm2) / fy = 320 Mpa.
- U 24 (2400 kg/cm2) / fy = 240 Mpa.
- Dimensi kolom
• Bawah sloof / kolom pondasi : 30/30 & 30/50
• Lantai 1 : 30/30 , 30/50 & praktis
• Lantai 2 : 30/30 & praktis

TABEL HASIL ANALISA STRUKTUR

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


B. TABEL HASIL PERHITUNGAN PENULANGAN
TABEL PENULANGAN KOLOM
Kolom
Spesifikasi
K1 K2 K3
Momen dan gaya aksial rencana
24352,15 13667,30
Pu (kg) 3 5 2931,476
(kg.m
Mu ) 3872,607 151,927 17,334
e (mm) 159,025 11,116 5,913
Penampang balok
b (mm) 300 300 300
h (mm) 300 300 300
Ag (mm²) 90000 90000 90000
Rencana penulangan pokok
Tul. pokok (mm) 16 16 16
Sengkang (mm) 8 8 8
Sel. Beton (mm) 40 40 40
d (mm) 244 244 244
d' (mm) 56 56 56
fy (MPa) 320 320 320
f'c (MPa) 12,5 12,5 12,5
 0,65 0,65 0,65
Menentukan penulangan
g (%) 1 0,8 0,5
As = As' (mm²) 732 585,6 366
(buah
Jml. Tulangan ) 4 Ø 16 3 Ø 16 2 Ø 16
Tul/lapis 1 1 1
As ada (mm²) 804,248 603,186 402,124
 0,0110 0,0082 0,0055
Pemeriksaan Pu terhadap beban setimbang Pub
cb (mm) 159,130 159,130 159,130
β1 0,85 0,85 0,85
ab (mm) 135,261 135,261 135,261
s 0,0019 0,0019 0,0019
fs' (MPa) 388,852 388,852 388,852
Pnb (kg) 28025 28025 28025
Kehancuran diawali oleh Tulangan Tulangan Tulangan
Pemeriksaan kekuatan penampang
34278,07 71264,85 69131,41
Pn (kg) 1 1 1

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


0,1×Ag×f'c (kg) 11250 11250 11250
Persyaratan terpenuhi Ya Ya Ya
Pemeriksaan tegangan pada tulangan tekan
fs' (MPa) 427,374 516,968 514,405
Tulangan tekan luluh Ya Ya Ya
Cek letak tulangan 276 276 276
Keadaan Kolom Pass Pass Pass
Jml. Tulangan kolom 12 Ø 16 8 Ø 16 4 Ø 16
Rencana penulangan geser
Gaya lateral rencana
Vu (kg) 4200 1800 1560
15129,02 14053,86 12973,58
Vc (kg) 1 9 8
Tulangan geser Praktis Praktis Praktis
S maks (mm) Ø 8 - 122 Ø 8 - 122 Ø 8 - 122

D. GAMBAR PENDENAHAN DAN PENULANGAN KOLOM

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


BAB VI
PERENCANAAN PONDASI

A. DATA PERENCANAAN
Dari hasil penyelidikan tanah dilapangan maupun di laboratorium
dapat diketahui data-data tanah yang ada. Dengan demikian dapat
ditentukan kedalaman dan jenis pondasi yang akan digunakan
sesuai dangan daya dukung tanah.
Dalam perencanaan ini dipilih jenis pondasi dengan spesifikasi
sebagai berikut:
 Jenis pondasi :Foot plat ( pondasi dangkal setempat )
dengan ukuran dimensi ( 1,5 x1,5 ) Meter.
 Kedalaman :± 1,4 meter dengan tegangan ijin tanah
berdasarkan nilai tekanan conus terkecil ( qc )
sebesar 10 kg/cm}2 yang doperoleh dari hasil
sounding test dengan data secara lengkap
terlampir.
 Mutu beton :Dipakai mutu beton dengan karakteristik
sebesar 125 kg/cm2 ( K 125 ).
 Mutu baja :Digunakan mutu baja sesuai pasar yaitu baja
polos dengan tegangan leleh ( fy ) = 240 Mpa.

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


B. PERHITUNGAN PENULANGAN
ANALISA DATA PEMBEBANAN:
- b.s pondasi :1.546,560 kg
- b.tnh. urug :5.875,200 kg +
:7.421,760 kg
qu = 1,2 . 7.421,760 = 8906,112 kg
Mu = 2.115,608 kgm
Pu = 41.485,944 kg

PERHITUNGAN PENULANGAN PONDASI SETEMPAT PADA JOIN “3”


(diambil beban beban max yang terjadi)
Penulangan arah melintang

Mz = Mu = 2.115,608 kgm
= 211.560,800 kgcm
Pu = 41.485,944 + (1,2 . 7.421,760)
150
= 50.392,056 kg
σ tan = 10 kg/cm2
A = 22.500 cm2
Pu
W = 1/6. 150. 1502 = 562.500 cm3
Digunakan tulangan pokok Ø 16 mm
dx = 122 mm
M
dy = 106 mm
Tegangan pondasi
25
P M
18
σ= ±
A W
150

60
30
60
σ min = 1,864 kg/cm2
σ max= 2,616 kg/cm2
σmin

σmax y1
y2 = 1,046 cm
Q1
y2 y1 = 1,569 cm
Q2 Q1 = 14.125,077 kg

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


Q2 = 4.708,359 kg
Mx= 612.086,675 . 102 Nmm
Rn = 3,427 MPa
ρ min = 0,00583
ρb = 0,02688
ρ max= 0,02016
m = 22,588
ρ = 0,01790 < ρ max
As prlu = 0,01790 . 1500 . 122 =
3275,038 mm2
Dipakai tulangan pokok melintang Ø16 –
80
Penulangan arah memanjang

My = Mu = 1.916,345 kgm
= 191.634,5 kgcm
Pu = 41.485,944 kg
σ tan = 10 kg/cm2
A = 40.000 cm3
150
W = 1/6. 150. 1502 =562.500 cm3
Digunakan tulangan pokok Ø 16 mm
dy = 106 mm
Pu
Tegangan pondasi
P M
σ= ±
A W
M σ min = 1,899 kg/cm2
σ max= 2,580 kg/cm2

25
y2 = 1,032 cm
18
y1 = 1,548 cm
150

30
Q1 = 13.933,785 kg
60 60

Q2 = 4.644,595 kg
σmin
y1
Mx= 603.797,334 . 102 Nmm
σmax
Q1
y2
Rn = 4,478
Q2

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


ρ min = 0,00583
ρb = 0,02688
ρ max= 0,02016
m = 21,513
ρ = 0,0267
As prlu = 0,0267 . 1500 . 106 =
4.249,471 mm2
Dipakai tulangan pokok melintang Ø16 –
60

KONTROL GESER FRIKSI PADA KETEBALAN PLAT PONDASI


β = h.kolom / b.kolom
= 300 / 300 = 1
bo = keliling bidang dasar
= ( 2 x 800 ) + ( 2 x 800 )
= 3200 mm
d = 180 – 50 – ½ .16
= 122 mm
vc = [ 1+ 1/βc]. 1/6 12,51/2 . 3200 . 122
= 460.090,812 N
vc = 1/3 fc’1/2. bo.d
= 460.090,812 N
dipakai vc = 460.090,812 N
∅vc= 0,6 . 460.090,812
= 276.054,487 N
Pu = Vu = 41.485,944 kg ~ 414.859,440 N
∅vc = 276.054,487 N < 414.859,440 N
Vu > ∅vc
Vs prlu = (Vu / ∅) – Vc
= 231.341,588 N
∅16 = 200,96 mm2
Vs = 231.341,588 / 200,96 . 240

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


= 4,797 ~ 5 btng

BAB VII
PERENCANAAN TANGGA

A. DATA PERENCANAAN
 Mutu beton :Dipakai mutu beton untuk penggunaan
umum dengan karakteristik sebesar 175 kg/cm 2 ( K
175 ).
 Mutu baja :Digunakan mutu baja sesuai pasar yaitu baja
polos dengan tegangan leleh ( fy ) = 240 Mpa.
L1 = 202 2 + 300 2

= 361,668 cm
L2 = 198 2 + 300 2
= 359,450 cm
θ1 = arc tg 202 / 300 = 33,95o
θ2 = arc tg 198 / 300 = 33,45o
tebal plat tangga 1 arah
L = 361,668 cm
h = (l / 20 ) ( 0,4 + ( 240 / 700 ) )
= 13,446 cm
dipakai 15 cm

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


B. PEMBEBANAN
Beban mati sendiri = 360 kg/m’
Berat tegel per cm tbl = 48 kg/m’
Berat spesi per cm tbl = 42 kg/m’
Berat sandaran = 50 kg/m’
Berat anak tangga = 84 kg/m
Jmlh total beban mati tangga = 584 kg/m’
Jmlh total beban mati bordes = 400 kg/m’
Berat hidup = 300 kg/m
Untuk hasil analisa statika terlampir

PERHITUNGAN PENULANGAN
- BORDES
b = 1000 mm
h = 150 mm
direncanakan TP Ø 10 (As = 78,5 mm2)
direncanakan TB Ø6 (As = 28,3 mm2)
d = 125 mm
tumpuan C
Mu = 746,8 kgm ~ 746,8 . 104 Nmm
Mu
Mn = = 9335000 Nmm
Ø
Mn
Rn = =0,597 MPa
b . dx 2
fy
m = 0,85 . f' c =16,134

ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy

= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1  2 . Rn . m 
ρo = 1 - 1- 
m  fy 

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


= 0,0025 < ρ min = 0,00583 (dipakai ρ min)
As prlu = 0,00583 . b . dx
= 728,75 mm2
n = 9,28 ≈ 10 batang
Dipakai tulangan Ø10 – 100 ( As ada = 785 mm2 > As prlu )
Tulang bagi
As TB = 0,2 . As prlu
= 145,75 mm2
n = 5,157 ≈ 6 batang
Dipakai tulangan Ø6 – 160 ( As ada = 169,56 mm2 > 145,75 mm2
)
- TANGGA
Tumpuan
b = 1000 mm
h = 150 mm
direncanakan TP Ø 10 (As = 78,5 mm2)
direncanakan TB Ø6 (As = 28,3 mm2)
d = 125 mm
Mu = 783,264 kgm ~ 783,264 . 104 Nmm
Mu
Mn = = 9790800 Nmm
Ø
Mn
Rn = =0,6266 MPa
b . dx 2
fy
m = 0,85 . f' c =16,134

ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy

= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1  2 . Rn . m 
ρo = 1 - 1- 
m  fy 

= 0,00267 < ρ min = 0,00583 (dipakai ρ min)

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


As prlu = 0,00583 . b . dx
= 728,75 mm2
n = 9,28 ≈ 10 batang
Dipakai tulangan Ø10 – 100 ( As ada = 785 mm2 > As prlu )
Tulang bagi
As TB = 0,2 . As prlu
= 145,75 mm2
n = 5,157 ≈ 6 batang
Dipakai tulangan Ø6 – 160 ( As ada = 169,56 mm2 > 145,75 mm2
)

Lapangan
Mu = 331,553 kgm ~ 331,553 . 104 Nmm
Mu
Mn = = 4144412,5 Nmm
Ø
Mn
Rn = =0,265 MPa
b . dx 2
fy
m = 0,85 . f' c =16,134

ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy

= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1  2 . Rn . m 
ρo = 1 - 1- 
m  fy 

= 0,001 < ρ min = 0,00583 (dipakai ρ min)


As prlu = 0,00583 . b . dx
= 728,75 mm2
n = 9,28 ≈ 10 batang
Dipakai tulangan Ø10 – 100 ( As ada = 785 mm2 > As prlu )

- BALOK BORDES

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


h = 300 mm
b = 150 mm
berat sendiri = 108 kg/m
berat reaksi plat= 894,666 kg/m
jumlah beban = 1002,666 kg/m
beban terfaktor = 1,2 . 1002,666 = 1203,1992 kg/m
momen lapangan = 108,288 kgm
momen tumpuan = 144,384 kgm

tumpuan
Mu = 144,384 kgm ~ 144,384 . 104 Nmm
d = 263 mm
direncanakan TP Ø 12 (As = 113,04 mm2)
direncanakan TB Ø6 (As = 28,3 mm2)
Mu
Mn = = 1804800 Nmm
Ø
Mn
Rn = =0,174 MPa
b . dx 2
fy
m = 0,85 . f' c =16,134

ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy

= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1  2 . Rn . m 
ρo = 1 - 1- 
m  fy 

= 0,00073 < ρ min = 0,00583 (dipakai ρ min)


As prlu = 0,00583 . b . dx
= 229,9935 mm2
n = 2,035 ≈ 3 batang
Dipakai tulangan 3 Ø12 ( As ada = 339,120 mm2 > As prlu )

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


Tulang sengkang
Vu = 601,5996 kg ~6,015996 KN
d act = 263 mm
Vc = 1/6 fc' b.d
= 27505,1984 N
½ Ø Vc = 8251,5595 N
karena ½ Ø Vc > Vu (dipakai tulang sengkang praktis )
TS Ø 6 – 130

LAMPIRAN

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


LAMPIRAN
OUT PUT DATA ANALISA STRUKTUR
GEDUNG

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


TABEL HASIL ANALISA STRUKTUR UNTUK PERENCANAAN
PONDASI

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


LAMPIRAN
OUT PUT DATA ANALISA STRUKTUR
TANGGA

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN


LAMPIRAN
DATA ANALISA TANAH
( TEST SONDIR )

KONSULTAN PERENCANA CV. JAKA PRENWAS KONSULTAN

Anda mungkin juga menyukai