JADWAL PRESTASI PEKERJAAN

PEKERJAAN PEMBANGUNAN GEDUNG KANTOR WILAYAH II 5/15/2017


PT. PEGADAIAN (Persero) PEKANBARU
PERIODE : MINGGU XXXII ( 16 S/D 22 JULI 2017 )

BOBOT
NO. URAIAN PEKERJAAN KONTRAK 10-Dec 17-Dec 24-Dec 31-Dec
(%) 16-Dec 23-Dec 30-Dec 6-Jan

A. PEKERJAAN LANTAI DASAR


I PEKERJAAN PENDAHULUAN 0.42 0.01 0.20 0.20
II PEKERJAAN TANAH 9.23 3.04 3.04
III PEKERJAAN PONDASI 6.76 0.09 0.09 1.95
IV PEKERJAAN STRUKTUR LANTAI DASAR 3.92
V PEKERJAAN PASANGAN & PLESTERAN LANTAI DASAR 1.46
VI PEKERJAAN LANTAI & DINDING KERAMIK LANTAI DASAR 0.27
VII PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI DASAR 0.18
VIII PEKERJAAN PENGECATAN LANTAI DASAR 0.16
IX PEKERJAAN LISTRIK LANTAI DASAR 0.21
B PEKERJAAN LANTAI 1
I PEKERJAAN STRUKTUR LANTAI 1 3.79
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 1 2.35
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 1 1.66
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 1 1.35
V PEKERJAAN PLAFOND LANTAI 1 0.37
VI PEKERJAAN SANITAIR LANTAI 1 0.26
VII PEKERJAAN PENGECATAN LANTAI 1 0.38
VIII PEKERJAAN INSTALASI AIR LANTAI 1 0.80
IX PEKERJAAN LISTRIK LANTAI 1 0.21
X PEKERJAAN LISTRIK KANTOR CABANG 0.16
XI PEKERJAAN AIR CONDITION (AC) LANTAI 1 0.93
XII PEKERJAAN FIRE ALARM LANTAI 1 0.36
XIII PEKERJAAN FURNITURE KANTOR CABANG 0.27
C PEKERJAAN LANTAI 2
I PEKERJAAN STRUKTUR LANTAI 2 3.06
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 2 2.08
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 2 1.50
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 2 0.82
V PEKERJAAN PLAFOND LANTAI 2 0.31
VI PEKERJAAN SANITAIR LANTAI 2 0.32
VII PEKERJAAN PENGECATAN LANTAI 2 0.35
VIII PEKERJAAN INSTALASI AIR LANTAI 2 0.13
IX PEKERJAAN LISTRIK LANTAI 2 0.26
X PEKERJAAN AIR CONDITION (AC) LANTAI 2 0.63
XI PEKERJAAN FIRE ALARM LANTAI 2 0.19
D PEKERJAAN LANTAI 3
I PEKERJAAN STRUKTUR LANTAI 3 2.81
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 3 1.82
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 3 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 3 0.70
V PEKERJAAN PLAFOND LANTAI 3 0.32
VI PEKERJAAN SANITAIR LANTAI 3 0.26
VII PEKERJAAN PENGECATAN LANTAI 3 0.33
VIII PEKERJAAN INSTALASI AIR LANTAI 3 0.13
IX PEKERJAAN LISTRIK LANTAI 3 0.25
X PEKERJAAN AIR CONDITION (AC) LANTAI 3 0.57
XI PEKERJAAN FIRE ALARM LANTAI 3 0.16
E PEKERJAAN LANTAI 4
I PEKERJAAN STRUKTUR LANTAI 4 2.66
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 4 1.07
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 4 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 4 0.49
V PEKERJAAN PLAFOND LANTAI 4 0.44
VI PEKERJAAN SANITAIR LANTAI 4 0.26
VII PEKERJAAN PENGECATAN LANTAI 4 0.29
VIII PEKERJAAN INSTALASI AIR LANTAI 4 0.13
IX PEKERJAAN LISTRIK LANTAI 4 0.30
X PEKERJAAN AIR CONDITION (AC) LANTAI 4 0.49
XI PEKERJAAN FIRE ALARM LANTAI 4 0.13
F PEKERJAAN LANTAI ATAP
I PEKERJAAN STRUKTUR LANTAI ATAP 1.54
II PEKERJAAN STRUKTUR PENUTUP TANGGA & LIFT 0.29
III PEKERJAAN PENUTUP ATAP 0.56
IV PEKERJAAN PASANGAN & PLESTERAN LANTAI ATAP 0.91
V PEKERJAAN LANTAI & DINDING KERAMIK LANTAI ATAP 0.18
VI PEKERJAAN PLAFOND LANTAI ATAP 0.04
VII PEKERJAAN PENGECATAN LANTAI ATAP 0.14
VIII PEKERJAAN INSTALASI AIR LANTAI ATAP 0.15
IX PEKERJAAN LISTRIK LANTAI ATAP 0.03
X PEKERJAAN PENANGKAL PETIR 0.09
G PEKERJAAN EKSTERIOR
I PEKERJAAN PENDAHULUAN 0.07
II PEKERJAAN EKSTERIOR TAMPAK DEPAN 2.39
III PEKERJAAN EKSTERIOR TAMPAK SAMPING KANAN 3.28
IV PEKERJAAN EKSTERIOR TAMPAK SAMPING KIRI 2.65
V PEKERJAAN EKSTERIOR TAMPAK BELAKANG 2.90
H PEKERJAAN HYDRANT
I LANTAI DASAR DAN SITE 5.83
II LANTAI 1 0.18
III LANTAI 2 0.18
IV LANTAI 3 0.18
V LANTAI 4 0.18
VI LANTAI ATAP 0.20
VII PEKERJAAN PIPA DALAM SHAFT 0.21
VIII PEKERJAAN INST. R. POMPA 0.26
I PEKERJAAN UNIT LIFT 3.99
J PEKERJAAN PRASARANA
I PEKERJAAN PEMASANGAN PAVING & KANSTEEN 3.46
II PEKERJAAN PAGAR 3.19
III PEKERJAAN SITE LISTRIK 0.51
IV PEKERJAAN LAIN-LAIN 3.42
K PEKERJAAN SOUND SYSTEM
I INSTALASI SOUND SYSTEM LT 1 0.11
II INSTALASI SOUND SYSTEM LT 2 0.05 16.
III INSTALASI SOUND SYSTEM LT 3 0.04
IV INSTALASI SOUND SYSTEM LT 4 0.03
PEKERJAAN INSTALASI TV DAN CCTV 13.8465592876
L
I INSTALASI CCTV LT DASAR 0.08
II INSTALASI TV DAN CCTV LT 1 0.30
III INSTALASI TV DAN CCTV LT 2 0.06
IV INSTALASI TV DAN CCTV LT 3 0.06
V INSTALASI CCTV LT 4 0.03 8.6192862477
M PEKERJAAN KABEL DATA
I INSTALASI KABEL DATA LT 1 0.14
II INSTALASI KABEL DATA LT 2 0.06
III INSTALASI KABEL DATA LT 3 0.07
IV INSTALASI KABEL DATA LT 4 0.04
N PEKERJAAN INSTALASI TELEPHON 3.6257188679
I INSTALASI TELEPHON LT 1 0.25
II INSTALASI TELEPHON LT 2 0.05
III INSTALASI TELEPHON LT 3 0.06
0.2965518271
IV INSTALASI TELEPHON LT 4 0.03 0 0.0107837121
BOBOT RENCANA ( %) 0.01 0.29 3.33 4.99
BOBOT KOMULATIF RENCANA ( %) 0.01 0.30 3.63 8.62
BOBOT REALISASI 0.12 0.17 0.26 0.32
DEVIASI 0.10 (0.13) (3.37) (8.30)
0.12 0.17 0.26 0.32
1 2 3 4
3/27/2017

JADWAL PELAKSANAAN PEKERJAAN 240 HARI KALENDER


7-Jan 14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr
13-Jan 20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 3-Mar 10-Mar 17-Mar 24-Mar 31-Mar 7-Apr

0.00
3.04
2.18 1.96 0.42
0.35 0.43 1.04 0.72 1.35
0.52 0.52 0.28 0.13
0.15 0.11
0.16 0.02
0.16
0.21

1.30 1.30 1.15


0.61 0.61 0.55 0.55
0.37 0.88 0.39
1.34
0.36
0.25
0.37
0.67 0.13
0.21
0.16
0.92
0.36

0.47 2.15
1.06 0.68
1.34
1.24
0.44
0.35

0.33
0.39
0.90
0.25

60.28973628

57.7823152134

54.9015940915
57.7823152134

54.9015940915

49.7468566719

46.8223769105

44.5578088782
43.6761873549

40.757947005

36.225906381 0.02 0.02 0.02 0.02


0.58 0.58 0.58

32.2798519903

5.77
0.18
0.18
28.3818534762
28.3818534762

0.05 0.05

0.36 0.36 0.36 0.46 0.46 0.36 0.04 0.04 0.15 0.15 0.11
0.51
18.7372081018 0.87

0.11
16.2354413072 0.04

13.8465592876
0.08
0.29
0.06

8.6192862477

0.14
0.06

3.6257188679
0.25
0.05

8271

5.23 2.39 2.50 9.64 3.90 3.95 4.53 2.92 0.88 2.26 2.92 5.15 2.88
13.85 16.24 18.74 28.38 32.28 36.23 40.76 43.68 44.56 46.82 49.75 54.90 57.78
0.42 0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86
(13.42) (15.81) (18.30) (27.94) (31.83) (35.77) (39.90) (42.13) (42.22) (44.46) (47.36) (52.12) (52.93)
0.42 0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86
5 6 7 8 9 10 11 12 13 14 15 16 17
AAN 240 HARI KALENDER
8-Apr 15-Apr 22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul
14-Apr 21-Apr 28-Apr 5-May 12-May 19-May 26-May 2-Jun 9-Jun 16-Jun 23-Jun 30-Jun 7-Jul 14-Jul

0.00
99.1
98.7274337663
98.3043261662

96.2961278217

91.2795098446

88.6026268653

86.5610385296

81.0925771775
86.5610385296

81.0925771775
0.14 0.14

77.1795586778

74.7753951439

0.31 73.0463644769

71.2106307452

0.46 1.93
0.93 0.64
66.2609905229
1.24
1.26
0.45
63.3184993033 0.28
0.29
0.33
60.2897362878 0.36
0.80
0.20
57.7823152134
0.37 0.99 0.93
0.89 0.11
4.9015940915 1.24
57.7823152134

4.9015940915
0.85
0.60
0.28
0.29
0.33
19 0.41
0.56
0.16

0.14 1.20
0.27
0.25 0.30
0.77
0.17
0.06
0.13
0.15
0.05
0.09

0.63
0.81 0.81 0.81 0.81
0.66 0.66 0.66 0.66
0.72 0.72 0.72 0.72

0.18
0.18
0.20
0.05 0.05
0.13 0.13
0.49 0.49 0.49 0.49 0.50 0.50 0.50 0.50

0.79 0.65 0.29 0.42


0.11 0.11 0.11

0.87 0.22 0.22 0.22 0.22 0.39 0.39

0.04
0.03

0.06
0.03

0.06
0.03

0.06
0.03
2.51 3.03 2.94 4.95 1.84 1.73 2.40 3.91 5.47 2.04 2.68 5.02 2.01 0.42
60.29 63.32 66.26 71.21 73.05 74.78 77.18 81.09 86.56 88.60 91.28 96.30 98.30 98.73
5.21 5.21 5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06
(55.08) (58.11) (60.69) (64.67) (65.44) (67.17) (69.58) (73.49) (78.96) (79.62) (81.78) (86.51) (87.87) (86.67)
5.21 5.21 5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06
18 19 20 21 22 23 24 25 26 27 28 29 30 31

Diperiksa oleh : Disetujui oleh :


PT.PEGADAIAN (Persero) Kontraktor Pelaksana
PT. Gedung BankExim

I WAYAN SUKERATA ADI MARDANI


Deputy Operasional Project Manager
MASA
15-Jul 22-Jul 29-Jul 5-Aug PEMELI KET
21-Jul 28-Jul 4-Aug 11-Aug HARAAN

0.00
99.7852027665
99.5736489664
99.1505413664
98.7274337663
98.3043261662

78217
0.42 0.42 0.21 0.21

0.42 0.42 0.21 0.21


99.15 99.57 99.79 100.00
14.30
(84.85)
14.30
32 33 34 35
Pekanbaru, 22 Juli 2017
Disetujui oleh : Dibuat oleh :
traktor Pelaksana Konsultan Pengawas
Gedung BankExim PT. ARSILIMA

ADI MARDANI OFIZAL


roject Manager PENGAWAS
JADWAL PRESTASI PEKERJAAN
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR WILAYAH II
PT. PEGADAIAN (Persero) PEKANBARU
PERIODE : MINGGU XXXII ( 16 S/D 22 JULI 2017 )

BOBOT
NO. URAIAN PEKERJAAN KONTRAK 10-Dec 17-Dec 24-Dec 31-Dec 7-Jan
(%) 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan

A. PEKERJAAN LANTAI DASAR


I PEKERJAAN PENDAHULUAN 0.42 0.01 0.20 0.20
II PEKERJAAN TANAH 9.23 3.04 3.04 3.04
III PEKERJAAN PONDASI 6.76 0.09 0.09 1.95 2.18
IV PEKERJAAN STRUKTUR LANTAI DASAR 3.92
V PEKERJAAN PASANGAN & PLESTERAN LANTAI DASAR 1.46
VI PEKERJAAN LANTAI & DINDING KERAMIK LANTAI DASAR 0.27
VII PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI DASAR 0.18
VIII PEKERJAAN PENGECATAN LANTAI DASAR 0.16
IX PEKERJAAN LISTRIK LANTAI DASAR 0.21
B PEKERJAAN LANTAI 1
I PEKERJAAN STRUKTUR LANTAI 1 3.79
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 1 2.35
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 1 1.66
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 1 1.35
V PEKERJAAN PLAFOND LANTAI 1 0.37
VI PEKERJAAN SANITAIR LANTAI 1 0.26
VII PEKERJAAN PENGECATAN LANTAI 1 0.38
VIII PEKERJAAN INSTALASI AIR LANTAI 1 0.80
IX PEKERJAAN LISTRIK LANTAI 1 0.21
X PEKERJAAN LISTRIK KANTOR CABANG 0.16
XI PEKERJAAN AIR CONDITION (AC) LANTAI 1 0.93
XII PEKERJAAN FIRE ALARM LANTAI 1 0.36
XIII PEKERJAAN FURNITURE KANTOR CABANG 0.27
C PEKERJAAN LANTAI 2
I PEKERJAAN STRUKTUR LANTAI 2 3.06
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 2 2.08
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 2 1.50
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 2 0.82
V PEKERJAAN PLAFOND LANTAI 2 0.31
VI PEKERJAAN SANITAIR LANTAI 2 0.32
VII PEKERJAAN PENGECATAN LANTAI 2 0.35
VIII PEKERJAAN INSTALASI AIR LANTAI 2 0.13
IX PEKERJAAN LISTRIK LANTAI 2 0.26
X PEKERJAAN AIR CONDITION (AC) LANTAI 2 0.63
XI PEKERJAAN FIRE ALARM LANTAI 2 0.19
D PEKERJAAN LANTAI 3
I PEKERJAAN STRUKTUR LANTAI 3 2.81
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 3 1.82
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 3 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 3 0.70
V PEKERJAAN PLAFOND LANTAI 3 0.32
VI PEKERJAAN SANITAIR LANTAI 3 0.26
VII PEKERJAAN PENGECATAN LANTAI 3 0.33
VIII PEKERJAAN INSTALASI AIR LANTAI 3 0.13
IX PEKERJAAN LISTRIK LANTAI 3 0.25
X PEKERJAAN AIR CONDITION (AC) LANTAI 3 0.57
XI PEKERJAAN FIRE ALARM LANTAI 3 0.16
E PEKERJAAN LANTAI 4
I PEKERJAAN STRUKTUR LANTAI 4 2.66
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 4 1.07
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 4 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 4 0.49
V PEKERJAAN PLAFOND LANTAI 4 0.44
VI PEKERJAAN SANITAIR LANTAI 4 0.26
VII PEKERJAAN PENGECATAN LANTAI 4 0.29
VIII PEKERJAAN INSTALASI AIR LANTAI 4 0.13
IX PEKERJAAN LISTRIK LANTAI 4 0.30
X PEKERJAAN AIR CONDITION (AC) LANTAI 4 0.49
XI PEKERJAAN FIRE ALARM LANTAI 4 0.13
F PEKERJAAN LANTAI ATAP
I PEKERJAAN STRUKTUR LANTAI ATAP 1.54
II PEKERJAAN STRUKTUR PENUTUP TANGGA & LIFT 0.29
III PEKERJAAN PENUTUP ATAP 0.56
IV PEKERJAAN PASANGAN & PLESTERAN LANTAI ATAP 0.91
V PEKERJAAN LANTAI & DINDING KERAMIK LANTAI ATAP 0.18
VI PEKERJAAN PLAFOND LANTAI ATAP 0.04
VII PEKERJAAN PENGECATAN LANTAI ATAP 0.14
VIII PEKERJAAN INSTALASI AIR LANTAI ATAP 0.15
IX PEKERJAAN LISTRIK LANTAI ATAP 0.03
X PEKERJAAN PENANGKAL PETIR 0.09
G PEKERJAAN EKSTERIOR
I PEKERJAAN PENDAHULUAN 0.07
II PEKERJAAN EKSTERIOR TAMPAK DEPAN 2.39
III PEKERJAAN EKSTERIOR TAMPAK SAMPING KANAN 3.28
IV PEKERJAAN EKSTERIOR TAMPAK SAMPING KIRI 2.65
V PEKERJAAN EKSTERIOR TAMPAK BELAKANG 2.90
H PEKERJAAN HYDRANT
I LANTAI DASAR DAN SITE 5.83
II LANTAI 1 0.18
III LANTAI 2 0.18
IV LANTAI 3 0.18
V LANTAI 4 0.18
VI LANTAI ATAP 0.20
VII PEKERJAAN PIPA DALAM SHAFT 0.21
VIII PEKERJAAN INST. R. POMPA 0.26
I PEKERJAAN UNIT LIFT 3.99
J PEKERJAAN PRASARANA
I PEKERJAAN PEMASANGAN PAVING & KANSTEEN 3.46
II PEKERJAAN PAGAR 3.19
III PEKERJAAN SITE LISTRIK 0.51
IV PEKERJAAN LAIN-LAIN 3.42
K PEKERJAAN SOUND SYSTEM
I INSTALASI SOUND SYSTEM LT 1 0.11
II INSTALASI SOUND SYSTEM LT 2 0.05 16.23
III INSTALASI SOUND SYSTEM LT 3 0.04
IV INSTALASI SOUND SYSTEM LT 4 0.03
PEKERJAAN INSTALASI TV DAN CCTV 13.8465592876
L
I INSTALASI CCTV LT DASAR 0.08
II INSTALASI TV DAN CCTV LT 1 0.30
III INSTALASI TV DAN CCTV LT 2 0.06
IV INSTALASI TV DAN CCTV LT 3 0.06
V INSTALASI CCTV LT 4 0.03 8.6192862477
M PEKERJAAN KABEL DATA
I INSTALASI KABEL DATA LT 1 0.14
II INSTALASI KABEL DATA LT 2 0.06
III INSTALASI KABEL DATA LT 3 0.07
IV INSTALASI KABEL DATA LT 4 0.04
N PEKERJAAN INSTALASI TELEPHON 3.6257188679
I INSTALASI TELEPHON LT 1 0.25
II INSTALASI TELEPHON LT 2 0.05
III INSTALASI TELEPHON LT 3 0.06
0.2965518271
IV INSTALASI TELEPHON LT 4 0.03 0 0.0107837121
0.17 0.26 0.32 0.42 0.42 0.43
BOBOT RENCANA ( %) 0.120.01 0.29 3.33 4.99 5.23
BOBOT KOMULATIF RENCANA ( %) 0.01 0.30 3.63 8.62 13.85
BOBOT REALISASI 0.12 0.17 0.26 0.32 0.42
DEVIASI 0.10 (0.13) (3.37) (8.30) (13.42)
0.12 0.17 0.26 0.32 0.42
1 2 3 4 5
JADWAL PELAKSANAAN PEKERJAAN 240 HARI KALENDER
14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr
20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 3-Mar 10-Mar 17-Mar 24-Mar 31-Mar 7-Apr 14-Apr 21-Apr

0.00

1.96 0.42
0.35 0.43 1.04 0.72 1.35
0.52 0.52 0.28 0.13
0.15 0.11
0.16 0.02
0.16
0.21

1.30 1.30 1.15


0.61 0.61 0.55 0.55
0.37 0.88 0.39
1.34
0.36
0.25
0.37
0.67 0.13
0.21
0.16
0.92
0.36

0.47 2.15
1.06 0.68
1.34
1.24
0.44
0.35
0.31
0.33
0.39
0.90
0.25

0.46 1.93

66

63.318499303

60.2897362878

57.7823152134

54.9015940915
57.7823152134

54.9015940915

49.7468566719

46.8223769105

44.5578088782
43.6761873549

40.757947005

36.225906381 0.02 0.02 0.02 0.02


0.58 0.58 0.58 0.63
0.81

32.2798519903

5.77
0.18
0.18
28.3818534762
28.3818534762

0.05 0.05 0.05


0.13 0.13

0.36 0.36 0.36 0.46 0.46 0.36 0.04 0.04 0.15 0.15 0.11 0.11 0.11
0.51
18.7372081018 0.87 0.87

0.11
16.2354413072 0.04

13.8465592876
0.08
0.29
0.06

8.6192862477

0.14
0.06

5.57
5.21 5.21
4.86
7188679
0.25
0.05 2.78
2.33 2.36 2.38
1.55
0.86
0.42 0.42 0.43 0.44 0.45 0.46
2.39 2.50 9.64 3.90 3.95 4.53 2.92 0.88 2.26 2.92 5.15 2.88 2.51 3.03
16.24 18.74 28.38 32.28 36.23 40.76 43.68 44.56 46.82 49.75 54.90 57.78 60.29 63.32
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
(15.81) (18.30) (27.94) (31.83) (35.77) (39.90) (42.13) (42.22) (44.46) (47.36) (52.12) (52.93) (55.08) (58.11)
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
6 7 8 9 10 11 12 13 14 15 16 17 18 19
ALENDER
22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul
28-Apr 5-May 12-May 19-May 26-May 2-Jun 9-Jun 16-Jun 23-Jun 30-Jun 7-Jul 14-Jul 21-Jul 28-Jul

0.00
99.7
99.5736489664
99.1505413664
98.7274337663
98.3043261662

96.2961278217

91.2795098446

88.6026268653

86.5610385296

81.0925771775
86.5610385296

81.0925771775
0.14 0.14

77.1795586778

74.7753951439

73.0463644769

71.2106307452

0.93 0.64
66.2609905229
1.24
1.26
0.45
63.3184993033 0.28
0.29
0.33
0.36
60.2897362878
0.80
0.20
3152134
0.37 0.99 0.93
0.89 0.11
1.24
3152134

0.85
0.60
0.28
0.29
0.33
0.41
0.56
0.16

0.14 1.20
0.27
0.25 0.30
0.77
0.17
0.06
0.13
0.15
0.05
0.09

0.81 0.81 0.81


0.66 0.66 0.66 0.66
0.72 0.72 0.72 0.72

0.18
0.18
0.20
0.05

0.49 0.49 0.49 0.49 0.50 0.50 0.50 0.50

0.79 0.65 0.29 0.42 0.42 0.42


0.11

0.22 0.22 0.22 0.22 0.39 0.39

0.04
0.03 15.18
14.30 14.38

12.06

0.06 10.44
0.03 9.50 9.79
8.99

7.60 7.60 7.60 7.60 7.60


6.54
0.06
5.57 0.03
5.21

0.06
0.03
2.94 4.95 1.84 1.73 2.40 3.91 5.47 2.04 2.68 5.02 2.01 0.42 0.42 0.42
66.26 71.21 73.05 74.78 77.18 81.09 86.56 88.60 91.28 96.30 98.30 98.73 99.15 99.57
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30 14.38
(60.69) (64.67) (65.44) (67.17) (69.58) (73.49) (78.96) (79.62) (81.78) (86.51) (87.87) (86.67) (84.85) (85.20)
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30
20 21 22 23 24 25 26 27 28 29 30 31 32 33

Diperiksa oleh : Disetujui oleh :


PT.PEGADAIAN (Persero) Kontraktor Pelaksana
PT. Gedung BankExim

I WAYAN SUKERATA ADI MARDANI


Deputy Operasional Project Manager
MASA
29-Jul 5-Aug PEMELI KET
4-Aug 11-Aug HARAAN

0.00
99.7852027665
99.5736489664
99.1505413664
337663
0.21 0.21

15.18
4.30 14.38

0.21 0.21
99.79 100.00
15.18
(84.60)

34 35
Pekanbaru, 22 Juli 2017
Dibuat oleh :
Konsultan Pengawas
PT. ARSILIMA

OFIZAL
PENGAWAS

16.92989
JADWAL PRESTASI PEKERJAAN
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR WILAYAH II
PT. PEGADAIAN (Persero) PEKANBARU
PERIODE : MINGGU XXXII ( 16 S/D 22 JULI 2017 )

BOBOT
NO. URAIAN PEKERJAAN KONTRAK 10-Dec 17-Dec 24-Dec 31-Dec 7-Jan
(%) 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan

A. PEKERJAAN LANTAI DASAR


I PEKERJAAN PENDAHULUAN 0.42 0.01 0.20 0.20
II PEKERJAAN TANAH 9.23 3.04 3.04 3.04
III PEKERJAAN PONDASI 6.76 0.09 0.09 1.95 2.18
IV PEKERJAAN STRUKTUR LANTAI DASAR 3.92
V PEKERJAAN PASANGAN & PLESTERAN LANTAI DASAR 1.46
VI PEKERJAAN LANTAI & DINDING KERAMIK LANTAI DASAR 0.27
VII PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI DASAR 0.18
VIII PEKERJAAN PENGECATAN LANTAI DASAR 0.16
IX PEKERJAAN LISTRIK LANTAI DASAR 0.21
B PEKERJAAN LANTAI 1
I PEKERJAAN STRUKTUR LANTAI 1 3.79
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 1 2.35
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 1 1.66
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 1 1.35
V PEKERJAAN PLAFOND LANTAI 1 0.37
VI PEKERJAAN SANITAIR LANTAI 1 0.26
VII PEKERJAAN PENGECATAN LANTAI 1 0.38
VIII PEKERJAAN INSTALASI AIR LANTAI 1 0.80
IX PEKERJAAN LISTRIK LANTAI 1 0.21
X PEKERJAAN LISTRIK KANTOR CABANG 0.16
XI PEKERJAAN AIR CONDITION (AC) LANTAI 1 0.93
XII PEKERJAAN FIRE ALARM LANTAI 1 0.36
XIII PEKERJAAN FURNITURE KANTOR CABANG 0.27
C PEKERJAAN LANTAI 2
I PEKERJAAN STRUKTUR LANTAI 2 3.06
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 2 2.08
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 2 1.50
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 2 0.82
V PEKERJAAN PLAFOND LANTAI 2 0.31
VI PEKERJAAN SANITAIR LANTAI 2 0.32
VII PEKERJAAN PENGECATAN LANTAI 2 0.35
VIII PEKERJAAN INSTALASI AIR LANTAI 2 0.13
IX PEKERJAAN LISTRIK LANTAI 2 0.26
X PEKERJAAN AIR CONDITION (AC) LANTAI 2 0.63
XI PEKERJAAN FIRE ALARM LANTAI 2 0.19
D PEKERJAAN LANTAI 3
I PEKERJAAN STRUKTUR LANTAI 3 2.81
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 3 1.82
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 3 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 3 0.70
V PEKERJAAN PLAFOND LANTAI 3 0.32
VI PEKERJAAN SANITAIR LANTAI 3 0.26
VII PEKERJAAN PENGECATAN LANTAI 3 0.33
VIII PEKERJAAN INSTALASI AIR LANTAI 3 0.13
IX PEKERJAAN LISTRIK LANTAI 3 0.25
X PEKERJAAN AIR CONDITION (AC) LANTAI 3 0.57
XI PEKERJAAN FIRE ALARM LANTAI 3 0.16
E PEKERJAAN LANTAI 4
I PEKERJAAN STRUKTUR LANTAI 4 2.66
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 4 1.07
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 4 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 4 0.49
V PEKERJAAN PLAFOND LANTAI 4 0.44
VI PEKERJAAN SANITAIR LANTAI 4 0.26
VII PEKERJAAN PENGECATAN LANTAI 4 0.29
VIII PEKERJAAN INSTALASI AIR LANTAI 4 0.13
IX PEKERJAAN LISTRIK LANTAI 4 0.30
X PEKERJAAN AIR CONDITION (AC) LANTAI 4 0.49
XI PEKERJAAN FIRE ALARM LANTAI 4 0.13
F PEKERJAAN LANTAI ATAP
I PEKERJAAN STRUKTUR LANTAI ATAP 1.54
II PEKERJAAN STRUKTUR PENUTUP TANGGA & LIFT 0.29
III PEKERJAAN PENUTUP ATAP 0.56
IV PEKERJAAN PASANGAN & PLESTERAN LANTAI ATAP 0.91
V PEKERJAAN LANTAI & DINDING KERAMIK LANTAI ATAP 0.18
VI PEKERJAAN PLAFOND LANTAI ATAP 0.04
VII PEKERJAAN PENGECATAN LANTAI ATAP 0.14
VIII PEKERJAAN INSTALASI AIR LANTAI ATAP 0.15
IX PEKERJAAN LISTRIK LANTAI ATAP 0.03
X PEKERJAAN PENANGKAL PETIR 0.09
G PEKERJAAN EKSTERIOR
I PEKERJAAN PENDAHULUAN 0.07
II PEKERJAAN EKSTERIOR TAMPAK DEPAN 2.39
III PEKERJAAN EKSTERIOR TAMPAK SAMPING KANAN 3.28
IV PEKERJAAN EKSTERIOR TAMPAK SAMPING KIRI 2.65
V PEKERJAAN EKSTERIOR TAMPAK BELAKANG 2.90
H PEKERJAAN HYDRANT
I LANTAI DASAR DAN SITE 5.83
II LANTAI 1 0.18
III LANTAI 2 0.18
IV LANTAI 3 0.18
V LANTAI 4 0.18
VI LANTAI ATAP 0.20
VII PEKERJAAN PIPA DALAM SHAFT 0.21
VIII PEKERJAAN INST. R. POMPA 0.26
I PEKERJAAN UNIT LIFT 3.99
J PEKERJAAN PRASARANA
I PEKERJAAN PEMASANGAN PAVING & KANSTEEN 3.46
II PEKERJAAN PAGAR 3.19
III PEKERJAAN SITE LISTRIK 0.51
IV PEKERJAAN LAIN-LAIN 3.42
K PEKERJAAN SOUND SYSTEM
I INSTALASI SOUND SYSTEM LT 1 0.11
II INSTALASI SOUND SYSTEM LT 2 0.05 16.23
III INSTALASI SOUND SYSTEM LT 3 0.04
IV INSTALASI SOUND SYSTEM LT 4 0.03
PEKERJAAN INSTALASI TV DAN CCTV 13.8465592876
L
I INSTALASI CCTV LT DASAR 0.08
II INSTALASI TV DAN CCTV LT 1 0.30
III INSTALASI TV DAN CCTV LT 2 0.06
IV INSTALASI TV DAN CCTV LT 3 0.06
V INSTALASI CCTV LT 4 0.03 8.6192862477
M PEKERJAAN KABEL DATA
I INSTALASI KABEL DATA LT 1 0.14
II INSTALASI KABEL DATA LT 2 0.06
III INSTALASI KABEL DATA LT 3 0.07
IV INSTALASI KABEL DATA LT 4 0.04
N PEKERJAAN INSTALASI TELEPHON 3.6257188679
I INSTALASI TELEPHON LT 1 0.25
II INSTALASI TELEPHON LT 2 0.05
III INSTALASI TELEPHON LT 3 0.06
0.2965518271
IV INSTALASI TELEPHON LT 4 0.03 0 0.0107837121
BOBOT RENCANA ( %) 0.01 0.29 3.33 4.99 5.23
BOBOT KOMULATIF RENCANA ( %) 0.01 0.30 3.63 8.62 13.85
BOBOT REALISASI 0.12 0.17 0.26 0.32 0.42
DEVIASI 0.10 (0.13) (3.37) (8.30) (13.42)
0.12 0.17 0.26 0.32 0.42
1 2 3 4 5
JADWAL PELAKSANAAN PEKERJAAN 240 HARI KALENDER
14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr
20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 3-Mar 10-Mar 17-Mar 24-Mar 31-Mar 7-Apr 14-Apr 21-Apr

0.00

1.96 0.42
0.35 0.43 1.04 0.72 1.35
0.52 0.52 0.28 0.13
0.15 0.11
0.16 0.02
0.16
0.21

1.30 1.30 1.15


0.61 0.61 0.55 0.55
0.37 0.88 0.39
1.34
0.36
0.25
0.37
0.67 0.13
0.21
0.16
0.92
0.36

0.47 2.15
1.06 0.68
1.34
1.24
0.44
0.35
0.31
0.33
0.39
0.90
0.25

0.46 1.93

66

63.318499303

60.2897362878

57.7823152134

54.9015940915
57.7823152134

54.9015940915

49.7468566719

46.8223769105

44.5578088782
43.6761873549

40.757947005

36.225906381 0.02 0.02 0.02 0.02


0.58 0.58 0.58 0.63
0.81

32.2798519903

5.77
0.18
0.18
28.3818534762
28.3818534762

0.05 0.05 0.05


0.13 0.13

0.36 0.36 0.36 0.46 0.46 0.36 0.04 0.04 0.15 0.15 0.11 0.11 0.11
0.51
18.7372081018 0.87 0.87

0.11
16.2354413072 0.04

13.8465592876
0.08
0.29
0.06

8.6192862477

0.14
0.06

7188679
0.25
0.05

2.39 2.50 9.64 3.90 3.95 4.53 2.92 0.88 2.26 2.92 5.15 2.88 2.51 3.03
16.24 18.74 28.38 32.28 36.23 40.76 43.68 44.56 46.82 49.75 54.90 57.78 60.29 63.32
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
(15.81) (18.30) (27.94) (31.83) (35.77) (39.90) (42.13) (42.22) (44.46) (47.36) (52.12) (52.93) (55.08) (58.11)
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
6 7 8 9 10 11 12 13 14 15 16 17 18 19
ALENDER
22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul
28-Apr 5-May 12-May 19-May 26-May 2-Jun 9-Jun 16-Jun 23-Jun 30-Jun 7-Jul 14-Jul 21-Jul 28-Jul

0.00
99.7
99.5736489664
99.1505413664
98.7274337663
98.3043261662

96.2961278217

91.2795098446

88.6026268653

86.5610385296

81.0925771775
86.5610385296

81.0925771775
0.14 0.14

77.1795586778

74.7753951439

73.0463644769

71.2106307452

0.93 0.64
66.2609905229
1.24
1.26
0.45
63.3184993033 0.28
0.29
0.33
0.36
60.2897362878
0.80
0.20
3152134
0.37 0.99 0.93
0.89 0.11
1.24
3152134

0.85
0.60
0.28
0.29
0.33
0.41
0.56
0.16

0.14 1.20
0.27
0.25 0.30
0.77
0.17
0.06
0.13
0.15
0.05
0.09

0.81 0.81 0.81


0.66 0.66 0.66 0.66
0.72 0.72 0.72 0.72

0.18
0.18
0.20
0.05

0.49 0.49 0.49 0.49 0.50 0.50 0.50 0.50

0.79 0.65 0.29 0.42 0.42 0.42


0.11

0.22 0.22 0.22 0.22 0.39 0.39

0.04
0.03

0.06
0.03

0.06
0.03

0.06
0.03
2.94 4.95 1.84 1.73 2.40 3.91 5.47 2.04 2.68 5.02 2.01 0.42 0.42 0.42
66.26 71.21 73.05 74.78 77.18 81.09 86.56 88.60 91.28 96.30 98.30 98.73 99.15 99.57
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30
(60.69) (64.67) (65.44) (67.17) (69.58) (73.49) (78.96) (79.62) (81.78) (86.51) (87.87) (86.67) (84.85)
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30
20 21 22 23 24 25 26 27 28 29 30 31 32 33

Diperiksa oleh : Disetujui oleh :


PT.PEGADAIAN (Persero) Kontraktor Pelaksana
PT. Gedung BankExim

I WAYAN SUKERATA ADI MARDANI


Deputy Operasional Project Manager
MASA
29-Jul 5-Aug PEMELI KET
4-Aug 11-Aug HARAAN

0.00
99.7852027665
99.5736489664
99.1505413664
337663
0.21 0.21

0.21 0.21
99.79 100.00

34 35
Pekanbaru, 22 Juli 2017
Dibuat oleh :
Konsultan Pengawas
PT. ARSILIMA

OFIZAL
PENGAWAS
RENCANA PENAMBAHAN WAKTU PEKERJAAN
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR WILAYAH II
PT. PEGADAIAN (Persero) PEKANBARU

BOBOT
NO. URAIAN PEKERJAAN KONTRAK 10-Dec 17-Dec 24-Dec 31-Dec 7-Jan
(%) 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan

A. PEKERJAAN LANTAI DASAR


I PEKERJAAN PENDAHULUAN 0.42 0.12 0.06 0.08 0.06 0.10
II PEKERJAAN TANAH 9.23
III PEKERJAAN PONDASI 6.76
IV PEKERJAAN STRUKTUR LANTAI DASAR 3.92
V PEKERJAAN PASANGAN & PLESTERAN LANTAI DASAR 1.46
VI PEKERJAAN LANTAI & DINDING KERAMIK LANTAI DASAR 0.27
VII PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI DASAR 0.18
VIII PEKERJAAN PENGECATAN LANTAI DASAR 0.16
IX PEKERJAAN LISTRIK LANTAI DASAR 0.21
B PEKERJAAN LANTAI 1
I PEKERJAAN STRUKTUR LANTAI 1 3.79
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 1 2.35
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 1 1.66
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 1 1.35
V PEKERJAAN PLAFOND LANTAI 1 0.37
VI PEKERJAAN SANITAIR LANTAI 1 0.26
VII PEKERJAAN PENGECATAN LANTAI 1 0.38
VIII PEKERJAAN INSTALASI AIR LANTAI 1 0.80
IX PEKERJAAN LISTRIK LANTAI 1 0.21
X PEKERJAAN LISTRIK KANTOR CABANG 0.16
XI PEKERJAAN AIR CONDITION (AC) LANTAI 1 0.93
XII PEKERJAAN FIRE ALARM LANTAI 1 0.36
XIII PEKERJAAN FURNITURE KANTOR CABANG 0.27
C PEKERJAAN LANTAI 2
I PEKERJAAN STRUKTUR LANTAI 2 3.06
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 2 2.08
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 2 1.50
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 2 0.82
V PEKERJAAN PLAFOND LANTAI 2 0.31
VI PEKERJAAN SANITAIR LANTAI 2 0.32
VII PEKERJAAN PENGECATAN LANTAI 2 0.35
VIII PEKERJAAN INSTALASI AIR LANTAI 2 0.13
IX PEKERJAAN LISTRIK LANTAI 2 0.26
X PEKERJAAN AIR CONDITION (AC) LANTAI 2 0.63
XI PEKERJAAN FIRE ALARM LANTAI 2 0.19
D PEKERJAAN LANTAI 3
I PEKERJAAN STRUKTUR LANTAI 3 2.81
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 3 1.82
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 3 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 3 0.70
V PEKERJAAN PLAFOND LANTAI 3 0.32
VI PEKERJAAN SANITAIR LANTAI 3 0.26
VII PEKERJAAN PENGECATAN LANTAI 3 0.33
VIII PEKERJAAN INSTALASI AIR LANTAI 3 0.13
IX PEKERJAAN LISTRIK LANTAI 3 0.25
X PEKERJAAN AIR CONDITION (AC) LANTAI 3 0.57
XI PEKERJAAN FIRE ALARM LANTAI 3 0.16
E PEKERJAAN LANTAI 4
I PEKERJAAN STRUKTUR LANTAI 4 2.66
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 4 1.07
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 4 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 4 0.49
V PEKERJAAN PLAFOND LANTAI 4 0.44
VI PEKERJAAN SANITAIR LANTAI 4 0.26
VII PEKERJAAN PENGECATAN LANTAI 4 0.29
VIII PEKERJAAN INSTALASI AIR LANTAI 4 0.13
IX PEKERJAAN LISTRIK LANTAI 4 0.30
X PEKERJAAN AIR CONDITION (AC) LANTAI 4 0.49
XI PEKERJAAN FIRE ALARM LANTAI 4 0.13
F PEKERJAAN LANTAI ATAP
I PEKERJAAN STRUKTUR LANTAI ATAP 1.54
II PEKERJAAN STRUKTUR PENUTUP TANGGA & LIFT 0.29
III PEKERJAAN PENUTUP ATAP 0.56
IV PEKERJAAN PASANGAN & PLESTERAN LANTAI ATAP 0.91
V PEKERJAAN LANTAI & DINDING KERAMIK LANTAI ATAP 0.18
VI PEKERJAAN PLAFOND LANTAI ATAP 0.04
VII PEKERJAAN PENGECATAN LANTAI ATAP 0.14
VIII PEKERJAAN INSTALASI AIR LANTAI ATAP 0.15
IX PEKERJAAN LISTRIK LANTAI ATAP 0.03
X PEKERJAAN PENANGKAL PETIR 0.09
G PEKERJAAN EKSTERIOR
I PEKERJAAN PENDAHULUAN 0.07
II PEKERJAAN EKSTERIOR TAMPAK DEPAN 2.39
III PEKERJAAN EKSTERIOR TAMPAK SAMPING KANAN 3.28
IV PEKERJAAN EKSTERIOR TAMPAK SAMPING KIRI 2.65
V PEKERJAAN EKSTERIOR TAMPAK BELAKANG 2.90
H PEKERJAAN HYDRANT
I LANTAI DASAR DAN SITE 5.83
II LANTAI 1 0.18
III LANTAI 2 0.18
IV LANTAI 3 0.18
V LANTAI 4 0.18
VI LANTAI ATAP 0.20
VII PEKERJAAN PIPA DALAM SHAFT 0.21
VIII PEKERJAAN INST. R. POMPA 0.26
I PEKERJAAN UNIT LIFT 3.99
J PEKERJAAN PRASARANA
I PEKERJAAN PEMASANGAN PAVING & KANSTEEN 3.46
II PEKERJAAN PAGAR 3.19
III PEKERJAAN SITE LISTRIK 0.51
IV PEKERJAAN LAIN-LAIN 3.42
K PEKERJAAN SOUND SYSTEM
I INSTALASI SOUND SYSTEM LT 1 0.11
II INSTALASI SOUND SYSTEM LT 2 0.05
III INSTALASI SOUND SYSTEM LT 3 0.04
IV INSTALASI SOUND SYSTEM LT 4 0.03
L PEKERJAAN INSTALASI TV DAN CCTV
I INSTALASI CCTV LT DASAR 0.08
II INSTALASI TV DAN CCTV LT 1 0.30
III INSTALASI TV DAN CCTV LT 2 0.06
IV INSTALASI TV DAN CCTV LT 3 0.06
V INSTALASI CCTV LT 4 0.03
M PEKERJAAN KABEL DATA
I INSTALASI KABEL DATA LT 1 0.14
II INSTALASI KABEL DATA LT 2 0.06
III INSTALASI KABEL DATA LT 3 0.07
IV INSTALASI KABEL DATA LT 4 0.04
N PEKERJAAN INSTALASI TELEPHON
I INSTALASI TELEPHON LT 1 0.25
II INSTALASI TELEPHON LT 2 0.05
III INSTALASI TELEPHON LT 3 0.06
IV INSTALASI TELEPHON LT 4 0.03
BOBOT RENCANA ( %) 0.12 0.06 0.08 0.06 0.10
BOBOT KOMULATIF RENCANA ( %) 0.12 0.17 0.26 0.32 0.42
0.12 0.17 0.26 0.32 0.42
1 Penambahan waktu 193 ( seratus sembilan puluh tiga) hari kalender
2 Jumlah hari tidak bisa belerja karena hujan : 23 hari kalender
3 Hari libur karena lebaran 10 hk
4 Persetujuan Perubahan lay out tgl 27 janiauri 2017, pekerjaan
pendahuluan sudah dimulai dikerjakan
5 Tanggal 20 Maret 2017 tentang struktur banguan dan pekerjaan tambah
kurang di wilayah parkir dan pagar keliling
6 Tanggal 1 April 2017 Persetujuan Pekerjaan Tiang pancang di wilayah parkir
7 Tanggal 04 mei 2017 persetujuan revisi struktur pondasi
8 Persetujuan Pekerjaan Tambah Kurang belum Final akibat pekerjaan dilapangan
terhambat karena menunggu persetujuan pekerjaan tsb.
14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr
20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 3-Mar 10-Mar 17-Mar 24-Mar 31-Mar 7-Apr 14-Apr 21-Apr

0.01 0.01 0.01 0.01 0.40 0.69 0.79 0.02 0.02 0.10
0.30 2.08 0.35 0.00
0.00 0.01 0.01 0.01 0.01 0.40 0.69 0.79 0.02 0.02 0.40 2.08 0.35 0.00
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
JADWAL PELAKSANAAN PEKERJAAN 433 HARI KALENDER
22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul
28-Apr 5-May 12-May 19-May 26-May 2-Jun 9-Jun 16-Jun 23-Jun 30-Jun 7-Jul 14-Jul 21-Jul 28-Jul

0.05 0.07
0.03 0.13 0.02 0.09
0.35 0.97 1.06 0.00 0.00 1.33 0.41 0.16 0.62 1.59 2.15 0.97
0.35
0.02 0.00
0.00 0.00

0.08

0.35 0.97 1.06 0.00 0.00 0.00 0.00 1.38 0.51 0.29 0.65 1.62 2.24 1.39
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30 15.69
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30 0.42
HARI KALENDER
29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct
4-Aug 11-Aug 18-Aug 25-Aug 1-Sep 8-Sep 15-Sep 22-Sep 29-Sep 6-Oct 13-Oct 20-Oct 27-Oct 3-Nov

0.00

0.97
0.43 1.04 0.72 1.35
0.52 0.52 0.28 0.13
0.15 0.11
0.16 0.02
0.16
0.21

1.30 1.30 1.15


0.61 0.61 0.55 0.55
0.37 0.88 0.39
1.34
0.36
0.25
0.37
0.67 0.13
0.21
0.16
0.92
0.36

0.47 2.15
1.06 0.68
1.34
1.24
0.44
0.35
0.31
0.33
0.39
0.90
0.25

0.46 1.93
0.93

0.33
0.36
0.02 0.02 0.02 0.02
0.58 0.58 0.58 0.63
0.81 0.81

5.77
0.18
0.18
0.18
0.05 0.05 0.05
0.13 0.13

0.36 0.36 0.36 0.46 0.46 0.36 0.04 0.04 0.15 0.15 0.11 0.11 0.11 0.11
0.51
0.87 0.87

0.11
0.04
0.04

0.29
0.06
0.06

0.14
0.06
0.06

0.25
0.05
0.06

3.05 9.64 3.90 3.95 4.53 2.92 0.88 2.26 2.92 5.15 2.88 2.51 3.03 2.94
18.74 28.38 32.28 36.23 40.76 43.68 44.56 46.82 49.75 54.90 57.78 60.29 63.32 66.26
0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21 5.57
4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan 3-Feb
10-Nov 17-Nov 24-Nov 1-Dec 8-Dec 15-Dec 22-Dec 29-Dec 5-Jan 12-Jan 19-Jan 26-Jan 2-Feb 9-Feb

0.00
0.14 0.14

0.64
1.24
1.26
0.45
0.28
0.29

0.80
0.20

0.37 0.99 0.93


0.89 0.11
1.24
0.85
0.60
0.28
0.29
0.33
0.41
0.56
0.16

0.14 1.20
0.27
0.25 0.30
0.77
0.17
0.06
0.13
0.15
0.05
0.09

0.81 0.81
0.66 0.66 0.66 0.66
0.72 0.72 0.72 0.72

0.18
0.20
0.05

0.49 0.49 0.49 0.49 0.50 0.50 0.50 0.50

0.79 0.65 0.29 0.42 0.42 0.42 0.21

0.22 0.22 0.22 0.22 0.39 0.39

0.03

0.03

0.03

0.03
4.95 1.84 1.73 2.40 3.91 5.47 2.04 2.68 5.02 2.01 0.42 0.42 0.42 0.21
71.21 73.05 74.78 77.18 81.09 86.56 88.60 91.28 96.30 98.30 98.73 99.15 99.57 99.79
6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30

Diperiksa oleh :
KONSULTAS PENGAWAS
PT.ARSI LIMA

OFIZAL
Konsultas Pengawas
MASA
10-Feb PEMELI KET
16-Feb HARAAN

0.00
0.21

0.21
100.00
Dibuat oleh :
Kontraktor Pelaksana
PT. Gedung BankExim

ADI MARDANI
Project Manager
JADWAL PRESTASI PEKERJAAN
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR WILAYAH II
PT. PEGADAIAN (Persero) PEKANBARU
PERIODE : MINGGU XXXII ( 16 S/D 22 JULI 2017 )

BOBOT
NO. URAIAN PEKERJAAN KONTRAK 10-Dec 17-Dec 24-Dec 31-Dec 7-Jan
(%) 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan

A. PEKERJAAN LANTAI DASAR


I PEKERJAAN PENDAHULUAN 0.42 0.01 0.20 0.20
II PEKERJAAN TANAH 9.23 3.04 3.04 3.04
III PEKERJAAN PONDASI 6.76 0.09 0.09 1.95 2.18
IV PEKERJAAN STRUKTUR LANTAI DASAR 3.92
V PEKERJAAN PASANGAN & PLESTERAN LANTAI DASAR 1.46
VI PEKERJAAN LANTAI & DINDING KERAMIK LANTAI DASAR 0.27
VII PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI DASAR 0.18
VIII PEKERJAAN PENGECATAN LANTAI DASAR 0.16
IX PEKERJAAN LISTRIK LANTAI DASAR 0.21
B PEKERJAAN LANTAI 1
I PEKERJAAN STRUKTUR LANTAI 1 3.79
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 1 2.35
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 1 1.66
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 1 1.35
V PEKERJAAN PLAFOND LANTAI 1 0.37
VI PEKERJAAN SANITAIR LANTAI 1 0.26
VII PEKERJAAN PENGECATAN LANTAI 1 0.38
VIII PEKERJAAN INSTALASI AIR LANTAI 1 0.80
IX PEKERJAAN LISTRIK LANTAI 1 0.21
X PEKERJAAN LISTRIK KANTOR CABANG 0.16
XI PEKERJAAN AIR CONDITION (AC) LANTAI 1 0.93
XII PEKERJAAN FIRE ALARM LANTAI 1 0.36
XIII PEKERJAAN FURNITURE KANTOR CABANG 0.27
C PEKERJAAN LANTAI 2
I PEKERJAAN STRUKTUR LANTAI 2 3.06
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 2 2.08
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 2 1.50
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 2 0.82
V PEKERJAAN PLAFOND LANTAI 2 0.31
VI PEKERJAAN SANITAIR LANTAI 2 0.32
VII PEKERJAAN PENGECATAN LANTAI 2 0.35
VIII PEKERJAAN INSTALASI AIR LANTAI 2 0.13
IX PEKERJAAN LISTRIK LANTAI 2 0.26
X PEKERJAAN AIR CONDITION (AC) LANTAI 2 0.63
XI PEKERJAAN FIRE ALARM LANTAI 2 0.19
D PEKERJAAN LANTAI 3
I PEKERJAAN STRUKTUR LANTAI 3 2.81
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 3 1.82
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 3 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 3 0.70
V PEKERJAAN PLAFOND LANTAI 3 0.32
VI PEKERJAAN SANITAIR LANTAI 3 0.26
VII PEKERJAAN PENGECATAN LANTAI 3 0.33
VIII PEKERJAAN INSTALASI AIR LANTAI 3 0.13
IX PEKERJAAN LISTRIK LANTAI 3 0.25
X PEKERJAAN AIR CONDITION (AC) LANTAI 3 0.57
XI PEKERJAAN FIRE ALARM LANTAI 3 0.16
E PEKERJAAN LANTAI 4
I PEKERJAAN STRUKTUR LANTAI 4 2.66
II PEKERJAAN PASANGAN & PLESTERAN LANTAI 4 1.07
III PEKERJAAN LANTAI & DINDING KERAMIK LANTAI 4 1.38
IV PEKERJAAN KUSEN PINTU DAN PENGGANTUNG LANTAI 4 0.49
V PEKERJAAN PLAFOND LANTAI 4 0.44
VI PEKERJAAN SANITAIR LANTAI 4 0.26
VII PEKERJAAN PENGECATAN LANTAI 4 0.29
VIII PEKERJAAN INSTALASI AIR LANTAI 4 0.13
IX PEKERJAAN LISTRIK LANTAI 4 0.30
X PEKERJAAN AIR CONDITION (AC) LANTAI 4 0.49
XI PEKERJAAN FIRE ALARM LANTAI 4 0.13
F PEKERJAAN LANTAI ATAP
I PEKERJAAN STRUKTUR LANTAI ATAP 1.54
II PEKERJAAN STRUKTUR PENUTUP TANGGA & LIFT 0.29
III PEKERJAAN PENUTUP ATAP 0.56
IV PEKERJAAN PASANGAN & PLESTERAN LANTAI ATAP 0.91
V PEKERJAAN LANTAI & DINDING KERAMIK LANTAI ATAP 0.18
VI PEKERJAAN PLAFOND LANTAI ATAP 0.04
VII PEKERJAAN PENGECATAN LANTAI ATAP 0.14
VIII PEKERJAAN INSTALASI AIR LANTAI ATAP 0.15
IX PEKERJAAN LISTRIK LANTAI ATAP 0.03
X PEKERJAAN PENANGKAL PETIR 0.09
G PEKERJAAN EKSTERIOR
I PEKERJAAN PENDAHULUAN 0.07
II PEKERJAAN EKSTERIOR TAMPAK DEPAN 2.39
III PEKERJAAN EKSTERIOR TAMPAK SAMPING KANAN 3.28
IV PEKERJAAN EKSTERIOR TAMPAK SAMPING KIRI 2.65
V PEKERJAAN EKSTERIOR TAMPAK BELAKANG 2.90
H PEKERJAAN HYDRANT
I LANTAI DASAR DAN SITE 5.83
II LANTAI 1 0.18
III LANTAI 2 0.18
IV LANTAI 3 0.18
V LANTAI 4 0.18
VI LANTAI ATAP 0.20
VII PEKERJAAN PIPA DALAM SHAFT 0.21
VIII PEKERJAAN INST. R. POMPA 0.26
I PEKERJAAN UNIT LIFT 3.99
J PEKERJAAN PRASARANA
I PEKERJAAN PEMASANGAN PAVING & KANSTEEN 3.46
II PEKERJAAN PAGAR 3.19
III PEKERJAAN SITE LISTRIK 0.51
IV PEKERJAAN LAIN-LAIN 3.42
K PEKERJAAN SOUND SYSTEM
I INSTALASI SOUND SYSTEM LT 1 0.11
II INSTALASI SOUND SYSTEM LT 2 0.05 16.23
III INSTALASI SOUND SYSTEM LT 3 0.04
IV INSTALASI SOUND SYSTEM LT 4 0.03
PEKERJAAN INSTALASI TV DAN CCTV 13.8465592876
L
I INSTALASI CCTV LT DASAR 0.08
II INSTALASI TV DAN CCTV LT 1 0.30
III INSTALASI TV DAN CCTV LT 2 0.06
IV INSTALASI TV DAN CCTV LT 3 0.06
V INSTALASI CCTV LT 4 0.03 8.6192862477
M PEKERJAAN KABEL DATA
I INSTALASI KABEL DATA LT 1 0.14
II INSTALASI KABEL DATA LT 2 0.06
III INSTALASI KABEL DATA LT 3 0.07
IV INSTALASI KABEL DATA LT 4 0.04
N PEKERJAAN INSTALASI TELEPHON 3.6257188679
I INSTALASI TELEPHON LT 1 0.25
II INSTALASI TELEPHON LT 2 0.05
III INSTALASI TELEPHON LT 3 0.06
0.2965518271
IV INSTALASI TELEPHON LT 4 0.03 0 0.0107837121
BOBOT RENCANA ( %) 0.01 0.29 3.33 4.99 5.23
BOBOT KOMULATIF RENCANA ( %) 0.01 0.30 3.63 8.62 13.85
BOBOT REALISASI 0.12 0.17 0.26 0.32 0.42
DEVIASI 0.10 (0.13) (3.37) (8.30) (13.42)
0.12 0.17 0.26 0.32 0.42
1 2 3 4 5
JADWAL PELAKSANAAN PEKERJAAN 240 HARI KALENDER
14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr
20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 3-Mar 10-Mar 17-Mar 24-Mar 31-Mar 7-Apr 14-Apr 21-Apr

0.00

1.96 0.42
0.35 0.43 1.04 0.72 1.35
0.52 0.52 0.28 0.13
0.15 0.11
0.16 0.02
0.16
0.21

1.30 1.30 1.15


0.61 0.61 0.55 0.55
0.37 0.88 0.39
1.34
0.36
0.25
0.37
0.67 0.13
0.21
0.16
0.92
0.36

0.47 2.15
1.06 0.68
1.34
1.24
0.44
0.35
0.31
0.33
0.39
0.90
0.25

0.46 1.93

66

63.318499303

60.2897362878

57.7823152134

54.9015940915
57.7823152134

54.9015940915

49.7468566719

46.8223769105

44.5578088782
43.6761873549

40.757947005

36.225906381 0.02 0.02 0.02 0.02


0.58 0.58 0.58 0.63
0.81

32.2798519903

5.77
0.18
0.18
28.3818534762
28.3818534762

0.05 0.05 0.05


0.13 0.13

0.36 0.36 0.36 0.46 0.46 0.36 0.04 0.04 0.15 0.15 0.11 0.11 0.11
0.51
18.7372081018 0.87 0.87

0.11
16.2354413072 0.04

13.8465592876
0.08
0.29
0.06

8.6192862477

0.14
0.06

7188679
0.25
0.05

2.39 2.50 9.64 3.90 3.95 4.53 2.92 0.88 2.26 2.92 5.15 2.88 2.51 3.03
16.24 18.74 28.38 32.28 36.23 40.76 43.68 44.56 46.82 49.75 54.90 57.78 60.29 63.32
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
(15.81) (18.30) (27.94) (31.83) (35.77) (39.90) (42.13) (42.22) (44.46) (47.36) (52.12) (52.93) (55.08) (58.11)
0.42 0.43 0.44 0.45 0.46 0.86 1.55 2.33 2.36 2.38 2.78 4.86 5.21 5.21
6 7 8 9 10 11 12 13 14 15 16 17 18 19
ALENDER
22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul
28-Apr 5-May 12-May 19-May 26-May 2-Jun 9-Jun 16-Jun 23-Jun 30-Jun 7-Jul 14-Jul 21-Jul 28-Jul

0.00
99.7
99.5736489664
99.1505413664
98.7274337663
98.3043261662

96.2961278217

91.2795098446

88.6026268653

86.5610385296

81.0925771775
86.5610385296

81.0925771775
0.14 0.14

77.1795586778

74.7753951439

73.0463644769

71.2106307452

0.93 0.64
66.2609905229
1.24
1.26
0.45
63.3184993033 0.28
0.29
0.33
0.36
60.2897362878
0.80
0.20
3152134
0.37 0.99 0.93
0.89 0.11
1.24
3152134

0.85
0.60
0.28
0.29
0.33
0.41
0.56
0.16

0.14 1.20
0.27
0.25 0.30
0.77
0.17
0.06
0.13
0.15
0.05
0.09

0.81 0.81 0.81


0.66 0.66 0.66 0.66
0.72 0.72 0.72 0.72

0.18
0.18
0.20
0.05

0.49 0.49 0.49 0.49 0.50 0.50 0.50 0.50

0.79 0.65 0.29 0.42 0.42 0.42


0.11

0.22 0.22 0.22 0.22 0.39 0.39

0.04
0.03

0.06
0.03

0.06
0.03

0.06
0.03
2.94 4.95 1.84 1.73 2.40 3.91 5.47 2.04 2.68 5.02 2.01 0.42 0.42 0.42
66.26 71.21 73.05 74.78 77.18 81.09 86.56 88.60 91.28 96.30 98.30 98.73 99.15 99.57
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30
(60.69) (64.67) (65.44) (67.17) (69.58) (73.49) (78.96) (79.62) (81.78) (86.51) (87.87) (86.67) (84.85)
5.57 6.54 7.60 7.60 7.60 7.60 7.60 8.99 9.50 9.79 10.44 12.06 14.30
20 21 22 23 24 25 26 27 28 29 30 31 32 33

Diperiksa oleh : Disetujui oleh :


PT.PEGADAIAN (Persero) Kontraktor Pelaksana
PT. Gedung BankExim

I WAYAN SUKERATA ADI MARDANI


Deputy Operasional Project Manager
MASA
29-Jul 5-Aug PEMELI KET
4-Aug 11-Aug HARAAN

0.00
99.7852027665
99.5736489664
99.1505413664
337663
0.21 0.21

0.21 0.21
99.79 100.00

34 35
Pekanbaru, 22 Juli 2017
Dibuat oleh :
Konsultan Pengawas
PT. ARSILIMA

OFIZAL
PENGAWAS
JADWAL PELAKSANAAN
1 PERIODE : MINGGU I ( 10 S/D 16 DESEMBER 2016 )
2 PERIODE : MINGGU II ( 17 S/D 23 DESEMBER 2016 )
3 PERIODE : MINGGU III ( 24 S/D 30 DESEMBER 2016 )
4 PERIODE : MINGGU IV ( 31 DESEMBER 2016 S/D 06 JANUARI 2017 )

5 PERIODE : MINGGU V ( 07 S/D 13 JANUARI 2017 )


6 PERIODE : MINGGU VI ( 14 S/D 20 JANUARI 2017 )
7 PERIODE : MINGGU VII ( 21 S/D 27 JANUARI 2017 )
8 PERIODE : MINGGU VIII ( 28 S/D 03 FEBRUARI 2017 )

9 PERIODE : MINGGU IX ( 04 S/D 10 FEBRUARI 2017 )


10 PERIODE : MINGGU X ( 11 S/D 17 FEBRUARI 2017 )
11 PERIODE : MINGGU XI ( 18 S/D 24 FEBRUARI 2017 )
12 PERIODE : MINGGU XII ( 25 FEBRUARI S/D 03 MARET 2017 )

13 PERIODE : MINGGU XIII ( 04 S/D 10 MARET 2017 )


14 PERIODE : MINGGU XIV ( 11 S/D 17 MARET 2017 )
15 PERIODE : MINGGU XV ( 18 S/D 24 MARET 2017 )
16 PERIODE : MINGGU XVI ( 25 S/D 31 MARET 2017 )

17 PERIODE : MINGGU XVII ( 01 S/D 07 APRIL 2017 )


18 PERIODE : MINGGU XVIII ( 08 S/D 14 APRIL 2017 )
19 PERIODE : MINGGU XIX ( 15 S/D 21 APRIL 2017 )
20 PERIODE : MINGGU XX ( 22 S/D 28 APRIL 2017 )

21 PERIODE : MINGGU XXI ( 29 APRIL S/D 05 MEI 2017 )


22 PERIODE : MINGGU XXII ( 06 S/D 12 MEI 2017 )
23 PERIODE : MINGGU XXIII ( 13 S/D 19 MEI 2017 )
24 PERIODE : MINGGU XXIV ( 20 S/D 26 MEI 2017 )

25 PERIODE : MINGGU XXV ( 27 MEI S/D 02 JUNI 2017 )


26 PERIODE : MINGGU XXVI ( 03 S/D 09 JUNI 2017 )
27 PERIODE : MINGGU XXVII ( 10 S/D 16 JUNI 2017 )
28 PERIODE : MINGGU XXVIII ( 17 S/D 24 JUNI 2017 )
29 PERIODE : MINGGU XXIX ( 25 JUNI S/D 1 JULI 2017 )

30 PERIODE : MINGGU XXX ( 02 S/D 08 JULI 2017 )


31 PERIODE : MINGGU XXXI ( 09 S/D 15 JULI 2017 )
32 PERIODE : MINGGU XXXII ( 16 S/D 22 JULI 2017 )
33 PERIODE : MINGGU XXXIII ( 23 S/D 29 JULI 2017 )

34 PERIODE : MINGGU XXXIV ( 30 JULI S/D 05 AGUSTUS 2017 )


35 PERIODE : MINGGU XXXV ( 06 S/D 12 AGUSTUS 2017 )
36 PERIODE : MINGGU XXXVI ( 13 S/D 19 AGUSTUS 2017 )
38 PERIODE : MINGGU XXXVII ( 20 S/D 30 AGUSTUS 2017 )

39 PERIODE : MINGGU XXXVIII ( 31 Agustus S/D 05 SEPTEMBER 2017 )