P EN E R I M A A N P O T O N G A N
BASE PAY 3,805,000.00
KOPERASI WR
TUNJ. KEHADIRAN 1,040,000.00
MASJID
TUNJ. LEMBUR 1,313,752.00
NO URUT :
STRUK GAJI BULAN
OKTOBER 2017
G A N
50,000.00
42,050.00
100,000.00
32,089.00
137,214.00
82,724.00
11,546.00
455,623.00
6,523,950.00
PT DIRGANTARA INDONESIA PERSERO
INDONESIAN AEROSPACE (IAe)
Jl. Pajajaran No.154 Bandung 40174
P EN E R I M A A N P O T O N G A N
BASE PAY 3,805,000.00
KOPERASI WR
TUNJ. KEHADIRAN 1,092,000.00
MASJID
TUNJ. LEMBUR 934,492.00
NO URUT :
STRUK GAJI BULAN
NOPEMBER 2017
G A N
50,000.00
42,050.00
100,000.00
32,089.00
137,214.00
47,989.00
24,914.00
434,256.00
5,814,050.00
PT DIRGANTARA INDONESIA PERSERO
INDONESIAN AEROSPACE (IAe)
Jl. Pajajaran No.154 Bandung 40174
P EN E R I M A A N P O T O N G A N
BASE PAY 3,805,000.00
KOPERASI WR
TUNJ. KEHADIRAN 1,144,000.00
MASJID
TUNJ. LEMBUR 1,178,806.00
NO URUT :
STRUK GAJI BULAN
DESEMBER 2017
G A N
50,000.00
42,050.00
100,000.00
32,089.00
137,214.00
62,766.00
4,618.00
428,737.00
6,130,650.00