RENCANA ANGGARAN BIAYA

PROYEK : RUMAH TINGGAL


LOKASI : KUPANG
PEKERJAAN : PERSIAPAN - STRUKTUR - ARSITEKTUR - MEP
TAHUN : 2012

TOTAL
No. Uraian Pekerjaan
(Rp.)

1. PEKERJAAN PERSIAPAN 162,621,383.21

2. PEKERJAAN STRUKTUR 171,663,673.31

3. PEKERJAAN ARSITEKTUR 462,117,379.79

4. PEKERJAAN MEKANIKAL & ELEKTRIKAL 54,650,616.90

Total 851,053,053
PPN 10% 85,105,305
Grand Total 936,158,359
Dibulatkan 936,158,000

Terbilang : # ........................................................................................................................................#

NB:
- Untuk Oekerjaan Elektrikal yang di perhitungkan tidak termasuk Fitting dan Bohlam/Lampu
RENCANA ANGGARAN BIAYA
PROYEK : RUMAH TINGGAL
LOKASI : KUPANG
PEKERJAAN : PERSIAPAN - STRUKTUR
TAHUN : 2012

Harga Satuan
No. Uraian Pekerjaan SAT Vol. Total Harga (Rp)
(Rp)

1. PEKERJAAN PERSIAPAN

I. PEKERJAAN PERSIAPAN DAN PEMBONGKARAN


1.1 Pembersihan Lapangan & Persiapan Lokasi. m² 515.08 8,965 4,617,890
1.2 Pembuatan Pagar Sementara Dari Seng Gelombang t. 2 m m¹ 89.90 556,850 50,063,172
1.3 Pek. Pengukuran dan Pemasangan Bowplank m¹ 480.84 77,092 37,068,575
1.4 Pek. Kantor Direksikeet, dengan lantai plesteran m² 7.50 972,639 7,294,796
1.5 Pembuatan Gudang Material dan Peralatan m² 12.50 814,096 10,176,202
1.6 Pembuatan Rumah Penjaga / Konstruksi Kayu m² 3.00 941,584 2,824,751
1.7 Air Kerja Proyek. month 6.00 1,500,000 9,000,000
1.8 Listrik Kerja Proyek. month 6.00 1,500,000 9,000,000
1.9 Pekerjaan Anti Rayap m² 735.83 40,000 29,433,385
1.10 Pengalian Tanah m² 58.70 49,164 2,885,726
1.11 Pengurugan Tanah m² 15.83 16,224 256,888
Sub Total PEKERJAAN PERSIAPAN 162,621,383
Total PEKERJAAN PERSIAPAN 162,621,383

2. PEKERJAAN STRUKTUR

2.1. PEKERJAAN STRUKTUR BAWAH


2.1.1 Pengurgan Pasir m³ 4.00 348,639 1,395,054
2.2.2 Pas.Batu Kali m³ 53.89 661,245 35,633,126
2.1.3 Sloof 15/20 m³ 10.20 998,279 10,179,725
2.1.4 Besi Ø6 - 1000 mm , l = 500 mm kg 14.14 17,947 253,859
Sub Total PEKERJAAN STRUKTUR BAWAH 47,461,764

2.2. PEKERJAAN STRUKTUR ATAS


2.2.1 Pengurugan Tanah dan Pemadatan tanah m³ 43.76 196,683 8,606,583
2.2.2 Lantai kerja t. 3 cm m³ 3.63 828,258 3,009,838
2.2.3 Plat Lantai t = 12 cm m³ 15.28 1,207,702 18,451,721
2.2.4 Kolom 11/11 m³ 1.44 1,132,502 1,627,948
2.2.5 Kolom 11/26 m³ 0.77 1,132,502 874,518
2.2.5 Balok 15/20 m³ 4.28 1,142,057 4,884,864
Sub Total PEKERJAAN STRUKTUR ATAS 37,455,472

3. PEKERJAAN LAIN LAIN


3.1 KANOPY GARASI
3.1.1 Plat Beton t = 12 mm m³ 33.42 1,207,702 40,359,574

Sub Total PEKERJAAN KANOPI 40,359,574


3.2 DINDING LUAR
3.2.1 Pengurugan Pasir m³ 33.70 348,639 11,750,110
3.2.2 Pas.Batu Kali m³ 32.08 661,245 21,214,651
3.2.3 Sloof uk. 15/20 m³ 3.65 998,279 3,643,719
3.2.4 Besi Ø6 - 1000 mm , l = 500 mm kg 5.06 17,947 90,866
3.2.5 Kolom uk. 11/11 m³ 0.46 1,132,502 517,984
3.2.6 Ring balok uk. 15/20 m³ 3.79 998,279 3,779,485
Sub Total PEKERJAAN DINDING LUAR 40,996,813
RENCANA ANGGARAN BIAYA
PROYEK : RUMAH TINGGAL
LOKASI : KUPANG
PEKERJAAN : PERSIAPAN - STRUKTUR
TAHUN : 2012

Harga Satuan
No. Uraian Pekerjaan SAT Vol. Total Harga (Rp)
(Rp)

3.3 PLAT LANTAI TERAS


3.3.1 Pas. Rolak bata m² 4.87 82,859 403,254
3.3.2 Pengurgan Tanah Urugan m³ 2.28 50,724 115,862
3.3.3 Lantai kerja t. 3 cm m³ 3.63 828,258 3,009,838
3.3.4 Plat Beton t = 12 cm m³ 1.54 1,207,702 1,861,098
Sub Total PLAT LANTAI TERAS 5,390,052
Total PEKERJAAN STRUKUR 171,663,673
RENCANA ANGGARAN BIAYA
PROYEK : RUMAH TINGGAL
LOKASI : KUPANG
PEKERJAAN : ARSITEKTUR
TAHUN : 2012

Harga Satuan Total Harga


No. Uraian Pekerjaan SAT Vol.
(Rp) (Rp)

3. PEKERJAAN ARSITEKTUR

I. PEKERJAAN LANTAI
3.1.1 Lantai Keramik uk.60x60 cm m² 121.44 237,500 28,842,238
3.1.2 Lantai Keramik uk.60x30 cm m² 24.70 230,500 5,693,350
3.1.3 Lantai Keramik uk.33x33 cm m² 2.25 230,500 518,625
3.1.4 Plint Keramik 10x60 cm m¹ 115.37 145,700 16,808,681
3.1.5 Plint karamik 10x30cm m¹ 1.45 115,900 168,055

II. PEKERJAAN DINDING + PELAPIS DINDING


3.2.1 Pas. Batu bata, t=1/2 bata, ad. 1 PC : 3 psr, tinggi 1,5 m m² 15.23 78,700 1,198,208
3.2.2 Pas. Batu bata, t=1/2 bata, ad. 1 PC : 5 psr m² 139.17 74,400 10,354,191
3.2.3 Plesteran t=15 mm ad. 1 PC : 3 psr + acian m² 15.23 37,400 569,415
3.2.4 Plesteran t=15 mm ad. 1 PC : 5 psr + acian m² 293.56 35,100 10,304,078
3.2.5 Pas. Keramik Dinding 60 x 30 cm m² 31.05 230,500 7,157,025
3.2.6 Pas. Keramik Dinding 33 x 33 cm m² 12.42 131,000 1,627,020
3.2.7 Dinding Partisi Gypsum 2x12mm m² 18.04 115,800 2,088,462
3.2.8 Kolom Canopy depan(dengan GRC rangka Siku 40x40x4) bh 10.00 718,800 7,188,000
3.2.9 Pas. Bata 1 PC : 3 PS (bak Bunga) m² 3.58 78,700 281,353

III. PEKERJAAN KUSEN PINTU DAN JENDELA


3.3.1 Type P1, uk.850x2250 mm unit 8.00 2,801,409 22,411,269
3.3.2 Type P2, uk.2660x2250 mm unit 1.00 7,998,132 7,998,132
3.3.3 Type P3, uk.2550x2250 mm (Pintu Folding) unit 1.00 11,182,355 11,182,355
3.3.4 Type P4, uk.800x2250 mm (PVC) unit 3.00 450,000 1,350,000
3.3.5 Type P5, uk.700x2100 mm (Besi) unit 2.00 3,460,625 6,921,250
3.3.6 Type P6, uk.1850x3200 mm (Besi) unit 1.00 7,132,500 7,132,500
3.3.7 Type P7, uk.720x2100 mm Slidding unit 1.00 3,476,409 3,476,409
3.3.8 Type J1, uk.600x1950 mm unit 5.00 2,415,738 12,078,688
3.3.9 Type J2, uk.1140x1950 mm unit 4.00 4,122,725 16,490,900
3.3.10 Type J3, uk.1680x1950 mm unit 2.00 5,548,868 11,097,735
3.3.11 Type J4, uk.(500+425)x1950 mm unit 2.00 2,322,063 4,644,125
3.3.12 Type J5, uk.2170x600 mm unit 1.00 4,152,425 4,152,425
3.3.13 Type J6, uk.1635x600 mm unit 1.00 3,148,225 3,148,225

IV. PEKERJAAN PLAFOND


3.4.1 Gypsum board t=9 mm + Rangka Hollow 40x40 m² 126.75 137,500 17,428,125
3.4.2 Gypsum board type WR t=6 mm + Rangka Hollow 40x40 m² 77.95 156,700 12,214,765
3.4.3 GRC Board plafond Canopy depan m² 59.69 225,000 13,430,250

V. PEKERJAAN PENGECATAN
3.5.1 Pengecatan Dinding Interior m² 116.02 35,800 4,153,464
3.5.2 Pengecatan Plafond Interior m² 204.70 35,800 7,328,260
3.5.3 Pengecatan Dinding Exterior m² 217.18 48,750 10,587,525
3.5.4 Pengecatan Plafond Exterior m² 128.39 48,750 6,259,013

VI. PEKERJAAN SANITARY


3.6.1 Kloset Duduk Type TOTO - CW 660 J set 2.00 2,250,000 4,500,000
3.6.2 Koset Jongkok Type TOTO - CE7 set 1.00 385,000 385,000
3.6.3 Wastafel Type Toto L 237 + Acc. & kran set 2.00 1,765,000 3,530,000
3.6.4 Shower set TOTO - TX 423 S set 2.00 735,000 1,470,000
3.6.5 Toto TX 403 SPIV + accessories set 2.00 335,000 670,000
3.6.6 Floor Drain TX1BN set 3.00 247,000 741,000
3.6.7 Meja beton wastafel fin.Keramik set 1.00 1,850,000 1,850,000
3.6.8 Kitchen zink 150 cm set 1.00 375,000 375,000
3.6.9 Kran kItchen zink set 1.00 225,000 225,000
3.6.10 Bak mandi uk.75x55 cm Fin. Keramik ls 1.00 2,600,000 2,600,000

VII. PEKERJAAN ATAP


3.7.1 Rangka atap baja ringan m² 220.70 175,000 38,622,063
3.7.2 Genteng Metal m² 205.60 385,000 79,156,000
3.7.3 Nok genteng m¹ 60.38 195,600 11,810,328
3.7.4 Lisplank kayu 2x (2x30 cm) fin. Cat m² 70.65 47,500 3,355,875
3.7.5 Atap PolyCarbonat Teras + Rangka besi m² 56.22 650,000 36,543,000

Sub Total PEKERJAAN ARSITEKTUR 462,117,380


RENCANA ANGGARAN BIAYA
PROYEK : RUMAH TINGGAL
LOKASI : KUPANG
PEKERJAAN : MEKANIKAL & ELEKTRIKAL
TAHUN : 2012

Harga Satuan
No. Uraian Pekerjaan SAT Vol. Total Harga (Rp)
(Rp)

4. PEKERJAAN MEKANIKAL & ELEKTRIKAL

4.1. PEKERJAAN MEKANIKAL


4.1.1 Pekerjaan Pipa PVC, Type AW Ø 4" m¹ 28.00 62,748 1,756,949
4.1.2 Pekerjaan Pipa PVC, Type AW Ø 3" m¹ 28.00 47,061 1,317,712
4.1.3 Pekerjaan Pipa PVC, Type AW Ø 2½" m¹ 20.00 30,906 618,110
4.1.4 Pekerjaan Pipa PVC, Type AW Ø ¾" m¹ 20.00 11,626 232,520
4.1.5 Pekerjaan Pipa PVC, Type AW Ø ½" m¹ 70.00 10,081 705,670
4.1.6 Pekerjaan GWT ls 1.00 1,500,000 1,500,000
4.1.7 Pekerjaan Bak Kontrol ls 2.00 450,000 900,000
4.1.8 Pekerjaan Septiktank ls 1.00 3,000,000 3,000,000
Sub Total PEKERJAAN MEKANIKAL 10,030,961

4.2 PEKERJAAN ELEKTRIKAL


4.2.1 Instalasi Lampu ttk 63.00 326,287 20,556,081
4.2.2 Instalasi Stop kontak ttk 16.00 631,060 10,096,960
4.2.3 Instalasi Penangkal Petir Ls 1.00 3,450,000 3,450,000
4.2.4 Instalasi TV ttk 3.00 322,197 966,591
4.2.5 Instalasi Telepon ttk 8.00 328,197 2,625,576
4.2.6 Armature Saklar Engkel ttk 8.00 37,931 303,450
4.2.7 Armature Saklar Double ttk 7.00 46,200 323,400
4.2.8 Armature Saklar Hotel ttk 2.00 52,631 105,263
4.2.9 Armature Stop kontak ttk 16.00 47,119 753,900
4.2.10 ArmatureTV ttk 3.00 89,381 268,144
4.2.11 ArmatureTelpone ttk 3.00 117,863 353,588
4.2.12 Panel MCB ttk 1.00 488,230 488,230
4.2.13 Pentanahan unit 1.00 1,374,824 1,374,824
4.2.14 PABX Ls 1.00 2,650,000 2,650,000
4.2.15 Kabel Toevoer m¹ 5.00 60,730 303,650
Sub Total PEKERJAAN ELEKTRIKAL 44,619,656
Total PEKERJAAN MEKANIKAL & ELEKTRIKAL 54,650,617