BAB I
1 2 3 4 5 6 7 8 9 10 11
3.00 3.00 3.00 3.00 3.00 1.78 1.22 3.25 1.625 1.625
3.50
G G
Plat canopy, hf = 10 cm, L = 1,27 m
B B B B B 3.00
F F
C
1.50 15.50
F 0.35
G
H A A 4.00
2.00
PERHITUNGAN PENULANGAN.
H
2.00 J I I
1.60
2.00
24.50
Lx = 3250 mm
M = 0,001 . qu . Lx2 . x
Mlx = 0.001 . 1140,4 . 3,252 . 35,20 = 424,001 kgm
Mly = 0.001 . 1140,4 . 3,252 . 21,40 = 257,773 kgm
Mtx = -0.001 . 1140,4 . 3,252 . 64,35 = 775,126 kgm
Mty = -0.001 . 1140,4 . 3,252 . 54,15 = 562,262 kgm
Direncanakan tulangan pokok : Ø 10 mm
Direncanakan tulangan bagi : Ø 6 mm
dx = h – selimut beton – ½ Ø tulang pokok x
= 120 – 20 – ½ . 10
= 95 mm
dy = h – selimut beton – tulang pokok x - ½ Ø tulang pokok y
= 120 – 20 – 10 - ½ . 10
= 85 mm
PENULANGAN LAPANGAN ARAH X.
Mu = 424,001 kgm
Mu
Mn = = 5.300.009 Nmm
Ø
Mn
Rn = = 0,587
b . dx 2
fy
m = 0,85 . f' c = 22,588
ρ min = 0,002
0,85 β. f' c 600
ρb = .
fy 600 + fy
= 0,0269
ρ max = 0,75 . ρb
= 0,0269
ρ max = 0,75 . ρb
Ø6 - 30
= 0,0202
1,65 1 2 . Rn . m
M ρo = 1 - 1-
m fy
= 0,0050>ρ min=0,002(dipakai
ρo)
As prlu = 0,0050 . b . dx
= 478 mm2
n = 6,089 ≈ 7 batang
Dipakai tulangan Ø10 – 14 ( As ada = 549,5 mm2 > As prlu )
Tulang bagi
As TB = 0,2 . As prlu
= 95,6 mm2
n = 3,383 ≈ 4 batang
Dipakai tulangan Ø6 – 30 ( As ada = 113,04 mm2 > As TB )
Untuk hasil perhitungan selanjutnya akan ditabelkan.
• Kombinasi pembebanan :
- Kombinasi beban mati + beban hidup
- Kombinasi beban mati + beban hidup + beban
gempa kiri
- Kombinasi beban mati + beban hidup + beban
gempa kanan
B. SKETSA MAIN STRUCTURE
A. DATA PERENCANAAN
- Mutu beton : K 175 (175 kg/cm2) / f’c = 17,5 Mpa.
- Mutu baja : U 32 (3200 kg/cm2) / fy = 320 Mpa.
U 24 (2400 kg/cm2) / fy = 240 Mpa.
- Dimensi balok / batang
• Lantai 1 ( sloof ) : /20, 20/30
15
A. DATA PERENCANAAN
- Mutu beton : K 175 (175 kg/cm2) / f’c = 17,5 Mpa.
- Mutu baja : U 32 (3200 kg/cm2) / fy = 320 Mpa.
- U 24 (2400 kg/cm2) / fy = 240 Mpa.
- Dimensi kolom
• Bawah sloof / kolom pondasi : 30/30 & 30/50
• Lantai 1 : 30/30 , 30/50 & praktis
• Lantai 2 : 30/30 & praktis
A. DATA PERENCANAAN
Dari hasil penyelidikan tanah dilapangan maupun di laboratorium
dapat diketahui data-data tanah yang ada. Dengan demikian dapat
ditentukan kedalaman dan jenis pondasi yang akan digunakan
sesuai dangan daya dukung tanah.
Dalam perencanaan ini dipilih jenis pondasi dengan spesifikasi
sebagai berikut:
Jenis pondasi :Foot plat ( pondasi dangkal setempat )
dengan ukuran dimensi ( 1,5 x1,5 ) Meter.
Kedalaman :± 1,4 meter dengan tegangan ijin tanah
berdasarkan nilai tekanan conus terkecil ( qc )
sebesar 10 kg/cm}2 yang doperoleh dari hasil
sounding test dengan data secara lengkap
terlampir.
Mutu beton :Dipakai mutu beton dengan karakteristik
sebesar 125 kg/cm2 ( K 125 ).
Mutu baja :Digunakan mutu baja sesuai pasar yaitu baja
polos dengan tegangan leleh ( fy ) = 240 Mpa.
Mz = Mu = 2.115,608 kgm
= 211.560,800 kgcm
Pu = 41.485,944 + (1,2 . 7.421,760)
150
= 50.392,056 kg
σ tan = 10 kg/cm2
A = 22.500 cm2
Pu
W = 1/6. 150. 1502 = 562.500 cm3
Digunakan tulangan pokok Ø 16 mm
dx = 122 mm
M
dy = 106 mm
Tegangan pondasi
25
P M
18
σ= ±
A W
150
60
30
60
σ min = 1,864 kg/cm2
σ max= 2,616 kg/cm2
σmin
σmax y1
y2 = 1,046 cm
Q1
y2 y1 = 1,569 cm
Q2 Q1 = 14.125,077 kg
My = Mu = 1.916,345 kgm
= 191.634,5 kgcm
Pu = 41.485,944 kg
σ tan = 10 kg/cm2
A = 40.000 cm3
150
W = 1/6. 150. 1502 =562.500 cm3
Digunakan tulangan pokok Ø 16 mm
dy = 106 mm
Pu
Tegangan pondasi
P M
σ= ±
A W
M σ min = 1,899 kg/cm2
σ max= 2,580 kg/cm2
25
y2 = 1,032 cm
18
y1 = 1,548 cm
150
30
Q1 = 13.933,785 kg
60 60
Q2 = 4.644,595 kg
σmin
y1
Mx= 603.797,334 . 102 Nmm
σmax
Q1
y2
Rn = 4,478
Q2
BAB VII
PERENCANAAN TANGGA
A. DATA PERENCANAAN
Mutu beton :Dipakai mutu beton untuk penggunaan
umum dengan karakteristik sebesar 175 kg/cm 2 ( K
175 ).
Mutu baja :Digunakan mutu baja sesuai pasar yaitu baja
polos dengan tegangan leleh ( fy ) = 240 Mpa.
L1 = 202 2 + 300 2
= 361,668 cm
L2 = 198 2 + 300 2
= 359,450 cm
θ1 = arc tg 202 / 300 = 33,95o
θ2 = arc tg 198 / 300 = 33,45o
tebal plat tangga 1 arah
L = 361,668 cm
h = (l / 20 ) ( 0,4 + ( 240 / 700 ) )
= 13,446 cm
dipakai 15 cm
PERHITUNGAN PENULANGAN
- BORDES
b = 1000 mm
h = 150 mm
direncanakan TP Ø 10 (As = 78,5 mm2)
direncanakan TB Ø6 (As = 28,3 mm2)
d = 125 mm
tumpuan C
Mu = 746,8 kgm ~ 746,8 . 104 Nmm
Mu
Mn = = 9335000 Nmm
Ø
Mn
Rn = =0,597 MPa
b . dx 2
fy
m = 0,85 . f' c =16,134
ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy
= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1 2 . Rn . m
ρo = 1 - 1-
m fy
ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy
= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1 2 . Rn . m
ρo = 1 - 1-
m fy
Lapangan
Mu = 331,553 kgm ~ 331,553 . 104 Nmm
Mu
Mn = = 4144412,5 Nmm
Ø
Mn
Rn = =0,265 MPa
b . dx 2
fy
m = 0,85 . f' c =16,134
ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy
= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1 2 . Rn . m
ρo = 1 - 1-
m fy
- BALOK BORDES
tumpuan
Mu = 144,384 kgm ~ 144,384 . 104 Nmm
d = 263 mm
direncanakan TP Ø 12 (As = 113,04 mm2)
direncanakan TB Ø6 (As = 28,3 mm2)
Mu
Mn = = 1804800 Nmm
Ø
Mn
Rn = =0,174 MPa
b . dx 2
fy
m = 0,85 . f' c =16,134
ρ min = 0,00583
0,85 β. f' c 600
ρb = .
fy 600 + fy
= 0,0376
ρ max = 0,75 . ρb
= 0,0282
1 2 . Rn . m
ρo = 1 - 1-
m fy
LAMPIRAN