HARGA
NO. URAIAN PEKERJAAN KODE VOLUME SATUAN SATUAN
(Rp)
a b c d e f
I. UMUM
1.1 Pekerjaan Persiapan
2 Pekerjaan Bobgkaran
a, Pek. Bongkaran Kusen Pintu dan jendela 1.000 Ls 441,000.00
Halaman - 4
Halaman - 5
JUMLAH
HARGA
(Rp)
g
721,000.00
441,000.00
9,185,486.10
4,593,525.00
8,221,325.00
250,000.00
23,412,336.10
Halaman - 6
Halaman - 7
RENCANA ANGGARAN BIAYA
VOLUME HARGA
NO. URAIAN PEKERJAAN KODE SATUAN SATUAN
(Rp)
a b c d e f
II. PEKERJAAN STRUKTUR
2.1 Pekerjaan Pondasi Batu Kali
1 - Pek Galian tanah Pondasi 12.600 M3 69,375.00
Urugan Sirtu 23.342 M3 279,750.00
- Pek Astamping Batu Kali 1.440 M3 519,007.50
- Pek Pondasi Batu Kali 5.610 M3 844,177.50
- Pek. Pasir Bawah Pondasi dan lantai 12.975 M3 279,750.00
1 Sloof 15 x 20 cm (RB3)
- Beton K-250 A.4.1.1.5 0.171 M3 519,007.50
- Tulangan Utama, Besi Polos 4 Ø 12 mm A.4.1.1.17.4 21.306 Kg 14,166.25
- Tulangan Beugel, Besi Polos Ø 8 mm - 15 cm A.4.1.1.17.2 10.795 Kg 14,166.25
- Bakesting Balok (2 Kali Pakai) A.4.1.1.23 1.750 M2 285,640.46
Halaman - 8
- Tulangan Utama, Besi Polos 6 Ø 12 mm A.4.1.1.17.2 101.205 Kg 13,902.00
- Tulangan Beugel, Besi Polos Ø 10 mm - 15 cm A.4.1.1.17.2 410.216 Kg 13,902.00
- Bakesting Kolom (3 Kali Pakai) A.4.1.1.21 4.000 M2 285,640.46
Halaman - 9
JUMLAH
HARGA
(Rp)
g
874,125.00
6,529,784.63
747,370.80
4,735,835.78
3,629,756.25
16,516,872.45
88,750.28
301,829.52
152,926.96
499,870.81
-
-
3,176,932.27
4,748,784.49
2,406,050.81
499,870.81
-
-
841,348.59
Halaman - 10
1,406,946.91
5,702,824.79
1,142,561.84
20,968,698.06
11,751,042.00
7,054,209.00
19,502,500.00
15,857,550.00
1,478,605.92
-
55,643,906.92
93,129,477.43
Halaman - 11
RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. URAIAN PEKERJAAN KODE VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b c d e f g
III. PEKERJAAN ARSITEKTUR
3.1 Pekerjaan Dinding dan Plesteran
1 - Pas. Dinding A.4.4.1.9 39.900 M2 133,502.00 5,326,729.80
2 - Plesteran Dinding Camp. 1 SP : 5 PP, Tebal 15 mm A.4.4.2.5 208.200 M2 58,555.10 12,191,171.82
3 - Acian Dinding 1 Pc : 7 Kpr A.4.4.2.27 321.000 M2 31,518.44 10,117,418.66
4 - Pek. Saluran air hujan AHSP - A.5.1.1 103.000 M2 114,986.25 11,843,583.75
5 - Glass blok 46.500 M2 59,173.75 2,751,579.38
6 - Pas Dinding Keramik 40x40 cm AHSP - A.4.4.3 57.000 M2 131795.00 7,512,315.00
7 - Pek. Saluran air dalam bagunan AHSP-A5.1.1 45.000 M2 114,986.25 5,174,381.25
Halaman - 12
- Pek. Slot Pintu 5.000 m2 34,825.00 174,125.00
- Pek. Slot Jendela 4.000 ls 33,000.00 132,000.00
4 - Pek. Sleding door 5.290 m2 1,400,000.00 7,406,000.00
Halaman - 13
RENCANA ANGGARAN BIAYA
a b c d e
IV. PEKERJAAN ELEKTRIKAL DAN PLUMBING
4.1 Pekerjaan Instalasi dan Armatur Lampu
Instalasi penerangan, daya, stop kontak, saklar menggunakan kabel Kabel NYM 2 x 1 x 2,5
mm2 dalam conduit hight impact Ø 20 mm, setiap pencabangan ke armature melalui junction
box dan diletakkan dlm fleksibel konduit jarak minimum 1,5 m dari armature
Halaman - 14
1 Pipa PVC Type AW Diameter 3" (Dari Floor Drain) - 6.000 M'
2 Pipa PVC Type AW Diameter 4" (Dari Kloset) - 6.000 M'
Pekerjaan Sanitary
1 Pek. Pemasangan Floor Drain - 3.000 Bh
2 Pek. Pemasangan Kloset jongkok - 1.000 Set
4 Pek. Pemasangan Kran Air - 5.000 Bh
Halaman - 15
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
f g
3,000,000.00 3,000,000.00
111,975.25 3,695,183.25
145,923.88 583,695.50
58,000.00 986,000.00
162,300.00 2,596,800.00
76,875.00 307,500.00
69,375.00 277,500.00
79,375.00 396,875.00
103,500.00 103,500.00
390,625.00 3,125,000.00
Jumlah Section 4.1 15,072,053.75
36,721.50 367,215.00
25,417.44 254,174.43
Halaman - 16
50,786.25 304,717.50
184,986.25 1,109,917.50
44,550.00 133,650.00
450,000.00 450,000.00
90,000.00 450,000.00
Halaman - 17
DAFTAR HARGA SATUAN UPAH DAN BAHAN
2. Kerikil
Kerikil Sungai Pilihan/ Koral M3 265,000.00 196.296
Kerikil Sungai Tersaring M3 265,000.00
Kerikil Sungai Tak Tersaring M3 265,000.00
Batu Pecah 0,5 - 1 Cm (Spilt) M3 320,000.00 237.037
Batu Pecah 1 - 2 (Spilt) M3 320,000.00 237.037
Batu Pecah 2 - 3 (Spilt) M3 320,000.00 237.037
Batu Pecah 3 - 5 (Spilt) M3 320,000.00 237.037
Batu Pecah 5 - 7 (Spilt) M3 320,000.00 237.037
3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 250,000.00
Batu Karang M3 230,000.00
Batu Andesit Bintik 30 x 30 cm M2 220,000.00
Batu Andesit Bintik 20 x 40 cm M2 220,000.00
Batu Sikat Motif Kecil Ktg 70,000.00
Batu Sikat Motif Besar Ktg 80,000.00
4. Batu Cetak :
Batu Bata Ukuran 5 x 11 x 22 cm Bh 1,000.00
Batu Bata Ukuran 5 x 9 x 22 cm Bh 850.00
Batu Bata Ukuran 5 x 7 x 22 cm Bh 700.00
Batu Bata Ukuran 5 x 11 x 22 cm M3 700,000.00
Batu Bata Ukuran 5 x 9 x 22 cm 1 M3 (700 Buah) M3 602,500.00 700 Bh
2. Semen
Semen Pc (50 Kg) Zak 70,000.00 1,400 /Kg
Semen Warna/ Putih Kg 1,750.00 88,367 /Zak
Halaman - 02
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
3. Bahan Atap
Seng Gelombang BJLS 0.20 Lbr 62,000.00
Seng Gelombang BJLS 0.18 Lbr 57,000.00
Genteng Metal (Multi Roof) T= 0,3 mm, 2 Susun Lbr 70,000.00 0,800 x 0,770
Genteng Metal (Sakura Roof) T= 0,3 mm, 2 Susun Lbr 51,500.00
Seng Plat BJLS 0.20 Lbr 175,000.00
Atap Zincalume 80 x 170 cm, T= 0,25 mm Lbr 55,000.00
Genteng Tanah/Plentong ex. Jatiwangi bh 2,400.00
4. Bahan Bubungan/ Nok
Seng Plat Lebar 90 Cm M1 30,000.00
Seng Plat Lebar 45 Cm M1 19,500.00
Seng Plat Lebar 30 Cm M1 15,000.00
Genteng Metal (Multi Roof) 0,3 mm Lbr 26,500.00
Genteng Metal (Sakura Roof) 0,25 mm Bh 24,000.00
Alumunium Zincalume 0,35 mm M1 50,000.00
Alumunium Zincalume 0,25 mm M1 35,000.00
Bubungan Genteng Tanah Bh 5,500.00
5. Bahan Kayu
Balok 6/16 x 4 m (Kayu Kelas I), Kayu Lasi M3 4,750,000.00
Balok 6/16 x 4 m (Kayu Kelas II) M3 2,850,000.00
Balok 8/12 x 4 m (Kayu Kelas II) M3 2,850,000.00
Balok 6/10 x 4 m (Kayu Kelas II) M3 2,850,000.00
Balok 5/7 x 4 m (Kayu Kelas II) M3 2,850,000.00
Balok 5/7 x 4 m (Kayu Kelas III) M3 2,400,000.00
Kayu Bakesting (Kayu Kelas III) M3 2,400,000.00
Papan Palapi M3 1,785,960.00
Papan (Kayu Kelas II) M3 2,350,000.00
Papan Mall (Kayu Kelas III) M3 2,400,000.00
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' Btg 18,500.00
6. Bahan Bambu
Bambu Besar 15 - 20 Cm Btg 20,000.00
Bambu Sedang 10 - 15 Cm Btg 18,000.00
Bambu Kecil 5 - 10 Cm Btg 15,000.00
Halaman - 03
NO. HARGA
UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
9. Bahan Kawat
Kawat Ikat Beton/ Bendrat Kg 28,000.00
Kawat Duri (50 m) 4 Kg Roll 156,250.00 3,125.00
Kawat Las Dos 150,000.00
Kawat Las LB (5 Kg) Kg 128,000.00 640,000.00 /5 Kg
Kawat Las Listrik Kg 40,000.00
Kawat Las RB (5 Kg) Kg 92,000.00 460,000.00 /5 Kg
Halaman - 04
NO. HARGA
UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Pipa Gip :
Diameter 1/2" Btg 51,000.00 8,500.00 /M1
Diameter 3/4" Btg 66,607.00 10,633.33 /M1
Diameter 1" Btg 126,000.00 15,491.67 /M1
Knie Gip 1/2" Bh 9,500.00 1,583.33 /M1
Double Niple 1" Bh 8,900.00 1,483.33 /M1
Clame Sadle 1/2"-3" Bh 51,500.00 8,583.33 /M1
Tee Gip 1/2" Bh 5,900.00 1,475.00
Socket Drat Gip 1/2" Bh 4,700.00 783.33 /M1
Hanger + Support Pipa GIP 4" Set 120,000.00 20,000.00
Hanger + Support Pipa GIP 3" Set 100,000.00 16,666.67
Hanger + Support Pipa GIP 2" Set 90,000.00 15,000.00
Hanger + Support Pipa GIP 3/4" Set 85,000.00 14,166.67
Hanger + Support Pipa GIP 1/2" Set 65,000.00 10,833.33
2. Bahan Finishing
Cat Kayu :
Minyak Cat/ Afduner Ltr 31,250.00
Meny Kayu Kg 23,200.00
Cat Kayu Kg 30,000.00
Meni Besi/ Seng Kg 28,000.00
Minyak Bekisting Ltr 7,500.00
Plamur Kayu Kg 28,000.00
Dempul Jadi Kg 5,900.00
Halaman - 05
NO. HARGA
UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Cat Tembok :
Cat Tembok & Plafond (Interior) Kg 35,000.00
Cat Tembok Wathersield (Exterior) Kg 49,000.00
Cat Tembok Metrolait Kg 27,550.00 102,500.00
Cat Tembok Paragon (20 Kg) Kg 22,850.00 457,000.00 Pail
Cat Tembok Cathylac Kg 21,600.00
Plamur Tembok Kg 13,500.00 30,500.00 Klg
Dempul Tembok Kg 23,438.00
Polimer Mortar Kg 25,000.00
EAL Water Proofing Epoxy (02) Kg 160,000.00
Cat Besi :
Meny Seng Kg 27,344.00
Meny Besi Kg 25,500.00
Cat Besi Kg 30,000.00
Cat Coating Clear (Glotex) Kg 56,000.00
Cat Dicco Kg 87,000.00
Cat Atap Seng Kg 24,375.00 87,500.00 Klg
Cat Atap dan Genting Kg 24,375.00 87,500.00 Klg
Cat Vernis Kg 32,000.00
3. Bahan Penggantung
Kunci - Kunci :
Kunci Tanam Bulat Ex. Muller Set 125,000.00
Kunci Pintu Gagang Tanam Kualitas Baik Set 168,920.00
Kunci Pintu 2 Slaag Kualitas Baik Buah 148,438.00
Kunci Pintu Bulat Ex. Muller Set 95,000.00
Handle Stainless Steel 80 cm Set 350,000.00
Handle Stainless Steel 40 cm Set 250,000.00
Grendel Jendela Bh 8,000.00
Grendel Pintu Bh 13,000.00
Hengsel Pintu Kualitas Baik Buah 26,000.00
Hengsel Jendela Buah 20,800.00
Kait Angin Jendela Bh 16,000.00
Spring Knip (Grendel Alumunium) Bh 22,500.00
Floor Hinges Kaca Frameless Set 450,000.00
Patch Fitting Kaca Bh 120,000.00
Patch Fitting Kunci Bh 100,000.00
Floor Hinges Standart Set 250,000.00
Halaman - 06
NO. HARGA
UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
4. Bahan Listrik
Macam - macam Kabel :
NYM 2 x 1,5 mm M1 12,740.00 637,000.00 Roll
NYM 2 x 2,5 mm M1 12,360.00 618,000.00 Roll
NYM 2 x 4 mm M1 10,924.00 546,200.00 Roll
NYM 2 x 6 mm M1 30,465.00 1,523,250.00 Roll
NYM 2 x 10 mm M1 50,243.00 2,512,150.00 Roll
NYM 3 x 2,5 mm M1 15,578.00 778,900.00 Roll
NYM 4 x 2,5 mm M1 9,362.00 468,100.00 Roll
NYY 2 x 1,5 mm M1 12,550.00 627,500.00 Roll
NYY 2 x 2,5 mm M1 15,255.00 762,750.00 Roll
NYY 2 x 4 mm M1 25,887.00 1,294,350.00 Roll
NYY 2 x 6 mm M1 35,026.00 1,751,300.00 Roll
NYA 2 x 1,5 mm M1 7,000.00 350,000.00 Roll
NYA 2 x 2,5 mm M1 9,000.00 450,000.00 Roll
Pipa Listrik :
Pipa listrik 5/8" Btg 4,500.00 1,125.00
Pipa Conduit Hight Impact Ø 20 mm Btg 4,650.00 1,162.50
Fleksible 20 mm M1 6,000.00
Saklar/ Sekring :
Saklar tunggal, 10 A, 250 VAC (Setara Panasonic) Bh 25,000.00
Saklar Seri, 10 A, 250 VAC (Setara Panasonic) Bh 35,000.00
Saklar Triple, 10 A, 250 VAC (Setara Panasonic) Bh 40,000.00
Stop Kontak 2 Phase, 16 A Bh 28,000.00
Stop Kontak 1 Phase, 13 A Bh 22,000.00
Switch Socket AC + Indikator Lamp 16 A Bh 25,000.00
Exhaust Fan Set 250,000.00
Fitting Tempel Kotak Bh 15,000.00
Box Sekring 1 Fase Bh 20,350.00
Box Sekring 2 Fase Bh 27,637.50
Sekring Kas Kosong DN 2 G Bh 87,750.00
Sekring Kas Kosong DN 3 G Bh 90,000.00
Sekring Kas Kosong DN 4 G Bh 94,500.00
T Duss Bh 3,500.00
Elbow Bh 350.00
Las dop Bh 1,000.00
Inbow Does Bh 5,000.00
Mangkok Saklar/ Stop Kontak Bh 1,500.00
Klem Biasa Bh 100.00
Lampu Pijar :
Lampu 25 Watt Bh 5,400.00
10 - 40 Watt Bh 15,000.00
60 - 100 Watt Bh 25,000.00
Lampu SL 23 Watt Bh 36,945.00
Lampu SL 20 Watt Bh 34,000.00
Lampu SL 18 Watt Bh 30,629.00
Lampu SL 15 Watt Bh 30,000.00
Lampu SL 10 Watt Bh 27,714.00
Lampu SL 11 Watt Bh 29,500.00
Lampu SL 8 Watt Bh 24,799.00
Lampu SL 5 Watt Bh 10,000.00
Halaman - 07
NO. HARGA
UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Balon Lampu TL :
TL Biasa 20 Watt Bh 49,900.00
TL Biasa 40 Watt Bh 75,000.00
TL Blok Bambu 20 Watt Set 112,000.00
TL Blok Bambu 40 Watt Set 121,641.67
Lampu TL (Perset) :
10 - 20 Watt (Model keranjang) Set 45,000.00
20 - 40 Watt (Model keranjang) Set 75,000.00
40 - 60 Watt (Model keranjang) Set 125,000.00
Lampu RM (Perset) :
Lampu RMI TL 2 x 18 Watt, Stainlees Grill Set 350,000.00
Lampu RM TL 2 x 20 Watt Komplit, Stainlees Grill Set 395,000.00
Lampu RM TL 2 x 18 Watt Komplit, Glass ALML Set 375,000.00
5. Bahan Kaca
Kaca Bening 3 mm M2 120,000.00
Kaca Bening 5 mm M2 175,000.00
Kaca Bening 6 mm M2 150,000.00
Kaca Bening 8 mm M2 260,000.00
Profil Kaca M1 12,000.00
Sealent (lem Kaca) Tube 20,000.00
Sealent (lem Kaca) Kg 22,000.00
6. Bahan Sanitair
Closet :
Kloset Duduk Monoblock (Type Toto EURO CW 660 J/SW 660) Buah 3,130,000.00
Kloset Duduk Standar Type INA Buah 1,100,000.00
Kloset Jongkok Standar Ex. INA Buah 186,875.00
Kloset Jongkok Biasa Ex. INA Buah 203,125.00
Kitchen Zink Stainless Buah 514,000.00
Kran Air :
Kran Air 1/2 " Bh 40,000.00
Kran Leher Angsa Unit 325,000.00
Kran Shower Panas dan Dingin Bh 437,500.00
Kran Wudhu Unit 275,000.00
8. Sewa Peralatan
Sewa Welding Hari 200,000.00
Concrete Mixer Hari 300,000.00
Concrete Vibrator Hari 225,000.00
Stamper Hari 55,000.00
Peralatan/ Alat Bantu Set 39,063.00
-
-
BERAT BESI/KG HARGA PER KG
4.716 #VALUE!
7.404 #VALUE!
10.644 #VALUE!
10.644 #VALUE!
/Kg
/Kg
/Kg
/Kg
/Kg
21,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-33
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 67,165.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 67,165.00
Halaman-34
Seng Gelombang - Lbr 1.500 62,000.00 93,000.00
Seng Plat - Lbr 0.250 175,000.00 43,750.00
JUMLAH HARGA BAHAN 810,700.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,135,700.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 1,135,700.00
Halaman-35
F. Harga Satuan Pekerjaan(D + E) 9,250.00
Halaman-36
ITEM PEMBAYARAN NO. : A.2.2.1.12 AHSP - A.2.2.1
KODE/ JENIS PEKERJAAN : Pembongkaran beton
SATUAN PEMBAYARAN : m3
Halaman-37
ITEM PEMBAYARAN NO. : A.2.2.1.14 AHSP - A.2.2.1
KODE/ JENIS PEKERJAAN : Pembongkaran genteng
SATUAN PEMBAYARAN : m2
Halaman-38
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-39
D Harga Satuan Pekerjaan(D + E) 13,687.50
Halaman-40
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-41
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 69,375.00
Halaman-42
ITEM PEMBAYARAN NO. : A.2.3.1.3 AHSP - A.2.3.1
KODE/ JENIS PEKERJAAN : Penggalian Tanah Biasa Sedalam 3 Meter
SATUAN PEMBAYARAN : M3
Halaman-43
1 2 3 4 5 6 7 = (5x6)
1. Penggalian 1 m3 Tanah Biasa Sedalam 1 Meter
0.333 69,375.00 23,125.00
2. Penggalian 1 m3 Tanah Biasa Sedalam 2 Meter
0.333 83,250.00 27,750.00
3. Penggalian 1 m3 Tanah Biasa Sedalam 3 Meter
0.333 97,125.00 32,375.00
Halaman-44
F. Harga Satuan Pekerjaan(D + E) 23,125.00
Halaman-45
KODE/ JENIS PEKERJAAN : Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan
SATUAN PEMBAYARAN : M2
Halaman-46
Pekerja L.01 Org/Hari 0.250 92,500.00 23,125.00
Mandor L.04 Org/Hari 0.025 - -
JUMLAH TENAGA KERJA 23,125.00
B. BAHAN :
Tanah Timbunan - M3 1.200 125,460.00 150,552.00
JUMLAH HARGA BAHAN 150,552.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 173,677.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 173,677.00
Halaman-47
0.500
0.050
Halaman-48
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-49
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 922,712.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 922,712.50
Halaman-50
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 876,337.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 876,337.50
Halaman-51
F. Harga Satuan Pekerjaan(D + E) 844,177.50
Halaman-52
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-53
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-54
JUMLAH HARGA BAHAN 713,671.43
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 898,321.43
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 898,321.43
Halaman-55
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 933,419.71
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 933,419.71
Halaman-56
D. Jumlah (A+B+C) 960,904.76
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 960,904.76
Halaman-57
F. Harga Satuan Pekerjaan(D + E) 834,257.01
Halaman-58
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-59
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-60
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
IV.2 AHSP - A.4.1.1 HARGA SATUAN PEKERJAAN BETON (Pembesian dan Bekisting)
Halaman-61
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 129,062.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 129,062.50
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 6 mm (Harga Satuan Pekerjaan / 10) 12,906.25
2. Besi Beton (Polos/ Ulir) Ǿ 8 mm
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 92,500.00 6,475.00
Tukang Besi L.02 Org/Hari 0.070 105,000.00 7,350.00
Kepala Tukang L.03 Org/Hari 0.007 112,500.00 787.50
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 14,612.50
B. BAHAN :
a. Besi Beton (Polos/ Ulir) Ǿ 8 mm - Kg 10.500 11,700.00 122,850.00
b. Kawat Beton - Kg 0.150 28,000.00 4,200.00
JUMLAH HARGA BAHAN 127,050.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 141,662.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 141,662.50
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 8 mm (Harga Satuan Pekerjaan / 10) 14,166.25
3. Besi Beton (Polos/ Ulir) Ǿ 10 mm
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 92,500.00 6,475.00
Tukang Besi L.02 Org/Hari 0.070 105,000.00 7,350.00
Kepala Tukang L.03 Org/Hari 0.007 112,500.00 787.50
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 14,612.50
Halaman-62
B. BAHAN :
a. Besi Beton (Polos/ Ulir) Ǿ 10 mm - Kg 10.500 11,700.00 122,850.00
b. Kawat Beton - Kg 0.150 28,000.00 4,200.00
JUMLAH HARGA BAHAN 127,050.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 141,662.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 141,662.50
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 10 mm (Harga Satuan Pekerjaan / 10) 14,166.25
4. Besi Beton (Polos/ Ulir) Ǿ 12 mm
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 92,500.00 6,475.00
Tukang Besi L.02 Org/Hari 0.070 105,000.00 7,350.00
Kepala Tukang L.03 Org/Hari 0.007 112,500.00 787.50
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 14,612.50
B. BAHAN :
a. Besi Beton (Polos/ Ulir) Ǿ 12 mm - Kg 10.500 11,700.00 122,850.00
b. Kawat Beton - Kg 0.150 28,000.00 4,200.00
JUMLAH HARGA BAHAN 127,050.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 141,662.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 141,662.50
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 12 mm (Harga Satuan Pekerjaan / 10) 14,166.25
5. Besi Beton (Polos/ Ulir) Ǿ 16 mm
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 92,500.00 6,475.00
Tukang Besi L.02 Org/Hari 0.070 105,000.00 7,350.00
Kepala Tukang L.03 Org/Hari 0.007 112,500.00 787.50
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 14,612.50
B. BAHAN :
Halaman-63
a. Besi Beton (Polos/ Ulir) Ǿ 16 mm - Kg 10.500 11,700.00 122,850.00
b. Kawat Beton - Kg 0.150 28,000.00 4,200.00
JUMLAH HARGA BAHAN 127,050.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 141,662.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 141,662.50
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Ǿ 12 mm (Harga Satuan Pekerjaan / 10) 14,166.25
Halaman-64
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 196,375.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 196,375.00
Halaman-65
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 327,212.50
Halaman-66
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-67
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-68
BEKISTING
0.20 0.40 - 0.80
0.08 m2 0.80 m2
1.00
12.50 m1/m3 10.00 m1/m3
Halaman-69
BEKISTING
0.45 0.45 0.90 0.90
0.20 m2 1.80 m2
1.00
4.94 m1/m3 8.89 m1/m3
0.02
0.178 m3
Halaman-70
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-71
Besi Beton Polos SNI - 4 Ø 12 mm - Kg 3.551 11,700.00 41,547.17
Besi Beton Polos SNI - Ø 8 mm - 15 - Kg 1.357 11,700.00 15,880.25
Kawat Beton - Kg 0.450 28,000.00 12,600.00
Semen Portland - Kg 4.000 1,400.00 5,600.00
Pasir Beton - M3 0.006 275,000.00 1,650.00
Kerikil - M3 0.009 265,000.00 2,385.00
JUMLAH HARGA BAHAN 91,972.42
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 115,597.42
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 115,597.42
Halaman-72
0.24 0.240
0.02
0.005
Halaman-73
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
SATUAN KERJA : DINAS PEKERJAAN UMUM DAN PERHUBUNGAN KABUPATEN BANGGAI LAUT
PEKERJAAN : REHABILITASI RUANG RPS AHPP
LOKASI : SMKN 5 GARUT
TAHUN ANGGARAN : 2022
Halaman-74
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 273,800.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 273,800.00
Halaman-75
D. Jumlah (A+B+C) 138,893.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 138,893.00
Halaman-76
VII. AHSP - A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
Halaman-77
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-78
ITEM PEMBAYARAN NO. : AHSP - A.4.4.2.27 AHSP - A.4.4.2
KODE/ JENIS PEKERJAAN : Pemasangan Acian
SATUAN PEMBAYARAN : M2
VIII. AHSP - A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
Halaman-79
KODE/ JENIS PEKERJAAN : Pemasangan Lantai Keramik Ukuran 40 cm x 40 cm
SATUAN PEMBAYARAN : M2
Halaman-80
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.090 92,500.00 8,325.00
Tukang Batu L.02 Org/Hari 0.090 105,000.00 9,450.00
Kepala Tukang L.03 Org/Hari 0.009 112,500.00 1,012.50
Mandor L.04 Org/Hari 0.005 - -
JUMLAH TENAGA KERJA 18,787.50
B. BAHAN :
Stop Nozing 10 cm x 40 cm - Buah 2.650 25,000.00 66,250.00
Semen Portland - Kg 1.140 1,400.00 1,596.00
Semen Warna - Kg 0.100 1,750.00 175.00
Pasir Pasang - M3 0.003 235,000.00 752.00
JUMLAH HARGA BAHAN 68,773.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 87,560.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 87,560.50
Halaman-81
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.090 92,500.00 8,325.00
Tukang Batu L.02 Org/Hari 0.090 105,000.00 9,450.00
Kepala Tukang L.03 Org/Hari 0.009 112,500.00 1,012.50
Mandor L.04 Org/Hari 0.005 - -
JUMLAH TENAGA KERJA 18,787.50
B. BAHAN :
Keramik 10 cm x 20 cm - Buah 2.650 2,380.00 6,307.00
Semen Portland - Kg 8.190 1,400.00 11,466.00
Semen Warna - Kg 2.750 1,750.00 4,812.50
Pasir Pasang - M3 0.045 235,000.00 10,575.00
JUMLAH HARGA BAHAN 33,160.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 51,948.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 51,948.00
Halaman-82
A. TENAGA :
Pekerja L.01 Org/Hari 0.700 92,500.00 64,750.00
Tukang Batu L.02 Org/Hari 0.350 105,000.00 36,750.00
Kepala Tukang L.03 Org/Hari 0.035 112,500.00 3,937.50
Mandor L.04 Org/Hari 0.035 - -
JUMLAH TENAGA KERJA 105,437.50
B. BAHAN :
Keramik 25 cm x 25 cm - Buah 26.500 2,665.00 70,622.50
Semen Portland - Kg 10.400 1,400.00 14,560.00
Semen Warna - Kg 1.620 1,750.00 2,835.00
Pasir Pasang - M3 0.045 235,000.00 10,575.00
JUMLAH HARGA BAHAN 98,592.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 204,030.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 204,030.00
Halaman-83
Mandor L.04 Org/Hari 0.013 - -
JUMLAH TENAGA KERJA 37,712.50
B. BAHAN :
Keramik Ukuran 60 cm x 60 cm - Buah 6.630 34,300.00 227,409.00
Semen Portland - Kg 9.800 1,400.00 13,720.00
Semen Warna - Kg 1.300 1,750.00 2,275.00
Pasir Pasang - M3 0.045 235,000.00 10,575.00
JUMLAH HARGA BAHAN 253,979.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 291,691.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 291,691.50
Halaman-84
0.8
0.8
0.64
1
1.5625 1.562
1.500
Halaman-85
0.100
Halaman-86
0.100
Halaman-87
0.100
0.8
0.8
0.64
1
1.5625 1.562
Halaman-88
1.500
Halaman-89
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 92,500.00
Tukang Kayu L.02 Org/Hari 0.050 105,000.00
Kepala Tukang L.03 Org/Hari 0.005 112,500.00
Mandor L.04 Org/Hari 0.005 -
JUMLAH TENAGA KERJA
B. BAHAN :
Gypsum board Ukuran (120 x 240 x 9) mm - Lbr 0.364 80,000.00
Paku Skrup - Kg 0.110 250.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
Halaman-90
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 92,500.00
Tukang Kayu L.02 Org/Hari 0.050 105,000.00
Kepala Tukang L.03 Org/Hari 0.005 112,500.00
Mandor L.04 Org/Hari 0.005 -
JUMLAH TENAGA KERJA
B. BAHAN :
Kalsiboard Ukuran (120 x 240 x 6) mm - Lbr 0.364 95,000.00
Paku Skrup - Kg 0.110 250.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-91
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.060 92,500.00
Tukang Kayu L.02 Org/Hari 0.060 105,000.00
Kepala Tukang L.03 Org/Hari 0.006 112,500.00
Mandor L.04 Org/Hari 0.003 -
JUMLAH TENAGA KERJA
B. BAHAN :
List Profil Gypsum 9 - 11 Cm - M1 1.050 20,000.00
Cornice Adhesive - Kg 0.150 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-92
ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.32
KODE/ JENIS PEKERJAAN : Pemasangan Atap Genteng Metal Zincalume
SATUAN PEMBAYARAN : M2
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 92,500.00
Tukang Alumunium L.02 Org/Hari 0.100 105,000.00
Kepala Tukang L.03 Org/Hari 0.010 112,500.00
Mandor L.04 Org/Hari 0.001 -
JUMLAH TENAGA KERJA
B. BAHAN :
Genteng Metal 0,800 x 0,770 - T= 0,25 mm - Lbr 1.644 51,500.00
Screw 10 - 16 x 16 - Bh 9.000 500.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-93
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 92,500.00
Tukang Alumunium L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.013 -
JUMLAH TENAGA KERJA
B. BAHAN :
Nok Genteng Metal Zincalume - Bh 1.100 24,000.00
Screw 10 - 16 x 16 - Bh 9.000 500.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Halaman-94
Pekerja L.01 Org/Hari 0.140 92,500.00
Tukang Alumunium L.02 Org/Hari 0.070 105,000.00
Kepala Tukang L.03 Org/Hari 0.007 112,500.00
Mandor L.04 Org/Hari 0.007 -
JUMLAH TENAGA KERJA
B. BAHAN :
Atap Zincalume 80 x 170 cm, T= 0,25 mm - Lbr 0.735 55,000.00
Screw 10 - 16 x 16 - Bh 8.000 500.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 92,500.00
Tukang Alumunium L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.013 -
Halaman-95
JUMLAH TENAGA KERJA
B. BAHAN :
Nok Zincalume, Tebal 0,25 mm - M1 1.100 35,000.00
Screw 10 - 16 x 16 - Bh 6.000 500.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 6.000 92,500.00
Tukang Kayu L.02 Org/Hari 18.000 105,000.00
Kepala Tukang L.03 Org/Hari 1.800 112,500.00
Mandor L.04 Org/Hari 0.300 -
JUMLAH TENAGA KERJA
B. BAHAN :
Halaman-96
Balok Kayu Kelas II - M3 1.200 2,850,000.00
Paku 10 cm - Kg 1.250 16,000.00
Lem Kayu - Kg 1.000 15,491.67
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 1.000 92,500.00
Tukang Kayu L.02 Org/Hari 3.000 105,000.00
Kepala Tukang L.03 Org/Hari 0.300 112,500.00
Mandor L.04 Org/Hari 0.050 -
JUMLAH TENAGA KERJA
B. BAHAN :
Papan Kayu Kelas II - M3 0.040 1,785,960.00
Lem Kayu - Kg 0.500 15,491.67
JUMLAH HARGA BAHAN
Halaman-97
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.800 92,500.00
Tukang Kayu L.02 Org/Hari 2.400 105,000.00
Kepala Tukang L.03 Org/Hari 0.240 112,500.00
Mandor L.04 Org/Hari 0.040 -
JUMLAH TENAGA KERJA
B. BAHAN :
Papan Kayu Kelas II - M3 0.024 1,785,960.00
Lem Kayu - Kg 0.300 15,491.67
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
Halaman-98
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.700 92,500.00
Tukang Kayu L.02 Org/Hari 2.100 105,000.00
Kepala Tukang L.03 Org/Hari 0.210 112,500.00
Mandor L.04 Org/Hari 0.035 -
JUMLAH TENAGA KERJA
B. BAHAN :
Papan Kayu Kelas II - M3 0.025 2,350,000.00
Paku 1 cm - 2,5 cm - Kg 0.030 24,800.00
Lem Kayu - Kg 0.500 15,491.67
Playwood 122 Cm x 244 Cm x 9 mm - Lembar 1.000 109,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-99
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.700 92,500.00
Tukang Kayu L.02 Org/Hari 2.100 105,000.00
Kepala Tukang L.03 Org/Hari 0.210 112,500.00
Mandor L.04 Org/Hari 0.035 -
JUMLAH TENAGA KERJA
B. BAHAN :
Papan Kayu Kelas II - M3 0.025 2,350,000.00
Paku 1 cm - 2,5 cm - Kg 0.030 24,800.00
Lem Kayu - Kg 0.500 15,491.67
Playwood 90 Cm x 210 Cm x 3 mm - Lembar 1.000 113,000.00
Tripleks Kulit Jeruk 90 Cm x 210 Cm x 3 mm - Lembar 1.000 110,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-100
ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.25
KODE/ JENIS PEKERJAAN : Pemasangan Dinding Pemisah Kalsiboard Rangkap, Rangka Kayu Kelas II
SATUAN PEMBAYARAN : M2
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 92,500.00
Tukang Kayu L.02 Org/Hari 0.600 105,000.00
Kepala Tukang L.03 Org/Hari 0.060 112,500.00
Mandor L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu 6/10 Kelas II - M3 0.024 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.150 31,000.00
Kalsiboard 122 Cm x 244 Cm x 6 mm - Lembar 0.860 95,000.00
Lem Kayu - Kg 0.560 15,491.67
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-101
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 92,500.00
Tukang Kayu L.02 Org/Hari 0.600 105,000.00
Kepala Tukang L.03 Org/Hari 0.060 112,500.00
Mandor L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu 5/7 Kelas II - M3 0.014 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.150 31,000.00
Playwood 120 Cm x 240 Cm x 9 mm - Lembar 0.430 109,000.00
Lem Kayu - Kg 0.280 15,491.67
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 90,000.00
Tukang Kayu L.02 Org/Hari 0.150 100,000.00
Kepala Tukang L.03 Org/Hari 0.015 110,000.00
Halaman-102
Mandor L.04 Org/Hari 0.013
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu Kelas II - M3 1.100 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.050 31,000.00
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 4.000 90,000.00
Tukang Kayu L.02 Org/Hari 0.600 100,000.00
Kepala Tukang L.03 Org/Hari 0.060 110,000.00
Mandor L.04 Org/Hari 0.010
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu 5/7 Kelas II - M3 0.014 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.150 31,000.00
Halaman-103
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 4.000 90,000.00
Tukang Kayu L.02 Org/Hari 12.000 100,000.00
Kepala Tukang L.03 Org/Hari 1.200 110,000.00
Mandor L.04 Org/Hari 0.010
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu Kelas II - M3 1.100 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.150 31,000.00
Halaman-104
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 6.700 90,000.00
Tukang Kayu L.02 Org/Hari 20.000 100,000.00
Kepala Tukang L.03 Org/Hari 2.000 110,000.00
Mandor L.04 Org/Hari 0.010
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu Kelas II - M3 1.100 2,850,000.00
Paku 5 cm - 10 cm - Kg 3.000 31,000.00
Halaman-105
ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.25.a
KODE/ JENIS PEKERJAAN : Pemasangan kaso-kaso 5/7 Kelas II
SATUAN PEMBAYARAN : M2
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 90,000.00
Tukang Kayu L.02 Org/Hari 0.010 100,000.00
Kepala Tukang L.03 Org/Hari 0.070 110,000.00
Mandor L.04 Org/Hari 0.010
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu Kelas II - M3 0.018 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.200 31,000.00
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
Halaman-106
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 90,000.00
Tukang Kayu L.02 Org/Hari 0.100 100,000.00
Kepala Tukang L.03 Org/Hari 0.010 110,000.00
Mandor L.04 Org/Hari 0.010
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu Kelas II - M3 0.012 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.150 31,000.00
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 90,000.00
Tukang Kayu L.02 Org/Hari 0.200 100,000.00
Kepala Tukang L.03 Org/Hari 0.020 110,000.00
Mandor L.04 Org/Hari 0.010
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu Kelas II - M3 1.000 2,850,000.00
Halaman-107
Paku 5 cm - 10 cm - Kg 0.040 31,000.00
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 90,000.00
Tukang Kayu L.02 Org/Hari 0.200 100,000.00
Kepala Tukang L.03 Org/Hari 0.020 110,000.00
Mandor L.04 Org/Hari 0.010
JUMLAH TENAGA KERJA
B. BAHAN :
Balok Kayu Kelas II - M3 0.011 2,850,000.00
Paku 5 cm - 10 cm - Kg 0.050 31,000.00
Halaman-108
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-109
AHSP - A.4.5.1
JUMLAH HARGA
(Rp).
7 = (5x6)
9,250.00
5,250.00
562.50
-
15,062.50
29,120.00
27.50
29,147.50
Halaman-110
-
44,210.00
44,210.00
AHSP - A.4.5.1
, Tebal 9 mm
JUMLAH HARGA
(Rp).
7 = (5x6)
9,250.00
5,250.00
562.50
-
15,062.50
34,580.00
27.50
34,607.50
-
-
49,670.00
49,670.00
Halaman-111
AHSP - A.4.5.1
JUMLAH HARGA
(Rp).
7 = (5x6)
5,550.00
6,300.00
675.00
-
12,525.00
21,000.00
2,250.00
23,250.00
-
-
35,775.00
35,775.00
Halaman-112
AHSP - A.4.5.2
JUMLAH HARGA
(Rp).
7 = (5x6)
18,500.00
10,500.00
1,125.00
-
30,125.00
84,666.00 0.616
4,500.00 1.623376623
89,166.00
-
-
119,291.00
AHSP - A.4.5.2
Halaman-113
JUMLAH HARGA
(Rp).
7 = (5x6)
23,125.00
15,750.00
1,687.50
-
40,562.50
26,400.00
4,500.00
30,900.00
-
-
71,462.50
71,462.50
AHSP - A.4.5.2
JUMLAH HARGA
(Rp).
7 = (5x6)
Halaman-114
12,950.00
7,350.00
787.50
-
21,087.50
- 1.000
-
65,512.50
65,512.50
AHSP - A.4.5.2
JUMLAH HARGA
(Rp).
7 = (5x6)
23,125.00
15,750.00
1,687.50
-
Halaman-115
40,562.50
38,500.00
3,000.00
41,500.00
-
-
82,062.50
82,062.50
AHSP - A.4.6.1
JUMLAH HARGA
(Rp).
7 = (5x6)
555,000.00
1,890,000.00
202,500.00
-
2,647,500.00
Halaman-116
3,420,000.00
20,000.00
15,491.67
3,455,491.67
-
-
6,102,991.67
6,102,991.67
AHSP - A.4.6.1
JUMLAH HARGA
(Rp).
7 = (5x6)
92,500.00
315,000.00
33,750.00
-
441,250.00
71,438.40
7,745.83
79,184.23
Halaman-117
-
-
520,434.23
520,434.23
AHSP - A.4.6.1
JUMLAH HARGA
(Rp).
7 = (5x6)
74,000.00
252,000.00
27,000.00
-
353,000.00
42,863.04
4,647.50
47,510.54
-
-
400,510.54
Halaman-118
400,510.54
AHSP - A.4.6.1
2 Cm x 244 Cm x 9 mm)
JUMLAH HARGA
(Rp).
7 = (5x6)
64,750.00
220,500.00
23,625.00
-
308,875.00
58,750.00
744.00
7,745.83
109,000.00
176,239.83
-
-
485,114.83
485,114.83
Halaman-119
AHSP - A.4.6.1
JUMLAH HARGA
(Rp).
7 = (5x6)
64,750.00
220,500.00
23,625.00
-
308,875.00
58,750.00
744.00
7,745.83
113,000.00
110,000.00
290,239.83
-
-
599,114.83
599,114.83
Halaman-120
AHSP - A.4.6.1
JUMLAH HARGA
(Rp).
7 = (5x6)
18,500.00
63,000.00
6,750.00
-
88,250.00
1 10
68,400.00 4 2.86
4,650.00 0.006
81,700.00
8,675.33 0.024
163,425.33
-
-
251,675.33
251,675.33
AHSP - A.4.6.1
Halaman-121
JUMLAH HARGA
(Rp).
7 = (5x6)
18,500.00
63,000.00
6,750.00
-
88,250.00
1 1.2
39,900.00 4 2.40
4,650.00 0.0035 2.88
46,870.00 0.35
4,337.67 0.014 0.69
95,757.67
-
-
184,007.67
184,007.67
AHSP - A.06. 33
JUMLAH HARGA
(Rp).
7 = (5x6)
22,500.00
15,000.00
1,650.00
Halaman-122
-
39,150.00
3,135,000.00
1,550.00
3,136,550.00
-
-
3,175,700.00
3,175,700.00
AHSP 06.33
JUMLAH HARGA
(Rp).
7 = (5x6)
360,000.00
60,000.00
6,600.00
-
426,600.00
39,900.00
4,650.00
Halaman-123
44,550.00
-
-
471,150.00
471,150.00
AHSP 06.35
JUMLAH HARGA
(Rp).
7 = (5x6)
360,000.00
1,200,000.00
132,000.00
-
1,692,000.00
3,135,000.00
4,650.00
3,139,650.00
-
-
4,831,650.00
Halaman-124
4,831,650.00
AHSP 06.36
JUMLAH HARGA
(Rp).
7 = (5x6)
603,000.00
2,000,000.00
220,000.00
-
2,823,000.00
3,135,000.00
93,000.00
3,228,000.00
-
-
6,051,000.00
6,051,000.00
Halaman-125
AHSP 06.37
JUMLAH HARGA
(Rp).
7 = (5x6)
6,300.00
1,000.00
7,700.00
-
15,000.00
51,300.00
6,200.00
57,500.00
-
-
72,500.00
72,500.00
AHSP 06.38
JUMLAH HARGA
(Rp).
7 = (5x6)
Halaman-126
9,000.00
10,000.00
1,100.00
-
20,100.00
34,200.00
4,650.00
38,850.00
-
-
58,950.00
58,950.00
AHSP 06.39
JUMLAH HARGA
(Rp).
7 = (5x6)
9,000.00
20,000.00
2,200.00
-
31,200.00
2,850,000.00
Halaman-127
1,240.00
2,851,240.00
-
-
2,882,440.00
2,882,440.00
AHSP 06.50
JUMLAH HARGA
(Rp).
7 = (5x6)
9,000.00
20,000.00
2,200.00
-
31,200.00
31,350.00
1,550.00
32,900.00
-
-
64,100.00
Halaman-128
64,100.00
Halaman-129
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 92,500.00
Tukang Kayu L.02 Org/Hari 0.500 105,000.00
Kepala Tukang L.03 Org/Hari 0.050 112,500.00
Mandor L.04 Org/Hari 0.005 -
JUMLAH TENAGA KERJA
B. BAHAN :
Kunci Tanam Kualitas Baik - Bh 1.000 148,438.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Halaman-130
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 92,500.00
Tukang Kayu L.02 Org/Hari 0.500 105,000.00
Kepala Tukang L.03 Org/Hari 0.050 112,500.00
Mandor L.04 Org/Hari 0.005 -
JUMLAH TENAGA KERJA
B. BAHAN :
Kunci Pintu Tanam Ex. Muller - Set 1.000 125,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-131
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 92,500.00
Tukang Kayu L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.0008 -
JUMLAH TENAGA KERJA
B. BAHAN :
Engsel Pintu Kualitas Baik - Bh 1.000 26,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-132
ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.6
KODE/ JENIS PEKERJAAN : Pemasangan Engsel Jendela
SATUAN PEMBAYARAN : Buah
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 92,500.00
Tukang Kayu L.02 Org/Hari 0.100 105,000.00
Kepala Tukang L.03 Org/Hari 0.010 112,500.00
Mandor L.04 Org/Hari 0.0005 -
JUMLAH TENAGA KERJA
B. BAHAN :
Engsel Jendela - Bh 1.000 20,800.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-133
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 92,500.00
Tukang Kayu L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.008 -
JUMLAH TENAGA KERJA
B. BAHAN :
Grendel Jendela - Bh 1.000 8,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 92,500.00
Halaman-134
Tukang Kayu L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.008 -
JUMLAH TENAGA KERJA
B. BAHAN :
Grendel Pintu - Bh 1.000 13,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 92,500.00
Tukang Kayu L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.008 -
JUMLAH TENAGA KERJA
B. BAHAN :
Halaman-135
Kait Angin Jendela - Bh 1.000 16,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 92,500.00
Tukang Kayu L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.008 -
JUMLAH TENAGA KERJA
B. BAHAN :
Handle Pintu Stainless Steel 80 cm - Set 1.000 350,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
Halaman-136
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 92,500.00
Tukang Kayu L.02 Org/Hari 0.150 105,000.00
Kepala Tukang L.03 Org/Hari 0.015 112,500.00
Mandor L.04 Org/Hari 0.0008 -
JUMLAH TENAGA KERJA
B. BAHAN :
Kaca Bening Tebal 5 mm - m2 1.100 175,000.00
Sealant - Kg 0.050 22,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-137
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6)
925.00
52,500.00
5,625.00
-
59,050.00
148,438.00
148,438.00
Halaman-138
-
-
207,488.00
207,488.00
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6)
925.00
52,500.00
5,625.00
-
59,050.00
125,000.00
125,000.00
-
-
184,050.00
184,050.00
Halaman-139
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6)
1,387.50
15,750.00
1,687.50
-
18,825.00
26,000.00
26,000.00
-
-
44,825.00
44,825.00
Halaman-140
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6)
925.00
10,500.00
1,125.00
-
12,550.00
20,800.00
20,800.00
-
-
33,350.00
33,350.00
AHSP - A.4.6.2
Halaman-141
JUMLAH HARGA
(Rp).
7 = (5x6)
1,387.50
15,750.00
1,687.50
-
18,825.00
8,000.00
8,000.00
-
-
26,825.00
26,825.00
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6)
1,387.50
Halaman-142
15,750.00
1,687.50
-
18,825.00
13,000.00
13,000.00
-
-
31,825.00
31,825.00
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6)
1,387.50
15,750.00
1,687.50
-
18,825.00
Halaman-143
16,000.00
16,000.00
-
-
34,825.00
34,825.00
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6) 1 SET PASANG HANDLE STAINLESS STEEL 80 CM
Bahan :
1,387.50 1.000 Set Handle Stainless Stee Rp700,000.00
15,750.00 Tenaga :
1,687.50 0.050 Oh Pekerja Rp 70,000.00
- 0.500 Oh Tukang Kunci Rp115,000.00
18,825.00 0.050 Oh Kepala Tukang Rp130,000.00
0.0025 Oh Mandor Rp100,000.00
350,000.00 Jumlah
350,000.00
-
-
Halaman-144
368,825.00
368,825.00
AHSP - A.4.6.2
JUMLAH HARGA
(Rp).
7 = (5x6)
1,387.50
15,750.00
1,687.50
-
18,825.00
192,500.00
1,100.00
193,600.00
-
-
212,425.00
212,425.00
Halaman-145
Rp 700,000.00
Rp 3,500.00
Rp 57,500.00
Rp 6,500.00
Rp 250.00
Rp 767,750.00
Halaman-146
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Halaman-147
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 3,563,143.00
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 3,563,143.00
Halaman-148
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 1,525,835.00
Halaman-149
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-150
ITEM PEMBAYARAN NO. : A.5.1.1.18 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC 1/2"
SATUAN PEMBAYARAN : M1
Halaman-151
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 92,500.00 925.00
Tukang Pipa L.02 Org/Hari 0.400 105,000.00 42,000.00
Kepala Tukang L.03 Org/Hari 0.040 112,500.00 4,500.00
Mandor L.04 Org/Hari 0.005 - -
JUMLAH TENAGA KERJA 47,425.00
B. BAHAN :
Kran Air Stainless - Buah 1.000 32,500.00 32,500.00
Seal Tape - Bh 0.0025 3,000.00 7.50
JUMLAH HARGA BAHAN 32,507.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 79,932.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 79,932.50
Halaman-152
A. TENAGA :
Pekerja L.01 Org/Hari 0.081 92,500.00 7,492.50
Tukang Pipa L.02 Org/Hari 0.135 105,000.00 14,175.00
Kepala Tukang L.03 Org/Hari 0.0135 112,500.00 1,518.75
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 23,186.25
B. BAHAN :
Pipa PVC 2,5" - M1 1.200 15,625.00 18,750.00
Perlengkapan 35% Harga Pipa - Ls 0.350 6,562.50 2,296.88
JUMLAH HARGA BAHAN 21,046.88
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 44,233.13
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 44,233.13
Halaman-153
Mandor L.04 Org/Hari 0.004 - -
JUMLAH TENAGA KERJA 23,186.25
B. BAHAN :
Pipa PVC 4" - M1 1.200 101,500.00 121,800.00
JUMLAH HARGA BAHAN 121,800.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 144,986.25
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 144,986.25
AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN Memasang 1 m' Pipa PVC tipe AW Ø ¾"
SATUAN PEMBAYARAN : M1
Halaman-154
JUMLAH HARGA BAHAN 11,544.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 36,721.50
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E) 36,721.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC Type AW Diameter 3"
SATUAN PEMBAYARAN : M1
Halaman-155
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 92,500.00
Tukang Kayu L.02 Org/Hari 0.105 105,000.00
Kepala Tukang L.03 Org/Hari 0.004 112,500.00
Mandor L.04 Org/Hari 0.003 -
JUMLAH TENAGA KERJA
B. BAHAN :
Cat Meni - Kg 0.200 23,200.00
Plamur Kayu - Kg 0.150 28,000.00
Cat Dasar - Kg 0.170 30,000.00
Cat Penutup - Kg 0.350 30,000.00
Kuas - Buah 0.010 5,688.00
Halaman-156
Pengencer - Kg 0.030 31,250.00
Ampelas - Lbr 0.200 4,875.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 92,500.00
Tukang Kayu L.02 Org/Hari 0.063 105,000.00
Kepala Tukang L.03 Org/Hari 0.0063 112,500.00
Mandor L.04 Org/Hari 0.003 -
JUMLAH TENAGA KERJA
B. BAHAN :
Plamur - Kg 0.100 13,500.00
Cat Dasar - Kg 0.100 22,850.00
Cat Penutup - Kg 0.260 22,850.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
Halaman-157
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 92,500.00
Tukang Kayu L.02 Org/Hari 0.063 105,000.00
Kepala Tukang L.03 Org/Hari 0.0063 112,500.00
Mandor L.04 Org/Hari 0.003 -
JUMLAH TENAGA KERJA
B. BAHAN :
Plamur - Kg 0.100 13,500.00
Cat Dasar - Kg 0.100 27,550.00
Cat Penutup - Kg 0.260 27,550.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-158
ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.16
KODE/ JENIS PEKERJAAN : Pengecatan Permukaan Baja Dengan Menie Besi
SATUAN PEMBAYARAN : M2
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 92,500.00
Tukang Kayu L.02 Org/Hari 0.200 105,000.00
Kepala Tukang L.03 Org/Hari 0.0200 112,500.00
Mandor L.04 Org/Hari 0.0025 -
JUMLAH TENAGA KERJA
B. BAHAN :
Menie Besi - Kg 0.100 28,000.00
Kuas - Bh 0.010 5,688.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
Halaman-159
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 92,500.00
Tukang Kayu L.02 Org/Hari 0.200 105,000.00
Kepala Tukang L.03 Org/Hari 0.0200 112,500.00
Mandor L.04 Org/Hari 0.0025 -
JUMLAH TENAGA KERJA
B. BAHAN :
Cat Besi - Kg 0.100 30,000.00
Kuas - Bh 0.010 5,688.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 92,500.00
Tukang Kayu L.02 Org/Hari 0.200 105,000.00
Kepala Tukang L.03 Org/Hari 0.0200 112,500.00
Mandor L.04 Org/Hari 0.0025 -
JUMLAH TENAGA KERJA
B. BAHAN :
Halaman-160
Cat Vernis - Kg 0.100 32,000.00
Kuas - Bh 0.010 5,688.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-161
AHSP - A.4.7.1
JUMLAH HARGA
(Rp).
7 = (5x6)
6,475.00
11,025.00
450.00
-
17,950.00
4,640.00
4,200.00
5,100.00
10,500.00
56.88
Halaman-162
937.50
975.00
26,409.38
-
-
44,359.38
44,359.38
AHSP - A.4.7.1
JUMLAH HARGA
(Rp).
7 = (5x6)
1,850.00
6,615.00
708.75
-
9,173.75
1,350.00
2,285.00
5,941.00
9,576.00
-
-
18,749.75
Halaman-163
18,749.75
AHSP - A.4.7.1
JUMLAH HARGA
(Rp).
7 = (5x6)
1,850.00
6,615.00
708.75
-
9,173.75
1,350.00
2,755.00
7,163.00
11,268.00
-
-
20,441.75
20,441.75
Halaman-164
AHSP - A.4.7.1
JUMLAH HARGA
(Rp).
7 = (5x6)
1,850.00
21,000.00
2,250.00
-
25,100.00
2,800.00
56.88
2,856.88
-
-
27,956.88
27,956.88
AHSP - A.4.7.1
JUMLAH HARGA
(Rp).
Halaman-165
7 = (5x6)
1,850.00
21,000.00
2,250.00
-
25,100.00
3,000.00
56.88
3,056.88
-
-
28,156.88
28,156.88
AHSP - A.4.7.1
JUMLAH HARGA
(Rp).
7 = (5x6)
1,850.00
21,000.00
2,250.00
-
25,100.00
Halaman-166
3,200.00
56.88
3,256.88
-
-
28,356.88
28,356.88
Halaman-167
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.180 92,500.00
Tukang Alumunium L.02 Org/Hari 0.240 105,000.00
Kepala Tukang L.03 Org/Hari 0.018 112,500.00
Mandor L.04 Org/Hari 0.024 -
JUMLAH TENAGA KERJA
B. BAHAN :
Cord - Kanal C Tebal = 1 mm - Btg 0.367 118,000.00
Reng - Kanal U Tebal = 0,6 mm - Btg 0.733 113,000.00
L. Braket 1,5 mm - Bh 0.025 2,000.00
Screw 12 - 14 x 20 - Bh 2.000 700.00
Halaman-168
Screw 10 - 16 x 16 - Bh 8.000 500.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.094 92,500.00
Tukang Kayu L.02 Org/Hari 0.156 105,000.00
Kepala Tukang L.03 Org/Hari 0.016 112,500.00
Mandor L.04 Org/Hari 0.016 -
JUMLAH TENAGA KERJA
B. BAHAN :
Lisplank GRC 30 Cm - Lbr 0.275 71,000.00
Holo 2/2 - Btg 0.750 89,100.00
Screw 1" - Bh 16.000 500.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Halaman-169
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.150 92,500.00
Tukang Allumunium L.02 Org/Hari 0.200 105,000.00
Kepala Tukang L.03 Org/Hari 0.010 112,500.00
Mandor L.04 Org/Hari 0.013 -
JUMLAH TENAGA KERJA
B. BAHAN :
Gypsumboard 9 mm - Lbr 0.364 80,000.00
Rangka Hollow Galvalum 2x4 cm, T = 0,35 mm - Btg 1.025 25,000.00
Stifenner/ Braket - Bh 3.000 3,500.00
Skrup Fixer - Kg 0.150 31,000.00
Penggantung dan Ramset - Bh 1.000 12,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
Halaman-170
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 92,500.00
Tukang Allumunium L.02 Org/Hari 0.300 105,000.00
Kepala Tukang L.03 Org/Hari 0.025 112,500.00
Mandor L.04 Org/Hari 0.013 -
JUMLAH TENAGA KERJA
B. BAHAN :
Kalsiboard 4 mm - Lbr 0.364 75,000.00
Rangka Hollow 2x4 cm, T = 0,35 mm - Btg 1.025 25,000.00
Stifenner/ Braket - Bh 3.000 3,500.00
Skrup Fixer - Kg 0.150 31,000.00
Penggantung dan Ramset - Bh 4.000 12,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
Halaman-171
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-172
F. Harga Satuan Pekerjaan(D + E)
Halaman-173
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 92,500.00
Tukang Kayu L.02 Org/Hari 0.063 105,000.00
Kepala Tukang L.03 Org/Hari 0.0063 112,500.00
Mandor L.04 Org/Hari 0.0025 -
JUMLAH TENAGA KERJA
B. BAHAN :
Cat Plafond ( Dasar ) - Kg 0.100 22,850.00
Cat Plafond ( Penutup 2 x ) - Kg 0.260 22,850.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-174
ITEM PEMBAYARAN NO. : Analisa Praktis - 08
KODE/ JENIS PEKERJAAN : Pengecatan Pelapis Kedap Air (Water Proofing)
SATUAN PEMBAYARAN : M2
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 92,500.00
Tukang Kayu L.02 Org/Hari 0.063 105,000.00
Kepala Tukang L.03 Org/Hari 0.0063 112,500.00
Mandor L.04 Org/Hari 0.0025 -
JUMLAH TENAGA KERJA
B. BAHAN :
Polimer Mortar - Kg 2.000 25,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-175
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 1.375 92,500.00
Tukang Besi L.02 Org/Hari 1.375 105,000.00
Kepala Tukang L.03 Org/Hari 0.138 112,500.00
Mandor L.04 Org/Hari 0.072 -
JUMLAH TENAGA KERJA
B. BAHAN :
Rangka Metal Hollow 40.40.2 mm - M1 11.950 24,933.33
Peralatan dan Accesories (Perkuatan, Las, dll) - Ls 25 % x 74,488.33
Material 297,953.33
Pengecatan Besi Hollow AHSP - A.4.7.1.5.1 M2 1.540 28,156.88
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
Halaman-176
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.500 92,500.00
Tukang Besi L.02 Org/Hari 0.500 105,000.00
Kepala Tukang L.03 Org/Hari 0.250 112,500.00
Mandor L.04 Org/Hari 0.025 -
JUMLAH TENAGA KERJA
B. BAHAN :
Rangka Metal Hollow 40.40.2 mm - M1 6.350 24,933.33
Peralatan dan Accesories (Perkuatan, Las, dll) - Ls 25 % x 39,581.67
Material 158,326.67
Pengecatan Besi Hollow AHSP - A.4.7.1.5.1 M2 0.867 28,156.88
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Halaman-177
Pembantu Tukang Listrik L.01 Org/Hari 0.250 92,500.00
Tukang istrik L.02 Org/Hari 0.420 105,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.030 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Kabel NYM 2 x 1 x 2,5 mm2 - M1 3.000 12,360.00
Pipa Hight Impact Ø 20 mm - M 1
2.000 1,162.50
fitting, kotak sambung, klem & alat bantu lainnya - Ls 5% x 39,405.00
Material
JUMLAH HARGA BAHAN
C. PERALATAN :
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.350 92,500.00
Tukang istrik L.02 Org/Hari 0.520 105,000.00
Halaman-178
Kepala Tukang Listrik L.03 Org/Hari 0.030 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Kabel NYM 2 x 1 x 2,5 mm - M1 4.000 12,360.00
Pipa Hight Impact Ø 20 mm - M1 3.000 1,162.50
fitting, kotak sambung, klem & alat bantu lainnya - Ls 5% x 52,927.50
Material
JUMLAH HARGA BAHAN
C. PERALATAN :
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 92,500.00
Tukang istrik L.02 Org/Hari 0.100 105,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.050 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.050 -
Halaman-179
JUMLAH TENAGA KERJA
B. BAHAN :
Stop Kontak 1P, 13 A - Bh 1.000 22,000.00
Inbow Does - Bh 1.000 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 92,500.00
Tukang istrik L.02 Org/Hari 0.100 105,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.050 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.050 -
JUMLAH TENAGA KERJA
B. BAHAN :
Stop Kontak 2 Phase, 16 A - Bh 1.000 28,000.00
Inbow Does - Bh 1.000 5,000.00
Halaman-180
JUMLAH HARGA BAHAN
C. PERALATAN :
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 92,500.00
Tukang istrik L.02 Org/Hari 0.100 105,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.050 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.050 -
JUMLAH TENAGA KERJA
B. BAHAN :
Switch Socket AC + Indikator Lamp 16 A - Bh 1.000 25,000.00
Inbow Does - Bh 1.000 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Halaman-181
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 92,500.00
Tukang istrik L.02 Org/Hari 0.100 105,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.010 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Saklar Tunggal, 10 A, 250 VAC - Bh 1.000 25,000.00
Inbow Does - Bh 1.000 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Halaman-182
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 92,500.00
Tukang istrik L.02 Org/Hari 0.100 105,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.010 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Saklar Seri, 10 A, 250 VAC - Bh 1.000 35,000.00
Inbow Does - Bh 1.000 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Halaman-183
ITEM PEMBAYARAN NO. : Analisa Praktis - 18
KODE/ JENIS PEKERJAAN : Pemasangan Saklar Triple, 10 A, 250 VAC
SATUAN PEMBAYARAN : Buah
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 92,500.00
Tukang istrik L.02 Org/Hari 0.100 105,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.010 112,500.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Saklar Triple, 10 A, 250 VAC - Bh 1.000 40,000.00
Inbow Does - Bh 1.000 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Halaman-184
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00
JUMLAH TENAGA KERJA
B. BAHAN :
Lampu RMI TL 2 x 18 Watt, Stainlees Grill - Bh 1.000 350,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00
JUMLAH TENAGA KERJA
B. BAHAN :
Halaman-185
Lampu RM TL 2 x 18 Watt Komplit, Glass ALML - Bh 1.000 375,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00
JUMLAH TENAGA KERJA
B. BAHAN :
Lampu Philips 20 Watt - Bh 1.000 34,000.00
Down Light Metal Ø 4" - Bh 1.000 52,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
Halaman-186
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00
JUMLAH TENAGA KERJA
B. BAHAN :
Lampu Philips 18 Watt - Bh 1.000 30,629.00
Down Light Metal Ø 4" - Bh 1.000 52,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-187
ITEM PEMBAYARAN NO. : Analisa Praktis - 23
KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 8 Watt + Downlight Metal Ø 3"
SATUAN PEMBAYARAN : Buah
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00
JUMLAH TENAGA KERJA
B. BAHAN :
Lampu Philips 8 Watt - Bh 1.000 24,799.00
Down Light Metal Ø 3" - Bh 1.000 40,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
Halaman-188
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00
JUMLAH TENAGA KERJA
B. BAHAN :
Lampu Philips 11 Watt - Bh 1.000 29,500.00
Fitting Tempel - Bh 1.000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00
JUMLAH TENAGA KERJA
B. BAHAN :
Sekring Kas Kosong DN 3 G - Bh 1.000 90,000.00
JUMLAH HARGA BAHAN
C. PERALATAN :
Halaman-189
Material Bantu/ Alat Bantu Ls 1.000 5,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Tukang Instalasi Listrik L.02 Ls 1.000 110,000.00
JUMLAH TENAGA KERJA
B. BAHAN :
Exhaust Fan - Set 1.000 250,000.00
Perlengkapan 35% Harga Bahan - Ls 0.350 87,500.00
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-190
ITEM PEMBAYARAN NO. : Analisa Terapan AHSP - A.4.4.2.27
KODE/ JENIS PEKERJAAN : Pemasangan Acian Dinding 1 PC : 7 KPR
SATUAN PEMBAYARAN : M2
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 92,500.00
Tukang Batu L.02 Org/Hari 0.100 105,000.00
Kepala Tukang L.03 Org/Hari 0.010 112,500.00
Mandor L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Semen Portland - Kg 0.800 1,400.00
Kapur Mil - Kg 0.070 3,906.26
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
Halaman-191
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 92,500.00
Tukang Batu L.02 Org/Hari 0.100 105,000.00
Kepala Tukang L.03 Org/Hari 0.010 112,500.00
Mandor L.04 Org/Hari 0.010 -
JUMLAH TENAGA KERJA
B. BAHAN :
Gypsum board 9 mm 2 sisi - m2 2.400 Err:520
Paku Sekrup - Kg 0.200 Err:520
Rangka metal stude / runer 10 mm - Btg 1.250 Err:520
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-192
Jakarta , April 2022
Dibuat Oleh
Konsultan Perencana :
-
-
Direktur
Halaman-193
ITEM PEMBAYARAN NO. : Analisa Praktis - 25
KODE/ JENIS PEKERJAAN : Pemasangan Gantungan Teralis, Rangka Besi Hollow 40.40.2 mm + 20.40.2 mm, (Lihat Gbr. Rencana)
SATUAN PEMBAYARAN : M2
HARGA SATUAN
No. URAIAN KODE SATUAN KOEFISIEN
(Rp).
1 2 3 4 5 6
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 92,500.00
Tukang Besi L.02 Org/Hari 0.250 105,000.00
Kepala Tukang L.03 Org/Hari 0.025 112,500.00
Mandor L.04 Org/Hari 0.013 -
JUMLAH TENAGA KERJA
B. BAHAN :
Rangka Metal Hollow 40.40.2 mm - M1 4.000 24,933.33
Rangka Metal Hollow 20.40.2 mm - M 1
3.000 15,833.33
Peralatan dan Accesories (Perkuatan, Las, dll) - Ls 25 % x 36,808.33
Material 147,233.33
Pengecatan Besi Hollow AHSP - A.4.7.1.5.1 M2 0.728 #REF!
JUMLAH HARGA BAHAN
C. PERALATAN :
- - - -
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan(D + E)
Halaman-194
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
16,650.00
25,200.00
2,025.00
-
43,875.00
43,306.00
82,829.00
50.00
1,400.00
Halaman-195
4,000.00
131,585.00
-
-
175,460.00
175,460.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
8,695.00
16,380.00
1,800.00
-
26,875.00
19,525.00
66,825.00
8,000.00
94,350.00
Halaman-196
-
-
121,225.00
121,225.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
29,120.00
25,625.00
10,500.00
4,650.00
12,000.00 0.100
81,895.00 0.050
0.005
- 0.005
Halaman-197
-
117,895.00
117,895.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
27,300.00
25,625.00
10,500.00
4,650.00
48,000.00 0.100
116,075.00 0.050
0.005
- 0.005
-
Halaman-198
173,512.50
173,512.50
AHSP - A.4.4.3
- 0.09
-
131,795.00
Halaman-199
131,795.00
AHSP - A.4.4.3
- 0.09
-
134,795.00
134,795.00
Halaman-200
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
1,850.00
6,615.00
708.75
-
9,173.75
2,285.00
5,941.00
8,226.00
-
-
17,399.75
17,399.75
Halaman-201
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
1,850.00
6,615.00
708.75
-
9,173.75
50,000.00
50,000.00
-
-
59,173.75
59,173.75
ANALISA TERAPAN
Halaman-202
JUMLAH HARGA
(Rp).
7 = (5x6)
127,187.50 0.500
144,375.00 0.500
15,468.75 0.250
- 0.025
287,031.25
297,953.33 4 4
74,488.33 4 2
8 6
43,361.60 14
415,803.26
- 0.12 0.08
- 0.480 ###
702,834.51 ###
702,834.51
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
Halaman-203
7 = (5x6)
46,250.00 0.500
52,500.00 0.500
28,125.00 0.250
- 0.025
126,875.00
158,326.67 4 4
39,581.67 4 2
8 6
24,412.01 14
222,320.35
- 0.12 0.08
- 0.480 ###
349,195.35 ###
349,195.35
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
Halaman-204
23,125.00
44,100.00
3,375.00
-
70,600.00
37,080.00
2,325.00
1,970.25
41,375.25
-
111,975.25
111,975.25
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
32,375.00
54,600.00
Halaman-205
3,375.00
-
90,350.00
49,440.00
3,487.50
2,646.38
55,573.88
-
145,923.88
145,923.88
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
27,750.00
10,500.00
5,625.00
-
Halaman-206
43,875.00
22,000.00
5,000.00
27,000.00
-
70,875.00
70,875.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
27,750.00
10,500.00
5,625.00
-
43,875.00
28,000.00
5,000.00
Halaman-207
33,000.00
-
76,875.00
76,875.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
27,750.00
10,500.00
5,625.00
-
43,875.00
25,000.00
5,000.00
30,000.00
Halaman-208
73,875.00
73,875.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
27,750.00
10,500.00
1,125.00
-
39,375.00
25,000.00
5,000.00
30,000.00
-
69,375.00
69,375.00
Halaman-209
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
27,750.00
10,500.00
1,125.00
-
39,375.00
35,000.00
5,000.00
40,000.00
-
79,375.00
79,375.00
Halaman-210
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
27,750.00
10,500.00
1,125.00
-
39,375.00
40,000.00
5,000.00
45,000.00
-
84,375.00
84,375.00
ANALISA TERAPAN
Halaman-211
JUMLAH HARGA
(Rp).
7 = (5x6)
8,500.00
8,500.00
350,000.00
350,000.00
5,000.00
5,000.00
363,500.00
363,500.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
8,500.00
8,500.00
Halaman-212
375,000.00
375,000.00
5,000.00
5,000.00
388,500.00
388,500.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
8,500.00
8,500.00
34,000.00
52,000.00
86,000.00
5,000.00
5,000.00
99,500.00
Halaman-213
99,500.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
8,500.00
8,500.00
30,629.00
52,000.00
82,629.00
5,000.00
5,000.00
96,129.00
96,129.00
Halaman-214
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
8,500.00
8,500.00
24,799.00
40,000.00
64,799.00
5,000.00
5,000.00
78,299.00
78,299.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
Halaman-215
8,500.00
8,500.00
29,500.00
15,000.00
44,500.00
5,000.00
5,000.00
58,000.00
58,000.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
8,500.00
8,500.00
90,000.00
90,000.00
Halaman-216
5,000.00
5,000.00
103,500.00
103,500.00
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
110,000.00
110,000.00
250,000.00
30,625.00
280,625.00
-
-
390,625.00
390,625.00
Halaman-217
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
18,500.00
10,500.00
1,125.00
-
30,125.00
1,120.00
273.44
1,393.44
-
-
31,518.44
31,518.44
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
Halaman-218
7 = (5x6)
18,500.00
10,500.00
1,125.00
-
30,125.00
Err:520
Err:520
Err:520
Err:520
-
-
Err:520
Err:520
Halaman-219
April 2022
n Perencana :
Halaman-220
ANALISA TERAPAN
JUMLAH HARGA
(Rp).
7 = (5x6)
23,125.00
26,250.00
2,812.50
-
52,187.50
99,733.33 4 4
47,500.00 4 2
36,808.33 4 2
12 8
#REF! 20
#REF!
- 0.12 0.08
- 0.480 0.240
#REF! 0.720
#REF!
#REF!
Halaman-221