KONTROL PELAT TERHADA

1.8
K= 1.3
P= 11.25 t = 11250 VC = 2d [ (b1 + d) + (a1 + d) ] x [ ( (√Fc') x 10 )/ 6 ] =

a1 = 0.2 m
b1 = 0.5 m V= p x 1,8 x K = 37607.14
Fc' = 30 Mpa 0.7

t lt jembatan = 0.2 m
Φ tulangan ulir = 13
d= 0.1685 m
= 16.85 cm

DESAIN LANTAI SETELAH DIUBAH


1,8
K= 1,3
P= 11,25 t = 11250

a1 = 0,2 m
b1 = 0,5 m
Fc' = 30 Mpa

t lt jembatan = 0,23 m
Φ tulangan ulir = 13
d = 0.1985 m
= 19.85 cm
0.2 0.276

0 -0.168 -0.168 -0.16762


0.11 -0.1658 -0.16542
0.2 -0.164 -0.164 -0.16362

1100 0.0035
1168.96 0.003776
1200 0.0039
RHADAP GESER PONDS

( (√Fc') x 10 )/ 6 ] = 31902.01

SYARAT = VC > P . 1,8 . K


0.7

VC = 31902.01 < V= 37607.14


TIDAK OK

GANTI MUTU BETON / TEBAL BETON

VC = 2d [ (b1 + d) + (a1 + d) ] x [ ( (√Fc') x 10 )/ 6 ] = 39756.35

SYARAT =
V= p x 1,8 x K = 37607.14
0,7
VC = 39756.35
OK
0.4

-0.167
-0.1648
-0.163
VC > P . 1,8 . K
0,7

> V= 37607.14
OK
PENENTUAN DIMENSI GIRDER BET

L= 14 m
t. aspal 0.08 m
t. pelat 0.23 m H1 = 1m
b1 = 0.5
a = 1.8125

H 2 = 1005 mm
BJ beton 2.4 = 1.1
BJ aspal 2.2 b2 = 0.55

digunakan dimensi girder


0.9 h = 1.3 m
4.9 h' = 1.07
1.4 b = 0.65 m
1.8
1.3
0.65
RDER BETON BERTULANG
ASPAL 0.319
1.0005
GIRDER 1.6692
qdl 2.9887 Mu lp = mMax = 245.4608 tm 2454.608 kNm
qll 1.63125 Mu tp = mMax = 55.70941 tm 557.0941 kNm
pll 12.43375 Dmax = 59.03011 tm 590.3011 kNm

penulangan

diameter sengkang 8 d = 119.5


diameter longitudinal D 22 d' = 6.9
jarak antar tulangan longitudinal 5
d'/d = 0.0577405858

Mu/bd² = 2644.4359813783

tulangan lapangan bawah


As = 68.7852976987
digunakam tulangan longitudinal D 22 As/tull = 3.8013271108
n = 18.0950746129
digunakam tulangan longitudinal bawah 20
digunakam tulangan longitudinal atas 10

a = 3.488888888888890
OK

10.5 0.085297
123.1

565.5865
penulangan

diameter sengkang 8
diameter longitudinal D 22
jarak antar tulangan longitudinal 5

digunakam tulangan longitudinal D 22

digunakam tulangan longitudinal bawah


digunakam tulangan longitudinal atas

73043.37 VU 843.28725

84.32873
11.28536

S 26.1790552341
ρ= 0.008856 lihat di tabel

ρ min= 0.003415
ρ max= 0.024375

2600 0.0087
2644.436 0.008856
2800 0.0094

> 3.3
OK
d = 123.1
d' = 10.5

d'/d = 0.085297

Mu/bd² = 565.5865 ρ= 0.003415 lihat di tabel

ρ min= 0.003415
ρ max= 0.024375

tulangan lapangan bawah 400 0.0013


As = 27.3222 565.5865 0.00188
As/tull = 3.801327 600 0.002
n = 7.187541
8
4

a = 14.86667 > 3.3


OK

0.502655
pemilihan girder bet
Fc, = K-500 = 500 x 0,83 /10 = 41,5 Mpa ≈ 42 Mpa = 420 kg/cm² = 4200 t/m²
panjang jembatan = 30 m

h > 0,05 x Lo
hf = 0.23 m
h= 1.5 > 1.3 d= 1.73 m
bw = 0.25 m
b= 1.3 m
H= 2m
t web = 0.25 m
hf-1 = 0.23 m
hf-2 = 0.1 m
hf-3 = 0.1 m a= 2
hf-4 = 0.25 m
wa = 1.8 m faktor kejut = 1.4
wb = 0.6 m
Bj aspal = 2.2 t/m
t aspal = 0.08 m
hf3.4' 0.300 m
d= 1.73 m Bj Beton = 2.4 t/m

b lt kerja = 1.3 m
cgc 0.27 t lt kerja = 0.07 m

t lt jembatan = 0.23 m

Fb DL = 1,2 - 1,3 = 1.25 Mult beban=(1/8 . qDL


Fb LL = 1.8
φ= 0.8
der beton prategang
grafik 0.065
p 4200 t/m²

Mukp = 0,06 x p x b x d² = 1062.18


849.7442

pembebanan pada girder


qLL = 0,9[0,5+15/Lo] x a = 1.65

pLL = 4,9 x 1,4 x a = 13.72

qDL = aspal = t x b x Bj = 0.2288


lt kerja = t x b lt kerja x BJ Beton= 0.2184
pot 1 = b x t lt jembatan x BJ Beton = 0.7176
pot 2 = t web x d x BJ Beton = 1.038
pot 3 = wb x hf3.4' x BJ Beton = 0.432
qDL = 3.1084

Mult beban=(1/8 . qDL.L².Fb)+(1/8.qLL.L².Fb)+(1/4.pLL.L.Fb) = 956.4638

Mukp φ > Mult beban


849.7442 > 956.4638 (ok)
ac 8925
a 150
t girder awal tengah t girder akhir tengah
h 177
h web 147
t web 25
wb 60
h wb 30

pot Agc Y Agc.Y Ip Io


1 3675 103.5 380362.5 6617756 3111148
2 1800 15 27000 135000 6351927
∑ 5475 407362.5 6752756 9463075

Yb = 74
ya = 103
Ix = 16215831
Ka = 40
Kb = 29
Wa = 158055
Wb = 217943
t girder akhir tengah t awal ujung t girder akhir ujung
h 200 ka 29.5 h
t 23 kb 29.5 t
b 130 27726165 b
h web 147 wb
t web 25 h wb
wb 60
h wb 30
pot
1
pot Agc Y Agc.Y Ip Io 2
1 3675 103.5 380362.5 6617756 461400.5299 ∑
2 1800 15 27000 135000 17893942.86
3 2990 188.5 563615 131809.17 16282666 Yb =
∑ 8465 970977.5 6884565 34638009.39 ya =
Ix =
Yb = 114.704961607 Ka =
ya = 85.2950383934 Kb =
Ix = 41522574.8083 Wa =
Ka = 42.763683822 Wb =
Kb = 57.5086992556
Wa = 486811.139199
Wb = 361994.583553
rder akhir ujung
200
23
130
60
177

Agc Y Agc.Y Ip Io
10620 88.5 939870 27726165 5125670.0108
2990 188.5 563615 131809.167 18205557.028
13610 1503485 27857974.2 23331227.039

110.469140338
89.530859662
51189201.2056
34.0470315338
42.0094961536
571749.242651
463380.099175
45 mpa 450 kg/cm² 4500 t/m²
pajang jembatan 30 m^2
agc awal tengah 0.8925 m^2 qdl 2.142
8925 cm^2 Mmax qdl 240.975 24097500
wa 158055.4 cm^3
wb 217942.7 cm^3

bj beton 2.4 t/m^3

yb 74 cm
cgs 27 cm
e 47

pi 811.1702 ton 811170.2 kg


8111.702 Kn

diameter tendon 12.7


luasan tendon 94.3 0.943
fu tendon 1750 175000
0.85

pi per tendon 140271.3


jumlah tendon 5.782869
n tendon per selongsong 1.927623 23

type angkur 27k13 b atas ang 315

pi/selongsong 8111.702 2703.901

max force 4595


stroke 250
max pressure 600

check stroke 147.111 mm


check tekanan kompr 353.0665 bar
-152.462 -90.8874 241.2129 -270 <
ok

110.5681 -90.8874 -174.931


check ke ka kb ujung akhir
-2.13687 < 5.303301
ok

-155.251 > -270


ok
loss prediksi 12% pe 1 713829.776 kg
pi 811170.2 kg mpe 1 33549999.472 kgcm

fc' 45 Mpa 450 kg/cm^2


panjang jembatan 30 m
t.pelat lantai 0.23 m qdl girder 2.142 t/m
t. lantai kerja 0.07 m
b 1.25 m 1.5
bj beton 2.4 t/m^3 qlt pelat lantai 0.828
tweb 0.25 m beban kerja 0.1
lantai kerja 0.21
kondisi tengah awal total qlt 1.138
ac girder 8925 0.8925
mlt 128.025 tm
wa 158.0554 158055.4
wb 217.9427 217942.7

cgc 74
cgs 27
e 47

loss of prestress loss prediksi 12 % ok

pi 811170.2
luasan tendon 0.943
n tendon 69 n selongsong 3
t 28 hari
0.85
panjang jembatan 30 m
0.15 per 100 meter

x 1500
cgs 27
α 4.688111155 cgc 27 n tendon/selongs
ß 85.311888845 e 0 cm
r 18352.731022 y 0 123
L 3003.35
μ 0,18 ~ 0,3 0.2
e̽ 2.7183
713.8298 ton
3355 Knm 335.5 tm

240.975 tm 24097500

t/m
t/m
t/m
t/m

12802500 kgcm

-152.462 -79.9809 212.2674 -81.0001

110.5681 -79.9809 -153.94 58.74251

11.79229 %

cek kuat tendon


Po 954317.9 kg
fpu 175000 kg

σpo 14666.7 ok fpy 148750

maka tambah luasan tendon


Ap 6.415582 Ap 94.3 0.943
n tendon revisi 6.803375
n tendon/selongsong 2.267792 23 69

revisi σpo 14666.7 ok fpy 148750

cek gesekan pd tendon


Po 954317.9
k 0.045
α 0.081817 rad
px 897517.9

kehilangan tegangan 56800.02

%loss 5.951897 %

susut beton
σpi 11756.09 kg/cm^2
Ec 31528.56 Mpa 315285.6 kg/cm^2

loss 0.001354 426.8919


%loss 3.631241 %

slip angkur
σpi 11756.09
Es 1950000 kg/cm^2
Δ 0,3 ~ 0,5 0.4 cm
%loss 2.209153 %
-101.176 > -202.5
ok

-64.6099 > -202.5


ok
panjang jembatan 30 pe 1 713829.78
loss prediksi 11%
pi 811170.2 kg pe 635308.5
fc' 45 mpa 450 kg/cm^2
panjang jembatan Mpe 55719708
t.pelat lantai 0.23
t. lantai kerja 0.07
b 1.5
bj beton 2.4
tweb 0.25
t. aspal 0.05
bj aspal 2.2

kondisi tengah akhir


ac girder 8925 0.8925 m^2 LT KERJA 0.21
qdl = girder = 2.142 t/m
wa 486811.1 486.8111 m^3 aspal = 0.165 t/m
wb 361994.6 361.9946 m^3 2.517 t/m

cgc 114.705 1.14705 m


cgs 27 0.27 m
e 87.70496 0.87705 m qll dr qll 1.35
dr pll 10.29

L>30 0.9
4.9
1.4
1.8
kg 7138.298 kN 713.8298 t

kg 6353.085 kN 635.3085 t

kgcm 5571.971 kNm 557.1971 tm

mdl = 283.1625 tm 2831.625 kNm 28316250 kgcm

mll = 229.05 tm 2290.5 kNm 22905000 kgcm

-58.1668 -71.183 114.4586 -47.0511

78.22286 -71.183 -153.924 63.27443


-61.9424 ok -202.5

-83.6099 ok -202.5
loss of presstress 11 %
§ Rangkak Beton
Es 1950000 kg/cm^2
Ec 315285.58 kg/cm^2

Øcc 1.31
Pi 811170.2 kg
Ap 65.067 cm^2
fc 45 Mpa 500 kg/cm^2
fp 10996.583 kg/cm^2

σjumlah 83.60989
αe 6.1848689

lo 677.42223

%Loss 6.1602976 % ok 13 %

§ Relaksasi Tendon
prediksi awal 10 %
pe 635308.50064 kg
Ap 65.067 cm^2
fp 175000 kg

fp 9763.9126

umur 50 tahun
fp 10500
K4 7.5504143

fp/fp’ 0.9298964

K5 1.7
suhu lok 32
K6 1.6

Rb 2 %
Rt 0.4107425
fp 10996.583

susut beton 426.89195


Ϫ 1104.3141766244
%L 4.124816 % ok 13 %

komulatif %Loss rangkak dan relaksasi = 10.285114 % ok 11 %


2.1 1.8
200 400 250 2.025
kondisi ujung akhir L 30
Pe = pu 635308.50064 kg yb = 110.4691 ya = 89.53086
α 4.687 cgc 27
Ac 13610 1.361 e= 83.46914
bj beton 2.4 y= 166.9383
qdl 3.2664 t/m x= 1500

Pv 51912.5675078 q 0.9
Ph 633183.998787 pLL 4.9
R 69.846 ton bw 1.5
fc' 45 450 450000 ton/m^2
bw 0.7 m
d 2m

Vc 51982.4135078 tidak perlu penahan geser Vc’ 52016350.830002

Vc < Vc’ ............(Tidak perlu Tulangan Geser)


11. Tulangan end Zone
pi 811170.2 kg
pi/angkur 270390.1 kg
dimensi angkur 315 mm 31.5 cm
luasan angkur 992.25 cm^2
fc' 45 Mpa
tegangan izin beton saat transfer (fcc) 27 Mpa 270 kg/cm^2
tegangan izin d form 2400

f= 272.501957 perlu tulangan end zone fcc 270 kg/cm^2

gaya tekan pada tulangan end zone 2482.5667 kg


digunakan tulangan D22 as/tull = 3.8013271

p tulangan end zone 9123.185 kg


n tulangan end zone 0.272116 ~ digunakan 8 tulangan
ok
saat tengah akhir
Ac 8465 0.8465 m^2 L 30 m 3000
b 1.5
Ec 315285.5848 kg/cm^2
Ix 41522574.81 cm^4 0.415226 m^4
pe 635308.5006 kg
e 87.70496161 cm 0.87705 m
qdl 2.0316 t/m 20.316 kg/cm
A 55719707657 kgcm
A' 900 cm
p 4.9
pll 7.35 ton 7350 kg
kontrol lendutan
chamber -2.193848912 ok -13.75

lendutan akibat beban hidup -1.87804 ok -3.75


cm
lantai jembatan
t lt jembatan = 0.23 m qDL = aspal = t aspal x 1 (per
Φ tulangan ulir = 13 beton lt jembatan = t lt jembatan x 1 (per m
d= 0.1975 m
= 19.75 cm

Bj aspal = 2.2 t/m TLL = 11,25 ton x faktor kejut =


t aspal = 0.08 m
Bj Beton = 2.4 t/m MT = (koef. MT x qDL x b² faktor kejut)+(
t lt jembatan = 0.23 m
b 1.8125 m ML = (koef. ML x qDL x b² faktor kejut)+(
faktor kejut (cor ditempat) = 1.3
Fb = 1.8
penulangan
dari tabel koef. MT = 1/10
koef. ML = 1/14 Mult = 1608.7589 ρ
b(permeter)*d²
ρ min = 0.0025 tabel 7
ρ max = 0.0484 tabel 8

tulangan = ρ x b (per meter) x h (dalam cm)=

digunakan diameter tulangan ulir Φ 13

jumlah tulangan (n) = as =


as/tul

fkp = 100 = 14.196726


n

tulangan bagi = 25% dari as tulangan=


digunakan diameter tulangan Φ 10

jumlah tulangan (n) = as =


as/tul

fkp = 100 = 33.601718


n
atan
t aspal x 1 (per meter) x BJ Aspal = 0.176
t lt jembatan x 1 (per meter) x BJ Beton = 0.552
qDL = 0.728 t/m²

14.625 t

T x qDL x b² faktor kejut)+(1/8 x TLL x L x Fb) = 6.28 tm = 62.75165 KNm


dianggap hampir sama MT ≈ ML maka Mult = MT
L x qDL x b² faktor kejut)+(1/8 x TLL x L x Fb) = 6.19 tm = 61.86334 KNm

0.004065 ρ min > ρ < ρ max


MU ρ . φ . Fy . ( 1 - 0,588
dari interpolasi tabel b . d^2

Mu 62.75165
meter) x h (dalam cm)= 9.3495 b 1.8125
d 0.1975
0.004065
mm => as/tulangan (luar lingkaran tulangan= 1.327323 cm 0.8
Fy 2400
7.0438776 ≈ 8 tulangan Fc' 50

digunakan tulangan Φ13-150mm

2.337375 cm²
as/tulangan
mm => (luar lingkaran tulangan= 0.785398 cm

2.9760383 ≈ 3 tulangan

digunakan tulangan Φ10-300mm


ρ . φ . Fy . ( 1 - 0,588 ρ Fy/Fc′ ) . 10 ᵌ

887.5911 -887.644
ok

Mpa
Mpa
pelat lantai kerja
fc' 30 Mpa
baja polos fy = 240 Mpa

tweb 0.2
BJ Beton = 1.8125 m
t lt jembatan = 0.23 m
t lt kerja = 0.07 m qDL = t lt kerja x 1 (per meter) x BJ beton =
BJ Beton = 2.4 t/m qLL = t lt jembatan x 1 (per meter) x BJ Beton =
L lantai kerja = 1.6125 m qLL pekerja = 0,1 ton x 1 (per meter) =

Φ tul = 0.01 m
d= 0.045 m Mult beban=(1/8 . qDL.L².Fb)+(1/8.qLL.L².Fb)+(1/4.pLL.L.F

Fb cor ditempat 1.2 penulangan


Fb = 1.8
Mult = 2207.244 ρ
b(per meter)*d²

ρ min = 0.0025 tabel 7 tulangan = ρ x b (per meter) x h (dalam cm)=


ρ max = 0.0484 tabel 8

digunakan diameter tulangan Φ 10

jumlah tulangan (n) = as =


as/tul

fkp = 100 = 16.6666667


n

tulangan bagi = 25% dari as tulangan=

digunakan diameter tulangan Φ 6

jumlah tulangan (n) = as =


as/tul

fkp = 100 = 25
n
erja
eter) x BJ beton = 0.168
er) x BJ Beton = 0.552
per meter) = 0.1

1/8.qLL.L².Fb)+(1/4.pLL.L.Fb) = 0.446967 tm = 4.469669 KNm

0.0064 ρ min > ρ < ρ max


MU ρ . φ . Fy . ( 1 - 0,588 ρ Fy/Fc
dari interpolasi tabel b . d^2

Mu 4.46966859
meter) x h (dalam cm)= 4.48 b 1
d 0.045
0.0064
mm => as/tulangan (luar lingkaran tulangan= 0.785398163 cm 0.8
Fy 2400 Mpa
5.704113 ≈ 6 tulangan Fc' 50 Mpa

digunakan tulangan Φ10-150mm

1.12 cm²

as/tulangan
mm => (luar lingkaran tulangan= 0.282743339 cm

3.96119 ≈ 4 tulangan
digunakan tulangan Φ10-200mm
. ( 1 - 0,588 ρ Fy/Fc′ ) . 10 ᵌ

2207.244 -2207.34
ok
analisa pilar (kolo
DIAMETER PILAR 1 200
tinggi pilar 6M

L1 = 12.5
L2 = 12.5

L PENGARUH = 12.5

T.GIRDER 2.3 M
L.girder 0.7 M
JUMLAH GIRDER 5M
T. PELAT LANTAI 0.23 M DL = 375.9412
T. TROROAR 0.25 M
L. PILE HEAD 2.1 M LL = 113.05
T. PILE HEAD 1M
T. ASPAL 0.05 M EL = 37.59412
BJ Beton 2.4
BJ aspal 2.2 Nu = 692.2136

L.lajur 3.5 M L. JALAN 7 Mu = -293.234


JUMLAH LAJUR 2 L.TROTOAR 2
L.trotoar 1M L. MELINTANG 9
jumlah trotoar 2

0.9
4.9
EL (EARTH LOAD) 0.1

1.3
1.8
2.2

Fc' 30
0.8
β 1.2

ρ diusahakan mendekati 1 %
yang ini haus liat tabel dari tabel

DIAMETER SENGKANG = 10
(kolom)

A = 0.785398163 M
KELILING = 3.141592654 M
r DIRASI = 0.25 M
Klu = 13.2 M
Klu/r = 52.8 M
Cm = 0.430552794

Ix = 4908738.521

BETON Fc' = 25742.9602 MPa = 257429.6 Kg/cm²

Pc = 7157811.663 Kg = 7157.812 TON

=δb 0.489756679

Mc/Pu = 0.423618016 M = 42.3618 Cm = 423.618 mm

et = 45

vertikal 1 0.531736753 data untuk lihat

grafik
data untuk lihat

vertikal 2 0.406622223

mendatar 0.211809008 grafik

kan mendekati 1 % ρ=rxβ 0.0144


dari tabel r = 0.012

A tot = ρ x Abr 113.0973355

penulangan

32 mm as/tul = 8.042477193 a

n = 14.0625 = 25

d = 6.6 dirubah yee

MM D = 86.8

a = 8.028760097 > 4.8

ok
analisa pilar (kolom
DIAMETER PILAR 1.125
tinggi pilar 6M

L1 = 15
L2 = 15

L PENGARUH = 15

T.GIRDER 1.18 M
L.girder 0.7 M
JUMLAH GIRDER 5M
T. PELAT LANTAI 0.22 M DL = 318.8749
T. TROROAR 0.25 M
L. PILE HEAD 1.2 M LL = 128.8
T. PILE HEAD 2.4 M
T. ASPAL 0.05 M EL = 31.88749
BJ Beton 2.4
BJ aspal 2.2 Nu = 646.3774

L.lajur 3.5 M L. JALAN 7 Mu = -248.722


JUMLAH LAJUR 2 L.TROTOAR 2
L.trotoar 1M L. MELINTANG 9
jumlah trotoar 2

0.9
4.9
EL (EARTH LOAD) 0.1

1.3
1.8
2.2
Fc' 30
0.8
β 1.2

ρ diusahakan mendekati 1 %
yang ini haus liat tabel dari tabel

DIAMETER SENGKANG = 10
(kolom)

A = 0.883572934 M
KELILING = 3.534291735 M
r DIRASI = 0.25 M
Klu = 13.2 M
Klu/r = 52.8 M
Cm = 0.446082215

Ix = 7862849.96

BETON Fc' = 25742.9602 MPa = 257429.6 Kg/cm²

Pc = 11465430.25 Kg = 11465.43 TON

=δb 0.479900957

Mc/Pu = 0.384794464 M = 38.47945 Cm = 384.7945 mm

et = 48.75
vertikal 1 0.441357222 data untuk lihat

vertikal 2 0.337508464

mendatar 0.171019762 grafik

kan mendekati 1 % ρ=rxβ 0.0348


dari tabel r = 0.029

A tot = ρ x Abr 307.483381

penulangan

32 mm as/tul = 8.042477193 a

n = 38.23242188 = 39

d = 6.6 dirubah yee

MM D = 99.3

a = 4.925267118 > 4.8

ok