NO. URAIAN PEKERJAAN SAT. VOLUME HARGA JUMLAH JUMLAH VOLUME HARGA JUMLAH JUMLAH
SATUAN HARGA BESAR SATUAN HARGA BESAR
( RP. ) ( RP. ) ( RP. ) ( RP. ) ( RP. ) ( RP. )
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan M² 178.87 13,888.92 2,484,311.34 178.87 13,888.92 2,484,311.34
Pas. Bowplank M1 178.51 72,787.09 12,993,223.47 178.51 72,787.09 12,993,223.47
2 Galian Tanah Sendimen Lama m3 58.24 62,561.50 3,643,581.70 58.24 62,561.50 3,643,581.70
19,121,116.51 - 19,121,116.51
II PEKERJAAN SALURAN -
Type Kanan A = 17,2 m -
a. Pekerjaan Galian Tanah M3 15.65 62,561.50 979,212.58 15.65 62,561.50 979,212.58
b. Pas.Aanstampang Batu Kali M3 6.02 377,646.37 2,273,431.17 6.02 377,646.37 2,273,431.17
c. Pas. Pondasi Batu Kali 1 : 4 M3 15.65 888,626.80 13,908,786.65 15.65 888,626.80 13,908,786.65
d. Pek. Plesteran 1 : 3 M2 24.08 68,521.17 1,649,989.84 24.08 68,521.17 1,649,989.84
e. Pek. Acian Dinding Saluran M2 20.64 29,220.59 603,113.05 20.64 29,220.59 603,113.05
f Pas. Weephole PVC 3" M1 5.33 49,140.51 261,918.92 5.33 49,140.51 261,918.92
19,676,452.22 - 19,676,452.22
( A ) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) Rp 167,941,837 Rp 167,941,837
( B ) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) Rp 16,794,184 Rp 16,794,184
( C ) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) Rp 184,736,020 Rp 184,736,020
(D) DIBULATKAN Rp 184,736,000 Rp 184,736,000
REALISASI MINGGUAN
DEVIASI (+/-)
TIME SCHEDULE
Kontraktor : PT. PADANG KARYA UTAMA
Konsultan Super : CV. FUZIRA CONSULTANT
NO. Kontrak : 78/Kont-SDA/APBD/DPU/2016
Tanggal Kontrak : 15 November 2016
1 2 3 4 5 6 7
11/15/2016 11/21/2016 11/28/2016 12/5/2016 12/12/2016 12/19/2016 12/26/2016
11/20/2016 11/27/2016 12/4/2016 12/11/2016 12/18/2016 12/25/2016 12/29/2016
11.39
#REF!
#REF!
0 #REF!
#REF!
#REF!