2015
PERHITUNGAN KONSTRUKSI
DATA PERENCANAAN
REFERENSI
- SNI 2847 2002
- SNI 1726 2002
- Peraturan Pembebanan Indonesia Untuk Gedung 1989
PEMBEBANAN
Beban Mati DL
Beban Hidup LL
Beban Gempa E
ANALISIS STRUKTUR
Menggunakan ETABS versi 9.0
Perhitungan Beban Gempa
Perhitungan berat bangunan
V= C1 x I x Wt
R
dimana
R= 8.5 faktor reduksi gempa
I= 1 faktor keutamaan gedung
Wt = 6,511,418 kg Berat total bangunan
sehingga
V= 0.55 x 1 x 6,511,418
8.5
= 421,327 kg
Fix = Wi . hi
.Vx
Wi .hi
hi Wi Wi.hi Fi Fix Fiy
Lantai
(m) (kg) (kg) (kg) (kg)
4 16 1,002,568 16041087 114,266
3 12 1,724,707 20696482 147,428
2 8 1,818,354 14546835 103,622
1 4 1,965,789 7863154 56,012 14,003 8,002
6,511,418 59147557 421,327 1/4 Fi 1/7 Fi
PERHITUNGAN PENULANGAN PLAT
Plat Lantai
Tebal plat = 12 cm
Mutu beton fc = 22 MPa
Mutu baja fy = 500 MPa WIREMESH
Beban Mati
Berat plat = 0.12 x 2400 = 288 kg/m2
Plafon = = 11 kg/m2
Penggantung = = 7 kg/m2
Pasir = 0.02 x 1600 = 32 kg/m2
Lantai = 0.01 x 2400 = 24 kg/m2
Spesi = 0.02 x 2200 = 44 kg/m2
406 kg/m2
Beban hidup
Beban guna = 250 kg/m2
qt = 1,2 qD + 1,6 qL
= 1.2 406 + 1.6 250.00
= 887.2
ly = 4.00 Ctx = 52
lx = 4.00 Cty = 52
b= 1.00
fy
m= 0,85. fc = 26.738
r = 1 1 1
2 m.Rn = 0.00210 OK
m fy
rpakai = 0.0021
As = r b d = 0.0021 x 1000 x 95
= 199.87 mm2
Digunakan tulangan q 8 - 150 As = 334.93 OK
Tulangan bagi = 20% As
= 39.97 mm2
Digunakan tulangan q 8 - 150 As = 334.93 OK
Plat Atap
Tebal plat = 12 cm
Mutu beton fc = 22 MPa
Mutu baja fy = 240 MPa
Beban Mati
Berat plat = 0.12 x 2400 = 288 kg/m2
Plafon = = 11 kg/m2
Penggantung = = 7 kg/m2
qt = 1,2 qD + 1,6 qL
= 1.2 350 + 1.6 100.00
= 580
ly = 4.00 Ctx = 52
lx = 4.00 Cty = 52
b= 1.00
fy
m= 0,85. fc = 12.834
r = 1 1 1
2 m.Rn = 0.00284 OK
m fy
rpakai = 0.0029
As = r b d = 277.08 mm2
Digunakan tulangan D 10 - 150 As = 523.33 OK
Tulangan bagi = 20% As
= 55.42 mm2
Digunakan tulangan D 10 - 150 As = 523.33 OK
Ecu
Xb = d = 450.3
Ecu Ey
ab = b xb = 382.755
Cc = 0,85.fc.a.b = 3220883 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0058 0.004375 OK
1 1
m fy
r = 0.0058
1
Vc = fc . bw . d = 264012 N
6
Vs = VU - Vc = 63361.56
q
Dipakai tul. geser q = 10
Av = 157 mm2
fyv = 240 Mpa
s= Av.fy.d/Vs
= 446.31
s max = d/2 = 375.25 mm
Dipakai sengkang q 10 - 100 OK
Lapangan
Mu = 33195.00 kgm = 331950000 Nmm
Mn = 414937500 Nmm
b= 450 mm
h= 800 mm
d' = 49.5 mm
d= 750.5 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Ecu
Xb = d = 450.3
Ecu Ey
ab = b xb = 382.755
Cc = 0,85.fc.a.b = 3220883 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0054 0.004375 OK
1 1
m fy
r = 0.0054
Ecu
Xb = d = 333.3
Ecu Ey
ab = b xb = 283.305
Cc = 0,85.fc.a.b = 1589341 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0067 0.004375 OK
1 1
m fy
r = 0.0067
1
Vc = fc . bw . d = 130276 N
6
Vs = VU - Vc = 11897.04
q
Dipakai tul. geser q = 10
Av = 157 mm2
fyv = 240 Mpa
s= Av.fy.d/Vs
= 1759.37
s max = d/2 = 277.75 mm
Dipakai sengkang q 10 - 100 OK
Lapangan
Mu = 8778.00 kgm = 87780000 Nmm
Mn = 109725000 Nmm
b= 300 mm
h= 600 mm
d' = 44.5 mm
d= 555.5 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Ecu
Xb = d = 333.3
Ecu Ey
ab = b xb = 283.305
Cc = 0,85.fc.a.b = 1589341 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0038 0.004375 OK
1 1
m fy
r = 0.0044
b= 400 mm
h= 700 mm
d' = 49.5 mm
d= 650.5 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Ecu
Xb = d = 390.3
Ecu Ey
ab = b xb = 331.755
Cc = 0,85.fc.a.b = 2481527 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0034 0 OK
1 1
m fy
r = 0.0044
1
Vc = fc . bw . d = 203408 N
6
Vs = VU - Vc = -31341
q
Dipakai tul. geser q = 10
Av = 157 mm2
fyv = 240 Mpa
s= Av.fy.d/Vs
= 782.07
s max = d/2 = 325.25 mm
Dipakai sengkang q 10 - 100 OK
Lapangan
Mu = 19566.00 kgm = 195660000 Nmm
Mn = 244575000 Nmm
b= 400 mm
h= 700 mm
d' = 49.5 mm
d= 650.5 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Ecu
Xb = d = 390.3
Ecu Ey
ab = b xb = 331.755
Cc = 0,85.fc.a.b = 2481527 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0047 0 OK
1 1
m fy
r = 0.0047
b= 300 mm
h= 500 mm
d' = 49.5 mm
d= 450.5 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Ecu
Xb = d = 270.3
Ecu Ey
ab = b xb = 229.755
Cc = 0,85.fc.a.b = 1288926 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0031 OK
1 1
m fy
r = 0.0031
1
Vc = fc . bw . d = 105652 N
6
Vs = VU - Vc = -49344.9
q
Dipakai tul. geser q = 10
Av = 157 mm2
fyv = 240 Mpa
s= Av.fy.d/Vs
= 344.00
s max = d/2 = 225.25 mm
Dipakai sengkang q 10 - 100 OK
Lapangan
Mu = 2521.00 kgm = 25210000 Nmm
Mn = 31512500 Nmm
b= 300 mm
h= 500 mm
d' = 49.5 mm
d= 450.5 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Ecu
Xb = d = 270.3
Ecu Ey
ab = b xb = 229.755
Cc = 0,85.fc.a.b = 1288926 N
fy
m= = 17.112
0,85. fc
r = 1 2 m.Rn
= 0.0016 OK
1 1
m fy
r = 0.0016
Dimensi :
b= 600 mm Tulangan pokok
h= 600 mm 20 D 19
d= 560 mm 0 D 12
As = 5667.7 mm2 1.57%
Vu = 4530 N
Vc = (1+Nu/14.Ag). 1 fc .bw.d
6
= 361078.1 N
Vn = Vc + Vs
= 501750.1 N
Vu = q Vn
= 376312.6 N > Vu = 4530 N OK
Av = 157 mm2
fy = 240 Mpa
Vs = Av.fy.d/s
= 140672 N
Vn = Vc + Vs
= 501750.1 N
Vu = q Vn
= 376312.6 N > Vu = 31120 N OK
Perhitungan Kolom K2
Dimensi :
b= 400 mm Tulangan pokok
h= 400 mm 12 D 16
d= 360 mm 0 D 12
As = 2411.52 mm2 1.51%
Vu = 2050 N
1
Vc = (1+Nu/14.Ag). fc .bw .d
6
= 154980.2 N
Vn = Vc + Vs
= 245412.2 N
Vu = q Vn
= 184059.1 N > Vu = 2050 N OK
Av = 157 mm2
fy = 240 Mpa
Vs = Av.fy.d/s
= 90432 N
Vn = Vc + Vs
= 245412.2 N
Vu = q Vn
= 184059.1 N > Vu = 1680 N OK
Perhitungan Sloof
Dimensi :
b= 300 mm L = 8 m
h= 600 mm
d= 560 mm
fc = 22 Mpa
fy = 320 Mpa
Beban Mati
Berat sendiri sloof = 0.3 0.6 2400 = 432 kg/m
Berat dinding = = 1000 kg/m
+
1432 kg/m
qd = 1.20 x 1432
= 1718.4 kgm
M = 1/12* q * L^2
= 9997.964 kg.m
= 99.97964 KNm
= 131331.6 N
Vs = Av.fy.d/s
= 140672 N
Vn = Vc + Vs
= 272003.6 N
Vu = q Vn
= 204002.7 N > Vu = 68736 N OK
Perhitungan Sloof
Dimensi :
b= 200 mm L = 4 m
h= 400 mm
d= 360 mm
fc = 22 Mpa
fy = 320 Mpa
Beban Mati
Berat sendiri sloof = 0.2 0.4 2400 = 192 kg/m
Berat dinding = = 1000 kg/m
+
1192 kg/m
qd = 1.20 x 1192
= 1430.4 kgm
M = 1/12* q * L^2
= 1907.2 kg.m
= 19.072 KNm
1
Vc = fc .bw .d
6
= 56284.99 N
Vs = Av.fy.d/s
= 57876.48 N
Vn = Vc + Vs
= 114161.5 N
Vu = q Vn
= 85621.1 N > Vu = 28608 N OK
PERHITUNGAN TANGGA
Dimensi
o
b = 300 mm lebar injakan kemiringan 30.96
h = 180 mm tinggi injakan
t = 150 mm tebal plat L 4.20
tr = 227 mm tebal total
d = 125 mm tinggi efektif
Pembebanan
Beban Mati
- Berat sendiri = 0.227 . 2400 = 629.50 kg/m2
cos 30.96
- Berat spesi = 0.03 . 2100 = 72.73 kg/m2
cos 30.96
- Berat lantai = 0.02 . 2400 = 55.42 kg/m2
cos 30.96
- Berat sandaran = = 50.00 kg/m2
+
DL = 807.65 kg/m2
Beban Hidup = LL = 300 kg/m2
Beban Total = 1.2 DL + 1.6 LL
= 1449.19 kg/m2
Momen maks = 2554.28 kg.m
PENULANGAN
b= 1000 mm
h= 150 mm
d' = 25 mm
d= 125 mm
fc = 22 Mpa
b= 0.85
fy = 240 Mpa
Mu = 2554.27703 kgm = 25542770.3 Nmm
Mn = 31928462.9 Nmm
Mu
Rn = = 2.043
.b.d 2
fy
m= = 12.834
0,85. fc
1 2 m.Rn
r= 1 1 = 0.0090 OK
m fy
0.0058
rpakai = 0.0090
P = 2311.76 KN = 231176 kg
Mx = 4.45 KNm = 445 kgm
My = 3.41 KNm = 341 kgm
S x^2 = 0.50 ^2 4 = 1 m2
1 2
S y^2 = 0.50 ^2 4 = 1 m2
P = P + Mx + My 1
n S x^2 S y^2 2
= 0.86
P ijin group = Pijin x n
= 863 4 0.86
= 2960.57
Penulangan arah x
Momen yang bekerja paada poer
q = 2 0.5 24
= 24 KN/m
M= Vp x n x L - 0.5QL^2
= 581.87 2 0.5 - 0.5 24 1. ^2
= 569.87 KNm
= 569870000 Nmm
b= 2000 mm
h= 500 mm
d' = 50 mm
d= 450 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Mu = 569870000 Nmm
Mn = 599863157.9 Nmm
r min = = 0.0044
0,85. . fc. 600
rb = = 0.0324
fy 600 fy
fy
m= = 17.112
0,85. fc
r pakai = 0.0036
b= 2000 mm
h= 500 mm
d' = 50 mm
d= 450 mm
fc = 22 Mpa
b= 0.85
fy = 320 Mpa
Mu = 569870000 Nmm
Mn = 599863157.9 Nmm
r min = = 0.0044
0,85. . fc. 600
rb = = 0.0324
fy 600 fy
fy
m= 0,85. fc
= 17.112
r pakai = 0.0036
b = 600
h = 600
t = 500
d' = 50
d = 450
bo = keliling dari penampang kritis pada poer
= 2 (bkolom + d) + 2 (h kolom + d)
= 4200
Pu = 231176 kg
= 2311760 N
as = 30 kolom tepi
= 40 kolom interior
b = 1.00 rasio dari sisi panjang terhadap sisi pendek pada kolom
2 f 'c bo d
Vc = 1 SNI 03–2847 – 2002 Ps.13.12.2.1.a
c 6
= 4432442.893 N
= 4643512
= 3482634 N > Vu 2311760 N OK
1
Vc = f ' c bo d SNI 03 – 2847 – 2002 Ps.13.12.2.c
3
Model Struktur
Beban Mati
beton struktur GMSC
Beban Hidup
Bidang M (Komb 2)
beton struktur GMSC
Bidang D (Komb 2 )
Bidang N (Komb 2 )
Perhitungan Gording
Dipakai profil C 150 65 20 3.2
A = 9.567 cm2 h = 150 mm
q = 7.51 kg/m b = 65 mm
Ix = 332 cm4 ts = 20 mm
Iy = 53.8 cm4 tb = 3.2 mm
Wx = 44.3 cm3
Wy = 12.2 cm3
ix = 5.89 cm
iy = 2.37 cm
o
a = 30 sudut kemiringan atap
q atap = 50 kg/m2 genting
dg = 1.2 m jarak gording
dk = 4 m jarak kuda-kuda
PEMBEBANAN
Beban sendiri
Berat atap = 50.00 x 1.2 = 60.00 kg/m
Berat gording = = 7.51 kg/m
Penyambung = 10% = 6.75 kg/m
74.26 kg/m
Beban Hidup
1. Beban Terpusat P (pekerja) 100 kg
Mx = 1/4 x P x cos a x L
= 1/4 x 100 x 0.866 x 4
= 86.60254
2. Beban Angin
Ckiri = 0.02 a - 0.4
= 0.2
Ckanan = -0.4
q = 50
q = C angin x q x dg
= 0.2 x 50 x 1.2
= 12
Mx = 1/8 x q x L^2
= 0.125 x 12.00 x 4. ^2
= 24.000
My = 1/8 x q x (L/3)^2
= 0.125 x 12.00 x (L/3)^2
= 2.667
Kombinasi Pembebanan
Beban Tetap
Beban Mati + Beban Hidup (Pekerja)+ Angin
Mx = 128.624 + 86.6025
= 215.226 kg m menentukan
My = 8.251 + 16.6667
= 24.918 kg m menentukan
Beban Mati + Beban Hidup (Hujan)+Angin
Mx = 128.624 + 41.58
= 170.199
My = 8.251 + 2.665
= 10.917
Beban Sementara
Beban Mati + Beban Hidup (Pekerja)+ Angin
Mx = 128.624 + 86.6025 + 24.000
= 239.226 kg m menentukan
My = 8.251 + 16.6667 + 2.667
= 27.585 kg m menentukan
Beban Mati + Beban Hidup (Hujan)+Angin
Mx = 128.624 + 41.58 + 24.000
= 194.199
My = 8.251 + 2.665 + 2.667
= 13.583
Kontrol Tegangan
Akibat Beban Tetap
s yg tjd = Mx + My
Wx Wy/2
= 21523 + 2492
44.3 6.1
= 894.33 < s = 1600 kg/cm2 OK
Kontrol Lendutan
f ijin = L = 400 = 2.22 cm
180 180
fx = 5 . qx . (L/3)^4 + 1 Px (L/3)^3
384 E Ix 48 E Ix
= 5 0.37 133 ^4 + 1 49.98 133 ^3
384 2.1E+06 53.8 48 2.1E+06 54
= 0.014 + 0.022
= 0.035 cm
f = fx^2 + fx^2
= 0.47 ^2 + 0.04 ^2
Pembebanan
Beban Tetap
Beban Mati
B Genting+Usuk = 4 x 50 = 200.00 kg/m
Berat gording = 7.51 x 4 / 1.2 = 25.03 kg/m
Berat rafter = 41.4 / cos 5 = otomatis program
Berat penyambung = 10% = 22.50 kg/m
qD = 247.54 kg/m
Beban Hidup
B Air Hujan = 20 x 4 = 80 kg/m
Beban Sementara
Beban Angin
w1 w2
q tekan = 5 x 4 = 20 kg/m
q hisap = 10 x 4 = 40 kg/m
Dari analisis struktur didapat
M= 5395 kg.m
D= 2776 kg
Mx < 1600
Wx
D Sx < 960
b Ix
Perhitungan Rafter
Direncanakan rafter menggunakan WF 200.100.5,5.8
A= 27.16 cm2 ts = 8 mm ix = 8.24 cm
q= 21.3 kg/m tb = 5.5 mm iy = 2.22 cm
b= 100 mm Ix = 1840 cm4 Wx = 184 cm3
h= 200 mm Iy = 134 cm4 Wy = 26.8 cm3
D= 1095 kg
Mx < 1600
Wx
D Sx < 960
b Ix
Perhitungan Kolom
Direncanakan rafter menggunakan WF 350x175x6x9
A= 52.6 cm2 ts = 9 mm ix = 14.5 cm
q= 41.4 kg/m tb = 6 mm iy = 3.88 cm
b= 175 mm Ix = 11100 cm4 Wx = 641 cm3
h= 350 mm Iy = 792 cm4 Wy = 91 cm3
N + Mx < 1600
A Wx
D Sx < 960
b Ix
Beban Mati
Beban Hidup
Bidang M (Komb D + L)
Bidang D (Komb D + L)
Bidang N (Komb D + L)
TABLE: Element Forces - Frames
Frame Station OutputCaseCaseType P V2 V3 T M2 M3
Text m Text Text Kgf Kgf Kgf Kgf-m Kgf-m Kgf-m
1 0 COMB1 Combination-8463.83 -9810.47 0 0 0 -5611.61
1 0.5 COMB1 Combination-8443.65 -9810.47 0 0 0 -706.37
1 1 COMB1 Combination-8423.47 -9810.47 0 0 0 4198.86
1 0 COMB2 Combination-10863.1 -12588.5 0 0 0 -7193.44
1 0.5 COMB2 Combination-10838.9 -12588.5 0 0 0 -899.18
1 1 COMB2 Combination-10814.7 -12588.5 0 0 0 5395.08
7 0 COMB1 Combination-8463.83 9810.47 0 0 0 5611.61
7 0.5 COMB1 Combination-8443.65 9810.47 0 0 0 706.37
7 1 COMB1 Combination-8423.47 9810.47 0 0 0 -4198.86
7 0 COMB2 Combination-10863.1 12588.52 0 0 0 7193.44
7 0.5 COMB2 Combination-10838.9 12588.52 0 0 0 899.18
7 1 COMB2 Combination-10814.7 12588.52 0 0 0 -5395.08
29 0 COMB1 Combination-12748.9 -2160.01 0 0 0 -4198.86
29 4.81408 COMB1 Combination -11589 -232.15 0 0 0 1559.17
29 9.62815 COMB1 Combination -10429 1695.71 0 0 0 -1963.66
29 0 COMB2 Combination-16362.1 -2776.75 0 0 0 -5395.08
29 4.81408 COMB2 Combination-14870.9 -298.32 0 0 0 2006.71
29 9.62815 COMB2 Combination-13379.7 2180.11 0 0 0 -2522.85
30 0 COMB1 Combination -119.63 -134.16 0 0 0 -371.76
30 2.18822 COMB1 Combination -74.1 -58.48 0 0 0 -160.99
30 4.37643 COMB1 Combination -28.57 17.19 0 0 0 -115.81
30 0 COMB2 Combination -129.48 -169.46 0 0 0 -483.75
30 2.18822 COMB2 Combination -74.84 -78.65 0 0 0 -212.28
30 4.37643 COMB2 Combination -20.2 12.16 0 0 0 -139.53
31 0 COMB1 Combination -28.57 -17.19 0 0 0 -115.81
31 2.18822 COMB1 Combination -74.1 58.48 0 0 0 -160.99
31 4.37643 COMB1 Combination -119.63 134.16 0 0 0 -371.76
31 0 COMB2 Combination -20.2 -12.16 0 0 0 -139.53
31 2.18822 COMB2 Combination -74.84 78.65 0 0 0 -212.28
31 4.37643 COMB2 Combination -129.48 169.46 0 0 0 -483.75
32 0 COMB1 Combination -10429 -1695.71 0 0 0 -1963.66
32 4.81408 COMB1 Combination -11589 232.15 0 0 0 1559.17
32 9.62815 COMB1 Combination-12748.9 2160.01 0 0 0 -4198.86
32 0 COMB2 Combination-13379.7 -2180.11 0 0 0 -2522.85
32 4.81408 COMB2 Combination-14870.9 298.32 0 0 0 2006.71
32 9.62815 COMB2 Combination-16362.1 2776.75 0 0 0 -5395.08
39 0 COMB1 Combination -437.2 -828.49 0 0 0 -1097.6
39 4.0175 COMB1 Combination-2027.22 10.58 0 0 0 545.36
39 8.035 COMB1 Combination-3617.25 849.65 0 0 0 -1182.62
39 0 COMB2 Combination -563.63 -1068.08 0 0 0 -1414.79
39 4.0175 COMB2 Combination-2613.79 13.8 0 0 0 702.99
39 8.035 COMB2 Combination-4663.95 1095.68 0 0 0 -1525.68
40 0 COMB1 Combination -437.2 -828.49 0 0 0 -1097.6
40 4.0175 COMB1 Combination-2027.22 10.58 0 0 0 545.36
40 8.035 COMB1 Combination-3617.25 849.65 0 0 0 -1182.62
40 0 COMB2 Combination -563.63 -1068.08 0 0 0 -1414.79
40 4.0175 COMB2 Combination-2613.79 13.8 0 0 0 702.99
40 8.035 COMB2 Combination-4663.95 1095.68 0 0 0 -1525.68
41 0 COMB1 Combination-8840.36 -151.35 0 0 0 -409.28
41 0.5 COMB1 Combination-8840.36 -131.17 0 0 0 -338.65
41 1 COMB1 Combination-8840.36 -110.99 0 0 0 -278.11
41 1.5 COMB1 Combination-8840.36 -90.81 0 0 0 -227.66
41 2 COMB1 Combination-8840.36 -70.63 0 0 0 -187.3
41 2.5 COMB1 Combination-8840.36 -50.45 0 0 0 -157.03
41 3 COMB1 Combination-8840.36 -30.27 0 0 0 -136.85
41 3.5 COMB1 Combination-8840.36 -10.09 0 0 0 -126.76
Frame Station OutputCaseCaseType P V2 V3 T M2 M3
Text m Text Text Kgf Kgf Kgf Kgf-m Kgf-m Kgf-m
41 4 COMB1 Combination-8840.36 10.09 0 0 0 -126.76
41 4.5 COMB1 Combination-8840.36 30.27 0 0 0 -136.85
41 5 COMB1 Combination-8840.36 50.45 0 0 0 -157.03
41 5.5 COMB1 Combination-8840.36 70.63 0 0 0 -187.3
41 6 COMB1 Combination-8840.36 90.81 0 0 0 -227.66
41 6.5 COMB1 Combination-8840.36 110.99 0 0 0 -278.11
41 7 COMB1 Combination-8840.36 131.17 0 0 0 -338.65
41 7.5 COMB1 Combination-8840.36 151.35 0 0 0 -409.28
41 0 COMB2 Combination-11357.3 -181.62 0 0 0 -513.42
41 0.5 COMB2 Combination-11357.3 -157.4 0 0 0 -428.66
41 1 COMB2 Combination-11357.3 -133.19 0 0 0 -356.01
41 1.5 COMB2 Combination-11357.3 -108.97 0 0 0 -295.47
41 2 COMB2 Combination-11357.3 -84.76 0 0 0 -247.04
41 2.5 COMB2 Combination-11357.3 -60.54 0 0 0 -210.72
41 3 COMB2 Combination-11357.3 -36.32 0 0 0 -186.5
41 3.5 COMB2 Combination-11357.3 -12.11 0 0 0 -174.4
41 4 COMB2 Combination-11357.3 12.11 0 0 0 -174.4
41 4.5 COMB2 Combination-11357.3 36.32 0 0 0 -186.5
41 5 COMB2 Combination-11357.3 60.54 0 0 0 -210.72
41 5.5 COMB2 Combination-11357.3 84.76 0 0 0 -247.04
41 6 COMB2 Combination-11357.3 108.97 0 0 0 -295.47
41 6.5 COMB2 Combination-11357.3 133.19 0 0 0 -356.01
41 7 COMB2 Combination-11357.3 157.4 0 0 0 -428.66
41 7.5 COMB2 Combination-11357.3 181.62 0 0 0 -513.42