1.8
K= 1.3
P= 11.25 t = 11250 VC = 2d [ (b1 + d) + (a1 + d) ] x [ ( (√Fc') x 10 )/ 6 ] =
a1 = 0.2 m
b1 = 0.5 m V= p x 1,8 x K = 37607.14
Fc' = 30 Mpa 0.7
t lt jembatan = 0.2 m
Φ tulangan ulir = 13
d= 0.1685 m
= 16.85 cm
a1 = 0,2 m
b1 = 0,5 m
Fc' = 30 Mpa
t lt jembatan = 0,23 m
Φ tulangan ulir = 13
d = 0.1985 m
= 19.85 cm
0.2 0.276
1100 0.0035
1168.96 0.003776
1200 0.0039
RHADAP GESER PONDS
( (√Fc') x 10 )/ 6 ] = 31902.01
SYARAT =
V= p x 1,8 x K = 37607.14
0,7
VC = 39756.35
OK
0.4
-0.167
-0.1648
-0.163
VC > P . 1,8 . K
0,7
> V= 37607.14
OK
PENENTUAN DIMENSI GIRDER BET
L= 14 m
t. aspal 0.08 m
t. pelat 0.23 m H1 = 1m
b1 = 0.5
a = 1.8125
H 2 = 1005 mm
BJ beton 2.4 = 1.1
BJ aspal 2.2 b2 = 0.55
penulangan
Mu/bd² = 2644.4359813783
a = 3.488888888888890
OK
10.5 0.085297
123.1
565.5865
penulangan
diameter sengkang 8
diameter longitudinal D 22
jarak antar tulangan longitudinal 5
73043.37 VU 843.28725
84.32873
11.28536
S 26.1790552341
ρ= 0.008856 lihat di tabel
ρ min= 0.003415
ρ max= 0.024375
2600 0.0087
2644.436 0.008856
2800 0.0094
> 3.3
OK
d = 123.1
d' = 10.5
d'/d = 0.085297
ρ min= 0.003415
ρ max= 0.024375
0.502655
pemilihan girder bet
Fc, = K-500 = 500 x 0,83 /10 = 41,5 Mpa ≈ 42 Mpa = 420 kg/cm² = 4200 t/m²
panjang jembatan = 30 m
h > 0,05 x Lo
hf = 0.23 m
h= 1.5 > 1.3 d= 1.73 m
bw = 0.25 m
b= 1.3 m
H= 2m
t web = 0.25 m
hf-1 = 0.23 m
hf-2 = 0.1 m
hf-3 = 0.1 m a= 2
hf-4 = 0.25 m
wa = 1.8 m faktor kejut = 1.4
wb = 0.6 m
Bj aspal = 2.2 t/m
t aspal = 0.08 m
hf3.4' 0.300 m
d= 1.73 m Bj Beton = 2.4 t/m
b lt kerja = 1.3 m
cgc 0.27 t lt kerja = 0.07 m
t lt jembatan = 0.23 m
Yb = 74
ya = 103
Ix = 16215831
Ka = 40
Kb = 29
Wa = 158055
Wb = 217943
t girder akhir tengah t awal ujung t girder akhir ujung
h 200 ka 29.5 h
t 23 kb 29.5 t
b 130 27726165 b
h web 147 wb
t web 25 h wb
wb 60
h wb 30
pot
1
pot Agc Y Agc.Y Ip Io 2
1 3675 103.5 380362.5 6617756 461400.5299 ∑
2 1800 15 27000 135000 17893942.86
3 2990 188.5 563615 131809.17 16282666 Yb =
∑ 8465 970977.5 6884565 34638009.39 ya =
Ix =
Yb = 114.704961607 Ka =
ya = 85.2950383934 Kb =
Ix = 41522574.8083 Wa =
Ka = 42.763683822 Wb =
Kb = 57.5086992556
Wa = 486811.139199
Wb = 361994.583553
rder akhir ujung
200
23
130
60
177
Agc Y Agc.Y Ip Io
10620 88.5 939870 27726165 5125670.0108
2990 188.5 563615 131809.167 18205557.028
13610 1503485 27857974.2 23331227.039
110.469140338
89.530859662
51189201.2056
34.0470315338
42.0094961536
571749.242651
463380.099175
45 mpa 450 kg/cm² 4500 t/m²
pajang jembatan 30 m^2
agc awal tengah 0.8925 m^2 qdl 2.142
8925 cm^2 Mmax qdl 240.975 24097500
wa 158055.4 cm^3
wb 217942.7 cm^3
yb 74 cm
cgs 27 cm
e 47
cgc 74
cgs 27
e 47
pi 811170.2
luasan tendon 0.943
n tendon 69 n selongsong 3
t 28 hari
0.85
panjang jembatan 30 m
0.15 per 100 meter
x 1500
cgs 27
α 4.688111155 cgc 27 n tendon/selongs
ß 85.311888845 e 0 cm
r 18352.731022 y 0 123
L 3003.35
μ 0,18 ~ 0,3 0.2
e̽ 2.7183
713.8298 ton
3355 Knm 335.5 tm
240.975 tm 24097500
t/m
t/m
t/m
t/m
12802500 kgcm
11.79229 %
%loss 5.951897 %
susut beton
σpi 11756.09 kg/cm^2
Ec 31528.56 Mpa 315285.6 kg/cm^2
slip angkur
σpi 11756.09
Es 1950000 kg/cm^2
Δ 0,3 ~ 0,5 0.4 cm
%loss 2.209153 %
-101.176 > -202.5
ok
L>30 0.9
4.9
1.4
1.8
kg 7138.298 kN 713.8298 t
kg 6353.085 kN 635.3085 t
-83.6099 ok -202.5
loss of presstress 11 %
§ Rangkak Beton
Es 1950000 kg/cm^2
Ec 315285.58 kg/cm^2
Øcc 1.31
Pi 811170.2 kg
Ap 65.067 cm^2
fc 45 Mpa 500 kg/cm^2
fp 10996.583 kg/cm^2
σjumlah 83.60989
αe 6.1848689
lo 677.42223
%Loss 6.1602976 % ok 13 %
§ Relaksasi Tendon
prediksi awal 10 %
pe 635308.50064 kg
Ap 65.067 cm^2
fp 175000 kg
fp 9763.9126
umur 50 tahun
fp 10500
K4 7.5504143
fp/fp’ 0.9298964
K5 1.7
suhu lok 32
K6 1.6
Rb 2 %
Rt 0.4107425
fp 10996.583
Pv 51912.5675078 q 0.9
Ph 633183.998787 pLL 4.9
R 69.846 ton bw 1.5
fc' 45 450 450000 ton/m^2
bw 0.7 m
d 2m
14.625 t
Mu 62.75165
meter) x h (dalam cm)= 9.3495 b 1.8125
d 0.1975
0.004065
mm => as/tulangan (luar lingkaran tulangan= 1.327323 cm 0.8
Fy 2400
7.0438776 ≈ 8 tulangan Fc' 50
2.337375 cm²
as/tulangan
mm => (luar lingkaran tulangan= 0.785398 cm
2.9760383 ≈ 3 tulangan
887.5911 -887.644
ok
Mpa
Mpa
pelat lantai kerja
fc' 30 Mpa
baja polos fy = 240 Mpa
tweb 0.2
BJ Beton = 1.8125 m
t lt jembatan = 0.23 m
t lt kerja = 0.07 m qDL = t lt kerja x 1 (per meter) x BJ beton =
BJ Beton = 2.4 t/m qLL = t lt jembatan x 1 (per meter) x BJ Beton =
L lantai kerja = 1.6125 m qLL pekerja = 0,1 ton x 1 (per meter) =
Φ tul = 0.01 m
d= 0.045 m Mult beban=(1/8 . qDL.L².Fb)+(1/8.qLL.L².Fb)+(1/4.pLL.L.F
fkp = 100 = 25
n
erja
eter) x BJ beton = 0.168
er) x BJ Beton = 0.552
per meter) = 0.1
Mu 4.46966859
meter) x h (dalam cm)= 4.48 b 1
d 0.045
0.0064
mm => as/tulangan (luar lingkaran tulangan= 0.785398163 cm 0.8
Fy 2400 Mpa
5.704113 ≈ 6 tulangan Fc' 50 Mpa
1.12 cm²
as/tulangan
mm => (luar lingkaran tulangan= 0.282743339 cm
3.96119 ≈ 4 tulangan
digunakan tulangan Φ10-200mm
. ( 1 - 0,588 ρ Fy/Fc′ ) . 10 ᵌ
2207.244 -2207.34
ok
analisa pilar (kolo
DIAMETER PILAR 1 200
tinggi pilar 6M
L1 = 12.5
L2 = 12.5
L PENGARUH = 12.5
T.GIRDER 2.3 M
L.girder 0.7 M
JUMLAH GIRDER 5M
T. PELAT LANTAI 0.23 M DL = 375.9412
T. TROROAR 0.25 M
L. PILE HEAD 2.1 M LL = 113.05
T. PILE HEAD 1M
T. ASPAL 0.05 M EL = 37.59412
BJ Beton 2.4
BJ aspal 2.2 Nu = 692.2136
0.9
4.9
EL (EARTH LOAD) 0.1
1.3
1.8
2.2
Fc' 30
0.8
β 1.2
ρ diusahakan mendekati 1 %
yang ini haus liat tabel dari tabel
DIAMETER SENGKANG = 10
(kolom)
A = 0.785398163 M
KELILING = 3.141592654 M
r DIRASI = 0.25 M
Klu = 13.2 M
Klu/r = 52.8 M
Cm = 0.430552794
Ix = 4908738.521
=δb 0.489756679
et = 45
grafik
data untuk lihat
vertikal 2 0.406622223
penulangan
32 mm as/tul = 8.042477193 a
n = 14.0625 = 25
MM D = 86.8
ok
analisa pilar (kolom
DIAMETER PILAR 1.125
tinggi pilar 6M
L1 = 15
L2 = 15
L PENGARUH = 15
T.GIRDER 1.18 M
L.girder 0.7 M
JUMLAH GIRDER 5M
T. PELAT LANTAI 0.22 M DL = 318.8749
T. TROROAR 0.25 M
L. PILE HEAD 1.2 M LL = 128.8
T. PILE HEAD 2.4 M
T. ASPAL 0.05 M EL = 31.88749
BJ Beton 2.4
BJ aspal 2.2 Nu = 646.3774
0.9
4.9
EL (EARTH LOAD) 0.1
1.3
1.8
2.2
Fc' 30
0.8
β 1.2
ρ diusahakan mendekati 1 %
yang ini haus liat tabel dari tabel
DIAMETER SENGKANG = 10
(kolom)
A = 0.883572934 M
KELILING = 3.534291735 M
r DIRASI = 0.25 M
Klu = 13.2 M
Klu/r = 52.8 M
Cm = 0.446082215
Ix = 7862849.96
=δb 0.479900957
et = 48.75
vertikal 1 0.441357222 data untuk lihat
vertikal 2 0.337508464
penulangan
32 mm as/tul = 8.042477193 a
n = 38.23242188 = 39
MM D = 99.3
ok