Anda di halaman 1dari 64

Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi

Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan


Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
1 2 3 4 5 6 7 8 9 10 11
A PEK. PENDAHULUAN
1 Survey Lokasi Pekerjaan Titik 25,000.00 69.00 1,725,000.00 0.95% 0.00 0.00% 69.00
2 Papan Nama Proyek Ls 300,000.00 1.00 300,000.00 0.17% 0.00 0.00% 1.00
3 Jasa Bongkar Line PJU & Ornamen PJU lama Ls 3,900,000.00 1.00 3,900,000.00 2.15% 0.00 0.00% 1.00
5,925,000.00 3.26% 0.00
B MATERIAL UTAMA
1 Kabel Twisted TC 2 x 10 mm2 Meter 7,700.00 ### 29,106,000.00 16.03% 0.00 0.00% ###
2 Kap/Housing Armature PJU Cobra Set 870,837.50 56.00 48,766,900.00 26.86% 0.00 0.00%
3 Kap/Housing Armature PJU lengkap Lampu SON-T 70 W Set 1,437,500.00 13.00 18,687,500.00 10.29% 0.00 0.00%
4 Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, t Set 270,000.00 69.00 18,630,000.00 10.26% 0.00 0.00%
5 Kabel NYY 2 x 2.5 mm2 Meter 14,950.00 245.00 3,662,750.00 2.02% 0.00 0.00% 245.00
6 Box KWH Bh 1,092,500.00 1.00 1,092,500.00 0.60% 0.00 0.00%
7 Magnetic Contactor (MC) 3P Koil 220 V bh 1,725,000.00 2.00 3,450,000.00 1.90% 0.00 0.00% 2.00
8 Time Switch 220 V bh 345,000.00 2.00 690,000.00 0.38% 0.00 0.00% 2.00
9 MCB 1P 220 V min. 6 A Bh 57,500.00 4.00 230,000.00 0.13% 0.00 0.00% 4.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
10 Lampu Hemat Energi LHE 52 Watt (Spiral) Bh 138,000.00 56.00 7,728,000.00 4.26% 0.00 0.00% 56.00
132,043,650.00 72.74% 0.00
C MATERIAL PENDUKUNG
1 Suspension Clamp Bh 37,500.00 61.00 2,287,500.00 1.26% 0.00 0.00%
2 Connector Bh 15,000.00 138.00 2,070,000.00 1.14% 0.00 0.00%
3 Klem Beugel untuk stang PJU + mur baut lkp Set 95,000.00 69.00 6,555,000.00 3.61% 0.00 0.00%
4 Isolasi Bh 10,000.00 20.00 200,000.00 0.11% 0.00 0.00%
5 SWC lengkap Bh 20,000.00 8.00 160,000.00 0.09% 0.00 0.00%
6 Pipa PCV 2 inch + Klem set 200,000.00 2.00 400,000.00 0.22% 0.00 0.00%
7 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 1,090,000.00 1.00 1,090,000.00 0.60% 0.00 0.00%
8 Ending Protection lengkap Set 125,000.00 4.00 500,000.00 0.28% 0.00 0.00%
9 Surge Arrester 1P + N, 40 kA Bh 850,000.00 2.00 1,700,000.00 0.94% 0.00 0.00%
14,962,500.00 8.24% 0.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
D UPAH / JASA
1 Pemasangan Line PJU Baru Gwg 140,000.00 68.00 9,520,000.00 5.24% 0.00 0.00%
2 Pasang Armature PJU Cobra Lengkap dan PJU SON-T Leng Set 105,000.00 69.00 7,245,000.00 3.99% 0.00 0.00%
3 Pemasangan dan Pengawatan Box KWH PJU Set 300,000.00 1.00 300,000.00 0.17% 0.00 0.00%
4 Pemasangan Material Box KWH (lkp) Set 1,000,000.00 2.00 2,000,000.00 1.10% 0.00 0.00%
5 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 420,000.00 1.00 420,000.00 0.23% 0.00 0.00%
6 Pasang Aksesoris Tiang Set 26,250.00 69.00 1,811,250.00 1.00% 0.00 0.00%
7 Transport Material ret 3,400,000.00 2.00 6,800,000.00 3.75% 0.00 0.00%
28,096,250.00 15.48% 0.00
E BIAYA PEMINDAHAN KWH
1 Tes Komisioning Bh 500,000.00 1.00 500,000.00 0.28% 0.00 0.00%
500,000.00 0.28% 0.00
JUMLAH 181,527,400.00 0.00
100.00%
DIBULATKAN 181,527,400.00 0.00

Disetujui Oleh : Disetujui Oleh :


Konsultan Pengawas DIREKSI TEKNIS
CV.SEIPUTRA PERSADA APRISAL, ST.,MT, : ..
NIP. 19750401 200701 1 012
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
Diperiksa Oleh :
PENGAWAS LAPANGAN
BANJAR LUKITO TOBING HELDA : ..
Direktur NIP. 19750509 201212 2 001
LAPORAN KEMAJUAN FISIK MINGGUAN
Untuk Bulan November
: 2017
Tanggal 15
: s.d. 21 November 2017
Nilai Kontrak/SPK Rp199,680,100
:
Waktu Pelaksanaan 30
: tiga puluh) Hari Kalender
Mulai Tanggal 15
: November 2017
s.d Tanggal 14
: Desember 2017

Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Item
Bobot Vol. Bobot
Rp)
12 13 14 15 16 17

1,725,000.00 100.00% 69.00 1,725,000.00 100.00% 0.95%


300,000.00 100.00% 1.00 300,000.00 100.00% 0.17%
3,900,000.00 100.00% 1.00 3,900,000.00 100.00% 2.15%
5,925,000.00 5,925,000.00 3.26%

29,106,000.00 100.00% 3780.00 29,106,000.00 100.00% 16.03%


0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
3,662,750.00 100.00% 245.00 3,662,750.00 100.00% 2.02%
0.00 0.00% - 0.00 0.00% 0.00%
3,450,000.00 100.00% 2.00 3,450,000.00 100.00% 1.90%
690,000.00 100.00% 2.00 690,000.00 100.00% 0.38%
230,000.00 100.00% 4.00 230,000.00 100.00% 0.13%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Item
Bobot Vol. Bobot
Rp)
7,728,000.00 100.00% 56.00 7,728,000.00 100.00% 4.26%
44,866,750.00 44,866,750.00 24.72%

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00 0.00%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Item
Bobot Vol. Bobot
Rp)

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00 0.00%

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00 0.00%
50,791,750.00 50,791,750.00
27.98%
50,791,750.00 50,791,750.00

Dibuat Oleh :
Pelaksana
PT.TABELA HARATI TEKNIK
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Item
Bobot Vol. Bobot
Rp)

FERRY YEREMIA
Direktur
Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi
Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan
Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
1 2 3 4 5 6 7 8 9 10 11
A PEK. PENDAHULUAN
1 Survey Lokasi Pekerjaan Titik 25,000.00 69.00 1,725,000.00 0.95% 69.00 1,725,000.00 100.00%
2 Papan Nama Proyek Ls 300,000.00 1.00 300,000.00 0.17% 1.00 300,000.00 100.00%
3 Jasa Bongkar Line PJU & Ornamen PJU lama Ls 3,900,000.00 1.00 3,900,000.00 2.15% 1.00 3,900,000.00 100.00%
5,925,000.00 3.26% 5,925,000.00
B MATERIAL UTAMA
1 Kabel Twisted TC 2 x 10 mm2 Meter 7,700.00 ### 29,106,000.00 16.03% ### 29,106,000.00 100.00%
2 Kap/Housing Armature PJU Cobra Set 870,837.50 56.00 48,766,900.00 26.86% 0.00 0.00% 56.00
3 Kap/Housing Armature PJU lengkap Lampu SON-T 70 W Set 1,437,500.00 13.00 18,687,500.00 10.29% 0.00 0.00%
4 Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, t Set 270,000.00 69.00 18,630,000.00 10.26% 0.00 0.00% 69.00
5 Kabel NYY 2 x 2.5 mm2 Meter 14,950.00 245.00 3,662,750.00 2.02% 245.00 3,662,750.00 100.00%
6 Box KWH Bh 1,092,500.00 1.00 1,092,500.00 0.60% 0.00 0.00%
7 Magnetic Contactor (MC) 3P Koil 220 V bh 1,725,000.00 2.00 3,450,000.00 1.90% 2.00 3,450,000.00 100.00%
8 Time Switch 220 V bh 345,000.00 2.00 690,000.00 0.38% 2.00 690,000.00 100.00%
9 MCB 1P 220 V min. 6 A Bh 57,500.00 4.00 230,000.00 0.13% 4.00 230,000.00 100.00%
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
10 Lampu Hemat Energi LHE 52 Watt (Spiral) Bh 138,000.00 56.00 7,728,000.00 4.26% 56.00 7,728,000.00 100.00%
132,043,650.00 72.74% 44,866,750.00
C MATERIAL PENDUKUNG
1 Suspension Clamp Bh 37,500.00 61.00 2,287,500.00 1.26% 0.00 0.00% 61.00
2 Connector Bh 15,000.00 138.00 2,070,000.00 1.14% 0.00 0.00% 138.00
3 Klem Beugel untuk stang PJU + mur baut lkp Set 95,000.00 69.00 6,555,000.00 3.61% 0.00 0.00% 69.00
4 Isolasi Bh 10,000.00 20.00 200,000.00 0.11% 0.00 0.00% 20.00
5 SWC lengkap Bh 20,000.00 8.00 160,000.00 0.09% 0.00 0.00% 8.00
6 Pipa PCV 2 inch + Klem set 200,000.00 2.00 400,000.00 0.22% 0.00 0.00% 2.00
7 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 1,090,000.00 1.00 1,090,000.00 0.60% 0.00 0.00% 1.00
8 Ending Protection lengkap Set 125,000.00 4.00 500,000.00 0.28% 0.00 0.00% 4.00
9 Surge Arrester 1P + N, 40 kA Bh 850,000.00 2.00 1,700,000.00 0.94% 0.00 0.00%
14,962,500.00 8.24% 0.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
D UPAH / JASA
1 Pemasangan Line PJU Baru Gwg 140,000.00 68.00 9,520,000.00 5.24% 0.00 0.00%
2 Pasang Armature PJU Cobra Lengkap dan PJU SON-T Leng Set 105,000.00 69.00 7,245,000.00 3.99% 0.00 0.00%
3 Pemasangan dan Pengawatan Box KWH PJU Set 300,000.00 1.00 300,000.00 0.17% 0.00 0.00%
4 Pemasangan Material Box KWH (lkp) Set 1,000,000.00 2.00 2,000,000.00 1.10% 0.00 0.00%
5 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 420,000.00 1.00 420,000.00 0.23% 0.00 0.00%
6 Pasang Aksesoris Tiang Set 26,250.00 69.00 1,811,250.00 1.00% 0.00 0.00%
7 Transport Material ret 3,400,000.00 2.00 6,800,000.00 3.75% 0.00 0.00% 1.00
28,096,250.00 15.48% 0.00
E BIAYA PEMINDAHAN KWH
1 Tes Komisioning Bh 500,000.00 1.00 500,000.00 0.28% 0.00 0.00%
500,000.00 0.28% 0.00
JUMLAH 181,527,400.00 50,791,750.00
100.00%
DIBULATKAN 181,527,400.00 50,791,750.00

Disetujui Oleh : Disetujui Oleh :


Konsultan Pengawas DIREKSI TEKNIS
CV.SEIPUTRA PERSADA APRISAL, ST.,MT, : ..
NIP. 19750401 200701 1 012
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
Diperiksa Oleh :
PENGAWAS LAPANGAN
BANJAR LUKITO TOBING HELDA : ..
Direktur NIP. 19750509 201212 2 001
LAPORAN KEMAJUAN FISIK MINGGUAN
Untuk Bulan November
: 2017
Tanggal 22
: s.d. 30 November 2017
Nilai Kontrak/SPK Rp199,680,100
:
Waktu Pelaksanaan 30
: tiga puluh) Hari Kalender
Mulai Tanggal 15
: November 2017
s.d Tanggal 14
: Desember 2017

Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
12 13 14 15 16 17

0.00 0.00% 69.00 1,725,000.00 100.00% 0.95%


0.00 0.00% 1.00 300,000.00 100.00% 0.17%
0.00 0.00% 1.00 3,900,000.00 100.00% 2.15%
0.00 5,925,000.00 3.26%

0.00 0.00% 3780.00 29,106,000.00 100.00% 16.03%


48,766,900.00 100.00% 56.00 48,766,900.00 100.00% 26.86%
0.00 0.00% - 0.00 0.00% 0.00%
18,630,000.00 100.00% 69.00 18,630,000.00 100.00% 10.26%
0.00 0.00% 245.00 3,662,750.00 100.00% 2.02%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% 2.00 3,450,000.00 100.00% 1.90%
0.00 0.00% 2.00 690,000.00 100.00% 0.38%
0.00 0.00% 4.00 230,000.00 100.00% 0.13%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
0.00 0.00% 56.00 7,728,000.00 100.00% 4.26%
67,396,900.00 112,263,650.00 61.84%

2,287,500.00 100.00% 61.00 2,287,500.00 100.00% 1.26%


2,070,000.00 100.00% 138.00 2,070,000.00 100.00% 1.14%
6,555,000.00 100.00% 69.00 6,555,000.00 100.00% 3.61%
200,000.00 100.00% 20.00 200,000.00 100.00% 0.11%
160,000.00 100.00% 8.00 160,000.00 100.00% 0.09%
400,000.00 100.00% 2.00 400,000.00 100.00% 0.22%
1,090,000.00 100.00% 1.00 1,090,000.00 100.00% 0.60%
500,000.00 100.00% 4.00 500,000.00 100.00% 0.28%
0.00 0.00% - 0.00 0.00% 0.00%
13,262,500.00 13,262,500.00 7.31%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
3,400,000.00 50.00% 1.00 3,400,000.00 50.00% 1.87%
3,400,000.00 3,400,000.00 1.87%

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00 0.00%
84,059,400.00 131,451,150.00
74.29%
84,059,400.00 131,451,150.00

Dibuat Oleh :
Pelaksana
PT.TABELA HARATI TEKNIK
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

FERRY YEREMIA
Direktur
Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi
Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan
Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
1 2 3 4 5 6 7 8 9 10 11
A PEK. PENDAHULUAN
1 Survey Lokasi Pekerjaan Titik 25,000.00 69.00 1,725,000.00 0.95% 0.00 0.00% 69.00
2 Papan Nama Proyek Ls 300,000.00 1.00 300,000.00 0.17% 0.00 0.00% 1.00
3 Jasa Bongkar Line PJU & Ornamen PJU lama Ls 3,900,000.00 1.00 3,900,000.00 2.15% 0.00 0.00% 1.00
5,925,000.00 3.26% 0.00
B MATERIAL UTAMA
1 Kabel Twisted TC 2 x 10 mm2 Meter 7,700.00 ### 29,106,000.00 16.03% 0.00 0.00% ###
2 Kap/Housing Armature PJU Cobra Set 870,837.50 56.00 48,766,900.00 26.86% 0.00 0.00% 56.00
3 Kap/Housing Armature PJU lengkap Lampu SON-T 70 W Set 1,437,500.00 13.00 18,687,500.00 10.29% 0.00 0.00%
4 Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, t Set 270,000.00 69.00 18,630,000.00 10.26% 0.00 0.00% 69.00
5 Kabel NYY 2 x 2.5 mm2 Meter 14,950.00 245.00 3,662,750.00 2.02% 0.00 0.00% 245.00
6 Box KWH Bh 1,092,500.00 1.00 1,092,500.00 0.60% 0.00 0.00%
7 Magnetic Contactor (MC) 3P Koil 220 V bh 1,725,000.00 2.00 3,450,000.00 1.90% 0.00 0.00% 2.00
8 Time Switch 220 V bh 345,000.00 2.00 690,000.00 0.38% 0.00 0.00% 2.00
9 MCB 1P 220 V min. 6 A Bh 57,500.00 4.00 230,000.00 0.13% 0.00 0.00% 4.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
10 Lampu Hemat Energi LHE 52 Watt (Spiral) Bh 138,000.00 56.00 7,728,000.00 4.26% 0.00 0.00% 56.00
132,043,650.00 72.74% 0.00
C MATERIAL PENDUKUNG
1 Suspension Clamp Bh 37,500.00 61.00 2,287,500.00 1.26% 0.00 0.00% 61.00
2 Connector Bh 15,000.00 138.00 2,070,000.00 1.14% 0.00 0.00% 138.00
3 Klem Beugel untuk stang PJU + mur baut lkp Set 95,000.00 69.00 6,555,000.00 3.61% 0.00 0.00% 69.00
4 Isolasi Bh 10,000.00 20.00 200,000.00 0.11% 0.00 0.00% 20.00
5 SWC lengkap Bh 20,000.00 8.00 160,000.00 0.09% 0.00 0.00% 8.00
6 Pipa PCV 2 inch + Klem set 200,000.00 2.00 400,000.00 0.22% 0.00 0.00% 2.00
7 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 1,090,000.00 1.00 1,090,000.00 0.60% 0.00 0.00% 1.00
8 Ending Protection lengkap Set 125,000.00 4.00 500,000.00 0.28% 0.00 0.00% 4.00
9 Surge Arrester 1P + N, 40 kA Bh 850,000.00 2.00 1,700,000.00 0.94% 0.00 0.00%
14,962,500.00 8.24% 0.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
D UPAH / JASA
1 Pemasangan Line PJU Baru Gwg 140,000.00 68.00 9,520,000.00 5.24% 0.00 0.00%
2 Pasang Armature PJU Cobra Lengkap dan PJU SON-T Leng Set 105,000.00 69.00 7,245,000.00 3.99% 0.00 0.00%
3 Pemasangan dan Pengawatan Box KWH PJU Set 300,000.00 1.00 300,000.00 0.17% 0.00 0.00%
4 Pemasangan Material Box KWH (lkp) Set 1,000,000.00 2.00 2,000,000.00 1.10% 0.00 0.00%
5 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 420,000.00 1.00 420,000.00 0.23% 0.00 0.00%
6 Pasang Aksesoris Tiang Set 26,250.00 69.00 1,811,250.00 1.00% 0.00 0.00%
7 Transport Material ret 3,400,000.00 2.00 6,800,000.00 3.75% 0.00 0.00% 1.00
28,096,250.00 15.48% 0.00
E BIAYA PEMINDAHAN KWH
1 Tes Komisioning Bh 500,000.00 1.00 500,000.00 0.28% 0.00 0.00%
500,000.00 0.28% 0.00
JUMLAH 181,527,400.00 0.00
100.00%
DIBULATKAN 181,527,400.00 0.00

Mengetahui : Disetujui Oleh : Disetujui Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas DIREKSI TEKNIS
CV.SEIPUTRA PERSADA APRISAL, ST.,MT,

NIP. 19750401 200701 1 012


Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)

Diperiksa Oleh :
PENGAWAS LAPANGAN
KURMIS, SH. BANJAR LUKITO TOBING HELDA
NIP. 19690210 198403 1 016 Direktur NIP. 19750509 201212 2 001
LAPORAN KEMAJUAN FISIK BULANAN
Untuk Bulan November
: 2017
Tanggal 15
: s.d. 30 November 2017
Nilai Kontrak/SPK Rp199,680,100
:
Waktu Pelaksanaan 30
: tiga puluh) Hari Kalender
Mulai Tanggal 15
: November 2017
s.d Tanggal 14
: Desember 2017

Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
12 13 14 15 16 17

1,725,000.00 100.00% 69.00 1,725,000.00 100.00% 0.95%


300,000.00 100.00% 1.00 300,000.00 100.00% 0.17%
3,900,000.00 100.00% 1.00 3,900,000.00 100.00% 2.15%
5,925,000.00 5,925,000.00 3.26%

29,106,000.00 100.00% 3780.00 29,106,000.00 100.00% 16.03%


48,766,900.00 100.00% 56.00 48,766,900.00 100.00% 26.86%
0.00 0.00% - 0.00 0.00% 0.00%
18,630,000.00 100.00% 69.00 18,630,000.00 100.00% 10.26%
3,662,750.00 100.00% 245.00 3,662,750.00 100.00% 2.02%
0.00 0.00% - 0.00 0.00% 0.00%
3,450,000.00 100.00% 2.00 3,450,000.00 100.00% 1.90%
690,000.00 100.00% 2.00 690,000.00 100.00% 0.38%
230,000.00 100.00% 4.00 230,000.00 100.00% 0.13%
Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
7,728,000.00 100.00% 56.00 7,728,000.00 100.00% 4.26%
112,263,650.00 112,263,650.00 61.84%

2,287,500.00 100.00% 61.00 2,287,500.00 100.00% 1.26%


2,070,000.00 100.00% 138.00 2,070,000.00 100.00% 1.14%
6,555,000.00 100.00% 69.00 6,555,000.00 100.00% 3.61%
200,000.00 100.00% 20.00 200,000.00 100.00% 0.11%
160,000.00 100.00% 8.00 160,000.00 100.00% 0.09%
400,000.00 100.00% 2.00 400,000.00 100.00% 0.22%
1,090,000.00 100.00% 1.00 1,090,000.00 100.00% 0.60%
500,000.00 100.00% 4.00 500,000.00 100.00% 0.28%
0.00 0.00% - 0.00 0.00% 0.00%
13,262,500.00 13,262,500.00 7.31%
Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
3,400,000.00 50.00% 1.00 3,400,000.00 50.00% 1.87%
3,400,000.00 3,400,000.00 1.87%

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00 0.00%
134,851,150.00 131,451,150.00
74.29%
134,851,150.00 131,451,150.00

Dibuat Oleh :
Pelaksana
: .. PT.TABELA HARATI TEKNIK
Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

: .. FERRY YEREMIA
Direktur
BACKUP DATA
BULAN : NOVEMBER 2017

Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi
Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan
Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

1 2 3 4 5 6 7 8
1 Pemasangan Line PJU Baru 68.00 Gwg - Gwg
- Kabel Twisted TC 2 x 10 mm2 - Meter
2 Pemasangan Armature PJU Cobra Lengkap dan PJU SON-T Lengkap 69.00 Set Set - Set
- Kap/Housing Armature PJU Cobra - Set
- Kap/Housing Armature PJU lengkap Lampu SON-T 70 W - Set
- Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, total 3 m) - Set
- Kabel NYY 2 x 2.5 mm2 - Meter
- Lampu Hemat Energi LHE 52 Watt (Spiral) - Bh
Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

- Connector - Bh
- Klem Beugel untuk stang PJU + mur baut lkp - Set
Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

3 Pemasangan dan Pengawatan Box KWH PJU 1.00 Set - Set


- Box KWH Bh
4 Pemasangan Material Box KWH (lkp) 2.00 Set - Set
- Magnetic Contactor (MC) 3P Koil 220 V - bh
- Time Switch 220 V - bh
- MCB 1P 220 V min. 6 A - Bh
- Surge Arrester 1P + N, 40 kA - Bh
- Pipa PCV 2 inch + Klem - set
Pemasangan Ardee BKT Lengkap Konduktor untuk Box Panel PJU 1.00 Set - Set
- Ardee BKT Lengkap Konduktor untuk Box Panel PJU - Set
5 Pasang Aksesoris Tiang 69.00 Set - Set
- Suspension Clamp - Bh
- SWC lengkap - Bh
- Ending Protection lengkap - Set

Dibuat oleh :
Mengetahui : Pelaksana
Pejabat Pelaksana Teknis Kegiatan APRISAL, ST.,MT, PT.TABELA HARATI TEKNIK
(PPTK) NIP. 19750401 200701 1 012

Direksi Teknis : ..
Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

HELDA
NIP. 19750509 201212 2 001
KURMIS, SH. Pengawas Lapangan : .. FERRY YEREMIA
NIP. 19690210 198403 1 016 Direktur
CV. SEIPUTRA PERSADA
BANJAR LUKITO TOBING
Konsultan Tengawas : ..
KUP DATA
: NOVEMBER 2017

Keterangan

9
Keterangan
Keterangan

Dibuat oleh :
Pelaksana
PT.TABELA HARATI TEKNIK
Keterangan

FERRY YEREMIA
Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi
Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan
Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
1 2 3 4 5 6 7 8 9 10 11
A PEK. PENDAHULUAN
1 Survey Lokasi Pekerjaan Titik 25,000.00 69.00 1,725,000.00 0.95% 69.00 1,725,000.00 100.00%
2 Papan Nama Proyek Ls 300,000.00 1.00 300,000.00 0.17% 1.00 300,000.00 100.00%
3 Jasa Bongkar Line PJU & Ornamen PJU lama Ls 3,900,000.00 1.00 3,900,000.00 2.15% 1.00 3,900,000.00 100.00%
5,925,000.00 3.26% 5,925,000.00
B MATERIAL UTAMA
1 Kabel Twisted TC 2 x 10 mm2 Meter 7,700.00 ### 29,106,000.00 16.03% ### 29,106,000.00 100.00%
2 Kap/Housing Armature PJU Cobra Set 870,837.50 56.00 48,766,900.00 26.86% 56.00 48,766,900.00 100.00%
3 Kap/Housing Armature PJU lengkap Lampu SON-T 70 W Set 1,437,500.00 13.00 18,687,500.00 10.29% 0.00 0.00% 13.00
4 Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, t Set 270,000.00 69.00 18,630,000.00 10.26% 69.00 18,630,000.00 100.00%
5 Kabel NYY 2 x 2.5 mm2 Meter 14,950.00 245.00 3,662,750.00 2.02% 245.00 3,662,750.00 100.00%
6 Box KWH Bh 1,092,500.00 1.00 1,092,500.00 0.60% 0.00 0.00% 1.00
7 Magnetic Contactor (MC) 3P Koil 220 V bh 1,725,000.00 2.00 3,450,000.00 1.90% 2.00 3,450,000.00 100.00%
8 Time Switch 220 V bh 345,000.00 2.00 690,000.00 0.38% 2.00 690,000.00 100.00%
9 MCB 1P 220 V min. 6 A Bh 57,500.00 4.00 230,000.00 0.13% 4.00 230,000.00 100.00%
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
10 Lampu Hemat Energi LHE 52 Watt (Spiral) Bh 138,000.00 56.00 7,728,000.00 4.26% 56.00 7,728,000.00 100.00%
132,043,650.00 72.74% 112,263,650.00
C MATERIAL PENDUKUNG
1 Suspension Clamp Bh 37,500.00 61.00 2,287,500.00 1.26% 61.00 2,287,500.00 100.00%
2 Connector Bh 15,000.00 138.00 2,070,000.00 1.14% 138.00 2,070,000.00 100.00%
3 Klem Beugel untuk stang PJU + mur baut lkp Set 95,000.00 69.00 6,555,000.00 3.61% 69.00 6,555,000.00 100.00%
4 Isolasi Bh 10,000.00 20.00 200,000.00 0.11% 20.00 200,000.00 100.00%
5 SWC lengkap Bh 20,000.00 8.00 160,000.00 0.09% 8.00 160,000.00 100.00%
6 Pipa PCV 2 inch + Klem set 200,000.00 2.00 400,000.00 0.22% 2.00 400,000.00 100.00%
7 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 1,090,000.00 1.00 1,090,000.00 0.60% 1.00 1,090,000.00 100.00%
8 Ending Protection lengkap Set 125,000.00 4.00 500,000.00 0.28% 4.00 500,000.00 100.00%
9 Surge Arrester 1P + N, 40 kA Bh 850,000.00 2.00 1,700,000.00 0.94% 0.00 0.00% 2.00
14,962,500.00 8.24% 13,262,500.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
D UPAH / JASA
1 Pemasangan Line PJU Baru Gwg 140,000.00 68.00 9,520,000.00 5.24% 0.00 0.00% 40.00
2 Pasang Armature PJU Cobra Lengkap dan PJU SON-T Leng Set 105,000.00 69.00 7,245,000.00 3.99% 0.00 0.00% 38.00
3 Pemasangan dan Pengawatan Box KWH PJU Set 300,000.00 1.00 300,000.00 0.17% 0.00 0.00%
4 Pemasangan Material Box KWH (lkp) Set 1,000,000.00 2.00 2,000,000.00 1.10% 0.00 0.00%
5 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 420,000.00 1.00 420,000.00 0.23% 0.00 0.00%
6 Pasang Aksesoris Tiang Set 26,250.00 69.00 1,811,250.00 1.00% 0.00 0.00% 40.00
7 Transport Material ret 3,400,000.00 2.00 6,800,000.00 3.75% 1.00 3,400,000.00 50.00% 1.00
28,096,250.00 15.48% 3,400,000.00
E BIAYA PEMINDAHAN KWH
1 Tes Komisioning Bh 500,000.00 1.00 500,000.00 0.28% 0.00 0.00%
500,000.00 0.28% 0.00
JUMLAH 181,527,400.00 134,851,150.00
100.00%
DIBULATKAN 181,527,400.00 134,851,150.00

Disetujui Oleh : Disetujui Oleh :


Konsultan Pengawas DIREKSI TEKNIS
CV.SEIPUTRA PERSADA APRISAL, ST.,MT, : ..
NIP. 19750401 200701 1 012
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
Diperiksa Oleh :
PENGAWAS LAPANGAN
BANJAR LUKITO TOBING HELDA : ..
Direktur NIP. 19750509 201212 2 001
LAPORAN KEMAJUAN FISIK MINGGUAN
Untuk Bulan Desember
: 2017
Tanggal 01
: s.d. 14 Desember 2017
Nilai Kontrak/SPK Rp199,680,100
:
Waktu Pelaksanaan 30
: tiga puluh) Hari Kalender
Mulai Tanggal 15
: November 2017
s.d Tanggal 14
: Desember 2017

Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
12 13 14 15 16 17

0.00 0.00% 69.00 1,725,000.00 100.00% 0.95%


0.00 0.00% 1.00 300,000.00 100.00% 0.17%
0.00 0.00% 1.00 3,900,000.00 100.00% 2.15%
0.00 5,925,000.00 3.26%

0.00 0.00% 3780.00 29,106,000.00 100.00% 16.03%


0.00 0.00% 56.00 48,766,900.00 100.00% 26.86%
18,687,500.00 100.00% 13.00 18,687,500.00 100.00% 10.29%
0.00 0.00% 69.00 18,630,000.00 100.00% 10.26%
0.00 0.00% 245.00 3,662,750.00 100.00% 2.02%
1,092,500.00 100.00% 1.00 1,092,500.00 100.00% 0.60%
0.00 0.00% 2.00 3,450,000.00 100.00% 1.90%
0.00 0.00% 2.00 690,000.00 100.00% 0.38%
0.00 0.00% 4.00 230,000.00 100.00% 0.13%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
0.00 0.00% 56.00 7,728,000.00 100.00% 4.26%
19,780,000.00 132,043,650.00 72.74%

0.00 0.00% 61.00 2,287,500.00 100.00% 1.26%


0.00 0.00% 138.00 2,070,000.00 100.00% 1.14%
0.00 0.00% 69.00 6,555,000.00 100.00% 3.61%
0.00 0.00% 20.00 200,000.00 100.00% 0.11%
0.00 0.00% 8.00 160,000.00 100.00% 0.09%
0.00 0.00% 2.00 400,000.00 100.00% 0.22%
0.00 0.00% 1.00 1,090,000.00 100.00% 0.60%
0.00 0.00% 4.00 500,000.00 100.00% 0.28%
1,700,000.00 100.00% 2.00 1,700,000.00 100.00% 0.94%
1,700,000.00 14,962,500.00 8.24%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

5,600,000.00 58.82% 40.00 5,600,000.00 58.82% 3.08%


3,990,000.00 55.07% 38.00 3,990,000.00 55.07% 2.20%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
0.00 0.00% - 0.00 0.00% 0.00%
1,050,000.00 57.97% 40.00 1,050,000.00 57.97% 0.58%
3,400,000.00 50.00% 2.00 6,800,000.00 100.00% 3.75%
14,040,000.00 17,440,000.00 9.61%

0.00 0.00% - 0.00 0.00% 0.00%


0.00 0.00 0.00%
35,520,000.00 152,931,150.00
93.85%
35,520,000.00 152,931,150.00

Dibuat Oleh :
Pelaksana
PT.TABELA HARATI TEKNIK
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

FERRY YEREMIA
Direktur
Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi
Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan
Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
1 2 3 4 5 6 7 8 9 10 11
A PEK. PENDAHULUAN
1 Survey Lokasi Pekerjaan Titik 25,000.00 69.00 1,725,000.00 0.95% 69.00 1,725,000.00 100.00%
2 Papan Nama Proyek Ls 300,000.00 1.00 300,000.00 0.17% 1.00 300,000.00 100.00%
3 Jasa Bongkar Line PJU & Ornamen PJU lama Ls 3,900,000.00 1.00 3,900,000.00 2.15% 1.00 3,900,000.00 100.00%
5,925,000.00 3.26% 5,925,000.00
B MATERIAL UTAMA
1 Kabel Twisted TC 2 x 10 mm2 Meter 7,700.00 ### 29,106,000.00 16.03% ### 29,106,000.00 100.00%
2 Kap/Housing Armature PJU Cobra Set 870,837.50 56.00 48,766,900.00 26.86% 56.00 48,766,900.00 100.00%
3 Kap/Housing Armature PJU lengkap Lampu SON-T 70 W Set 1,437,500.00 13.00 18,687,500.00 10.29% 13.00 18,687,500.00 100.00%
4 Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, t Set 270,000.00 69.00 18,630,000.00 10.26% 69.00 18,630,000.00 100.00%
5 Kabel NYY 2 x 2.5 mm2 Meter 14,950.00 245.00 3,662,750.00 2.02% 245.00 3,662,750.00 100.00%
6 Box KWH Bh 1,092,500.00 1.00 1,092,500.00 0.60% 1.00 1,092,500.00 100.00%
7 Magnetic Contactor (MC) 3P Koil 220 V bh 1,725,000.00 2.00 3,450,000.00 1.90% 2.00 3,450,000.00 100.00%
8 Time Switch 220 V bh 345,000.00 2.00 690,000.00 0.38% 2.00 690,000.00 100.00%
9 MCB 1P 220 V min. 6 A Bh 57,500.00 4.00 230,000.00 0.13% 4.00 230,000.00 100.00%
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
10 Lampu Hemat Energi LHE 52 Watt (Spiral) Bh 138,000.00 56.00 7,728,000.00 4.26% 56.00 7,728,000.00 100.00%
132,043,650.00 72.74% 132,043,650.00
C MATERIAL PENDUKUNG
1 Suspension Clamp Bh 37,500.00 61.00 2,287,500.00 1.26% 61.00 2,287,500.00 100.00%
2 Connector Bh 15,000.00 138.00 2,070,000.00 1.14% 138.00 2,070,000.00 100.00%
3 Klem Beugel untuk stang PJU + mur baut lkp Set 95,000.00 69.00 6,555,000.00 3.61% 69.00 6,555,000.00 100.00%
4 Isolasi Bh 10,000.00 20.00 200,000.00 0.11% 20.00 200,000.00 100.00%
5 SWC lengkap Bh 20,000.00 8.00 160,000.00 0.09% 8.00 160,000.00 100.00%
6 Pipa PCV 2 inch + Klem set 200,000.00 2.00 400,000.00 0.22% 2.00 400,000.00 100.00%
7 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 1,090,000.00 1.00 1,090,000.00 0.60% 1.00 1,090,000.00 100.00%
8 Ending Protection lengkap Set 125,000.00 4.00 500,000.00 0.28% 4.00 500,000.00 100.00%
9 Surge Arrester 1P + N, 40 kA Bh 850,000.00 2.00 1,700,000.00 0.94% 2.00 1,700,000.00 100.00%
14,962,500.00 8.24% 14,962,500.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
D UPAH / JASA
1 Pemasangan Line PJU Baru Gwg 140,000.00 68.00 9,520,000.00 5.24% 40.00 5,600,000.00 58.82% 28.00
2 Pasang Armature PJU Cobra Lengkap dan PJU SON-T Leng Set 105,000.00 69.00 7,245,000.00 3.99% 38.00 3,990,000.00 55.07% 31.00
3 Pemasangan dan Pengawatan Box KWH PJU Set 300,000.00 1.00 300,000.00 0.17% 0.00 0.00% 1.00
4 Pemasangan Material Box KWH (lkp) Set 1,000,000.00 2.00 2,000,000.00 1.10% 0.00 0.00% 2.00
5 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 420,000.00 1.00 420,000.00 0.23% 0.00 0.00% 1.00
6 Pasang Aksesoris Tiang Set 26,250.00 69.00 1,811,250.00 1.00% 40.00 1,050,000.00 57.97% 29.00
7 Transport Material ret 3,400,000.00 2.00 6,800,000.00 3.75% 2.00 6,800,000.00 100.00%
28,096,250.00 15.48% 17,440,000.00
E BIAYA PEMINDAHAN KWH
1 Tes Komisioning Bh 500,000.00 1.00 500,000.00 0.28% 0.00 0.00% 1.00
500,000.00 0.28% 0.00
JUMLAH 181,527,400.00 170,371,150.00
100.00%
DIBULATKAN 181,527,400.00 170,371,150.00

Disetujui Oleh : Disetujui Oleh :


Konsultan Pengawas DIREKSI TEKNIS
CV.SEIPUTRA PERSADA APRISAL, ST.,MT, : ..
NIP. 19750401 200701 1 012
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Minggu Lalu Minggu Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
Diperiksa Oleh :
PENGAWAS LAPANGAN
BANJAR LUKITO TOBING HELDA : ..
Direktur NIP. 19750509 201212 2 001
LAPORAN KEMAJUAN FISIK MINGGUAN
Untuk Bulan Desember
: 2017
Tanggal 08
: s.d. 14 Desember 2017
Nilai Kontrak/SPK Rp199,680,100
:
Waktu Pelaksanaan 30
: tiga puluh) Hari Kalender
Mulai Tanggal 15
: November 2017
s.d Tanggal 14
: Desember 2017

Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
12 13 14 15 16 17

0.00 0.00% 69.00 1,725,000.00 100.00% 0.95%


0.00 0.00% 1.00 300,000.00 100.00% 0.17%
0.00 0.00% 1.00 3,900,000.00 100.00% 2.15%
0.00 5,925,000.00 3.26%

0.00 0.00% 3780.00 29,106,000.00 100.00% 16.03%


0.00 0.00% 56.00 48,766,900.00 100.00% 26.86%
0.00 0.00% 13.00 18,687,500.00 100.00% 10.29%
0.00 0.00% 69.00 18,630,000.00 100.00% 10.26%
0.00 0.00% 245.00 3,662,750.00 100.00% 2.02%
0.00 0.00% 1.00 1,092,500.00 100.00% 0.60%
0.00 0.00% 2.00 3,450,000.00 100.00% 1.90%
0.00 0.00% 2.00 690,000.00 100.00% 0.38%
0.00 0.00% 4.00 230,000.00 100.00% 0.13%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
0.00 0.00% 56.00 7,728,000.00 100.00% 4.26%
0.00 132,043,650.00 72.74%

0.00 0.00% 61.00 2,287,500.00 100.00% 1.26%


0.00 0.00% 138.00 2,070,000.00 100.00% 1.14%
0.00 0.00% 69.00 6,555,000.00 100.00% 3.61%
0.00 0.00% 20.00 200,000.00 100.00% 0.11%
0.00 0.00% 8.00 160,000.00 100.00% 0.09%
0.00 0.00% 2.00 400,000.00 100.00% 0.22%
0.00 0.00% 1.00 1,090,000.00 100.00% 0.60%
0.00 0.00% 4.00 500,000.00 100.00% 0.28%
0.00 0.00% 2.00 1,700,000.00 100.00% 0.94%
0.00 14,962,500.00 8.24%
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

3,920,000.00 41.18% 68.00 9,520,000.00 100.00% 5.24%


3,255,000.00 44.93% 69.00 7,245,000.00 100.00% 3.99%
300,000.00 100.00% 1.00 300,000.00 100.00% 0.17%
2,000,000.00 100.00% 2.00 2,000,000.00 100.00% 1.10%
420,000.00 100.00% 1.00 420,000.00 100.00% 0.23%
761,250.00 42.03% 69.00 1,811,250.00 100.00% 1.00%
0.00 0.00% 2.00 6,800,000.00 100.00% 3.75%
10,656,250.00 28,096,250.00 15.48%

500,000.00 100.00% 1.00 500,000.00 100.00% 0.28%


500,000.00 500,000.00 0.28%
11,156,250.00 153,431,150.00
100.00%
11,156,250.00 153,431,150.00

Dibuat Oleh :
Pelaksana
PT.TABELA HARATI TEKNIK
Realisasi Fisik yang dicapai

Minggu Ini Sampai dengan Minggu Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

FERRY YEREMIA
Direktur
Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi
Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan
Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
1 2 3 4 5 6 7 8 9 10 11
A PEK. PENDAHULUAN
1 Survey Lokasi Pekerjaan Titik 25,000.00 69.00 1,725,000.00 0.95% 69.00 1,725,000.00 100.00%
2 Papan Nama Proyek Ls 300,000.00 1.00 300,000.00 0.17% 1.00 300,000.00 100.00%
3 Jasa Bongkar Line PJU & Ornamen PJU lama Ls 3,900,000.00 1.00 3,900,000.00 2.15% 1.00 3,900,000.00 100.00%
5,925,000.00 3.26% 5,925,000.00
B MATERIAL UTAMA
1 Kabel Twisted TC 2 x 10 mm2 Meter 7,700.00 ### 29,106,000.00 16.03% ### 29,106,000.00 100.00%
2 Kap/Housing Armature PJU Cobra Set 870,837.50 56.00 48,766,900.00 26.86% 56.00 48,766,900.00 100.00%
3 Kap/Housing Armature PJU lengkap Lampu SON-T 70 W Set 1,437,500.00 13.00 18,687,500.00 10.29% 0.00 0.00% 13.00
4 Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, t Set 270,000.00 69.00 18,630,000.00 10.26% 69.00 18,630,000.00 100.00%
5 Kabel NYY 2 x 2.5 mm2 Meter 14,950.00 245.00 3,662,750.00 2.02% 245.00 3,662,750.00 100.00%
6 Box KWH Bh 1,092,500.00 1.00 1,092,500.00 0.60% 0.00 0.00% 1.00
7 Magnetic Contactor (MC) 3P Koil 220 V bh 1,725,000.00 2.00 3,450,000.00 1.90% 2.00 3,450,000.00 100.00%
8 Time Switch 220 V bh 345,000.00 2.00 690,000.00 0.38% 2.00 690,000.00 100.00%
9 MCB 1P 220 V min. 6 A Bh 57,500.00 4.00 230,000.00 0.13% 4.00 230,000.00 100.00%
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
10 Lampu Hemat Energi LHE 52 Watt (Spiral) Bh 138,000.00 56.00 7,728,000.00 4.26% 56.00 7,728,000.00 100.00%
132,043,650.00 72.74% 112,263,650.00
C MATERIAL PENDUKUNG
1 Suspension Clamp Bh 37,500.00 61.00 2,287,500.00 1.26% 61.00 2,287,500.00 100.00%
2 Connector Bh 15,000.00 138.00 2,070,000.00 1.14% 138.00 2,070,000.00 100.00%
3 Klem Beugel untuk stang PJU + mur baut lkp Set 95,000.00 69.00 6,555,000.00 3.61% 69.00 6,555,000.00 100.00%
4 Isolasi Bh 10,000.00 20.00 200,000.00 0.11% 20.00 200,000.00 100.00%
5 SWC lengkap Bh 20,000.00 8.00 160,000.00 0.09% 8.00 160,000.00 100.00%
6 Pipa PCV 2 inch + Klem set 200,000.00 2.00 400,000.00 0.22% 2.00 400,000.00 100.00%
7 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 1,090,000.00 1.00 1,090,000.00 0.60% 1.00 1,090,000.00 100.00%
8 Ending Protection lengkap Set 125,000.00 4.00 500,000.00 0.28% 4.00 500,000.00 100.00%
9 Surge Arrester 1P + N, 40 kA Bh 850,000.00 2.00 1,700,000.00 0.94% 0.00 0.00% 2.00
14,962,500.00 8.24% 13,262,500.00
Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)
D UPAH / JASA
1 Pemasangan Line PJU Baru Gwg 140,000.00 68.00 9,520,000.00 5.24% 0.00 0.00% 68.00
2 Pasang Armature PJU Cobra Lengkap dan PJU SON-T Leng Set 105,000.00 69.00 7,245,000.00 3.99% 0.00 0.00% 69.00
3 Pemasangan dan Pengawatan Box KWH PJU Set 300,000.00 1.00 300,000.00 0.17% 0.00 0.00% 1.00
4 Pemasangan Material Box KWH (lkp) Set 1,000,000.00 2.00 2,000,000.00 1.10% 0.00 0.00% 2.00
5 Ardee BKT Lengkap Konduktor untuk Box Panel PJU Set 420,000.00 1.00 420,000.00 0.23% 0.00 0.00% 1.00
6 Pasang Aksesoris Tiang Set 26,250.00 69.00 1,811,250.00 1.00% 0.00 0.00% 69.00
7 Transport Material ret 3,400,000.00 2.00 6,800,000.00 3.75% 1.00 3,400,000.00 50.00% 1.00
28,096,250.00 15.48% 3,400,000.00
E BIAYA PEMINDAHAN KWH
1 Tes Komisioning Bh 500,000.00 1.00 500,000.00 0.28% 0.00 0.00% 1.00
500,000.00 0.28% 0.00
JUMLAH 181,527,400.00 134,851,150.00
100.00%
DIBULATKAN 181,527,400.00 134,851,150.00

Mengetahui : Disetujui Oleh : Disetujui Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas DIREKSI TEKNIS
CV.SEIPUTRA PERSADA APRISAL, ST.,MT,

NIP. 19750401 200701 1 012


Harga Target/Fisik Realisasi Fisik yang

Satuan Jumlah Sampai dengan Bulan Lalu Bulan Ini


No. Uraian Sat.
Vol. Bobot
Rp.) Harga Jumlah Harga
Vol. Bobot Vol.
Rp.) Rp)

Diperiksa Oleh :
PENGAWAS LAPANGAN
KURMIS, SH. BANJAR LUKITO TOBING HELDA
NIP. 19690210 198403 1 016 Direktur NIP. 19750509 201212 2 001
LAPORAN KEMAJUAN FISIK BULANAN
Untuk Bulan Desember
: 2017
Tanggal 01
: s.d. 14 Desember 2017
Nilai Kontrak/SPK Rp199,680,100
:
Waktu Pelaksanaan 30
: tiga puluh) Hari Kalender
Mulai Tanggal 15
: November 2017
s.d Tanggal 14
: Desember 2017

Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
12 13 14 15 16 17

0.00 0.00% 69.00 1,725,000.00 100.00% 0.95%


0.00 0.00% 1.00 300,000.00 100.00% 0.17%
0.00 0.00% 1.00 3,900,000.00 100.00% 2.15%
0.00 5,925,000.00 3.26%

0.00 0.00% 3780.00 29,106,000.00 100.00% 16.03%


0.00 0.00% 56.00 48,766,900.00 100.00% 26.86%
18,687,500.00 100.00% 13.00 18,687,500.00 100.00% 10.29%
0.00 0.00% 69.00 18,630,000.00 100.00% 10.26%
0.00 0.00% 245.00 3,662,750.00 100.00% 2.02%
1,092,500.00 100.00% 1.00 1,092,500.00 100.00% 0.60%
0.00 0.00% 2.00 3,450,000.00 100.00% 1.90%
0.00 0.00% 2.00 690,000.00 100.00% 0.38%
0.00 0.00% 4.00 230,000.00 100.00% 0.13%
Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)
0.00 0.00% 56.00 7,728,000.00 100.00% 4.26%
19,780,000.00 132,043,650.00 72.74%

0.00 0.00% 61.00 2,287,500.00 100.00% 1.26%


0.00 0.00% 138.00 2,070,000.00 100.00% 1.14%
0.00 0.00% 69.00 6,555,000.00 100.00% 3.61%
0.00 0.00% 20.00 200,000.00 100.00% 0.11%
0.00 0.00% 8.00 160,000.00 100.00% 0.09%
0.00 0.00% 2.00 400,000.00 100.00% 0.22%
0.00 0.00% 1.00 1,090,000.00 100.00% 0.60%
0.00 0.00% 4.00 500,000.00 100.00% 0.28%
1,700,000.00 100.00% 2.00 1,700,000.00 100.00% 0.94%
1,700,000.00 14,962,500.00 8.24%
Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

9,520,000.00 100.00% 68.00 9,520,000.00 100.00% 5.24%


7,245,000.00 100.00% 69.00 7,245,000.00 100.00% 3.99%
300,000.00 100.00% 1.00 300,000.00 100.00% 0.17%
2,000,000.00 100.00% 2.00 2,000,000.00 100.00% 1.10%
420,000.00 100.00% 1.00 420,000.00 100.00% 0.23%
1,811,250.00 100.00% 69.00 1,811,250.00 100.00% 1.00%
3,400,000.00 50.00% 2.00 6,800,000.00 100.00% 3.75%
24,696,250.00 28,096,250.00 15.48%

500,000.00 100.00% 1.00 500,000.00 100.00% 0.28%


500,000.00 500,000.00 0.28%
46,676,250.00 153,431,150.00
100.00%
46,676,250.00 153,431,150.00

Dibuat Oleh :
Pelaksana
: .. PT.TABELA HARATI TEKNIK
Realisasi Fisik yang dicapai

Bulan Ini Sampai dengan Bulan Ini Bobot


thd Tiap
Jumlah Harga Jumlah Harga Item
Bobot Vol. Bobot
Rp) Rp)

: .. FERRY YEREMIA
Direktur
BACKUP DATA
BULAN : DESEMBER 2017

Program : Pengawasan Atas Pelaksanaan Kegiatan Kelistrikan, Minyak dan Gas Bumi
Kegiatan : Pengawasan Ijin Usaha Penggunaan Ketenagalistrikan
Pekerjaan : Pengadaan Penerangan Jalan Umum PJU) Kincong - Jaar
Lokasi : Kincong - Jaar
Nomor SPK : 027.01/III.43/SPK-PERKIM/XI/2017
Pelaksana : PT.BANUA JAYA MANDIRI
Konsultan Pengawas : CV. SEIPUTRA PERSADA

Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

1 2 3 4 5 6 7 8
1 Pemasangan Line PJU Baru 68.00 Gwg 68.00 Gwg
- Kabel Twisted TC 2 x 10 mm2 3,780.00 Meter
2 Pemasangan Armature PJU Cobra Lengkap dan PJU SON-T Lengkap 69.00 Set 69.00 Set
- Kap/Housing Armature PJU Cobra 56.00 Set
- Kap/Housing Armature PJU lengkap Lampu SON-T 70 W 13.00 Set
- Stang PJU (galvanis 1,5 mm panjang bentangan 2,25 m, total 3 m) 69.00 Set
- Kabel NYY 2 x 2.5 mm2 245.00 Meter
- Lampu Hemat Energi LHE 52 Watt (Spiral) 56.00 Bh
Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

- Connector 138.00 Bh
- Klem Beugel untuk stang PJU + mur baut lkp 69.00 Set
Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

3 Pemasangan dan Pengawatan Box KWH PJU 1.00 Set 1.00 Set
- Box KWH 1.00 Bh
4 Pemasangan Material Box KWH (lkp) 2.00 Set 2.00 Set
- Magnetic Contactor (MC) 3P Koil 220 V 2.00 bh
- Time Switch 220 V 2.00 bh
- MCB 1P 220 V min. 6 A 4.00 Bh
- Surge Arrester 1P + N, 40 kA 2.00 Bh
- Pipa PCV 2 inch + Klem 2.00 set
Pemasangan Ardee BKT Lengkap Konduktor untuk Box Panel PJU 1.00 Set 1.00 Set
- Ardee BKT Lengkap Konduktor untuk Box Panel PJU 1.00 Set
5 Pasang Aksesoris Tiang 69.00 Set 69.00 Set
- Suspension Clamp 61.00 Bh
- SWC lengkap 8.00 Bh
- Ending Protection lengkap 4.00 Set

Dibuat oleh :
Mengetahui : Pelaksana
Pejabat Pelaksana Teknis Kegiatan APRISAL, ST.,MT, PT.TABELA HARATI TEKNIK
(PPTK) NIP. 19750401 200701 1 012

Direksi Teknis : ..
Relisasi Fisik
Target Fisik
PJU Lengkap Material
No. Uraian Terpasang Terpasang

Vol. Satuan Vol. Satuan Vol. Satuan

HELDA
NIP. 19750509 201212 2 001
KURMIS, SH. Pengawas Lapangan : .. FERRY YEREMIA
NIP. 19690210 198403 1 016 Direktur
CV. SEIPUTRA PERSADA
BANJAR LUKITO TOBING
Konsultan Tengawas : ..
KUP DATA
N : DESEMBER 2017

Keterangan

9
Keterangan
Keterangan

Dibuat oleh :
Pelaksana
PT.TABELA HARATI TEKNIK
Keterangan

FERRY YEREMIA