A. DATA BAHAN
C. SECTION PROPERTY
G = E / [ 2 * (1 + u) ] = 76923.0769 MPa
h = ht - t = 147.50 mm
J = 2 * 1/3 * b * t + 1/3 * (ht - 2 * t) * t + 2/3 * ( a - t ) * t3 =
3 3
1458.33 mm4
Iw = I y * h2 / 4 = 1.251E+09 mm6
X1 = p / Sx * √ [ E * G * J * A / 2 ] = 9112.29 MPa
X2 = 4 * [ Sx / (G * J) ]2 * Iw / Iy = 0.00158 mm2/N2
Zx = 1 / 4 * ht * t2 + a * t * ( ht - a ) + t * ( b - 2 * t ) * ( ht - t ) = 23328 mm3
Zy = ht*t*(c - t / 2) + 2*a*t*(b - c - t / 2) + t * (c - t)2 + t * (b - t - c)2 = 11651 mm3
Beban hidup akibat beban air hujan diperhitungkan setara dengan beban genangan air
setebal 1 inc = 25 mm. qhujan = 0.025 * 10 = 0.25 kN/m2
Jarak antara gording, s= 1.2 m
Beban air hujan, qhujan * s * 103 = 300 N/m
Beban hidup merata akibat air hujan, QLL = 300 N/m
Beban hidup terpusat akibat beban pekerja, PLL = 1000 N
3. BEBAN TERFAKTOR
8. TAHANAN GESER
A. DATA BAHAN
Data Perencanaan :
Panjang ½ bentang rafter Lx = 600 mm
Jarak antar gording Ly = 650 mm
Jarak antar rib a= 22 mm
Tebal plat rib t= 13 mm
Momen maximum (Mu) ts = 70
PERHITUNGAN BALOK LANTAI (BEAM)
BAHAN STRUKTUR
Kuat tekan beton, fc ' = 29 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 400 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b= 600 mm
Tinggi balok h= 650 mm
Diameter tulangan (deform) yang digunakan, D= 22 mm
Diameter sengkang (polos) yang digunakan, P= 13 mm
Tebal bersih selimut beton, ts = 70 mm
MOMEN DAN GAYA GESER RENCANA
Momen rencana positif akibat beban terfaktor, Mu+ = 63.170 kNm
Momen rencana negatif akibat beban terfaktor, Mu - = 141.334 kNm
Gaya geser rencana akibat beban terfaktor, Vu = 170.554 kN
B. PERHITUNGAN TULANGAN
3. TULANGAN GESER