Anda di halaman 1dari 2

DAFTAR PUSTAKA

Anonim. 2016. Penyegaran Perawatan Sumur Tingkat OUP/APS. PT Pertamina EP


Asset 2 – Prabumulih. Palembang.
Anonim. 2016. Typical Electric Submersible Pumping System. Schlumberger.
Anonim. 2014. Arsip PT.Pertamina Asset 2 Limau Field. Prabumulih : Limau Field.
Palembang
Bezerra, M.A.D., Schnitman, L., BarettoFilho, M. de A. and de Souza, J.A.M.F.
(2009):Pattern Recognition for Downhold Dynamometer Card in Oil Rod
Pump System using Artificial Neural Networks. Proceedings of the 11th
International Conference onEnterprise Information Systems ICEIS 2009,
Milan, Italy. 351 - 355.
Brown, K.E. 1980. The Technology of Artificial Lift Method, Vol.2A. Tulsa : Pen
Well Publishing Company.
Collins, Dr.R.Eugene. 1983. Petroleum Production Engineering. Washington D.C :
New Hampshire Avenue, N.W.
Craft, B.C., Holden, W.R., Graves Jr., E.D. "Well Design, Drilling and Production" ,
1962, Prentice Hall Inc., Englewoods Cliffs, New Jersey.
Day, John J., Byrd J.P., "Chapter 2 Beam Pumping :Design and Analysis", in " The
Technology of Artificial Lift Method, Volume II" by Kermit E. Brown,
Penn Well Books, 1977, Tulsa.
Desi Arini.2014. Desain Sucker Rod Pump Untuk Optimalisasi Produksi Sumur
Sembur Alam L5A-X Di Pertamina EP Asset 2 Field Limau. Skripsi
Jurusan Teknik Pertambangan Universitas Sriwijaya. Palembang.
Desmawan, Muhammad, 2016. Evaluasi dan Optimasi Electric Submersible Pump
(ESP) Sumur LDK-226 dan KWG-28 Pada Lapangan Ledok dan Lapangan
Kawengan KSO Pertamina EP Geo Cepu Indonesia. Thesis, UPN “Veteran
Yogyakarta”. Yogyakarta.
Echometer Company, “Well Analyzer Operating Manual”, 1993, Echometer
Company, Wichita Falls, Texas.
Hafizah Azmi Anisa.2014. Optimasi produksi Hasil Perencanaan Sucker Rod Pump
Terpasang Pada Sumur X Di TAC-Pertamina EP Golwater TMT. Skripsi
Jurusan Teknik Pertambangan Universitas Sriwijaya. Palembang.
Johnson, L.D. 1968. Here are The Guidelines for Picking an Artificial Lift Method.
The Oil & Gas Journal.

59
Lamiah. 2013. Perencanaan Desain Electric Submersible Pump Pada Sumur L5A-
241 Untuk Peningkatan Produksi Minyak di PT Pertamina EP Asset 2
Limau Field. Skripsi Jurusan Teknik Pertambangan Universitas Sriwijaya.
Palembang.
Lyons,Willliam dan Gary J.Plisga. 2005. Petroleum And Natural Gas Enginering
Handbook Second Edition. USA : Gulf Professional Publishing.
Puspa. 2013. Evaluasi Dan Perencanaan Desain Ulang Electric Submersible Pump
Pada Sumur X Dalam Usaha Meningkatkan Produksi Minyak di PT
Pertamina EP Asset 2 Limau Field. Skripsi Jurusan Teknik Pertambangan
Universitas Sriwijaya. Palembang.
Rothrock, R. 1977. Downhole Maintenance Cost Approach $2 Billion. Petroleum
Engineer.
SCraft-Holden., Well Design Drilling and Production, 1962.

60

Anda mungkin juga menyukai