REVIEW PEKERJAAN SIPIL RUMAH SAKIT MUARA TEWEH

KARYA PERENCANAAN KONTRAK 2016-2017 HSIL REVIEW KONSULTAN MK


PT. ETIKA PRANA PT. ASTA KENCANA ARSIMETAMA

NO URAIAN PEKERJAAN SAT VOLUME URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN HARGA TOTAL

GEDUNG WING A
A PEKERJAAN SIPIL PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasan = 600 m2 ) Ls 1.00 Pembersihan Lapangan ( Dengan Luasan = 600 m2 ) m2 600.00 Rp5,052.50 Rp3,031,500.00
2 Uitzet & Bouwplank m' 150.00 Uitzet & Bouwplank m' 150.00 Rp55,465.00 Rp8,319,750.00
3 Bongkaran Bangunan Lama Ls 1.00 TIDAK DISETUJUI PPK
4 Buang Bongkaran Ls 1.00 TIDAK DISETUJUI PPK
5 Shop Drawing dan As Built drawing Ls 1.00 TIDAK DISETUJUI PPK
Pagar Proyek seng gelombang t = 2 m m' 250.00 Rp200,240.00 Rp50,060,000.00
Direksikeet Ls 1.00 Rp50,000,000.00 Rp50,000,000.00
Papan nama proyek bh 1.00 Rp350,000.00 Rp350,000.00

II. PEKERJAAN TANAH PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Rp74,275.00 Rp21,415,116.55
2 Urugan Tanah Kembali m3 52.44 Urugan Tanah Kembali m3 52.44 Rp24,758.33 Rp1,298,426.03
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Rp272,897.50 Rp35,715,460.31
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Rp269,159.75 Rp122,938,715.81
5 Urugan Sirtu padat (Peninggian Elevasi) t = 0,4 m m3 522.00 Urugan Sirtu padat (Peninggian Elevasi) t = 0,4 m m3 522.00 Rp269,159.75 Rp140,501,389.50

III. PEKERJAAN BETON PEKERJAAN BETON


1 Sloof S1 30x60cm (K-300)
S1 30 x 60 cm ( K-300) m3 104.40 Beton K-300 m3 104.40 Rp1,272,231.35 Rp132,820,952.86
Pembesian Ulir kg 11,333.66 Rp18,174.60 Rp205,984,809.73
Pembesian Polos kg 3,455.64 Rp17,649.60 Rp60,990,663.74
Begisting m2 522.00 Rp326,759.50 Rp170,568,459.00
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44 Lantai Kerja Bawah Sloof t = 5 cm (K-100) m3 9.44 Rp1,063,296.96 Rp10,036,991.63
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44 Rabatan Beton t = 5 cm bawah lantai (K-100) m3 65.44 Rp1,063,296.96 Rp69,579,494.67
4 Kolom Kolom
Lantai 1 Lantai 1
K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp1,272,231.35 Rp51,907,039.05
Pembesian Polos kg 10,451.33 Rp17,649.60 Rp184,461,758.67
Begisting m2 453.33 Rp233,221.00 Rp105,726,853.33
KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp1,272,231.35 Rp3,893,027.93
Pembesian Polos kg 658.08 Rp17,649.60 Rp11,614,912.31
Begisting m2 17.00 Rp233,221.00 Rp3,964,757.00
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp1,272,231.35 Rp215,834,048.39
Pembesian Polos kg 39,463.98 Rp17,649.60 Rp696,523,514.36
Begisting m2 706.88 Rp233,221.00 Rp164,858,094.38
Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp1,272,231.35 Rp128,469,921.64
Pembesian Polos kg 23,489.97 Rp17,649.60 Rp414,588,532.15
Begisting m2 420.75 Rp238,021.00 Rp100,147,335.75
Lantai 2 Lantai 2
K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp1,272,231.35 Rp51,907,039.05
Pembesian Polos kg 10,451.33 Rp17,649.60 Rp184,461,758.67
Begisting m2 453.33 Rp233,221.00 Rp105,726,853.33
KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp1,272,231.35 Rp3,893,027.93
Pembesian Polos kg 658.08 Rp17,649.60 Rp11,614,912.31
Begisting m2 17.00 Rp233,221.00 Rp3,964,757.00
Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp1,272,231.35 Rp215,834,048.39
Pembesian Polos kg 39,463.98 Rp17,649.60 Rp696,523,514.36
Begisting m2 706.88 Rp233,221.00 Rp164,858,094.38
Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp1,272,231.35 Rp128,469,921.64
Pembesian Polos kg 23,489.97 Rp17,649.60 Rp414,588,532.15
Begisting m2 589.05 Rp238,021.00 Rp140,206,270.05
Lantai 3 Lantai 3
K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp1,272,231.35 Rp51,907,039.05
Pembesian Polos kg 10,451.33 Rp17,649.60 Rp184,461,758.67
Begisting m2 453.33 Rp233,221.00 Rp105,726,853.33
KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp1,272,231.35 Rp3,893,027.93
Pembesian Polos kg 658.08 Rp17,649.60 Rp11,614,912.31
Begisting m2 17.00 Rp233,221.00 Rp3,964,757.00
Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 208.35 Beton K-300 m3 169.65 Rp1,272,231.35 Rp215,834,048.39
Pembesian Polos kg 39,463.98 Rp17,649.60 Rp696,523,514.36
Begisting m2 706.88 Rp233,221.00 Rp164,858,094.38
Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp1,272,231.35 Rp128,469,921.64
Pembesian Polos kg 23,489.97 Rp17,649.60 Rp414,588,532.15
Begisting m2 589.05 Rp238,021.00 Rp140,206,270.05
Lantai 4 Lantai 4
K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp1,272,231.35 Rp51,907,039.05
Pembesian Polos kg 10,451.33 Rp17,649.60 Rp184,461,758.67
Begisting m2 453.33 Rp233,221.00 Rp105,726,853.33
KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp1,272,231.35 Rp3,893,027.93
Pembesian Polos kg 658.08 Rp17,649.60 Rp11,614,912.31
Begisting m2 17.00 Rp233,221.00 Rp3,964,757.00
Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp1,272,231.35 Rp215,834,048.39
Pembesian Polos kg 39,463.98 Rp17,649.60 Rp696,523,514.36
Begisting m2 706.88 Rp233,221.00 Rp164,858,094.38
Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp1,272,231.35 Rp128,469,921.64
Pembesian Polos kg 23,489.97 Rp17,649.60 Rp414,588,532.15
Begisting m2 589.05 Rp238,021.00 Rp140,206,270.05
Lantai 5 Lantai 5
K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp1,272,231.35 Rp51,907,039.05
Pembesian Polos kg 10,451.33 Rp17,649.60 Rp184,461,758.67
Begisting m2 453.33 Rp233,221.00 Rp105,726,853.33
KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp1,272,231.35 Rp3,893,027.93
Pembesian Polos kg 658.08 Rp17,649.60 Rp11,614,912.31
Begisting m2 17.00 Rp233,221.00 Rp3,964,757.00
Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp1,272,231.35 Rp215,834,048.39
Pembesian Polos kg 39,463.98 Rp17,649.60 Rp696,523,514.36
Begisting m2 706.88 Rp233,221.00 Rp164,858,094.38
Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp1,272,231.35 Rp128,469,921.64
Pembesian Polos kg 23,489.97 Rp17,649.60 Rp414,588,532.15
Begisting m2 589.05 Rp238,021.00 Rp140,206,270.05
Lantai atap Lantai atap
K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp1,272,231.35 Rp51,907,039.05
Pembesian Polos kg 10,451.33 Rp17,649.60 Rp184,461,758.67
Begisting m2 453.33 Rp233,221.00 Rp105,726,853.33
KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp1,272,231.35 Rp3,893,027.93
Pembesian Polos kg 658.08 Rp17,649.60 Rp11,614,912.31
Begisting m2 17.00 Rp233,221.00 Rp3,964,757.00
Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp1,272,231.35 Rp215,834,048.39
Pembesian Polos kg 39,463.98 Rp17,649.60 Rp696,523,514.36
Begisting m2 706.88 Rp233,221.00 Rp164,858,094.38
Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp1,272,231.35 Rp128,469,921.64
Pembesian Polos kg 23,489.97 Rp17,649.60 Rp414,588,532.15
Begisting m2 589.05 Rp238,021.00 Rp140,206,270.05
Shearwall Shearwall
Shearwall 25cm (K-300)
SW t=25 cm ( K-300 ) m3 225.00 Beton K-300 m3 225.00 Rp1,272,231.35 Rp286,252,053.57
Pembesian Polos kg 57,636.00 Rp17,649.60 Rp1,017,252,345.60
Begisting m2 2,500.00 Rp233,221.00 Rp583,052,500.00
Tangga U
Plat Tangga-U t=15cm (K-225)
Plat ramp m3 155.52 Beton K-225 m3 0.64 Rp1,220,358.86 Rp779,077.10
Pembesian Polos kg 115.88 Rp17,649.60 Rp2,045,164.77
Begisting m2 1.42 Rp233,221.00 Rp330,862.86
Anak Tangga-U (K-225)
Beton K-225 m3 0.37 Rp1,220,358.86 Rp451,044.64
Pembesian Polos kg 67.09 Rp17,649.60 Rp1,184,042.76
Begisting m2 0.82 Rp233,221.00 Rp191,552.18
Plat Bordes Tangga-U t=15cm (K-225)
Beton K-225 m3 1.18 Rp1,220,358.86 Rp1,441,548.91
Pembesian Polos kg 214.41 Rp17,649.60 Rp3,784,227.57
Begisting m2 2.63 Rp233,221.00 Rp612,205.13
Tangga lurus
Tangga lurus Plat Tangga Lurus t=15cm (K-225)
Plat Tangga K300 m3 27.00 Beton K-225 m3 10.15 Rp1,220,358.86 Rp12,383,591.56
Pembesian Polos kg 1,841.87 Rp17,649.60 Rp32,508,316.85
Begisting m2 22.55 Rp233,221.00 Rp5,259,133.55
Anak Tangga Lurus t=15cm (K-225)
Beton K-225 m3 0.91 Rp1,220,358.86 Rp1,107,475.67
Pembesian Polos kg 164.72 Rp17,649.60 Rp2,907,247.85
Begisting m2 2.02 Rp233,221.00 Rp470,329.02
Water Profing Water Profing
Atap Atap
Plat Atap m2 1,305.00 Plat Atap m2 1,309.50 Rp84,797.50 Rp111,042,326.25
Helipad m2 208.80 Rp84,797.50 Rp17,705,718.00
Plat t=15 cm (K300)
Plat helipad t=20 cm K300 m3 29.40 Beton K-300 m3 34.56 Rp1,272,231.35 Rp43,968,315.43
Pembesian Polos kg 8,039.35 Rp17,649.60 Rp141,891,262.34
Begisting m2 144.00 Rp233,221.00 Rp33,583,824.00
K1 60x60cm (K-300)
Kolom 60/60 K300 m3 8.64 Beton K-300 m3 8.64 Rp1,272,231.35 Rp10,992,078.86
Pembesian Polos kg 2,213.22 Rp17,649.60 Rp39,062,490.07
Begisting m2 96.00 Rp233,221.00 Rp22,389,216.00
Balok 30/60cm (K300)
Balok 30/60 K300 m3 31.10 Beton K-300 m3 23.33 Rp1,272,231.35 Rp29,678,612.91
Pembesian Polos kg 5,426.56 Rp17,649.60 Rp95,776,602.08
Begisting m2 136.08 Rp238,021.00 Rp32,389,897.68
tandon air 40 m3 m3 19.80
balok tandon 30/60 m3 7.20
tandon air 20 m3 m3 13.00
balok tandon 30/60 m3 7.20
IV PEKERJAAN PONDASI PANCANG PEKERJAAN PONDASI PANCANG
I. PEKERJAAN BETON PEKERJAAN BETON
1 Beton Poer Beton Poer
P1 110 x 180 x 70 cm
P1 110 x 180 x 70 cm m3 62.37 Beton K-300 m3 62.37 Rp1,220,358.86 Rp76,113,782.25
Pembesian Ulir kg 7,763.19 Rp18,174.60 Rp141,092,943.85
Begisting m2 91.35 Rp326,759.50 Rp29,849,480.33
P2 260 x 340 x 70 cm
P2 260 x 340 x 70 cm m3 12.38 Beton K-300 m3 12.38 Rp1,220,358.86 Rp15,103,161.28
Pembesian Ulir kg 1,180.79 Rp18,174.60 Rp21,460,461.54
Begisting m2 8.40 Rp326,759.50 Rp2,744,779.80
P3 260 x 260 x 70 cm
P3 260 x 260 x 70 cm m3 4.73 Beton K-300 m3 4.73 Rp1,220,358.86 Rp5,774,738.14
Pembesian Ulir kg 505.24 Rp18,174.60 Rp9,182,455.66
Begisting m2 7.28 Rp326,759.50 Rp2,378,809.16
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Rp1,063,296.96 Rp16,045,151.09
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Rp299,500.00 Rp1,785,020,000.00
Biaya Pemancangan m1 5,960.00 Rp154,874.00 Rp923,049,040.00
4 Kepruk Kepala TP ttk 298.00 Kepruk Kepala TP ttk 298.00 Rp63,040.00 Rp18,785,920.00
PDA Test ttk 3.00 Rp15,000,000.00 Rp45,000,000.00
V PEKERJAAN PASANGAN PEKERJAAN PASANGAN
1 Pasangan Aanstampeng m3 8.28 Pasangan Aanstampeng m3 8.28 Rp352,797.00 Rp2,921,159.16
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Rp851,825.00 Rp19,396,055.25
3 Pasangan Rollag 1 : 5 m3 14.88 Pasangan Rollag 1 : 5 m3 14.88 Rp1,107,535.00 Rp16,480,120.80
PEKERJAAN LAIN - LAIN
Alat bantu & Biaya Operasional
Mobil Crane
- Biaya Sewa dan Operasional (termasuk mobilisasi dan demob bulan 6.00 Rp175,000,000.00 Rp1,050,000,000.00
- BBM (solar) liter 24,000.00 Rp7,500.00 Rp180,000,000.00
Biaya pemakaian air kerja ls 1.00 Rp36,000,000.00 Rp36,000,000.00
Biaya operasional genset 100 KVA
- Biaya Sewa genset (termasuk mobilisasi dan demobilisasi a bulan 12.00 Rp16,500,000.00 Rp198,000,000.00
- BBM (solar) liter 36,000.00 Rp7,500.00 Rp270,000,000.00
Program K3 ls 1.00 Rp100,200,000.00 Rp100,200,000.00

Rp48,639,272,303.62 Rp21,270,936,292.57

GEDUNG CENTER B
A PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasan = 600 m2 ) Ls 1.00
2 Uitzet & Bouwplank m' 150.00
3 Bongkaran Bangunan Lama Ls 1.00
4 Buang Bongkaran Ls 1.00
5 Shop Drawing dan As Built drawing Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32
2 Urugan Tanah Kembali m3 52.44
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75
5 Urugan Sirtu padat (Peninggian Elevasi) t = 0,4 m m3 522.00

III. PEKERJAAN BETON


1 Sloof
S1 30 x 60 cm ( K-300) m3 104.40

2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44


3 Rabatan Beton t = 5 cm bawah lantai m3 65.44
4 Kolom
a Lantai 1
K1 60 x 60 cm ( K-300 ) m3 40.80

KP 12 x 12 cm ( K-300 ) m3 3.06

Plat beton t=15cm K300 m3 195.75

Balok 30/60 cm m3 100.98

Lantai 2
K1 60 x 60 cm ( K-300 ) m3 40.80

KP 12 x 12 cm ( K-300 ) m3 3.06

Plat beton t=15cm K300 m3 195.75


Balok 30/60 cm m3 100.98

Lantai 3
K1 60 x 60 cm ( K-300 ) m3 40.80

KP 12 x 12 cm ( K-300 ) m3 3.06

Plat beton t=15cm K300 m3 271.35

Balok 30/60 cm m3 100.98

Lantai 4
K1 60 x 60 cm ( K-300 ) m3 40.80

KP 12 x 12 cm ( K-300 ) m3 3.06

Plat beton t=15cm K300 m3 195.75

Balok 30/60 cm m3 100.98


Lantai 5
K1 60 x 60 cm ( K-300 ) m3 40.80

KP 12 x 12 cm ( K-300 ) m3 3.06

Plat beton t=15cm K300 m3 195.75

Balok 30/60 cm m3 100.98

Lantai atap
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75

Balok 30/60 cm m3 100.98

5 Shearwall
SW t=25 cm ( K-300 ) m3 225.00

Tangga lurus
Plat Tangga K300 m3 27.00
6 tandon air 20 m3 m3 19.80
balok tandon 30/60 m3 7.20
tandon air 20 m3 m3 13.00
balok tandon 30/60 m3 7.20

7 Water Profing
a Atap
Plat Atap m3 1,305.00

IV PEKERJAAN PONDASI PANCANG


I. PEKERJAAN BETON
1 Beton Poer
P1 110 x 180 x 70 cm m3 62.37

P2 260 x 340 x 70 cm m3 12.38

P3 260 x 260 x 70 cm m3 4.73


2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00
4 Kepruk Kepala TP ttk 298.00

V PEKERJAAN PASANGAN
1 Pasangan Aanstampeng m3 8.28
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77
3 Pasangan Rollag 1 : 5 m3 14.88
PEKERJAAN ATAP DAN PLAFOND
1 WF 200.100 kg 12,672.00
2 Gording C 150.65.20.2,3 kg 14,400.00
3 Plat tebal 5 mm kg 578.07
4 Plat plendes t = 16 mm kg 615.44
5 Angkur f 25 mm L = 800 mm kg 84.00
6 Trekstang f 10 mm kg 152.35
7 Ikatan Angin f 16 mm m2 390.01
8 Jarum Pengeras 16 mm kg 100.00
9 Plafon Kalsibord & rangka hollo m2 600.00
10 Atap zyncalum m2 600.00

GEDUNG WING C
A PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasan = 600 m2 ) Ls 1.00
2 Uitzet & Bouwplank m' 150.00
3 Bongkaran Bangunan Lama Ls 1.00
4 Buang Bongkaran Ls 1.00
5 Shop Drawing dan As Built drawing Ls 1.00

II. PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32
2 Urugan Tanah Kembali m3 52.44
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75
5 Urugan Sirtu padat (Peninggian Elevasi) t = 0,4 m m3 522.00
III. PEKERJAAN BETON
1 Sloof
S1 30 x 60 cm ( K-300) m3 104.40
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44
4 Kolom
a Lantai 1
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai 2
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai 3
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 208.35
Balok 30/60 cm m3 100.98
Lantai 4
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai 5
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai atap
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
5 Shearwall
SW t=25 cm ( K-300 ) m3 225.00
Tangga lurus
Plat Tangga K300 m3 27.00

6 tandon air 40 m3 m3 19.80


balok tandon 30/60 m3 7.20
tandon air 20 m3 m3 13.00
balok tandon 30/60 m3 7.20

7 Water Profing
a Atap
Plat Atap m3 1,305.00

IV PEKERJAAN PONDASI PANCANG


I. PEKERJAAN BETON
1 Beton Poer
P1 110 x 180 x 70 cm m3 62.37
P2 260 x 340 x 70 cm m3 12.38
P3 260 x 260 x 70 cm m3 4.73
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00
4 Kepruk Kepala TP ttk 298.00

V PEKERJAAN PASANGAN
1 Pasangan Aanstampeng m3 8.28
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77
3 Pasangan Rollag 1 : 5 m3 14.88
PEKERJAAN ATAP DAN PLAFOND
1 WF 200.100 kg 12,672.00
2 Gording C 150.65.20.2,3 kg 14,400.00
3 Plat tebal 5 mm kg 578.07
4 Plat plendes t = 16 mm kg 615.44
5 Angkur f 25 mm L = 800 mm kg 84.00
6 Trekstang f 10 mm kg 152.35
7 Ikatan Angin f 16 mm m2 390.01
8 Jarum Pengeras 16 mm kg 100.00
9 Plafon Kalsibord & rangka hollo m2 1,200.00
10 Atap zyncalum m2 1,200.00
KONTRAK 2017 HSIL REVIEW KONSULTAN MK
PT. ASTA KENCANA ARSIMETAMA

URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN HARGA TOTAL

Rp5,052.50 Rp0.00
Uitzet & Bouwplank m' 0.00 55,465.00 Rp0.00

Pagar Proyek seng gelombang t = 2 m m' 0.00 200,240.00 Rp0.00


Direksikeet Ls 0.00 50,000,000.00 Rp0.00
Papan nama proyek bh 0.00 350,000.00 Rp0.00

Galian Tanah Poer, Sloof, & Batu Kali m3 0.00 74,275.00 Rp0.00
Urugan Tanah Kembali m3 0.00 24,758.33 Rp0.00
Urugan Pasir Bawah Lantai t = 10 cm m3 0.00 272,897.50 Rp0.00
Urugan Sirtu dibawah lantai t = 35 cm m3 0.00 269,159.75 Rp0.00
Urugan Sirtu padat (Peninggian Elevasi) t = 0,4 m m3 0.00 269,159.75 Rp0.00

S1 30x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Ulir kg 0.00 18,174.60 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 326,759.50 Rp0.00
Lantai Kerja Bawah Sloof t = 5 cm (K-100) m3 0.00 1,063,296.96 Rp0.00
Rabatan Beton t = 5 cm bawah lantai (K-100) m3 0.00 1,063,296.96 Rp0.00

Lantai 1
K1 60x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
KP 12x12cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Plat beton t=15cm K300
Beton K-300 m3 26.10 1,272,231.35 Rp33,205,238.21
Pembesian Polos kg 6,071.38 17,649.60 Rp107,157,463.75 232.62
Begisting m2 108.75 233,221.00 Rp25,362,783.75 4.1666666667
Balok 30/60cm (K300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 238,021.00 Rp0.00
Lantai 2
K1 60x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
KP 12x12cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Plat beton t=15cm (K300)
Beton K-300 m3 26.10 1,272,231.35 Rp33,205,238.21
Pembesian Polos kg 6,071.38 17,649.60 Rp107,157,463.75 232.62
Begisting m2 108.75 233,221.00 Rp25,362,783.75 4.1666666667
Balok 30/60cm (K300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 238,021.00 Rp0.00
Lantai 3
K1 60x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
KP 12x12cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Plat beton t=15cm (K300)
Beton K-300 m3 38.70 1,272,231.35 Rp49,235,353.21
Pembesian Polos kg 9,002.39 17,649.60 Rp158,888,653.14 232.62
Begisting m2 161.25 233,221.00 Rp37,606,886.25 4.1666666667
Balok 30/60cm (K300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 238,021.00 Rp0.00
Lantai 4
K1 60x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
KP 12x12cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Plat beton t=15cm (K300)
Beton K-300 m3 26.10 1,272,231.35 Rp33,205,238.21
Pembesian Polos kg 6,071.38 17,649.60 Rp107,157,463.75 232.62
Begisting m2 108.75 233,221.00 Rp25,362,783.75 4.1666666667
Balok 30/60cm (K300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 238,021.00 Rp0.00
Lantai 5
K1 60x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
KP 12x12cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Plat beton t=15cm (K300)
Beton K-300 m3 26.10 1,272,231.35 Rp33,205,238.21
Pembesian Polos kg 6,071.38 17,649.60 Rp107,157,463.75 232.62
Begisting m2 108.75 233,221.00 Rp25,362,783.75 4.1666666667
Balok 30/60cm (K300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 238,021.00 Rp0.00
Lantai atap
K1 60x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
KP 12x12cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Plat beton t=15cm (K300)
Beton K-300 m3 26.10 1,272,231.35 Rp33,205,238.21
Pembesian Polos kg 6,071.38 17,649.60 Rp107,157,463.75 232.62
Begisting m2 108.75 233,221.00 Rp25,362,783.75 4.1666666667
Balok 30/60cm (K300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 238,021.00 Rp0.00

Shearwall 25cm (K-300)


Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00

Plat Tangga-U t=15cm (K-225)


Beton K-225 m3 154.88 1,220,358.86 Rp189,011,133.19
Pembesian Polos kg 28,112.56 17,649.60 Rp496,175,425.14 181.51
Begisting m2 344.18 233,221.00 Rp80,270,314.74 2.2222222222
Anak Tangga-U (K-225)
Beton K-225 m3 0.00 1,220,358.86 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Plat Bordes Tangga-U t=15cm (K-225)
Beton K-225 m3 0.00 1,220,358.86 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00

Plat Tangga Lurus t=15cm (K-225)


Beton K-225 m3 16.85 1,220,358.86 Rp20,566,097.73
Pembesian Polos kg 3,058.90 17,649.60 Rp53,988,313.34 181.51
Begisting m2 37.45 233,221.00 Rp8,734,126.45 2.2222222222
Anak Tangga Lurus t=15cm (K-225)
Beton K-225 m3 0.00 1,220,358.86 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00

Plat Atap m2 0.00 84,797.50 Rp0.00


Helipad m2 0.00 84,797.50 Rp0.00
Plat t=15 cm (K300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
K1 60x60cm (K-300)
Beton K-300 m3 0.00 1,272,231.35 Rp0.00
Pembesian Polos kg 0.00 17,649.60 Rp0.00
Begisting m2 0.00 233,221.00 Rp0.00
Balok 30/60cm (K300)
Beton K-300 m3 7.78 1,272,231.35 Rp9,892,870.97
Pembesian Polos kg 1,808.85 17,649.60 Rp31,925,534.03 232.62
Begisting m2 45.36 238,021.00 Rp10,796,632.56 5.8333333333
tandon air 40 m3 m3 19.80 - Rp0.00
balok tandon 30/60 m3 7.20 - Rp0.00
tandon air 20 m3 m3 13.00 - Rp0.00
balok tandon 30/60 m3 7.20 - Rp0.00

P1 110 x 180 x 70 cm
Beton K-300 m3 0.00 1,220,358.86 Rp0.00
Pembesian Ulir kg 0.00 18,174.60 Rp0.00
Begisting m2 0.00 326,759.50 Rp0.00
P2 260 x 340 x 70 cm
Beton K-300 m3 0.00 1,220,358.86 Rp0.00
Pembesian Ulir kg 0.00 18,174.60 Rp0.00
Begisting m2 0.00 326,759.50 Rp0.00
P3 260 x 260 x 70 cm
Beton K-300 m3 0.00 1,220,358.86 Rp0.00
Pembesian Ulir kg 0.00 18,174.60 Rp0.00
Begisting m2 0.00 326,759.50 Rp0.00
Lantai Kerja Bawah Poer t = 5 cm m3 0.00 1,063,296.96 Rp0.00
Pancang mini pile Uk. 25x25 cm2 m1 0.00 299,500.00 Rp0.00 pc-1 312
Biaya Pemancangan m1 0.00 154,874.00 Rp0.00 core-A 11
Kepruk Kepala TP ttk 0.00 63,040.00 Rp0.00 core-B 24
PDA Test ttk 0.00 15,000,000.00 Rp0.00 core-C 24 387 6966
pc-3 16
Pasangan Aanstampeng m3 0.00 352,797.00 Rp0.00 pc-4 24 411 7398
Pasangan Pondasi Batu Kali 1 : 5 m3 0.00 851,825.00 Rp0.00
Pasangan Rollag 1 : 5 m3 0.00 1,107,535.00 Rp0.00
PEKERJAAN LAIN - LAIN
Alat bantu & Biaya Operasional
Mobil Crane
- Biaya Sewa dan Operasional (termasuk mobilisasi dan demob bulan 0.00 175,000,000.00 Rp0.00
- BBM (solar) liter 0.00 7,500.00 Rp0.00
Biaya pemakaian air kerja ls 0.00 36,000,000.00 Rp0.00
Biaya operasional genset 100 KVA
- Biaya Sewa genset (termasuk mobilisasi dan demobilisasi a bulan 0.00 16,500,000.00 Rp0.00
- BBM (solar) liter 0.00 7,500.00 Rp0.00
Program K3 ls 0.00 100,200,000.00 Rp0.00

Rp1,975,718,769.31

GEDUNG CENTER B
PEKERJAAN SIPIL
PEKERJAAN PERSIAPAN
Pembersihan Lapangan ( Dengan Luasan = 600 m2 ) Ls 1.00
Uitzet & Bouwplank m' 161.00
Bongkaran Bangunan Lama Ls 1.00
Buang Bongkaran Ls 1.00
Shop Drawing dan As Built drawing Ls 1.00

PEKERJAAN TANAH
Galian Tanah Poer, Sloof, & Batu Kali m3 215.63
Urugan Tanah Kembali m3
Urugan Pasir Bawah Lantai t = 10 cm m3
Urugan Sirtu dibawah lantai t = 35 cm m3
Urugan Sirtu padat (Peninggian Elevasi) t = 0,4 m m3 824.52

PEKERJAAN BETON
S1 30 x 60 cm ( K-300)
Beton K-300 m3 144.11
Pembesian Ulir kg 51,938.13
Pembesian Polos kg 19,190.12
Begisting m2 960.73
Lantai Kerja Bawah Sloof t = 5 cm m3 12.01
Rabatan Beton t = 5 cm bawah lantai m3 68.71
Kolom
Lantai 1
K1 60 x 60 cm ( K-300 )
Beton K-300 m3 76.50
Pembesian Ulir kg 11,153.67
Pembesian Polos kg 90.55
Begisting m2 510.00
KP 12 x 12 cm ( K-300 )
Beton K-300 m3
Pembesian Polos kg
Begisting m2
Plat beton t=12cm K300
Beton K-300 m3
Pembesian Polos kg
Begisting m2
Balok 30/60 cm
Beton K-300 m3
Pembesian Ulir kg
Pembesian Polos kg
Begisting m2
Lantai 2
K1 60 x 60 cm ( K-300 )
Beton K-300 m3 76.50
Pembesian Ulir kg 11,153.67
Pembesian Polos kg 90.55
Begisting m2 510.00
KP 12 x 12 cm ( K-300 )
Beton K-300 m3
Pembesian Polos kg
Begisting m2
Plat beton t=12cm K300
Beton K-300 m3 116.59
Pembesian Polos kg 19,167.33
Begisting m2 1,088.17
Balok induk 30/60 cm
Beton K-300 m3 82.91
Pembesian Ulir kg 32,600.99
Pembesian Polos kg 11,040.96
Begisting m2 690.94
Balok anak 30/60 cm
Beton K-300 m3 48.87
Pembesian Ulir kg 14,638.77
Pembesian Polos kg 6,507.72
Begisting m2 407.25
Lantai 3
K1 60 x 60 cm ( K-300 )
Beton K-300 m3 71.10
Pembesian Ulir kg 10,616.57
Pembesian Polos kg 84.16
Begisting m2 474.00
KP 12 x 12 cm ( K-300 )
Beton K-300 m3
Pembesian Polos kg
Begisting m2
Plat beton t=12cm K300
Beton K-300 m3 159.44
Pembesian Polos kg 26,212.49
Begisting m2 1,488.14
Balok induk 30/60 cm
Beton K-300 m3 93.65
Pembesian Ulir kg 36,824.88
Pembesian Polos kg 12,471.46
Begisting m2 780.46
Balok anak 30/60 cm
Beton K-300 m3 70.34
Pembesian Ulir kg 21,071.21
Pembesian Polos kg 9,367.29
Begisting m2 586.20
Lantai 4
K1 60 x 60 cm ( K-300 )
Beton K-300 m3 71.10
Pembesian Ulir kg 10,616.57
Pembesian Polos kg 84.16
Begisting m2 474.00
KP 12 x 12 cm ( K-300 )
Beton K-300 m3
Pembesian Polos kg
Begisting m2
Plat beton t=12cm K300
Beton K-300 m3 123.03
Pembesian Polos kg 20,226.72
Begisting m2 1,148.31
Balok induk 30/60 cm
Beton K-300 m3 69.98
Pembesian Ulir kg 27,517.54
Pembesian Polos kg 9,319.35
Begisting m2 583.20
Balok anak 30/60 cm
Beton K-300 m3 50.89
Pembesian Ulir kg 15,242.66
Pembesian Polos kg 6,776.18
Begisting m2 424.05
Lantai 5
K1 60 x 60 cm ( K-300 )
Beton K-300 m3 71.10
Pembesian Ulir kg 10,616.57
Pembesian Polos kg 84.16
Begisting m2 474.00
KP 12 x 12 cm ( K-300 )
Beton K-300 m3
Pembesian Polos kg
Begisting m2
Plat beton t=12cm K300
Beton K-300 m3 123.03
Pembesian Polos kg 20,226.72
Begisting m2 1,148.31
Balok induk 30/60 cm
Beton K-300 m3 69.98
Pembesian Ulir kg 27,517.54
Pembesian Polos kg 9,319.35
Begisting m2 583.20
Balok anak 30/60 cm
Beton K-300 m3 48.65
Pembesian Ulir kg 14,574.07
Pembesian Polos kg 6,478.96
Begisting m2 405.45
Lantai atap
K1 60 x 60 cm ( K-300 ) m3
KP 12 x 12 cm ( K-300 ) m3
Plat beton t=12cm K300
Beton K-300 m3 30.21
Pembesian Polos kg 4,966.62
Begisting m2 281.97
Balok induk 30/60 cm
Beton K-300 m3 59.29
Pembesian Ulir kg 23,313.47
Pembesian Polos kg 7,895.56
Begisting m2 494.10
Balok anak 30/60 cm
Beton K-300 m3 20.09
Pembesian Ulir kg 6,017.26
Pembesian Polos kg 2,675.00
Begisting m2 167.40
Shearwall
SW t=25 cm ( K-300 )
Beton K-300 m3 117.58
Pembesian Ulir kg 13,544.64
Begisting m2 804.60
Tangga lurus
Plat Tangga K300 m3
tandon air 20 m3 m3
balok tandon 30/60 m3
tandon air 20 m3 m3
balok tandon 30/60 m3

Water Profing
Atap
Plat Atap m3

PEKERJAAN PONDASI PANCANG


PEKERJAAN BETON
Beton Poer
P1 205 x 130 x 70 cm (32bh)
Beton K-300 m3 59.70
Pembesian Ulir kg 7,149.30
Begisting m2 150.08
P2 130 x 130 x 70 cm (10bh)
Beton K-300 m3 11.83
Pembesian Ulir kg 1,542.89
Begisting m2 36.40
P3 260 x 260 x 70 cm m3
Lantai Kerja Bawah Poer t = 5 cm m3 5.11
Pancang mini pile Uk. 25x25 cm2 m1 4,392.00
Kepruk Kepala TP ttk 244.00

PEKERJAAN PASANGAN
Pasangan Aanstampeng m3
Pasangan Pondasi Batu Kali 1 : 5 m3
Pasangan Rollag 1 : 5 m3
PEKERJAAN ATAP DAN PLAFOND
WF 200.100 kg
Gording C 150.65.20.2,3 kg
Plat tebal 5 mm kg
Plat plendes t = 16 mm kg
Angkur f 25 mm L = 800 mm kg
Trekstang f 10 mm kg
Ikatan Angin f 16 mm m2
Jarum Pengeras 16 mm kg
Plafon Kalsibord & rangka hollo m2
Atap zyncalum m2

GEDUNG WING C
PEKERJAAN SIPIL
PEKERJAAN PERSIAPAN
Pembersihan Lapangan ( Dengan Luasan = 600 m2 ) Ls 1.00
Uitzet & Bouwplank m' 150.00
Bongkaran Bangunan Lama Ls 1.00
Buang Bongkaran Ls 1.00
Shop Drawing dan As Built drawing Ls 1.00

PEKERJAAN TANAH
Galian Tanah Poer, Sloof, & Batu Kali m3 288.32
Urugan Tanah Kembali m3 52.44
Urugan Pasir Bawah Lantai t = 10 cm m3 130.88
Urugan Sirtu dibawah lantai t = 35 cm m3 456.75
Urugan Sirtu padat (Peninggian Elevasi) t = 0,4 m m3 522.00
PEKERJAAN BETON
Sloof
S1 30 x 60 cm ( K-300) m3 104.40
Lantai Kerja Bawah Sloof t = 5 cm m3 9.44
Rabatan Beton t = 5 cm bawah lantai m3 65.44
Kolom
Lantai 1
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai 2
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai 3
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 208.35
Balok 30/60 cm m3 100.98
Lantai 4
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai 5
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Lantai atap
K1 60 x 60 cm ( K-300 ) m3 40.80
KP 12 x 12 cm ( K-300 ) m3 3.06
Plat beton t=15cm K300 m3 195.75
Balok 30/60 cm m3 100.98
Shearwall
SW t=25 cm ( K-300 ) m3 225.00
Tangga lurus
Plat Tangga K300 m3 27.00

tandon air 40 m3 m3 19.80


balok tandon 30/60 m3 7.20
tandon air 20 m3 m3 13.00
balok tandon 30/60 m3 7.20

Water Profing
Atap
Plat Atap m3 1,305.00

PEKERJAAN PONDASI PANCANG


PEKERJAAN BETON
Beton Poer
P1 110 x 180 x 70 cm m3 62.37
P2 260 x 340 x 70 cm m3 12.38
P3 260 x 260 x 70 cm m3 4.73
Lantai Kerja Bawah Poer t = 5 cm m3 15.09
Pancang mini pile Uk. 25x25 cm2 m1 5,960.00
Kepruk Kepala TP ttk 298.00

PEKERJAAN PASANGAN
Pasangan Aanstampeng m3 8.28
Pasangan Pondasi Batu Kali 1 : 5 m3 22.77
Pasangan Rollag 1 : 5 m3 14.88
PEKERJAAN ATAP DAN PLAFOND
WF 200.100 kg 12,672.00
Gording C 150.65.20.2,3 kg 14,400.00
Plat tebal 5 mm kg 578.07
Plat plendes t = 16 mm kg 615.44
Angkur f 25 mm L = 800 mm kg 84.00
Trekstang f 10 mm kg 152.35
Ikatan Angin f 16 mm m2 390.01
Jarum Pengeras 16 mm kg 100.00
Plafon Kalsibord & rangka hollo m2 1,200.00
Atap zyncalum m2 1,200.00
galian
GEDUNG WING-A jumlah panjang lebar tinggi tul.utama tul.torsi beugel tanah
(m3)
50
sloof pengikat 30/60 602.9 m 0.3 m 0.6 m 12 D25 2 D16 d12 325.57
100
50
sloof anak 30/60 311.4 m 0.3 m 0.6 m 12 D25 2 D16 d12 168.16
100
area LT-1 1570.148 m2
pilecap PC-1 60 bh 2.05 m 1.3 m 0.7 m D16 125 211.47
pilecap PC-4 2 bh 6.6 m 1.3 m 0.7 m D16 125 19.152
pancang 435 ttk 18 m 7830 m
59 bh 0.6 m 0.6 m 4.25 m 12 D22 d12 100
kolom LT-1 8 bh 0.9 m 0.2 m 4.25 m 10 D22 d12 100
1 bh 0.6 m 4.25 m 12 D22 d12 100
shearwall 1LIFT 1 bh 13 m 0.25 m 5.75 m D16 170 D13 250 17.34
shearwall 2LIFT 2 bh 18 m 0.25 m 5.75 m D16 170 D13 250 47.43
shearwall tangga 2 bh 12.5 m 0.25 m 5.75 m D16 250 D13 250 33.405
pondasi pit 1LIFT 1 bh 3.5 m 3 m 1 m D22 125 14.76
pondasi pit 2LIFT 2 bh 5.5 m 3.5 m 1 m D22 125 50.02
pondasi tangga 2 bh 6 m 3 m 1 m D22 125 47.52
plat tangga darurat 2 bh 6.28 m 1.27 m 0.15 m d12 200 d10 150
plat anak tangga 2 bh 3.88 m 1.27 m 0.08 m 11 d08 d06 300
plat bordes 1 bh 2.87 m 1.2 m 0.15 m d12 200 d10 150
plat ramp 1 bh 35.7 m 2 m 0.15 m d12 200 d10 150
50
balok induk LT-2 614.9 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-2 380.2 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-2 1639.844 m2 0.12 m d10 125
60 bh 0.6 m 0.6 m 4.25 m 12 D22 d12 100
kolom LT-2 8 bh 0.9 m 0.2 m 4.25 m 10 D22 d12 100
1 bh 0.6 m 4.25 m 12 D22 d12 100
shearwall 1LIFT 1 bh 13 m 0.25 m 4.25 m D16 170 D13 250
shearwall 2LIFT 2 bh 18 m 0.25 m 4.25 m D16 170 D13 250
shearwall tangga 2 bh 12.5 m 0.25 m 4.25 m D16 250 D13 250
plat tangga darurat 2 bh 6.28 m 1.27 m 0.15 m d12 200 d10 150
plat anak tangga 2 bh 3.88 m 1.27 m 0.08 m 11 d08 d06 300
plat bordes 1 bh 2.87 m 1.2 m 0.15 m d12 200 d10 150
plat ramp 1 bh 35.7 m 2 m 0.15 m d12 200 d10 150
50
balok induk LT-3 614.9 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-3 420.2 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-3 1639.844 m2 0.12 m d10 125
60 bh 0.6 m 0.6 m 3.95 m 12 D22 d12 100
kolom LT-3
kolom LT-3 8 bh 0.9 m 0.2 m 3.95 m 10 D22 d12 100
1 bh 0.6 m 3.95 m 12 D22 d12 100
shearwall 1LIFT 1 bh 13 m 0.25 m 3.95 m D16 170 D13 250
shearwall 2LIFT 2 bh 18 m 0.25 m 3.95 m D16 170 D13 250
shearwall tangga 2 bh 12.5 m 0.25 m 3.95 m D16 250 D13 250
plat tangga darurat 2 bh 6.28 m 1.27 m 0.15 m d12 200 d10 150
plat anak tangga 2 bh 3.88 m 1.27 m 0.08 m 11 d08 d06 300
plat bordes 1 bh 2.87 m 1.2 m 0.15 m d12 200 d10 150
plat ramp 1 bh 35.7 m 2 m 0.15 m d12 200 d10 150
50
balok induk LT-4 614.9 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-4 465.6 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-4 1639.844 m2 0.12 m d10 125
60 bh 0.6 m 0.6 m 3.95 m 12 D22 d12 100
kolom LT-4 8 bh 0.9 m 0.2 m 3.95 m 10 D22 d12 100
1 bh 0.6 m 3.95 m 12 D22 d12 100
shearwall 1LIFT 1 bh 13 m 0.25 m 3.95 m D16 170 D13 250
shearwall 2LIFT 2 bh 18 m 0.25 m 3.95 m D16 170 D13 250
shearwall tangga 2 bh 12.5 m 0.25 m 3.95 m D16 250 D13 250
plat tangga darurat 2 bh 6.28 m 1.27 m 0.15 m d12 200 d10 150
plat anak tangga 2 bh 3.88 m 1.27 m 0.08 m 11 d08 d06 300
plat bordes 1 bh 2.87 m 1.2 m 0.15 m d12 200 d10 150
plat ramp 1 bh 35.7 m 2 m 0.15 m d12 200 d10 150
50
balok induk LT-5 614.9 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-5 468.3 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-5 1639.844 m2 0.12 m d10 125
60 bh 0.6 m 0.6 m 3.95 m 12 D22 d12 100
kolom LT-5 8 bh 0.9 m 0.2 m 3.95 m 10 D22 d12 100
1 bh 0.6 m 3.95 m 12 D22 d12 100
shearwall 1LIFT 1 bh 13 m 0.25 m 3.95 m D16 170 D13 250
shearwall 2LIFT 2 bh 18 m 0.25 m 3.95 m D16 170 D13 250
shearwall tangga 2 bh 12.5 m 0.25 m 3.95 m D16 250 D13 250
plat tangga darurat 2 bh 6.28 m 1.27 m 0.15 m d12 200 d10 150
plat anak tangga 2 bh 3.88 m 1.27 m 0.08 m 11 d08 d06 300
plat bordes 1 bh 2.87 m 1.2 m 0.15 m d12 200 d10 150
plat ramp 1 bh 35.7 m 2 m 0.15 m d12 200 d10 150
50
balok induk LT-6 605.9 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-6 386.3 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-6 1669.544 m2 0.12 m d10 125
60 bh 0.6 m 0.6 m 3.95 m 12 D22 d12 100
kolom LT-6
kolom LT-6 8 bh 0.9 m 0.2 m 3.95 m 10 D22 d12 100
1 bh 0.6 m 3.95 m 12 D22 d12 100
shearwall 1LIFT 1 bh 13 m 0.25 m 4.6 m D16 170 D13 250
shearwall 2LIFT 2 bh 18 m 0.25 m 4.6 m D16 170 D13 250
shearwall tangga 2 bh 12.5 m 0.25 m 4.6 m D16 250 D13 250
dak 1LIFT 1 bh 3.5 m 3 m 0.12 m d10 125
dak 2LIFT 2 bh 5.5 m 3.5 m 0.12 m d10 125
dak tangga 2 bh 6 m 3 m 0.12 m d10 125
50
balok induk heli 53.6 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak heli 53.6 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area heli 179.55 m2 0.15 m d10 125
kolom heli 4 bh 0.6 m 0.6 m 1.5 m 12 D22 d12 100
galian
GEDUNG CENTER-B jumlah panjang lebar tinggi tul.utama tul.torsi beugel tanah
(m3)
50
sloof pengikat 30/60 520.3 m 0.3 m 0.6 m 16 D25 2 D16 d12 280.96
100
50
sloof anak 30/60 280.3 m 0.3 m 0.6 m 12 D25 2 D16 d12 151.36
100
area LT-1 1374.195 m2
pilecap PC-1 32 bh 2.05 m 1.3 m 0.7 m D16 125 112.78
pilecap PC-2 10 bh 1.3 m 1.3 m 0.7 m D16 125 25.27
pancang 244 ttk 18 m 4392 m
kolom LT-1 50 bh 0.6 m 0.6 m 4.25 m 12 D22 d12 100
50
balok induk LT-2 460.6 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-2 271.5 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-2 971.58 m2 0.12 m d10 125
kolom LT-2 50 bh 0.6 m 0.6 m 4.25 m 12 D22 d12 100
50
balok induk LT-3 520.3 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-3 390.8 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-3 1328.695 m2 0.12 m d10 125
kolom LT-3 50 bh 0.6 m 0.6 m 3.95 m 12 D22 d12 100
50
balok induk LT-4 388.8 m 0.3 m 0.6 m 16 D25 2 D16 d12
balok induk LT-4 388.8 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-4 282.7 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-4 1025.28 m2 0.12 m d10 125
kolom LT-4 50 bh 0.6 m 0.6 m 3.95 m 12 D22 d12 100
50
balok induk LT-5 388.8 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-5 270.3 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-5 1025.28 m2 0.12 m d10 125
kolom LT-5 50 bh 0.6 m 0.6 m 3.95 m 12 D22 d12 100
50
balok induk LT-6 329.4 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-6 111.6 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-6 251.755 m2 0.12 m d10 125
shear wall 1 bh 18 m 0.25 m 21.85 m D16 170 D13 250 23.715
pondasi pit lif 1 bh 5.5 m 3.5 m 1 m D22 125 25.01
dak 2LIFT 1 bh 5.5 m 3.5 m 0.12 m d10 125

GEDUNG WING-C jumlah panjang lebar tinggi tul.utama tul.torsi beugel

50
sloof pengikat 30/60 612.8 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
50
sloof anak 30/60 202.4 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-1 1507.201 m2
pilecap PC-1 60 bh 2.05 m 1.3 m 0.7 m D16 125 211.47
pilecap PC-4 2 bh 6.6 m 1.3 m 0.7 m D16 125 19.152
pancang 404 ttk 18 m 7272 m
60 bh 0.6 m 0.6 m 4.25 m 12 D22 d12 100
kolom LT-1
8 bh 0.9 m 0.2 m 4.25 m 10 D22 d12 100
shearwall 1LIFT 2 bh 13 m 0.25 m 5.75 m D16 170 D13 250 34.68
shearwall tangga 2 bh 12.5 m 0.25 m 5.75 m D16 250 D13 250 33.405
pondasi pit 1LIFT 2 bh 3.5 m 3 m 1 m D22 125 29.52
pondasi tangga 2 bh 6 m 3 m 1 m D22 125 47.52
plat tangga darurat 2 bh 6.28 m 1.27 m 0.15 m d12 200 d10 150
plat anak tangga 2 bh 3.88 m 1.27 m 0.08 m 11 d08 d06 300
plat bordes 1 bh 2.87 m 1.2 m 0.15 m d12 200 d10 150
plat ramp 1 bh 35.7 m 2 m 0.15 m d12 200 d10 150
50
balok induk LT-2 619.6 m 0.3 m 0.6 m 16 D25 2 D16 d12
100
50
balok anak LT-2 453.8 m 0.3 m 0.6 m 12 D25 2 D16 d12
100
area LT-2 1627.948 m2 0.12 m d10 125
60 bh 0.6 m 0.6 m 4.25 m 12 D22 d12 100
kolom LT-2
8 bh 0.9 m 0.2 m 4.25 m 10 D22 d12 100
shearwall 1LIFT 1 bh 13 m 0.25 m 4.25 m D16 170 D13 250
shearwall tangga 2 bh 12.5 m 0.25 m 4.25 m D16 250 D13 250
plat tangga darurat 2 bh 6.28 m 1.27 m 0.15 m d12 200 d10 150
plat anak tangga 2 bh 3.88 m 1.27 m 0.08 m 11 d08 d06 300
plat bordes 1 bh 2.87 m 1.2 m 0.15 m d12 200 d10 150
plat ramp 1 bh 35.7 m 2 m 0.15 m d12 200 d10 150
lantai kerja begisting urugan
polos (kg) ulir (kg) K-300 (m3) tanah
5cm (m3) (m2) (m3)

9634.1491
9.0435 723.48 32507.243 108.522
4817.0745
4976.0724
4.671 373.68 16790.107 56.052
2488.0362
78.5074 942.0888
7.995 281.4 13404.939 111.93
0.858 22.12 1285.5712 12.012

601.8 5342.5397 13161.329 90.27


74.8 664.04448 1487.1558 6.12
8.0110613 45.27576 223.07337 1.2016592
149.5 2358.5542 18.6875
414 6531.3809 51.75
287.5 3467.6769 35.9375
0.525 23.5 1468.0591 10.5
1.925 74.5 4965.143 38.5
1.8 72 4726.4342 36
19.7192 272.72724 2.39268
0.6208 20.70133 0.788416
4.2345 58.884134 0.5166
76.755 1220.7686 10.71
9825.9052
922.35 43519.89 110.682
4912.9526
6075.4743
570.3 20499.675 68.436
3037.7372
1836.6253 32350.842 196.78128
612 5433.0912 13384.402 91.8
74.8 664.04448 1487.1558 6.12
8.0110613 45.27576 223.07337 1.2016592
110.5 1833.9533 13.8125
306 5078.64 38.25
212.5 2681.6394 26.5625
19.7192 272.72724 2.39268
0.6208 20.70133 0.788416
4.2345 58.884134 0.5166
76.755 1220.7686 10.71
9825.9052
922.35 43519.89 110.682
4912.9526
6714.6615
630.3 22656.4 75.636
3357.3308
1836.6253 32350.842 196.78128
568.8 84.159648 12739.889 85.32
69.52 77.146344 1415.5432 5.688
7.4455746 42.079824 212.33148 1.1168362
102.7 1729.0331 12.8375
284.4 4788.0918 35.55
197.5 2524.4319 24.6875
19.7192 272.72724 2.39268
0.6208 20.70133 0.788416
4.2345 58.884134 0.5166
76.755 1220.7686 10.71
9825.9052
922.35 43519.89 110.682
4912.9526
7440.139
698.4 25104.283 83.808
3720.0695
1836.6253 32350.842 196.78128
568.8 84.159648 12739.889 85.32
69.52 77.146344 1415.5432 5.688
7.4455746 42.079824 212.33148 1.1168362
102.7 1729.0331 12.8375
284.4 4788.0918 35.55
197.5 2524.4319 24.6875
19.7192 272.72724 2.39268
0.6208 20.70133 0.788416
4.2345 58.884134 0.5166
76.755 1220.7686 10.71
9825.9052
922.35 43519.89 110.682
4912.9526
7483.2841
702.45 25249.862 84.294
3741.6421
1836.6253 32350.842 196.78128
568.8 84.159648 12739.889 85.32
69.52 77.146344 1415.5432 5.688
7.4455746 42.079824 212.33148 1.1168362
102.7 1729.0331 12.8375
284.4 4788.0918 35.55
197.5 2524.4319 24.6875
19.7192 272.72724 2.39268
0.6208 20.70133 0.788416
4.2345 58.884134 0.5166
76.755 1220.7686 10.71
9682.0881
908.85 42882.91 109.062
4841.0441
6172.9504
579.45 20828.575 69.534
3086.4752
1869.8893 32936.764 200.34528
568.8 5049.5789 12739.889 85.32
69.52 617.17075 1415.5432 5.688
7.4455746 42.079824 212.33148 1.1168362
119.6 1956.3602 14.95
331.2 5417.6128 41.4
230 2865.0481 28.75
18.22 207.144 1.26
62.18 759.528 4.62
61.44 710.208 4.32
856.51085
80.4 3793.5698 9.648
428.25542
856.51085
80.4 2890.012 9.648
428.25542
206.4825 3542.1624 26.9325
14.4 127.83744 498.42397 2.16

lantai kerja begisting urugan


polos (kg) ulir (kg) K-300 (m3) tanah
5cm (m3) (m2) (m3)

8314.3074
7.804575 624.366 36824.876 93.6549
4157.1537
4479.1043
4.2045 336.36 15113.253 50.454
2239.5522
68.70975 824.517
4.264 150.08 7149.3009 59.696
0.845 36.4 1542.8874 11.83

510 90.55152 11153.669 76.5


7360.6401
690.9375 32600.991 82.9125
3680.3201
4338.4831
407.25 14638.773 48.87
2169.2416
1088.1696 19167.33 116.5896
510 90.55152 11153.669 76.5
8314.3074
780.4575 36824.876 93.6549
4157.1537
6244.8589
586.2 21071.207 70.344
3122.4295
1488.1384 26212.495 159.4434
474 84.159648 10616.574 71.1
6212.8996
583.2 27517.536 69.984
583.2 27517.536 69.984
3106.4498
4517.4555
424.05 15242.657 50.886
2258.7278
1148.3136 20226.724 123.0336
474 84.159648 10616.574 71.1
6212.8996
583.2 27517.536 69.984
3106.4498
4319.3075
405.45 14574.072 48.654
2159.6538
1148.3136 20226.724 123.0336
474 84.159648 10616.574 71.1
5263.7066
494.1 23313.468 59.292
2631.8533
1783.3323
167.4 6017.2638 20.088
891.66614
281.9656 4966.6226 30.2106
786.6 11062.067 98.325
0.9625 18 2482.5715 19.25
31.09 379.764 2.31

lantai kerja begisting urugan


polos (kg) ulir (kg) K-300 (m3) tanah
5cm (m3) (m2) (m3)

9792.3479
9.192 735.36 30268.631 110.304
4896.174
3234.2872
3.036 242.88 9997.3416 36.432
1617.1436
75.36005 904.3206
7.995 281.4 13404.939 111.93
0.858 22.12 1285.5712 12.012

612 5433.0912 13384.402 91.8


74.8 664.04448 1487.1558 6.12
299 4717.1084 37.375
287.5 3467.6769 35.9375
1.05 47 2936.1182 21
1.8 72 4726.4342 36
19.7192 272.72724 2.39268
0.6208 20.70133 0.788416
4.2345 58.884134 0.5166
76.755 1220.7686 10.71
9901.0097
929.4 43852.535 111.528
4950.5049
7251.5788
680.7 24468.049 81.684
3625.7894
1823.3018 32116.158 195.35376
612 5433.0912 13384.402 91.8
74.8 664.04448 1487.1558 6.12
110.5 1833.9533 13.8125
212.5 2681.6394 26.5625
19.7192 272.72724 2.39268
0.6208 20.70133 0.788416
4.2345 58.884134 0.5166
76.755 1220.7686 10.71
REVIEW PEKERJAAN SIPIL RUMAH SAKIT MUARA TEWEH
KARYA PERENCANAAN KONTRAK 2016-2017 HSIL REVIEW KONSULTAN MK KONTRAK 2017
PT. ETIKA PRANA PT. ASTA KENCANA ARSIMETAMA PT. ASTA K

NO URAIAN PEKERJAAN SAT VOLUME URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN HARGA TOTAL URAIAN PEKERJAAN

GEDUNG WING A
A PEKERJAAN SIPIL PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasa Ls 1.00 Pembersihan Lapangan ( Dengan Luasa m2 1,571.00 Rp 5,052.50 Rp 7,937,477.50
2 Uitzet & Bouwplank m' 150.00 Uitzet & Bouwplank m' 228.00 Rp 55,465.00 Rp 12,646,020.00 Uitzet & Bouwplank
3 Bongkaran Bangunan Lama Ls 1.00 TIDAK DISETUJUI PPK
4 Buang Bongkaran Ls 1.00 TIDAK DISETUJUI PPK
5 Shop Drawing dan As Built drawing Ls 1.00 TIDAK DISETUJUI PPK
Pagar Proyek seng gelombang t = 2 m m' 236.00 Rp 200,240.00 Rp 47,256,640.00 Pagar Proyek seng gelombang t = 2 m
Direksikeet Ls 1.00 Rp 50,000,000.00 Rp 50,000,000.00 Direksikeet
Papan nama proyek bh 1.00 Rp 350,000.00 Rp 350,000.00 Papan nama proyek

II. PEKERJAAN TANAH PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Galian Tanah Poer, Sloof, & Batu Kali m3 934.82 Rp 74,275.00 Rp 69,433,681.23 Galian Tanah Poer, Sloof, & Batu Kali
2 Urugan Tanah Kembali m3 52.44 Urugan Tanah Kembali m3 454.93 Rp 24,758.33 Rp 11,263,259.07 Urugan Tanah Kembali
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Urugan Pasir Bawah Lantai t = 10 cm m3 157.01 Rp 272,897.50 Rp 42,848,946.38 Urugan Pasir Bawah Lantai t = 10 cm
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Urugan Sirtu dibawah lantai t = 35 cm m3 Rp 269,159.75 Rp - Urugan Sirtu dibawah lantai t = 35 cm
5 Urugan Sirtu padat (Peninggian Elevasi) m3 522.00 Urugan Sirtu padat (Peninggian Elevasi) m3 942.09 Rp 269,159.75 Rp 253,572,385.89 Urugan Sirtu padat (Peninggian Elevasi)

III. PEKERJAAN BETON PEKERJAAN BETON


1 Sloof S1 30x60cm induk (K-300) S1 30x60cm (K-300)
S1 30 x 60 cm ( K-300) m3 104.40 Beton K-300 m3 108.52 Rp 1,272,231.35 Rp 138,065,090.48 Beton K-300
Pembesian Ulir kg 32,507.24 Rp 18,174.60 Rp 590,806,143.08 Pembesian Ulir
Pembesian Polos kg 14,451.22 Rp 17,649.60 Rp 255,058,316.19 Pembesian Polos
Begisting m2 723.48 Rp 326,759.50 Rp 236,403,963.06 Begisting
S1 30x60cm anak (K-300)
Beton K-300 m3 56.05 Rp 1,272,231.35 Rp 71,311,111.59
Pembesian Ulir kg 16,790.11 Rp 18,174.60 Rp 305,153,479.77
Pembesian Polos kg 7,464.11 Rp 17,649.60 Rp 131,738,529.88
Begisting m2 373.68 Rp 326,759.50 Rp 122,103,489.96
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44 Lantai Kerja Bawah Sloof t = 5 cm (K-10 m3 13.71 Rp 1,063,296.96 Rp 14,582,586.13 Lantai Kerja Bawah Sloof t = 5 cm (K-10
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44 Rabatan Beton t = 5 cm bawah lantai ( m3 78.51 Rp 1,063,296.96 Rp 83,476,679.57 Rabatan Beton t = 5 cm bawah lantai (
4 Kolom Kolom
Lantai 1 Lantai 1 Lantai 1
K1~60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 90.27 Rp 1,272,231.35 Rp 114,844,323.89 Beton K-300
Pembesian Ulir kg 13,161.33 Rp 18,174.60 Rp 239,201,890.81
Pembesian Polos kg 5,342.54 Rp 17,649.60 Rp 94,293,688.34 Pembesian Polos
Begisting m2 601.80 Rp 233,221.00 Rp 140,352,397.80 Begisting
K2~20x90cm (K-300)
Beton K-300 m3 6.12 Rp 1,272,231.35 Rp 7,786,055.86
Pembesian Ulir kg 1,487.16 Rp 18,174.60 Rp 27,028,462.24
Pembesian Polos kg 664.04 Rp 17,649.60 Rp 11,720,119.45
Begisting m2 74.80 Rp 233,221.00 Rp 17,444,930.80
CK~D60cm (K-300)
Beton K-300 m3 1.20 Rp 1,272,231.35 Rp 1,528,788.49
Pembesian Ulir kg 223.07 Rp 18,174.60 Rp 4,054,269.34
Pembesian Polos kg 45.28 Rp 17,649.60 Rp 799,099.05
Begisting m2 8.01 Rp 233,221.00 Rp 1,868,347.72
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Polos kg Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 Rp 233,221.00 Rp - Begisting
Plat beton PIT LIFT t=15cm K300 Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 49.00 Rp 1,272,231.35 Rp 62,339,336.11 Beton K-300
Pembesian Polos kg 0.00 Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 98.00 Rp 233,221.00 Rp 22,855,658.00 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Polos kg Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 Rp 238,021.00 Rp - Begisting
Lantai 2 Lantai 2 Lantai 2
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 91.80 Rp 1,272,231.35 Rp 116,790,837.86 Beton K-300
Pembesian Ulir kg 13,384.40 Rp 18,174.60 Rp 243,256,160.15
Pembesian Polos kg 5,433.09 Rp 17,649.60 Rp 95,891,886.44 Pembesian Polos
Begisting m2 612.00 Rp 233,221.00 Rp 142,731,252.00 Begisting
K2~20x90cm (K-300)
Beton K-300 m3 6.12 Rp 1,272,231.35 Rp 7,786,055.86
Pembesian Ulir kg 1,487.16 Rp 18,174.60 Rp 27,028,462.24
Pembesian Polos kg 664.04 Rp 17,649.60 Rp 11,720,119.45
Begisting m2 74.80 Rp 233,221.00 Rp 17,444,930.80
CK~D60cm (K-300)
Beton K-300 m3 1.20 Rp 1,272,231.35 Rp 1,528,788.49
Pembesian Ulir kg 223.07 Rp 18,174.60 Rp 4,054,269.34
Pembesian Polos kg 45.28 Rp 17,649.60 Rp 799,099.05
Begisting m2 8.01 Rp 233,221.00 Rp 1,868,347.72
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Polos kg Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 Rp 233,221.00 Rp - Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 196.78 Rp 1,272,231.35 Rp 250,351,313.35 Beton K-300
Pembesian Polos kg 32,350.84 Rp 17,649.60 Rp 570,979,428.59 Pembesian Polos
Begisting m2 1,836.63 Rp 233,221.00 Rp 428,339,584.43 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 179.12 Rp 1,272,231.35 Rp 227,879,534.81 Beton K-300
Pembesian Ulir kg 64,019.56 Rp 18,174.60 Rp 1,163,529,972.91
Pembesian Polos kg 23,852.07 Rp 17,649.60 Rp 420,979,483.24 Pembesian Polos
Begisting m2 1,492.65 Rp 238,021.00 Rp 355,282,045.65 Begisting
Lantai 3 Lantai 3 Lantai 3
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 85.32 Rp 1,272,231.35 Rp 108,546,778.71 Beton K-300
Pembesian Ulir kg 12,739.89 Rp 18,174.60 Rp 231,542,380.37
Pembesian Polos kg 84.16 Rp 17,649.60 Rp 1,485,384.12 Pembesian Polos
Begisting m2 568.80 Rp 233,221.00 Rp 132,656,104.80 Begisting
K2~20x90cm (K-300)
Beton K-300 m3 5.69 Rp 1,272,231.35 Rp 7,236,451.91
Pembesian Ulir kg 1,415.54 Rp 18,174.60 Rp 25,726,931.15
Pembesian Polos kg 77.15 Rp 17,649.60 Rp 1,361,602.11
Begisting m2 69.52 Rp 233,221.00 Rp 16,213,523.92
CK~D60cm (K-300)
Beton K-300 m3 1.12 Rp 1,272,231.35 Rp 1,420,874.01
Pembesian Ulir kg 212.33 Rp 18,174.60 Rp 3,859,039.67
Pembesian Polos kg 42.08 Rp 17,649.60 Rp 742,692.06
Begisting m2 7.45 Rp 233,221.00 Rp 1,736,464.35
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Polos kg Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 Rp 233,221.00 Rp - Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 208.35 Beton K-300 m3 196.78 Rp 1,272,231.35 Rp 250,351,313.35 Beton K-300
Pembesian Polos kg 32,350.84 Rp 17,649.60 Rp 570,979,428.59 Pembesian Polos
Begisting m2 1,836.63 Rp 233,221.00 Rp 428,339,584.43 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 186.32 Rp 1,272,231.35 Rp 237,039,600.52 Beton K-300
Pembesian Ulir kg 66,176.29 Rp 18,174.60 Rp 1,202,727,593.95
Pembesian Polos kg 24,810.85 Rp 17,649.60 Rp 437,901,580.84 Pembesian Polos
Begisting m2 1,552.65 Rp 238,021.00 Rp 369,563,305.65 Begisting
Lantai 4 Lantai 4 Lantai 4
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 85.32 Rp 1,272,231.35 Rp 108,546,778.71 Beton K-300
Pembesian Ulir kg 12,739.89 Rp 18,174.60 Rp 231,542,380.37
Pembesian Polos kg 84.16 Rp 17,649.60 Rp 1,485,384.12 Pembesian Polos
Begisting m2 568.80 Rp 233,221.00 Rp 132,656,104.80 Begisting
K2~20x90cm (K-300)
Beton K-300 m3 5.69 Rp 1,272,231.35 Rp 7,236,451.91
Pembesian Ulir kg 1,415.54 Rp 18,174.60 Rp 25,726,931.15
Pembesian Polos kg 77.15 Rp 17,649.60 Rp 1,361,602.11
Begisting m2 69.52 Rp 233,221.00 Rp 16,213,523.92
CK~D60cm (K-300)
Beton K-300 m3 1.12 Rp 1,272,231.35 Rp 1,420,874.01
Pembesian Ulir kg 212.33 Rp 18,174.60 Rp 3,859,039.67
Pembesian Polos kg 42.08 Rp 17,649.60 Rp 742,692.06
Begisting m2 7.45 Rp 233,221.00 Rp 1,736,464.35
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Polos kg Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 Rp 233,221.00 Rp - Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 196.78 Rp 1,272,231.35 Rp 250,351,313.35 Beton K-300
Pembesian Polos kg 32,350.84 Rp 17,649.60 Rp 570,979,428.59 Pembesian Polos
Begisting m2 1,836.63 Rp 233,221.00 Rp 428,339,584.43 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 194.49 Rp 1,272,231.35 Rp 247,436,275.11 Beton K-300
Pembesian Ulir kg 68,624.17 Rp 18,174.60 Rp 1,247,216,893.83
Pembesian Polos kg 25,899.07 Rp 17,649.60 Rp 457,108,161.63 Pembesian Polos
Begisting m2 1,620.75 Rp 238,021.00 Rp 385,772,535.75 Begisting
Lantai 5 Lantai 5 Lantai 5
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 85.32 Rp 1,272,231.35 Rp 108,546,778.71 Beton K-300
Pembesian Ulir kg 12,739.89 Rp 18,174.60 Rp 231,542,380.37
Pembesian Polos kg 84.16 Rp 17,649.60 Rp 1,485,384.12 Pembesian Polos
Begisting m2 568.80 Rp 233,221.00 Rp 132,656,104.80 Begisting
K2~20x90cm (K-300)
Beton K-300 m3 5.69 Rp 1,272,231.35 Rp 7,236,451.91
Pembesian Ulir kg 1,415.54 Rp 18,174.60 Rp 25,726,931.15
Pembesian Polos kg 77.15 Rp 17,649.60 Rp 1,361,602.11
Begisting m2 69.52 Rp 233,221.00 Rp 16,213,523.92
CK~D60cm (K-300)
Beton K-300 m3 1.12 Rp 1,272,231.35 Rp 1,420,874.01
Pembesian Ulir kg 212.33 Rp 18,174.60 Rp 3,859,039.67
Pembesian Polos kg 42.08 Rp 17,649.60 Rp 742,692.06
Begisting m2 7.45 Rp 233,221.00 Rp 1,736,464.35
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Polos kg Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 Rp 233,221.00 Rp - Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 196.78 Rp 1,272,231.35 Rp 250,351,313.35 Beton K-300
Pembesian Polos kg 32,350.84 Rp 17,649.60 Rp 570,979,428.59 Pembesian Polos
Begisting m2 1,836.63 Rp 233,221.00 Rp 428,339,584.43 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 194.98 Rp 1,272,231.35 Rp 248,054,579.54 Beton K-300
Pembesian Ulir kg 68,769.75 Rp 18,174.60 Rp 1,249,862,733.25
Pembesian Polos kg 25,963.78 Rp 17,649.60 Rp 458,250,403.22 Pembesian Polos
Begisting m2 1,624.80 Rp 238,021.00 Rp 386,736,520.80 Begisting
Lantai atap Lantai atap Lantai atap
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05 Beton K-300
Pembesian Ulir kg
Pembesian Polos kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67 Pembesian Polos
Begisting m2 453.33 Rp 233,221.00 Rp 105,726,853.33 Begisting
K2~20x90cm (K-300)
Beton K-300 m3 0.00 Rp 1,272,231.35 Rp -
Pembesian Ulir kg 0.00 Rp 18,174.60 Rp -
Pembesian Polos kg 0.00 Rp 17,649.60 Rp -
Begisting m2 0.00 Rp 233,221.00 Rp -
CK~D60cm (K-300)
Beton K-300 m3 76.50 Rp 1,272,231.35 Rp 97,325,698.21
Pembesian Ulir kg 11,153.67 Rp 18,174.60 Rp 202,713,466.79
Pembesian Polos kg 90.55 Rp 17,649.60 Rp 1,598,198.11
Begisting m2 510.00 Rp 233,221.00 Rp 118,942,710.00
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Polos kg Rp 17,649.60 Rp - Pembesian Polos
Begisting m2 Rp 233,221.00 Rp - Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 200.35 Rp 1,272,231.35 Rp 254,885,545.88 Beton K-300
Pembesian Polos kg 32,936.76 Rp 17,649.60 Rp 581,320,710.46 Pembesian Polos
Begisting m2 1,869.89 Rp 233,221.00 Rp 436,097,447.77 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 178.60 Rp 1,272,231.35 Rp 227,215,430.04 Beton K-300
Pembesian Ulir kg 63,711.48 Rp 18,174.60 Rp 1,157,930,753.29
Pembesian Polos kg 23,782.56 Rp 17,649.60 Rp 419,752,631.16 Pembesian Polos
Begisting m2 1,488.30 Rp 238,021.00 Rp 354,246,654.30 Begisting
Shearwall Shearwall
Shearwall 25cm (K-300) Shearwall 25cm (K-300)
SW t=25 cm ( K-300 ) m3 225.00 Beton K-300 m3 489.33 Rp 1,272,231.35 Rp 622,534,604.95 Beton K-300
Pembesian Ulir kg 59,315.54 Rp 18,174.60 Rp 1,078,036,143.31 Pembesian Polos
Begisting m2 3,914.60 Rp 233,221.00 Rp 912,966,926.60 Begisting
Pondasi Shearwall (K-300)
Beton K-300 m3 85.00 Rp 1,272,231.35 Rp 108,139,664.68
Pembesian Ulir kg 11,159.64 Rp 18,174.60 Rp 202,821,927.72
Begisting m2 170.00 Rp 233,221.00 Rp 39,647,570.00
Dak Atap Shearwall (K-300)
Beton K-300 m3 10.20 Rp 1,272,231.35 Rp 12,976,759.76
Pembesian Polos kg 1,676.88 Rp 17,649.60 Rp 29,596,261.25
Begisting m2 141.84 Rp 233,221.00 Rp 33,080,066.64
Plat Tangga Ramp t=15cm (K-300) Plat Tangga-U t=15cm (K-225)
Plat ramp m3 155.52 Beton K-300 m3 53.55 Rp 1,272,231.35 Rp 68,127,988.75 Beton K-225
Pembesian Polos kg 6,103.84 Rp 17,649.60 Rp 107,730,390.94 Pembesian Polos
Begisting m2 383.78 Rp 233,221.00 Rp 89,504,389.28 Begisting
Anak Tangga-U (K-225)
Beton K-225
Pembesian Polos
Begisting
Plat Bordes Tangga-U t=15cm (K-225)
Beton K-225
Pembesian Polos
Begisting
Tangga Darurat
Plat Tangga Darurat (K-300) Plat Tangga Lurus t=15cm (K-225)
Plat Tangga K300 m3 27.00 Beton K-300 m3 11.96 Rp 1,272,231.35 Rp 15,220,212.52 Beton K-225
Pembesian Polos kg 1,363.64 Rp 17,649.60 Rp 24,067,633.22 Pembesian Polos
Begisting m2 98.60 Rp 233,221.00 Rp 22,994,657.72 Begisting
Anak Tangga Darurat (K-300) Anak Tangga Lurus t=15cm (K-225)
Beton K-300 m3 3.94 Rp 1,272,231.35 Rp 5,015,237.76 Beton K-225
Pembesian Polos kg 103.51 Rp 17,649.60 Rp 1,826,850.99 Pembesian Polos
Begisting m2 3.10 Rp 233,221.00 Rp 723,917.98 Begisting
Bordes Tangga Darurat (K-300)
Beton K-300 m3 2.58 Rp 1,272,231.35 Rp 3,286,173.58
Pembesian Polos kg 294.42 Rp 17,649.60 Rp 5,196,407.09
Begisting m2 21.17 Rp 233,221.00 Rp 4,937,871.62
Water Profing
Atap
Plat Atap m2 1,305.00 Water Proofing Plat Atap m2 1,309.50 Rp 84,797.50 Rp 111,042,326.25 Plat Atap
Water Proofing Helipad m2 208.80 Rp 84,797.50 Rp 17,705,718.00 Helipad
Plat Beton HeliPad
Plat t=15 cm (K300) Plat t=15 cm (K300)
Plat helipad t=20 cm K300 m3 29.40 Beton K-300 m3 26.93 Rp 1,272,231.35 Rp 34,264,370.81 Beton K-300
Pembesian Polos kg 3,542.16 Rp 17,649.60 Rp 62,517,749.50 Pembesian Polos
Begisting m2 206.48 Rp 233,221.00 Rp 48,156,055.13 Begisting
K1 60x60cm (K-300) K1 60x60cm (K-300)
Kolom 60/60 K300 m3 8.64 Beton K-300 m3 2.16 Rp 1,272,231.35 Rp 2,748,019.71 Beton K-300
Pembesian Ulir kg 498.42 Rp 18,174.60 Rp 9,058,656.37
Pembesian Polos kg 127.84 Rp 17,649.60 Rp 2,256,279.68 Pembesian Polos
Begisting m2 14.40 Rp 233,221.00 Rp 3,358,382.40 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 K300 m3 31.10 Beton K-300 m3 19.30 Rp 1,272,231.35 Rp 24,548,976.11 Beton K-300
Pembesian Ulir kg 6,683.58 Rp 18,174.60 Rp 121,471,426.20
Pembesian Polos kg 2,569.53 Rp 17,649.60 Rp 45,351,221.59 Pembesian Polos
Begisting m2 160.80 Rp 238,021.00 Rp 38,273,776.80 Begisting
tandon air 40 m3 m3 19.80 tandon air 40 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
tandon air 20 m3 m3 13.00 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
IV PEKERJAAN PONDASI PANCANG PEKERJAAN PONDASI PANCANG
I. PEKERJAAN BETON PEKERJAAN BETON
1 Beton Poer Beton Poer
P1 205 x 130 x 70 cm P1 110 x 180 x 70 cm
P1 110 x 180 x 70 cm m3 62.37 Beton K-300 m3 111.93 Rp 1,272,231.35 Rp 142,400,854.92 Beton K-300
Pembesian Ulir kg 13,404.94 Rp 18,174.60 Rp 243,629,409.15 Pembesian Ulir
Begisting m2 281.40 Rp 326,759.50 Rp 91,950,123.30 Begisting
P2 260 x 340 x 70 cm P2 260 x 340 x 70 cm
P2 260 x 340 x 70 cm m3 12.38 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Ulir kg Rp 18,174.60 Rp - Pembesian Ulir
Begisting m2 Rp 326,759.50 Rp - Begisting
P3 260 x 260 x 70 cm P3 260 x 260 x 70 cm
P3 260 x 260 x 70 cm m3 4.73 Beton K-300 m3 Rp 1,272,231.35 Rp - Beton K-300
Pembesian Ulir kg Rp 18,174.60 Rp - Pembesian Ulir
Begisting m2 Rp 326,759.50 Rp - Begisting
P4 660 x 130 x 70 cm
Beton K-300 m3 12.01 Rp 1,272,231.35 Rp 15,282,042.97
Pembesian Ulir kg 1,285.57 Rp 18,174.60 Rp 23,364,741.87
Begisting m2 22.12 Rp 326,759.50 Rp 7,227,920.14
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Lantai Kerja Bawah Poer t = 5 cm m3 8.85 Rp 1,063,296.96 Rp 9,413,367.97 Lantai Kerja Bawah Poer t = 5 cm
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Pancang mini pile Uk. 25x25 cm2 m1 7,830.00 Rp 299,500.00 Rp 2,345,085,000.00 Pancang mini pile Uk. 25x25 cm2
Biaya Pemancangan m1 7,830.00 Rp 154,874.00 Rp 1,212,663,420.00 Biaya Pemancangan
4 Kepruk Kepala TP ttk 298.00 Kepruk Kepala TP ttk 435.00 Rp 63,040.00 Rp 27,422,400.00 Kepruk Kepala TP
PDA Test ttk 3.00 Rp 15,000,000.00 Rp 45,000,000.00 PDA Test
V PEKERJAAN PASANGAN PEKERJAAN PASANGAN
1 Pasangan Aanstampeng m3 8.28 Pasangan Aanstampeng m3 Rp 352,797.00 Rp - Pasangan Aanstampeng
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Pasangan Pondasi Batu Kali 1 : 5 m3 Rp 851,825.00 Rp - Pasangan Pondasi Batu Kali 1 : 5
3 Pasangan Rollag 1 : 5 m3 14.88 Pasangan Rollag 1 : 5 m3 Rp 1,107,535.00 Rp - Pasangan Rollag 1 : 5
PEKERJAAN LAIN - LAIN PEKERJAAN LAIN - LAIN
Alat bantu & Biaya Operasional Alat bantu & Biaya Operasional
Mobil Crane Mobil Crane
- Biaya Sewa dan Operasional (termasukbulan 6.00 Rp 175,000,000.00 Rp 1,050,000,000.00 - Biaya Sewa dan Operasional (termasuk
- BBM (solar) liter 24,000.00 Rp 7,500.00 Rp 180,000,000.00 - BBM (solar)
Biaya pemakaian air kerja ls 1.00 Rp 36,000,000.00 Rp 36,000,000.00 Biaya pemakaian air kerja
Biaya operasional genset 100 KVA Biaya operasional genset 100 KVA
- Biaya Sewa genset (termasuk mobilisas
bulan 12.00 Rp 16,500,000.00 Rp 198,000,000.00 - Biaya Sewa genset (termasuk mobilisas
- BBM (solar) liter 36,000.00 Rp 7,500.00 Rp 270,000,000.00 - BBM (solar)
Program K3 ls 1.00 Rp 100,200,000.00 Rp 100,200,000.00 Program K3

Rp15,981,398,536.74 Rp 33,653,581,377.11

GEDUNG CENTER B GEDUNG CENTER B


A PEKERJAAN SIPIL PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasa Ls 1.00 Pembersihan Lapangan ( Dengan Luasa
2 Uitzet & Bouwplank m' 150.00 Uitzet & Bouwplank
3 Bongkaran Bangunan Lama Ls 1.00 Bongkaran Bangunan Lama
4 Buang Bongkaran Ls 1.00 Buang Bongkaran
5 Shop Drawing dan As Built drawing Ls 1.00 Shop Drawing dan As Built drawing

II. PEKERJAAN TANAH PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Galian Tanah Poer, Sloof, & Batu Kali
2 Urugan Tanah Kembali m3 52.44 Urugan Tanah Kembali
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Urugan Pasir Bawah Lantai t = 10 cm
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Urugan Sirtu dibawah lantai t = 35 cm
5 Urugan Sirtu padat (Peninggian Elevasi) m3 522.00 Urugan Sirtu padat (Peninggian Elevasi)

III. PEKERJAAN BETON PEKERJAAN BETON


1 Sloof S1 30 x 60 cm ( K-300)
S1 30 x 60 cm ( K-300) m3 104.40 Beton K-300
Pembesian Ulir
Pembesian Polos
Begisting
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44 Lantai Kerja Bawah Sloof t = 5 cm
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44 Rabatan Beton t = 5 cm bawah lantai
4 Kolom Kolom
a Lantai 1 Lantai 1
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Ulir
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 2 Lantai 2
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=12cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai 3 Lantai 3
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=12cm K300
Plat beton t=15cm K300 m3 271.35 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai 4 Lantai 4
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai 5 Lantai 5
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai atap Lantai atap
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
5 Shearwall Shearwall
SW t=25 cm ( K-300 )
SW t=25 cm ( K-300 ) m3 225.00 Beton K-300
Pembesian Polos
Begisting
Tangga lurus Tangga lurus
Plat Tangga K225
Plat Tangga K300 m3 27.00 Beton K-225
Pembesian Polos
Begisting
6 tandon air 20 m3 m3 19.80 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
tandon air 20 m3 m3 13.00 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60

7 Water Profing Water Profing


a Atap Atap
Plat Atap m3 1,305.00 Plat Atap

IV PEKERJAAN PONDASI PANCANG PEKERJAAN PONDASI PANCANG


I. PEKERJAAN BETON PEKERJAAN BETON
1 Beton Poer Beton Poer
P1 205 x 130 x 70 cm (32bh)
P1 110 x 180 x 70 cm m3 62.37 Beton K-225
Pembesian Ulir
Begisting
P2 130 x 130 x 70 cm (10bh)
P2 260 x 340 x 70 cm m3 12.38 Beton K-225
Pembesian Ulir
Begisting
P3 260 x 260 x 70 cm
P3 260 x 260 x 70 cm m3 4.73 Beton K-225
Pembesian Ulir
Begisting
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Lantai Kerja Bawah Poer t = 5 cm
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Pancang mini pile Uk. 25x25 cm2
4 Kepruk Kepala TP ttk 298.00 Kepruk Kepala TP

V PEKERJAAN PASANGAN PEKERJAAN PASANGAN


1 Pasangan Aanstampeng m3 8.28 Pasangan Aanstampeng
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Pasangan Pondasi Batu Kali 1 : 5
3 Pasangan Rollag 1 : 5 m3 14.88 Pasangan Rollag 1 : 5
PEKERJAAN ATAP DAN PLAFOND PEKERJAAN ATAP DAN PLAFOND
1 WF 200.100 kg 12,672.00 WF 200.100
2 Gording C 150.65.20.2,3 kg 14,400.00 Gording C 150.65.20.2,3
3 Plat tebal 5 mm kg 578.07 Plat tebal 5 mm
4 Plat plendes t = 16 mm kg 615.44 Plat plendes t = 16 mm
5 Angkur f 25 mm L = 800 mm kg 84.00 Angkur f 25 mm L = 800 mm
6 Trekstang f 10 mm kg 152.35 Trekstang f 10 mm
7 Ikatan Angin f 16 mm m2 390.01 Ikatan Angin f 16 mm
8 Jarum Pengeras 16 mm kg 100.00 Jarum Pengeras 16 mm
9 Plafon Kalsibord & rangka hollo m2 600.00 Plafon Kalsibord & rangka hollo
10 Atap zyncalum m2 600.00 Atap zyncalum

Rp 16,320,140,947.78

GEDUNG WING C GEDUNG WING C


A PEKERJAAN SIPIL PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasa Ls 1.00 Pembersihan Lapangan ( Dengan Luasa
2 Uitzet & Bouwplank m' 150.00 Uitzet & Bouwplank
3 Bongkaran Bangunan Lama Ls 1.00 Bongkaran Bangunan Lama
4 Buang Bongkaran Ls 1.00 Buang Bongkaran
5 Shop Drawing dan As Built drawing Ls 1.00 Shop Drawing dan As Built drawing

II. PEKERJAAN TANAH PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Galian Tanah Poer, Sloof, & Batu Kali
2 Urugan Tanah Kembali m3 52.44 Urugan Tanah Kembali
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Urugan Pasir Bawah Lantai t = 10 cm
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Urugan Sirtu dibawah lantai t = 35 cm
5 Urugan Sirtu padat (Peninggian Elevasi) m3 522.00 Urugan Sirtu padat (Peninggian Elevasi)

III. PEKERJAAN BETON PEKERJAAN BETON


1 Sloof Sloof
S1 30 x 60 cm ( K-300)
S1 30 x 60 cm ( K-300) m3 104.40 Beton K-300
Pembesian Ulir
Pembesian Polos
Begisting
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44 Lantai Kerja Bawah Sloof t = 5 cm
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44 Rabatan Beton t = 5 cm bawah lantai
4 Kolom Kolom
a Lantai 1 Lantai 1
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 2 Lantai 2
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 3 Lantai 3
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 208.35 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 4 Lantai 4
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 5 Lantai 5
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai atap Lantai atap
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
5 Shearwall Shearwall
SW t=25 cm ( K-300 )
SW t=25 cm ( K-300 ) m3 225.00 Beton K-300
Pembesian Polos
Begisting
Tangga lurus Tangga lurus
Plat Tangga K300
Plat Tangga K300 m3 27.00 Beton K-225
Pembesian Polos
Begisting
6 tandon air 40 m3 m3 19.80 tandon air 40 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
tandon air 20 m3 m3 13.00 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60

7 Water Profing Water Profing


a Atap Atap
Plat Atap m3 1,305.00 Plat Atap
IV PEKERJAAN PONDASI PANCANG PEKERJAAN PONDASI PANCANG
I. PEKERJAAN BETON PEKERJAAN BETON
1 Beton Poer Beton Poer
P1 110 x 180 x 70 cm
P1 110 x 180 x 70 cm m3 62.37 Beton K-225
Pembesian Ulir
Begisting
P2 260 x 340 x 70 cm
P2 260 x 340 x 70 cm m3 12.38 Beton K-225
Pembesian Ulir
Begisting
P3 260 x 260 x 70 cm
P3 260 x 260 x 70 cm m3 4.73 Beton K-225
Pembesian Ulir
Begisting
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Lantai Kerja Bawah Poer t = 5 cm
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Pancang mini pile Uk. 25x25 cm2
4 Kepruk Kepala TP ttk 298.00 Kepruk Kepala TP

V PEKERJAAN PASANGAN PEKERJAAN PASANGAN


1 Pasangan Aanstampeng m3 8.28 Pasangan Aanstampeng
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Pasangan Pondasi Batu Kali 1 : 5
3 Pasangan Rollag 1 : 5 m3 14.88 Pasangan Rollag 1 : 5
PEKERJAAN ATAP DAN PLAFOND PEKERJAAN ATAP DAN PLAFOND
1 WF 200.100 kg 12,672.00 WF 200.100
2 Gording C 150.65.20.2,3 kg 14,400.00 Gording C 150.65.20.2,3
3 Plat tebal 5 mm kg 578.07 Plat tebal 5 mm
4 Plat plendes t = 16 mm kg 615.44 Plat plendes t = 16 mm
5 Angkur f 25 mm L = 800 mm kg 84.00 Angkur f 25 mm L = 800 mm
6 Trekstang f 10 mm kg 152.35 Trekstang f 10 mm
7 Ikatan Angin f 16 mm m2 390.01 Ikatan Angin f 16 mm
8 Jarum Pengeras 16 mm kg 100.00 Jarum Pengeras 16 mm
9 Plafon Kalsibord & rangka hollo m2 1,200.00 Plafon Kalsibord & rangka hollo
10 Atap zyncalum m2 1,200.00 Atap zyncalum

Rp 16,337,732,819.10
KONTRAK 2017 HSIL REVIEW KONSULTAN MK
PT. ASTA KENCANA ARSIMETAMA

SAT VOLUME HARGA SATUAN HARGA TOTAL

m' 0.00 Rp 55,465.00 Rp -

m' 0.00 Rp 200,240.00 Rp -


Ls 0.00 Rp 50,000,000.00 Rp -
bh 0.00 Rp 350,000.00 Rp -

m3 0.00 Rp 74,275.00 Rp -
m3 0.00 Rp 24,758.33 Rp -
m3 0.00 Rp 272,897.50 Rp -
m3 456.75 Rp 269,159.75 Rp 122,938,715.81
m3 0.00 Rp 269,159.75 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 18,174.60 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 326,759.50 Rp -

m3 0.00 Rp 1,063,296.96 Rp -
m3 0.00 Rp 1,063,296.96 Rp -

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -
m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 0
m2 0.00 Rp 233,221.00 Rp - 2

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 164.4
m2 0.00 Rp 233,221.00 Rp - 9.3333333333

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -
m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 164.4
m2 0.00 Rp 233,221.00 Rp - 9.3333333333

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 164.4
m2 0.00 Rp 233,221.00 Rp - 9.3333333333

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -
m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 164.4
m2 0.00 Rp 233,221.00 Rp - 9.3333333333

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 164.4
m2 0.00 Rp 233,221.00 Rp - 9.3333333333

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 18,174.60 Rp -
m2 0.00 Rp 233,221.00 Rp -
m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 113.984
m2 0.00 Rp 233,221.00 Rp - 7.1666666667

m3 0.00 Rp - Rp -
kg 0.00 Rp - Rp -
m2 0.00 Rp - Rp -

m3 0.00 Rp - Rp -
kg 0.00 Rp - Rp -
m2 0.00 Rp - Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 113.984
m2 0.00 Rp 233,221.00 Rp - 8.2414698163

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m2 0.00 Rp 84,797.50 Rp -
m2 0.00 Rp 84,797.50 Rp -

m3 2.47 Rp 1,272,231.35 Rp 3,139,230.85


kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 6.48 Rp 1,272,231.35 Rp 8,244,059.14

kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -

kg 0.00 Rp 17,649.60 Rp - 133.164


m2 0.00 Rp 238,021.00 Rp - 8.3333333333
m3 19.80 Rp - Rp -
m3 7.20 Rp - Rp -
m3 13.00 Rp - Rp -
m3 7.20 Rp - Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 18,174.60 Rp -
m2 0.00 Rp 326,759.50 Rp -

m3 12.38 Rp 1,272,231.35 Rp 15,745,135.18


kg 0.00 Rp 18,174.60 Rp -
m2 0.00 Rp 326,759.50 Rp -

m3 4.73 Rp 1,272,231.35 Rp 6,020,198.74


kg 0.00 Rp 18,174.60 Rp -
m2 0.00 Rp 326,759.50 Rp -

m3 6.24 Rp 1,063,296.96 Rp 6,631,783.13


m1 0.00 Rp 299,500.00 Rp - pc-1 312
m1 0.00 Rp 154,874.00 Rp - core-A 11
ttk 0.00 Rp 63,040.00 Rp - core-B 24
ttk 0.00 Rp 15,000,000.00 Rp - core-C 24 387 6966
pc-3 16
m3 8.28 Rp 352,797.00 Rp 2,921,159.16 pc-4 24 411 7398
m3 22.77 Rp 851,825.00 Rp 19,396,055.25
m3 14.88 Rp 1,107,535.00 Rp 16,480,120.80

bulan 0.00 Rp 175,000,000.00 Rp -


liter 0.00 Rp 7,500.00 Rp -
ls 0.00 Rp 36,000,000.00 Rp -

bulan 0.00 Rp 16,500,000.00 Rp -


liter 0.00 Rp 7,500.00 Rp -
ls 0.00 Rp 100,200,000.00 Rp -

Rp 353,344,547.28

m2 1,510.00 Rp 5,052.50 Rp 7,629,275.00


m' 169.00 Rp 55,465.00 Rp 9,373,585.00
Ls Rp 200,240.00 Rp -
Ls Rp 50,000,000.00 Rp -
Ls Rp 350,000.00 Rp -

m3 619.11 Rp 74,275.00 Rp 45,984,075.87


m3 285.90 Rp 24,758.33 Rp 7,078,303.52
m3 137.42 Rp 272,897.50 Rp 37,501,438.00
m3 Rp 269,159.75 Rp -
m3 824.52 Rp 269,159.75 Rp 221,926,789.59

m3 144.11 Rp 1,272,231.35 Rp 183,339,860.28


kg 51,938.13 Rp 18,174.60 Rp 943,954,717.51
kg 19,190.12 Rp 17,649.60 Rp 338,697,898.88
m2 960.73 Rp 326,759.50 Rp 313,926,347.40
m3 12.01 Rp 1,063,296.96 Rp 12,769,212.91
m3 68.71 Rp 1,063,296.96 Rp 73,058,868.14

m3 76.50 Rp 1,272,231.35 Rp 97,325,698.21


kg 11,153.67 Rp 18,174.60 Rp 202,713,466.79
kg 90.55 Rp 17,649.60 Rp 1,598,198.11
m2 510.00 Rp 233,221.00 Rp 118,942,710.00

m3 Rp 1,272,231.35 Rp -
kg Rp 17,649.60 Rp -
m2 Rp 233,221.00 Rp -

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 271.35 Rp 1,272,231.35 Rp 345,219,976.61


kg 63,121.44 Rp 17,649.60 Rp 1,114,068,114.48
m2 1,130.72 Rp 233,221.00 Rp 263,706,587.96

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81
m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61
kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 Rp 1,272,231.35 Rp -
kg Rp 17,649.60 Rp -
m2 Rp 238,021.00 Rp -

m3 225.00 Rp 1,272,231.35 Rp 286,252,053.57


kg 57,636.00 Rp 17,649.60 Rp 1,017,252,345.60
m2 2,499.75 Rp 233,221.00 Rp 582,994,194.75

m3 27.00 Rp 1,220,358.86 Rp 32,949,689.29


kg 4,900.77 Rp 17,649.60 Rp 86,496,630.19
m2 59.94 Rp 233,221.00 Rp 13,979,266.74
m3 19.80 Rp -
m3 7.20 Rp -
m3 13.00 Rp -
m3 7.20 Rp -

m3 1,305.00 Rp 84,797.50 Rp 110,660,737.50

m3 62.37 Rp 1,220,358.86 Rp 76,113,782.25


kg 7,763.19 Rp 18,174.60 Rp 141,092,943.85
m2 91.06 Rp 326,759.50 Rp 29,754,785.42

m3 12.38 Rp 1,220,358.86 Rp 15,103,161.28


kg 1,540.44 Rp 18,174.60 Rp 27,996,893.91
m2 18.07 Rp 326,759.50 Rp 5,904,204.34

m3 4.73 Rp 1,220,358.86 Rp 5,774,738.14


kg 588.99 Rp 18,174.60 Rp 10,704,694.73
m2 6.91 Rp 326,759.50 Rp 2,257,489.89
m3 15.09 Rp 1,063,296.96 Rp 16,045,151.09
m1 5,960.00 Rp 299,500.00 Rp 1,785,020,000.00
ttk 298.00 Rp 63,040.00 Rp 18,785,920.00
m3 8.28 Rp 352,797.00 Rp 2,921,159.16
m3 22.77 Rp 851,825.00 Rp 19,396,055.25
m3 14.88 Rp 1,107,535.00 Rp 16,480,120.80

kg 12,672.00
kg 14,400.00
kg 578.07
kg 615.44
kg 84.00
kg 152.35
m2 390.01
kg 100.00
m2 600.00
m2 600.00

Rp 20,764,445,317.42

Ls 1.00 Rp 5,052.50 Rp 5,052.50


m' 150.00 Rp 55,465.00 Rp 8,319,750.00
Ls 1.00 Rp 200,240.00 Rp 200,240.00
Ls 1.00 Rp 50,000,000.00 Rp 50,000,000.00
Ls 1.00 Rp 350,000.00 Rp 350,000.00

m3 288.32 Rp 74,275.00 Rp 21,415,116.55


m3 52.44 Rp 24,758.33 Rp 1,298,426.03
m3 130.88 Rp 272,897.50 Rp 35,715,460.31
m3 456.75 Rp 269,159.75 Rp 122,938,715.81
m3 522.00 Rp 269,159.75 Rp 140,501,389.50

m3 104.40 Rp 1,272,231.35 Rp 132,820,952.86


kg 11,333.66 Rp 18,174.60 Rp 205,984,809.73
kg 3,455.64 Rp 17,649.60 Rp 60,990,663.74
m2 522.00 Rp 326,759.50 Rp 170,568,459.00
m3 9.44 Rp 1,063,296.96 Rp 10,036,991.63
m3 65.44 Rp 1,063,296.96 Rp 69,579,494.67

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 208.35 Rp 1,272,231.35 Rp 265,069,401.61


kg 48,466.38 Rp 17,649.60 Rp 855,412,167.50
m2 868.19 Rp 233,221.00 Rp 202,481,177.82

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18
m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05
kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 225.00 Rp 1,272,231.35 Rp 286,252,053.57


kg 57,636.00 Rp 17,649.60 Rp 1,017,252,345.60
m2 2,499.75 Rp 233,221.00 Rp 582,994,194.75

m3 27.00 Rp 1,220,358.86 Rp 32,949,689.29


kg 4,900.77 Rp 17,649.60 Rp 86,496,630.19
m2 59.94 Rp 233,221.00 Rp 13,979,266.74
m3 19.80
m3 7.20
m3 13.00
m3 7.20

m3 1,305.00 Rp 84,797.50 Rp 110,660,737.50


m3 62.37 Rp 1,220,358.86 Rp 76,113,782.25
kg 7,763.19 Rp 18,174.60 Rp 141,092,943.85
m2 91.06 Rp 326,759.50 Rp 29,754,785.42

m3 12.38 Rp 1,220,358.86 Rp 15,103,161.28


kg 1,540.44 Rp 18,174.60 Rp 27,996,893.91
m2 18.07 Rp 326,759.50 Rp 5,904,204.34

m3 4.73 Rp 1,220,358.86 Rp 5,774,738.14


kg 588.99 Rp 18,174.60 Rp 10,704,694.73
m2 6.91 Rp 326,759.50 Rp 2,257,489.89
m3 15.09 Rp 1,063,296.96 Rp 16,045,151.09
m1 5,960.00 Rp 299,500.00 Rp 1,785,020,000.00
ttk 298.00 Rp 63,040.00 Rp 18,785,920.00

m3 8.28 Rp 352,797.00 Rp 2,921,159.16


m3 22.77 Rp 851,825.00 Rp 19,396,055.25
m3 14.88 Rp 1,107,535.00 Rp 16,480,120.80

kg 12,672.00
kg 14,400.00
kg 578.07
kg 615.44
kg 84.00
kg 152.35
m2 390.01
kg 100.00
m2 1,200.00
m2 1,200.00

Rp 19,140,879,409.85
REVIEW PEKERJAAN SIPIL RUMAH SAKIT MUARA TEWEH
KARYA PERENCANAAN KONTRAK 2016-2017 HSIL REVIEW KONSULTAN MK KONTRAK 2017
PT. ETIKA PRANA PT. ASTA KENCANA ARSIMETAMA PT. ASTA K

NO URAIAN PEKERJAAN SAT VOLUME URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN HARGA TOTAL URAIAN PEKERJAAN

GEDUNG WING A
A PEKERJAAN SIPIL PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasa Ls 1.00 Pembersihan Lapangan ( Dengan Luasa m2 600.00 Rp 5,052.50 Rp 3,031,500.00
2 Uitzet & Bouwplank m' 150.00 Uitzet & Bouwplank m' 150.00 Rp 55,465.00 Rp 8,319,750.00 Uitzet & Bouwplank
3 Bongkaran Bangunan Lama Ls 1.00 TIDAK DISETUJUI PPK
4 Buang Bongkaran Ls 1.00 TIDAK DISETUJUI PPK
5 Shop Drawing dan As Built drawing Ls 1.00 TIDAK DISETUJUI PPK
Pagar Proyek seng gelombang t = 2 m m' 250.00 Rp 200,240.00 Rp 50,060,000.00 Pagar Proyek seng gelombang t = 2 m
Direksikeet Ls 1.00 Rp 50,000,000.00 Rp 50,000,000.00 Direksikeet
Papan nama proyek bh 1.00 Rp 350,000.00 Rp 350,000.00 Papan nama proyek

II. PEKERJAAN TANAH PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Rp 74,275.00 Rp 21,415,116.55 Galian Tanah Poer, Sloof, & Batu Kali
2 Urugan Tanah Kembali m3 52.44 Urugan Tanah Kembali m3 52.44 Rp 24,758.33 Rp 1,298,426.03 Urugan Tanah Kembali
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Rp 272,897.50 Rp 35,715,460.31 Urugan Pasir Bawah Lantai t = 10 cm
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Rp 269,159.75 Rp 122,938,715.81 Urugan Sirtu dibawah lantai t = 35 cm
5 Urugan Sirtu padat (Peninggian Elevasi) m3 522.00 Urugan Sirtu padat (Peninggian Elevasi) m3 522.00 Rp 269,159.75 Rp 140,501,389.50 Urugan Sirtu padat (Peninggian Elevasi)

III. PEKERJAAN BETON PEKERJAAN BETON


1 Sloof S1 30x60cm (K-300) S1 30x60cm (K-300)
S1 30 x 60 cm ( K-300) m3 104.40 Beton K-300 m3 104.40 Rp 1,272,231.35 Rp 132,820,952.86 Beton K-300
Pembesian Ulir kg 11,333.66 Rp 18,174.60 Rp 205,984,809.73 Pembesian Ulir
Pembesian Polos kg 3,455.64 Rp 17,649.60 Rp 60,990,663.74 Pembesian Polos
Begisting m2 522.00 Rp 326,759.50 Rp 170,568,459.00 Begisting
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44 Lantai Kerja Bawah Sloof t = 5 cm (K-10 m3 9.44 Rp 1,063,296.96 Rp 10,036,991.63 Lantai Kerja Bawah Sloof t = 5 cm (K-10
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44 Rabatan Beton t = 5 cm bawah lantai ( m3 65.44 Rp 1,063,296.96 Rp 69,579,494.67 Rabatan Beton t = 5 cm bawah lantai (
4 Kolom Kolom
Lantai 1 Lantai 1 Lantai 1
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05 Beton K-300
Pembesian Polos kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67 Pembesian Polos
Begisting m2 453.33 Rp 233,221.00 Rp 105,726,853.33 Begisting
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93 Beton K-300
Pembesian Polos kg 658.08 Rp 17,649.60 Rp 11,614,912.31 Pembesian Polos
Begisting m2 17.00 Rp 233,221.00 Rp 3,964,757.00 Begisting
Plat beton t=15cm K300 Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp 1,272,231.35 Rp 215,834,048.39 Beton K-300
Pembesian Polos kg 39,463.98 Rp 17,649.60 Rp 696,523,514.36 Pembesian Polos
Begisting m2 706.88 Rp 233,221.00 Rp 164,858,094.38 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64 Beton K-300
Pembesian Polos kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15 Pembesian Polos
Begisting m2 420.75 Rp 238,021.00 Rp 100,147,335.75 Begisting
Lantai 2 Lantai 2 Lantai 2
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05 Beton K-300
Pembesian Polos kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67 Pembesian Polos
Begisting m2 453.33 Rp 233,221.00 Rp 105,726,853.33 Begisting
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93 Beton K-300
Pembesian Polos kg 658.08 Rp 17,649.60 Rp 11,614,912.31 Pembesian Polos
Begisting m2 17.00 Rp 233,221.00 Rp 3,964,757.00 Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp 1,272,231.35 Rp 215,834,048.39 Beton K-300
Pembesian Polos kg 39,463.98 Rp 17,649.60 Rp 696,523,514.36 Pembesian Polos
Begisting m2 706.88 Rp 233,221.00 Rp 164,858,094.38 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64 Beton K-300
Pembesian Polos kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15 Pembesian Polos
Begisting m2 589.05 Rp 238,021.00 Rp 140,206,270.05 Begisting
Lantai 3 Lantai 3 Lantai 3
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05 Beton K-300
Pembesian Polos kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67 Pembesian Polos
Begisting m2 453.33 Rp 233,221.00 Rp 105,726,853.33 Begisting
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93 Beton K-300
Pembesian Polos kg 658.08 Rp 17,649.60 Rp 11,614,912.31 Pembesian Polos
Begisting m2 17.00 Rp 233,221.00 Rp 3,964,757.00 Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 208.35 Beton K-300 m3 169.65 Rp 1,272,231.35 Rp 215,834,048.39 Beton K-300
Pembesian Polos kg 39,463.98 Rp 17,649.60 Rp 696,523,514.36 Pembesian Polos
Begisting m2 706.88 Rp 233,221.00 Rp 164,858,094.38 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64 Beton K-300
Pembesian Polos kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15 Pembesian Polos
Begisting m2 589.05 Rp 238,021.00 Rp 140,206,270.05 Begisting
Lantai 4 Lantai 4 Lantai 4
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05 Beton K-300
Pembesian Polos kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67 Pembesian Polos
Begisting m2 453.33 Rp 233,221.00 Rp 105,726,853.33 Begisting
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93 Beton K-300
Pembesian Polos kg 658.08 Rp 17,649.60 Rp 11,614,912.31 Pembesian Polos
Begisting m2 17.00 Rp 233,221.00 Rp 3,964,757.00 Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp 1,272,231.35 Rp 215,834,048.39 Beton K-300
Pembesian Polos kg 39,463.98 Rp 17,649.60 Rp 696,523,514.36 Pembesian Polos
Begisting m2 706.88 Rp 233,221.00 Rp 164,858,094.38 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64 Beton K-300
Pembesian Polos kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15 Pembesian Polos
Begisting m2 589.05 Rp 238,021.00 Rp 140,206,270.05 Begisting
Lantai 5 Lantai 5 Lantai 5
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05 Beton K-300
Pembesian Polos kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67 Pembesian Polos
Begisting m2 453.33 Rp 233,221.00 Rp 105,726,853.33 Begisting
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93 Beton K-300
Pembesian Polos kg 658.08 Rp 17,649.60 Rp 11,614,912.31 Pembesian Polos
Begisting m2 17.00 Rp 233,221.00 Rp 3,964,757.00 Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp 1,272,231.35 Rp 215,834,048.39 Beton K-300
Pembesian Polos kg 39,463.98 Rp 17,649.60 Rp 696,523,514.36 Pembesian Polos
Begisting m2 706.88 Rp 233,221.00 Rp 164,858,094.38 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64 Beton K-300
Pembesian Polos kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15 Pembesian Polos
Begisting m2 589.05 Rp 238,021.00 Rp 140,206,270.05 Begisting
Lantai atap Lantai atap Lantai atap
K1 60x60cm (K-300) K1 60x60cm (K-300)
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300 m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05 Beton K-300
Pembesian Polos kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67 Pembesian Polos
Begisting m2 453.33 Rp 233,221.00 Rp 105,726,853.33 Begisting
KP 12x12cm (K-300) KP 12x12cm (K-300)
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300 m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93 Beton K-300
Pembesian Polos kg 658.08 Rp 17,649.60 Rp 11,614,912.31 Pembesian Polos
Begisting m2 17.00 Rp 233,221.00 Rp 3,964,757.00 Begisting
Plat beton t=15cm (K300) Plat beton t=15cm (K300)
Plat beton t=15cm K300 m3 195.75 Beton K-300 m3 169.65 Rp 1,272,231.35 Rp 215,834,048.39 Beton K-300
Pembesian Polos kg 39,463.98 Rp 17,649.60 Rp 696,523,514.36 Pembesian Polos
Begisting m2 706.88 Rp 233,221.00 Rp 164,858,094.38 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 cm m3 100.98 Beton K-300 m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64 Beton K-300
Pembesian Polos kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15 Pembesian Polos
Begisting m2 589.05 Rp 238,021.00 Rp 140,206,270.05 Begisting
Shearwall Shearwall
Shearwall 25cm (K-300) Shearwall 25cm (K-300)
SW t=25 cm ( K-300 ) m3 225.00 Beton K-300 m3 225.00 Rp 1,272,231.35 Rp 286,252,053.57 Beton K-300
Pembesian Polos kg 57,636.00 Rp 17,649.60 Rp 1,017,252,345.60 Pembesian Polos
Begisting m2 2,500.00 Rp 233,221.00 Rp 583,052,500.00 Begisting
Tangga U
Plat Tangga-U t=15cm (K-225) Plat Tangga-U t=15cm (K-225)
Plat ramp m3 155.52 Beton K-225 m3 0.64 Rp 1,220,358.86 Rp 779,077.10 Beton K-225
Pembesian Polos kg 115.88 Rp 17,649.60 Rp 2,045,164.77 Pembesian Polos
Begisting m2 1.42 Rp 233,221.00 Rp 330,862.86 Begisting
Anak Tangga-U (K-225) Anak Tangga-U (K-225)
Beton K-225 m3 0.37 Rp 1,220,358.86 Rp 451,044.64 Beton K-225
Pembesian Polos kg 67.09 Rp 17,649.60 Rp 1,184,042.76 Pembesian Polos
Begisting m2 0.82 Rp 233,221.00 Rp 191,552.18 Begisting
Plat Bordes Tangga-U t=15cm (K-225) Plat Bordes Tangga-U t=15cm (K-225)
Beton K-225 m3 1.18 Rp 1,220,358.86 Rp 1,441,548.91 Beton K-225
Pembesian Polos kg 214.41 Rp 17,649.60 Rp 3,784,227.57 Pembesian Polos
Begisting m2 2.63 Rp 233,221.00 Rp 612,205.13 Begisting
Tangga lurus
Tangga lurus Plat Tangga Lurus t=15cm (K-225) Plat Tangga Lurus t=15cm (K-225)
Plat Tangga K300 m3 27.00 Beton K-225 m3 10.15 Rp 1,220,358.86 Rp 12,383,591.56 Beton K-225
Pembesian Polos kg 1,841.87 Rp 17,649.60 Rp 32,508,316.85 Pembesian Polos
Begisting m2 22.55 Rp 233,221.00 Rp 5,259,133.55 Begisting
Anak Tangga Lurus t=15cm (K-225) Anak Tangga Lurus t=15cm (K-225)
Beton K-225 m3 0.91 Rp 1,220,358.86 Rp 1,107,475.67 Beton K-225
Pembesian Polos kg 164.72 Rp 17,649.60 Rp 2,907,247.85 Pembesian Polos
Begisting m2 2.02 Rp 233,221.00 Rp 470,329.02 Begisting
Water Profing Water Profing
Atap Atap
Plat Atap m2 1,305.00 Plat Atap m2 1,309.50 Rp 84,797.50 Rp 111,042,326.25 Plat Atap
Helipad m2 208.80 Rp 84,797.50 Rp 17,705,718.00 Helipad
Plat t=15 cm (K300) Plat t=15 cm (K300)
Plat helipad t=20 cm K300 m3 29.40 Beton K-300 m3 34.56 Rp 1,272,231.35 Rp 43,968,315.43 Beton K-300
Pembesian Polos kg 8,039.35 Rp 17,649.60 Rp 141,891,262.34 Pembesian Polos
Begisting m2 144.00 Rp 233,221.00 Rp 33,583,824.00 Begisting
K1 60x60cm (K-300) K1 60x60cm (K-300)
Kolom 60/60 K300 m3 8.64 Beton K-300 m3 8.64 Rp 1,272,231.35 Rp 10,992,078.86 Beton K-300
Pembesian Polos kg 2,213.22 Rp 17,649.60 Rp 39,062,490.07 Pembesian Polos
Begisting m2 96.00 Rp 233,221.00 Rp 22,389,216.00 Begisting
Balok 30/60cm (K300) Balok 30/60cm (K300)
Balok 30/60 K300 m3 31.10 Beton K-300 m3 23.33 Rp 1,272,231.35 Rp 29,678,612.91 Beton K-300
Pembesian Polos kg 5,426.56 Rp 17,649.60 Rp 95,776,602.08 Pembesian Polos
Begisting m2 136.08 Rp 238,021.00 Rp 32,389,897.68 Begisting
tandon air 40 m3 m3 19.80 tandon air 40 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
tandon air 20 m3 m3 13.00 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
IV PEKERJAAN PONDASI PANCANG PEKERJAAN PONDASI PANCANG
I. PEKERJAAN BETON PEKERJAAN BETON
1 Beton Poer Beton Poer
P1 110 x 180 x 70 cm P1 110 x 180 x 70 cm
P1 110 x 180 x 70 cm m3 62.37 Beton K-300 m3 62.37 Rp 1,272,231.35 Rp 79,349,069.25 Beton K-300
Pembesian Ulir kg 7,763.19 Rp 18,174.60 Rp 141,092,943.85 Pembesian Ulir
Begisting m2 91.35 Rp 326,759.50 Rp 29,849,480.33 Begisting
P2 260 x 340 x 70 cm P2 260 x 340 x 70 cm
P2 260 x 340 x 70 cm m3 12.38 Beton K-300 m3 12.38 Rp 1,272,231.35 Rp 15,745,135.18 Beton K-300
Pembesian Ulir kg 1,180.79 Rp 18,174.60 Rp 21,460,461.54 Pembesian Ulir
Begisting m2 8.40 Rp 326,759.50 Rp 2,744,779.80 Begisting
P3 260 x 260 x 70 cm P3 260 x 260 x 70 cm
P3 260 x 260 x 70 cm m3 4.73 Beton K-300 m3 4.73 Rp 1,272,231.35 Rp 6,020,198.74 Beton K-300
Pembesian Ulir kg 505.24 Rp 18,174.60 Rp 9,182,455.66 Pembesian Ulir
Begisting m2 7.28 Rp 326,759.50 Rp 2,378,809.16 Begisting
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Rp 1,063,296.96 Rp 16,045,151.09 Lantai Kerja Bawah Poer t = 5 cm
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Rp 299,500.00 Rp 1,785,020,000.00 Pancang mini pile Uk. 25x25 cm2
Biaya Pemancangan m1 5,960.00 Rp 154,874.00 Rp 923,049,040.00 Biaya Pemancangan
4 Kepruk Kepala TP ttk 298.00 Kepruk Kepala TP ttk 298.00 Rp 63,040.00 Rp 18,785,920.00 Kepruk Kepala TP
PDA Test ttk 3.00 Rp 15,000,000.00 Rp 45,000,000.00 PDA Test
V PEKERJAAN PASANGAN PEKERJAAN PASANGAN
1 Pasangan Aanstampeng m3 8.28 Pasangan Aanstampeng m3 8.28 Rp 352,797.00 Rp 2,921,159.16 Pasangan Aanstampeng
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Rp 851,825.00 Rp 19,396,055.25 Pasangan Pondasi Batu Kali 1 : 5
3 Pasangan Rollag 1 : 5 m3 14.88 Pasangan Rollag 1 : 5 m3 14.88 Rp 1,107,535.00 Rp 16,480,120.80 Pasangan Rollag 1 : 5
PEKERJAAN LAIN - LAIN PEKERJAAN LAIN - LAIN
Alat bantu & Biaya Operasional Alat bantu & Biaya Operasional
Mobil Crane Mobil Crane
- Biaya Sewa dan Operasional (termasukbulan 6.00 Rp 175,000,000.00 Rp 1,050,000,000.00 - Biaya Sewa dan Operasional (termasuk
- BBM (solar) liter 24,000.00 Rp 7,500.00 Rp 180,000,000.00 - BBM (solar)
Biaya pemakaian air kerja ls 1.00 Rp 36,000,000.00 Rp 36,000,000.00 Biaya pemakaian air kerja
Biaya operasional genset 100 KVA Biaya operasional genset 100 KVA
- Biaya Sewa genset (termasuk mobilisas
bulan 12.00 Rp 16,500,000.00 Rp 198,000,000.00 - Biaya Sewa genset (termasuk mobilisas
- BBM (solar) liter 36,000.00 Rp 7,500.00 Rp 270,000,000.00 - BBM (solar)
Program K3 ls 1.00 Rp 100,200,000.00 Rp 100,200,000.00 Program K3

Rp15,981,398,536.74 Rp 21,275,059,014.07

GEDUNG CENTER B GEDUNG CENTER B


A PEKERJAAN SIPIL PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasa Ls 1.00 Pembersihan Lapangan ( Dengan Luasa
2 Uitzet & Bouwplank m' 150.00 Uitzet & Bouwplank
3 Bongkaran Bangunan Lama Ls 1.00 Bongkaran Bangunan Lama
4 Buang Bongkaran Ls 1.00 Buang Bongkaran
5 Shop Drawing dan As Built drawing Ls 1.00 Shop Drawing dan As Built drawing

II. PEKERJAAN TANAH PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Galian Tanah Poer, Sloof, & Batu Kali
2 Urugan Tanah Kembali m3 52.44 Urugan Tanah Kembali
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Urugan Pasir Bawah Lantai t = 10 cm
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Urugan Sirtu dibawah lantai t = 35 cm
5 Urugan Sirtu padat (Peninggian Elevasi) m3 522.00 Urugan Sirtu padat (Peninggian Elevasi)

III. PEKERJAAN BETON PEKERJAAN BETON


1 Sloof S1 30 x 60 cm ( K-300)
S1 30 x 60 cm ( K-300) m3 104.40 Beton K-300
Pembesian Ulir
Pembesian Polos
Begisting
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44 Lantai Kerja Bawah Sloof t = 5 cm
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44 Rabatan Beton t = 5 cm bawah lantai
4 Kolom Kolom
a Lantai 1 Lantai 1
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 2 Lantai 2
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=12cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai 3 Lantai 3
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=12cm K300
Plat beton t=15cm K300 m3 271.35 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai 4 Lantai 4
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai 5 Lantai 5
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
Lantai atap Lantai atap
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok induk 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Balok anak 30/60 cm
Beton K-300
Pembesian Polos
Begisting
5 Shearwall Shearwall
SW t=25 cm ( K-300 )
SW t=25 cm ( K-300 ) m3 225.00 Beton K-300
Pembesian Polos
Begisting
Tangga lurus Tangga lurus
Plat Tangga K225
Plat Tangga K300 m3 27.00 Beton K-225
Pembesian Polos
Begisting
6 tandon air 20 m3 m3 19.80 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
tandon air 20 m3 m3 13.00 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60

7 Water Profing Water Profing


a Atap Atap
Plat Atap m3 1,305.00 Plat Atap

IV PEKERJAAN PONDASI PANCANG PEKERJAAN PONDASI PANCANG


I. PEKERJAAN BETON PEKERJAAN BETON
1 Beton Poer Beton Poer
P1 205 x 130 x 70 cm (32bh)
P1 110 x 180 x 70 cm m3 62.37 Beton K-225
Pembesian Ulir
Begisting
P2 130 x 130 x 70 cm (10bh)
P2 260 x 340 x 70 cm m3 12.38 Beton K-225
Pembesian Ulir
Begisting
P3 260 x 260 x 70 cm
P3 260 x 260 x 70 cm m3 4.73 Beton K-225
Pembesian Ulir
Begisting
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Lantai Kerja Bawah Poer t = 5 cm
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Pancang mini pile Uk. 25x25 cm2
4 Kepruk Kepala TP ttk 298.00 Kepruk Kepala TP

V PEKERJAAN PASANGAN PEKERJAAN PASANGAN


1 Pasangan Aanstampeng m3 8.28 Pasangan Aanstampeng
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Pasangan Pondasi Batu Kali 1 : 5
3 Pasangan Rollag 1 : 5 m3 14.88 Pasangan Rollag 1 : 5
PEKERJAAN ATAP DAN PLAFOND PEKERJAAN ATAP DAN PLAFOND
1 WF 200.100 kg 12,672.00 WF 200.100
2 Gording C 150.65.20.2,3 kg 14,400.00 Gording C 150.65.20.2,3
3 Plat tebal 5 mm kg 578.07 Plat tebal 5 mm
4 Plat plendes t = 16 mm kg 615.44 Plat plendes t = 16 mm
5 Angkur f 25 mm L = 800 mm kg 84.00 Angkur f 25 mm L = 800 mm
6 Trekstang f 10 mm kg 152.35 Trekstang f 10 mm
7 Ikatan Angin f 16 mm m2 390.01 Ikatan Angin f 16 mm
8 Jarum Pengeras 16 mm kg 100.00 Jarum Pengeras 16 mm
9 Plafon Kalsibord & rangka hollo m2 600.00 Plafon Kalsibord & rangka hollo
10 Atap zyncalum m2 600.00 Atap zyncalum

Rp 16,320,140,947.78

GEDUNG WING C GEDUNG WING C


A PEKERJAAN SIPIL PEKERJAAN SIPIL
I. PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan ( Dengan Luasa Ls 1.00 Pembersihan Lapangan ( Dengan Luasa
2 Uitzet & Bouwplank m' 150.00 Uitzet & Bouwplank
3 Bongkaran Bangunan Lama Ls 1.00 Bongkaran Bangunan Lama
4 Buang Bongkaran Ls 1.00 Buang Bongkaran
5 Shop Drawing dan As Built drawing Ls 1.00 Shop Drawing dan As Built drawing

II. PEKERJAAN TANAH PEKERJAAN TANAH


1 Galian Tanah Poer, Sloof, & Batu Kali m3 288.32 Galian Tanah Poer, Sloof, & Batu Kali
2 Urugan Tanah Kembali m3 52.44 Urugan Tanah Kembali
3 Urugan Pasir Bawah Lantai t = 10 cm m3 130.88 Urugan Pasir Bawah Lantai t = 10 cm
4 Urugan Sirtu dibawah lantai t = 35 cm m3 456.75 Urugan Sirtu dibawah lantai t = 35 cm
5 Urugan Sirtu padat (Peninggian Elevasi) m3 522.00 Urugan Sirtu padat (Peninggian Elevasi)

III. PEKERJAAN BETON PEKERJAAN BETON


1 Sloof Sloof
S1 30 x 60 cm ( K-300)
S1 30 x 60 cm ( K-300) m3 104.40 Beton K-300
Pembesian Ulir
Pembesian Polos
Begisting
2 Lantai Kerja Bawah Sloof t = 5 cm m3 9.44 Lantai Kerja Bawah Sloof t = 5 cm
3 Rabatan Beton t = 5 cm bawah lantai m3 65.44 Rabatan Beton t = 5 cm bawah lantai
4 Kolom Kolom
a Lantai 1 Lantai 1
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 2 Lantai 2
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 3 Lantai 3
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 208.35 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 4 Lantai 4
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai 5 Lantai 5
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
Lantai atap Lantai atap
K1 60 x 60 cm ( K-300 )
K1 60 x 60 cm ( K-300 ) m3 40.80 Beton K-300
Pembesian Polos
Begisting
KP 12 x 12 cm ( K-300 )
KP 12 x 12 cm ( K-300 ) m3 3.06 Beton K-300
Pembesian Polos
Begisting
Plat beton t=15cm K300
Plat beton t=15cm K300 m3 195.75 Beton K-300
Pembesian Polos
Begisting
Balok 30/60 cm
Balok 30/60 cm m3 100.98 Beton K-300
Pembesian Polos
Begisting
5 Shearwall Shearwall
SW t=25 cm ( K-300 )
SW t=25 cm ( K-300 ) m3 225.00 Beton K-300
Pembesian Polos
Begisting
Tangga lurus Tangga lurus
Plat Tangga K300
Plat Tangga K300 m3 27.00 Beton K-225
Pembesian Polos
Begisting
6 tandon air 40 m3 m3 19.80 tandon air 40 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60
tandon air 20 m3 m3 13.00 tandon air 20 m3
balok tandon 30/60 m3 7.20 balok tandon 30/60

7 Water Profing Water Profing


a Atap Atap
Plat Atap m3 1,305.00 Plat Atap

IV PEKERJAAN PONDASI PANCANG PEKERJAAN PONDASI PANCANG


I. PEKERJAAN BETON PEKERJAAN BETON
1 Beton Poer Beton Poer
P1 110 x 180 x 70 cm
P1 110 x 180 x 70 cm m3 62.37 Beton K-225
Pembesian Ulir
Begisting
P2 260 x 340 x 70 cm
P2 260 x 340 x 70 cm m3 12.38 Beton K-225
Pembesian Ulir
Begisting
P3 260 x 260 x 70 cm
P3 260 x 260 x 70 cm m3 4.73 Beton K-225
Pembesian Ulir
Begisting
2 Lantai Kerja Bawah Poer t = 5 cm m3 15.09 Lantai Kerja Bawah Poer t = 5 cm
3 Pancang mini pile Uk. 25x25 cm2 m1 5,960.00 Pancang mini pile Uk. 25x25 cm2
4 Kepruk Kepala TP ttk 298.00 Kepruk Kepala TP

V PEKERJAAN PASANGAN PEKERJAAN PASANGAN


1 Pasangan Aanstampeng m3 8.28 Pasangan Aanstampeng
2 Pasangan Pondasi Batu Kali 1 : 5 m3 22.77 Pasangan Pondasi Batu Kali 1 : 5
3 Pasangan Rollag 1 : 5 m3 14.88 Pasangan Rollag 1 : 5
PEKERJAAN ATAP DAN PLAFOND PEKERJAAN ATAP DAN PLAFOND
1 WF 200.100 kg 12,672.00 WF 200.100
2 Gording C 150.65.20.2,3 kg 14,400.00 Gording C 150.65.20.2,3
3 Plat tebal 5 mm kg 578.07 Plat tebal 5 mm
4 Plat plendes t = 16 mm kg 615.44 Plat plendes t = 16 mm
5 Angkur f 25 mm L = 800 mm kg 84.00 Angkur f 25 mm L = 800 mm
6 Trekstang f 10 mm kg 152.35 Trekstang f 10 mm
7 Ikatan Angin f 16 mm m2 390.01 Ikatan Angin f 16 mm
8 Jarum Pengeras 16 mm kg 100.00 Jarum Pengeras 16 mm
9 Plafon Kalsibord & rangka hollo m2 1,200.00 Plafon Kalsibord & rangka hollo
10 Atap zyncalum m2 1,200.00 Atap zyncalum
Rp 16,337,732,819.10
KONTRAK 2017 HSIL REVIEW KONSULTAN MK
PT. ASTA KENCANA ARSIMETAMA

SAT VOLUME HARGA SATUAN HARGA TOTAL

m' 0.00 Rp 55,465.00 Rp -

m' 0.00 Rp 200,240.00 Rp -


Ls 0.00 Rp 50,000,000.00 Rp -
bh 0.00 Rp 350,000.00 Rp -

m3 0.00 Rp 74,275.00 Rp -
m3 0.00 Rp 24,758.33 Rp -
m3 0.00 Rp 272,897.50 Rp -
m3 0.00 Rp 269,159.75 Rp -
m3 0.00 Rp 269,159.75 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 18,174.60 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 326,759.50 Rp -
m3 0.00 Rp 1,063,296.96 Rp -
m3 0.00 Rp 1,063,296.96 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 232.62
m2 0.00 Rp 233,221.00 Rp - 4.1666666667

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 232.62
m2 0.00 Rp 233,221.00 Rp - 4.1666666667

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 232.62
m2 0.00 Rp 233,221.00 Rp - 4.1666666667

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 232.62
m2 0.00 Rp 233,221.00 Rp - 4.1666666667

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -
m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 232.62
m2 0.00 Rp 233,221.00 Rp - 4.1666666667

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 232.62
m2 0.00 Rp 233,221.00 Rp - 4.1666666667

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 238,021.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,220,358.86 Rp -
kg 0.00 Rp 17,649.60 Rp - 181.51
m2 0.00 Rp 233,221.00 Rp - 2.2222222222

m3 0.00 Rp 1,220,358.86 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,220,358.86 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,220,358.86 Rp -
kg 0.00 Rp 17,649.60 Rp - 181.51
m2 0.00 Rp 233,221.00 Rp - 2.2222222222

m3 0.00 Rp 1,220,358.86 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m2 0.00 Rp 84,797.50 Rp -
m2 0.00 Rp 84,797.50 Rp -
m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp -
m2 0.00 Rp 233,221.00 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 17,649.60 Rp - 232.62
m2 0.00 Rp 238,021.00 Rp - 5.8333333333
m3 19.80 Rp - Rp -
m3 7.20 Rp - Rp -
m3 13.00 Rp - Rp -
m3 7.20 Rp - Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 18,174.60 Rp -
m2 0.00 Rp 326,759.50 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 18,174.60 Rp -
m2 0.00 Rp 326,759.50 Rp -

m3 0.00 Rp 1,272,231.35 Rp -
kg 0.00 Rp 18,174.60 Rp -
m2 0.00 Rp 326,759.50 Rp -
m3 0.00 Rp 1,063,296.96 Rp -
m1 0.00 Rp 299,500.00 Rp - pc-1 312
m1 0.00 Rp 154,874.00 Rp - core-A 11
ttk 0.00 Rp 63,040.00 Rp - core-B 24
ttk 0.00 Rp 15,000,000.00 Rp - core-C 24 387 6966
pc-3 16
m3 0.00 Rp 352,797.00 Rp - pc-4 24 411 7398
m3 0.00 Rp 851,825.00 Rp -
m3 0.00 Rp 1,107,535.00 Rp -

bulan 0.00 Rp 175,000,000.00 Rp -


liter 0.00 Rp 7,500.00 Rp -
ls 0.00 Rp 36,000,000.00 Rp -

bulan 0.00 Rp 16,500,000.00 Rp -


liter 0.00 Rp 7,500.00 Rp -
ls 0.00 Rp 100,200,000.00 Rp -

Rp -
Ls 1.00 Rp 5,052.50 Rp 5,052.50
m' 150.00 Rp 55,465.00 Rp 8,319,750.00
Ls 1.00 Rp 200,240.00 Rp 200,240.00
Ls 1.00 Rp 50,000,000.00 Rp 50,000,000.00
Ls 1.00 Rp 350,000.00 Rp 350,000.00

m3 288.32 Rp 74,275.00 Rp 21,415,116.55


m3 52.44 Rp 24,758.33 Rp 1,298,426.03
m3 130.88 Rp 272,897.50 Rp 35,715,460.31
m3 456.75 Rp 269,159.75 Rp 122,938,715.81
m3 522.00 Rp 269,159.75 Rp 140,501,389.50

m3 104.40 Rp 1,272,231.35 Rp 132,820,952.86


kg 11,333.66 Rp 18,174.60 Rp 205,984,809.73
kg 3,455.64 Rp 17,649.60 Rp 60,990,663.74
m2 522.00 Rp 326,759.50 Rp 170,568,459.00
m3 9.44 Rp 1,063,296.96 Rp 10,036,991.63
m3 65.44 Rp 1,063,296.96 Rp 69,579,494.67

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 271.35 Rp 1,272,231.35 Rp 345,219,976.61


kg 63,121.44 Rp 17,649.60 Rp 1,114,068,114.48
m2 1,130.72 Rp 233,221.00 Rp 263,706,587.96

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81
m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61
kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3
kg
m2

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 Rp 1,272,231.35 Rp -
kg Rp 17,649.60 Rp -
m2 Rp 238,021.00 Rp -

m3 225.00 Rp 1,272,231.35 Rp 286,252,053.57


kg 57,636.00 Rp 17,649.60 Rp 1,017,252,345.60
m2 2,499.75 Rp 233,221.00 Rp 582,994,194.75

m3 27.00 Rp 1,220,358.86 Rp 32,949,689.29


kg 4,900.77 Rp 17,649.60 Rp 86,496,630.19
m2 59.94 Rp 233,221.00 Rp 13,979,266.74
m3 19.80 Rp -
m3 7.20 Rp -
m3 13.00 Rp -
m3 7.20 Rp -

m3 1,305.00 Rp 84,797.50 Rp 110,660,737.50


m3 62.37 Rp 1,220,358.86 Rp 76,113,782.25
kg 7,763.19 Rp 18,174.60 Rp 141,092,943.85
m2 91.06 Rp 326,759.50 Rp 29,754,785.42

m3 12.38 Rp 1,220,358.86 Rp 15,103,161.28


kg 1,540.44 Rp 18,174.60 Rp 27,996,893.91
m2 18.07 Rp 326,759.50 Rp 5,904,204.34

m3 4.73 Rp 1,220,358.86 Rp 5,774,738.14


kg 588.99 Rp 18,174.60 Rp 10,704,694.73
m2 6.91 Rp 326,759.50 Rp 2,257,489.89
m3 15.09 Rp 1,063,296.96 Rp 16,045,151.09
m1 5,960.00 Rp 299,500.00 Rp 1,785,020,000.00
ttk 298.00 Rp 63,040.00 Rp 18,785,920.00

m3 8.28 Rp 352,797.00 Rp 2,921,159.16


m3 22.77 Rp 851,825.00 Rp 19,396,055.25
m3 14.88 Rp 1,107,535.00 Rp 16,480,120.80

kg 12,672.00
kg 14,400.00
kg 578.07
kg 615.44
kg 84.00
kg 152.35
m2 390.01
kg 100.00
m2 600.00
m2 600.00

Rp 19,540,911,341.97

Ls 1.00 Rp 5,052.50 Rp 5,052.50


m' 150.00 Rp 55,465.00 Rp 8,319,750.00
Ls 1.00 Rp 200,240.00 Rp 200,240.00
Ls 1.00 Rp 50,000,000.00 Rp 50,000,000.00
Ls 1.00 Rp 350,000.00 Rp 350,000.00

m3 288.32 Rp 74,275.00 Rp 21,415,116.55


m3 52.44 Rp 24,758.33 Rp 1,298,426.03
m3 130.88 Rp 272,897.50 Rp 35,715,460.31
m3 456.75 Rp 269,159.75 Rp 122,938,715.81
m3 522.00 Rp 269,159.75 Rp 140,501,389.50
m3 104.40 Rp 1,272,231.35 Rp 132,820,952.86
kg 11,333.66 Rp 18,174.60 Rp 205,984,809.73
kg 3,455.64 Rp 17,649.60 Rp 60,990,663.74
m2 522.00 Rp 326,759.50 Rp 170,568,459.00
m3 9.44 Rp 1,063,296.96 Rp 10,036,991.63
m3 65.44 Rp 1,063,296.96 Rp 69,579,494.67

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 208.35 Rp 1,272,231.35 Rp 265,069,401.61


kg 48,466.38 Rp 17,649.60 Rp 855,412,167.50
m2 868.19 Rp 233,221.00 Rp 202,481,177.82
m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64
kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 40.80 Rp 1,272,231.35 Rp 51,907,039.05


kg 10,451.33 Rp 17,649.60 Rp 184,461,758.67
m2 453.29 Rp 233,221.00 Rp 105,716,280.65

m3 3.06 Rp 1,272,231.35 Rp 3,893,027.93


kg 658.08 Rp 17,649.60 Rp 11,614,912.31
m2 17.01 Rp 233,221.00 Rp 3,967,928.81

m3 195.75 Rp 1,272,231.35 Rp 249,039,286.61


kg 45,535.37 Rp 17,649.60 Rp 803,680,978.10
m2 815.69 Rp 233,221.00 Rp 190,236,095.80

m3 100.98 Rp 1,272,231.35 Rp 128,469,921.64


kg 23,489.97 Rp 17,649.60 Rp 414,588,532.15
m2 588.71 Rp 238,021.00 Rp 140,126,152.18

m3 225.00 Rp 1,272,231.35 Rp 286,252,053.57


kg 57,636.00 Rp 17,649.60 Rp 1,017,252,345.60
m2 2,499.75 Rp 233,221.00 Rp 582,994,194.75

m3 27.00 Rp 1,220,358.86 Rp 32,949,689.29


kg 4,900.77 Rp 17,649.60 Rp 86,496,630.19
m2 59.94 Rp 233,221.00 Rp 13,979,266.74
m3 19.80
m3 7.20
m3 13.00
m3 7.20

m3 1,305.00 Rp 84,797.50 Rp 110,660,737.50

m3 62.37 Rp 1,220,358.86 Rp 76,113,782.25


kg 7,763.19 Rp 18,174.60 Rp 141,092,943.85
m2 91.06 Rp 326,759.50 Rp 29,754,785.42

m3 12.38 Rp 1,220,358.86 Rp 15,103,161.28


kg 1,540.44 Rp 18,174.60 Rp 27,996,893.91
m2 18.07 Rp 326,759.50 Rp 5,904,204.34

m3 4.73 Rp 1,220,358.86 Rp 5,774,738.14


kg 588.99 Rp 18,174.60 Rp 10,704,694.73
m2 6.91 Rp 326,759.50 Rp 2,257,489.89
m3 15.09 Rp 1,063,296.96 Rp 16,045,151.09
m1 5,960.00 Rp 299,500.00 Rp 1,785,020,000.00
ttk 298.00 Rp 63,040.00 Rp 18,785,920.00

m3 8.28 Rp 352,797.00 Rp 2,921,159.16


m3 22.77 Rp 851,825.00 Rp 19,396,055.25
m3 14.88 Rp 1,107,535.00 Rp 16,480,120.80

kg 12,672.00
kg 14,400.00
kg 578.07
kg 615.44
kg 84.00
kg 152.35
m2 390.01
kg 100.00
m2 1,200.00
m2 1,200.00
Rp 19,140,879,409.85