3885.17658 m²
1.2 Pemagaran Lokasi
1 Panjang = Keliling Lokasi Pembangunan
= 68064 + 59760 + 68698 + 53992
= 250514 mm
= 250.514 m
250.514 m
1.3 Pemasangan Bouwplank
a 1 a = 52 m
b = 22 m
Panjang = Jumlah x (4 x a) + (10 x b)
2
1 2 3 4 5 6 7 8 9 10
B
1 KORIDOR
20000
4000
FL ±0.00
D
5000 6000 6000 6000 4000 6000 6000 6000 5000
50000
1
2
2
1 2 3 4 5 6 7 8 9 10
RUANG KOPERASI
RUANG RUANG RUANG RUANG
TATA SEKOLAH PANTRY
8000
UKS OSIS ROHIS ROKRIS
FL ±0.00 USAHA FL ±0.00 FL ±0.00 FL ±0.00 FL ±0.00
FL ±0.00
FL ±0.00
TOILET PRIA TOILET
F L -0 .05 WANITA
FL - 0.05
B
1
= 428 m
KORIDOR
20000
4000
FL ±0.00
8000
STAFF WAKIL STAFF WAKIL
MPK BK
428 m
BAGIAN BAGIAN BAGIAN B AGIAN KEPALA
FL ±0.00 KURIKULUM KURIKULUM KESIS WAAN KES ISWAAN SEKOLAH FL ±0.00 FL ±0.00
FL ±0. 00 FL ± 0.00 FL ±0.00 FL ±0.00
FL ±0.00
D
5000 6000 6000 6000 4000 6000 6000 6000 5000
50000
1
a 1 a = 2.4 m
b = 1.75 m
Papan b Luas = Jumlah x a x b
Nama = 4.2 m²
Proyek 4.2 m²
1.5 Pembuatan Direksi Keet
a 1 a = 10 m
b = 5m
b Luas = Jumlah x a x b
Direksi Keet = 50 m²
50 m²
1.6 Pembuatan Gudang
a 1 a = 7m
b = 5m
b Luas = Jumlah x a x b
Gudang
= 35 m²
35 m²
1.7 Pembuatan Bedeng
a 1 a = 7m
b = 5m
b Luas = Jumlah x a x b
Bedeng = 35 m²
35 m²
1.8 Pembuatan Pos Pengamanan
a 2 a = 2m
b = 2m
Luas = Jumlah x a x b
Pos
Pos b = 8 m²
8 m²
1.9 Pembuatan Mushola
a 1 a = 3m
b = 2.5 m
Mushola b Luas = Jumlah x a x b
= 7.5 m²
7.5 m²
1.10 Pembuatan MCK
a 2 a = 1.5 m
b = 1.5 m
MCK b Luas = Jumlah x a x b
= 4.5 m²
4.5 m²
1.11 Pembuatan Los Kerja
a 1 a = 4m
Los b = 6m
Kerja b Luas = Jumlah x a x b
= 24 m²
24 m²
1.12 Pembuatan Area Parkir
a 1 a = 10 m
Area Parkir b = 6m
b Luas = Jumlah x a x b
= 60 m²
60 m²
1.13 Pengadaan Air Kerja
1 1 Ls
1.14 Pengadaan Listrik Kerja
1 1 Ls
1.15 Mobilisasi dan Demobilisasi
1 1 Ls
1.16 Dokumentasi dan Laporan Berkala
1 1 Ls
2 Pekerjaan Struktur
2.1 Pekerjaan Struktur Bawah
2.1.1 Pekerjaan Tanah
2.1.1.1 Galian Tanah
2564
Galian Pondasi3326
Tipe 1 (Pondasi P1, P2, P3) 36 P dasar = 2786 mm
478
478
Lb dasar = 2024 mm
650
L1 (dasar) = Panjang x Lebar 5
650
5
1
1
700
750
12D19
700
5.639 m²
750
=
263
D=254mm
= 8527864 mm²
Lean Concrete t = 4 cm
478
D =254 mm
= 8.528 m²
1/3 𝑡(𝐿1+√(𝐿1.𝐿2)+L
L = 9.4 m
L = 9.4 m
t = 1400 mm
650
5
5
1
12D19
=
PONDASI P1, P2, P3
1.4 m
263 1
1 PONDASI P1, P2, P3 B'
Volume Skala 1 : 40=
700
750
B' 2
750
1 Skala 1 : 40
D19-70
2024
= 9.847 m³
Urugan Pasir t = 1 cm
t = 1 cm
Lean Concrete t = 4 cm Total = Jumlah x Volume
ete t = 4 cm = 354.501 m³
D =254 mm
2571
Lb dasar = 2111 mm
1 PONDASI P1, P2, P3
B'
650
2 Skala 1 : 40
1 263
12D19
500
550
D19-100
2111 Urugan Pasir t = 1 cm
2571
480
L1 (dasar) = Panjang x Lebar
650
1
= 4456321 mm²
263
12D19
500
550
= 4.456 m²
D19-100
2111 Urugan Pasir t = 1 cm P atas = 2571 mm
Lean Concrete t = 4 cm
D =254 mm
Lb atas = 2571 mm
L2 (atas) = Panjang x Lebar
L = 9.4 m
= 6610041 mm²
1/3 𝑡(𝐿1+√(𝐿1.𝐿2)+L
= 6.610 m²
t = 1200 mm
= 1.2 m
2 PONDASI P4
B'
1 Skala 1 : 40 Volume =
= 6.597 m³
2 1
P4
TB4
P3
TB2
P3
TB2
P3
TB2 TB3
P2 P2
TB2
P3
TB2
P3
TB2
P3
TB4
P4
Total = Jumlah x Volume
= 26.390 m³
TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
8000
P2 P1 P1 P1 P2 P2 P1 P1 P1 P2
TB4 TB2 TB2 TB2 TB3 TB2 TB2 TB2 TB4
4000
P2 P1 P1 P1 P2 P2 P1 P1 P1 P2
TB4 TB2 TB2 TB2 TB3 TB2 TB2 TB2 TB4
TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
8000
P4 P3 P3 P3 P2 P2 P3 P3 P3 P4
TB4 TB2 TB2 TB2 TB3 TB2 TB2 TB2 TB4
5000 6000 6000 6000 4000 6000 6000 6000 5000
50000
d
c
f
e
b = 550 mm
d c = 650 mm
d = 2286 mm
e = 1524 mm
f = 750 mm
Volume =( a x b x c ) + ( d x e x f )
= 2809523000 mm³
= 2.810 m³
Total Isi = Jumlah x Volume
a b = 101.143 m³
c Vol. Urug = Total Galian Tipe 1 - Total Isi Tipe 1
f = 253.358 m³
272.007 m³
2.1.2 Pekerjaan Pondasi Mini Pile
2.1.2.1 Pengadaan Mini2286Pile Uk. 254 x 254 mm
Panjang Pasaran 12m
2238
480
Tipe 1 (Pondasi P1, P2, P3) 36 Jumlah = Banyak Pile
650
2064 2064
2826 2826 1 263
6D19
500
= 6 buah
1
1778
478
478
478
478
D19-100
650
650
5 L = 9.4 m
650
650
5
= 216 buah
5 1778
1 1
D19-70
1
D19-70
D19-70
1
D19-70
1 1 6D19 6D19
1524
1524
263 263
700
700
750
1
750
700
700
750
750
D19-150 D19-150
6D19 6D19
263 263 1 1
1778
1778
D19-70 D19-70 D19-150 D19-150
D19-70 D19-70
2286 2286 D1
Lean Concrete t = 4 cm
4 Jumlah Urugan Pasir t = 1 cm
Lean Concrete t = 4 cm
= Banyak
B'
1 Pile
PONDASI P1, P2, P3
1.1
B'
1
1.1
PONDASI P1, P2, P3
Skala 1 : 40
Skala 1 : 40
D=254mm
Lean Concrete t = 4 cm
D=254mm
Lean Concrete t = 4 cm = 4 buah 1778 1778
2 PONDASI P4 2 PONDASI P4
Total = Jumlah x Banyak Pile
D =254 mm
D =254 mm
B' B'
Skala 1 : 40 Skala 1 : 40
L = 9.4 m
L = 9.4 m L = 9.4 m
L = 9.4 m
= 16 buah
1 PONDASI P1, P2, P3 B'
1 PONDASI P1, P2, P3 B'
1 PONDASI P1, P2, P3 B'
1 PONDASI P1, P2, P3
2 Skala 1 : 40
232 buah
B' 1 Skala 1 : 40 2 Skala 1 : 40
1 Skala 1 : 40
2.1.2.1 Pemancangan Mini Pile Uk. 254 x 254 mm
232 Panjang = Panjang 1 Buah Pile
2 = 9.4 m
1
Total = Jumlah x Panjang
= 2180.8 m
1524
1 263
1
95
331
331
95
1778
D19-100
D =254 mm
L = 9.4 m
= 6 titik
1778
Total = Jumlah x Banyak Pile
= 216 titik
1524
2286
232 titik
2.1.3.2 Urugan Pasir
Tipe 1 (Pondasi P1, P2, P3) 36 Luas Pile Cap = 2286 x 2286
= 5225796 mm²
Luas 1 Pile = 254 x 254
= 64516 mm²
Banyak Pile
2238
= 9 buah
Luas Pile = Banyak Pile x Luas 1 Pile
= 580644 mm²
480
L. Urugan Ps = L. Pile Cap - L. Pile
650
= 4645152 mm²
1 263
T Urugan Ps 6D19 = 10 mm
500
1
95
331
331
95
Vol Urugan Ps = L x T Urugan Pasir
1778
D19-100
=
D =254 mm
46451520 mm³
= 0.046 m³
1778 Total L = 9.4 m
= Jumlah Tipe 1 x Vol. Urugan Pasir
= 1.672 m³
= 29032200 mm³
2286
2
1524
= 0.029 m³
Total 2238 = Jumlah Tipe 2 x Vol. Urugan Pasir
2286
= 0.116 m³
1.788 m³
480
2.1.3.3 Lantai Kerja Spesi 1 PC : 3 PS
650
Tipe 1 (Pondasi P1, P2, P3) 36 1 Luas Lantai Kerja
263
= Luas Urugan Pasir
6D19 = 4645152 mm²
500
1
95
331
331
95
T Lantai Kerja = 40 mm
1778
Vol Lantai Kerja
D19-100
= Luas x T Lean Concrete
D =254 mm
= 185806080 mm³
L = 9.4 m
1778 = 0.186 m³
Total = Jumlah Tipe 1 x Vol. Lean Concrete
= 6.689 m³
Tipe 2 (Pondasi P4) 4 Luas Lantai Kerja = Luas Urugan Pasir 2064
2826
= 2903220 mm²
D19-70
D19-70
T Lantai Kerja = 40 mm
4781524
478
D19-150
Vol Lantai Kerja = Luas x T Lean Concrete
D19-150
= 116128800 mm³
2286
= 0.116 m³
650
5
650
700
750
700
12D19
2.1.3.4 Tulangan Pile Cap
750
D =254 mm
L = 9.4 m
L = 9.4 m
Berat/m = 2.226
Bending Setengah = 3D
a = 60 mm
Bending Full = 6D
b = 120 mm
Kait = 95 mm
= 45432 mm
45.432 m
Berat = Berat/m x Panjang Total
650
5 = 101.112 kg
1 Arah Memanjang - Bawah
D19-70
D19-70
Jarak Tulangan = 150 mm
12D19
263 a = Panjang - 2p
700
750
= 2136 mm D1
Panjang Tulangan = a + 2 Bend. Setengah + 2 Kait
= 2446 mm
D19-70 D
Jumlah = (Lebar Pile Cap : Jarak Tulangan) + 1
2286
Urugan Pasir t = 1 cm
1 PONDASI
Lean Concrete t = 4 cm
B' 1.1
Skala 1 : 4
= 12 buah
Panjang Total = Panjang Tulangan x Jumlah
= 29352 mm
29.352 m
Berat = Berat/m x Panjang Total
= 65.325 kg
c Arah Melintang - Atas
Jarak Tulangan = 70 mm
d c = Lebar - 2p
= 1374 mm
d = Tebal - 2p
= 550 mm
Panjang Tulangan = c + 2d + 2 Bend. Full + 2 Bend. Setengah
+ 2 Kait
= 3024 mm
Jumlah = (Panjang Pile Cap : Jarak Tulangan) + 1
= 34 buah
Panjang Total = Panjang Tulangan x Jumlah
= 102816 mm
102.816 m
2064 Berat = Berat/m x Panjang Total
= 228.824 kg
Arah Melintang - Bawah
Jarak Tulangan = 70 mm
478
c = Lebar - 2p
= 1374 mm
Panjang Tulangan = c + 2 Bend. Setengah + 2 Kait
650
5 = 1684 mm
1 Jumlah = (Panjang Pile Cap : Jarak Tulangan) + 1
D19-70
D19-70
= 34 buah
263
12D19
700
750
D19-70 D
650
5
1
D19-70
D19-70
263
12D19
Panjang Total = Panjang Tulangan x Jumlah
700
750
= 57256 mm D
57.256 m
Berat = Berat/m x Panjang Total D
D19-70
= 687.072 kg
2238 Tulangan Penjangkaran Ke Kolom 2286
Tinggi = 1676 mm
Urugan Pasir t = 1 cm
1 PONDAS
Jangkar = 263 mm B' 1.1
D19-100
D19-100
480
1778
+ Bend Setengah
D19-100 = 2214 mm
D19-100
650 D =254 mm Jumlah = 12 buah
1778
Panjang Total = Panjang Tulangan x Jumlah
1 263 L = 9.4 m = 26568 mm
D19-100
D19-100
12D19
500 26.568 m
550 Berat = Berat/m x Panjang Total
1778
= 59.129 kg
Total Tipe I = 41092.602 kg
D19-100 1 PONDASI P1, P2, P3
B'
2 Skala 1 : 40 Urugan Pasir t = 1 cm D19-100
Tipe 2 (Pondasi P4) 4
Ukuran Pile Cap :
Lean Concrete t = 4 cm
Panjang = D19-100 1778 mm
D =254 mm
Lebar = 1778 mm
Tebal = 1778 500 mm
Selimut Beton (P) = 75 mm
2 PONDASI P4
L = 9.4 m Dia. Tulangan = B' 1.1 19 mm
Berat/m = Skala 1 : 30 2.226
Bending Setengah = 3D
= 60 mm
a Bending Full = 6D
= 120 mm
2 PONDASI P4
B'
1 Skala 1 : 40
b Kait = 95 mm
54.682 m
Berat = Berat/m x Panjang Total
= 121.698 kg
650
D19-100
a = Lebar - 2p
D19-100
12D19
500
550
= 1628 mm
1778
Panjang Tulangan = a + 2 Bend. Setengah + 2 Kait
= 1938 mm
D19-100 Jumlah = (Panjang Pile Cap : Jarak Tulangan) + 1
Urugan Pasir t = 1 cm D19-100
= 19 buah
Lean Concrete t = 4 cm
Panjang Total = Panjang Tulangan x Jumlah
D19-100
D =254 mm = 36822 mm
1778 36.822 m
Berat = Berat/m x Panjang Total
L = 9.4 m c = B' 2 PONDASI P4 699.618 kg
1.1
Skala 1 : 30
c
Tulangan Penjangkaran Ke Kolom
Tinggi = 1480 mm
a b Jangkar = 263 mm
Panjang = Tinggi + Jangkar + Kait + Bend Full
+ Bend Setengah
= 2018 mm
Jumlah = 12 buah
Panjang Total = Panjang Tulangan x Jumlah
= 24216 mm
c
24.216 m
Berat = Berat/m x Panjang Total
= 53.894 kg
a b
Total Tipe II = 4315.435 kg
45408.036 kg
2.1.3.5 Bekisting
Tipe 1 (Pondasi P1, P2, P3) 36 a = 2286 mm
b = 1524 mm
c = 700 mm
Luas =2 x ( a x c ) + 2 x ( b x c )
= 5334000 mm²
c = 5.334 m²
a Total Luas = Jumlah x Luas
b = 192.024 m²
206.248 m²
2.1.3.6 Beton
Tipe 1 (Pondasi P1, P2, P3) 36 a = 2286 mm
1150 b = 1524 mm
c = 700 mm
Volume =a x b x c
= 2438704800 mm³
= 2.439 m³
Total Volume = Jumlah x Volume
1000
= 87.793 m³
750
750
750
Volume = luas alas x tinggi
= (( 1150 + 750 ) x 1000) x 1925
1 2
300
= 1828750000 mm³
= 1.82875 m³
1000
1925
750 1.83 m³
800
1925 = 0.0721875 m³
50
750 0.07 m³
2.1.4.3 Urugan Aanstamping
1 = 216562500 mm³
750
1925 = 0.2165625 m³
150
750 0.22 m³
2.1.4.4 Pemasangan Batu Kali
300
Volume = luas alas x tinggi
1 = (( 700 + 300 ) x 800 x 1925
2
30
1000
1925
750 0.77 m³
2.1.5 Pekerjaan Tie Beam
2.1.5.1 Urugan Pasir
20 Panjang = 6350 mm
Volume = Lebar x Tinggi x Panjang
= 50800000 mm³
= 0.051 m³
20 Total = 1.016 m³
400
24 Panjang = 3715 mm
Volume = Lebar x Tinggi x Panjang
= 29720000 mm³
= 0.030 m³
Total = 0.713 m³
10 Panjang = 2480 mm
Volume = Lebar x Tinggi x Panjang
30
400
= 19840000 mm³
= 0.020 m³
Total = 0.198 m³
4 Panjang = 1715 mm
Volume = Lebar x Tinggi x Panjang
= 13720000 mm³
= 0.014 m³
Total = 0.055 m³
8 Panjang = 2970 mm
Volume = Lebar x Tinggi x Panjang
= 23760000 mm³
= 0.024 m³
Total = 0.190 m³
10 Panjang = 2480 mm
650
40
400
650
= 29760000 mm³
= 0.030 m³
Total = 0.298 m³
40
650
Total = 0.082 m³
8 Panjang = 2970 mm
Volume = Lebar x Tinggi x Panjang
40
= 35640000 mm³
= 0.036 m³
Total = 0.285 m³
Melintang 8 m
Panjang Total = 160 m
BJ Tulangan = 7850 kg/m³
Berat tul D22 = 2.984 kg/m
Berat tul D13 = 1.042 kg/m
Tulangan utama
Tumpuan
Jumlah tul atas = 4 bh
D tul atas = 0.022 m
Jumlah tul bawah = 2 bh
D tul bawah = 0.022 m
D sengkang = 0.013 m
Jarak sengkang = 0.10 m
Tekuk 6D = 0.078 m
Lapangan
Jumlah tul atas = 2 bh
D tul atas = 0.022 m
Jumlah tul bawah = 4 bh
D tul bawah = 0.022 m
D sengkang = 0.013 m
Jarak sengkang = 0.1 m
Tekuk 6D = 0.078 m
Melintang 4 m
Panjang Total = 40 m
BJ Tulangan = 7850 kg/m³
Berat tul D22 = 2.984 kg/m
Berat tul D13 = 1.042 kg/m
Tulangan utama
Tumpuan
Jumlah tul atas = 4 bh
D tul atas = 0.022 m
Jumlah tul bawah = 2 bh
D tul bawah = 0.022 m
D sengkang = 0.013 m
Jarak sengkang = 0.10 m
Tekuk 6D = 0.078 m
Lapangan
Jumlah tul atas = 2 bh
D tul atas = 0.022 m
Jumlah tul bawah = 4 bh
D tul bawah = 0.022 m
D sengkang = 0.013 m
Jarak sengkang = 0.1 m
Tekuk 6D = 0.078 m
X Panjang = 4m
4 Lebar = 0.4 m
X = Panjang Tinggi = 0.65 m
Luas = 10.4 m2
Panjang = 7.6 m
32 Lebar = 0.4 m
Tinggi = 0.65 m
Luas = 158.08 m2
Panjang = 8.2 m
4 Lebar = 0.4 m
Tinggi = 0.65 m
Luas = 21.32 m2
400
Panjang = 7.8 m
6 Lebar = 0.4 m
Tinggi = 0.65 m
650
Luas = 30.42 m2
Panjang = 5.2 m
40
650
40 4 Lebar = 0.4 m
Tinggi = 0.65 m
Luas = 13.52 m2
Panjang = 4.8 m
4 Lebar = 0.4 m
Tinggi = 0.65 m
Luas = 12.48 m2
Panjang = 4.6 m
8 Lebar = 0.4 m
Tinggi = 0.65 m
Luas = 23.92 m2
Panjang = 6m
24 Lebar = 0.4 m
Tinggi = 0.65 m
Luas = 93.6 m2
Panjang = 5.6 m
24 Lebar = 0.4 m
Tinggi = 0.65 m
Luas = 87.36 m2
40
550
= 1.651 m³
550
Total = 33.020 m³
650
40
24 Panjang = 3715 mm
Volume = Lebar x Tinggi x Panjang
= 965900000 mm³
550 = 0.966 m³
Total = 23.182 m³
550
10 Panjang = 2480 mm
Volume = Lebar x Tinggi x Panjang
40 = 644800000 mm³
= 0.645 m³
Total = 6.448 m³
4 Panjang = 1715 mm
Volume = Lebar x Tinggi x Panjang
= 445900000 mm³
= 0.446 m³
Total = 1.784 m³
8 Panjang = 2970 mm
Volume = Lebar x Tinggi x Panjang
= 772200000 mm³
= 0.772 m³
Total = 6.178 m³
L = 2.5 m
40
550
550
= 2062.57 kg
Sengkang
40 Tumpuan
Jumlah sengkang = (2 Lo/jarak sengkang) + 1
= 12 bh
Berat tul sengkang = L sengkang x jml sengkang x berat tul D13
= 27.41 kg
Kaki sengkang
Berat Kaki Sengkang = L kaki sengkang x jumlah kaki sengkang x berat tul D13
= 31.31 kg
Berat Total Sengkang = (tul sengkang + kaki sengkang) x jml kolom
= 939.45 kg
Lapangan
Jumlah sengkang = (L/jarak sengkang) + 1
= 14 bh
Berat tul sengkang = L sengkang x jml sengkang x berat tul D13
= 31.98 kg
Kaki sengkang
Berat Kaki Sengkang = L kaki sengkang x jumlah kaki sengkang x berat tul D13
= 27.39 kg
Berat Total Sengkang = (tul sengkang + kaki sengkang) x jml kolom
= 949.92 kg
Tekuk 6D = 0.078 m
Bending (3D) = 0.039 m
40 L = 2.5 m
Lapangan
Jumlah sengkang = (L/jarak sengkang) + 1
= 14 bh
Berat tul sengkang = L sengkang x jml sengkang x berat tul D13
= 31.98 kg
Kaki sengkang
Berat Kaki Sengkang = L kaki sengkang x jumlah kaki sengkang x berat tul D13
= 27.39 kg
Berat Total Sengkang = (tul sengkang + kaki sengkang) x jml kolom
= 237.48 kg
Lapangan
Jumlah sengkang = (L/jarak sengkang) + 1
= 14 bh
Berat tul sengkang = L sengkang x jml sengkang x berat tul D13
= 31.98 kg
Kaki sengkang
Berat Kaki Sengkang = L kaki sengkang x jumlah kaki sengkang x berat tul D13
= 27.39 kg
Berat Total Sengkang = (tul sengkang + kaki sengkang) x jml kolom
= 1187.40 kg
550
550 303.60 m2
2.2.1.1.2 Beton
550
550 41.745 m3
2.2.1.2 Pekerjaan Balok Utama
2.2.1.2.1 Tulangan BJ Tulangan = 7850 kg/m³
Balok Utama 1 Panjang = 8m
Tumpuan 12D22 Berat tul D22 = 2.984 kg/m
400 Berat tul D10 = 0.617 kg/m
4D10-100 Tulangan utama
350 Tumpuan
650 Jml tul atas 12 bh
20 D tul atas 0.022 m
Jml tul bawah 6 bh
550
Panjang = 5.2 m
4 Lebar = 0.55 m
Luas = 11.44 m2
a = Lebar
b = Panjang Panjang = 4m
Panjang diketahui diperhitungan 4 Lebar = 0.55 m
Luas = 8.8 m2
Panjang = 6m
24 Lebar = 0.55 m
Luas = 79.2 m2
Panjang = 3.675 m
72 Lebar = 0.65 m
Luas = 171.99 m2
Panjang = 4.8 m
4 Lebar = 0.55 m
Luas = 10.56 m2
Panjang = 3.6 m
6 Lebar = 0.55 m
Luas = 11.88 m2
Panjang = 3.65 m
18 Lebar = 0.55 m
Luas = 36.135 m2
Panjang = 5.6 m
24 Lebar = 0.55 m
Luas = 73.92 m2
Panjang = 4.6 m
8 Lebar = 0.55 m
Luas = 20.24 m2
Bekisting Alas
Panjang = 8.3 m
20 Lebar = 0.4 m
Luas = 66.4 m2
Panjang = 3.7 m
10 Lebar = 0.35 m
Luas = 12.95 m2
Panjang = 3.6 m
4 Lebar = 0.35 m
Luas = 5.04 m2
Panjang = 4.6 m
8 Lebar = 0.35 m
Luas = 12.88 m2
Panjang = 5.6 m
24 Lebar = 0.35 m
Luas = 47.04 m2
BU2
Panjang = 5.6 m
24 Lebar = 0.35 m
b Tinggi = 0.4 m
a = Tinggi Volume = 18.816 m3
b = Lebar
Panjang diketahui diperhitungan BU3
Panjang = 3.6 m
4 Lebar = 0.35 m
Tinggi = 0.4 m
Volume = 2.016 m3
BU3
Panjang = 3.65 m
10 Lebar = 0.35 m
Tinggi = 0.4 m
Volume = 5.110 m3
BU4
Panjang = 4.6 m
8 Lebar = 0.35 m
Tinggi = 0.4 m
Volume = 5.152 m3
Panjang = 5.6 m
24 Lebar = 0.45 m
Luas = 60.48 m2
a = Lebar
b = Panjang Panjang = 4.6 m
Panjang diketahui diperhitungan 8 Lebar = 0.45 m
Luas = 16.56 m2
Bekisting Alas
Panjang = 3.6 m
2 Lebar = 0.3 m
Luas = 2.16 m2
Panjang = 4.6 m
a 8 Lebar = 0.3 m
Luas = 11.04 m2
b
Panjang = 5.6 m
12 Lebar = 0.3 m
Luas = 20.16 m2
BA2
Panjang = 3.6 m
2 Lebar = 0.3 m
b Tinggi = 0.3 m
a = Tinggi Volume = 0.648 m3
b = Lebar
Panjang diketahui diperhitungan BA3
Tinggi diperhitungan sudah dikurangi Panjang = 4.6 m
tebal pelat lantai 4 Lebar = 0.3 m
Tinggi = 0.3 m
288
D10
Volume = 1.656 m3
D10 - 200
D10 - 150
Volume Total Balok Anak 8.352 m3
2.2.1.4 Pekerjaan Balok Tangga
1039
288 204
2.2.1.4.1 Tulangan
1213
150 3D10
205
205
2D10-110 204
Tumpuan
3001213 Jml tul atas 3 bh
352 D10 -1150 D tul atas 0.010 m
D10 - 250
Jml tul bawah 2 bh
D tul bawah 0.010 m
250
D10 - 250 2D10 D sengkang 0.01 m
180
205
205
D10 - 250
D10 250
D10 - 250
Lapangan Jrk sengkang 0.11 m
180
150 2D10 Bending 3D 0.03 m
205
D10 - 200 Tekuk 6D 0.06 m
205
Lapangan
2D10-110 Jml tul atas 2 bh
D tul atas 0.010 m
300 Jml tul bawah 3 bh
D10 - 150
1039 D tul bawah 0.010 m
204
D sengkang 0.01 m
3D10 Jrk sengkang 0.11 m
1213
Tekuk 6D 0.06 m
352 D10 - 150 Bending 3D 0.03 m
Panjang = 3.6 m
1 Lebar = 0.1 m
Luas = 0.36 m2
a = Lebar
b 288
= Panjang Bekisting Alas
PanjangD10
diketahui diperhitungan Panjang = 3.6 m
1 Lebar = 0.15 m
D10 - 200
Luas = 0.54 m2
D10 - 150
1039
204
Total Luas Bekisting 0.9 m2
2.2.1.4.3 Beton
1213
Tinggi = 0.3 m
205
205
Volume = 0.162 m3
b
150
a = Tinggi
b = Lebar
Panjang diketahui diperhitungan
Volume Total Balok Tangga 0.162 m3
2.2.1.5 Pekerjaan Tangga
2.2.1.5.1 Tulangan Pelat Dasar Anak Tangga
6000
D = 0.01 m
Berat tul D10 = 0.617 kg/m
D10 - 120
D10 - 120
16 Panjang = 3.12 m
Berat tulangan = Berat tul D10 x Pjg x Jml
D10 - 120
D10 - 120 D10 - 120
D10 - 120
4000
D10 - 120
D = 0.01 m
Berat tul D10 = 0.617 kg/m
12 Panjang 0 2.02 m
Berat tulangan = Berat tul D10 x Pjg x Jml
= 14.945 kg
Pelat Bordes
D = 0.01 m
Tul. Pelat Berat tul D10 = 0.617 kg/m
Dasar Anak 12 Panjang = 4.12 m
Tangga Berat tulangan = Berat tul D10 x Pjg x Jml
= 30.482 kg
D = 0.01 m
Tul Antrede Optrede Berat tul D10 = 0.617 kg/m
8 Panjang = 2.01 m
Berat tulangan = Berat tul D10 x Pjg x Jml
= 9.914 kg
Pelat Bordes Antrede Optrede
D = 0.01 m
Berat tul D10 = 0.617 kg/m
200 Panjang = 0.45 m
Berat tulangan = Berat tul D10 x Pjg x Jml
= 55.488 kg
D10 - 120
D10 - 120
D10 - 120
D10 - 120
Alas = 3.09 m
D10 - 120
D10 - 120
D10 - 120 D10 - 120
Luas = 1.607 m2
a = Lebar
D10 - 120
D10 - 120
Bekisting Optrede
Panjang = 2m
20 Lebar = 0.2 m
Luas = 8 m2
Antrede Optrede
19 Antrede = 0.25 m
Optrede = 0.18 m
Panjang Anak Tangga= 2m
Volume = 0.855 m3
D10 - 120
D10 - 120
D10 - 120
D10 - 120
4000
D10 - 120
Plat arah y = 4m
D10 - 120 D10 - 120
D10 - 1
D10 - 120
4000
D10 - 120 D10 - 120
D10 - 120
D10 - 120
Tebal Plat = 0.15 m
Selimut Plat (p) = 20 mm
Jarak Tul = 0.12 m
Diameter = 10 mm
Berat Tul D10 = 0.617 kg/m
Sumbu X
Lapis Bawah
Jumlah = (6000/200)+1
= 51 bh
Panjang = L-2p-10d
= 4.06 m
Lapis Atas
Jumlah 1 Bentang = (3000/200)+1
= 26 bh
Jumlah 1/4 Bentang = ((1500/200)+1)x2
= 27 bh
Panjang 1 Bentang = L-2p-10d
= 4.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.08 m
Berat = 210.72 kg
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
Panjang = L-2p-10d
= 6.06 m
Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
= 17.6666666667 bh
Jumlah 1/4 Bentang = ((1000/200)+1)x2
= 19 bh
Panjang 1 Bentang = L-2p-10d
6000 = 6.06 m
Panjang 1/4 Bentang = L/4-p-10d
D10 - 120
D10 - 120
= 1.58 m
D10 - 120
D10 - 120
D10 - 120
D10 - 120
D10 - 120
D10 - 120
D10 - 120
TIPE B
Plat arah x = 6m
Plat arah y = 4m
Tebal Plat = 0.15 m
Selimut Plat (p) = 20 mm
Jarak Tul = 0.12 m
Diameter = 10 mm
Berat Tul D10 = 0.617 kg/m
Sumbu X
Lapis Bawah
Jumlah = (6000/200)+1
= 51 bh
Panjang = L-2p-10d
= 4.06 m
Lapis Atas
Jumlah 1 Bentang = (3000/200)+1
= 26 bh
Jumlah 1/4 Bentang = ((1500/200)+1)x2
= 27 bh
Panjang 1 Bentang = L-2p-10d
= 4.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.08 m
Berat = 210.72 kg
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
Panjang = L-2p-10d
= 6.06 m
Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
= 17.6666666667 bh
Jumlah 1/4 Bentang = ((1000/200)+1)x2
6000 = 19 bh
Panjang 1 Bentang = L-2p-10d
D10 - 120
D10 - 120
D10 - 120
D10 - 120
= 6.06 m
Panjang 1/4 Bentang = L/4-p-10d
D10 - 120
D10 - 120
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
Panjang = L-2p-10d
= 5.06 m
Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
4000 = 17.6666666667 bh
D10 - 120
D10 - 120
0
4000
D10 - 120
D10 - 120
D10 - 120 D10 - 120 = 5.06 m
D10 - 120
Panjang 1/4 Bentang = L/4-p-10d
4000
D10 - 120 D10 - 120
= 1.33 m
Berat = 85.09 kg
D10 - 120
D10 - 120
Berat = Berat Sumbu X + Berat Sumbu Y 261.751 kg
TIPE C
Plat arah x = 6m
Plat arah y = 4m
Tebal Plat = 0.15 m
Selimut Plat (p) = 20 mm
Jarak Tul = 0.12 m
Diameter = 10 mm
Berat Tul D10 = 0.617 kg/m
Sumbu X
Lapis Bawah
Jumlah = (6000/200)+1
= 51 bh
Panjang = L-2p-10d
= 4.06 m
Lapis Atas
Jumlah 1 Bentang = (3000/200)+1
= 26 bh
Jumlah 1/4 Bentang = ((1500/200)+1)x2
= 27 bh
Panjang 1 Bentang = L-2p-10d
= 4.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.08 m
Berat = 210.72 kg
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
Panjang = L-2p-10d
= 6.06 m
4000 Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
D10 - 120
D10 - 120
= 17.6666666667 bh
Jumlah 1/4 Bentang = ((1000/200)+1)x2
D10 - 120 D10 - 120 = 19 bh
D10 - 120
D10 - 120 D10 - 120
Panjang 1 Bentang = L-2p-10d
4000
= 6.06 m
Panjang 1/4 Bentang = L/4-p-10d
D10 - 120
D10 - 120
= 1.58 m
Berat = 101.76 kg
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
4000 Panjang = L-2p-10d
= 5.06 m
D10 - 120
D10 - 120
Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
D10 - 120 D10 - 120 = 17.6666666667 bh
D10 - 120
D10 - 120 D10 - 120 Jumlah 1/4 Bentang = ((1000/200)+1)x2
4000
= 19 bh
Panjang 1 Bentang = L-2p-10d
D10 - 120
D10 - 120
= 5.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.33 m
Berat = 85.09 kg
Berat = Berat Sumbu X + Berat Sumbu Y 261.751 kg
TIPE E
Plat arah x = 4m
Plat arah y = 4m
Tebal Plat = 0.15 m
Selimut Plat (p) = 20 mm
Jarak Tul = 0.12 m
Diameter = 10 mm
Berat Tul D10 = 0.617 kg/m
Sumbu X
Lapis Bawah
Jumlah = (4000/200)+1
= 34 bh
Panjang = L-2p-10d
= 4.06 m
Lapis Atas
Jumlah 1 Bentang = (2000/200)+1
= 17.6666666667 bh
Jumlah 1/4 Bentang = ((1000/200)+1)x2
= 19 bh
Panjang 1 Bentang = L-2p-10d
= 4.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.08 m
Berat = 142.59 kg
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
Panjang = L-2p-10d
= 4.06 m
a Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
= 17.6666666667 bh
b
Jumlah 1/4 Bentang = ((1000/200)+1)x2
= 19 bh
Panjang 1 Bentang = L-2p-10d
= 4.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.08 m
Berat = 68.43 kg
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
Panjang = L-2p-10d
= 4.06 m
Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
= 17.6666666667 bh
Jumlah 1/4 Bentang = ((1000/200)+1)x2
= 19 bh
Panjang 1 Bentang = L-2p-10d
= 4.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.08 m
Berat = 68.43 kg
Sumbu Y
Lapis Bawah
Jumlah = (4000/200)+1
=5 bh
Panjang = L-2p-10d
= 4.06 m
Lapis Atas
Jumlah 1 Bentang = 2000/200)+1
= 17.6666666667 bh
Jumlah 1/4 Bentang = ((1000/200)+1)x2
= 19 bh
Panjang 1 Bentang = L-2p-10d
= 4.06 m
Panjang 1/4 Bentang = L/4-p-10d
= 1.08 m
Berat = 68.43 kg
b B1
a
Panjang = 4.6 m
4 Lebar = 3.675 m
Luas = 67.62 m2
C
Panjang = 5.6 m
10 Lebar = 3.675 m
Luas = 205.8 m2
D
Panjang = 4.6 m
4 Lebar = 3.675 m
Luas = 67.62 m2
D1
Panjang = 4.6 m
2 Lebar = 3.65 m
Luas = 33.58 m2
E
Panjang = 3.6 m
1 Lebar = 3.675 m
Luas = 13.23 m2
E1
Panjang = 3.65 m
1 Lebar = 3.65 m
Luas = 13.3225 m2
F
Panjang = 3.6 m
1 Lebar = 3.675 m
Luas = 13.23 m2
G
Panjang = 3.6 m
1 Lebar = 3.675 m
Luas = 13.23 m2
a = Panjang
b = Lebar
Tebal diketahui diperhitungan
Volume Total Beton Pelat Lantai 150 m3
2.2.1.7 Pekerjaan Kolom Praktis
2.2.1.7.1 Tulangan BJ Tulangan = 7850 kg/m³
Berat tul D10 = 0.617 kg/m
Tumpuan
150 4D22 Tulangan utama
Tumpuan (Lo)
2D10-100 Jumlah tul utama = 4 bh
150 D tul utama = 0.010 m
D sengkang = 0.010 m
Jarak sengkang = 0.10 m
Tekuk (6D) = 0.06 m
Bending (3D) = 0.03 m
Lapangan 2 Lo = 0.3 m
150 4D22
Lapangan
2D10-200 Jumlah tul utama = 4 bh
150 52 D tul utama = 0.010 m
D sengkang = 0.010 m
Jarak sengkang = 0.20 m
Tekuk 6D = 0.06 m
Bending (3D) = 0.03 m
L = 3.3 m
150
150 107.64 m2
2.2.1.7.2 Beton
150
150 4.037 m3
2:02:02 Struktur Lantai 2
2.2.2.1 Pekerjaan Kolom
2.2.2.1.1 Tulangan 9879.868 kg
2.2.2.1.2 Bekisting 303.6 m2
2.2.2.1.3 Beton 41.745 m3
2.2.2.2 Pekerjaan Balok Utama
2.2.2.2.1 Tulangan 20679.052 kg
2.2.2.2.2 Bekisting 589.7 m2
2.2.2.2.3 Beton 63.094 m3
2.2.2.3 Pekerjaan Balok Anak
2.2.2.3.1 Tulangan 1520.826 kg
2.2.2.3.2 Bekisting 116.9 m2
2.2.2.3.3 Beton 8.352 m3
2.2.2.4 Pekerjaan Balok Tangga
2.2.2.4.1 Tulangan 32.553 kg
2.2.2.4.2 Bekisting 0.9 m2
2.2.2.4.3 Beton 0.162 m3
2.2.2.5 Pekerjaan Tangga
2.2.2.5.1 Tulangan 166.268 kg
2.2.2.5.2 Bekisting 30.767 m2
2.2.2.5.3 Beton 4.062 m3
2.2.2.6 Pekerjaan Pelat Lantai
2.2.2.6.1 Tulangan 2094.012 kg
2.2.2.6.2 Bekisting 838.393 m2
2.2.2.6.3 Beton 150 m3
2.2.2.7 Pekerjaan Kolom Praktis
2.2.2.7.1 Tulangan 828.429 kg
2.2.2.7.2 Bekisting 107.640 m2
2.2.2.7.3 Beton 4.037 m3
2:02:03 Struktur Lantai 3
2.2.3.1 Pekerjaan Kolom
2.2.3.1.1 Tulangan 9879.868 kg
2.2.3.1.2 Bekisting 303.600 m2
2.2.3.1.3 Beton 41.745 m3
2.2.3.2 Pekerjaan RingBalk
2.2.3.2.1 Tulangan BJ Tulangan = 7850 kg/m³
BingBalk 1 Panjang = 8m
Tumpuan Berat tul D16 = 1.578 kg/m
250 3D16 Berat tul D10 = 0.617 kg/m
Tulangan utama
2D10-100 Tumpuan
500 Jml tul atas 3 bh
20 D tul atas 0.016 m
Jml tul bawah 2 bh
D tul bawah 0.016 m
2D16 D sengkang 0.01 m
Lapangan Jrk sengkang 0.10 m
250 2D16 Bending 3D 0.03 m
Tekuk 6D 0.06 m
Lapangan
2D10-200 Jml tul atas 2 bh
D tul atas 0.016 m
500 Jml tul bawah 2 bh
D tul bawah 0.016 m
D sengkang 0.01 m
2D16 Jrk sengkang 0.2 m
Tekuk 6D 0.06 m
Bending 3D 0.03 m
BAUT Ø1/2'
20
550
Tumpuan Berat tul D16 = 1.578 kg/m
300
260
BAJA SIKU 40 x 40 x 3 mm PLAT t 12 mm
250 3D16 Berat tul D10 = 0.617 kg/m
20
BAUT ANGKUR 6D22 300 Tulangan utama
WF 175 x 175 x 7,5 x 11
550 2D10-100 Tumpuan
WF 175 x 175 x 7,5 x 11
500 Jml tul atas 3 bh
2 LAS t 10 mm
8 D tul atas 0.016 m
Jml tul bawah 2 bh
1 D tul bawah 0.016 m
2D16 D sengkang 0.01 m
Lapangan Jrk sengkang 0.10 m
368
17 133 133 17
BASE PLATE 300 x 300 x 15 mm
20
Jumlah Tul x (Panjang/2) x Berat Tul
Tul atas = 11.84 kg
550
300
BAUT Ø5/8'
260
BAUT Ø1/2'
Tul bawah = 7.89 kg
BAJA SIKU 40 x 40 x 3 mm PLAT t 12 mm Lapangan
Jumlah Tul x (Panjang/2) x Berat Tul
20
UT ANGKUR 6D22
Tul atas
WF 175 x 175 x 7,5 x 11
= 7.89 kg
300
WFTul175 bawah
x 175 x 7,5 x 11 = 7.89 kg
2 LAS t 10 mm Berat tul utama = 284.10 kg
550
426
###
1
Berat tul sengkang
(Panjang/2) / Jarak sengkang + 1
Tumpuan = 26 bh
368
Lapangan = 14 bh
1 NOK SPANDEK ZINCALUM
20000
4 Lebar = 0.5 m
215
107
LAS t 10Luas
cm = 10.25 m2
a = Lebar
54
b = Panjang Panjang = 4m
PLAT t 12 mm
Panjang diketahui diperhitungan 4 Lebar = 0.5 m
215 Luas = 8 m2
BAUT Ø1/2' NOK SPANDEK ZINCALUM
LIPPED CHANNEL 150 x 75 x 20 x 4,5
BAJA SIKU 40 x 40 x 3 mm
SAGROD Ø8
Panjang = 6m
190
24 Lebar = 0.5 m
466
276
Luas = 72 m2
1082
BAUT Ø5/8'
Panjang = 4.875 m
PLAT t 12 mm
4 Lebar = 0.5 m
Luas = 9.75 m2
Panjang = 3.75 m
24 Lebar = 0.5 m
Luas = 45 m2
BAUT Ø5/8'
52 37 37 37 52
Panjang
WF 175 x 175 x 7,5 x 11
= 5.75 m
54
24 Lebar = 0.5 m
215
Luas = 69 m2
107
LAS t 10 cm
54
Bekisting Alas
Panjang = 8.25 m
20 Lebar = 0.25 m
Luas = 41.25 m2
Panjang = 3.5 m
12 Lebar = 0.25 m
Luas = 10.5 m2
LIPPED CHANNEL 150 x 75 x 20 x 4,5
BAJA SIKU 40 x 40 x 3 mm
SAGROD Ø8
Panjang = 4.75 m
8 Lebar = 0.25 m
190
Luas = 9.5 m2
466
276
Panjang = 5.75 m
1082 24 Lebar = 0.25 m
BAUT Ø5/8'
Luas
PLAT t 12 mm
= 34.5 m2
a = Tinggi KOLOMVolume
STRUKTUR = 17.25 m3
550
300
b = Lebar
260
17 133 133 17
14 Lebar = 0.25 m
20
300
Tinggi
WF 175 x 175 x 7,5 x 11 = 0.5 m
550 Volume = 6.563 m3
300
550
260
20
300
WF 175 x 175 x 7,5 x 11
300
550
260
RB4
Panjang = 4.75 m
20
300 8 Lebar = 0.25 m
Tinggi
WF 175 x 175 x 7,5 x 11 = 0.5 m
550 Volume = 4.75 m3
20 Panjang = 426 mm
= 0.426 m
426 q = 40.2 kg/m
52000
Berat = Jumlah x Panjang x q
= 342.504 kg
342.504 kg
2.1.4.3 Rangka Gable Frame IWF 175 x 175 x 7.5 x 11
12390 12390 10 Panjang = 12390 + 12390
= 24780 mm
= 24.78 m
q = 40.2 kg/m
Berat = Jumlah x Panjang x q
= 9961.560 kg
9961.560 kg
2.1.4.4 Plat Penyambung Gable Frame
2.1.4.4.1 Plat Baja t = 12 mm
Tipe 1 20 Luas = 215 x 215
= 46225 mm²
= 0.046 m²
Tebal Plat = 12 mm
215 = 0.012 m
Berat = Jumlah x Luas x Tebal x 7850
= 87.088 kg
215
Tipe 2 10 b IWF = 175 mm
Luas 1 (Ver.) = 466 x 175
466 = 81550 mm²
= 0.082 m²
Luas 2 (Hor.) = 1082 x 175
1082 1 NOK SPANDEK ZINCALUM = 189350 mm²
LIPPED CHANNEL 150 x 75 x 20 x 4,5
= 0.189 m²
Luas
RAFTER WF 175 x 175 x 7,5 x 11
= 0.271 m²
Tebal Plat = 12 mm
SAGROD Ø8
= 0.012 m
Berat BAUT 5/8 '
= Jumlah x Luas x Tebal x 7850
LISTPLANK 25/400
WF 175 x 175 x 7,5 x 11
3 2 = 255.188 kg
20000 342.276 kg
2.1.4.4.2 Baut ∅5/8'
Tipe 1 20 Jumlah dalam 1 Plat = 8 baut
Diameter = 15.87 mm
Luas = 197.808 mm²
= 0.000198 m²
Panjang = 80 mm
= 0.08 m
Berat Baut = Jumlah x Jumlah dalam 1 Plat x Luas
x Panjang x 7850
= 19.876 kg
Tebal Mur = 13.0 mm
= 0.013 m
Diameter Luar Mur = 24 mm
Luas Mur = 452.389 mm²
0.000452 m²
Berat Mur = Jumlah x Tebal x Luas x 7850
= 0.923 kg
Berat = Berat Baut + Berat Mur
= 20.799 kg
46.65 m
2.1.4.5 Ikatan Angin ∅10
2.1.4.5.1 Baja Tulangan ∅10
Tipe 1 2 Panjang 1 = 7711 mm
7711 Panjang 1 Set = 4 x Panjang 1
= 30844 mm
Sudut Atap = 27 °
Panjang = Panjang 1 Set / Sin Sudut Atap
= 67939.748 mm
= 67.940 m
Diameter = 10 mm
Berat/m = 0.6165
Berat = Jumlah x Panjang x Berat/m
= 83.770 kg
Tipe 2 6 Panjang 1 = 8394 mm
8394 Panjang 1 Set = 4 x Panjang 1
= 33576 mm
Sudut Atap = 27 °
Panjang = Panjang 1 Set / Sin Sudut Atap
= 73957.495 mm
= 73.957 m
Diameter = 22 mm
Berat/m = 2.984
Berat = Jumlah x Panjang x Berat/m
= 1324.073 kg
Tipe 3 1 Panjang 1 = 7103 mm
7103 Panjang 1 Set = 4 x Panjang 1
= 28412 mm
Sudut Atap = 27 °
Panjang = Panjang 1 Set / Sin Sudut Atap
= 62582.807 mm
= 62.583 m
Diameter = 22 mm
Berat/m = 2.984
Berat = Jumlah x Panjang x Berat/m
= 186.738 kg
1594.581 kg
2.1.4.5.2 Sambungan Las t = 10 mm 72 Diameter = 10 mm
Keliling = 31.416 mm
= 0.031 m
Panjang = Jumlah x Keliling
= 2.262 m
2.262 m
2.1.4.6 Gording Lipped Channel 50 x 75 x 20 x 4,5 mm
2.1.4.6.1 Lipped Channel 50 x 75 x 20 x 4,5 mm
36 Panjang 1 = 52000 mm
= 52 m
q = 11 kg/m
Berat = Jumlah x Panjang 1 x q
= 20592 kg
52000
20592 kg
2.1.4.6.2 Plat Penyambung Siku 40 x 40 x 3 mm
340 Panjang 1 = 50 mm
= 0.05 m
q = 1.84 kg/m
Berat = Jumlah x Panjang 1 x q
= 31 kg
31 kg
2.1.4.6.3 Baut ∅1/2'
680 Diameter = 12.7 mm
Luas = 126.677 mm²
= 0.000127 m²
Panjang = 80 mm
= 0.08 m
Berat Baut = Jumlah x Luas x Panjang x 7850
= 54.096 kg
Tebal Mur = 10.0 mm
= 0.01 m
Diameter Luar Mur = 19 mm
Luas Mur = 283.529 mm²
0.000284 m²
Berat Mur = Jumlah x Tebal x Luas x 7850
= 15.135 kg
Berat = Berat Baut + Berat Mur
= 69.231 kg
69.231 kg
2.1.4.7 Sagrod ∅8
2.1.4.7.1 Baja Tulangan ∅8
10 Panjang = 2 x Panjang Miring Rangka Kuda - Kuda
= 24780 mm
12390 = 24.78 m
Diameter = 8 mm
Berat/m = 0.395
Berat = Jumlah x Panjang x Berat/m
= 97.772 kg
97.772 kg
2.1.4.7.2 Mur Baut Tulangan ∅8
40 Tebal Mur = 6.5 mm
= 0.0065 m
Diameter Luar Mur = 17 mm
Luas Mur = 226.980 mm²
0.000227 m²
Berat = Jumlah x Tebal x Luas x 7850
= 0.463 kg
0.463 kg
3 Pekerjaan Arsitektur
3.1 Arsitektur Lantai 1
3.1.1 Pekerjaan Kusen Pintu dan Jendela
3.1.1.1 Pekerjaan Pintu
Tipe P1 1 Kusen Pintu = 2100 + 2150 + 2150
2100 = 6400 mm
= 6.4 m
Daun Pintu = 2100 x 2150
= 4515000 mm²
2150 = 4.515 m²
Kunci Pintu = 1 buah
Engsel Pintu = 4 buah
Handle Pintu = 2 buah
Grandle Pintu = 1 buah
Cat Daun Pintu = Luas Daun Pintu x 2
= 9.03 m²
Tipe P2 5 Kusen Pintu = 1500 + 2150 + 2150
1500 = 5800 mm
= 5.8 m
Daun Pintu = 1500 x 2150
= 3225000 mm²
2150 = 3.225 m²
Kunci Pintu = 1 buah
Engsel Pintu = 4 buah
Handle Pintu = 2 buah
Grandle Pintu = 1 buah
Cat Daun Pintu = Luas Daun Pintu x 2
= 6.45 m²
Tipe P3 12 Kusen Pintu = 900 + 2150 + 2150
900 = 5200 mm
= 5.2 m
Daun Pintu = 1500 x 2150
= 1935000 mm²
2150 = 1.935 m²
Kunci Pintu = 1 buah
Engsel Pintu = 2 buah
Handle Pintu = 1 buah
Grandle Pintu = 1 buah
Cat Daun Pintu = Luas Daun Pintu x 2
= 3.87 m²
Tipe P4 8 Kusen Pintu = 800 + 1900 + 1900
800 = 4600 mm
= 4.6 m
Daun Pintu = 800 x 1900
= 1520000 mm²
1900 = 1.52 m²
Kunci Pintu = 1 buah
Engsel Pintu = 2 buah
Handle Pintu = 1 buah
Grandle Pintu = 1 buah
Cat Daun Pintu = Luas Daun Pintu x 2
= 3.04 m²
3.1.1.1.1 Kusen Pintu Panjang = Banyak x Panjang Semua Tipe
= 134.6 m
134.6 m
3.1.1.1.2 Daun Pintu Luas = Banyak x Luas Semua Tipe
= 56.02 m²
56.02 m²
3.1.1.1.3 Kunci Pintu Jumlah = Banyak x Jumlah Semua Tipe
= 26 buah
26 buah
3.1.1.1.4 Engsel Pintu Jumlah = Banyak x Jumlah Semua Tipe
= 64 buah
64 buah
3.1.1.1.5 Handle Pintu Jumlah = Banyak x Jumlah Semua Tipe
= 32 buah
32 buah
3.1.1.1.6 Grandle Pintu Jumlah = Banyak x Jumlah Semua Tipe
= 26 buah
26 buah
3.1.1.2 Pekerjaan Jendela
Tipe J1 32 Kusen Jendela = 3 x 1200 + 3 x 1720
1200 = 8760 mm
= 8.76 m
Daun Jendela = 1200 x 1720
= 2064000 mm²
1720 = 2.064 m²
Engsel Jendela = 4 buah
Hak Angin Jendela = 2 buah
Tarikan Jendela = 2 buah
Grandle Jendela = 2 buah
3.1.1.2.1 Kusen Jendela Panjang = Banyak x Panjang
= 280.32 m
280.32 m
3.1.1.2.2 Daun Jendela Luas = Banyak x Luas
= 66.048 m²
66.048 m²
3.1.1.2.3 Engsel Jendela Jumlah = Banyak x Jumlah
= 128 buah
128 buah
3.1.1.2.4 Hak Angin Jendela Jumlah = Banyak x Jumlah
= 64 buah
64 buah
3.1.1.2.5 Tarikan Jendela Jumlah = Banyak x Jumlah
= 64 buah
64 buah
3.1.1.2.6 Grandle Jendela Jumlah = Banyak x Jumlah
= 64 buah
64 buah
3.1.2 Pekerjaan Dinding
3.1.2.1 Pasangan Bata
Tipe 1 1 Luas P1 = 4.515 m²
3450 Luas = 3450 x 3050
= 10522500 mm²
= 10.5225 m²
Luas Dinding = 6.008 m²
3050 Luas Dinding Total = Jumlah x Luas Dinding
= 6.008 m²
200
= 16622500 mm²
= 16.6225 m²
3050 Luas Dinding = 12.495 m²
7850
7450
7850
7450
200
200
Luas Dinding Total = Jumlah x Luas Dinding
7850
7450
7850
7450
= 149.934 m²
200 200
Tipe 5 2 Luas J1 (2) = 4.128 m²
200
200
7450 Luas = 7450 x 2950
= 21977500 mm²
2950 = 21.9775 m²
Luas Dinding = 17.850 m²
7450
7850
7850
7450
200
7850
7450
200 200
200
200
= 16622500 mm²
7850
7450
7850
7450
= 16.623 m²
Luas Dinding = 14.688 m²
3050 Luas Dinding Total = Jumlah x Luas Dinding
= 102.813 m²
4450 5450
5850
4850
Tipe 8 3 Luas P3 = 1.935 m²
4450 Luas = 4450 x 3050
= 13572500 mm²
= 13.573 m²
200
Luas Dinding = 11.638 m²
200
3050 Luas Dinding Total = Jumlah x Luas Dinding
7850
7450
= 34.913 m²
5450 550 5450 550 5450
Tipe 9 17850
2 Luas Dinding = 5450 x 3050
5450 = 16622500 mm²
= 16.623 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 33.245 m²
3050
3600
200
200 4450 550 5450 550 5450 550 5450 550 550 5450 550 5450 550 5450 550 4450
3450
7600
200
200
Tipe 12 7450 1 Luas P3 (2) = 3.87 m²
7850
7850
7450
4450 Luas = 4450 x 3050
= 13572500 mm²
= 13.573 m²
Tinggi Trasram = 1500 mm
3050 Luas Trasram = 6675000 mm²
4450 5450
4850
5850 = 6.675 m²
Luas Dinding = 3.028 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 3.028 m²
200
7850
7450
200
Tipe 15 1 Luas Dinding = 4450 x 2950
7850
7450
799.597 m²
3.1.2.2 Pasangan Bata Trasram 1 a = 23800 mm
a b = 1500 mm
Luas Trasram = Jumlah x a x b
= 35700000 mm²
b = 35.7 m²
35.7 m²
3600
200 4450 550 5450 550 5450 550 5450 550 550 5450 550 5450 550 5450 550 4450
3450
200
7850
7450
5450
7450
7850
7850
7450
200 1 Keliling = ( 2 x 7450) + ( 2 x 4450 ) + ( 8 x 200 )
= 25400 mm
Tinggi = 1500 mm
7850 Luas = Keliling x Tinggi
4450 5450
4850
5850 = 38100000 mm²
= 38.1 m²
Luas Total = Jumlah x Luas
7450 = 38.1 m²
200 200
200
200
4450
7850
7450
7850
7450
4850 38.1 m²
3.1.3 Pekerjaan Plafond
3.1.3.1 Rangka Plafond Hollow 40 x 40 x 4 mm
Tipe 1 4 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
4450 5450 200 = 37912500 mm²
5850
4850 = 37.9125 m²
Luas Total = Jumlah x Luas
7850 = 151.65 m²
200
200
7450
7850
7450
4450
3600
200
200 4450 550 5450 550 5450 550 5450 550 550 5450 550 5450 550 5450 550 4450
3450
7600
4850
Tipe 2 9 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
3600
200
200 = 45762500 mm²
200 4450 550 5450 550 5450 550 5450 550 550 5450 550 5450 550 5450 550 4450
3450
7600
= 45.763 m²
Luas Total = Jumlah x Luas
7850 = 411.8625 m²
200 200
7450
200
200
7850
7450
7450
7850
5450
5850
Tipe 3 1 Luas = 17850 x 7850 - (4 x 200 x 200 )
200 - ( 4 x 200 x 550 )
= 139522500 mm²
5450
4450 5850 = 139.523 m²
4850
7850 Luas Total = Jumlah x Luas
= 139.5225 m²
17850
200 200
Tipe 4 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
200
200
7850
7450
= 220.630 m²
23125 23125 Luas Total = Jumlah x Luas
3450 = 220.63 m²
4450 5450
5850
4850
7850
7450
7850
7450
923.665 m²
3.1.3.2
4450
Penggantung Plafond5450
Hollow 40 x 40 x 4 mm
5850
4850 Pjg Penggantung = 358 mm
50 = 0.358 m
258
200
200
50
7850
7450
= 2148 mm
200
200 4450 550 5450 550 5450 550 5450 550 550 5450 550 5450 550 5450 550 4450
3450
Arah Y
7600
200
= 30072 mm
= 30.072 m
Tipe 2 9 Arah X
7450
7850
7850
7450
4450 5450
5850
4850
7450
7850
7850
7450
= 6 buah
7850 Panjang 1 = 358 mm
Panjang
5450 = Jumlah x Panjang 1
4450 5850
4850 = 2148 mm
Arah Y
7450 Jarak Antar Btg = 600 mm
Jumlah = 7850 : 600 + 1
200 = 15 buah
200
Panjang 1 = 358 mm
200
200
5450 Panjang = Jumlah x Panjang 1
5850 = 5370 mm
Total = Jumlah Tipe x (Arah X +Arah Y)
7850
7450
7850
7450
= 67662 mm
= 67.662 m
Tipe 3 1
200 Arah X
4450 5450 Jarak Antar Btg = 1200 mm
5850
4850
Jumlah = 17850 : 1200 + 1
7850 = 16 buah
Panjang 1 = 358 mm
Panjang = Jumlah x Panjang 1
17850 200
= 5728 mm
200
Arah Y
Jarak Antar Btg = 600 mm
7850
7450
200 4450 550 5450 550 5450 550 5450 550 550 5450 550 5450 550 5450 550 4450
3450
7600
= 11098 mm
3600
200
= 11.098 m
200 4450 550 5450 550 5450 550 5450 550 550 5450 550 5450 550 5450 550 4450
3450
7600
Tipe 4 1 Arah X kiri - kanan
Jarak Antar Btg = 1200 mm
7450 Jumlah = ( 23125 + 23125 ) : 1200 + 1
3450 = 40 buah
Panjang 1 = 358 mm
23125 23125
200 Panjang 200 = Jumlah x Panjang 1
3450 = 14320 mm
200
200
Arah X tengah
Jarak Antar Btg = 1200 mm
Jumlah = (7450 + 3450 + 7450) : 1200 + 1
7450
7850
7850
7450
= 17 buah
Panjang 1 = 358 mm
Panjang = Jumlah x Panjang 1
= 6086 mm
Arah
5450 Y atas - bawah
4450 5850
4850 Jarak Antar Btg = 600 mm
Jumlah = 7450 : 600 + 1
= 14 buah
Panjang 1 = 358 mm
Panjang = Jumlah x Panjang 1
= 5012 mm
Arah Y tengah
Jarak Antar Btg = 600 mm
Jumlah = 3450 : 600 + 1
= 7 buah
Panjang 1 = 358 mm
Panjang = Jumlah x Panjang 1
= 2506 mm
2250 1324
1800
1800
2250 1324
Total = Jumlah Tipe x (Arah X +Arah Y)
= 27924 mm
= 27.924 m
1800
136.756 m
3.1.3.3 Penutup Plafond Gypsum t = 9 mm 1200
1800
180
200 = 37912500 mm²
250
ADUKAN 1 PC : 4 PASIR
1200 = 37.9125 m²
1 Luas Total = Jumlah x Luas
7850 = 151.65 m²
1800
180
250
1
7450 ADUKAN 1 PC : 4 PASIR
1925 1925
1750
UP
4450
1 4850
Tipe 2 9 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 45762500 mm²
2250
= 45.763 m²
Luas Total = Jumlah x Luas
7850 300
= 411.8625 m²
1
7450
5450
5850
Tipe 3 1 Luas = 17850 x 7850 - (4 x 200 x 200 )
200 - ( 4 x 200 x 550 )
= 139522500 mm²
= 139.523 m²
7850 Luas Total = Jumlah x Luas
= 139.5225 m²
17850
Tipe 4 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
+ (2 x 3450 x 7450 ) - ( 12 x 200 x 200)
7450 - ( 16 x 550 x 200 )
3450 = 220630000 mm²
= 220.630 m²
23125 23125 Luas Total = Jumlah x Luas
3450 = 220.63 m²
923.665 m²
3.1.3.4 List Plafond Gypsum
Tipe 1 4 Keliling = ( 2 x 7450) + ( 2 x 4450 ) + ( 8 x 200 )
200 = 25400 mm
= 25.4 m
Panjang = Jumlah x Keliling
7850 = 101.6 m
7450
4450
4850
Tipe 2 9 Keliling = ( 2 x 7450 ) + ( 2 x 5450 ) + ( 8 x 200 )
200 = 27400 mm
= 27.4 m
Panjang = Jumlah x Keliling
7850 = 246.6 m
7450
5450
5850
Tipe 3 1 Keliling = ( 6 x 5450 ) + ( 2 x 7450 ) + ( 16 x 200 )
200 + ( 4 x 550 )
= 53000 mm
= 53 m
7850 Panjang = Jumlah x Keliling
= 53 m
17850
Tipe 4 1 Keliling = ( 12 x 5450 ) +( 4 x 4450) +( 20 x 550 )
+ ( 4 x 3450 ) + ( 48 x 200 ) + ( 4 x 7450 )
7450 = 147400 mm
3450 = 147.4 m
Panjang = Jumlah x Keliling
23125 23125 = 147.4 m
3450
548.6 m
3.1.4 Pekerjaan Lantai
3.1.4.1 Pasangan Keramik
Tipe 1 3 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 37912500 mm²
= 37.9125 m²
Luas Total = Jumlah x Luas
7850 = 113.738 m²
7450
4450
4850
Tipe 2 9 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 45762500 mm²
= 45.763 m²
Luas Total = Jumlah x Luas
7850 = 411.863 m²
7450
5450
5850
Tipe 3 1 Luas = 17850 x 7850 - (4 x 200 x 200 )
200 - ( 4 x 200 x 550 )
= 139522500 mm²
= 139.523 m²
7850 Luas Total = Jumlah x Luas
= 139.523 m²
17850
Tipe 4 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
+ ( 3450 x 7450 ) + ( 4150 x 3450 )
4150 - ( 10 x 200 x 200) - ( 16 x 550 x 200)
3450 = 209325000 mm²
= 209.325 m²
7450 Luas Total = Jumlah x Luas
23125 3450 23125 = 209.325 m²
874.448 m²
3.1.4.2 Pasangan Keramik Toilet
Tipe 1 1 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 37912500 mm²
= 37.9125 m²
Luas Total = Jumlah x Luas
7850 = 37.913 m²
7450
4450
4850
37.913 m²
3.1.4.3 Waterproofing Lantai Toilet
1 Luas = Luas Lantai Toilet
= 37.9125 m²
Luas Total = Jumlah x Luas
= 37.9125 m²
37.913 m²
3.1.5 Pekerjaan Tangga
3.1.5.1 Pekerjaan Railing Tangga
1 Panjang = 2834 + 3069
2834 = 5903 mm
= 5.903 m
Panjang Total = Jumlah x Panjang
= 5.903 m
3069
5.903 m
3.1.5.2 Pasangan Keramik Tangga
1 Jumlah Antrede = 18 buah
180 Jumlah Optrede = 20 buah
200
72.24 m²
3.2.1.2.3 Engsel Jendela Jumlah = Banyak x Jumlah
= 140 buah
7850
7450
7850
7450
140 buah
3.2.1.2.4 Hak Angin Jendela Jumlah = Banyak x Jumlah
4450 5450
5850
7850
7450
7850
7450
= 70 buah
70 buah
3.2.1.2.5 Tarikan Jendela Jumlah = Banyak x Jumlah
4450 5450 = 70 buah
5850
4850
70 buah
3.2.1.2.6 Grandle Jendela Jumlah = Banyak x Jumlah
= 70 buah
70 buah
3.2.2 Pekerjaan Dinding
3.2.2.1 Pasangan Bata 200 200
Tipe 3 12 Luas J1 (2) = 4.128 m²
200
200
5450 Luas = 5450 x 3050
= 16622500 mm²
= 16.6225 m²
3050 Luas Dinding = 12.495 m²
7850
7450
7850
7450 Luas Dinding Total = Jumlah x Luas Dinding
= 149.934 m²
200
7850
7450
4450 5450
5850
4850
7850
7450
7850
7450
2950 = 21.9775 m²
Luas Dinding = 17.850 m²
4450 5450 Luas Dinding Total = Jumlah x Luas Dinding
5850
4850 = 35.699 m²
200
3050 Luas Dinding = 13.398 m²
Luas Dinding Total = Jumlah x Luas Dinding
7850
7450
= 66.988 m²
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
7450
0
5450 = 16622500 mm²
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
= 16.623 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 16.623 m²
3050
200
= 21.978 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 307.685 m²
7450
7850
7850
7450
2950
200
200
Tipe 13 2 Luas Dinding = 7450 x 2950
7450 = 21977500 mm²
= 21.978 m²
7850
7450
7850
7450
Tinggi Trasram = 1500 mm
Luas Trasram = 11175000 mm²
2950 = 11.175 m²
Luas Dinding = 10.803 m²
4450 5450
5850
Luas Dinding Total = Jumlah x Luas Dinding
4850
= 21.605 m²
200
Luas Dinding Total = Jumlah x Luas Dinding
= 25.376 m²
7850
7450
= 35.7 m²
0
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
35.700 m²
3.2.2.3 Dinding Partisi
Tipe 1 8 Luas P4 = 1.52 m²
1500 Luas = 1500 x 2500
= 3750000 mm²
= 3.75 m²
2500 Luas Partisi = 2.23 m²
Luas Partisi Total = Jumlah x Luas Partisi
= 17.84 m²
200
= 412.529 m²
412.529 m²
3.2.2.5 Keramik Dinding Tiolet
200 1 Keliling = ( 2 x 7450) + ( 2 x 4450 ) + ( 8 x 200 )
7450
7850
7850
7450
= 25400 mm
Tinggi = 1500 mm
7850 Luas = Keliling x Tinggi
= 38100000 mm²
4450 5450
5850
4850
4450 5450 = 38.1 m²
5850
4850 Luas Total = Jumlah x Luas
7450 = 38.1 m²
200 200
200
200
4450
4850 38.1 m²
3.2.3 Pekerjaan Plafond
7850
7450
7850
7450
200
7450
200
7850
7450
4450
4850
3450 550 5450
Tipe 2 9850 9 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 45762500 mm²
= 45.763 m²
200
Luas Total = Jumlah x Luas
200
7850
7450
200
200
7850 = 411.8625 m²
7850
7450
7450
5450 550 5450
11850
5450
5850
Tipe 5 1 Luas = ( 9850 x 7850 ) - ( 4 x 200 x 200 )
7450
200 550
5450 4450
550
200
= 76942500 mm²
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
= 76.943 m²
Luas Total = Jumlah x Luas
7850 = 76.9425 m²
200 200
200
200
9850
Tipe 6 1 Luas = ( 11850 x 7850 ) - ( 4 x 200 x 200 )
200 - (2 x 200 x 550 )
= 92642500 mm²
7850
7450
7450
7850
= 92.643 m²
7850 Luas Total = Jumlah x Luas
= 92.6425 m²
4450 5450
5850
4850
11850
Tipe
200 7 200
1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
+ (3450 x 7450 ) - ( 8 x 200 x 200)
200
200
7450 - ( 16 x 550 x 200 )
3450 = 220790000 mm²
= 220.790 m²
7850
7450
7850
7450
23125 3450 23125 Luas Total = Jumlah x Luas
= 220.79 m²
953.888 m²
3.2.3.2 Penggantung Plafond Hollow 40 x 40 x 4 mm
4450 5450 Pjg Penggantung = 358 mm
5850
4850
50 = 0.358 m
258
50
7450
0
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
Tipe 1 4 Arah X
200 Jarak Antar Btg = 1200 mm
Jumlah = 4850 : 1200 + 1
200
= 6 buah
7850 Panjang 1 = 358 mm
200
Arah Y
7450 Jarak Antar Btg = 600 mm
Jumlah = 7850 : 600 + 1
= 15 buah
3450 550 5450
9850
7
7
3450 550 5450
9850 Panjang 1 = 358 mm
Panjang = Jumlah x Panjang 1
4450 = 5370 mm
200
4850 Total = Jumlah x (Arah X +Arah Y)
200
= 30072 mm
= 30.072 m
7850
7450
Tipe 2 9 Arah X
200 Jarak Antar Btg = 1200 mm
Jumlah = 5850 : 1200 + 1
5450 550 5450 = 6 buah
11850
7850 Panjang 1 = 358 mm
Panjang = Jumlah x Panjang 1
= 2148 mm
Arah Y
7450 Jarak Antar Btg = 600 mm
Jumlah = 7850 : 600 + 1
200 200 = 15 buah
Panjang 1 = 358 mm
200
200
5450 Panjang = Jumlah x Panjang 1
5850 = 5370 mm
Total = Jumlah x (Arah X +Arah Y)
7450
7850
7850
7450
= 67662 mm
= 67.662 m
Tipe 5 1 Arah X
200 Jarak Antar Btg = 1200 mm
Jumlah = 9850 : 1200 + 1
4450 5450
4850
5850 = 10 buah
Panjang 1 = 358 mm
7850 Panjang = Jumlah x Panjang 1
= 3580 mm
200
Arah Y
200
Jarak Antar Btg = 600 mm
200
200
Jumlah = 7850 : 600 + 1
9850 = 15 buah
Panjang 1 = 358 mm
7850
7450
7850
7450
Panjang = Jumlah x Panjang 1
= 5370 mm
Total = Jumlah x (Arah X +Arah Y)
= 8950 mm
4450 5450
5850
= 8.95 m
4850
Tipe 6 1 Arah X
200 Jarak Antar Btg = 1200 mm
Jumlah = 11850 : 1200 + 1
= 11 buah
200 Panjang 1 = 358 mm
200
= 9.308 m
Tipe 7 1 Arah X kiri - kanan
7850
7450
7450
Jumlah = (7450 + 3450) : 1200 + 1
0
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
= 11 buah
Panjang 1 = 3450 mm
Panjang = Jumlah x Panjang 1
= 37950 mm
Arah Y atas
Jarak Antar Btg = 600 mm
200
Jumlah = 7450 : 600 + 1
200
= 14 buah
200
200
Panjang 1 = 3450 mm
Panjang = Jumlah x Panjang 1
= 48300 mm
7450
7850
7850
7450
Arah Y tengah
Jarak Antar Btg = 600 mm
Jumlah = 3450 : 600 + 1
= 7 buah
Panjang 1 = 49700 mm
4450 5450
Panjang
5850 = Jumlah x Panjang 1
4850
= 347900 mm
Total = Jumlah x (Arah X +Arah Y)
= 572150 mm
= 572.15 m
688.142 m
3.2.3.3 Penutup Plafond Gypsum t = 9 mm
2250 1324
1800
2250 1324
7450
1800
1200
1800
180
250
ADUKAN 1 PC : 4 PASIR
4450 1200
4850
1
Tipe 2 9 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 45762500 mm²
1800
180
= 45.763 m²
250
Luas Total = Jumlah x Luas
7850 1 = 411.8625 m²
1925 1925 ADUKAN 1 PC : 4 PASIR
1750
7450
UP
1
5450
5850
2250
300
1
200 - (2 x 200 x 550 )
= 76942500 mm²
= 76.943 m²
Luas Total = Jumlah x Luas
7850 = 76.9425 m²
9850
Tipe 6 1 Luas = ( 11850 x 7850 ) - ( 4 x 200 x 200 )
200 - (2 x 200 x 550 )
= 92642500 mm²
= 92.643 m²
7850 Luas Total = Jumlah x Luas
= 92.6425 m²
11850
Tipe 7 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
+ (3450 x 7450 ) - ( 8 x 200 x 200)
7450 - ( 16 x 550 x 200 )
3450 = 220790000 mm²
= 220.790 m²
23125 3450 23125 Luas Total = Jumlah x Luas
= 220.79 m²
953.888 m²
3.2.3.4 List Plafond Gypsum
Tipe 1 4 Keliling = ( 2 x 7450) + ( 2 x 4450 ) + ( 8 x 200 )
200 = 25400 mm
= 25.4 m
Panjang = Jumlah x Keliling
= 101.6 m
7850
7450
4450
4850
Tipe 2 9 Keliling = ( 2 x 7450 ) + ( 2 x 5450 ) + ( 8 x 200 )
200 = 27400 mm
= 27.4 m
Panjang = Jumlah x Keliling
7850 = 246.6 m
7450
5450
5850
Tipe 4 1 Keliling = ( 12 x 5450 ) + ( 4 x 4450) + ( 18 x 550 )
+ ( 4 x 3450 ) + ( 44 x 200 ) + ( 2 x 7450 )
7450 = 131700 mm
3450 = 131.7 m
Panjang = Jumlah x Keliling
23125 3450 23125 = 131.7 m
9850
Tipe 6 1 Keliling = ( 4 x 5450 ) + ( 2 x 7450 ) + ( 12 x 200 )
200 + ( 2 x 550 )
= 40200 mm
= 40.2 m
7850 Panjang = Jumlah x Keliling
= 40.2 m
11850
556.3 m
3.2.4 Pekerjaan Lantai
3.2.4.1 Pasangan Keramik
Tipe 1 3 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 37912500 mm²
= 37.9125 m²
Luas Total = Jumlah x Luas
7850 = 113.738 m²
7450
4450
4850
Tipe 2 9 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 45762500 mm²
= 45.763 m²
Luas Total = Jumlah x Luas
7850 = 411.863 m²
7450
5450
5850
Tipe 5 1 Luas = ( 9850 x 7850 ) - ( 4 x 200 x 200 )
200 - (2 x 200 x 550 )
= 76942500 mm²
= 76.943 m²
Luas Total = Jumlah x Luas
7850 = 76.943 m²
9850
Tipe 6 1 Luas = ( 11850 x 7850 ) - ( 4 x 200 x 200 )
200 - (2 x 200 x 550 )
= 92642500 mm²
= 92.643 m²
7850 Luas Total = Jumlah x Luas
= 92.643 m²
11850
Tipe 7 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
+ (3450 x 4150 ) - ( 8 x 200 x 200)
4150 - ( 16 x 550 x 200 )
3450 = 198020000 mm²
= 198.020 m²
23125 3450 23125 Luas Total = Jumlah x Luas
= 198.020 m²
893.205 m²
3.2.4.2 Pasangan Keramik Toilet
Tipe 1 1 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 37912500 mm²
= 37.9125 m²
Luas Total = Jumlah x Luas
7850 = 37.913 m²
7450
4450
4850
37.913 m²
3.2.4.3 Waterproofing Lantai Toilet
1 Luas = Luas Lantai Toilet
= 37.9125 m²
Luas Total = Jumlah x Luas
= 37.9125 m²
37.913 m²
3.2.5 Pekerjaan Tangga
3.2.5.1 Pekerjaan Railing Tangga
1 Panjang = 2834 + 3069
2834 = 5903 mm
= 5.903 m
Panjang Total = Jumlah x Panjang
= 5.903 m
3069
5.903 m
3.2.5.2 Pasangan Keramik Tangga
1 Jumlah Antrede = 18 buah
180 Jumlah Optrede = 20 buah
200
= 3.87 m²
Tipe P4 8 Kusen Pintu = 800 + 1900 + 1900
800 = 4600 mm
= 4.6 m
7850
7450
7850
7450
200
200 200 139.4 m
200
200
3.3.1.1.2 Daun Pintu Luas = Banyak x Luas Semua Tipe
= 66.34 m²
66.34 m²
3.3.1.1.3 Kunci Pintu Jumlah = Banyak x Jumlah Semua Tipe
7450
7850
7850
7450
= 26 buah
26 buah
3.3.1.1.4 Engsel Pintu Jumlah = Banyak x Jumlah Semua Tipe
= 123 buah
4450 5450
5850
123 buah
3.3.1.1.5 Handle Pintu 4850
Jumlah = Banyak x Jumlah Semua Tipe
= 41 buah
41 buah
3.3.1.1.6 Grandle Pintu Jumlah = Banyak x Jumlah Semua Tipe
200 200 = 26 buah
26 buah
200
200
7850
7450
= 8.76 m
Daun Jendela = 1200 x 1720
= 2064000 mm²
5450
1720 = 2.064 m²
4450
4850
5850 Engsel Jendela = 4 buah
Hak Angin Jendela = 2 buah
Tarikan Jendela = 2 buah
Grandle Jendela = 2 buah
3.3.1.2.1 Kusen Jendela Panjang = Banyak x Panjang
7450
= 306.6 m
0
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
306.6 m
3.3.1.2.2 Daun Jendela Luas = Banyak x Luas
= 72.24 m²
72.24 m²
3.3.1.2.3 Engsel Jendela Jumlah = Banyak x Jumlah
= 140 buah
200 140 buah
3.3.1.2.4 Hak Angin Jendela Jumlah = Banyak x Jumlah
200
= 70 buah
70 buah
3.3.1.2.5 Tarikan Jendela 7850 Jumlah = Banyak x Jumlah
7450
= 70 buah
70 buah
3.3.1.2.6 Grandle Jendela Jumlah = Banyak x Jumlah
3450
= 70 buah
3850 70 buah
3.3.2 Pekerjaan Dinding
3.3.2.1 Pasangan Bata
Tipe 3 12 Luas J1 (2) = 4.128 m²
5450 Luas = 5450 x 3050
50
= 16622500 mm²
= 16.6225 m²
50
50
50
50
50
50
50
5508
5202
50
4821
= 149.934 m²
4515
50
4209
3904
50
3598
3292
50
2986
2681
50
2375
2069
50
1764
1458
1152
200
200
2950 = 21.9775 m²
Luas Dinding = 17.850 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 35.699 m²
7850
7450
7850
7450
Tipe 6 12 Luas P2 = 3.225 m²
5450 Luas = 5450 x 3050
= 16622500 mm²
4450 5450
5850
= 16.623 m²
4850
3050 Luas Dinding = 13.398 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 160.770 m²
200 200
Tipe 10 1 Luas Dinding = 3450 x 3050
200
200
7850
7450
3050 = 10.523 m²
7450
= 13572500 mm²
0
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450 = 13.573 m²
Tinggi Trasram = 1500 mm
3050 Luas Trasram = 6675000 mm²
= 6.675 m²
Luas Dinding = 3.028 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 3.028 m²
200
200
Tipe 15 1 Luas Dinding = 4450 x 2950
7450 4450 = 13572500 mm²
7850
7850
7450
= 13.573 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 13.573 m²
3050
4450 5450
5850
Tipe 16 4850 3 Luas J1 = 2.064 m²
3450 Luas = 3450 x 3050
= 10522500 mm²
= 10.523 m²
200 200 3050 Luas Dinding = 8.459 m²
Luas Dinding Total = Jumlah x Luas Dinding
200
200
= 25.376 m²
7850
7450
7450
= 10522500 mm²
0
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
= 10.523 m²
3050 Luas Dinding = 8.588 m²
Luas Dinding Total = Jumlah x Luas Dinding
= 8.588 m²
837.563 m²
3.3.2.2 Pasangan Bata Trasram 1 a = 23800 mm
a 200 b = 1500 mm
Luas Trasram =a x b
200
= 35700000 mm²
b = 35.7 m²
Luas Trasram Total = Jumlah x Luas Dinding
7850
7450
= 35.7 m²
35.7 m²
3.3.2.3 Dinding Partisi
Tipe 1 8 Luas P4 = 1.52 m²
3450
1500 3850 Luas = 1500 x 2500
= 3750000 mm²
= 3.75 m²
2500 Luas Partisi = 2.23 m²
Luas Partisi Total = Jumlah x Luas Partisi
= 17.84 m²
= 200 3.75 m²
Luas Partisi Total = Jumlah x Luas Partisi
2500 = 30 m²
7850
7450
7450
7850
4450 5450
7850
7450
7450
7850
Tipe 3 1 Luas Partisi = 7850 x 2500
7850 5450 = 19625000 mm²
4450 5850
4850 = 19.625 m²
2500 Luas Partisi Total = Jumlah x Luas Partisi
= 19.625 m²
25.605 m²
200 200
3.3.2.4 Plesteran 2 Luas Satu Sisi = Total Luas Dinding
200
200
= 171.905 m²
Luas Plesteran = 343.809 m²
Luas Plesteran = Jumlah x Luas Satu Sisi
7850
7450
7850
7450
= 687.618 m²
687.618 m²
3.3.2.5 Keramik Dinding Toilet
200 1 Keliling = ( 2 x 7450) + ( 2 x 4450 ) + ( 8 x 200 )
5450 = 25400 mm
4450 5850
4850 Tinggi = 1500 mm
7850 Luas = Keliling x Tinggi
= 38100000 mm²
= 38.1 m²
Luas Total = Jumlah x Luas
7450 = 38.1 m²
7450
0
200 550
5450 4450
550
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
4450 200
200
4850 38.1 m²
3.3.3 Pekerjaan Plafond
7850
7450
200
200
3.3.3.1 Rangka Plafond Hollow 40 x 40 x 4 mm
7850
7450
Tipe 1 4 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 37912500 mm²
= 37.9125 m²
Luas Total = Jumlah x Luas
7850 3450 = 151.65 m²
3850
7450
200 200
4450
200
200
4850
Tipe 2 12 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 45762500 mm²
7450
7850
7850
7450
= 45.763 m²
Luas Total = Jumlah x Luas
7850 = 549.15 m²
4450 5450
5850
4850
7450
200 200
5450
200
200
5850
7850
7450
7850
7450
200 200
200
200
Tipe 7 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
7450 + (3450 x 7450 ) - ( 8 x 200 x 200)
7850
7450
7850
7450
- ( 16 x 550 x 200 )
3450 = 220790000 mm²
23125 3450 23125 = 220.790 m²
Luas Total = Jumlah x Luas
5450
4450
4850
5850 = 220.79 m²
200 550
5450 4450
550
7850 = 30.0625 m²
200
4450 550 5450 550 5450 550 5450 550 3450 550 5450 550 5450 550 5450 550 4450
7450
200
200
3450
3850
951.653 m²
7850
7450
200
200
Panjang Btg 12 = 4615 mm
Panjang Btg 13 = 4921 mm
7450 Panjang Btg 14 = 5302 mm
7850
7850
7450
Panjang Btg 15 = 5608 mm
Panjang Btg 16 = 5913 mm
Tipe 1 4 Jumlah = 2
200 Panjang = Btg 1 - 13
4450 5450 = 39124 mm
5850
4850
= 39.124 m
7850 Total = Jumlah Tipe x Jumlah x Panjang
= 312.992 m
7450
4450
4850
Tipe 2 12 Jumlah = 2
200 Panjang = Btg 1 - 13
1925 = 39124 mm
= 39.124 m
7850 Total = Jumlah Tipe x Jumlah x Panjang
1925
= 938.976 m
7450
5450
KUDA-KUDA GABLE FRAME
BAJA IWF 175 x 175 x 7,5 x 11
GORDING BAJA
LIPPED C HANNEL 50 x 75 x 20 x 4,5
SAGROD Ø8
5850
GENTENG METAL
FRISCO 750 x 820 mm
Tipe 7 1 Daerah A
Jumlah = 2
7450 Panjang = Btg 1 - 13
3450 = 39124 mm
52000 A = 39.124 m
Total A = Jumlah x Panjang
1 NOK SPANDEK ZINCALUM
7450
3450
3850
1744.924 m
GORDING BAJA
KUDA-KUDA GABLE FRAME
LIPPED CHANNEL 50 x 75 x 20 x 4,5
BAJA IWF 175 x 175 x 7,5 x 11 GENTENG METAL
SAGROD Ø8 FRISCO 750 x 820 mm
GORDING BAJA
KUDA-KUDA GABLE FRAME
LIP PED CHANNEL 50 x 75 x 20 x 4,5
BAJA IWF 175 x 175 x 7,5 x 11 GENTENG METAL
7450
SAGROD Ø8 FRISCO 750 x 820 mm
52000
4450
1 NOK SPANDEK ZINCALUM
Tipe 2 9 0
12 Luas
RAFTER WF 175 x 175 x 7,5 x 11 = 7850 x 4850 - ( 4 x 200 x 200 )
123
200 SAGROD Ø8
549.15 m²
3 2
7850 =
20000
7450
5450
5850
Tipe 7 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
7450 + (3450 x 7450 ) - ( 8 x 200 x 200)
- ( 16 x 550 x 200 )
3450 = 220790000 mm²
23125 3450 23125 = 220.790 m²
Luas Total = Jumlah x Luas
= 220.79 m²
7450
SOPI-SOPI
DINDING BATA MERAH
2244
5183
939
3692
2000
20550
3450
3850
951.653 m²
3.3.3.4 List Plafond Gypsum
Tipe 1 4 Keliling = ( 2 x 7450) + ( 2 x 4450 ) + ( 8 x 200 )
200 = 25400 mm
= 25.4 m
Panjang = Jumlah x Keliling
= 101.6 m
7850
7450
4450
4850
Tipe 2 12 Keliling = ( 2 x 7450 ) + ( 2 x 5450 ) + ( 8 x 200 )
200 = 27400 mm
= 27.4 m
Panjang = Jumlah x Keliling
7850 = 328.8 m
7450
5450
5850
Tipe 7 1 Keliling = ( 12 x 5450 ) + ( 4 x 4450) + ( 18 x 550 )
+ ( 4 x 3450 ) + ( 44 x 200 ) + ( 2 x 7450 )
7450 = 131700 mm
3450 = 131.7 m
Panjang = Jumlah x Keliling
23125 3450 23125 = 131.7 m
7450
3450
3850
585.5 m
3.3.4 Pekerjaan Lantai
3.3.4.1 Pasangan Keramik
Tipe 1 3 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 37912500 mm²
= 37.9125 m²
Luas Total = Jumlah x Luas
7850 = 113.738 m²
7450
4450
4850
Tipe 2 12 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 45762500 mm²
= 45.763 m²
Luas Total = Jumlah x Luas
7850 = 549.150 m²
7450
5450
5850
Tipe 7 1 Luas = (( 23125 + 3450 + 23125 ) x 3450 )
4150 + (3450 x 4150 ) - ( 8 x 200 x 200)
- ( 16 x 550 x 200 )
3450 = 198020000 mm²
23125 3450 23125 = 198.020 m²
Luas Total = Jumlah x Luas
= 198.020 m²
7450
3450
3850
890.970 m²
3.3.4.2 Pasangan Keramik Toilet
Tipe 1 1 Luas = 7850 x 4850 - ( 4 x 200 x 200 )
200 = 37912500 mm²
= 37.9125 m²
Luas Total = Jumlah x Luas
7850 = 37.913 m²
7450
4450
4850
37.913 m²
3.3.4.3 Waterproofing Lantai Toilet
1 Luas = Luas Lantai Toilet
= 37.9125 m²
Luas Total = Jumlah x Luas
= 37.9125 m²
37.913 m²
3.3.5 Pekerjaan Tangga
3.3.5.1 Pekerjaan Railing Tangga
1 Panjang = 1925 mm
1925 = 1.925 m
Panjang Total = Jumlah x Panjang
= 1.925 m
1.925 m
3.4 Pekerjaan Penutup Atap
3.4.1 Genteng Metal
3.4.1.1 Genteng Metal Frisco 750 x 820 mm
1 Luas = 2 x 5200 x 12390
= 128856000 mm²
= 128.856 m²
Luas Total = Jumlah x Luas
= 128.856 m²
5200
12390
128.856 m²
3.4.1.2 Sambungat Atap ( Baut ∅5/8' )
4380 Diameter = 15.87 mm
Luas = 197.808 mm²
= 0.000198 m²
Panjang = 80 mm
= 0.08 m
Berat Baut = Jumlah x Luas x Panjang x 7850
= 544.123 kg
Tebal Mur = 13.0 mm
= 0.013 m
Diameter Luar Mur = 24 mm
Luas Mur = 452.389 mm²
0.000452 m²
Berat Mur = Jumlah x Tebal x Luas x 7850
= 202.218 kg
Berat = Berat Baut + Berat Mur
= 746.340 kg
746.340 kg
3.4.2 Genteng Nok Spandek Zincalum
1 Panjang = Panjang Atap
= 5200 mm
= 5.2 m
Panjang Total = Jumlah x Panjang
= 5.2 m
5200
5.2 m
3.4.3 Lisplank
3.4.3.1 Lisplank Kayu 400 x 25 mm
1 Panjang = 2 x Panjang Atap + 4 x Sisi Miring Atap
= 59960 mm
= 59.96 m
Panjang Total = Jumlah x Panjang
= 59.96 m
5200
12390
59.96 m
3.4.3.2 Plat Penyambung Siku 40 x 40 x 3 mm
20 Panjang 1 = 50 mm
= 0.05 m
q = 1.84 kg/m
Berat = Jumlah x Panjang 1 x q
= 2 kg
2 kg
3.4.3.3 Baut ∅1/2'
40 Diameter = 12.7 mm
Luas = 126.677 mm²
= 0.000127 m²
Panjang = 80 mm
= 0.08 m
Berat Baut = Jumlah x Luas x Panjang x 7850
= 3.182 kg
Tebal Mur = 10.0 mm
= 0.01 m
Diameter Luar Mur = 19 mm
Luas Mur = 283.529 mm²
0.000284 m²
Berat Mur = Jumlah x Tebal x Luas x 7850
= 0.890 kg
Berat = Berat Baut + Berat Mur
= 4.072 kg
4.072 kg
3.4.4 Pekerjaan Dinding Sopi - Sopi
3.4.4.1 Pasangan Bata
10742
2 Luas = 20550 x 5183 : 2
939 5183 = 53255325 mm²
2700
LAPANGAN
25000
Luas Total = Jumlah x Luas Plesteran
LAPANGAN
= 103.044 m²
25000
103.044 m²
4 Pekerjaan Mekanikal
4.1 Pekerjaan Instalasi Air Bersih
45000
1 Jumlah = 1 set
6473
1 set
4.1.1.3 Tangki Air
1 Jumlah = 1 set
21600
1 set
4.1.2 Pemasangan Pipa
7830
45000
1125 m²
7.2.2 Lapangan Parkir
Parkir Mobil
30751 1 Luas = Jumlah x Panjang x Lebar
= 199051223 mm²
6473 = 199.051 m²
Parkir Motor
21600 2 Luas = Jumlah x Panjang x Lebar
= 338256000 mm²
= 338.256 m²
7830
537.307 m²
7.2.3 Balok Kanstein 40 x 20 x 10 cm
1 Panjang Parkir Mobil = 30751 mm
Jumlah Baris Mobil = 1 baris
Panjang Parkir Mobil = 21600 mm
Jumlah Baris Mobil = 4 baris
Panjang = Panjang Parkir + Jumlah Baris
= 117151 mm
117.151 m
Total = Jumlah x Panjang
= 117.151 m
117.151 m
Nama:
Lutfi Ramadhan / 1114030006
Muhamad Naufal Rachman / 1114030037
volume pasir)
BILL OF QUANTITY
PROYEK PEMBANGUNAN GEDUNG SMA SLEMAN PERSADA
BAHAN INSTALASI
1 Kabel NYM 3x2.5 mm m 8,280.00
2 Aksesoris Listrik ls 40,000.00
3 meteran ls 3,000,000.00
klem pipa ls 35,000.00
lampu
Lampu TL 2x40 wat buah 56,000.00
Lampu DL buah 45,000.00
Lampu Taman 40 wat buah 45,000.00
Saklar Seri buah 12,000.00
Saklar Tunggal buah 9,000.00
Stop Kontak buah 10,000.00
Genset unit 30,000,000.00
CCTV unit 2,000,000.00
Box Panel unit 25,000.00
pesawat telpon unit 300,000.00
Fire estinguisher unit 530,000.00
AC buah 2,000,000.00
Elbow 90 buah 10,000.00
Reducer Tee buah 7,000.00
Socket buah 5,000.00
Tee buah 5,000.00
Stop Kran Air buah 15,000.00
pemasangan pipa ls 5,000,000.00
torrent buah 500,000.00
N BAHAN DAN UPAH
Rp. per Kg
Rp. per Kg
Rp. 12,000.00 per Kg
Rp. per Kg
Rp. per Kg
Rp. per Kg
Rp. 4,340.00 per bh 15
Rp. 2,150.00 per bh 8
Rp. per bh
Rp. per bh
Rp. per bh
Rp. per m1
Rp. per m1
Rp. per m1
Rp. per m1
Rp. per m1
Rp. per m1
Rp. per m1
Rp. per m1
Rp. per m1
Rp. per Kg
Rp. per Kg
Rp. per lbr
Rp. per m1
Rp. per unit
Rp. per Bh
Rp. per m2
Rp. per m2
Rp. per m2
Rp. per m2
Rp. per m2
Rp. per m2 750,000.00
Rp. per m1
Rp. per Lbr 2.98
251,948.40
Rp. 65,000.00 per bh
Rp. 110,000.00 per set
Rp. 220,000.00 per set
Rp. 300,000.00 per set
Rp. 30,000.00 per unit
Rp. 80,000.00 per Bh
Rp. 1,200,000.00 per stel
Rp. 150,000.00 per unit
Rp. 175,000.00 per unit
Rp. 165,000.00 per set
Rp. 140,000.00 per set
Rp. 40,000.00 per Set
Rp. 60,000.00 per Set
Rp. 30,000.00 per stel
Rp. 300,000.00 per stel
Rp. 340,000.00 per stel
Rp. 256,000.00 per stel
Rp. 140,000.00 per stel
Rp. 125,000.00 per stel
Rp. 60,000.00 per stel
2 Urugan Pasir m3
Pasir Urug m3
Pekerja OH
Mandor OH
Jumlah 1 m3
2 Pasang Dinding Bata 1:5 1/2 Bata m2
Batu Bata Merah bh
Semen Portland 50 kg zak
Pasir Pasang m3
Pekerja OH
Tukang Batu OH
Kepala Tukang Batu OH
Mandor OH
3 Benangan Sudut 1 : 2 m
Semen Portland zak
Pasir Pasang m3
Pekerja OH
Tukang Batu OH
Kepala Tukang Batu OH
Mandor OH
4 Acian Beton m2
Semen Portland zak
Pekerja OH
Tukang Batu OH
Kepala Tukang Batu OH
Mandor OH
3 Beton K-225 m3
Semen Portland 40 kg zak
Pasir beton m3
Batu pecah mesin 1/2 m3
Air (biaya air tawar) lt
Pekerja OH
Tukang Batu OH
Kepala Tukang Batu OH
Mandor OH
4 Beton K-300 m3
Semen Portland 40 kg zak
Pasir beton m3
Batu pecah mesin 1/2 m3
Air (biaya air tawar) lt
Pekerja OH
Tukang Batu OH
Kepala Tukang Batu OH
Mandor OH
7 Pembesian Wiremesh M6 m2
Wiremesh M6 (210 x 495 cm ) lbr
Kawat beton kg
Pekerja OH
Tukang Besi OH
Kepala Tukang Besi OH
Mandor OH
Pekerja OH
Tukang Kayu OH
Kepala Tukang Kayu OH
Mandor OH
Pekerja OH
Tukang Kayu OH
Kepala Tukang Kayu OH
Mandor OH
Pekerja OH
Tukang Kayu OH
Kepala Tukang Kayu OH
Mandor OH
Pekerja OH
Tukang Kayu OH
Kepala Tukang Kayu OH
Mandor OH
13 Bekisting Tangga m3
Kayu meranti usuk m3
Paku Usuk kg
Minyak Begesting ltr
Balok Kayu Kamper 3/5 m3
Multiplek tebal 9 mm lbr
Pekerja OH
Tukang Kayu OH
Kepala Tukang Kayu OH
Mandor OH
6 Lisplank Kayu m
Lisplank Kayu 400 x 25 mm m3
Plat Penyambung Siku 40 x 40 x 3 mm
Baut ∅1/2' bh
Pekerja OH
Tukang OH
Kepala Tukang kayu OH
Mandor OH
8 Pasang Kaca t= 6 mm m2
Kaca polos t= 6 mm m2
Pekerja OH
Tukang OH
Kepala Tukang OH
Mandor OH
12 Pasang Multiplek t= 12 mm m2
Multiplek t= 12 mm (122X244 cm lbr
Pekerja OH
Tukang OH
Kepala Tukang OH
Mandor OH
17 Railing Tangga 2 m1
Untuk panjang reiling m1
Hand railing pipa BSP dia 2 1/2 " t= 3,2 mm m1
Kolom Railing Hollow 40x40x2,3 mm m1
Hollow 20x20x2 mm m1
Base Plate bh
Cat pipa railing m2
4 Pengerjaan Waterproofing m2
Water Proofing dan Scredding kg
Pekerja OH
Tukang cat OH
Kepala Tukang cat OH
Mandor OH
XV PEKERJAAN ELEKTRIKAL
1 Pemasangan 1 Titik Lampu
Kabel NYM m
aksesoris listrik ls
klem pipa ls
Tukang listrik OH
Kepala tukang OH
Tukang listrik OH
Kepala tukang OH
Tukang listrik OH
Kepala tukang OH
Tukang listrik OH
Kepala tukang OH
Tukang listrik OH
Kepala tukang OH
Tukang listrik OH
Kepala tukang OH
AN PEKERJAAN
014
1.000
0.100 102,920.00 10,292.00
0.050 157,901.00 7,895.05
Jumlah 18,187.05
1.000
0.012 3,300,000.00 39,600.00
0.020 15,000.00 300.00
0.007 5,750,000.00 40,250.00
0.100 102,920.00 10,292.00
0.100 121,230.00 12,123.00
0.010 139,574.00 1,395.74
0.005 157,901.00 710.55
Jumlah 104,671.29
1.000
7.000 1,650,000.00 11,550,000.00
Jumlah 11,550,000.00
1.000
1.000
0.750 80,000.00 60,000.00
0.025 115,000.00 2,875.00
Jumlah 62,875.00
1.000
1.100 260,000.00 286,000.00
0.300 80,000.00 24,000.00
0.100 115,000.00 11,500.00
Jumlah 321,500.00
1.000
0.102 80,000.00 8,160.00
0.019 115,000.00 2,185.00
Jumlah 10,345.00
1.000
0.200 80,000.00 16,000.00
0.040 115,000.00 4,600.00
Jumlah 20,600.00
1.000
1.2000 265,000.00 318,000.00
0.3000 260,000.00 78,000.00
0.7800 102,920.00 80,277.60
0.3900 121,230.00 47,279.70
0.0390 139,574.00 5,443.39
0.0390 157,901.00 6,158.14
Jumlah 535,158.83
1.000
70.000 500.00 35,000.00
0.287 70,000.00 20,118.00
0.040 260,000.00 10,400.00
0.300 102,920.00 30,876.00
0.100 121,230.00 12,123.00
0.010 139,574.00 1,395.74
0.015 157,901.00 2,368.52
Jumlah 112,281.26
8.330 112,281.26 935,302.85
1.000
70.000 500.00 35,000.00
0.194 70,000.00 13,580.00
0.045 260,000.00 11,700.00
0.300 102,920.00 30,876.00
0.100 121,230.00 12,123.00
0.010 139,574.00 1,395.74
0.015 157,901.00 2,368.52
Jumlah 107,043.26
1.000
0.156 70,000.00 10,885.00
0.023 260,000.00 5,980.00
0.300 102,920.00 30,876.00
0.150 121,230.00 18,184.50
0.015 139,574.00 2,093.61
0.015 157,901.00 2,368.52
Jumlah 70,387.63
1.000
0.104 70,000.00 7,259.00
0.026 260,000.00 6,760.00
0.300 102,920.00 30,876.00
0.150 121,230.00 18,184.50
0.015 139,574.00 2,093.61
0.015 157,901.00 2,368.52
Jumlah 67,541.63
1.000
0.010 70,000.00 700.00
0.013 260,000.00 3,380.00
0.080 102,920.00 8,233.60
0.040 121,230.00 4,849.20
0.040 139,574.00 5,582.96
0.004 157,901.00 631.60
Jumlah 23,377.36
1.000
0.065 70,000.00 4,550.00
0.200 102,920.00 20,584.00
0.100 121,230.00 12,123.00
0.010 139,574.00 1,395.74
0.010 157,901.00 1,579.01
Jumlah 40,231.75
1.000
1.000 #N/A #N/A
0.125 187,901.00 23,487.63
0.218 130,000.00 28,340.00
0.218 #N/A #N/A
Jumlah #N/A
1.000
1.000 30,000.00 30,000.00
0.500 35,000.00 17,500.00
0.050 30,000.00 1,500.00
1.000 6,500.00 6,500.00
0.050 50,000.00 2,500.00
0.250 121,230.00 30,307.50
Jumlah 88,307.50
1.000
0.420 102,920.00 43,226.40
0.250 121,230.00 30,307.50
0.020 157,901.00 3,158.02
Jumlah 76,691.92
1.000
5.750 57,000.00 327,750.00
0.558 275,000.00 153,477.50
0.541 240,000.00 129,720.00
215.000 20.00 4,300.00
1.200 102,920.00 123,504.00
0.200 121,230.00 24,246.00
0.020 139,574.00 2,791.48
0.060 157,901.00 9,474.06
Jumlah 775,263.04
1.000
6.900 57,000.00 393,300.00
0.518 275,000.00 142,312.50
0.533 240,000.00 127,824.00
215.000 20.00 4,300.00
1.650 102,920.00 169,818.00
0.275 121,230.00 33,338.25
0.028 139,574.00 3,908.07
0.083 157,901.00 13,105.78
Jumlah 887,906.61
1.000
9.275 57,000.00 528,675.00
0.436 275,000.00 119,982.50
0.551 240,000.00 132,264.00
215.000 20.00 4,300.00
1.650 102,920.00 169,818.00
0.275 121,230.00 33,338.25
0.028 139,574.00 3,908.07
0.083 157,901.00 13,105.78
Jumlah 1,005,391.61
1.000
10.325 57,000.00 588,525.00
0.426 275,000.00 117,040.00
0.537 240,000.00 128,976.00
215.000 20.00 4,300.00
1.650 102,920.00 169,818.00
0.275 121,230.00 33,338.25
0.028 139,574.00 3,908.07
0.083 157,901.00 13,105.78
Jumlah 1,059,011.11
1.000
1.050 9,600.00 10,080.00
0.015 16,000.00 240.00
0.007 102,920.00 720.44
0.007 121,230.00 848.61
0.001 139,574.00 97.70
0.000 157,901.00 63.16
Jumlah 12,049.91
1.000
1.050 9,400.00 9,870.00
0.015 16,000.00 240.00
0.007 102,920.00 720.44
0.007 121,230.00 848.61
0.001 139,574.00 97.70
0.000 157,901.00 63.16
Jumlah 11,839.91
1.000
0.0900 400,000.00 36,000.00
0.0300 16,000.00 480.00
0.1500 102,920.00 15,438.00
0.0300 121,230.00 3,636.90
0.0150 139,574.00 2,093.61
0.0300 157,901.00 4,737.03
Jumlah 62,385.54
1.000
14.000 1,500.00 21,000.00
0.027 260,000.00 7,020.00
7.500 1,400.00 10,500.00
0.320 102,920.00 32,934.40
0.100 121,230.00 12,123.00
0.010 139,574.00 1,395.74
0.005 157,901.00 789.51
Jumlah 85,762.65
1.000
0.022 1,750,000.00 38,500.00
0.002 3,300,000.00 6,600.00
0.300 15,000.00 4,500.00
0.100 6,500.00 650.00
Jumlah bahan 50,250.00
0.520 102,920.00 53,518.40
0.260 121,230.00 31,519.80
0.026 139,574.00 3,628.92
0.026 157,901.00 4,105.43
Jumlah upah 92,772.55
0.500 50,250.00 25,125.00
1.000 92,772.55 92,772.55
Jumlah begesting 2 x pakai 117,897.55
1.000
0.010 3,300,000.00 33,000.00
0.400 15,000.00 6,000.00
0.200 6,500.00 1,300.00
0.015 3,650,000.00 54,750.00
0.350 158,000.00 55,300.00
2.000 14,000.00 28,000.00
Jumlah bahan 178,350.00
0.660 102,920.00 67,927.20
0.330 121,230.00 40,005.90
0.033 139,574.00 4,605.94
0.033 157,901.00 5,210.73
Jumlah upah 117,749.78
0.500 178,350.00 89,175.00
1.000 117,749.78 117,749.78
Jumlah begesting 2 x pakai 206,924.78
1.000
0.020 3,300,000.00 66,000.00
0.400 15,000.00 6,000.00
0.200 6,500.00 1,300.00
0.018 3,650,000.00 65,700.00
0.350 158,000.00 55,300.00
2.000 14,000.00 28,000.00
Jumlah bahan 222,300.00
0.660 102,920.00 67,927.20
0.330 121,230.00 40,005.90
0.033 139,574.00 4,605.94
0.033 157,901.00 5,210.73
Jumlah upah 117,749.78
0.500 222,300.00 111,150.00
1.000 117,749.78 117,749.78
Jumlah begesting 2 x pakai 228,899.78
1.000
0.0238 3,300,000.00 78,540.00
0.4000 15,000.00 6,000.00
0.2000 6,500.00 1,300.00
0.0150 3,650,000.00 54,750.00
0.3500 158,000.00 55,300.00
6.0000 14,000.00 84,000.00
Jumlah bahan 279,890.00
0.660 102,920.00 67,927.20
0.330 121,230.00 40,005.90
0.033 139,574.00 4,605.94
0.033 157,901.00 5,210.73
Jumlah upah 117,749.78
0.500 279,890.00 139,945.00
1.000 117,749.78 117,749.78
Jumlah begesting 2 x pakai 257,694.78
1.000
0.030 3,300,000.00 99,000.00
0.400 15,000.00 6,000.00
0.150 6,500.00 975.00
0.015 3,650,000.00 54,750.00
0.350 106,000.00 37,100.00
Jumlah bahan 197,825.00
0.660 102,920.00 67,927.20
0.330 121,230.00 40,005.90
0.033 139,574.00 4,605.94
0.033 157,901.00 5,210.73
Jumlah upah 117,749.78
0.500 197,825.00 98,912.50
1.000 117,749.78 117,749.78
Jumlah begesting 2 x pakai 216,662.28
1.000
3.000 17,000.00 51,000.00
6.000 500.00 3,000.00
0.005 157,901.00 789.51
0.001 139,574.00 139.57
0.100 121,213.00 12,121.30
0.100 102,920.00 10,292.00
Jumlah 77,342.38
1.000
4.000 8,000.00 32,000.00 261250
10.000 500.00 5,000.00
0.005 157,901.00 789.51
0.001 139,574.00 139.57
0.100 121,213.00 12,121.30
0.100 102,920.00 10,292.00 85000
Jumlah 60,342.38 75000
1.000 70000
Jumlah
2.600 17,000.00 44,200.00
1.100 20,000.00 22,000.00
6.000 500.000 5,000.00 205865
0.005 157,901.00 789.51
0.020 139,574.00 2,791.48 85000
0.200 121,213.00 24,242.60 80000
0.100 102,920.00 10,292.00 75000
Jumlah 109,315.59
1.000
1.020 87,100.00 88,842.00
7.221 4,340.00 31,339.14
1.100 28,500.00 31,350.00
0.200 80,000.00 16,000.00
0.100 95,000.00 9,500.00
0.010 105,000.00 1,050.00
0.010 115,000.00 1,150.00
Jumlah 179,231.14
1.000
0.011 53,000.00 583.00
0.037 12,000.00 444.00
1.155 2,150.00 2,483.25
0.100 80,000.00 8,000.00
0.200 95,000.00 19,000.00
0.020 105,000.00 2,100.00
0.005 115,000.00 575.00
Jumlah 30,510.25
1.000
0.233 57,000.00 13,281.00
1.940 9,500.00 18,430.00
0.018 260,000.00 4,680.00
1.060 67,000.00 71,020.00
0.900 102,920.00 92,628.00
0.450 121,230.00 54,553.50
0.045 139,574.00 6,280.83
0.045 157,901.00 7,105.55
Jumlah 267,978.88
1.000
0.233 57,000.00 13,281.00
1.500 9,500.00 14,250.00
0.045 260,000.00 11,700.00
1.068 66,000.00 70,507.80
0.700 102,920.00 72,044.00
0.350 121,230.00 42,430.50
0.035 139,574.00 4,885.09
0.035 157,901.00 5,526.54
Jumlah 234,624.93
1.000
1.050 67,000.00 70,350.00
11.380 1,400.00 15,932.00
0.045 260,000.00 11,700.00
1.620 9,500.00 15,390.00
0.700 102,920.00 72,044.00
0.350 121,230.00 42,430.50
0.035 139,574.00 4,885.09
0.035 157,901.00 5,526.54
Jumlah 238,258.13
1.000
1.050 67,000.00 70,350.00
11.380 1,400.00 15,932.00
0.045 260,000.00 11,700.00
1.620 9,500.00 15,390.00
0.700 102,920.00 72,044.00
0.350 121,230.00 42,430.50
0.035 139,574.00 4,885.09
0.035 157,901.00 5,526.54
Jumlah 238,258.13
1.000
1.050 160,000.00 168,000.00
10.000 1,400.00 14,000.00
0.045 260,000.00 11,700.00
1.500 9,500.00 14,250.00
0.260 102,920.00 26,759.20
0.130 121,230.00 15,759.90
0.013 139,574.00 1,814.46
0.013 157,901.00 2,052.71
Jumlah 254,336.28
1.000
3.500 10,000.00 35,000.00
11.400 1,400.00 15,960.00
0.003 260,000.00 780.00
0.025 9,500.00 237.50
0.090 102,920.00 9,262.80
0.090 121,230.00 10,910.70
0.009 139,574.00 1,256.17
0.005 157,901.00 789.51
Jumlah 74,196.67
1.000
1.050 82,000.00 86,100.00
1.000 400.00 400.00
4.000 2,200.00 8,800.00
0.150 102,920.00 15,438.00
0.250 121,213.00 30,303.25
0.022 139,574.00 3,070.63
0.025 157,901.00 3,947.53
Jumlah 148,059.40
1.000
1.050 80,000.00 84,000.00
1.000 400.00 400.00
4.000 2,200.00 8,800.00
0.150 102,920.00 15,438.00
0.250 121,213.00 30,303.25
0.022 139,574.00 3,070.63
0.025 157,901.00 3,947.53
Jumlah 145,959.40
1.000
1.050 84,000.00 88,200.00
1.000 2,200.00 2,200.00
4.000 400.00 1,600.00
0.150 102,920.00 15,438.00
0.250 121,213.00 30,303.25
0.022 139,574.00 3,070.63
0.025 157,901.00 3,947.53
Jumlah 144,759.40
1.000
1.050 87,000.00 91,350.00
1.000 2,200.00 2,200.00
4.000 400.00 1,600.00
0.150 102,920.00 15,438.00
0.250 121,213.00 30,303.25
0.022 139,574.00 3,070.63
0.025 157,901.00 3,947.53
Jumlah 147,909.40
1.000
1.050 78,000.00 81,900.00
1.000 2,200.00 2,200.00
4.000 400.00 1,600.00
0.150 102,920.00 15,438.00
0.250 121,213.00 30,303.25
0.022 139,574.00 3,070.63
0.025 157,901.00 3,947.53
Jumlah 138,459.40
1.000
1.050 22,000.00 23,100.00
4.000 400.00 1,600.00
0.150 102,920.00 15,438.00
0.150 121,213.00 18,181.95
0.010 139,574.00 1,395.74
0.020 157,901.00 3,158.02
Jumlah 62,873.71
1.000
1.050 80,000.00 84,000.00
0.015 102,920.00 1,543.80
0.150 121,213.00 18,181.95
0.015 139,574.00 2,093.61
0.008 157,901.00 1,184.26
Jumlah 107,003.62
1.000
1.050 112,000.00 117,600.00
0.015 102,920.00 1,543.80
0.150 121,213.00 18,181.95
0.015 139,574.00 2,093.61
0.008 157,901.00 1,184.26
Jumlah 140,603.62
1.000
1.050 175,000.00 183,750.00
0.015 102,920.00 1,543.80
0.150 121,213.00 18,181.95
0.015 139,574.00 2,093.61
0.008 157,901.00 1,184.26
Jumlah 206,753.62
1.000
1.050 530,000.00 556,500.00
0.020 102,920.00 2,058.40
0.200 121,213.00 24,242.60
0.020 139,574.00 2,791.48
0.010 157,901.00 1,579.01
Jumlah 587,171.49
1.000
1.050 1,250,000.00 1,312,500.00
0.025 102,920.00 2,573.00
0.250 121,213.00 30,303.25
0.025 139,574.00 3,489.35
0.013 157,901.00 1,973.76
Jumlah 1,350,839.36
1.000
0.350 158,000.00 55,300.00
0.0250 102,920.00 2,573.00
0.0750 121,213.00 9,090.98
0.0075 139,574.00 1,046.81
0.0013 157,901.00 205.27
Jumlah 68,216.05
1.000
1.0500 160,000.00 168,000.00
20.0000 1,000.00 20,000.00
0.040 102,920.00 4,116.80
0.400 121,213.00 48,485.20
0.040 139,574.00 5,582.96
0.0200 157,901.00 3,158.02
Jumlah 249,342.98
1.000
1.0500 220,000.00 231,000.00
20.0000 1,000.00 20,000.00
0.040 102,920.00 4,116.80
0.400 121,213.00 48,485.20
0.040 139,574.00 5,582.96
0.0200 157,901.00 3,158.02 Jumlah
Jumlah 312,342.98
1.000
9.560 148,059.40 1,415,447.89
9.840 144,759.40 1,424,432.53
1.440 147,909.40 212,989.54
2.310 68,216.05 157,579.08
6.390 64,000.00 408,960.00
3.600 40,000.00 144,000.00
0.310 107,003.62 33,171.12
1.060 140,603.62 149,039.83
2.000 300,000.00 600,000.00
3.000 30,000.00 90,000.00
2.000 300,000.00 600,000.00
1.000 165,000.00 165,000.00
2.000 30,000.00 60,000.00
1.000 60,000.00 60,000.00
1.000 40,000.00 40,000.00
Jumlah 5,560,619.99
1.000
7.840 1,350,839.36 10,590,580.60
5.840 587,171.49 3,429,081.50
4.000 340,000.00 1,360,000.00
4.000 150,000.00 600,000.00
4.000 175,000.00 700,000.00
4.000 1,200,000.00 4,800,000.00
4.000 110,000.00 440,000.00
4.000 220,000.00 880,000.00
8.900 249,342.98 2,219,152.52
56.600 37,707.45 2,134,241.81
0.280 #REF! #REF!
Jumlah #REF!
1.000
10.120 148,059.40 1,498,361.16
10.120 144,759.40 1,464,965.16
1.720 147,909.40 254,404.17
2.800 206,753.62 578,910.13
5.160 62,873.71 324,428.34
2.000 256,000.00 512,000.00
3.000 30,000.00 90,000.00
2.000 300,000.00 600,000.00
1.000 165,000.00 165,000.00
1.000 60,000.00 60,000.00
1.000 40,000.00 40,000.00
Jumlah 5,588,068.96
1.000
9.560 148,059.40 1,415,447.89
9.840 144,759.40 1,424,432.53
1.440 147,909.40 212,989.54
2.310 68,216.05 157,579.08
6.390 64,000.00 408,960.00
3.600 40,000.00 144,000.00
0.310 107,003.62 33,171.12
4.200 62,873.71 264,069.58
2.000 300,000.00 600,000.00
3.000 30,000.00 90,000.00
2.000 300,000.00 600,000.00
1.000 165,000.00 165,000.00
2.000 30,000.00 60,000.00
1.000 60,000.00 60,000.00
1.000 40,000.00 40,000.00
Jumlah 5,675,649.74
1.000
4.480 148,059.40 663,306.13
10.120 144,759.40 1,464,965.16
1.720 147,909.40 254,404.17
0.970 68,216.05 66,169.57
1.940 64,000.00 124,160.00
1.000 140,000.00 140,000.00
2.000 30,000.00 60,000.00
1.000 165,000.00 165,000.00
Jumlah 2,938,005.03
1.000
7.660 148,059.40 1,134,135.03
5.050 144,759.40 731,034.99
0.850 147,909.40 125,722.99
1.380 68,216.05 94,138.15
2.760 64,000.00 176,640.00
1.800 40,000.00 72,000.00
0.150 107,003.62 16,050.54
0.610 140,603.62 85,768.21
1.000 140,000.00 140,000.00
2.000 30,000.00 60,000.00
1.000 165,000.00 165,000.00
Jumlah 2,800,489.90
1.000
7.660 148,059.40 1,134,135.03
5.050 144,759.40 731,034.99
0.850 147,909.40 125,722.99
1.380 68,216.05 94,138.15
2.760 64,000.00 176,640.00
1.800 40,000.00 72,000.00
0.150 107,003.62 16,050.54
5.100 62,873.71 320,655.92
1.000 140,000.00 140,000.00
2.000 30,000.00 60,000.00
1.000 165,000.00 165,000.00
Jumlah 3,035,377.62
1.000
5.010 148,059.40 741,777.61
4.930 144,759.40 713,663.86
1.460 147,909.40 215,947.73
0.990 68,216.05 67,533.89
1.990 64,000.00 127,360.00
1.000 140,000.00 140,000.00
2.000 30,000.00 60,000.00
1.000 165,000.00 165,000.00
Jumlah 2,231,283.08
1.000
4.260 148,059.40 630,733.06
6.280 144,759.40 909,089.05
0.700 68,216.05 47,751.24
1.400 64,000.00 89,600.00
1.000 125,000.00 125,000.00
2.000 30,000.00 60,000.00
1.000 140,000.00 140,000.00
Jumlah 2,002,173.34
1.000
3.500 148,059.40 518,207.91
3.340 144,759.40 483,496.41
0.300 68,216.05 20,464.82
0.600 64,000.00 38,400.00
1.000 125,000.00 125,000.00
1.000 30,000.00 30,000.00
1.000 140,000.00 140,000.00
Jumlah 1,355,569.13
1.000
16.150 148,059.40 2,391,159.36
5.960 138,459.40 825,218.04
3.810 107,003.62 407,683.78
24.600 2,200.00 54,120.00
2.000 65,000.00 130,000.00
2.000 60,000.00 120,000.00
Jumlah 3,928,181.18
1.000
16.600 148,059.40 2,457,786.09
6.120 138,459.40 847,371.55
3.920 107,003.62 419,454.18
22.100 2,200.00 48,620.00
2.000 65,000.00 130,000.00
2.000 60,000.00 120,000.00
Jumlah 4,023,231.82
1.000
16.150 148,059.40 2,391,159.36
5.960 138,459.40 825,218.04
14.400 62,873.71 905,381.42
1.880 107,003.62 201,166.80
9.400 2,200.00 20,680.00
2.000 65,000.00 130,000.00
2.000 60,000.00 120,000.00
Jumlah 4,593,605.63
1.000
16.600 148,059.40 2,457,786.09
6.120 138,459.40 847,371.55
15.120 62,873.71 950,650.50
2.010 107,003.62 215,077.27
11.300 2,200.00 24,860.00
2.000 65,000.00 130,000.00
2.000 60,000.00 120,000.00
Jumlah 4,745,745.40
1.000
5.560 148,059.40 823,210.28
3.240 138,459.40 448,608.47
3.840 62,873.71 241,435.05
0.430 107,003.62 46,011.56
2.700 2,200.00 5,940.00
1.000 65,000.00 65,000.00
1.000 60,000.00 60,000.00
Jumlah 1,690,205.35
1.000
31.800 148,059.40 4,708,289.02
11.580 138,459.40 1,603,359.89
20.100 62,873.71 1,263,761.57
6.630 107,003.62 709,433.98
38.100 2,200.00 83,820.00
2.000 65,000.00 130,000.00
3.000 60,000.00 180,000.00
Jumlah 8,678,664.46
1.000
26.500 148,059.40 3,923,574.18
7.840 138,459.40 1,085,521.72
16.800 62,873.71 1,056,278.33
5.400 107,003.62 577,819.53
26.600 2,200.00 58,520.00
2.000 65,000.00 130,000.00
2.000 60,000.00 120,000.00
Jumlah 6,951,713.76
1.000
2.000 148,059.40 296,118.81
1.520 138,459.40 210,458.29
1.100 107,003.62 117,703.98
1.400 2,200.00 3,080.00
2.000 65,000.00 130,000.00
1.000 60,000.00 60,000.00
Jumlah 817,361.08
1.000
14.600 148,059.40 2,161,667.28
9.760 138,459.40 1,351,363.77
2.480 140,603.62 348,696.97
17.000 2,200.00 37,400.00
4.000 65,000.00 260,000.00
4.000 60,000.00 240,000.00
Jumlah 4,399,128.03
1.000
15.600 148,059.40 2,309,726.69
3.040 140,603.62 427,435.00
20.000 2,200.00 44,000.00
Jumlah 2,781,161.68
1.000
29.900 148,059.40 4,426,976.15
6.880 140,603.62 967,352.89
42.400 2,200.00 93,280.00
Jumlah 5,487,609.04
1.000
19.100 148,059.40 2,827,934.60
9.120 138,459.40 1,262,749.76
4.400 140,603.62 618,655.92
24.040 2,200.00 52,888.00
2.000 65,000.00 130,000.00
2.000 60,000.00 120,000.00
Jumlah 5,012,228.27
10.000
0.400 35,000.00 14,000.00
0.300 6,500.00 1,950.00
0.040 28,000.00 1,120.00
0.170 50,000.00 8,500.00
0.002 157,901.00 315.80
0.020 121,213.00 2,424.26
0.002 139,574.00 279.15
0.002 102,920.00 205.84
Jumlah 28,795.05
1.000
0.006 35,000.00 210.00
0.005 6,500.00 29.25
0.001 28,000.00 16.80
0.210 50,000.00 10,500.00
0.002 157,901.00 315.80
0.060 121,213.00 7,272.78
0.006 139,574.00 837.44
0.028 102,920.00 2,881.76
Jumlah 22,063.84
1.000
0.200 28,795.05 5,759.01
0.001 157,901.00 78.95
0.001 121,213.00 121.21
0.000 139,574.00 13.96
0.001 102,920.00 102.92
Jumlah 6,076.05
1.000
1.050 12,000.00 12,600.00
1.000 6,076.05 6,076.05
Jumlah 18,676.05
1.000
1.050 12,000.00 12,600.00
1.000 6,076.05 6,076.05
Jumlah 18,676.05
1.000
1.050 12,000.00 12,600.00
1.000 6,076.05 6,076.05
Jumlah 18,676.05
1.000
1.050 12,000.00 12,600.00
1.000 6,076.05 6,076.05
Jumlah 18,676.05
1.000
1.050 9,600.00 10,080.00
1.000 6,076.05 6,076.05
Jumlah 16,156.05
1.000
1.050 9,600.00 10,080.00
1.000 6,076.05 6,076.05
Jumlah 16,156.05
1.000
1.050 7,000.00 7,350.00
0.250 22,063.84 5,515.96
Jumlah 12,865.96
1.000
1.050 14,000.00 14,700.00
0.500 22,063.84 11,031.92
Jumlah 25,731.92
1.000
1.050 17,000.00 17,850.00
0.900 22,063.84 19,857.45
Jumlah 37,707.45
1.000
1.050 21,000.00 22,050.00
1.500 22,063.84 33,095.75
Jumlah 55,145.75
1.000
1.050 28,000.00 29,400.00
1.750 22,063.84 38,611.71
Jumlah 68,011.71
1.000
1.050 350,000.00 367,500.00
2.940 22,063.84 64,867.68
Jumlah 432,367.68
1.000
1.050 175,000.00 183,750.00
2.500 22,063.84 55,159.59
Jumlah 238,909.59
1.000
1.050 200,000.00 210,000.00
2.940 22,063.84 64,867.68
Jumlah 274,867.68
1.000
1.050 125,000.00 131,250.00
1.200 22,063.84 26,476.60
Jumlah 157,726.60
1.000
395.850 18,676.05 7,392,914.75
300.900 55,145.75 16,593,357.38
87.190 31,885.36 2,780,084.83
217.200 3,000.00 651,600.00
Jumlah 27,417,956.95
1.000
1.000 432,367.68 432,367.68
2.200 247,500.00 544,500.00
1.260 432,367.68 544,783.27
0.750 238,909.59 179,182.19
1.900 25,000.00 47,500.00
1.000 56,000.00 56,000.00
Jumlah 1,804,333.14
1.000
1.100 432,367.68 475,604.45
1.000 50,000.00 50,000.00
Jumlah 525,604.45
1.000
8.500
8.500 274,867.68 2,336,375.26
11.700 37,707.45 441,177.19
23.000 12,865.96 295,917.06
1.000 56,000.00 56,000.00
22.000 31,885.36 701,477.99
Jumlah 8,5 M 3,830,947.50
Jumlah 1 M 450,699.71
1.000
5.600
5.600 274,867.68 1,539,259.00
1.344 31,885.36 42,853.93
4.000 50,000.00 200,000.00
Jumlah 5 M 1,782,112.92
Jumlah 1 M 318,234.45
1.000
0.750 37,707.45 28,280.59
2.000 25,731.92 51,463.84
0.382 62,000.00 23,677.80
4.000 500.00 2,000.00
0.150 102,920.00 15,438.00
0.250 121,230.00 30,307.50
0.025 139,574.00 3,489.35
0.075 157,901.00 11,842.58
Jumlah 166,499.65
1.000
0.750 37,707.45 28,280.59
2.000 25,731.92 51,463.84
0.382 84,000.00 32,079.60
4.000 500.00 2,000.00
0.150 102,920.00 15,438.00
0.250 121,230.00 30,307.50
0.025 139,574.00 3,489.35
0.075 157,901.00 11,842.58
Jumlah 174,901.45
1.000
1.050 26,000.00 27,300.00
4.000 500.00 2,000.00
0.050 102,920.00 5,146.00
0.050 121,230.00 6,061.50
0.005 139,574.00 697.87
0.003 157,901.00 473.70
Jumlah 41,679.07
1.000
1.050 10,000.00 10,500.00
4.000 500.00 2,000.00
0.050 102,920.00 5,146.00
0.050 121,230.00 6,061.50
0.005 139,574.00 697.87
0.003 157,901.00 473.70
Jumlah 24,879.07
1.000
0.120 25,000.00 3,000.00
0.360 20,000.00 7,200.00
0.028 102,920.00 2,881.76
0.042 121,230.00 5,091.66
0.004 139,574.00 586.21
0.003 157,901.00 394.75
Jumlah 19,154.38
1.000
0.120 25,000.00 3,000.00
0.360 115,000.00 41,400.00
0.028 102,920.00 2,881.76
0.042 121,230.00 5,091.66
0.004 139,574.00 586.21
0.003 157,901.00 394.75
Jumlah 53,354.38
1.000
0.100 45,000.00 4,500.00
0.010 10,000.00 100.00
0.020 102,920.00 2,058.40
0.200 121,230.00 24,246.00
0.004 139,574.00 586.21
0.003 157,901.00 394.75
Jumlah 31,885.36
1.000
0.350 42,000.00 14,700.00
0.050 102,920.00 5,146.00
0.075 121,230.00 9,092.25
0.008 139,574.00 1,046.81
0.003 157,901.00 394.75
Jumlah 30,379.81
1.000
1.000 140,000.00 140,000.00
0.160 62,875.00 10,060.00
0.040 321,500.00 12,860.00
Jumlah 162,920.00
1.000
1.000 270,000.00 270,000.00
0.590 62,875.00 37,096.25
0.070 321,500.00 22,505.00
Jumlah 329,601.25
1.000
1.000 98,000.00 98,000.00
0.100 98,000.00 9,800.00
0.080 102,920.00 8,233.60
0.135 121,230.00 16,366.05
0.014 139,574.00 1,884.25
0.004 157,901.00 647.39
Jumlah 134,931.29
425
7500
28000
324100
226452
425
800
7500
263177
PEMASANGAN MCB + BOX
buah MCB BOX 200,000.00 200,000.00
buah mcb 25 a 3,500,000.00 3,500,000.00
TOTAL 66,600.00
FITTING LAMPU DOWN LIGHT