BACK UP DATA

GEDUNG B ASISTENSI

No Sketsa Vol Sat Perhitungan

I PEKERJAAN STRUKTUR BAWAH ( TANAH DAN PONDASI )


1 Galian Tanah Pondasi Pondasi Menerus
Pondasi Menerus 68.552 m3 P = 38.00 m
74 Lantai Granito 60 X 60 CM
30 Rabat Beton 1 Pc : 3 Psr : 5 Krl
Pas ir Urug
Urugan Tanah Dipadatkan
Pondasi
P = 76.000 m
L = 1.100 m

10 11
28

T = 0.820 m

40
V = PxLxT

5
107 7 15

10 7
= 68.552 m3

57
25
12

Permukaan Tanah
Urugan Tanah
68

Dipadatkan

160
20

PAS. PONDASI
10

BATU GUNUNG
1 Pc : 4 Psr
40

Perm uk aan Tanah


35

5
5

15 20 15 5 40

520
5

30 PAS. BATU KOSONG


PASIR URUG
10 90 10

170 100

De t. Po n d a si
SELA SA R A NTA R BA NG UNA N
SKALA 1 : 30

2 Urugan Tanah di Padatkan 34.436 m3 Luas = 0.4531 m2


P = 76.000 m
Volume = 34.44 m3

3 Urugan pasir Pondasi 4.180 m3 P = 76.000 m


L = 1.100 m
T = 0.050 m
Volume = PxLxT
= 76.000 x 1.100 x 0.050
= 4.180 m3

4 Pas. Batu Kosong (astamping) 16.720 m3 P = 76.000 m


L = 1.100 m
T = 0.200 m
Volume = PxLxT
= 76.000 x 1.100 x 0.200
= 16.720 m3
5 Pasangan Pondasi Batu Gunung 1:4 72.960 m3 P = 76.00 m
Lebar atas = 0.30 m
Lebar bawah = 0.90 m
T = 1.60 m

Luas = (Lebar atas + lebar bawah)/2 x T


0.96 m2
Volume = Luas x P
= 0.96 x 76.00
= 72.96 m3

II Pekerjaan Struktur tengah (kolom, Sloef, Rinkbalk)

1 Kolom
kolom K1 16 titik Panjang kolom = 5.600 M
- bekisting 56.320 M2 Bekisting Kolom
v = P X L.total
v = 5.600 x 0.629
= 3.520 M2
Vt = 3.520 x 16.000
= 56.320 M2
- pembesian 403.873 Kg
berat besi dalam 1 kolom
besi Jml p berat/m berat.ttl SAT
B12 4.00 5.600 0.888 19.891 Kg
Beugel 38.00 0.634 0.222 5.351 Kg
25.242 Kg

Vt = 25.242 x 16.000
= 403.873 Kg

- pek. Beton 2.816 M3 P = 5.600 m


Luas = 0.031 m2
Jumlah = 16.000 Bh
V = P x Luas x jumlah
V = 5.600 X 0.031 x 16.000
= 2.816 M3

Plesteran 1:3 kolom 81.894 m2 Jumlah = 16.000 bh


Diameter = 0.200 m
Keliling = 0.994 m
Tinggi = 5.150 m
volume = keliling x Jumlah x tinggi
81.894 m2

2 sloef 20x25
Sloef (20x25)
Panjang Sloof = 77.500 m
- Bekisting 38.750 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.500
= 0.500 M2
Vt = 77.500 x 0.500
= 38.750 M2

- Pembesian 420.873 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 77.500 x 5.431
= 420.873 Kg
- Pek. Beton 2.325 M3
P = 77.500
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 77.500 X 0.150 X 0.200
= 2.325 M3

3 Balok 15x20
Panjang balok = 76.000 m
- Bekisting 41.800 M2 Bekisting 1m balok
v = PXT
v = 1.000 x 0.550
= 0.550 M2
Vt = 76.000 x 0.550
= 41.800 M2

- Pembesian 412.727 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 76.000 x 5.431
= 412.727 Kg
- Pek. Beton 2.280 M3
P = 76.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 76.000 X 0.150 X 0.200
= 2.280 M3

4 Rinkbalk 15x20
Panjang balok = 76.000 m
- Bekisting 41.800 M2 Bekisting 1m balok
v = PXT
v = 1.000 x 0.550
= 0.550 M2
Vt = 76.000 x 0.550
= 41.800 M2

- Pembesian 412.727 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 76.000 x 5.431
= 412.727 Kg
- Pek. Beton 2.280 M3
P = 76.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 76.000 X 0.150 X 0.200
= 2.280 M3

III Pekerjaan lantai

1 Urugan tanah yang dipadatkan 148.687 m3 Luas = 126.327 m2


T = 1.177 m
V = Luas x T
148.687 m3

2 Urugan pasir 6.316 m3 Luas = 126.327 m2


T = 0.050 m
V = Luas x T
= 6.316 m3

3 Rabat Beton 1pc : 3psr : 5 krl 8.843 m3 Luas = 126.327 m2


T = 0.070 m
V = Luas x T
= 8.843 m3

4 lantai Granito 60cm x 60cm 126.327 m2 Luas = 126.327 m2

IV Pekerjaan langit-langit / plafond

Plafond GRC tebal 4.5 mm 278.160 m2 L = 7.320 m


P = 38.000 m
Luas = PxL
= 38.000 x 7.320
= 278.160 m2

V PEKERJAAN POT BUNGA SAMPING PONDASI

1 Galian Tanah 13.300 m3 P = 76.000 m


L = 0.5 m
T = 0.35 m
Volume = PxLxT
= 13.30 m3

2 Urugan Tanah kembali 2.280 m3. P = 76.000 m


L = 0.1 m
T = 0.3 m
Volume = PxLxT
= 2.28 m3

3 Urugan tanah humus 49.309 m3. P = 76.000 m


Luas = 0.6488 m
Volume = Luas x P
= 49.31 m3

4 Urugan pasir 2.320 m3. P = 62.000 m


L = 0.5 m
T = 0.05 m
Volume = PxLxT
= 1.55 m3

P = 14.000 m
L = 1.1 m
T = 0.05 m
Volume = PxLxT
= 0.77 m3
Total Volume = 2.32 m3

5 Pas. Batu Kosong 3.080 m3. P = 14.000 m


L = 1.1 m
T = 0.2 m
Volume = PxLxT
= 3.08 m3

5 Pas. Pondasi batu Gunung 26.517 m3. P = 48.000 m


L = 0.4 m
T = 0.4 m
Volume = PxLxT
= 7.68 m3
P = 14.000 m
L = 0.65 m
T = 2.07 m
Volume = PxLxT
= 18.84 m3

Total Volume = 26.52 m3

6 Sloef (15x20)
Panjang Sloof = 77.500 m
- Bekisting 31.000 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.400
= 0.400 M2
Vt = 77.500 x 0.400
= 31.000 M2

- Pembesian 420.873 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 77.500 x 5.431
= 420.873 Kg
- Pek. Beton 2.325 M3
P = 77.500
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 77.500 X 0.150 X 0.200
= 2.325 M3

7 Rinkbalk (12x15)
Panjang Rinkbalk = 77.500 m
- Bekisting 18.600 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.240
= 0.240 M2
Vt = 77.500 x 0.240
= 18.600 M2

- Pembesian 433.719 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.740 0.395 2.044 Kg
5.596 Kg

Vt = 77.500 x 5.596
= 433.719 Kg
- Pek. Beton 1.744 M3
P = 77.500
L = 0.150 m
T = 0.150 m
V = PXLXT
V = 77.500 X 0.150 X 0.150
= 1.744 M3

8 Dinding Trasram 1:3 58.125 m2 P = 77.500


Tebal = 0.150 m
Tinggi = 0.750 m
Volume = PxT
= 77.500 x 0.750
= 58.125 m2

VI Pek. Saluran air hujan dan Lantai Rabat keliling Selasar

1 Lantai rabat Keliling bangunan


- Pekerjaan urugan pasir 1.027 m3 T = 0.050 m
Luas = 20.548 m2
Volume = Luas x T
20.548 x 0.050
1.027 m3

- Pekerjaan Rabat beton 1.438 m3 T = 0.070 m


Luas = 20.548 m2
Volume = Luas x T
20.548 x 0.070
1.438 m3

2 Pekerjaan Saluran air hujan


- Pekerjaan Galian Tanah 12.000 m3 P = 60.000 m
L = 0.500 m
T = 0.400 m
V = PxLxT
= 60.000 x 0.500 x 0.400
= 12.000 m3

- Pekerjaan Urugan Pasir 3.000 m2 P = 60.000 m


T = 0.050 m
V = Px T
= 60.000 x 0.050
= 3.000 m2

- Pekerjaan Pasangan Bata 1:4 60.000 m3 P = 60.000 m


Lebar = 1.000 m
V = Luas x P
= 1.000 x 60.000
= 60.000 m3

- Pekerjaan Pasangan Plasteran 1 : 4 62.400 m3 P = 60.000 m


Lebar = 1.040 m
V = Luas x P
= 1.040 x 60.000
= 62.400 m3
VII Pekerjaan Tangga
1 Tangga dalam selasar Lebar Tangga = 3.5 m
- Pekerjaan Urugan Pasir 0.980 m3 P = 5.600 m
L = 3.500 m
T = 0.050 m
V = PxLxT
5.600 x 3.500 x 0.050
0.980 m3

- Pekerjaan Urugan Tanah 23.277 m3 Luas = 6.651 m2


Lebar = 3.500 m
Volume = Luas x Lebar
= 6.651 x 3.500
= 23.277 m3

- Pekerjaan Pasangan Pondasi batu gunung 1:4 3.150 m3 P = 3.000 m


Lebar = 3.500 m
T = 0.300 m
V = PxLxT
3.150 m3

- Rabat Beton 1pc : 3psr : 5 krl 0.637 m3 P = 2.600 m


Lebar = 3.500 m
T = 0.070 m
V = PxLxT
0.637 m3

- lantai Granito 60cm x 60cm 30.450 m2 P = 8.700 m


L = 3.500 m
V = PxL
= 30.450 m2

2 Tangga di luar selasar


PEKERJAAN TANGGA
PANJANG = 15.200 M
- pek. Urugan Tanah di Padatkan 13.640 M3
Luas = 0.897 M2
P = 15.200 M
VOLUME = Luas X PANJANG
= 13.640 M3

- pek. Pasangan Batu Gunung 13.911 M3 Luas = 0.764 M


P = 15.200 M
VOLUME = Luas X PANJANG
= 11.611 M3
- pek. Pasangan Batu Samping Tangga
Luas = 2.874 M2
Tebal = 0.200 M
Jumlah = 4.000
Volume = 2.299 M3

total volume = 13.911

- pek. Lantai Granit 60 x 60 cm 69.008 M2 PANJANG = 15.200 M


L = 4.540 M
V = PXL
= 15.200 X 4.540
= 69.008 M2

- pek. Plat Beton Tebal 12cm 0.480 M2 P = 8.000 M


L = 0.500 M
T = 0.120 M
Volume = PxLxT
= 8.000 x 0.500 x 0.12
= 0.480 M2

- pek. Pasangan Batu Samping Tangga 2.299 M3 Luas = 2.874 M2


Tebal = 0.200 M
Jumlah = 4.000
Volume = 2.299 M3

- pek. Plesteran 14.473 M2 Luas = 3.618 M2


Jumlah = 4.000
= 14.473 M2

3. #REF!
' pek. Profil Kolom Bawah 7.815 M3 Bawah = 0.830 x 0.830 x 1.00
= 0.689 m3
Tengah = 0.700 x 0.700 x 0.80
0.392 m3

Atas 01 = 0.840 x 0.840 x 0.12


= 0.085 m3

Atas 02 =
Luasbawah = 3,14xr2
Diameter R = 0.530
Luasbawah = 3.140 x 0.081 = 0.26 m2
Luas Atas = 3.140 x 0.060 = 0.19 m2
0.44 m2
Luas Rata2 = 0.222 m2
v = 0.222 x 0.090
= 0.020 m3

Volume Tot= 1.186 m3


Luas Kolom = 0.697 m3 -
Total V 0.488 m3
Jumlah Kolom Utuh = 16.000 Bh
Volume Kolom
a = 16.000 x 0.488 = 7.82 m3
7.82 m3

' pek. Profil Kolom Tengah 3.467 M3 Luas Profil = 3,14xR2


Luas Profil = 3.140 x 0.040 = 0.13 m2
Luas Kolom = 3.140 x 0.010 = 0.03 m2 -
0.09 m2
Panjang Ko = 36.800 m

V. Profil = 36.800 x 0.094


= 3.467 m3

' pek. Profil Kolom Atas 1.029 M3 Luas Profil = 3,14xR2


Diameter R = 0.575 m
Luas Profil = 3.140 x 0.201 = 0.63 m2
Luas Kolom = 3.140 x 0.015 = 0.05 m2 -
0.58 m2
Panjang Ko = 0.110 m

V. Profil = 0.110 x 0.585


= 0.064 m3

Jumlah Kolom Utuh = 16.000 Bh


Volume Kolom
a = 16.000 x 0.064 = 1.03 m3

1. Pengecatan Kolom 20.352 M2


Pek. Pengecetan Kolom tengah
Jumlah Kolom = 16.000 Bh
Panjang Kolom = 37.600 M
Luas Lingkaran Kolom = 0.126 M2
= 37.600 x 0.126
= 4.723

Pek. Pengecetan Kolom Bawah


Jumlah Kolom = 16.000 Bh
Luas Pengecetan = 1.272 M

= 16.000 x 1.272
= 20.352
No Sketsa Vol Sat Perhitungan
BACK UP DATA
SELASAR PENGHUBUNG GEDUNG BUAPTI KE ASISTEN

No Sketsa Vol Sat Perhitungan


I PEKERJAAN STRUKTUR BAWAH ( TANAH DAN PONDASI )

PONDASI BANGUNAN
a. Pondasi Menerus 36.080 m3

Pondasi Type A(Luar Bangunan)


P = 20.000 m
L = 1.100 m
T = 0.820 m
V = PxLxT
= 18.040 m3
SELASAR KIRI KANAN = 36.080 M3
2 Urugan Pasir Pondasi 2.200 m3

Urugan Pasir
P = 20.000 m
L = 1.100 m
T = 0.050 m
V = PxLxT
= 1.100 m3
SELASAR KIRI KANAN = 2.200 M3

3 Pondasi Batu Kosong ( Astamping) 8.800 M3

Pondasi Type
P = 20.000 m
L = 1.100 m
T = 0.200 m
V = PxLxT
= 4.400 m3
SELASAR KIRI KANAN = 8.800 M3
4 Pasangan Batu Gunung 1 : 4 40.802 M3 T
Pasangan Batu Gunung 1 : 5
P = 20.000 m
L1 = 0.300 m
L2 = 0.700 m
T = 1.600 m
V = L1 + L2 x tinggi x panjang
2.000
V = 0.500 x 1.600 x 20.000
= 16.000 M3

PONDASI BAWAH KOLOM


90
JMLH = 4.000 m
P = 0.500 m
L = 1.350 m
157

163
T = 1.630 m
V = P X L X T X Jumlah
V = 0.500 x 1.350 x 1.630 x 4.00
= 4.401 M3
180 50
TTL VOL. = 16.000 + 4.401
= 20.401 m3

SELASAR KIRI KANAN = 40.802 M3

3 Urugan Tanah Kembali 36.080 m3


v = 1/4 / vol. Galian Tana m
v = 18.040 m2
SELASAR KIRI KANAN = 36.080 M3

4 Urugan Tanah Dibawah Lantai 16.800 m3


P = 10.000 m2
L = 2.800 m2
Tinggi = 0.300 m
V = pxlxt
V = 10.000 X 2.800 x 0.300
= 8.400 M3
SELASAR KIRI KANAN = 16.800 M3

5 Urugan Pasir Bawah Lantai 5.600 m3


P = 10.000 m2
L = 2.800 m2
Tinggi = 0.100 m
V = pxlxt
V = 10.000 X 2.800 x 0.100
= 2.800 M3
SELASAR KIRI KANAN = 5.600 M3

II PEKERJAAN STRUKTUR TENGAH


(SLOOF, KOLOM, BALOK, PLAT)

Panjang Sloof = 20.000 m


1 Pek. Sloof ( 15 / 20 cm )
- Bekisting 12.000 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.300
= 0.300 M2
15 Vt = 20.000 x 0.300
= 6.000 M2
SELASAR KIRI KANAN = 12.000 M3

- Pembesian 217.225 Kg berat besi dalam 1m


20

besi Jml p berat/m berat.ttl SAT


B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 20.000 x 5.431
= 108.612 Kg
SELASAR KIRI KANAN = 217.225 Kg

- Pek. Beton 1.200 M3


P = 20.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 20.000 X 0.150 X 0.200
= 0.600 M3
SELASAR KIRI KANAN = 1.200 M3

5 Pek. Kolom K1 Dia, 20 cm 4 titik Panjang kolom = 22.400 M


- bekisting 28.160 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.629
= 0.629 M2
Vt = 22.400 x 0.629
= 14.080 M2
SELASAR KIRI KANAN = 28.160 M3

- pembesian 203.288 Kg
berat besi dalam 1m
besi Jml p berat/m berat.ttl SAT
B14 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.634 0.222 0.986 Kg
4.538 Kg

Vt = 22.400 x 4.538
= 101.644 Kg
SELASAR KIRI KANAN = 203.288 Kg

- pek. Beton 1.408 M3 P = 22.400


Luas = 0.031 m

V = P x Luas
V = 22.400 X 0.031
= 0.704 M3
SELASAR KIRI KANAN = 1.408 M3

11 Pek. Balok ( 15 / 20 cm ) Panjang Balok = 20.000 M


- Bekisting 16.000 M2 Bekisting Kolom
v = P X L.total
TIPE RINGBALOK RB2 -150 X 200 v = 1.000 x 0.400
TUMPUAN LAPANGAN = 0.400 M2
Vt = 20.000 x 0.400
15 = 8.000 M2
SELASAR KIRI KANAN = 16.000 M3
20

SKETSA
20

15

- Pembesian 217.225 Kg berat besi dalam 1m


DIMENSI 150 X 200 150 X 200 besi Jml p berat/m berat.ttl SAT
TULANGAN TUMPUAN 4 D12 MM 4 D12 MM
TULANGAN EKSRA - - B12 4.00 1.000 0.888 3.552 Kg
TULANGAN PINGGANG
SENGKANG
-
Ø 6 - 150
-
Ø 6 - 150
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 20.000 x 5.431

= 108.612 Kg
SELASAR KIRI KANAN = 217.225 Kg

- Pek. Beton 1.200 M3


P = 20.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 20.000 X 0.150 X 0.200
= 0.600 M3
SELASAR KIRI KANAN = 1.200 M3
11 Pek. RingBalok ( 15 / 20 cm ) Panjang Balok = 20.000 M
- Bekisting 16.000 M2 Bekisting Kolom
v = P X L.total
TIPE RINGBALOK RB2 -150 X 200 v = 1.000 x 0.400
TUMPUAN LAPANGAN = 0.400 M2
Vt = 20.000 x 0.400
15 = 8.000 M2
SELASAR KIRI KANAN = 16.000 M3

20
SKETSA

20
15

- Pembesian 217.225 Kg berat besi dalam 1m


DIMENSI 150 X 200 150 X 200 besi Jml p berat/m berat.ttl SAT
TULANGAN TUMPUAN 4 D12 MM 4 D12 MM
TULANGAN EKSRA - - B12 4.00 1.000 0.888 3.552 Kg
TULANGAN PINGGANG
SENGKANG
-
Ø 6 - 150
-
Ø 6 - 150
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 20.000 x 5.431

= 108.612 Kg
SELASAR KIRI KANAN = 217.225 Kg

- Pek. Beton 1.200 M3


P = 20.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 20.000 X 0.150 X 0.200
= 0.600 M3
SELASAR KIRI KANAN = 1.200 M3
III. PEKERJAAN DINDING & PLESTERAN

1 Plasteran Pondasi 1 : 3 48.260 m2 Pondasi


Panjang = 20.000 m
URUGAN P. Rata2 Dudukan Kolom = 5.400 m
TANAH DIPADATKAN 5
= 25.400 m
Diplaster 1 Pc : 3 Psr, + Acian
Tinggi = 0.950 M

V = Panjang x Tinggi
= 25.400 X 0.950
V = 24.130 M2
PAS. PONDASI SELASAR KIRI KANAN = 48.26 M2
BATU GUNUNG
1 Pc : 4 Psr

2 Pek. Acian 48.260 m2 Pondasi


Panjang = 20.000 m
URUGAN P. Rata2 Dudukan Kolom = 5.400 m
TANAH DIPADATKAN 5
= 25.400 m
Diplaster 1 Pc : 3 Psr, + Acian
Tinggi = 0.950 M

V = Panjang x Tinggi
= 25.400 X 0.950
V = 24.130 M2
PAS. PONDASI SELASAR KIRI KANAN = 48.26 -
BATU GUNUNG
1 Pc : 4 Psr

3. #REF!
' pek. Profil Kolom Bawah 1.954 M3 Bawah = 0.830 x 0.830 x 1.00
= 0.689 m3

Tengah = 0.700 x 0.700 x 0.80


0.392 m3
84
73 Atas 01 = 0.840 x 0.840 x 0.12
57
49 = 0.085 m3

Atas 02 =
12

Luasbawah = 3,14xr2
Diameter Rata2 = 0.530
Luasbawah = 3.140 x 0.081 = 0.26 m2
80

Luas Atas = 3.140 x 0.060 = 0.19 m2


0.44 m2
Luas Rata2 = 0.222 m2
10

v = 0.222 x 0.090
78 = 0.020 m3
83

Volume Total = 1.186 m3


Luas Kolom K1 = 0.697 m3 -
Total V 0.488 m3
Jumlah Kolom Utuh = 4.000 Bh
Volume Kolom
a = 4.000 x 0.488 = 1.95 m3
1.95 m3

' pek. Profil Kolom Tengah 1.289 M3 Luas Profil = 3,14xR2


Luas Profil = 3.140 x 0.040 = 0.13 m2
Luas Kolom K1 = 3.140 x 0.010 = 0.03 m2 -
0.09 m2
Panjang Kolom = 13.680 m

V. Profil = 13.680 x 0.094


= 1.289 m3
342

' pek. Profil Kolom Atas 0.257 M3 Luas Profil = 3,14xR2


Diameter Rata = 0.575 m
Luas Profil = 3.140 x 0.201 = 0.63 m2
Luas Kolom K1 = 3.140 x 0.015 = 0.05 m2 -
0.58 m2
Panjang Kolom = 0.110 m

65 V. Profil = 0.110 x 0.585


= 0.064 m3

Jumlah Kolom Utuh = 4.000 Bh


11

Volume Kolom
a = 4.000 x 0.064 = 0.26 m3
50
VI PEKERJAAN LANTAI

1 Lantai Rabat Beton Tebal 7cm 4.480 M3 LUAS = 32.000 M2


T = 0.070 M
V = LUAS X Tebal
= 32.000 X 0.070
= 2.240 M3
SELASAR KIRI KANAN 4.48 M3
2. Lantai Keramik Uk. 60x60 64.000 M2
VII PEKERJAAN STRUKTUR RANGKA ATAP
1 Pek. Rangka Atap Baja Ringan 144.180 m2

- luas total atap a =


P.atas = 7.300 m

4,05
Lebar Atap 8.100 m
p = pxl
Volume =
v = 7.300 x 8.100
v = 59.130 m2
730 320
- luas total atap b =
P.atas = 3.200 m
Lebar Atap 4.050 m
p = pxl
Volume =
v = 3.200 x 4.050
v = 12.960 m2

Total Luas Atap = 59.130 + 12.960


= 72.090 m2
SELASAR KIRI KANAN = 144.18 m2

4. Pek. Bubungan Atap 40.000 M'

6. Pek. Lesplank Alcopan 29.200 M'


VIII PEKERJAAN LANGIT-LANGIT/PLAFOND

1 Rangka Plafond Besi Hollow 60 x 120 cm 86.140 M2 P = 7.300


L = 5.900
V = PXL
= 7.300 X 5.900
= 43.070 M2
SELASAR KIRI KANAN = 86.14 M2

2 Plafond GRC Tebal 4,5 mm Rangka Besi Hollow 86.140 M2


X PEKERJAAN PENGECETAN

1. Pengecatan Kolom 3.668 M2


Pek. Pengecetan Kolom
Jumlah Kolom = 4.000 Bh
Panjang Kolom = 14.600 M
Luas Lingkaran Kolom = 0.126 M2
= 14.600 x 0.126
= 1.834

SELASAR KIRI KANAN = 3.67 -


2. Pengecatan Plafond 86.140 M2
X1 PEKERJAAN akhir dan finishing

A PEKERJAAN RABAT DAN SALURAN AIR HUJAN KELILING BANGUNAN


1. RABAT BETON KELILING BANGUNAN Panjang = 14.600 m'
- Rabat Beton Keliling Bangunan 3.679
P = 14.600 m
L = 1.800 m
T = 0.070 m
V=pxlxt
v = 14.600 x 1.800 x 0.070
= 1.840 m3
SELASAR KIRI KANAN = 3.68 m3

- Pasir Urug 2.628


P = 14.600 m
L = 1.800 m
T = 0.050 m
V=pxlxt
v = 14.600 x 1.800 x 0.050
= 1.314 m3
SELASAR KIRI KANAN = 2.63 m3
2. PEK. SALURAN KELILING BANGUNAN
- Galian Tanah 6.570 m3 Panjang = 14.600 m'

P = 14.600 m
L = 0.500 m
T = 0.450 m
V=pxlxt
v = 14.600 x 0.500 x 0.450
= 3.285 m3
SELASAR KIRI KANAN = 6.57 m3

- Urugan Pasir 0.730 m3 P = 14.600 m


L = 0.500 m
T = 0.050 m
V=pxlxt
v = 14.600 x 0.500 x 0.050
= 0.365 m3
SELASAR KIRI KANAN = 0.73 m3

29.200 m2
- Pas. Bata 1 : 3 P = 14.600 m
L = 1.000 m

V=pxlxt
v = 14.600 x 1.000
= 14.600 m3
SELASAR KIRI KANAN = 29.20 m3

- Plasteran 1 + 3 30.368 m2 P = 14.600 m


L = 1.040 m
V=pxlxt
v = 14.600 x 1.040
= 15.184 M2
SELASAR KIRI KANAN = 30.37 M2
No Sketsa Vol Sat Perhitungan
A LANTAI 01

DATA - DATA :
1 PANJANG PONDASI LUAR = 200.4 M
PANJANG PONDASI DALAM BANGUNAN = 52 M
LUAS LANTAI KM/WC
- WC PRIA = 21 M2
- WC WANITA = 21 M2
- WC RUANG TUNGGU = 3.6 M2
45.6 M2

2 LANTAI 60 X 60 BANGUNAN INDUK/DILUAR STAGE = 732 M2


LANTAI TERAS
- TERAS DEPAN = 31.2 M2
- TERAS SAMPING = 63.58 M2
- TERAS BELAKANG = 19.5 M2
846.28 M2

Total Luas Bangunan = 891.88 m2

3 PANJANG KOLOM PEDESTAL K1 = 45 Bh


- PANJANG KOLOM = 2.45 M
PANJANG TOTAL KOLOM PEDESTAL K1 = 110.25 M'

4 JUMLAH KOLOM K1 = 43 Bh
- PANJANG KOLOM = 6.4 M
'-KOLOM TERAS SAMPING,T = 4,4 M,JMLH= 8 BH = 4.4 M
PANJANG TOTAL KOLOM K1 = 310.4 M'

5 JUMLAH KOLOM PEDESTAL Kp PRAKTIS = 4 Bh


- PANJANG KOLOM = 2.45 M
PANJANG TOTAL KOLOM PEDESTAL Kp = 9.8 M'

6 JUMLAH KOLOM Kp PRAKTIS = 104 Bh


- PANJANG KOLOM = 6.4 M
PANJANG TOTAL KOLOM Kp = 665.6 M'

7 PANJANG SLOOF 20 / 30 = 285.6 M'

8 PANJANG SLOOF S2 15 / 20 CM = 39 M'

9 PANJANG BALOK LATEY = 183 M'

10 PANJANG BALOK TENGAH BT ( 20 /30 ) = 29 M'

11 PANJANG BALOK TENGAH BT 1( 25 /50 ) = 32 M'

12 PANJANG RINGBALOK RB1 = 224.5 M'

13 PANJANG RINGBALOK RB2 = 141 M'


BACK UP DATA
GEDUNG POLA

No Sketsa Vol Sat Perhitungan


I PEKERJAAN STRUKTUR BAWAH ( TANAH DAN PONDASI )
1 Galian Tanah Pondasi Pondasi Poer Plat 1 (P1)
a. Pondasi Poer Plat 114.560 m3 P = 1.000 m
L = 1.000 m
T.Rata2 = 2.480 m
Jml = 37.000 bh
Per mukaan T anah Per mukaan Tanah
V = P X L X T X Jmlh
V = 1.000 X 1.000 X 2.480 X 37.00
= 91.760 M3
Permukaan Tanah
Pondasi Poer Plat 2 (P2)
P = 1.900 m
L = 1.000 m
248

T.Rata2 = 1.500 m

150
Jml = 8.000 bh
V = P X L X T X Jmlh
V = 1.900 X 1.000 X 1.500 X 8.00
= 22.800 M3
10 170 10

10 80 10
TOTAL GALIAN
VT = VOL.P1+VOL.P2
= 91.760 + 22.800
PONDASI P1 PONDASI P2 = 114.560 M3

PONDASI BANGUNAN
b. Pondasi Menerus 219.749 m3

Pondasi Type A (Dalam Bangunan)


P = 45.600 m
L = 0.900 m
T = 0.950 m
V = PxLxT
= 38.988 m3
PAS. PONDASI
BATU GUNUNG
70

1 Pc : 4 Psr
PAS. PONDASI
Pondasi Type B (Luar Bangunan)
BATU GUNUNG
1 Pc : 4 Psr
P = 200.400 m
L = 1.100 m
20

T = 0.820 m
57
5

10 70 10
V = PxLxT
= 180.761 m3
5 20

10 90 10 TOTAL GALIAN
VT = VOL.P1+VOL.P2
PONDASI DALAM BANGUNAN PONDASI LUAR BANGUNAN = 38.988 + 180.761
= 219.749 M3
2 Urugan Pasir Pondasi 13.074 M3
PONDASI BANGUNAN

Pondasi Type A (Dalam Bangunan)


P = 45.600 m
L = 0.900 m
T = 0.050 m
V = PxLxT
= 2.052 m3
PAS. PONDASI
BATU GUNUNG
70

1 Pc : 4 Psr
PAS. PONDASI
Pondasi Type B (Luar Bangunan)
BATU GUNUNG
1 Pc : 4 Psr
P = 200.400 m
L = 1.100 m
20

T = 0.050 m

57
5

V = PxLxT
10 70 10
= 11.022 m3
5 20

10 90 10 TOTAL GALIAN
VT = VOL.P1+VOL.P2
= 2.052 + 11.022
= 13.074 M3
3 Urugan Tanah Kembali 83.577 m3
v = 1/4 / vol. Galian Tana m
v = 83.577 m2

4 Urugan Tanah Dibawah Lantai 321.077 m3


Luas = 891.880 m2
Tinggi = 0.360 m

V = Luas X tinggi
V = 891.880 X 0.360
= 321.077 M3

5 Urugan Pasir Bawah Lantai 31.040 m3


Luas = 310.400 m2
Tinggi = 0.100 m

V = Luas X tinggi
V = 310.400 X 0.100
= 31.040 M3

6 Pondasi Batu Kosong ( Astamping) 52.296 M3

Pondasi Type A (Dalam Bangunan)


P = 45.600 m
L = 0.900 m
T = 0.200 m
V = PxLxT
= 8.208 m3

PAS. PONDASI Pondasi Type B (Luar Bangunan)


BATU GUNUNG
P = 200.400 m
70

1 Pc : 4 Psr
PAS. PONDASI L = 1.100 m
BATU GUNUNG
1 Pc : 4 Psr T = 0.200 m
5 20

V = PxLxT
57

= 44.088 m3
10 70 10
5 20

TOTAL GALIAN
VT = VOL.P1+VOL.P2
10 90 10
= 8.208 + 44.088
= 52.296 M3
7 Pasangan Batu Gunung 1 : 4 210.624 M3 Pondasi Type A (Dalam Bangunan)
Pasangan Batu Gunung 1 : 5
P = 45.600 m
30
L1 = 0.300 m
30
L2 = 0.700 m
T = 0.800 m
V = L1 + L2 x tinggi x panjang
2.000
V = 0.500 x 0.800 x 45.600
PAS. PONDASI
= 18.240 M3

80
BATU GUNUNG

160
1 Pc : 4 Psr
Pondasi Type B
Pasangan Batu Gunung 1 : 5
P = 200.400 m
70 L1 = 0.300 m
L2 = 0.900 m
90
T = 1.600 m
V = L1 + L2 x tinggi x panjang
2.000
V = 0.600 x 1.600 x 200.400
= 192.384 M3

TOTAL PAS. BATU GUNUNG


VT = VOL.P1+VOL.P2
= 18.240 + 192.384
= 210.624 M3

8 Lantai Kerja Pondasi Poer Plat 3.654 m3 Poer Plat P1


P = 1.000 m
L = 1.000 m
t = 0.070 m
Jml = 37.000 bh
V = P X L X T X Jmlh
V = 1.000 X 1.000 X 0.070 X 37.00
= 2.590 M3

Poer Plat P2
P = 1.900 m
L = 1.000 m
t = 0.070 m
Jml = 8.000 bh
V = P X L X T X Jmlh
V = 1.900 X 1.000 X 0.070 X 8.00
= 1.064 M3

Jumlah Lantai Kerja

v = Lantai Kerja P1 + Lantai Kerja P2


= 2.590 + 1.064
= 3.654 m3

8 Pondasi Poer Type P1 Bekisting 1 Buah Poer Plat


- Pek. Bekisting 29.600 M2 Keliling = 3.200 M
Tebal = 0.250 M
V = Keliling x Tebal
= 0.800 M2

jml = 37.000 Bh
Vt = 37.000 x 0.800
= 29.600 M2

Berat besi dalam 1 Kg


- Pek. Pembesian 634.920 Kg besi jmlh p berat/m berat.ttl SAT
B 12 5.00 1.950 0.880 8.580 Kg
B 12 5.00 1.950 0.880 8.580 Kg
17.160 Kg
Jumlah = 37.000 Bh
Volume = 634.920 Kg

- Pek. Beton 5.446 M3 Volume Bagian Atas


Luas Atas
P = 0.400 m
L = 0.400 m
Luas = PxL
Luas = 0.400 X 0.400
= 0.160 M2
Luas Bawah
P = 0.800 m
L = 0.800 m
Luas = PxL
Luas = 0.800 X 0.800
= 0.640 M2
V = (Luas Atas + Luas Bawah)/2 x Tebal
T = 0.080 M
Volume = 0.480 X 0.080
= 0.038 M3
Volume Bawah( segi empat )
P = 0.800 m
L = 0.800 m
T = 0.170 m
Luas = PxLxT
Luas = 0.800 X 0.800 x 0.170
= 0.109 M2
jumlah = 37.000 Bh
Volume = 5.446 M3
Pondasi Poer Type P2 Bekisting 1 Buah Poer Plat
- Pek. Bekisting 6.800 M2 Keliling = 5.000 M
Tebal = 0.170 M
V = Keliling x Tebal
= 0.850 M2

jml = 8.000 Bh
Vt = 8.000 x 0.850
= 6.800 M2

Berat besi dalam 1 Kg


- Pek. Pembesian 407.194 Kg besi jmlh p berat/m berat.ttl SAT
B 12 ( 80 cm 6.00 2.640 0.880 13.939 Kg
B 12 ( 1,7 m) 12.00 3.500 0.880 36.960 Kg
50.899 Kg
Jumlah = 8.000 Bh
Volume = 407.194 Kg
- Pek. Beton 2.560 M3 Volume Bagian Atas
Luas
P = 1.300 m
L = 0.400 m
Luas = PxL
Luas = 1.300 X 0.400
= 0.520 M2
Luas Bawah
P = 1.700 m
L = 0.800 m
Luas = PxL
Luas = 1.700 X 0.800
= 1.360 M2
V = (Luas Atas + Luas Bawah)/2 x Tebal
T = 0.080 M
Volume = 1.110 X 0.080
= 0.089 M3

Volume Bawah( segi empat )


P = 1.700 m
L = 0.800 m
T = 0.170 m
Luas = PxLxT
Luas = 1.700 X 0.800 x 0.170
= 0.231 M2
jumlah = 8.000 Bh

volume = ( Volume Atas + Volume Bawah ) x Jumlah Poer Plat


= 0.089 + 0.231 x 8.000
= 2.560 m3

II PEKERJAAN STRUKTUR TENGAH


(SLOOF, KOLOM, BALOK, PLAT)

Panjang Sloof = 285.600 m


1 Pek. Sloof S1 ( 20 / 30 cm )
- Bekisting 171.360 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.600
TUMPUAN LAPANGAN = 0.600 M2
Vt = 285.600 x 0.600
20 = 171.360 M2
2 D14 MM
20 2 D14 MM
- Pembesian 3,025.319 Kg berat besi dalam 1m
1 D12 MM besi Jml p berat/m berat.ttl SAT
30

30

2 D12 MM 2 D12 MM B14 4.00 1.000 1.209 4.835 Kg


1 D12 MM B12 3.00 1.000 0.888 2.664 Kg
Beugel 8.00 0.980 0.395 3.094 Kg
2 D14 MM 2 D16 MM 10.593 Kg

Vt = 285.600 x 10.593
= 3,025.319 Kg
- Pek. Beton 17.136 M3
P = 285.600
L = 0.200 m
T = 0.300 m
V = PXLXT
V = 285.600 X 0.200 X 0.300
= 17.136 M3

Panjang Sloof = 39.000 m


2 Pek. Sloof S2 ( 15 / 20 cm )
- Bekisting 11.700 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.300
= 0.300 M2
15 Vt = 39.000 x 0.300
= 11.700 M2

- Pembesian 211.794 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
20

B12 4.00 1.000 0.888 3.552 Kg


Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 39.000 x 5.431
= 211.794 Kg
- Pek. Beton 1.170 M3
P = 39.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 39.000 X 0.150 X 0.200
= 1.170 M3
3 Pek. Kolom Pedestal K1 43 titik Panjang kolom = 110.250 M
- bekisting 103.950 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.943
= 0.943 M2
Vt = 110.250 x 0.943
= 103.950 M2
KOLOM UTAMA
- pembesian TYPE GAMBAR 1,354.964 Kg
(K1)
50
berat besi dalam 1m
30
besi Jml p berat/m berat.ttl SAT
B14 8.00 1.000 1.209 9.669 Kg
GAMBAR Beugel 7.00 0.949 0.395 2.621 Kg

50
12.290 Kg

TULANGAN = 8 Ø 14 MM
Vt = 110.250 x 12.290
TULANGAN BEUGEL = Ø 8 - 150 MM
= 1,354.964 Kg

- pek. Beton 7.796 M3 P = 110.250


Luas = 0.071 m

V = P x Luas
V = 110.250 X 0.071
= 7.796 M3

4 Pek. Kolom Pedestal Kp ( Praktis ) 104 titik Panjang kolom = 9.800 M


- bekisting 5.096 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.520
= 0.520 M2
Vt = 9.800 x 0.520
= 5.096 M2
- pembesian 49.430 Kg
berat besi dalam 1m
besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.540 0.395 1.492 Kg
5.044 Kg

Vt = 9.800 x 5.044
= 49.430 Kg

- pek. Beton 0.166 M3 P = 9.800


Luas = 0.017 m

V = P x Luas
V = 9.800 X 0.017
= 0.166 M3

5 Pek. Kolom K1 43 titik Panjang kolom = 310.400 M


- bekisting 292.663 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.943
= 0.943 M2
Vt = 310.400 x 0.943
= 292.663 M2
KOLOM UTAMA
- pembesian TYPE GAMBAR 3,814.791 Kg
(K1)
50
berat besi dalam 1m
30
besi Jml p berat/m berat.ttl SAT
B14 8.00 1.000 1.209 9.669 Kg
GAMBAR Beugel 7.00 0.949 0.395 2.621 Kg
50

12.290 Kg

TULANGAN = 8 Ø 14 MM
Vt = 310.400 x 12.290
TULANGAN = 3,814.791 Kg
BEUGEL = Ø 8 - 150 MM

- pek. Beton 21.950 M3 P = 310.400


Luas = 0.071 m

V = P x Luas
V = 310.400 X 0.071
= 21.950 M3
6 Pek. Kolom Kp ( Praktis ) 104 titik Panjang kolom = 665.600 M
- bekisting 346.112 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.520
= 0.520 M2
Vt = 665.600 x 0.520
= 346.112 M2
- pembesian 3,357.180 Kg
berat besi dalam 1m
besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.540 0.395 1.492 Kg
5.044 Kg

Vt = 665.600 x 5.044
= 3,357.180 Kg

- pek. Beton 11.249 M3 P = 665.600


Luas = 0.017 m

V = P x Luas
V = 665.600 X 0.017
= 11.249 M3

7 Balok Latei Panjang Balok = 183.000 M


- Bekisting 43.920 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.240
= 0.240 M2
Vt = 183.000 x 0.240
TYPE GAMBAR BALOK LATEI
= 43.920 M2

- Pembesian 663.739 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
12

GAMBAR
B10 4.00 1.000 0.617 2.467 Kg
10
Beugel 7.00 0.420 0.395 1.160 Kg
3.627 Kg
TULANGAN = 4 Ø 10
TULANGAN BEUGEL = Ø 8 - 200 Vt = 183.000 x 3.627

= 663.739 Kg

- Pek. Beton 2.196 M3


P = 183.000
L = 0.100 m
T = 0.120 m
V = PXLXT
V = 183.000 X 0.100 X 0.120
= 2.196 M3

8 Pek. Balok Tengah 20/30 CM Panjang Balok = 29.000 M


- Bekisting 23.200 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.800
= 0.800 M2
TIPE BT
Vt = 29.000 x 0.800
BT-200 X 300
TUMPUAN LAPANGAN
= 23.200 M2

- Pembesian 20 273.973 Kg berat besi dalam 1m


20 2 D14 MM 2 D14 MM
besi Jml p berat/m berat.ttl SAT
1 D10 MM
SKETSA B14 4.00 1.000 1.209 4.835 Kg
30
30

2 D10 MM 2 D10 MM
1 D10 MM B10 3.00 1.000 0.617 1.850 Kg
2 D14 MM
2 D14 MM Beugel 7.00 1.000 0.395 2.763 Kg
9.447 Kg

DIMENSI 200 X 300 200 X 300


TULANGAN TUMPUAN 4 D14 MM 4 D14 MM
Vt = 29.000 x 9.447
TULANGAN EKSRA 1 D10 MM 1 D10 MM
TULANGAN PINGGANG 2 D 10 MM 2 D 10 MM
SENGKANG Ø 8 - 100 Ø 8 - 150 = 273.973 Kg

- Pek. Beton 1.740 M3


P = 29.000
L = 0.200 m
T = 0.300 m
V = PXLXT
V = 29.000 X 0.200 X 0.300
= 1.740 M3
9 Pek. Balok Tengah 25/ 50 CM Panjang Balok = 32.000 M
- Bekisting 40.000 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 1.250
= 1.250 M2
Vt = 32.000 x 1.250
TIPE BT1 BT 1-250 X 500 = 40.000 M2
TUMPUAN LAPANGAN
- Pembesian 470.443 Kg berat besi dalam 1m
25 2 D16 MM
25
2 D14 MM besi Jml p berat/m berat.ttl SAT
1 D12 MM B16 4.00 1.000 1.579 6.315 Kg
SKETSA

50
50
2 D12 MM 2 D12 MM
B12 4.00 1.000 0.888 3.552 Kg
1 D12 MM

10
10
2 D16 MM Beugel 7.00 1.750 0.395 4.835 Kg
25 25 2 D14 MM
25 25 14.701 Kg

DIMENSI 250 X 500 250 X 500 Vt = 32.000 x 14.701


TULANGAN TUMPUAN 4 D16 MM 4 D16 MM
TULANGAN EKSRA 1 D12 MM 1 D12 MM
TULANGAN PINGGANG 2 D 12 MM 2 D 12 MM = 470.443 Kg
SENGKANG Ø 8 - 100 Ø 8 - 150

- Pek. Beton 4.000 M3


P = 32.000
L = 0.250 m
T = 0.500 m
V = PXLXT
V = 32.000 X 0.250 X 0.500
= 4.000 M3

10 Pek. Ringbalok RB 1 ( 20 / 30 cm ) Panjang Balok = 224.500 M


- Bekisting 179.600 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.800
= 0.800 M2
Vt = 224.500 x 0.800
= 179.600 M2

- Pembesian 2,303.669 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B14 4.00 1.000 1.209 4.835 Kg
TIPE RINGBALOK RB1-200 X 300 B12 3.00 1.000 0.888 2.664 Kg
TUMPUAN LAPANGAN Beugel 7.00 1.000 0.395 2.763 Kg
10.261 Kg
20
2 D14 MM
20 2 D14 MM

1 D12 MM Vt = 224.500 x 10.261


SKETSA
30

30

2 D12 MM 2 D12 MM

1 D12 MM

2 D14 MM 2 D14 MM
= 2,303.669 Kg

DIMENSI 200 X 300 200 X 300


- Pek. Beton TULANGAN TUMPUAN 4 D14 MM 4 D14 MM 13.470 M3
TULANGAN EKSRA
TULANGAN PINGGANG
1 D12 MM
2 D 12 MM
1 D12 MM
2 D 12 MM
P = 224.500
SENGKANG Ø 8 - 100 Ø 8 - 150 L = 0.200 m
T = 0.300 m
V = PXLXT
V = 224.500 X 0.200 X 0.300
= 13.470 M3

11 Pek. Ringbalok RB ( 15 / 20 cm ) Panjang Balok = 141.000 M


- Bekisting 56.400 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.400
= 0.400 M2
Vt = 141.000 x 0.400
= 56.400 M2

- Pembesian 765.716 Kg berat besi dalam 1m


TIPE RINGBALOK RB2 -150 X 200 besi Jml p berat/m berat.ttl SAT
TUMPUAN LAPANGAN B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.680 0.395 1.879 Kg
15
5.431 Kg
20

SKETSA
20

Vt = 141.000 x 5.431
15

= 765.716 Kg
DIM ENSI 150 X 200 150 X 200
TULANGAN TU MPUAN 4 D12 MM 4 D12 MM
TULANGAN EKSRA - -

- Pek. Beton TULANGAN PINGGANG


SENGKANG
-
Ø 6 - 150
-
Ø 6 - 150
4.230 M3
P = 141.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 141.000 X 0.150 X 0.200
= 4.230 M3
12 Pek. Plat Dak Jendela Panjang Plat = 51.400 M
- Bekisting 20.560 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.400
= 0.400 M2
Vt = 51.400 x 0.400
= 20.560 M2

- Pembesian 228.216 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B10.atas 3.00 1.000 0.617 1.850 Kg
B10 bwh 7.00 0.600 0.617 2.590 Kg
4.440 Kg

Vt = 51.400 x 4.440

= 228.216 Kg

- Pek. Beton 2.056 M3


P = 51.400
L = 0.400 m
T = 0.100 m
V = PXLXT
V = 51.400 X 0.400 X 0.100
= 2.056 M3
13 Pek. Plat Dak Teras Depan Dan Belakang Panjang Plat = 28.750 M
- Bekisting 11.500 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.400
= 0.400 M2
Vt = 28.750 x 0.400
= 11.500 M2

- Pembesian 127.650 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B10.atas 3.00 1.000 0.617 1.850 Kg
B10 bwh 7.00 0.600 0.617 2.590 Kg
4.440 Kg

Vt = 28.750 x 4.440

= 127.650 Kg

- Pek. Beton 1.150 M3


P = 28.750
L = 0.400 m
T = 0.100 m
V = PXLXT
V = 28.750 X 0.400 X 0.100
= 1.150 M3

14 Pek. Balok Kuda - Kuda Beton Uk. 15 / 20 cm, Atap Teras Samping Bangunan Panjang Balok Kiri Kanan = 50.500 M
- Bekisting 20.200 M2 Bekisting Kolom
TIPE RINGBALOK
TUMPUAN
RB2 -150 X 200
LAPANGAN
v = P X L.total
15
v = 1.000 x 0.400
= 0.400 M2
20

SKETSA
20

15 Vt = 50.500 x 0.400
DIMENS I 150 X 200 150 X 200
= 20.200 M2
TULANGA N TUMPUAN 4 D12 MM 4 D12 MM
TUL ANGAN EKSRA - -
TUL ANGAN P INGGANG - -
SEN GKANG Ø 6 - 150 Ø 6 - 150

- Pembesian 274.246 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.680 0.395 1.879 Kg
5.431 Kg

Vt = 50.500 x 5.431

= 274.246 Kg
475
232

- Pek. Beton 1.515 M3


P = 50.500
L = 0.150 m
T = 0.200 m
V = PXLXT
679 V = 50.500 X 0.150 X 0.200
= 1.515 M3

III. PEKERJAAN DINDING & PLESTERAN

1 Dinding Dinding Trasram 166.133 M2 a. Trasram Km/Wc


Panjang Dinding Trasram km/wc pria = 15.1 M P = 30.750
= 15.1 M T = 2.270 m
30.2 m V = PX T
V = 30.750 X 2.270
Panjang Dinding Trasram km/wc ruang tunggu = 5.35 M = 69.803 M2
= M
5.35 m
B. TRASRAM KELILIN DINDING T = 60 CM
panjang total = 35.55 m P = 160.550
Panjang Kusen Pintu = 4.8 m T = 0.600 m
30.75 m V = PX T
V = 160.550 X 0.600
Panjang Dinding = 109 m = 96.330 M2
106 m
215 m
Panjang Kusen Pintu TOTAL PEK. DINDING TRASRAM
P1 = 11.9 M = A+B
P2 = 5.4 M = 69.803 + 96.330
P3 = 3.2 M = 166.133 M2
LUBANG DINDING = 3.2 M
23.7 M

TOTAL PANJANG DINDING = PANJANG TTL DINDING - PANJANG KUSEN - PANJANG KM/.WC
= 160.55 M
2 Dinding Tembok Tebal 1/2 Bata (1: 5) 1,108.051 M2 A. PAS. DINDING KELILING
P = 215.000 M
T = 6.100 M
PANJANG DINDING KESELURUHAN = 109 m V = PXT
106 m = 215.000 X 6.100
215 m = 1,311.500 M2

B. PAS. DINDING PADA TERAS DEPAN DAN BELAKANG

P = 29.000 M
T = 2.400 M
V = PXT
= 29.000 X 2.400
= 69.600 M2

C. PAS. DINDING PADA TERAS SAMPING


A
P = 16.000 M
T = 2.000 M
V = PXT
= 16.000 X 2.000
= 32.000 M2

B
P = 8.000 M
T = 2.000 M
V = PXT
= 8.000 X 2.000
= 16.000 M2

TOTAL C = 32.000 + 16.000


= 48.000 M2

TOTAL Luas Dinding


v = A+B
= 1,311.500 + 69.600 + 48.000
= 1,429.100 M2
LUAS BUKAAN KUSEN PINTU, JENDELA DAN VENTILASI
KUSEN PINTU
V = L X T X JMLH
P1 = 2.200 X 3.160 X 7.000 = 48.66 M2
P2 = 0.900 X 2.450 X 6.000 = 13.23 M2
P3 = 0.800 X 2.450 X 7.000 = 13.72 M2
75.61 m2
KUSEN JENDELA

V = L X T X JMLH
J1 = 0.750 X 2.850 X 28.000 = 59.85 M2
J2 = 0.600 X 3.500 X 4.000 = 8.40 M2
68.25 m2
KUSEN VENTILASI

V = L X T X JMLH
V1 = 1.450 X 0.550 X 1.000 = 0.80 M2
V2 = 0.750 X 0.550 X 14.000 = 5.78 M2
V.LOBSTER = 0.200 X 0.800 X 28.000 = 4.48 M2
11.05 m2

TOTAL BUKAAN KUSEN =


= 75.614 + 68.250 + 11.05
= 154.917 m2

LUAS DINDING 1 ; 5 =
V = DINDING - KUSEN - TRASRAM
= 1,429.100 - 154.917 - 166.13
= 1,108.051 M2

3 Plasteran Trasram 1 : 3 267.690 m2 Luas Din ding Trasram = 166.133 m2


Luas Dinding Tegel Km /wc = 64.575 m2
Luas Plasteran
v = 2 x Luas Dinding - Luas Pas. Dinding Tegel Km
= 2.000 x 166.133 - 64.58
= 267.690 m2

4 Plasteran Trasram 1 : 3 1,948.412 m2 Luas Din ding 1 : 5 = 1,108.051 m2


Luas Dinding Trasram = 267.690 m2
Luas Plasteran
v = 2 x Luas Dinding - Luas Pas. Dinding Tegel Km
= 2.000 x 1,108.051 - 267.69
= 1,948.412 m2

5 Plasteran Beton 1 ; 3 202.635 M2 A Sloof S1


Panjang = 171.000 Bh
Tinggi = 0.300 M

V = Panjang x Tinggi
= 171.000 X 0.300
V = 51.300 M2

B. Balok Tengah BT
Panjang = 29.000 Bh
Tinggi = 0.800 M

V = Panjang x Tinggi
= 29.000 X 0.800
V = 23.200 M2

C. Balok Tengah BT1


Panjang = 32.000 Bh
Tinggi = 1.750 M

V = Panjang x Tinggi
= 32.000 X 1.750
V = 56.000 M2

D. Plasteran Plat DakBeton Jendela Dan Teras

PANJANG = 80.150 M
TINGGI = 0.900 M
V = PXT
= 80.150 X 0.900
= 72.135 M2

TOTAL LUAS PLASTERAN BETON


V = A+B+C+D
= 202.635 M2
6. Plasteran Pondasi 1 : 3 82.270 m2 Pondasi
Panjang = 86.600 Bh
URUGAN Tinggi = 0.950 M
TANAH DIPADATKAN 5

Diplaster 1 Pc : 3 Psr, + Acian


V = Panjang x Tinggi
= 86.600 X 0.950
V = 82.270 M2

PAS. PONDASI
BATU GUNUNG
1 Pc : 4 Psr

7 Pek. Acian 82.270 m2 Pondasi


Panjang = 86.600 Bh
URUGAN Tinggi = 0.950 M
TANAH DIPADATKAN 5

Diplaster 1 Pc : 3 Psr, + Acian


V = Panjang x Tinggi
= 86.600 X 0.950
V = 82.270 M2

PAS. PONDASI
BATU GUNUNG
1 Pc : 4 Psr

8 Pek.kolom
' pek. Profil Kolom Bawah 5.854 M3 Bawah = 1.260 x 1.260 x 0.18
= 0.286 m3

126 Tengah = 1.000 x 1.000 x 1.23


105 1.230 m3

Atas 01 = 1.260 x 1.260 x 0.20


22

= 0.318 m3
20

Atas 02 =
Luasbawah = 3,14xr2
Luasbawah = 3.140 x 0.276 = 0.87 m2
Luas Atas = 3.140 x 0.144 = 0.45 m2
123

1.32 m2
Luas Rata = 0.659 m2
v = 0.659 x 0.220
= 0.145 m3
18

13 35 30 35 13
Volume Total = 1.978 m3
Luas Kolom K1 = 1.724 m3 -
Total V 0.255 m3
Jumlah Kolom Utuh = 8.000 Bh
Kolom Sandar Pondasi = 30.000 Bh
Volume Kolom
a = 8.000 x 0.255 = 2.04 m3
b = 30.000 x 0.127 = 3.82 m3 +
5.85 m3

' pek. Profil Kolom Tengah 23.110 M3 Luas Profil = 3,14xR2


Luas Profil = 3.140 x 0.063 = 0.20 m2
50

Luas Kolom K1 = 3.140 x 0.023 = 0.07 m2 -


0.13 m2
Panjang Kolom = 184.000 m

V. Profil = 184.000 x 0.126


= 23.110 m3
460
460
' pek. Profil Kolom Atas 4.550 M3 Luas Profil = 3,14xR2
Diameter Rata = 0.700 m
Luas Profil = 3.140 x 0.123 = 0.38 m2
Luas Kolom K1 = 3.140 x 0.023 = 0.07 m2 -
0.31 m2
80
Panjang Kolom = 0.630 m

V. Profil = 0.630 x 0.314


= 0.198 m3

63
Jumlah Kolom Utuh = 8.000 Bh
Kolom Sandar Pondasi = 30.000 Bh
Volume Kolom
a = 8.000 x 0.198 = 1.58 m3
60 b = 30.000 x 0.099 = 2.97 m3 +
4.55 m3
VI PEKERJAAN LANTAI

LUAS LANTAI KM/WC


- WC PRIA = 21 M2
- WC WANITA = 21 M2
- WC RUANG TUNGGU = 3.6 M2
45.6 M2

LANTAI 60 X 60 BANGUNAN INDUK/DILUAR STAGE = 732 M2


LANTAI TERAS
- TERAS DEPAN = 31.2 M2
- TERAS SAMPING = 63.58 M2
- TERAS BELAKANG = 19.5 M2
846.28 M2

TOTAL LUAS LANTAI = 45.6 M2


846.28 M2
891.88 M2

1 Lantai Rabat Beton Tebal 7cm 62.432 M3 LUAS = 891.880 M2


T = 0.070 M
V = LUAS X Tebal
= 891.880 X 0.070
= 62.432 M3

2. Lantai Keramik Uk. 60x60 846.280 M2

3 Err:509 19.290 m2 P = 192.900 M


L = 0.100 M
V = PXL
= 192.900 X 0.100
= 19.290 M2

4 Lantai Keramik Anti Slip 40x40 (Km/Wc) 45.600 M2

5 Dinding Keramik 40x40 (KM/WC) 61.500 M2 P = 30.750 M


L = 2.000 M
V = PXL
= 30.750 X 2.000
= 61.500 M2

6 List Atas Dinding Keramik 10 x 40 (Km/Wc) 3.075 m2 P = 30.750 M


L = 0.100 M
V = PXL
= 30.750 X 0.100
= 3.075 M2
V PEKERJAAN KUSEN, PINTU/JENDELA

1 Pintu Type P1 7 buah


a. Pintu
- Kusen STENLIS STEEL 7.100 M panjang = 7.100 M

- Pek. Daun Pintu Kaca Tempered 15.120 m2 panjang = 2.400 M


lebar = 0.900 M
jumlah = 7 M
V = P X L X jumlah
= 2.400 X 0.900 X 7.00
= 15.120 m2

- Engsel Pintu Bawah 28.000 buah


- Grendel Pintu Atas Dan Bawah 14.000 buah
- Door Closer/Expanyolet 7.000 buah
- Kunci pintu 7.000 buah

b. Ventilasi
- Pek. Kusen Kayu 0.291 m3 Panjang = 6.150 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 6.150 X 0.135 X 0.05
= 0.042 M3
V total = V x jumlah
= 0.042 x 7.000
= 0.291 m3

- Pek. Daun Jendela Kaca T = 5 mm 7.172 m2 panjang = 2.180 M


lebar = 0.470 M
jumlah = 7 M
V = PXLXT
= 2.180 X 0.470 X 7.00
= 7.172 m2

2 Pintu Type P2 6 buah


- Kusen Pintu Kayu 0.231 m3 panjang = 5.700 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 5.700 X 0.135 X 0.05
= 0.038 M3
V total = V x jumlah
= 0.038 x 6
= 0.231 m3

- Pek. Daun Pintu 11.520 m2 panjang = 2.400 M


lebar = 0.800 M
jumlah = 6 M
V = PXLXT
= 2.400 X 0.800 X 6.00
= 11.520 m2

- Pek. Kaca T = 5 mm 0.918 m2 panjang = 0.170 M


lebar = 0.900 M
jumlah = 6
V = PXLXT
= 0.170 X 0.900 X 6.00
= 0.918 m2

- Engsel Pintu 18.000 buah


- Kunci pintu 6.000 buah

b.Ventilasi 6 buah
- Pek. Kusen Kayu 0.134 - panjang = 3.300 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 3.300 X 0.135 X 0.05
= 0.022 M3
V total = V x jumlah
= 0.022 x 6.000
= 0.134 m3

- Pek. Bingkai Jendela Kaca 0.823 - panjang = 1.960 M


lebar = 0.070 M
jumlah = 6
V = PXLXT
= 1.960 X 0.070 X 6.00
= 0.823 m2

- Pek. Daun Jendela Kaca T = 5 mm 1.155 - panjang = 0.550 M


lebar = 0.350 M
jumlah = 6
V = PXLXT
= 0.550 X 0.350 X 6.00
= 1.155 m2

- Engsel Jendela 12.000 buah


- Grendel Jendela 6.000 buah
- Hak Angin 12.000 buah

Total Volume = volume Jendela + Volume Ventilasi


- Pek. Kusen Kayu = 0.365 M3
- Pek. Bingkai Jendela Kaca = 0.823 M2
- Pek. Daun Jendela Kaca T = 5 mm = 1.155 M2
- Engsel Jendela = 12.000 BH'
- Grendel Jendela = 24.000 BH'
- Hak Angin = #REF! BH'
3 Pintu Type P3 7 buah
- Pek. Kusen Kayu 0.265 m3 panjang = 5.600 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 5.600 X 0.135 X 0.05
= 0.038 M3
V total = V x jumlah
= 0.038 x 7
= 0.265 m3

- Pek. Daun Pintu 12.096 m2 panjang = 2.400 M


lebar = 0.720 M
jumlah = 7 M
V = PXLXT
= 2.400 X 0.720 X 7.00
= 12.096 m2

- Pek. Lapiasan Aluminium Pada Daun Pintu Panil Bagian Dalam 12.096 m2 panjang = 2.400 M
lebar = 0.720 M
jumlah = 7 M
V = PXLXT
= 2.400 X 0.720 X 7.00
= 12.096 m2

- Engsel Pintu 21.000 buah


- Grendel Pintu 7.000 buah
- Kunci Pintu 7.000 buah
4 Jendela Type J1

a. Jendela 28 buah
- Pek. Kusen Kayu 1.191 m3 panjang = 6.300 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 6.300 X 0.135 X 0.05
= 0.043 M3
V total = V x jumlah
= 0.043 x 28.000
= 1.191 m3

- Pek. Bingkai Jendela Kaca 10.702 m2 panjang = 5.460 M


lebar = 0.070 M
jumlah = 28
V = PXLXT
= 5.460 X 0.070 X 28.00
= 10.702 m2

- Pek. Daun Jendela Kaca T = 5 mm 32.340 m2 panjang = 2.100 M


lebar = 0.550 M
jumlah = 28
V = PXLXT
= 2.100 X 0.550 X 28.00
= 32.340 m2

- Engsel Jendela 56.000 buah 1,568.00 buah


- Grendel Jendela 28.000 buah 784.00 buah
- Hak Angin 56.000 buah 1,568.00 buah

b.Ventilasi 28 buah
- Pek. Kusen Kayu 0.529 m3 panjang = 2.800 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 2.800 X 0.135 X 0.05
= 0.019 M3
V total = V x jumlah
= 0.019 x 28.000
= 0.529 m3

- Pek. Bingkai Jendela Kaca 3.842 m2 panjang = 1.960 M


lebar = 0.070 M
jumlah = 28
V = PXLXT
= 1.960 X 0.070 X 28.00
= 3.842 m2

- Pek. Daun Jendela Kaca T = 5 mm 5.390 m2 panjang = 0.550 M


lebar = 0.350 M
jumlah = 28
V = PXLXT
= 0.550 X 0.350 X 28.00
= 5.390 m2

- Engsel Jendela 56.000 buah


- Grendel Jendela 28.000 buah
- Hak Angin 56.000 buah

Total Volume = volume Jendela + Volume Ventilasi


- Pek. Kusen Kayu = 1.720 M3
- Pek. Bingkai Jendela Kaca = 14.543 M2
- Pek. Daun Jendela Kaca T = 5 mm = 37.730 M2
- Engsel Jendela = 112.000 BH'
- Grendel Jendela = 56.000 BH'
- Hak Angin = 112.000 BH'
5 Jendela Type J2 4 buah
- Pek. Kusen Kayu 0.265 m3 panjang = 9.800 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 9.800 X 0.135 X 0.05
= 0.066 M3
V total = V x jumlah
= 0.066 x 4.000
= 0.265 m3

- Pek. Daun Jendela Kaca T = 5 mm 6.656 m2 panjang = 3.200 M


lebar = 0.520 M
jumlah = 4
V = PXLXT
= 3.200 X 0.520 X 4.00
= 6.656 m2

6 VENTILASI TYPE V1 1 buah


- Pek. Kusen Kayu 0.031 m3 panjang = 4.650 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 4.650 X 0.135 X 0.05
= 0.031 M3
V total = V x jumlah
= 0.031 x 1.000
= 0.031 m3

- Pek. Bingkai Jendela Kaca 0.274 m2 panjang = 3.920 M


lebar = 0.070 M
jumlah = 1 M
V = PXLXT
= 3.920 X 0.070 X 1.00
= 0.274 m2

- Pek. Daun Jendela Kaca T = 5 mm 0.385 m2 panjang = 0.550 M


lebar = 0.350 M
jumlah = 2 M
V = PXLXT
= 0.550 X 0.350 X 2.00
= 0.385 m2

- Engsel ventilasi 4.000 buah


- Grendel ventilasi 2.000 buah
- Hak Angin 4.000 buah

7 VENTILASI TYPE V2 14 buah


- Pek. Kusen Kayu 0.265 m3 panjang = 2.800 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 2.800 X 0.135 X 0.05
= 0.019 M3
V total = V x jumlah
= 0.019 x 14.000
= 0.265 m3

- Pek. Bingkai Jendela Kaca 1.921 m2 panjang = 1.960 M


lebar = 0.070 M
jumlah = 14 M
V = PXLXT
= 1.960 X 0.070 X 14.00
= 1.921 m2

- Pek. Daun Jendela Kaca T = 5 mm 2.695 m2 panjang = 0.550 M


lebar = 0.350 M
jumlah = 14 M
V = PXLXT
= 0.550 X 0.350 X 14.00
= 2.695 m2

- Engsel ventilasi 28.000 buah


- Grendel ventilasi 14.000 buah
- Hak Angin 28.000 buah
VII PEKERJAAN STRUKTUR RANGKA ATAP

1 Pek. Kuda - Kuda Baja IWF 27,971.160 Kg ATAP 01

1. Kuda - Kuda K1
Jumlah Kuda2 = 5.000 bh
Panjang Baja IWF 300 / 200 = 27.000 x 5.000 = 135 M
Panjang Baja IWF 200 = 6.400 x 5.000 = 32 M

profil Baja IWF panjang berat Total Berat


IWF 300 135.000 56.8 7668
IWF 200 32.000 49.9 1596.8

2. Kuda - Kuda 1/2K1


Jumlah Kuda2 = 2.000 bh
Panjang Baja IWF 300 / 200 = 13.500 x 2.000 = 27 M
Panjang Baja IWF 200 = 3.000 x 2.000 = 6 M

profil Baja IWF panjang berat Total Berat


IWF 300 27.000 56.8 1533.6
IWF 200 6.000 49.9 299.4

3. Kuda - Kuda 1/2K1.a


Jumlah Kuda2 = 8.000 bh
Panjang Baja IWF 300 / 200 = 8.350 x 8.000 = 66.8 M
Panjang Baja IWF 200 = 3.450 x 8.000 = 27.6 M

Berat Baja iWf 300/m = Kg

profil Baja IWF panjang berat Total Berat


IWF 300 66.800 56.8 3794.24
IWF 200 27.600 49.9 1377.24

4. JURAI LUAR

Jumlah Kuda2 = 8.000 bh


Panjang Baja IWF 300 / 200 = 18.700 x 8.000 = 149.6 M
Panjang Baja IWF 200 = 3.450 x 8.000 = 27.6 M

profil Baja IWF panjang berat Total Berat


IWF 300 149.600 56.8 8497.28
IWF 200 27.600 49.9 1377.24

ATAP 02

1. Kuda - Kuda 1/2K


Jumlah Kuda2 = 2.000 bh
Panjang Baja IWF 300 / 200 = 18.100 x 2.000 = 36.2 M

profil Baja IWF panjang berat Total Berat


IWF 300 36.200 56.8 2056.16

2. JURAI LUAR

Jumlah Kuda2 = 4.000 bh


Panjang Baja IWF 300 / 200 = 11.600 x 4.000 = 46.4 M
Panjang Baja IWF 200 = 3.450 x 4.000 = 13.8 M

profil Baja IWF panjang berat Total Berat


IWF 300 46.400 56.8 2635.52
IWF 200 13.800 49.9 688.62
ATAP 03

1. Kuda - Kuda k3
Jumlah Kuda2 = 4.000 bh
Panjang Baja IWF 150 / 100 = 18.100 x 4.000 = 72.4 M

profil Baja IWF panjang berat Total Berat


IWF 150 / 100 33.570 21.100 708.327

2. JURAI Dalam

Jumlah Kuda2 = 4.000 bh


Panjang Baja IWF 150 / 100 = 20.350 x 4.000 = 81.4 M

profil Baja IWF panjang berat Total Berat


IWF 150 / 100 81.400 21.100 1717.54

ATAP 04
1. Kuda - Kuda 1/1 k.3
Jumlah Kuda2 = 1.000 bh
Panjang Baja IWF 300 / 200 = 12.900 x 1.000 = 12.9 M
Panjang Baja IWF 200 = 16.650 x 1.000 = 16.65 M

profil Baja IWF panjang berat Total Berat


IWF 300 12.900 56.8 732.72
IWF 200 16.650 49.9 830.835

2. JURAI LUAR

Jumlah Kuda2 = 8.000 bh


Panjang Baja IWF 300 / 200 = 11.600 x 8.000 = 92.8 M
Panjang Baja IWF 200 = 3.450 x 8.000 = 27.6 M

profil Baja IWF panjang berat Total Berat


IWF 300 15.700 56.8 891.76
IWF 200 27.600 49.9 1377.24

ATAP 05
1. Kuda - Kuda 1/1 k.2
Jumlah Kuda2 = 1.000 bh
Panjang Baja IWF 300 / 200 = 2.850 x 1.000 = 2.85 M
Panjang Baja IWF 150 = 12.200 x 1.000 = 12.2 M

profil Baja IWF panjang berat Total Berat


IWF 300 2.850 56.8 161.88
IWF 150 / 100 12.200 21.100 257.42

2. JURAI LUAR

Jumlah Kuda2 = 2.000 bh


Panjang Baja IWF 150 = 13.350 x 2.000 = 26.7 M

profil Baja IWF panjang berat Total Berat


Baja Iwf 150 / 100 26.700 21.100 563.37
3. JURAI DALAM
Jumlah Kuda2 = 2.000 bh
Panjang Baja IWF 150 = 13.350 x 2.000 = 26.7 M

profil Baja IWF panjang berat Total Berat


Baja Iwf 150 / 100 26.700 21.100 563.37

ATAP 06
1. Kuda - Kuda k.4
Jumlah Kuda2 = 1.000 bh
Panjang Baja IWF 150 / 100 = 13.000 x 1.000 = 13 M

profil Baja IWF panjang berat Total Berat


IWF 150 / 100 13.000 21.100 274.30

2. Kuda - Kuda 1/1 k.4


Jumlah Kuda2 = 1.000 bh
Panjang Baja IWF 150 / 100 = 6.500 x 1.000 = 6.5 M

profil Baja IWF panjang berat Total Berat


IWF 150 / 100 6.500 21.100 137.15

3. JURAI LUAR

Jumlah Kuda2 = 2.000 bh


Panjang Baja IWF 150 = 7.200 x 2.000 = 14.4 M

profil Baja IWF panjang berat Total Berat


Baja Iwf 150 / 100 14.400 21.100 303.84

3. JURAI DALAM
Jumlah Kuda2 = 2.000 bh
Panjang Baja IWF 150 = 7.200 x 2.000 = 14.4 M

profil Baja IWF panjang berat Total Berat


Baja Iwf 150 / 100 14.400 21.100 303.84

TOTAL BERAT KUDA - KUDA


Baja IWF 300 x 200 = 27,971.160 Kg
Baja IWF 200 x 200 = 7,547.375 Kg
Baja IWF 150 x 100 = 4,525.317 Kg

2 Pek. Gording Baja Canal [ 100.50.6 8,725.920 Kg

Panjang Gording Canal = 823.200 M'

profil Baja IWF panjang berat Total Berat


canal 100.50.6 823.200 10.6 8725.92
Total 8725.92

G o rd in g Ba ja C a n a l [ 100.50.6

3. PENGELASAN 4,557.000 KUDA - KUDA K1


1 KAKI Tiang kd2 = 70.000 CM
2 Peertmuan kaki Kuda2 dng Blk Tekan = 175.000 cm
Pertemuan
3 Balok Tekan = 148.000 cm
4 las iwf 200/200 = 160.000 cm
5Las baja siku 70.70.7 = 98.000 cm
= 651.000 cm
jmlh total kiri kanan = 2.000 x 651.000
= 1,302.000 cm
jumlah kuda-kuda = 5.000 bh
= 5.000 x 1,302.000
= 6,510.000 cm

KUDA - KUDA 1/2k1


1 KAKI Tiang kd2 = 70.000 CM
2 Peertmuan kaki Kuda2 dng Blk Tekan = 175.000 cm
Pertemuan
3 Balok Tekan = 148.000 cm
4 las iwf 200/200 = 160.000 cm
5Las baja siku 70.70.7 = 98.000 cm
= 651.000 cm
jumlah kuda-kuda = 2.000 bh
= 2.000 x 651.000
= 1,302.000 cm

KUDA - KUDA 1/2k1.a


1 KAKI Tiang kd2 = 70.000 CM
2 Peertmuan kaki Kuda2 dng Blk Tekan = 175.000 cm
Pertemuan
3 Balok Tekan = 148.000 cm
4 las iwf 200/200 = 160.000 cm
5Las baja siku 70.70.7 = 98.000 cm
= 651.000 cm
jumlah kuda-kuda = 2.000 bh
= 2.000 x 651.000
= 1,302.000 cm
3. Pek. Rangka Atap Baja Ringan 1,853.620 m2
atap 01
1000 2000
1000 - luas total atap Samping =
'a P.atas = 16.000 m

400
P.Bawah 40.000 m

600
p = (p.a+p.b)/2
= 28.000 m
1600 L.Kemiringan = 15.150 m

1200
'b 1600
c v = 28.000 x 15.150
v = 424.200 m2

- luas total Depan =

600
400

a p = 12.000 m
1000
1000 L.Kemiringan = 15.150 m
jumlah = 2.000 Bh
v = 12.000 x 15.150 x 2
v = 363.600 m2

Total Luas Atap = 424.200 + 363.600


= 787.800 m2

- luas a
p = 10.000 m
L.Kemiringan = 12.650 m
jumlah = 2.000 Bh
v = 10.000 x 12.650 x 2
v = 253.000 m2

- luas b
p = 8.000 m
L.Kemiringan = 10.120 m
jumlah = 2.000 Bh
v = 1.000 x 10.120 x 2
v = 20.240 m2

- luas a
p = 6.000 m
L.Kemiringan = 7.600 m
jumlah = 1.000 Bh
v = 6.000 x 7.600 x 2
v = 91.200 m2
Total Luas = 364.440 m2

Total Luas Atap 01 = 787.800 - 364.440


= 423.360 m2

ATAP 02 JUMLAH 2 BH

400 1140 400


luas area a =
P = 34.700 m
L = 4.500 m


410

Jmlh = 2.000
V = P X LX 2
980

= 34.700 X 4.500 X 2.000


= 312.300 M2
450

 luas area b
P.atas
=
= 17.350 m

 P.Bawah
p =
10.000
(p.a+p.b)/2
m

= 13.675 m
L = 4.000 m
Jumlah = 2.000 m
v = 13.675 x 4.000 X 2.000
v = 109.400 m2

LUAS AREA C =
LUAS Ca
P = 5.700 m
L = 10.000 m
Jmlh = 1.000
V = P X LX 2
= 5.700 X 10.000 X 1.000
= 57.000 M2

LUAS Cb
P = 4.100 m
L = 9.000 m
Jmlh = 2.000
V = P X LX 2
= 4.100 X 9.000 X 2.000
= 73.800 M2
Total Luas C = 57.000 + 73.800
= 130.800 m2
TOTAL LUAS AREA ATAP 02 = 130.800 + 109.400 + 312.300
= 552.500 M2
= 552.500 X 2.000
= 1,105.000 M2
LUAS ATAP 03
luas area a =
400 450 P = 13.740 m
L = 4.500 m
Jmlh = 2.000

350

V = P X LX 2
= 13.740 X 4.500 X 2.000

 = 123.660 M2

  luas area b =
840

 P.atas = 13.740 m

 P.Bawah
p =
7.500
(p.a+p.b)/2
m

= 10.620 m
350

L = 3.500 m
Jumlah = 2.000 m
v = 10.620 x 3.500 X 2.000
v = 74.340 m2

LUAS AREA C =
LUAS Ca
P = 7.500 m
L = 4.000 m
Jmlh = 2.000
V = P X LX 2
= 7.500 X 4.000 X 2.000
= 60.000 M2

LUAS Cb
P = 4.200 m
L = 5.700 m
Jmlh = 1.000
V = P X LX 2
= 4.200 X 5.700 X 1.000
= 23.940 M2
Total Luas C = 60.000 + 23.940
= 83.940 m2
400
TOTAL LUAS AREA 03 = L.A+L.B+L.C
= 123.660 + 74.340 + 83.940
= 281.940 M2


51
10


1140

atap 04


- luas total atap Samping =
P = 10.150 m
L = 4.000 m
Jmlh = 2.000
V = P X LX 2
= 10.150 X 4.000 X 2.000
760
= 81.200 M2

- luas total Depan =


p = 5.700 m
L.Kemiringan = 7.600 m
jumlah = 1.000 Bh
v = 5.700 x 7.600 x 1.000
v = 43.320 m2

Total Luas Atap = 81.200 + 43.320 +


= 124.520 m2

TOTAL LUAS PEK. ATAP = ATAP 01 + 02 + 03 + 04


= 423.360 + 1,105.000 + 281.940 + 43.320
= 1,853.620 M2

4. Pek. Bubungan Atap 235.600 M' 1 Jurai luar atas = 41.100 M


2 Jurai Atap Miring = 194.500 m
235.600 m

5 Pek. Jurai Atap Dalam 159.200 M' 1 Panjang Jurai = 159.200 M

6. Pek. Lesplank Alcopan 181.600 M' P.Lesplank Alcopang Keliling Bangunan


= 163.400 M
= 18.200 M
181.600 M
VIII PEKERJAAN LANGIT-LANGIT/PLAFOND

1 Rangka Plafond Besi Hollow 60 x 120 cm 1,458.580 M2 Fkafond Dalam Bangunan


a. plafond dalam gedung = 386.400 M2
Km / wc pria = 26.020 M2
Km / wc Wanita = 20.740 M2
Rg, Tunggu Blkg = 25.000 m2
Rg.t vip / tamu = 23.950 m2
482.110 m2
b. Plafond Ruang Tengah Samping
Trap 1 = 85.050 m2
trap 2 = 34.125 m2
trap 3 = 58.940 m2
178.115 m2

c Plafond Ruang Tengah Depan


Trap 1 = 44.625 m2
trap 2 = 79.100 m2
trap 3 = 19.600 m2
143.325 m2

d. Tengah = 123.000 m2
= 27.600 m2
150.600 m2
e Flafond Luar Bangunan
Teras = 111.010 m2'
Plafond Luar Keliling = 307.620 m2'
Plafond Atap Perisai = 85.800 m2'
504.430 m2'

Total Plafond = a+b+c+d+e


= 1,458.580 m2

2 Plafond GRC Tebal 4,5 mm Rangka Besi Hollow 1,458.580 M2


4 List Plafond Alumunium 612.810 m
list flafond Dalam Bangunan
a. plafond dalam gedung = 150.000 M
Km / wc pria = 43.800 M
Km / wc Wanita = 44.000 M
Rg, Tunggu Blkg = 32.400 M
Rg.t vip / tamu = 33.400 M
303.600 M
B Flafond Luar Bangunan
Teras = 111.010 m2'
Plafond Luar Keliling = 141.000 m2'
Plafond Atap Perisai = 57.200 m2'
309.210 m2'

Total Plafond = a+b


= 612.810 m2

IX PEKERJAAN SANITAIR

1. Pek. Klosed Duduk Ex Toto 7.000 Bh


2. Pek. Wastafel 8.000 Bh
3. Pas. Kran Air 7.000 Bh
4. Pas. Floor Drain 11.000 Bh
5. Pas. Septictank 4.000 Ls
6. Pas.Pipa Air Bersih 173.000 M
7. Pek. Pipa Air Kotor 3 " 21.000 M
8. Pek. Pipa Air Kotor 2" 24.000 M

X PEKERJAAN PENGECETAN

1. Pengecatan Tembok 2,688.327 M2


Pek. Pengecetan Tembok = Vol. Plasteran Dinding 1: 5+Plasteran Trasram 1: 3-Tegel Plint Dinding
= 2,399.447

Pek. Pengecetan Kolom =


jumlah =
luas = 1.570 m2
V = jumlah Kolom x Luas x Tinggi
= 184.000 x 1.570
= 288.880 m2
volume total = 2,399.447 + 288.880
= 2,688.327 m2

2. Pengecatan Plafond 1,458.580 M2


3. Pek. Cat Kilap Daun Pintu , Jendela Dan Ventilasi 91.507 M2 Luas luas X jumlah
- Pintu Type P1; Buah =
- Pintu Type P2; Buah = 23.040 X 1.000 = 23.04
- Pintu Type P3; Buah = 24.192 X 1.000 = 24.19
- Jendela Type J1; Buah = 29.086 X 1.000 = 29.09
- Jendela Type J2; Buah = X = -
- Ventilasi Type V1; Buah = 0.549 X 1.000 = 0.55
- Ventilasi Type V2; Buah = 3.842 X 1.000 = 3.84
LUAS 80.71 m2

bagian ketebalan bingkai

- Pintu Type P2; Buah = 0.273 X 6.000 = 1.64


- Pintu Type P3; Buah = 0.188 X 7.000 = 1.31
- Jendela Type J1; Buah = 0.248 X 28.000 = 6.96
- Ventilasi Type V1; Buah = 0.109 X 1.000 = 0.11
- Ventilasi Type V2; Buah = 0.056 X 14.000 = 0.78
LUAS 10.80 m2

total luas = 80.709 + 10.798


= 91.507 M2

4. Pek. Cat Kilap Kusen Pintu, Jendela dan kusen 99.887 m2 Luas Panjang X tebal x jumlah
- Pintu Type P2; Buah = 8.000 X 0.235 x 6.000 11.28
- Pintu Type P3; Buah = 5.600 X 0.235 x 7.000 9.21
- Jendela Type J1; Buah = 9.100 X 0.235 x 28.000 59.88
- Jendela Type J2; Buah = 9.800 X 0.235 x 4.000 9.21
- Ventilasi Type V1; Buah = 4.650 X 0.235 x 1.000 1.09
- Ventilasi Type V2; Buah = 2.800 X 0.235 x 14.000 9.21
LUAS 99.89 m2

X1 PEKERJAAN akhir dan finishing

A PEKERJAAN RABAT DAN SALURAN AIR HUJAN KELILING BANGUNAN


1. RABAT BETON KELILING BANGUNAN Panjang = 164.600 m'
- Rabat Beton Keliling Bangunan 20.740
P = 164.600 m
L = 1.800 m
T = 0.070 m
V=pxlxt
v = 164.600 x 1.800 x 0.070
= 20.740 m3

- Pasir Urug 14.814


P = 164.600 m
L = 1.800 m
T = 0.050 m
V=pxlxt
v = 164.600 x 1.800 x 0.050
= 14.814 m3

2. PEK. SALURAN KELILING BANGUNAN


- Galian Tanah 39.960 m3 Panjang = 177.600 m'

P = 177.600 m
L = 0.500 m
T = 0.450 m
V=pxlxt
v = 177.600 x 0.500 x 0.450
= 39.960 m3

- Urugan Pasir 4.440 m3 P = 177.600 m


L = 0.500 m
T = 0.050 m
V=pxlxt
v = 177.600 x 0.500 x 0.050
= 4.440 m3

27.706 m2
- Pas. Bata 1 : 3 P = 177.600 m
L = 1.040 m
T = 0.150 m
V=pxlxt
v = 177.600 x 1.040 x 0.150
= 27.706 m3

- Plasteran 1 + 3 184.704 m2 P = 177.600 m


L = 1.040 m
V=pxlxt
v = 177.600 x 1.040
= 184.704 M2
B. PEK. TANGGA TERAS

- Galian Tanah 1.365 M3 Panjang = 13.000 m'

P = 13.000 m
L = 0.700 m
T = 0.150 m
V=pxlxt
v = 13.000 x 0.700 x 0.150
= 1.365 m3

- Urugan Tanah 11.700 m3 P = 13.000 m


L = 0.900 m2

V=pxlxt
v = 13.000 x 0.900
= 11.700 m3

- Pas. Batu Gunung 1 : 4 11.780 m3 A Pas. BT gunung Bawah Lantai

P = 13.000 m
L = 4.000 m
T = 0.200 m
V=pxlxt
v = 13.000 x 4.000 x 0.200
= 10.400 m3

B Pas. Batu Samping Tangga


P = 0.200 m
L = 1.150 m2
jmlh = 6.000 Bh
V = p x l xj
v = 0.200 x 1.150 x 6.000
= 1.380 m3

Total Pas. Batu = 10.400 + 1.380


= 11.780 m3

- Pek. Tegel Lantai 54.600 P = 13.000 m


L = 4.200 m
V=pxlxt
v = 13.000 x 4.200
= 54.600 M2
c. PEK. POT BUNGA

- Galian Tanah 9.800 M3 Panjang = 56.000 m'

P = 56.000 m
L = 0.500 m
T = 0.350 m
V=pxlxt
v = 56.000 x 0.500 x 0.350
= 9.800 m3

- Urugan Tanah Humus 37.800 m3 P = 56.000 m


L = 0.675 m
T = 1.000 m
V=pxlxt
v = 56.000 x 0.675 x 1.000
= 37.800 m3

- Pas. Batu Gunung 1 : 4 8.960 m3 A Pas. BT gunung Bawah Lantai

P = 56.000 m
L = 0.400 m
T = 0.400 m
V=pxlxt
v = 56.000 x 0.400 x 0.400
= 8.960 m3
- pek. Dinding Bata 1 : 3 39.200 P = 56.000 m
L = 0.700 m
V=pxlxt
v = 56.000 x 0.700
= 39.200 M2

- pek. Plasteran Dinding 1 : 3 56.000 P = 56.000 m


L = 1.000 m
V=pxlxt
v = 56.000 x 1.000
= 56.000 M2

- Pek Sloof 15 x 15 cm Panjang Balok = 56.000 M


- Bekisting 16.800 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.300
= 0.300 M2
Vt = 56.000 x 0.300
= 16.800 M2

- Pembesian 227.865 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B10 4.00 1.000 0.617 2.467 Kg
Beugel 7.00 0.580 0.395 1.602 Kg
4.069 Kg

Vt = 56.000 x 4.069

= 227.865 Kg

- Pek. Beton 1.260 M3


P = 56.000
L = 0.150 m
T = 0.150 m
V = PXLXT
V = 56.000 X 0.150 X 0.150
= 1.260 M3

- Pek Balok 15 x 15 cm Panjang Balok = 56.000 M


- Bekisting 16.800 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.300
= 0.300 M2
Vt = 56.000 x 0.300
= 16.800 M2

- Pembesian 227.865 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B10 4.00 1.000 0.617 2.467 Kg
Beugel 7.00 0.580 0.395 1.602 Kg
4.069 Kg

Vt = 56.000 x 4.069

= 227.865 Kg

- Pek. Beton 1.260 M3


P = 56.000
L = 0.150 m
T = 0.150 m
V = PXLXT
V = 56.000 X 0.150 X 0.150
= 1.260 M3
D. STAGE / PANGGUNG GEDUNG POLA
a. Stage
- Galian Tanah 2.965 M3 Panjang = 18.300 m'

P = 18.300 m
L = 0.900 m
T = 0.180 m
V=pxlxt
v = 18.300 x 0.900 x 0.180
= 2.965 m3

- Urugan PASIR Bawah Pondasi 0.824 m3 P = 18.300 m


L = 0.900 m
T = 0.050 m
V=pxlxt
v = 18.300 x 0.900 x 0.050
= 0.824 m3

- Pas. Batu Kosong 3.294 m3 A Pas. BT gunung Bawah Lantai

P = 18.300 m
L = 0.900 m
T = 0.200 m
V=pxlxt
v = 18.300 x 0.900 x 0.200
= 3.294 m3

- pek. Batu gunung 1 Pc : 4 Psr 9.127 m3 P = 18.300 m


L = 0.475 m
t = 1.050 m

V=pxlxt
v = 18.300 x 0.475 x 1.050
= 9.127 M2

- pek. Urugan Tanah 52.640 m3 Luas = 47.000 m2


L = 1.120 m
V = Luas x Tinggi
v = 47.000 x 1.120
= 52.640 m3

- pek. Urugan Urugan Pasir Bawah Lantai 4.700 m3 Luas = 47.000 m2


L = 0.100 m
V = Luas x Tinggi
v = 47.000 x 0.100
= 4.700 m3

- pek. Rabat Beton Bawah Lantai 3.290 m3 Luas = 47.000 m2


L = 0.070 m
V = Luas x Tinggi
v = 47.000 x 0.070
= 3.290 m3
- pek. Lantai Granit 60 x 60 cm 47.000 m2

b. Tangga Stage

- Urugan Tanah 2.174 m3 P = 8.050 m


L = 0.270 m2

V=pxlxt
v = 8.050 x 0.270
= 2.174 m3

- Pas. Batu Gunung 1 : 4 4.065 m3 A Pas. BT gunung Bawah Lantai

P = 8.050 m
33 40 40
L =
a = 0.330 x 0.200 = 0.066 m2
a = 0.580 x 0.200 = 0.116 m2
20

a = 0.580 x 0.140 = 0.0812 m2


20

a = 0.400 x 0.400 = 0.16 m2


jumlah luas = 0.4232 m2
14

18 18
40

V=pxl
v = 8.050 x 0.423
= 3.407 m3
33 40
40
B Pas. Batu Samping Tangga
P = 0.200 m
20

L =
a = 0.330 x 0.200 = 0.066 m2
20

a = 0.730 x 0.200 = 0.146 m2


a = 1.130 x 0.540 = 0.6102 m2
jumlah luas = 0.8222 m2
54

V = p x l xj Jumlah = 4.000
v = 0.200 x 0.822 x 4.000
= 0.658 m3

Total Pas. Batu = 3.407 + 0.658


= 4.065 m3

- Pek. Tegel Lantai 14.490 P = 8.050 m


L = 1.800 m
V=pxlxt
v = 8.050 x 1.800
= 14.490 M2
c. Pot Bunga

- Urugan Tanah Humus 1.560 m3 P = 7.800 m


L = 0.400 m
T = 0.500 m
V=pxlxt
v = 7.800 x 0.400 x 0.500
= 1.560 m3

- Pas. Batu Gunung 1 : 4 1.248 m3 A Pas. BT gunung Bawah Lantai

P = 7.800 m
L = 0.400 m
T = 0.400 m
V=pxlxt
v = 7.800 x 0.400 x 0.400
= 1.248 m3

- pek. Dinding Bata 1 : 3 3.510 P = 7.800 m


L = 0.450 m
V=pxlxt
v = 7.800 x 0.450
= 3.510 M2

- pek. Plasteran Dinding 1 : 3 4.680 P = 7.800 m


L = 0.600 m
V=pxlxt
v = 7.800 x 0.600
= 4.680 M2

- Pek Sloof 15 x 15 cm Panjang Balok = 7.800 M


- Bekisting 2.340 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.300
= 0.300 M2
Vt = 7.800 x 0.300
= 2.340 M2

- Pembesian 31.738 Kg berat besi dalam 1m


besi Jml p berat/m berat.ttl SAT
B10 4.00 1.000 0.617 2.467 Kg
Beugel 7.00 0.580 0.395 1.602 Kg
4.069 Kg

Vt = 7.800 x 4.069

= 31.738 Kg

- Pek. Beton 0.176 M3


P = 7.800
L = 0.150 m
T = 0.150 m
V = PXLXT
V = 7.800 X 0.150 X 0.150
= 0.176 M3
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN POSYANDU
PEKERJAAN : PEMBANGUNAN P>.>>>>>>
LOKASI : KABUPATEN BOMBANA
TAHUN ANGG. : 2020
TOTAL HARGA
NO URAIAN PEKERJAAN
(Rp.)
I 3,614,000.00
II PEKERJAAN GEDUNG -
III PEK. AKHIR DAN FINISHING 250,000.00
a Real Cost ( I + II + III ) Unit Bangunan 3,864,000.00
b PPn = 10 % x a 386,400.00
c Total Cost = a + b 4,250,400.00
DIBULATKAN 4,250,000.00
Terbilang : Empat Juta Dua Ratus Lima Puluh Ribu Rupiah

Kendari, Januari 2020

Disetujui Oleh : Estimate By


Konsultan Perencana

xxxxxxxxxxxxxxxxxxxxxxxxxxxx

Direktur
PEMERINTAH KABUPATEN BOMBANA
KECAMATAN POLEANG
Alamat : Jl. Poros Bombana-Kolaka, Kec. Poleang, Kab. Bombana, 93772

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN POSYANDU KEL. KASABOLO


LOKASI : KEL. KASABOLO, KEC. POLEANG
TAHUN ANGGARAN : 2020

TOTAL HARGA
NO URAIAN PEKERJAAN
(Rp.)
I PEKERJAAN PERSIAPAN Rp 3,614,000.00
II PEKERJAAN GEDUNG
A PEKERJAAN STRUKTUR BAWAH (TANAH & PONDASI) Rp 11,747,782.92
B PEKERJAAN STRUKTUR TENGAH (SLOOF, KOLOM DAN BALOK ) Rp 28,558,585.92
C PEKERJAAN DINDING & PLESTERAN Rp 12,552,138.12
D PEKERJAAN LANTAI Rp 5,407,315.29
E PEKERJAAN PINTU & JENDELA Rp 1,628,085.83
F PEKERJAAN PLAMBING Rp 5,116,906.82
H PEKERJAAN PENGECATAN Rp -
III PEK. AKHIR DAN FINISHING Rp 250,000.00

A. REAL COST Rp 93,181,861.61


B. PPN 10% X A Rp 9,318,186.16
C. TOTAL REAL COST Rp 102,500,047.77
D. PEMBULATAN Rp 102,500,000.00

Total Biaya Pembangunan Posyandu Rp 102,500,000.00


Terbilang :

Poleang, ….Agustus 2020

Mengetahui / Menyetuhjui Oleh :


Pejabat Pembuat Komitmen (PPK)
Camat Poleang

SYUKRI. HS, S.Ip


Nip. 19660214 200604 1 001
LANTAI 01
LUAS LANTAI = 204 M2

PANJANG PONDASI = 42 M
PONDASI POER PLAT =
UTUH = 26 Bh
STENGAH = 10 Bh
PANJANG SLOOF 15 X30 = 88 M
KOLOM PEDESTAL 30 X 30 = 55.8 M
JUMLAH = 36 BH
PANJANG = 1.55 M
P.TOTAL = 36 X 1.55
= 55.8 M
KOLOM PRAKTIS ( Kp) 15 X 15 = 25.55 M
JUMLAH = 7 BH
PANJANG = 3.65 M
P.TOTAL = 7 X 3.65
= 25.55 M
KOLOM KU1 ( 30 X 30 ) = 140.8 M
Struktur utama JUMLAH = 28 BH
PANJANG = 4 M
P.TOTAL = 28 X 4
= 112 M

KOLOM TERAS DEPAN JUMLAH = 8 BH


PANJANG = 3.6 M
P.TOTAL = 8 X 3.6
= 28.8 M
PANJANG TOTAL = 140.8 M

PANJANG BALOK LATEY


LT.01 = 25.75 M

BALOK PLAT LANTAI 15 / 30 CM = 135.05 M


P.HRINTAL = 78.35 M
P.VERTCL = 56.7 M
PLAT LANTAI 02 = 158.2225 M2
LUAS A = 144.7725 M2
LUAS B = 13.45 M2

BALOK PLAT ATAP TERAS 15 / 30 = 26.3 M


P.TTL = 26.3 M

ATAP PLAT TERAS = 50.05 M2


LUAS A = 63.5 M2
LUAS .B.UT = 13.45 M2
L.TOTAL = 63.5 - 13.45
= 50.05 M2
= 50.05 M2

PANJANG DINDING = 63.45 M


P = 63.45 M

LUAS LANTAI TIMBUNAN = 197.0459 M2


TERAS = 61.82085 M2
TERAS DPN = 54 M2
GE. UTMA = 81.225 M2

LUAS LANTAI KERAMIK 40 X 40 = 172.205 M2


TERAS = 63.36 M2
TERAS DPN = 55.55 M2
GE. UTMA = 53.295 M2

LUAS LANTAI KERAMIK20 X 20 = 10.368 M2


WC = 7.29 M2
T. WUDHUH= 3.078 M2

PANJANG DINDING KERAMIK = 28.38 M


WC = 21.6 M
T. WUDHUH= 6.78 M

LUAS PLAFOND = 131.208 M2


TERAS = 58.14 M2
SELASAR = 17.5275 M2
GE. UTMA = 55.5405 M2

LANTAI 02
L. LANTAI TEGEL 40 X 40 = 146.0575 M2
BALKON = 5.2725 M2
R.KPLA = 8.1225 M2
R.STAF = 13.8225 M2
MUSHLLH = 28.3725 M2
AULA = 28.3725 M2
R.TGGU = 48.7 M2
R.JAGA = 8.1225 M2
P.TERA = 5.2725 M2

KOLOM PRAKTIS ( Kp) 15 X 15 = 3.8 M


JUMLAH = 1 BH
PANJANG = 3.8 M
P.TOTAL = 1 X 3.8
= 3.8 M
KOLOM KU1 ( 30 X 30 ) = 104 M
Struktur utama JUMLAH = 26 BH
PANJANG = 4 M
P.TOTAL = 26 X 4
= 104 M

KOLOM KU3 ( 15 X 40 ) = 50.4 M


Struktur utama JUMLAH = 10 BH
PANJANG = 5.04 M
P.TOTAL = 10 X 5.04
= 50.4 M

PANJANG BALOK LATEY


LT.02 = 36 M

PANJANG Ringbalok 13/ 20 = 71.7 M


LT.02 = 71.7 M

BALOK PLAT Dak 15 / 30 CM = 16.95 M

lisplank beton dak atap = 11.3 M

PANJANG DINDING = 75.7 M


P,vert = 37.8 M
P,Hrntl = 37.9 M
kolom 20 x 20

1 'Galian Tanah Pondasi Batu Gunung Dan Poer Plat #REF! M3 PONDASI MENERUS
P = 42.00 M
L = 0.65 M
T = #REF! M
V = PXTXL
V = 42.00 X 0.65 X #REF!
= #REF! M3

PONDASI POER PLAT


J = 26 BH
P = 1.00 M
L = 1.00 M
T = 1.22 M
V = P X T X LX J
V = 1.00 X 1.00 X 1.22 X 26.00
= 31.72 M3

PONDASI POER PLAT STENGAH


J = 10
P = 1.00 M
L = 1.00 M
T = 1.22 M
V = (P X T X LX J)/2
V = 1.00 X 1.00 X 1.22 X 10.00
= 6.10 M3

TTL.VOL = A+B+C
= #REF! + 31.72 + 6.10
= #REF! M3

2 Pasir Urug Bawah Pondasi #REF! M3 P = 42.00 M


L = #REF! M
T = 0.05 M
V = PXTXL
V = 42.00 X #REF! X 0.05
= #REF! M3

PONDASI POER PLAT


J = 26 BH
P = 1.00 M
L = 1.00 M
T = 0.05 M
V = P X T X LX J
V = 1.00 X 1.00 X 0.05 X 26.00
= 1.30 M3

PONDASI POER PLAT STENGAH


J = 10
P = 1.00 M
L = 1.00 M
T = 0.05 M
V = (P X T X LX J)/2
V = 1.00 X 1.00 X 0.05 X 10.00
= 0.25 M3

TTL.VOL = A+B+C
= #REF! + 1.30 + 0.25
= #REF! M3

3 Pondasi Batu Kosong (Anstamping) #REF! M3 P = 42.00 M


L = #REF! M
T = 0.15 M
V = PXTXL
V = 42.00 X #REF! X 0.15
= #REF! M3

4 Pondasi Batu Gunung 1 : 4 #REF! M3 P = 42.00 M


L = #REF! M
T = 0.60 M
V = PXTXL
V = 42.00 X #REF! X 0.60
= #REF! M3

4 Urugan Kembali Galian #REF! M3 V = #REF! M3


V = 1/4 x V
= #REF! M3

5 Urugan Tanah Dibawah Lantai 114.29 M3 L = 197.05 M2


T = 0.58 M
V = LXT
V = 197.05 X 0.58
= 114.29 M3

6 Lantai Kerja Pondasi Poer; t = 7cm (f'c=7.4 Mpa (K100) 2.17 M3 PONDASI POER PLAT UTUH
J.P = 26.00 M
P = 1.00 M
L = 1.00 M
T = 0.07 M
V = J.P X P X T X L
V = 26.00 X 1.00 X 1.00 X 0.07
= 1.82 M3

PONDASI POER PLAT STENGAH


J.P = 10.00 M
P = 1.00 M
L = 1.00 M
T = 0.07 M
V = (J.P X P X T X L)/2
V = 10.00 X 1.00 X 1.00 X 0.07
= 0.35 M3

TTL.VOL = A+B
= 1.82 + 0.35
= 2.17 M3
7 Pondasi Poer Type P1 Bekisting 1 Buah Poer Plat
Jumlah = 31.000 bh
PONDASI UTUH PONDASI STENGAH
Jumlah = 26.000 Jumlah = 10.000
- Pek. Bekisting 43.40 M2 Keliling = 4.000 M Keliling = 2.000 M
Tebal = 0.350 M Tebal = 0.350 M
V = Keliling x Tebal V = Keliling x Tebal
= 36.400 M2 = 7.000 M2

V.T = 36.400 + 7.000

= 43.400 M2

Berat besi dalam 1 Poer Plat UTUH


- Pek. Pembesian 1,245.55 Kg besi jmlh p berat/m berat.ttl SAT
B 14 7 2.560 1.200 21.504 Kg
B 12 7 2.560 0.880 15.770 Kg

37.274 Kg

v = J.p X Jml. Besi Per Buah


= 26.000 x 37.274
= 969.114 kg

Berat besi dalam 1 Poer Plat STENGAH


besi jmlh p berat/m berat.ttl SAT
B 14 7 1.950 1.200 16.380 Kg
B 12 5 2.560 0.880 11.264 Kg

27.644 Kg

v = J.p X Jml. Besi Per Buah


= 10.000 x 27.644
= 276.440 kg

V.TOTAL = P1 + P2
= 969.114 + 276.440
= 1,245.554 kg

- Pek. Beton 11.55 M3 Volume atas


PONDASI UTUH
jumlah = 26.000 bh
P = 1.000 m
L = 1.000 m
T = 0.350 m
V = PXLXT
V = 26.000 X 1.000 X 1.000 X 0.35
V = 9.100 M3

PONDASI STENGAH
jumlah = 10.000 bh
P = 1.000 m
L = 0.700 m
T = 0.350 m
V = PXLXT
V = 10.000 X 1.000 X 0.700 X 0.35
V = 2.450 M3

V.TOTAL = P1 + P2
= 9.10 + 2.45
= 11.55 M3

B. PEKERJAAN STRUKTUR TENGAH (SLOOF, KOLOM, BALOK, PLAT DAN TANGGA)

1 Sloof S1 (15x30)
- Bekisting 52.80 M2 P = 88.00 M
L = 0.60 M
v = PXL
v = 88.00 x 0.60
V = 52.80 M2

- Pembesian 821.81 KG
besi Jml p berat/m berat.ttl SAT
B12 5 1.00 1.209 6.043 Kg
B12 2 1.00 0.888 1.776 Kg
Beugel 5 0.77 0.395 1.519 Kg
9.34 Kg

v = P.TTL X BERAT/M
= 88.000 x 9.339
= 821.814 kg

- Pek. Beton 3.96 M3


P = 88.00
L = 0.15 m
T = 0.30 m
V = PXLXT
V = 88.00 X 0.15 X 0.30
= 3.96 M3

2 Kolom Pedestal K1 (UK,30 X 30)


- Bekisting 66.96 M2 P = 55.80 M
L = 1.20 M
v = PXL
v = 55.80 x 1.20
V = 66.96 M2

- Pembesian 684.90 KG
besi Jml p berat/m berat.ttl SAT
B14 8 1.00 1.209 9.669 Kg
B12 - 1.00 0.888 - Kg
Beugel 6 1.10 0.395 2.605 Kg
12.27 Kg

28 v = P.TTL X BERAT/M
= 55.800 x 12.274
= 684.897 kg

- Pek. Beton 5.02 M3


P = 55.80
L = 0.30 m
T = 0.30 m
V = PXLXT
V = 55.80 X 0.30 X 0.30
= 5.02 M3
3 Kolom K1 (UK. 30 X 30)
- Bekisting 168.96 M2 P = 140.80 M
L = 1.20 M
v = PXL
v = 140.80 x 1.20
V = 168.96 M2

- Pembesian 1,728.20 KG
besi Jml p berat/m berat.ttl SAT
B14 8 1.00 1.209 9.669 Kg
B12 - 1.00 0.888 - Kg
Beugel 6 1.10 0.395 2.605 Kg
12.27 Kg

v = P.TTL X BERAT/M
= 140.800 x 12.274
= 1,728.198 kg

- Pek. Beton 12.67 M3


P = 140.80
L = 0.30 m
T = 0.30 m
V = PXLXT
V = 140.80 X 0.30 X 0.30
= 12.67 M3

4 Kolom Praktis ( Kp)


- Bekisting 6.13 M2 P = 25.55 M
L = 0.24 M
v = PXL
v = 25.55 x 0.24
V = 6.13 M2

- Pembesian 113.74 KG
besi Jml p berat/m berat.ttl SAT

B12 4 1.00 0.888 3.552 Kg


Beugel 6 0.38 0.395 0.900 Kg
4.45 Kg

v = P.TTL X BERAT/M
= 25.550 x 4.452
= 113.745 kg

- Pek. Beton 0.37 M3


P = 25.55
L = 0.12 m
T = 0.12 m
V = PXLXT
V = 25.55 X 0.12 X 0.12
= 0.37 M3

5 Balok Latey
- Bekisting 7.73 M2 P = 25.75 M
L = 0.30 M
v = PXL
v = 25.75 x 0.30
V = 7.73 M2

- Pembesian 99.09 KG
besi Jml p berat/m berat.ttl SAT

B10 4 1.00 0.617 2.467 Kg


Beugel 7 0.50 0.395 1.381 Kg
3.85 Kg

v = P.TTL X BERAT/M
= 25.750 x 3.848
= 99.086 kg

- Pek. Beton 0.50 M3


P = 25.75
L = 0.13 m
T = 0.15 m
V = PXLXT
V = 25.75 X 0.13 X 0.15
= 0.50 M3
6 Pek. Balok Plat Lantai , Uk. 15/30 cm
- Bekisting 68.88 M2 P = 135.05 M
L = 0.51 M
v = PXL
v = 135.05 x 0.51
V = 68.88 M2

- Pembesian 1,311.84 KG
besi Jml p berat/m berat.ttl SAT
B14 5 1.00 1.209 6.043 Kg
B12 2 1.00 0.888 1.776 Kg
Beugel 6 0.80 0.395 1.894 Kg
9.71 Kg

v = P.TTL X BERAT/M
= 135.050 x 9.714
= 1,311.840 kg

- Pek. Beton 3.65 M3


P = 135.05
L = 0.15 m
T = 0.18 m
V = PXLXT
V = 135.05 X 0.15 X 0.18
= 3.65 M3

7 Pek.Plat Lantai , T = 12 cm
- Bekisting 158.22 M2 L = 158.22 M
V = 158.22 M2

- Pembesian 2,486.40 KG besi area 1/5 .L


besi Jml p berat/m berat.ttl SAT
B10 V 10 1.00 0.617 6.167 Kg
B10.H 14 1.00 0.617 8.633 Kg
B EXTRA ATAS 5 1.00 0.617 3.083 Kg
17.88 Kg

v = P.TTL X BERAT/M
= 108.00 x 17.883 AREA HASIL HACT CAAD
= 1,931.40 kg

besi area Lapangan


besi Jml p berat/m berat.ttl SAT
B10 9 1.00 0.617 5.550 Kg
B10 9 1.00 0.617 5.550 Kg

11.10 Kg

v = P.TTL X BERAT/M
= 50.00 x 11.100
= 555.00 kg AREA HASIL HACT CAAD
total = 1,931.40 + 555.00
= 2,486.40 kg

- Pek. Beton 18.99 M3


P = 158.22
L = 0.12 m
V = Luas x T
V = 158.22 X 0.12
= 18.99 M3

8 PEKERJAN TANGGA

a Pek. Urugan Pondasi 0.08 M3


J.P = 1.00 M
P = 1.50 M
L = 1.10 M
T = 0.05 M
V = J.P X P X T X L
V = 1.00 X 1.50 X 1.10 X 0.05
= 0.08 M3

b Lantai Kerja Pondasi Poer; t = 7cm (f'c=7.4 Mpa (K100) 0.12 M3


J.P = 1.00 M
P = 1.50 M
L = 1.10 M
T = 0.07 M
V = J.P X P X T X L
V = 1.00 X 1.50 X 1.10 X 0.07
= 0.12 M3
c Pondasi Poer Bekisting 1 Buah Poer Plat
Jumlah = 1.000 bh
- Pek. Bekisting 1.50 m2 Keliling = 5.000 M
Tebal = 0.300 M
V = Keliling x Tebal
= 1.500 M2

Berat besi dalam 1 Poer Plat


- Pek. Pembesian 44.00 Kg besi jmlh p berat/m berat.ttl SAT
B 12 6 2.500 0.880 13.200 Kg
10 B 12 10 3.500 0.880 30.800 Kg

44.000 Kg

v = J.p X Jml. Besi Per Buah


= 1.000 x 44.000
= 44.000 kg

- Pek. Beton 0.45 M3 Volume atas


jumlah = 1.000 bh
P = 1.500 m
L = 1.000 m
T = 0.300 m
V = PXLXT
V = 1.000 X 1.500 X 1.000 X 0.30
V = 0.450 M3
d Kolom Pedestal Bekisting 1 Buah Poer Plat
Jumlah = 1.000 bh
- Pek. Bekisting 4.03 m2 Keliling = 3.600 M
Tebal = 1.120 M
V = Keliling x Tebal
= 4.032 M2

Berat besi dalam 1 Poer Plat


- Pek. Pembesian 47.52 Kg besi jmlh p berat/m berat.ttl SAT
B 12 10 3.300 0.880 29.040 Kg
B 12 6 3.500 0.880 18.480 Kg

47.520 Kg

v = J.p X Jml. Besi Per Buah


= 1.000 x 47.520
= 47.520 kg

- Pek. Beton 0.50 M3 Volume atas


jumlah = 1.000 bh
P = 1.500 m
L = 1.120 m
T = 0.300 m
V = PXLXT
V = 1.000 X 1.500 X 1.120 X 0.30
V = 0.504 M3

e Balok Bordes Bekisting


p = 7.000 M
- Pek. Bekisting 5.25 m2 L = 0.150 M
T = 0.300 M
V = PX(L+T+T)
= 5.250 M2

Berat besi dalam 1 Poer Plat


- Pek. Pembesian 45.87 Kg besi jmlh p berat/m berat.ttl SAT
B 12 5 1.000 0.880 4.400 Kg
B8 6 0.920 0.390 2.153 Kg

6.553 Kg

v = J.p X Jml. Besi Per Buah


= 7.000 x 6.553
= 45.870 kg

- Pek. Beton 0.63 M3 Volume atas


jumlah = 7.000 bh
P = 1.500 m
L = 0.200 m
T = 0.300 m
V = PXLXT
V = 7.000 X 1.500 X 0.200 X 0.30
V = 0.630 M3

9 Balok Plat Atap Beton Teras A


p = 26.300 M
- Pek. Bekisting 19.73 m2 L = 0.150 M
T = 0.300 M
V = PX(L+T+T)
= 19.725 M2

Berat besi dalam 1 M


- Pek. Pembesian 260.45 Kg besi Jml p berat/m berat.ttl SAT
B14 5 1.00 1.209 6.043 Kg
B12 2 1.00 0.888 1.776 Kg
Beugel 6 0.88 0.395 2.084 Kg
9.90 Kg

v = P.TTL X BERAT/M
= 26.300 x 9.903
= 260.453 kg

- Pek. Beton 0.71 M3 Volume atas


P = 26.300 m
L = 0.150 m
T = 0.180 m
V = PXLXT
V = 26.300 X 0.150 X 0.180
V = 0.710 M3

10 Pek.Plat Atap Teras A , T = 12 cm


- Bekisting 50.05 M2 L = 50.05 M
V = 50.05 M2

- Pembesian 740.74 KG Berat Besi


besi Jml p berat/m berat.ttl SAT
B10 12 1.00 0.617 7.400 Kg
B10 12 1.00 0.617 7.400 Kg

14.80 Kg

v = P.TTL X BERAT/M
= 50.05 x 14.800
= 740.74 kg
6.67

- Pek. Beton 5.01 M3


P = 50.05
L = 0.10 m
V = Luas x T
V = 50.05 X 0.10
= 5.01 M3
C PEKERJAAN DINDING DAN PLASTERAN

1 PEK. DINDING BATA 1 PC ; 5 PSR 146.80 M2


P = 63.45 M
T = 3.65 M
V = PXT
= 63.45 X 3.65
= 231.59 M2

VOLUME BUKAAN KUSEN


PL = 2.55 X 2.55 X 4.00 = 26.01 M2
P3 = 2.15 X 0.75 X 4.00 = 6.45 M2
V1 = 0.70 X 0.50 X 2.00 = 0.70 M2
J1 = 1.67 X 0.68 X 2.00 == 2.27 M2
P.WC = 0.70 X 2.10 X 2.00 = 2.94 M2
T.WUDU = 1.00 X 2.10 ]X 1.00 = 2.10 M2
LOOBSTER = 20.00 X 0.15 ]X 0.30 = 0.90 M2
41.37 M2
TOTAL = 231.59 - 41.37 - 43.43
= 146.80 M2
2 PEK. DINDING BATA 1 PC ; 3 PSR 43.43 M2 TRASRAM KM/WC
P = 13.00 M
T = 1.50 M
V = PXT
= 13.00 X 1.50
= 19.50 M2

TRASRAM KELILING BANGUNAN


P = 63.45 M
T = 0.50 M
V = PXT
= 63.45 X 0.50
= 31.73 M2

VOLUME BUKAAN KUSEN


PL = 2.55 X 0.50 X 4.00 = 5.10 M2
P3 = 0.50 X 0.75 X 4.00 = 1.50 M2
P.WC = 0.70 X 0.50 X 2.00 = 0.70 M2
T.WUDU = 1.00 X 0.50 ]X 1.00 = 0.50 M2
7.80 M2

TOTAL = 19.50 + 31.73 - 7.80


= 43.43 M2

3 Plesteran Biasa (1:5) 293.59 M2

4 Plesteran (1:3) 86.85 M2

5 Plasteran beton 28.80 m jkolom = 36.00 m


l = 0.80 m
v = 36.00 x 0.80
= 28.80
6 Dinding Alcopan 96.16 m2
Kolom Teras A 1
Luas = 3.09 m2 Area Samping Kiri'
= 3.09 m2 Area Samping Kanan
= 2.54 m2 Area Depan Dan Belakang
8.72 m2

jmlh klm = 8.00 bh


v = Jml Klm X Luas /kolom
= 8.00 x 8.72
= 69.76 m2

Kolom Teras A 2
P = 8.00 M
L = 1.65 M
JML = 2.00 BH

V = 8.00 X 1.65 X 2.00


= 26.40 M2

Kolom Belakang
Luas = 3.68 m2 Area Samping Kiri'
= 3.68 m2 Area Samping Kanan
= 1.43 m2 Area Depan Dan Belakang
- m2

jmlh klm = 4.00 bh


v = Jml Klm X Luas /kolom
= 4.00 x -
= - m2

TOTAL Volume
= 69.76 + 26.40 + -
= 96.16 m2

D PEKERJAAN LANTAI

1 Pek. Rabat Beton Bawah Lantai 9.13 M3 LUAS = 182.57 M2


T = 0.07 M
V = LXT
= 182.57 X 0.05
= 9.13 M3

2 Pek. Urugan Pasir 9.13 M3 LUAS = 182.57 M2


T = 0.10 M
V = LXT
= 182.57 X 0.05
= 9.13 M3
3 Pek. Lapis Lantai Granito 40 x 40 cm 172.21 M2

TERAS = 63.36 M2
TERAS DPN = 55.55 M2
GE. UTMA = 53.295 M2
172.21 M2

4 Lantai Keramik Anti Slip 40x40 (Km/Wc) 10.37 M2 Kamar Mandi


Jumlah = 4.00 Bh
L = 1.82 m2
V = jumlah x Luas
= 4.00 X 1.82
= 7.29 m2

Tempst Whudu
Jumlah = 1.08 Bh
L = 2.85 m2
V = jumlah x Luas
= 1.08 X 2.85
= 3.08 m2

Jumlah V = 7.29 + 3.08


= 10.37 m2

5 Dinding Keramik 20x40 (KM/WC) 49.40 M2 Kamar Mandi


P = 8.75 m
T = 2.00 m
jmlh = 2.00 bh
V = P X L X Jmlh
= 8.75 X 2.00 X 2.00
= 35.00 m2

Tempst Whudu
P = 7.20 m
T = 2.00 m
jmlh = 1.00 bh
V = P X L X Jmlh
= 7.20 X 2.00 X 1.00
= 14.40 m2

Jumlah V = 35.00 + 14.40


= 49.40 m2

6 List Atas Dinding Keramik 10 x 40 (Km/Wc) 2.47 M2 Kamar Mandi


P = 8.75 m
T = 0.10 m
jmlh = 2.00 bh
V = P X L X Jmlh
= 8.75 X 0.10 X 2.00
= 1.75 m2

Tempst Whudu
P = 7.20 m
T = 0.10 m
jmlh = 1.00 bh
V = P X L X Jmlh
= 7.20 X 0.10 X 1.00
= 0.72 m2

Jumlah V = 1.75 + 0.72


= 2.47 m2

E PEKERJAAN KUSEN, PINTU/JENDELA


1 Pintu Rolling Door Atas ( Pabrikasi ) 4.00 Bh

2 Pek. Pintu Type P2


- Kusen Pintu Kayu Jati 0.05 m3 P = 7.10 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 7.10 X 0.14 X 0.05
= 0.05 m2

- Pek. Daun Pintu Panil Jati 3 cm 1.72 M2 P = 2.10 m


L = 0.82 m
V = PXL
= 2.10 X 0.82
= 1.72 m2

- Kaca Tebal 5mm ( Ventilasi ) 0.32 m2 P = 0.80 m


L = 0.40 m
V = PXL
= 0.80 X 0.40
= 0.32 m2
,- Engsel Pintu 3.00 Bh

,- Kunci Pintu 1.00 Bh

3 Pek. Pintu Type P3 2.00 bh


- Kusen Pintu Kayu Jati 0.07 m3 P = 5.15 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 5.15 X 0.14 X 0.05
= 0.03 m2 x 2.00
= 0.07 M3

- Pek. Daun Pintu Panil Jati 3 cm 2.81 M2 P = 2.10 m


L = 0.67 m
V = PXL
= 2.10 X 0.67
= 1.41 m2 x 2.00
= 2.81 M3
,- Engsel Pintu 6.00 Bh

,- Kunci Pintu 2.00 Bh

4 Pek. Jendela Type J1 2.00 Bh


- Kusen Jendela Kayu Jati 0.07 m3 P = 4.86 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 4.86 X 0.14 X 0.05
= 0.03 m2 x 2.00
= 0.07 M3
- Pek. Bingkai Jendela Kaca Jati 3 cm 0.51 M2 P = 4.26 m
L = 0.06 m
V = PXL
= 4.26 X 0.06
= 0.26 m2 x 2.00
= 0.51 M3

- Pek. Kaca Tebal 5 MM 1.41 M2 P = 1.47 m


L = 0.48 m
V = PXL
= 1.47 X 0.48
= 0.71 m2 x 2.00
= 1.41 M3

,- Engsel Jendela 4.00 Bh

,- grendel Jendela 2.00 Bh

5 Pek. Ventilasi Type V1 2.00 Bh


- Kusen Jendela Kayu Jati 0.04 m3 P = 2.60 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 2.60 X 0.14 X 0.05
= 0.02 m2 x 2.00
= 0.04 M3
- Pek. Bingkai Jendela Kaca Jati 3 cm 0.24 M2 P = 2.00 m
L = 0.06 m
V = PXL
= 2.00 X 0.06
= 0.12 m2 x 2.00
= 0.24 M3

- Pek. Kaca Tebal 5 MM 0.29 M2 P = 0.48 m


L = 0.30 m
V = PXL
= 0.48 X 0.30
= 0.14 m2 x 2.00
= 0.29 M3

,- Engsel Jendela 4.00 Bh

,- grendel Jendela 2.00 Bh

E PEK. PLAFOND

1 Pek. Rangka Plafond Besi Holow modul 60 x 120cm 131.21 M2

2 Pek. Lapis Plafond GRC Board t = 4,5 mm 131.21 M2


3 Pek. List Plafond Gipsum Board 176.90 M GEDUNG UTAMA = 176.90 M

F PEKERJAAN PLAMBING

1 Pek. Klosed Duduk Ex. Toto + Pelengkap 2.00 Bh

2 Pek. Wastafel Ex.Toto, Cermin + Pelengkap 2.00 bh

3 Pek. Kran Air 3/4 Wastaffel Stainlist Still 2.00 Bh

4 Pek. Kran Air 3/4 5.00 Bh

5 Pek. Floor Drink Stainlist Still 3.00 Bh

6 Pek. Pipa Air Bersih 3/4" 25.00 m

7 Pek. Pipa Air Kotor PVC 3" 20.00 m

8 Pek. Pipa Air Kotor PVC 2" 15.00 m

9 Pek. Septic Tank + Bak Resapan 1.00 Unit

G PEKERJAAN PENGECATAN

1 Pengecatan Tembok 409.24 m2 Pengecetan Tembok


Plasteran Tembok 1:5 = 293.59 m2
Dinding 1 : 3 = 86.85 m2
Plasteran Beton = 28.80 m2
409.24 m2
2 Pengecatan Plafond 131.21 m2

3 Pek. Cat Kilap Daun Pintu , Jendela Dan Ventilasi 10.57 m2 Type Pintu Dan Jendela
P2 = 3.44 m2
P3 = 5.63 m2
J1 = 1.02 m2
V1 = 0.48 m2
10.57 m2

4 Pek. Cat Kilap Kusen Pintu dan Jendela 7.60 m2 Type Pintu Dan Jendela
P2 = 1.67 m2
P3 = 2.42 m2
J1 = 2.28 m2
V1 = 1.22 m2
7.60 m2

### LANTAI 02

1 Kolom K1 (UK. 30 X 30)


- Bekisting 124.80 M2 P = 104.00 M
L = 1.20 M
v = PXL
v = 104.00 x 1.20
V = 124.80 M2

- Pembesian 1,296.21 KG
besi Jml p berat/m berat.ttl SAT
B14 8 1.00 1.209 9.669 Kg
B12 - 1.00 0.888 - Kg
Beugel 6 1.18 0.395 2.794 Kg
12.46 Kg

v = P.TTL X BERAT/M
= 104.000 x 12.464
= 1,296.212 kg

- Pek. Beton 9.36 M3


P = 104.00
L = 0.30 m
T = 0.30 m
V = PXLXT
V = 104.00 X 0.30 X 0.30
= 9.36 M3

2 Kolom KU3 ( 15 X 40 )
- Bekisting 45.36 M2 P = 50.40 M
L = 0.90 M
v = PXL
v = 50.40 x 0.90
V = 45.36 M2

- Pembesian 542.04 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 1.209 4.835 Kg
B10 4 1.00 0.888 3.552 Kg
Beugel 6 1.00 0.395 2.368 Kg
10.75 Kg

v = P.TTL X BERAT/M
= 50.400 x 10.755
= 542.035 kg

- Pek. Beton 3.02 M3


P = 50.40
L = 0.15 m
T = 0.40 m
V = PXLXT
V = 50.40 X 0.15 X 0.40
= 3.02 M3

3 Kolom Praktis ( Kp)


- Bekisting 0.38 M2 P = 3.80 M
L = 0.10 M
v = PXL
v = 3.80 x 0.10
V = 0.38 M2

- Pembesian 18.00 KG
besi Jml p berat/m berat.ttl SAT

B12 4 1.00 0.888 3.552 Kg


Beugel 6 0.50 0.395 1.184 Kg
4.74 Kg

v = P.TTL X BERAT/M
= 3.800 x 4.736
= 17.997 kg

- Pek. Beton 0.05 M3


P = 3.80
L = 0.12 m
T = 0.12 m
V = PXLXT
V = 3.80 X 0.12 X 0.12
= 0.05 M3

4 Balok Latey
- Bekisting 10.80 M2 P = 36.00 M
L = 0.30 M
v = PXL
v = 36.00 x 0.30
V = 10.80 M2

- Pembesian 131.42 KG
besi Jml p berat/m berat.ttl SAT

B10 4 1.00 0.617 2.467 Kg


Beugel 6 0.50 0.395 1.184 Kg
3.65 Kg

v = P.TTL X BERAT/M
= 36.000 x 3.651
= 131.424 kg

- Pek. Beton 0.70 M3


P = 36.00
L = 0.13 m
T = 0.15 m
V = PXLXT
V = 36.00 X 0.13 X 0.15
= 0.70 M3

5 Pek. Balok Beton Uk. 13 x 20 cm


- Bekisting 28.68 M2 P = 71.70 M
L = 0.40 M
v = PXL
v = 71.70 x 0.40
V = 28.68 M2

- Pembesian 404.09 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 - 1.00 0.617 - Kg
Beugel 6 0.88 0.395 2.084 Kg
5.64 Kg

v = P.TTL X BERAT/M
= 71.700 x 5.636
= 404.090 kg

- Pek. Beton 1.86 M3


P = 71.70
L = 0.13 m
T = 0.20 m
V = PXLXT
V = 71.70 X 0.13 X 0.20
= 1.86 M3
6 Pek. Balok Atap 15 x 40 cm
- Bekisting 12.71 M2 P = 16.95 M
L = 0.75 M
v = PXL
v = 16.95 x 0.75
V = 12.71 M2

- Pembesian 167.86 KG
besi Jml p berat/m berat.ttl SAT
B14 5 1.00 1.209 6.043 Kg
B12 2 1.00 0.888 1.776 Kg
Beugel 6 0.88 0.395 2.084 Kg
9.90 Kg

v = P.TTL X BERAT/M
= 16.950 x 9.903
= 167.859 kg

- Pek. Beton 0.46 M3


P = 16.95 m
L = 0.15 m
6 T = 0.18 m
6.666667 6 V = PXLXT
V = 16.95 X 0.15 X 0.18
= 0.46 M3

7 Pek.Plat Atap
- Bekisting 17.90 M2 L = 11.30 M
V = 17.90 M2

- Pembesian 167.24 KG berat besi


besi Jml p berat/m berat.ttl SAT
B10 12 1.00 0.617 7.400 Kg
B10 12 1.00 0.617 7.400 Kg

14.80 Kg

v = P.TTL X BERAT/M
= 11.30 x 14.800
= 167.24 kg

- Pek. Beton 1.13 M3


P = 11.30
L = 0.10 m
V = Luas x T
V = 11.30 X 0.10
= 1.13 M3

8 Pek. Beton Talang Air Hujan

a. Talang Utama P = 31.8 M


- Bekisting 76.96 M2 L = 2.42 M
V = PXL
V = 31.80 X 2.42
V = 76.96 M2

- Pembesian 480.45 KG Berat Besi/M


besi Jml p berat/m berat.ttl SAT
B10 14 1.00 0.617 8.633 Kg
B10 6 1.75 0.617 6.475 Kg

15.11 Kg

v = P.TTL X BERAT/M
= 31.80 x 15.108
= 480.45 kg

- Pek. Beton 6.42 M3


P = 31.80
Luas = 0.20 m
V = Luas x T
V = 31.80 X 0.20
= 6.42 M3

b Talang Depan ( Pinggir) P = 6M


- Bekisting 13.92 M2 L = 2.32 M
V = PXL
V = 6.00 X 2.32
V = 13.92 M2

- Pembesian 90.65 KG Berat Besi/M


besi Jml p berat/m berat.ttl SAT
B10 14 1.00 0.617 8.633 Kg
B10 6 1.75 0.617 6.475 Kg

15.11 Kg

v = P.TTL X BERAT/M
= 6.00 x 15.108
= 90.65 kg
- Pek. Beton 1.21 M3
P = 6.00
Luas = 0.20 m
V = Luas x T
V = 6.00 X 0.20
= 1.21 M3
c Talang Depan ( Tengah) P = 9M
- Bekisting 13.05 M2 L = 1.45 M
V = PXL
V = 9.00 X 1.45
V = 13.05 M2

- Pembesian 120.99 KG Berat Besi/M


besi Jml p berat/m berat.ttl SAT
B10 14 1.00 0.617 8.633 Kg
B10 6 1.30 0.617 4.810 Kg

13.44 Kg

v = P.TTL X BERAT/M
= 9.00 x 13.443
= 120.99 kg
- Pek. Beton 1.04 M3
P = 9.00
Luas = 0.12 M2
V = Luas x T
V = 9.00 X 0.12
= 1.04 M3

Total Volume Bekisting


v = a+b+c
= 76.96 + 13.92 + 13.05
= 103.93 m2

Total Volume Tulangan


v = a+b+c
= 480.45 + 90.65 + 120.99
= 692.09 m2

Total Volume Beton


v = a+b+c
= 6.42 + 1.21 + 1.04
= 8.67 m2

9 Pek.Lisplank Beton T=10 cm


- Bekisting 9.20 M2 P = 11.50 M
L = 0.80 M
v = PXL
v = 11.50 x 0.80
V = 9.20 M2

- Pembesian 56.73 KG
besi Jml p berat/m berat.ttl SAT
B10 2 1.00 0.617 1.233 Kg
B10 6 1.00 0.617 3.700 Kg

4.93 Kg

v = P.TTL X BERAT/M
= 11.500 x 4.933
= 56.733 kg

- Pek. Beton 0.60 M3


P = 11.50
L = 0.15 m
T = 0.35 m
V = PXLXT
V = 11.50 X 0.15 X 0.35
= 0.60 M3

B PEKERJAAN DINDING DAN PLASTERAN

1 PEK. DINDING BATA 1 PC ; 5 PSR 258.63 M2


P = 77.70 M
T = 3.80 M
V = PXT
= 77.70 X 3.80
= 295.26 M2

VOLUME BUKAAN KUSEN


P1 = 1.70 X 2.60 X 1.00 = 4.42 M2
P2 = 0.90 X 2.60 X 6.00 = 14.04 M2
J1 = 1.67 X 0.68 X 16.00 == 18.17 M2
36.63 M2
TOTAL = 295.26 - 36.63
= 258.63 M2
10.00
10.00
5.00
5.00
10.00
15.00
3.00
15.00
3.00
3 Plesteran Biasa (1:5) 517.26 M2 3.00
3.00
5 Plasteran beton 20.80 M2 jkolom = 26.00 m 82.00
l = 0.80 m
v = 26.00 x 0.80
= 20.80
C PEKERJAAN KUSEN, PINTU/JENDELA

1 Pek. Pintu Type P1


- Kusen Pintu Kayu Jati 0.06 m3 P = 8.80 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 8.80 X 0.14 X 0.05
= 0.06 m2

- Pek. Daun Pintu Panil Jati 3 cm 3.44 M2 P = 2.10 m


L = 1.64 m
V = PXL
= 2.10 X 1.64
= 3.44 m2

- Pek. Bingkai Kaca Ventilasi 0.27 M2 P = 4.48 m


L = 0.06 m
V = PXL
= 4.48 X 0.06
= 0.27 m2

- Kaca Tebal 5mm ( Ventilasi ) 0.42 m2 P = 0.70 m


L = 0.60 m
V = PXL
= 0.70 X 0.60
= 0.42 m2
,- Engsel Pintu 6.00 Bh

,- Grendel Pintu 1.00 Bh

,- Engsel Ventilasi 4.00 Bh

,- Kunci Pintu 1.00 Bh

2 Pek. Pintu Type P2


- Kusen Pintu Kayu Jati 0.29 m3 P = 7.10 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 7.10 X 0.14 X 0.05
= 0.05 m2 x 6.00
= 0.29 m2

- Pek. Daun Pintu Panil Jati 3 cm 10.33 M2 P = 2.10 m


L = 0.82 m
V = PXL
= 2.10 X 0.82
= 1.72 m2 x 6.00
= 10.33 m2

- Pek. Bingkai Kaca Ventilasi 0.81 M2 P = 2.24 m


L = 0.06 m
V = PXL
= 2.24 X 0.06
= 0.13 m2 x 6.00
= 0.81 m2

- Kaca Tebal 5mm ( Ventilasi ) 1.92 m2 P = 0.80 m


L = 0.40 m
V = PXL
= 0.80 X 0.40
= 0.32 m2 x 6.00
= 1.92 m2

,- Engsel Pintu 3.00 Bh

,- Engsel Ventilasi 2.00 Bh

,- Grendel Pintu 1.00 Bh

,- Kunci Pintu 1.00 Bh

4 Pek. Jendela Type J1 16.00 Bh


- Kusen Jendela Kayu Jati 0.52 m3 P = 4.86 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 4.86 X 0.14 X 0.05
= 0.03 m2 x 16.00
= 0.52 M3
- Pek. Bingkai Jendela Kaca Jati 3 cm 4.09 M2 P = 4.26 m
L = 0.06 m
V = PXL
= 4.26 X 0.06
= 0.26 m2 x 16.00
= 4.09 M3

- Pek. Kaca Tebal 5 MM 11.29 M2 P = 1.47 m


L = 0.48 m
V = PXL
= 1.47 X 0.48
= 0.71 m2 x 16.00
= 11.29 M3

,- Engsel Jendela 32.00 Bh

,- grendel Jendela 16.00 Bh

,- Hak Angin 16.00 Bh

5 Pek. Jendela Type J2 4.00 Bh


- Kusen Jendela Kayu Jati 0.12 m3 P = 4.50 m
L = 0.14 m
T = 0.05 m
V = PXLXT
= 4.50 X 0.14 X 0.05
= 0.03 m2 x 4.00
= 0.12 M3
- Pek. Bingkai Jendela Kaca Jati 3 cm 0.84 M2 P = 3.48 m
L = 0.06 m
V = PXL
= 3.48 X 0.06
= 0.21 m2 x 4.00
= 0.84 M3

- Pek. Kaca Tebal 5 MM 2.28 M2 P = 1.14 m


L = 0.50 m
V = PXL
= 1.14 X 0.50
= 0.57 m2 x 4.00
= 2.28 M3
,- Engsel Jendela 8.00 Bh

,- grendel Jendela 4.00 Bh

,- Hak Angin 4.00 Bh

D PEKERJAAN ATAP

1 Pek. Rangka Atap Baja Ringan 155.00 M2 PAKAI SKETCHUP

2 Pek. Psangan Atap Spandek 155.00 M2 9.40


6.00
3 Pek. Nok Atap Oundoline 33.57 M 112.80

E PEKERJAAN LANTAI

1 Pek. Lapis Lantai Granito 40 x 40 cm 146.06 M2

F PEK. PLAFOND

1 Pek. Rangka Plafond Besi Holow modul 60 x 120cm 146.06 M2

2 Pek. Lapis Plafond GRC Board t = 4,5 mm 146.06 M2

3 Pek. List Plafond Gipsum Board M GEDUNG UTAMA = M

3 PEKERJAAN LAIN - LAIN

1 Pek. Pot Bunga


- Galian Tanah 3.01 M3 p = 25.10
l = 0.40
t = 0.30
v = PXLXT
= 25.10 X 0.40 X 0.30
= 3.01 M3

- Urugan Tanah 0.75 M3

- Pas. Pondasi Batu Gunung 1.70 M3 p = 20.60


l = 0.28
t = 0.30
v = PXLXT
= 20.60 X 0.28 X 0.30
= 1.70 M3

- Kolom Praktis ( Kp)


- Bekisting 5.95 M2 P = 24.80 M
L = 0.24 M
v = PXL
v = 24.80 x 0.24
V = 5.95 M2

- Pembesian 122.35 KG
besi Jml p berat/m berat.ttl SAT

B12 4 1.00 0.888 3.552 Kg


Beugel 7 0.50 0.395 1.381 Kg
4.93 Kg

v = P.TTL X BERAT/M
= 24.800 x 4.933
= 122.347 kg

- Pek. Beton 0.36 M3


P = 24.80
L = 0.12 m
T = 0.12 m
V = PXLXT
V = 24.80 X 0.12 X 0.12
= 0.36 M3

- Pas. Dinding Bata 1 : 3 40.16 m2 p = 25.10


t = 1.60
v = PXT
= 25.10 X 1.60
= 40.16 M3

- Pas. Plasteran Dinding Bata 1 : 3 17.68 m2 p = 11.05


t = 1.60
v = PXT
= 11.05 X 1.60
= 17.68 M3
f PEKERJAAN LAIN - LAIN

1 Pek. Pot Bunga


- Galian Tanah 2.90 M3 p = 24.20
l = 0.40
t = 0.30
v = PXLXT
= 24.20 X 0.40 X 0.30
= 2.90 M3

- Urugan Tanah 0.73 M3

- Pas. Pondasi Batu Gunung 2.00 M3 p = 24.20


l = 0.28
t = 0.30
v = PXLXT
= 24.20 X 0.28 X 0.30
= 2.00 M3

- Kolom Praktis ( Kp)


- Bekisting 4.46 M2 P = 18.60 M
L = 0.24 M
v = PXL
v = 18.60 x 0.24
V = 4.46 M2

- Pembesian 91.76 KG
besi Jml p berat/m berat.ttl SAT

B12 4 1.00 0.888 3.552 Kg


Beugel 7 0.50 0.395 1.381 Kg
4.93 Kg

v = P.TTL X BERAT/M
= 18.600 x 4.933
= 91.760 kg

- Pek. Beton 0.27 M3


P = 18.60
L = 0.12 m
T = 0.12 m
V = PXLXT
V = 18.60 X 0.12 X 0.12
= 0.27 M3

- Pas. Dinding Bata 1 : 3 38.72 m2 p = 24.20


t = 1.60
v = PXT
= 24.20 X 1.60
= 38.72 M3

- Pas. Plasteran Dinding Bata 1 : 3 17.68 m2 p = 11.05


t = 1.60
v = PXT
= 11.05 X 1.60
= 17.68 M3

2 Profil Kolom Teras Kt2 18.00


- Pas. Dinding Bata 1 : 3 3.75 M2 Pas.Dinding Bata Seg. A
p = 1.32
t = 1.20
v = PXT
= 1.32 X 1.20
= 1.58 M3
Pas.Dinding Bata Seg. B
p = 1.55
t = 1.40
v = PXT
= 1.55 X 1.40
= 2.17 M3

Total Pek. Dinding Bata 1: 3


V = Seg. A + Seg. B
= 1.58 + 2.17
= 3.75 M2

- Pas. Plasteran Dinding Bata 1 : 3 3.75 M2

- Urugan Pasir Urug 0.27 M2 P = 0.63


L = 0.33 m
T = 1.30 m
V = PXLXT
V = 0.63 X 0.33 X 1.30
= 0.27 M3

- Pengecetan 3.75 M2

3 pek. Tangga teras 33.00


Urugan Tanah 4.13 M2 Urugan Tanah
p = 1.00
l = 0.50
t = 0.25
v = PXT
= 1.00 X 0.50 x 0.25
= 0.13 M3

- pek. Pas. Batu Gunung 1 : 4 4.79 m3


p = 1.00
l = 1.45
t = 0.10
v = PXT
= 1.00 X 1.45 x 0.10
= 0.15 M3

pek. Tegel 40 x 40 62.70 M2 P = 1.00


L = 1.90 m
V = PXLXT
V = 1.00 X 1.90
= 1.90 M3
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN POSYANDU KEL. KASABOLO


LOKASI : KEL. KASABOLO, KEC. POLEANG
TAHUN ANGGARAN : 2020

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOL. SAT. Tenaga
(Rp.) (Rp.)
I PEKERJAAN PERSIAPAN
1. Pengukuran dan Pemasangan Bowplank 1.00 Ls 250,000.00 250,000.00
###
2. Pembersihan Lokasi 1.00 Ls 250,000.00 250,000.00
3. Papan Nama Proyek 1.00 Ls 250,000.00 250,000.00
4. Administrasi, Dokumentasi dan Pelaporan 1.00 Ls 300,000.00 300,000.00
5. Air Kerja 1.00 Ls 264,000.00 264,000.00
6. Biaya Penunjang Kegiatan 1.00 Ls 2,300,000.00 2,300,000.00
3,614,000.00
II PEKERJAAN GEDUNG
A. PEKERJAAN STRUKTUR BAWAH (TANAH & PONDASI)
1. Galian Tanah Pondasi 6.35 m3 137,500.00 872,437.50
###
2. Pasir Urug Bawah Pondasi 1.10 m3 319,000.00 350,900.00
###
3. Urugan Kembali Galian pondasi 1.59 m3 99,000.00 157,038.75
###
4. Urugan Tanah Dibawah Lantai 8.12 m3 155,100.00 1,259,412.00
5. Urugan Pasir Bawah Lantai 2.11 m3 319,000.00 673,090.00
###
6. Pemasangan 1 m3 pondasi batu belah campuran 1SP:4PP 7.87 m3 1,071,779.50 8,434,904.67
###
11,747,782.92
B. PEKERJAAN STRUKTUR TENGAH (SLOOF, KOLOM DAN BALOK )
1. Sloof Type 1 Uk. 150x200 mm
- Bekisting 2 x Pakai 14.52 m2 231,990.00 3,368,494.80
- Besi Beton 124.04 kg 16,789.58 2,082,578.88
- Beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61 1.04 m3 1,369,393.98 1,424,169.74
2. Kolom Teras Uk. 150x250mm
- Bekisting 2 x Pakai 5.04 m2 344,781.25 1,737,697.50
- Besi Beton 30.08 kg 16,789.58 505,030.42
- Beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61 0.24 m3 1,369,393.98 328,654.55
3. Kolom Praktis ( Kp) ( UK. 12 X 12 )
- Bekisting 2 x Pakai 25.22 m2 344,781.25 8,696,762.25
- Besi Beton 142.11 kg 16,789.58 2,385,966.50
- Beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61 0.76 m3 1,369,393.98 1,040,739.42
4. Ringbalok (UK. 120 x 150)
- Bekisting 2 x Pakai 10.17 m2 350,556.25 3,563,895.06
- Besi Beton 142.80 kg 16,789.58 2,397,551.31
###
- Beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61 0.75 m3 1,369,393.98 1,027,045.48
###
28,558,585.92
C. PEKERJAAN DINDING & PLESTERAN
1. Dinding Tembok Tebal 1/2 Bata (1:4) 68.43 m2 162,151.00 11,095,992.93
2. Dinding Tembok Tebal 1/2 Bata (1:3) 8.77 m2 166,037.08 1,456,145.19
12,552,138.12
D. PEKERJAAN LANTAI
2. Pek. Plat Lantai Teras
- Bekisting 7.88 m2 399,781.25 3,150,276.25
- Besi Beton 70.16 kg 16,789.58 1,177,956.58
- Beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61 0.79 m3 1,369,393.98 1,079,082.45
5,407,315.29
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOL. SAT. Tenaga
(Rp.) (Rp.)
I PEKERJAAN PERSIAPAN
E. PEKERJAAN PINTU & JENDELA
1. Pek. Pintu Type P1 1.00 Unit
- Pembuatan dan Pemasangan 1 M3 Kusen Kayu Kelas II 0.04 m3 9,934,925.00 402,364.46
2. Pek. Pintu Type P2 1.00 Unit
- Pembuatan dan Pemasangan 1 M3 Kusen Kayu Kelas II 0.03 m3 9,934,925.00 331,578.12
3. Pek. Jendela 1.00 Unit
- Pembuatan dan Pemasangan 1 M3 Kusen Kayu Kelas II 0.03 m3 9,934,925.00 298,047.75
4. Pek. Ventilasi 3.00 Unit ###
- Pembuatan dan Pemasangan 1 M3 Kusen Kayu Kelas II 0.06 m3 9,934,925.00 596,095.50
1,628,085.83

F PEKERJAAN PLAMBING
1 Pemasangan 1 buah closet Jongkok Porselen 1.00 Bh 701,404.00 701,404.00
2 Pek. Kran Air 3/4 1.00 Bh 54,257.50 54,257.50
3 Pek. Pipa Air Bersih 3/4" 17.00 m' 37,610.02 639,370.32
4 Pek. Pipa Air Kotor PVC 3" 17.00 m' 71,875.00 1,221,875.00
5 Pek. Septic Tank 1.00 Unit 2,500,000.00 2,500,000.00
5,116,906.82
I PEKERJAAN ATAP DAN PENUTUP ATAP
1. Pek. Kuda-Kuda Kayu kls. II 0.59 m3 8,716,455.00 5,142,708.45
2. Pek. Gording Kayu kls. II 0.68 m3 8,418,025.00 5,744,460.26
3. Pek. Pasangan Atap Spandek 85.61 m2 137,676.00 11,786,442.36
4. Pek. Nok Atap Seng 24.78 m' 65,917.50 1,633,435.65
24,307,046.72
III PEK. AKHIR DAN FINISHING
1 Pek. Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00
JUMLAH 250,000.00
JUMLAH TOTAL 93,181,861.61

Poleang, ….Agustus 2020

Mengetahui / Menyetuhjui Oleh :


Pejabat Pembuat Komitmen (PPK)
Camat Poleang

SYUKRI. HS, S.Ip


Nip. 19660214 200604 1 001
A. PEKERJAAN PONDASI POERPLAT

1 Galian Tanah Pondasi Poer Plat 14.40 M3 PONDASI POER PLAT


J = 8 BH
P = 1.00 M
L = 1.00 M
T = 1.80 M
V = P X T X LX J
V = 1.00 X 1.00 X 1.80 X 8.00
= 14.40 M3

2 Pasir Urug Bawah Pondasi 0.40 M3 PONDASI POER PLAT


J = 8 BH
P = 1.00 M
L = 1.00 M
T = 0.05 M
V = P X T X LX J
V = 1.00 X 1.00 X 0.05 X 8.00
= 0.40 M3

3 Urugan Kembali Galian 3.60 M3 V = 14.40 M3


V = 1/4 x V
= 3.60 M3

4 Urugan Pasir Dibawah Lantai 3.44 M3 L = 49.12 M2


T = 0.07 M
V = LXT
V = 49.12 X 0.07
= 3.44 M3

5 Urugan Tanah Dibawah Lantai 44.20 M3 L = 49.12 M2


T = 1.20 M
V = LXT
V = 49.12 X 1.20
= 58.94 M3

6 Lantai Kerja Pondasi Poer; t = 5 cm (f'c=7.4 Mpa (K100) 0.40 M3 PONDASI POER PLAT UTUH
J.P = 8.00 M
P = 1.00 M
L = 1.00 M
T = 0.05 M
V = J.P X P X T X L
V = 8.00 X 1.00 X 1.00 X 0.05
= 0.40 M3

7 Pondasi Poer Bekisting 1 Buah Poer Plat

Jumlah = 8.000 bh

Jumlah = 8.000
- Pek. Bekisting 6.00 M2 Keliling = 4.000 M
Tebal = 0.250 M
V = Keliling x Tebal
= 8.000 M2

- Pek. Pembesian 256.58 Kg besi jmlh p berat/m berat.ttl SAT


B 12 8 2.258 0.888 16.036 Kg
B 12 8 2.258 0.888 16.036 Kg

32.073 Kg
32.07 x 8.00
- Pek. Beton 2.00 M3 = 256.58
jumlah = 8.000 bh
P = 1.000 m
L = 1.000 m
T = 0.250 m
V = PXLXT
V = 8.000 X 1.000 X 1.000 X 0.25
V = 2.000 M3

8 Pondasi Batu Kali 29.70 M3 l atas = 0.30 m


l bawah = 0.80 m
T = 1.20 m
P tot = 45.00 m
V Penampang = L atas + L bawah / 2 x tinggi
= 0.30 + 0.80 / 2.00 x 1.20
= 1.10 / 2.00 x 1.20
= 0.55 x 1.20
= 0.66 m2
V tot = V Penampang x P tot
= 29.70 M3

9 Aanstamping 9.00 M3 l = 1.00 m


T = 0.20 m
P tot = 45.00 m
V Penampang = L x tinggi
= 1.00 x 0.20
= 0.20 m2
V tot = V Penampang x P tot
= 9.00 M3

10 Pondasi Tangga Bekisting 1 Buah Poer Plat

Jumlah = 1.000 bh

- Pek. Bekisting 4.99 M2 Str 1


p = 1.20 m
l = 0.78 m
t = 0.25 m
V =
= 0.30 + 0.19
= 0.49 x 2.00
= 0.99 m2

Str 2
p = 1.00 m
l = 0.25 m
t = 1.60 m
V =
= 1.60 + 0.40
= 2.00 x 2.00
= 4.00 m2

V tot = 4.99 m2

- Pek. Pembesian 85.64 Kg besi jmlh p berat/m berat.ttl SAT


B 12 7 4.760 0.888 29.580 Kg
B 12 12 2.390 0.888 25.461 Kg
B 12 1 16.630 0.888 14.763 Kg
B 12 1 17.840 0.888 15.838 Kg

85.642 Kg
85.64 x 1.00
- Pek. Beton 0.63 M3 = 85.64
Str 1 = 1.000 bh
P = 1.200 m
L = 0.775 m
T = 0.250 m
V = PXLXT
V = 1.000 X 1.200 X 0.775 X 0.25
V = 0.233 M3

Str 2 = 1.000 bh
P = 1.000 m
L = 0.250 m
T = 1.600 m
V = PXLXT
V = 1.000 X 1.000 X 0.250 X 1.60
V = 0.400 M3

V tot = 0.63 m3

B. PEKERJAAN STRUKTUR TENGAH (SLOOF, KOLOM DAN BALOK)

1 Sloof (UK. 20 x 40)

- Bekisting 35.25 M2 P = 47.00 M


L = 1 M
v = PXL
v = 47.00 x 1.00
V = 47.00 M2

- Pembesian 458.43 KG
besi Jml p berat/m berat.ttl SAT
B12 7.000 49.40 0.888 306.987 Kg
B10 2 49.40 0.617 60.910 Kg
Beugel 314 0.73 0.395 90.537 Kg
458.43 Kg

- Pek. Beton 3.76 M3


P = 47.00
L = 0.20 m
T = 0.40 m
V = PXLXT
V = 47.00 X 0.20 X 0.40
= 3.76 M3

2 Kolom Pedestal (UK. 30 X 30)

- Bekisting 17.28 M2 P = 14.40 M


L = 1.20 M
v = PXL
v = 14.40 x 1.20
V = 17.28 M2

- Pembesian 125.39 KG
besi Jml p berat/m berat.ttl SAT
B12 8 14.40 0.888 102.270 Kg
Beugel 97 0.60 0.395 23.116 Kg
125.39 Kg

- Pek. Beton 1.30 M3


P = 14.40
L = 0.30 m
T = 0.30 m
V = PXLXT
V = 14.40 X 0.30 X 0.30
= 1.30 M3

3 Balok Pelat (UK. 20 x 40)

- Bekisting 47.00 M2 P = 47.00 M


L = 1 M
v = PXL
v = 47.00 x 1.00
V = 47.00 M2

- Pembesian 370.72 KG
besi Jml p berat/m berat.ttl SAT
B12 5.000 49.40 0.888 219.277 Kg
B10 2.000 49.40 0.617 60.910 Kg
Beugel 314.333 0.73 0.395 90.537 Kg
370.72 Kg

- Pek. Beton 3.76 M3


P = 47.00
L = 0.20 m
T = 0.40 m
V = PXLXT
V = 47.00 X 0.20 X 0.40
= 3.76 M3

4 Kolom Utama (UK. 30 X 30)

- Bekisting 28.80 M2 P = 24.00 M


L = 1.20 M
v = PXL
v = 24.00 x 1.20
V = 28.80 M2

- Pembesian 305.22 KG
besi Jml p berat/m berat.ttl SAT
B12 12 24.00 0.888 255.675 Kg
Beugel 161 0.78 0.395 49.549 Kg
305.22 Kg

- Pek. Beton 2.16 M3


P = 24.00
L = 0.30 m
T = 0.30 m
V = PXLXT
V = 24.00 X 0.30 X 0.30
= 2.16 M3

5 Kolom Type 2 (UK. 25 X 25)

- Bekisting 24.00 M2 P = 24.00 M


L = 1.00 M
v = PXL
v = 24.00 x 1.00
V = 24.00 M2

- Pembesian 230.16 KG
besi Jml p berat/m berat.ttl SAT
B12 8 24.00 0.888 170.450 Kg
Beugel 161 0.94 0.395 59.713 Kg
230.16 Kg

- Pek. Beton 1.50 M3


P = 24.00
L = 0.25 m
T = 0.25 m
V = PXLXT
V = 24.00 X 0.25 X 0.25
= 1.50 M3

6 Kolom Praktis ( Kp) ( UK. 12 X 12 )

- Bekisting 10.80 M2 P = 45.00 M


L = 0.24 M
v = PXL
v = 45.00 x 0.24
V = 10.80 M2

- Pembesian 165.60 KG
besi Jml p berat/m berat.ttl SAT
B12 4 45.00 0.617 110.970 Kg
Beugel 301 0.46 0.395 54.631 Kg
165.60 Kg

- Pek. Beton 0.65 M3


P = 45.00
L = 0.12 m
T = 0.12 m
V = PXLXT
V = 45.00 X 0.12 X 0.12
= 0.65 M3

7 Balok Latey (UK.12 X 15) 12


2 Ø10

Ø8 - 15
15

2 Ø10

- Bekisting 0.51 M2 P = 37.90 M


L = 0.02 M
v = PXL
v = 37.90 x 0.02
V = 0.68 M2

- Pembesian 143.54 KG
besi Jml p berat/m berat.ttl SAT

B10 4 37.90 0.617 93.487 Kg


Beugel 254 0.50 0.395 50.057 Kg
143.54 Kg

- Pek. Beton 0.682 M3


P = 37.90
L = 0.120 m
T = 0.15 m
V = PXLXT
V = 37.90 X 0.12 X 0.15
= 0.682 M3

7 Ringbalk (UK.12 X 15)

- Bekisting 19.86 M2 P = 73.55 M


L = 0.15 M
T = 0.12 M
v = PXL
v = 73.55 x 0.27
V = 19.86 M2

- Pembesian 596.24 KG
besi Jml p berat/m berat.ttl SAT

B10 4 73.55 0.617 181.374 Kg


Beugel 491 2.14 0.395 414.861 Kg
596.24 Kg

- Pek. Beton 1.324 M3


P = 73.55
L = 0.12 m
T = 0.15 m
V = PXLXT
V = 73.55 X 0.12 X 0.15
= 1.324 M3

C PEKERJAAN DINDING DAN PLASTERAN

1 PEK. DINDING BATA 1 PC ; 5 PSR 168.16 M2


DINDING TINGGI 1 M DINDING TINGGI 2,5 M
P = 14.10 M P = 14.10 M
T = 1.00 M T = 2.50 M
V = PXT V = PXT
= 14.10 X 1.00 = 14.10 X 2.50
= 14.10 M2 = 35.25 M2

DINDING TINGGI 2.85 M


P = 49.40 M
T = 2.85 M
V = PXT
= 49.40 X 2.85
= 140.79 M2

VOLUME BUKAAN KUSEN


P1 = 0.90 X 2.25 X 3.00 = 6.08 M2
J1 = 0.95 X 1.85 X 3.00 = 5.27 M2
J2 = 1.85 X 1.70 X 3.00 = 9.44 M2
V2 = 0.20 X 0.20 X 30.00 = 1.20 M2
21.98 M2

TOTAL = 14.10 + 35.25 + 140.79 - 21.98


= 168.16 M2

2 PEK. DINDING BATA 1 PC ; 3 PSR 5.64 M2 TRASRAM KM/WC


P = 14.10 M 6.35
T = 0.30 M
V = PXT
= 14.10 X 0.30
= 4.23 M2

TRASRAM KELILING BANGUNAN


P = 4.70 M
T = 0.30 M
V = PXT
= 4.70 X 0.30
= 1.41 M2

TOTAL = 4.23 + 1.41


= 5.64 M2

3 Plesteran Biasa (1:5) 347.38 M2 11.07

4 Plesteran (1:3) 11.28 M2

5 Plasteran beton 26.64 M2 K 30x30 = 1.20 - 0.30


= 0.36 x 8.00
= 2.88 x 3.00
= 8.64 M2

K25x25 = 1.00 - 0.30


= 0.30 x 8.00
= 2.40 x 3.00
= 7.20 M2

K12x12 = 0.30
= 0.30 x 8.00
= 2.40 x 3.00
= 7.20 M2

= 0.15
= 0.15 x 8.00
= 1.20 x 3.00
= 3.60 M2

V Tot = 26.64 M2

D PEKERJAAN LANTAI

1 Pek. Rabat Beton Lantai 2.46 M3 LUAS = 49.12 M2


T = 0.05 M
V = LXT
= 49.12 X 0.05
= 2.46 M3

2 Pek. Urugan Pasir 3.44 M3 LUAS = 49.12 M2


T = 0.07 M
V = LXT
= 49.12 X 0.07
= 3.44 M3

3 Pek.Plat Lantai , T = 12 cm
- Bekisting 75.00 M2 L = 75.00 M
5.00 M
15.00 M

V = 75.00 M2

Berat besi dalam 1 Poer Plat


- Pembesian 1,233.33 KG Berat Besi
besi Jml p berat/m berat.ttl SAT
B10 13 1.00 0.617 8.222 Kg
B10 13 1.00 0.617 8.222 Kg

16.44 Kg

v = P.TTL X BERAT/M
= 75.00 x 16.444
= 1,233.33 kg
- Pek. Beton 9.38 M3
P = 75.00
L = 0.13 m
V = Luas x T
V = 75.00 X 0.13
= 9.38 M3

4 Lantai Keramik 40x40 98.77 M2

5 Lantai Keramik 20x20 (KM/WC) 5.77 M2

6 Dinding Keramik 20x40 (KM/WC) 10.80 M2 Kamar Mandi


P = 3.00 m
T = 1.20 m
jmlh = 3.00 bh
V = P X L X Jmlh
= 3.00 X 1.20 X 3.00
= 10.80 m2

E PEKERJAAN KUSEN, PINTU/JENDELA

1 Pek. Pintu Type P1

- Kusen Pintu Kayu Kelas II 3.00 Bh


0.12 m3 P = 5.60 m
L = 0.06 m
T = 0.12 m
V = PXLXT
= 5.60 X 0.06 X 0.12
= 0.04 m2 x 3.00
= 0.12 M3

- Pek. Daun Pintu Panil Jati 3 cm 0.41 M2 P = 2.21 m


L = 0.82 m
V = PXL
= 2.21 X 0.82
= 1.81 m2
= 1.81 - 1.68 ( Ventilasi )
= 0.14 m2

- Engsel Pintu 9.00 Bh

- Kunci Pintu 3.00 Bh

- Kaca Tebal 5mm ( Ventilasi ) 1.68 m2 P = 1.27 m


L = 0.22 m
V = PXL
= 1.27 X 0.22
= 0.56 m2

2 Pek. Pintu Type P2 3.00 bh

- Kusen Pintu Kayu Jati 0.09 m3 P = 4.50 m


L = 0.14 m
T = 0.05 m
V = PXLXT
= 4.50 X 0.14 X 0.05
= 0.03 m2 x 3.00
= 0.09 M3

- Pek. Daun Pintu Panil Jati 3 cm 3.27 M2 P = 1.76 m


L = 0.62 m
V = PXL
= 1.76 X 0.62
= 1.09 m2

- Engsel Pintu 9.00 Bh

- Kunci Pintu 3.00 Bh

3 Pek. Jendela Type 1 3.00 Bh

#REF! 0.24 m3 P = 11.20 m


Luas Pen.g Balok = 0.01
jumlah = 11.20 X 0.01 x 3.00
Total Volume = 0.24

- Pek. Kaca Tebal 5 MM 5.55 M2 P = 1.55 m


L = 0.30 m
V = PXL
= 1.55 X 0.30
= 0.47 m2
= 0.47 x 2.00 x 3.00
Total Volume = 2.79 m2

P = 1.77 m
L = 0.52 m
V = PXL
= 1.77 X 0.52
= 0.92 m2
= 0.92 x 3.00 x 1.00
Total Volume = 2.76 m2

- Pek. Daun Jendela Panil Jati 3 cm 2.73 M2 P = 1.77 m


L = 0.52 m
V = PXL
= 1.77 X 0.52 x 2.00
= 0.92 m2
= 1.84 x 3.00
= 5.52 m2
= 2.73 m2

- Engsel Jendela 12.00 Bh

4 Pek. Jendela Type 2 3.00 Bh

#REF! 0.17 m3 P = 7.85 m


Luas Pen.g Balok = 0.01
jumlah = 7.85 X 0.01 x 3.00
Total Volume = 0.17

- Pek. Kaca Tebal 5 MM 1.84 M2 P = 1.53 m


L = 0.20 m
V = PXL
= 1.53 X 0.20
= 0.31 m2
= 0.31 x 2.00 x 3.00
Total Volume = 1.84 m2

- Pek. Daun Jendela Panil Jati 3 cm 0.89 M2 P = 1.77 m


L = 0.42 m
V = PXL
= 1.77 X 0.42 x 2.00
= 0.74 m2
= 1.49 x 1.84
= 2.73 m2
= 0.89 m2

- Engsel Jendela 12.00 Bh

5 Pek. Jendela Type 3 2.00 Bh

#REF! 0.08 m3 P = 5.60 m


Luas Pen.g Balok = 0.01
jumlah = 5.60 X 0.01 x 2.00
Total Volume = 0.08

- Pek. Kaca Tebal 5 MM 2.01 M2 P = 0.96 m


L = 0.52 m
V = PXL
= 0.96 X 0.52
= 0.50 m2
= 0.50 x 2.00 x 2.00
Total Volume = 2.01 m2

- Pek. Daun Jendela Panil Jati 3 cm 1.06 M2 P = 1.12 m


L = 0.68 m
V = PXL
= 1.12 X 0.68 x 2.00
= 0.76 m2
= 1.53 x 2.01
= 3.07 m2
= 1.06 m2

F PEKERJAAN PLAMBING

Pek. Klosed Duduk Ex. Toto + Pelengkap 3.00 Bh

Pek. Kran Air 3/4 7.00 Bh

Pek. Pipa Air Bersih 3/4" 21.00 m

Pek. Pipa Air Kotor PVC 3" 12.00 m

Pek. Septic Tank + Bak Resapan 1.00 Unit

G PEKERJAAN PENGECATAN

1 Pengecatan Tembok 385.30 m2 Pengecetan Tembok


Plasteran Tembok 1:5 = 347.38 m2
Dinding 1 : 3 = 11.28 m2
Plasteran Beton = 26.64 m2
385.30 m2
2 Pengecatan Plafond 143.10 m2 Luas Lt 1 = 46.00
Luas Lt 2 = 97.10

3 Pek. Cat Kilap Daun Pintu Dan Ventilasi 15.71 m2 Type Pintu Dan Jendela
P1 = 0.81 m2
P2 = 2.18 m2
J1 = 10.93 m2
J2 = 1.79 m2
J3 = 2.13 m3
15.71 m2

H PEKERJAAN ATAP

1 Pek. Kuda - Kuda 4.00 bh


218,36
145,35

100
332,17

500

- Balok Nok 8/12 0.10 m3


JUMLAH = 1.00
P = 10.00
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 1.00 x 10.00 x 0.01
= 0.10 m3

- Gording 6/12 1.21 m3


JUMLAH = 1.00
P = 167.47
L Penampang = 0.007
V = Jumlah X P X L Penampang
= 1.00 x 167.47 x 0.01
= 1.21 m3

- Balok Sokong 6/12 1.25


JUMLAH = 6.00
P = 29.00
L Penampang = 0.007
V = Jumlah X P X L Penampang
= 6.00 x 29.00 x 0.01
= 1.25 m3

Total Volume Balok 2.55 m3

- Kaki Kuda - Kuda 8/12 0.38 m3


JUMLAH = 5.00
P = 7.96
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 5.00 x 7.96 x 0.01
= 0.38 m3

- Tiang Raja 8/12 0.13 m3


JUMLAH = 6.00
P = 2.18
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 6.00 x 2.18 x 0.01
= 0.13 m3

- Balok Pengunci 8/12 0.03 m3


JUMLAH = 4.00
P = 0.80
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 4.00 x 0.80 x 0.01
= 0.03 m3

- Balok Sokong 8/12 0.16 m3


JUMLAH = 5.00
P = 3.30
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 5.00 x 3.30 x 0.01
= 0.16 m3

- Balok Gapit 6/12 0.10 m3


JUMLAH = 5.00
P = 2.90
L Penampang = 0.007
V = Jumlah X P X L Penampang
= 5.00 x 2.90 x 0.01
= 0.10 m3

- Balok Tarik 8/12 0.32 m3


JUMLAH = 5.00
P = 6.64
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 5.00 x 6.64 x 0.01
= 0.32 m3

Total Volume Balok 1.12 m3

2 Pek. Pasangan Atap Metal 149.00 M2 Luas Atap utama = 149.00 M2

1715
436,43

357,5

1000
715

715

436,43 436,43
1000
436,43

357,5 357,5
1715

Luas Atap Kanopi = - M2


Total Luas Atap = 149.00 M2

3 Pek. Nok Atap Seng 30.22 m'

I PEKERJAAN TANGGA

1 - Bekisting 10.62 M2 Jumlah Step = 16.00


T.upt = 0.18 M
Lebar Tangga = 1.00 M
= 0.18 M

Miring = 0.33 M
T.Bek. Samp = 0.25 M
= 0.16 M

Dasar = 0.33 M

V Bekisting/Tangga = 0.66 M
V Total = 10.62 M

Panjang As Tangga = 2.19 + 3.42


= 5.61 M

- Pembesian 219.05 KG
besi Jml p berat/m berat.ttl SAT

2D10 Tengah H 16 5.61 0.617 55.337 Kg


2D10 Tengah V 90 1.00 0.617 55.337 Kg
Anak Tangga
H 144 0.64 0.617 57.083 Kg
V 83 1.00 0.617 51.293 Kg

219.05 Kg

- Pek. Beton 0.572 M3


Up = 0.18 M
Antr = 0.28 M
T = 0.05 M
Tot Luas Tanjakan = 0.05 M
Pijakkan
Tebal = 0.10 M
Pjg = 0.33 M
= 0.033 M

V Tot = 0.05 + 0.03 x 16.00


= 0.57

J PEK. PLAFOND

1 Pek. Rangka Plafond Besi Holow modul 60 x 120cm 143.10 M2


L Lt 1 = 46.00 m2 By BIM

L Lt 2 = 97.10 m2 By BIM
Kamar = 49.26 m2
Km = 5.46 m2
Area Overstek = 42.38 m2

L tot = 143.10 m2 By BIM

2 Pek. Lapis Plafond GRC Board t = 4,5 mm 75.00 M2

3 Pek. List Plafond Gipsum Board 60.44 m'

K PEKERJAAN TERAS

1 Galian Tanah Pondasi Teras - M3


P = - M
L penamp. galian = 0.34 M
V = P X Luas Penampang Galian
V = - X 0.34
= - M3

2 Pasir Urug Bawah Pondasi - M3


P = - M
L = 0.45 M
T = 0.07 M
V = P X T X LX J
V = - X 0.45 X 0.07
= - M3

3 Urugan Kembali Galian - M3


P = - M
L penamp. galian = 0.09 M
V = P X Luas Penampang Galian
V = - X 0.09
= - M3

4 Urugan Pasir Dibawah Lantai - M3


P = - M
L penamp. Urugan = 0.16 M2
V = P X Luas Penampang Urugan
V = - X 0.16
= - M3

5 Urugan Tanah Dibawah Lantai - M3 p = - M2


luas = 0.27
V = - X 0.27
= - M3

6 Pemasangan batu kosong (anstamping) - M3


P = - M
L = 0.45 M2
T = 0.15 M
V = PXTXL
V = - X 0.45 X 0.15
= - M3

7 Pondasi Batu Gunung (1:3) - M3


P = - M
L = 0.15 m2
V = PxL
= - x 0.15
= - m3

8 Pek. Lantai Rabat Beton - M3


P = - M
L = 0.19 m2
V = PxL
= - x 0.19
= - m3

J PEKERJAAN LAIN - LAIN

1 Pek. Saluran Keliling Bangunan

- Galian Tanah 2.09 M3


P = 32.50 M
L = 0.06 m2
V = PxL
= 32.50 x 0.06
= 2.09 m3

- Urugan Pasir 1.18 M3


P = 32.50 M
L = 0.04 m2
V = PxL
= 32.50 x 0.04
= 1.18 m3

- Pek. Lantai Rabat Beton 0.46 M3


P = 32.50 M
L = 0.01 m2
V = PxL
= 32.50 x 0.01
= 0.46 m3

- Pek. Dinding Saluran Pas. Bata 1 Pc : 5 Psr 2.22 M3


P = 32.50 M
L = 0.07 m2
V = PxL
= 32.50 x 0.07
= 2.22 m3

- Pek. Acian dengan semen kental 0.33 m2


P = 32.50 M
L = 0.01 m2
V = PxL
= 32.50 x 0.01
= 0.33 m3

Pek. Pipa Pembuangan Air Hujan Dari Talang Beton

Ke saluran Keliling Bangunan

- Pipa Dia. 3"

- Sambungan Knee 3"

Pek. Pembersihan Lokasi

L PEKERJAAN LAIN - LAIN

2 Pek. Rangka Atap Kanopi Teras

#REF! 22.80 #REF! - KUDA - KUDA 1 = 10.55 M1


- KUDA - KUDA 2 = 8.58 M1
- KUDA - KUDA 3 = 9.36 M1
PANJANG TOTAL = 28.50 M1

- Dynabold 8.00 bh
3
Pek. Pasangan Atap Metal 10.80 M2
M

2
DAFTAR HARGA SATUAN PEKERJAAN
HARGA SATUAN
KODE URAIAN PEKERJAAN (Rp.)

A.2.3.1. HARGA SATUAN PEKERJAAN TANAH DAN PASIR

A. 2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m 137,500.00


A. 2.3.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m 168,300.00
A. 2.3.1.4 Penggalian 1 m3 tanah keras sedalam 1 m 183,040.00
A. 2.3.1.6 Menggali 1 m3 tanah lumpur sedalam 1 m 310,200.00
A. 2.3.1.9 Pengurugan kembali 1 m3 galian tanah 99,000.00
A. 2.3.1.11 Pengurugan 1 m3 pasir urug 319,000.00
A. 2.3.1.14 Pengurugan 1 m3 Sirtu Padat 155,100.00

A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

A. 3.2.1.1 Pemasangan 1 m3 pondasi batu belah campuran 1SP:3PP 1,125,855.50


A. 3.2.1.2 Pemasangan 1 m3 pondasi batu belah campuran 1SP:4PP 1,071,779.50
A. 3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP:5PP 1,034,291.50
A. 3.2.1.9 Pemasangan 1 m3 batu kosong (anstamping) 583,357.50

A.4.1.1. HARGA SATUAN PEKERJAAN BETON


BETON
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c=7.4 Mpa (K100), Slump (3-6) cm, w/c=0.87 1,099,264.95
A.4.1.1.5 Membuat 1 m3 beton mutu f'c=14.5 Mpa (K175), Slump (12±2) cm, w/c=0.66 1,332,160.22
A.4.1.1.6 Membuat 1 m3 beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61 1,369,393.98
A.4.1.1.7 Membuat 1 m3 beton mutu f'c=19.3 Mpa (K225), Slump (12±2) cm, w/c=0.58 1,399,159.43
A.4.1.1.8 Membuat 1 m3 beton mutu f'c=21.7 Mpa (K250), Slump (12±2) cm, w/c=0.56 1,416,380.99
A.4.1.1.9 Membuat 1 m3 beton mutu f'c=24.0 Mpa (K275), Slump (12±2) cm, w/c=0.53 1,446,027.02
A.4.1.1.10 Membuat 1 m3 beton mutu f'c=26.4 Mpa (K300), Slump (12±2) cm, w/c=0.52 1,455,126.35
PEMBESIAN
A.4.1.1.17 Pembesian 10 Kg dengan besi polos atau besi ulir 16,789.58
BEKISTING
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi 223,740.00
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof 231,990.00
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom 344,781.25
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok 350,556.25
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai 399,781.25
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga 326,906.25

A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.11 Pemasangan 1 m kusen pintu aluminium 118,934.75


Lumpsum Pembuatan 1M' Railing Tangga 750,000.00
Lumpsum Pembuatan 1 Unit Tex Depan 7,500,000.00
Anl Pemasangan 1M2 Pas. Aluminium Composite ( Seven) 1,199,636.90
Anl Pemasangan 1 m pintu besi plat baja tebal 2 mm rangkap, rangka besi hollow 40.40.2 604,865.80
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½batu campuran 1SP:3PP 166,037.08
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½batu campuran 1SP:4PP 162,151.00

A.4.4.2. HARGA SATUAN PEKERJAAN PENUTUP PLESTERAN

A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP:3PP tebal 15 mm 104,414.68


A.4.4.2.4 Pemasangan 1 m2 plesteran 1SP:4PP tebal 15 mm 102,201.66
A.4.4.2.27 Pemasangan 1 m2 acian 63,173.00

A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

LANTAI
Anl. Tambahan Pemasangan 1 m2 lantai Keramik ukuran 40cm x 40cm 142,678.07
Anl. Tambahan Pemasangan 1 m2 lantai Keramik ukuran 40 cm x 40 cm Anti Slip 188,219.90
Anl. Tambahan Pemasangan 1 m2 dinding Keramik ukuran 20 cm x 40 cm 294,649.30
Anl. Tambahan 1 m2 Lantai Beton Sikat 380,000.00
Anl. Tambahan 1 m2 Lantai Penyandang Cacat 750,000.00
Anl. Tambahan Loster 20 /40 27,000.00

A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, plafond 178,997.50
Anl. Tambahan Pemasangan 1 m2 rangka kayu balok 5/7 modul 60 x 60 cm, plafond 186,532.50
A.4.5.1.7 Pemasangan 1 m2 langit-langit Kalsi Board Tebal 4.5 mm 96,361.10
A.4.5.1.9 Pemasangan 1 m' list langit-langit Multipleks Tebal 10 mm Uk. 1 x 5 cm 24,520.38

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

Anl. Tambahan Pemasangan 1 m3 Konstruksi Gording, kayu kelas II 8,418,025.00


Anl. Tambahan Pemasangan 1 m3 Konstruksi kuda-kuda expose, kayu kelas II 8,716,455.00
Anl. Tambahan Pemasangan 1 m2 Atap Seng Gelombang 69,395.70
Anl. Tambahan Pemasangan 1 m2 Atap Spandek 137,676.00
Anl. Tambahan Pemasangan 1 m' Nok Atap Seng 65,917.50

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

Lumpsum Pintu Depan 1 Set 3,500,000.00


A.4.6.1.1 Pembuatan dan Pemasangan 1 M3 Kusen Kayu Kelas II 9,934,925.00
A.4.6.1.5 Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel Jati t = 3 cm 994,400.00
A.4.6.1.6 Pembuatan dan Pemasangan 1 M2 Bingkai Jendela, Ventilasi t = 3 cm 757,790.00

A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2 Pemasangan 1 buah kunci tanam 2x putar antik 426,030.00


A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi 410,795.00
A.4.6.2.5 Pemasangan 1 buah engsel pintu 86,553.50
Anl. Tambahan Grendel Pintu 55,753.50
A.4.6.2.6 Pemasangan 1 buah engsel jendela 64,625.00
Anl. Tambahan Grendel jendela 42,608.50
A.4.6.2.9 Pemasangan 1 buah kait angin 59,053.50
A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm 144,193.50
A.4.6.2.17 Pemasangan 1 m2 kaca Akrilik 522,350.60

A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.4 Pengecatan 1 m2 Pengecatan Bidang Kayu Baru 70,279.29


A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasat, 2 lapis cat penutup) 36,156.81
A.4.7.1.16 Pengecatan 1 m2 permukaan baja dengan menie besi 51,645.00
A.5.1.1. HARGA SATUAN PEKERJAAN PLAMBING

A.5.1.1.1 Pemasangan 1 buah closet duduk/ monoblock' 1,628,165.00


A.5.1.1.2 Pemasangan 1 buah closet Jongkok Porselen 701,404.00
A.5.1.1.5 Pemasangan 1 buah wastafel 6,547,409.00
Anl. Tambahan Kran Air 54,257.50
Anl. Tambahan Kran Wastafel 2,300,897.50
A.5.1.1.14 Pemasangan 1 buah floor drain 55,110.00
A.5.1.1.25 Pemasangan 1 m' pipa PVC tipe AW diameter ½" 33,350.13
A.5.1.1.26 Pemasangan 1 m' pipa PVC tipe AW diameter ¾" 37,610.02
A.5.1.1.27 Pemasangan 1 m' pipa PVC tipe AW diameter 1" 44,000.59
A.5.1.1.28 Pemasangan 1 m' pipa PVC tipe AW diameter 1½" 83,097.78
A.5.1.1.29 Pemasangan 1 m' pipa PVC tipe AW diameter 2" 84,105.04
A.5.1.1.31 Pemasangan 1 m' pipa PVC tipe AW diameter 3" 149,476.94
Lumpsum Pemasangan 1 Bh Septic tank dan Bak Resapan 5,000,000.00
DAFTAR HARGA UPAH, BAHAN DAN ALAT
TAHUN 2019

I. UPAH KERJA
HARGA HARGA UPAH/JAM
No. NAMA TENAGA KERJA SATUAN
UPAH/HARI KERJA KERJA
sk B
- Pekerja Org/Hr Rp 160,000.00 22,857.14###
- Tukang Org/Hr Rp 170,000.00 24,285.71###
- Kepala Tukang Org/Hr Rp 175,000.00 25,000.00###
- Mandor Org/Hr Rp 200,000.00 28,571.43###

II. HARGA BAHAN


No. NAMA BAHAN SATUAN HARGA BAHAN KETERANGAN

A BAHAN DASAR
###
- Tanah Timbunan Pilihan M3 Rp 80,000.00 Lokasi Pekerjaan ###
- Tanah Urug Biasa M3 Rp 80,000.00 Lokasi Pekerjaan ###
- Tanah Humus M3 Rp 97,000.00 Lokasi Pekerjaan ###
- Pasir urug M3 Rp 200,000.00 ###
- Pasir Pasangan M3 Rp 200,000.00 ###
- Pasir Beton M3 Rp 200,000.00 ###
- Portland Cement 50 Kg Zak Rp 72,000.00 ###
- Portland Cement Kg Rp 1,440.00 ###
- Semen Warna Kg Rp 1,500.00 ###
- Batu Belah (Batu Kali) M3 Rp 200,000.00 ###
- Batu Gunung M3 Rp 200,000.00 ###
- Split 2 - 3 cm M3 Rp 400,000.00 Pecah Manual ###
- Kerikil / Batu Telor M3 Rp 400,000.00 ###
- Batu Merah Buah Rp 750.00 ###

B BAHAN KAYU
###
- Balok Kayu Kelas I M3 Rp 4,000,000.00 ###
- Papan Kayu Kelas I M3 Rp 4,000,000.00 ###
- Kayu Kelas II Balok (Sejenis) M3 Rp 3,500,000.00 ###
- Kayu Kelas III Sejenis (Papan Bekisting) M3 Rp 3,000,000.00 ###
- Kayu Dolken dia 8 - 10/4 meter Btg Rp 25,000.00 ###

C BAHAN PENUTUP LANTAI DAN DINDING


###
- Tegel Keramik Kia 40 x 40 cm Buah Rp 13,333.33 ###
- Tegel Keramik Anti Slip, Uk. 40 x 40 cm Buah Rp 12,800.00 ###
- Tegel Keramik Anti Slip 20 x 20 cm Buah Rp 3,231.52 ###
- Tegel Keramik Dinding 20 x 40 cm Buah Rp 6,463.04 ###
- list Keramik Dinding 10 X 20 Buah Rp 26,833.00 ###

D BAHAN BESI / BAJA ###


- Besi Holow 40 x 40 cm t = 1,4 mm M' Rp 40,192.00 ###
- Besi Holow 40 x 20 cm t = 1,4 mm M' Rp 30,144.00
- Besi Kanal C 100.50.2,0 mm M' Rp 125,600.00
- Besi Plat 2 mm Kg Rp 10,500.00
- Hollow Galvalume 40 x 40 mm M' Rp 7,500.00
- Hollow Galvalume 20 x 40 mm M' Rp 6,250.00
- Besi Tulangan Beton U24 Kg Rp 11,815.00 ###
- Profil Alumiium M' Rp 75,000.00
- Kawat Beton/Bindrat Kg Rp 23,000.00 ###
- Kawat Las Kg Rp 66,700.00 ###
- Paku 1" s/d 3" Kg Rp 30,000.00 ###
- Paku Biasa 5-10 cm Kg Rp 25,000.00
- Paku Sekrup 3,5 " Kg Rp 138,000.00 ###
- Aluminium Composite Panel PE ( Setara Seven ) Lbr Rp 920,000.00 ###
- Baut Sekrup Bh Rp 500.00
- Rolling Door One Sheet, T=0,45 mm, Finishing Cat Oven/Coat Unit Rp 4,000,000.00
E BAHAN KACA, PENGGANTUNG / JENDELA / PINTU ###
- Kaca 5 mm M2 Rp 87,500.00 ###
- Kaca Akrilik 5 mm M2 Rp 403,117.44
- Engsel Pintu Pasang Rp 48,000.00 ###
- Engsel Jendela Pasang Rp 19,550.00 ###
- Grendel Pintu Pasang Rp 20,000.00 ###
- Grendel Jendela Pasang Rp 8,050.00 ###
- Hak Angin Besar Buah Rp 23,000.00 ###
- Kunci 2 slang silinder Utama Standar Buah Rp 290,950.00 ###
- Kunci KM Bulat Kualitas Biasa Buah Rp 278,300.00
- Silicon Tube Rp 83,000.00
- Ramset Nails Buah Rp 4,680.00 ###

F PENUTUP ATAP ###


- Atap Spandek Anoa Deck ,T= 0,25 dengan Cat m2 Rp 50,000.00 ###
- Nok Spandek Anoa Deck ,T= 0,25 dengan Cat m2 Rp 32,500.00 ###
- Kalsiplank Ukuran 3 m x 20 cm x 8 mm Lbr Rp 44,400.00 ###
- Seng Plat BJLS 28 Lebat 90 cm M' 68,000.00 ###

G BAHAN LANGIT-LANGIT ###


- Kalsiboard, t = 4.5 mm Lbr Rp 126,500.00 ###
- Gypsum Board 9 mm Lbr Rp 126,500.00 ###
- Profil Gypsum Type CE (Sedang) M' Rp 126,500.00 ###
- Tepung Gypsum Kg Rp 51,750.00 ###
- multipleks 6 mm Lbr Rp 103,500.00 ###
- List Profil Kayu Kelas II M' Rp 3,825.00

I BAHAN CAT ###


- Cat Tembok metroligh Kg Rp 42,780.00 ###
- Plamir Tembok Kg Rp 11,500.00 ###
- Cat Besi Kg Rp 63,250.00 ###
- Cat Meni Besi Kg Rp 57,500.00 ###
- Water Profing Kg Rp 63,250.00
- Seal Tape Buah Rp 15,000.00
- Kus Rol Buah Rp 70,653.00
- Kus 3" Buah Rp 19,626.00
- Kuas 1" Buah Rp 5,234.00
- Cat Meni Kayu Kg Rp 57,500.00
- Cat Kayu Glotex Kg Rp 57,500.00
- Plamur Kayu Kg Rp 57,500.00
- Amplas Lbr Rp 11,500.00
- Pengecer Kg Rp 31,050.00

J BAHAN SANITASI ###


- Kloset Duduk Buah Rp 690,000.00 ###
- Kloset Jongkok ex. Ina Buah Rp 145,000.00 ###
- Kran Air Buah Rp 27,600.00 ###
- Wastafel Ex. Toto Lengkap Buah Rp 2,070,000.00 ###
- Kran Wastafel Buah Rp 27,600.00 ###
- Floor Drain Buah Rp 28,750.00 ###
- Pipa Wafin PVC Dia 1/2" M' Rp 9,583.00 ###
- Pipa Wafin PVC Dia 3/4" M' Rp 12,458.00 ###
- Pipa Wafin PVC Dia 1" M' Rp 16,771.00 ###
- Pipa PVC Dia 2 " M' Rp 37,375.00 ###
- Pipa PVC Dia 3 " M' Rp 71,875.00
- Sambungan Knee 3 " M' Rp 25,000.00

K BAHAN JADI / LAIN - LAIN ###


- Minyak Bekisting Ltr Rp 25,000.00 ###
- Solar Ltr Rp 9,660.00 ###
- Minyak Pelumas/Oli Ltr Rp 53,577.00 ###
- Air Ltr Rp 78.75 ###
- Karosene / Minyak Bakar (Pertamina) Ltr Rp 12,926.00 ###
Filler Kg 1,000.00
ANALISA HARGA SATUAN
0%XD -
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c=7.4 Mpa (K100), Slump (3-6) cm, w/c=0.87
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 160,000.00 192,000.00
Tukang Batu L.02 OH 0.200 170,000.00 34,000.00
Kepala Tukang L.03 OH 0.020 175,000.00 3,500.00
Mandor L.04 OH 0.060 200,000.00 12,000.00
JUMLAH TENAGA KERJA 241,500.00
B BAHAN
Sement portland Kg 230.0 1,440.00 331,200.00
Pasir beton Kg 893.0 142.86 127,571.43
Kerikil (maks 30 mm) Kg 1,027.0 275.86 283,310.34
Air Ltr 200.0 78.75 15,750.00
JUMLAH TENAGA KERJA 757,831.77
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 999,331.77


E Overhead & Profit 10 % x D 99,933.18
F Harga Satuan Pekerjaan (D+E) 1,099,264.95

A.4.1.1.5 Membuat 1 m3 beton mutu f'c=14.5 Mpa (K175), Slump (12±2) cm, w/c=0.66

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 326.000 1,440.00 469,440.00
Pasir beton Kg 760.000 142.86 108,571.43
Kerikil (maks 30 mm) Kg 1,029.000 275.86 283,862.07
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 878,804.75
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,211,054.75
E Overhead & Profit 10 % x D 121,105.47
F Harga Satuan Pekerjaan (D+E) 1,332,160.22

A.4.1.1.6 Membuat 1 m3 beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 352.000 1,440.00 506,880.00
Pasir beton Kg 731.000 142.86 104,428.57
Kerikil (maks 30 mm) Kg 1,031.000 275.86 284,413.79
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 912,653.61
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,244,903.61


E Overhead & Profit 10 % x D 124,490.36
F Harga Satuan Pekerjaan (D+E) 1,369,393.98
A.4.1.1.7 Membuat 1 m3 beton mutu f'c=19.3 Mpa (K225), Slump (12±2) cm, w/c=0.58
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 371.000 1,440.00 534,240.00
Pasir beton Kg 698.000 142.86 99,714.29
Kerikil (maks 30 mm) Kg 1,047.000 275.86 288,827.59
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 939,713.12
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,271,963.12
E Overhead & Profit 10 % x D 127,196.31
F Harga Satuan Pekerjaan (D+E) 1,399,159.43

A.4.1.1.8 Membuat 1 m3 beton mutu f'c=21.7 Mpa (K250), Slump (12±2) cm, w/c=0.56

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 384.000 1,440.00 552,960.00
Pasir beton Kg 692.000 142.86 98,857.14
Kerikil (maks 30 mm) Kg 1,039.000 275.86 286,620.69
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 955,369.08
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,287,619.08
E Overhead & Profit 10 % x D 128,761.91
F Harga Satuan Pekerjaan (D+E) 1,416,380.99

A.4.1.1.9 Membuat 1 m3 beton mutu f'c=24.0 Mpa (K275), Slump (12±2) cm, w/c=0.53
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 406.000 1,440.00 584,640.00
Pasir beton Kg 684.000 142.86 97,714.29
Kerikil (maks 30 mm) Kg 1,026.000 275.86 283,034.48
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 982,320.02
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,314,570.02
E Overhead & Profit 10 % x D 131,457.00
F Harga Satuan Pekerjaan (D+E) 1,446,027.02
A.4.1.1.10 Membuat 1 m3 beton mutu f'c=26.4 Mpa (K300), Slump (12±2) cm, w/c=0.52

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang Batu L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 413.000 1,440.00 594,720.00
Pasir beton Kg 681.000 142.86 97,285.71
Kerikil (maks 30 mm) Kg 1,021.000 275.86 281,655.17
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 990,592.14
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,322,842.14


E Overhead & Profit 10 % x D 132,284.21
F Harga Satuan Pekerjaan (D+E) 1,455,126.35

A.4.1.1.17 Pembesian 1 Kg dengan besi polos atau besi ulir

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 160,000.00 1,120.00
Tukang Besi L.02 OH 0.007 170,000.00 1,190.00
Kepala Tukang L.03 OH 0.0007 175,000.00 122.50
Mandor L.04 OH 0.0004 200,000.00 80.00
JUMLAH TENAGA KERJA 2,512.50
B BAHAN
Besi beton (polos/Ulir) Kg 1.050 11,815.00 12,405.75
Kawat beton Kg 0.015 23,000.00 345.00
JUMLAH TENAGA KERJA 12,750.75
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,263.25


E Overhead & Profit 10 % x D 1,526.33
F Harga Satuan Pekerjaan (D+E) 16,789.58

A.4.1.1.18 Pemasangan 10 Kg kabel presstressed strands

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 160,000.00 8,000.00
Tukang Besi L.02 OH 0.050 170,000.00 8,500.00
Kepala Tukang L.03 OH 0.005 175,000.00 875.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 17,975.00
B BAHAN
Besi beton (polos/Ulir) Kg 10.500 11,815.00 124,057.50
Kawat beton Kg 0.100 23,000.00 2,300.00
JUMLAH TENAGA KERJA 126,357.50
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 144,332.50


E Overhead & Profit 10 % x D 14,433.25
F Harga Satuan Pekerjaan (D+E) 158,765.75
15,876.58
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi (2 X Pakai)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 160,000.00 83,200.00
Tukang Kayu L.02 OH 0.260 170,000.00 44,200.00
Kepala Tukang L.03 OH 0.026 175,000.00 4,550.00
Mandor L.04 OH 0.026 200,000.00 5,200.00
JUMLAH TENAGA KERJA 137,150.00
B BAHAN
Kayu Kelas III m3 0.020 3,000,000.00 60,000.00
Paku 5-10 cm Kg 0.150 25,000.00 3,750.00
Minyak bekisting Ltr 0.100 25,000.00 2,500.00
JUMLAH TENAGA KERJA 66,250.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 203,400.00


E Overhead & Profit 10 % x D 20,340.00
F Harga Satuan Pekerjaan (D+E) 223,740.00

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof ( 2 X pakai )

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 160,000.00 83,200.00
Tukang Kayu L.02 OH 0.260 170,000.00 44,200.00
Kepala Tukang L.03 OH 0.026 175,000.00 4,550.00
Mandor L.04 OH 0.026 200,000.00 5,200.00
JUMLAH TENAGA KERJA 137,150.00
B BAHAN
Kayu Kelas III m3 0.023 3,000,000.00 67,500.00
Paku 5-10 cm Kg 0.150 25,000.00 3,750.00
Minyak bekisting Ltr 0.100 25,000.00 2,500.00
JUMLAH TENAGA KERJA 73,750.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 210,900.00


E Overhead & Profit 10 % x D 21,090.00
F Harga Satuan Pekerjaan (D+E) 231,990.00

A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom (2 x Pakai)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 160,000.00 105,600.00
Tukang Kayu L.02 OH 0.330 170,000.00 56,100.00
Kepala Tukang L.03 OH 0.033 175,000.00 5,775.00
Mandor L.04 OH 0.033 200,000.00 6,600.00
JUMLAH TENAGA KERJA 174,075.00
B BAHAN
Kayu kelas III m3 0.020 3,000,000.00 60,000.00
Paku 5-12 cm Kg 0.200 25,000.00 5,000.00
Minyak bekisting Ltr 0.200 25,000.00 5,000.00
Balok kayu kelas II m3 0.008 3,500,000.00 26,250.00
Plywood 9 mm Lbr 0.175 103,500.00 18,112.50
Dolken kayu φ 8-10cm panjang 4m Btng 1.000 25,000.00 25,000.00
JUMLAH TENAGA KERJA 139,362.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 313,437.50


E Overhead & Profit 10 % x D 31,343.75
F Harga Satuan Pekerjaan (D+E) 344,781.25
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok (2 X Pakai)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 160,000.00 105,600.00
Tukang Kayu L.02 OH 0.330 170,000.00 56,100.00
Kepala Tukang L.03 OH 0.033 175,000.00 5,775.00
Mandor L.04 OH 0.033 200,000.00 6,600.00
JUMLAH TENAGA KERJA 174,075.00
B BAHAN
Kayu Kelas III m3 0.020 3,000,000.00 60,000.00
Paku 5-12 cm Kg 0.200 25,000.00 5,000.00
Minyak bekisting Ltr 0.200 25,000.00 5,000.00
Balok kayu kelas II m3 0.009 3,500,000.00 31,500.00
Plywood 6 mm Lbr 0.175 103,500.00 18,112.50
Dolken kayu φ 8-10cm panjang 4m Btng 1.000 25,000.00 25,000.00
JUMLAH TENAGA KERJA 144,612.50
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 318,687.50


E Overhead & Profit 10 % x D 31,868.75
F Harga Satuan Pekerjaan (D+E) 350,556.25

A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai (2 X Pakai)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 160,000.00 105,600.00
Tukang Kayu L.02 OH 0.330 170,000.00 56,100.00
Kepala Tukang L.03 OH 0.033 175,000.00 5,775.00
Mandor L.04 OH 0.033 200,000.00 6,600.00
JUMLAH TENAGA KERJA 174,075.00
B BAHAN
Kayu Kelas III m3 0.020 3,000,000.00 60,000.00
Paku 5-12 cm Kg 0.200 25,000.00 5,000.00
Minyak bekisting Ltr 0.200 25,000.00 5,000.00
Balok kayu kelas II m3 0.008 3,500,000.00 26,250.00
Plywood 6 mm Lbr 0.175 103,500.00 18,112.50
Dolken kayu φ 8-10cm panjang 4m Btng 3.000 25,000.00 75,000.00
JUMLAH TENAGA KERJA 189,362.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 363,437.50


E Overhead & Profit 10 % x D 36,343.75
F Harga Satuan Pekerjaan (D+E) 399,781.25
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga (2 X Pakai)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 160,000.00 105,600.00
Tukang Kayu L.02 OH 0.330 170,000.00 56,100.00
Kepala Tukang L.03 OH 0.033 175,000.00 5,775.00
Mandor L.04 OH 0.033 200,000.00 6,600.00
JUMLAH TENAGA KERJA 174,075.00
B BAHAN
Kayu Kelas III m3 0.015 3,000,000.00 45,000.00
Paku 5-12 cm Kg 0.200 25,000.00 5,000.00
Minyak bekisting Ltr 0.150 25,000.00 3,750.00
Balok kayu kelas II m3 0.008 3,500,000.00 26,250.00
Plywood 6 mm Lbr 0.175 103,500.00 18,112.50
Dolken kayu φ 8-10cm panjang 4m Btng 1.000 25,000.00 25,000.00
JUMLAH TENAGA KERJA 123,112.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 297,187.50


E Overhead & Profit 10 % x D 29,718.75
F Harga Satuan Pekerjaan (D+E) 326,906.25
A. PEKERJAAN PONDASI POERPLAT

1 Galian Tanah Pondasi Poer Plat 14.40 M3 PONDASI POER PLAT


J = 8 BH
P = 1.00 M
L = 1.00 M
T = 1.80 M
V = P X T X LX J
V = 1.00 X 1.00 X 1.80 X 8.00
= 14.40 M3

2 Pasir Urug Bawah Pondasi 0.40 M3 PONDASI POER PLAT


J = 8 BH
P = 1.00 M
L = 1.00 M
T = 0.05 M
V = P X T X LX J
V = 1.00 X 1.00 X 0.05 X 8.00
= 0.40 M3

3 Urugan Kembali Galian 3.60 M3 V = 14.40 M3


V = 1/4 x V
= 3.60 M3

4 Urugan Pasir Dibawah Lantai 6.48 M3 L = 92.51 M2


T = 0.07 M
V = LXT
V = 92.51 X 0.07
= 6.48 M3

5 Urugan Tanah Dibawah Lantai 20.81 M3 L = 92.51 M2


T = 0.30 M
V = LXT
V = 92.51 X 0.30
= 27.75 M3

6 Lantai Kerja Pondasi Poer; t = 5 cm (f'c=7.4 Mpa (K100) 0.32 M3 PONDASI POER PLAT UTUH
J.P = 8.00 M
P = 0.90 M
L = 0.90 M
T = 0.05 M
V = J.P X P X T X L
V = 8.00 X 0.90 X 0.90 X 0.05
= 0.32 M3

7 Pondasi Poer Bekisting 1 Buah Poer Plat

Jumlah = 8.000 bh

Jumlah = 8.000
- Pek. Bekisting 5.40 M2 Keliling = 3.600 M
Tebal = 0.250 M
V = Keliling x Tebal
= 7.200 M2

- Pek. Pembesian 164.81 Kg besi jmlh p berat/m berat.ttl SAT


B 12 6 1.858 0.880 9.810 Kg
B 12 6 1.858 0.880 9.810 Kg
19.620 Kg
19.62 x 14.00
- Pek. Beton 1.28 M3 = 274.69
jumlah = 8.000 bh
P = 0.800 m
L = 0.800 m
T = 0.250 m
V = PXLXT
V = 8.000 X 0.800 X 0.800 X 0.25
V = 1.280 M3

B. PEKERJAAN STRUKTUR TENGAH (SLOOF, KOLOM DAN BALOK)

1 Sloof (UK. 20 x 40)

- Bekisting 28.20 M2 P = 47.00 M


L = 0.8 M
v = PXL
v = 47.00 x 0.80
V = 37.60 M2

- Pembesian 204.59 KG
besi Jml p berat/m berat.ttl SAT
B12 6 47.00 0.888 250.416 Kg
Beugel 314 0.73 0.395 90.562 Kg
340.98 Kg

- Pek. Beton 3.76 M3


P = 47.00
L = 0.20 m
T = 0.40 m
V = PXLXT
V = 47.00 X 0.20 X 0.40
= 3.76 M3

2 Kolom Pedestal (UK. 30 X 30)

- Bekisting 12.96 M2 P = 14.40 M


L = 1.20 M
v = PXL
v = 14.40 x 1.20
V = 17.28 M2

- Pembesian 59.91 KG
besi Jml p berat/m berat.ttl SAT
B12 6 14.40 0.888 76.723 Kg
Beugel 97 0.60 0.395 23.123 Kg
99.85 Kg

- Pek. Beton 1.30 M3


P = 14.40
L = 0.30 m
T = 0.30 m
V = PXLXT
V = 14.40 X 0.30 X 0.30
= 1.30 M3

3 Kolom Utama (UK. 30 X 30)

- Bekisting 7.88 M2 P = 17.50 M


L = 0.60 M
v = PXL
v = 17.50 x 0.60
V = 10.50 M2

- Pembesian 59.03 KG
besi Jml p berat/m berat.ttl SAT
B12 4 17.50 0.888 62.160 Kg
Beugel 118 0.78 0.395 36.223 Kg
98.38 Kg

- Pek. Beton 0.39 M3


P = 17.50
L = 0.15 m
T = 0.15 m
V = PXLXT
V = 17.50 X 0.15 X 0.15
= 0.39 M3

4 Kolom Type 2 (UK. 25 X 25)

- Bekisting 24.00 M2 P = 24.00 M


L = 1.00 M
v = PXL
v = 24.00 x 1.00
V = 24.00 M2

- Pembesian 134.81 KG
besi Jml p berat/m berat.ttl SAT
B12 4 24.00 0.888 85.248 Kg
Beugel 161 0.78 0.395 49.562 Kg
134.81 Kg

- Pek. Beton 1.50 M3


P = 24.00
L = 0.25 m
T = 0.25 m
V = PXLXT
V = 24.00 X 0.25 X 0.25
= 1.50 M3

4 Kolom Praktis ( Kp) ( UK. 12 X 12 )

- Bekisting 6.21 M2 P = 34.50 M


L = 0.24 M
v = PXL
v = 34.50 x 0.24
V = 8.28 M2

- Pembesian 71.85 KG
besi Jml p berat/m berat.ttl SAT
B12 4 34.50 0.617 85.100 Kg
Beugel 231 0.38 0.395 34.644 Kg
119.74 Kg

- Pek. Beton 0.50 M3


P = 34.50
L = 0.12 m
T = 0.12 m
V = PXLXT
V = 34.50 X 0.12 X 0.12
= 0.50 M3

5 Balok Tengah ( UK. 10 x 10 )

- Bekisting 4.37 M2 P = 29.13 M


L = 0.20 M
v = PXL
v = 29.13 x 0.20
V = 5.83 M2

- Pembesian 56.10 KG
besi Jml p berat/m berat.ttl SAT

B10 4 29.13 0.617 71.842 Kg


Beugel 195 0.50 0.222 21.664 Kg
93.51 Kg

- Pek. Beton 0.291 M3


P = 29.13
L = 0.10 m
T = 0.10 m
V = PXLXT
V = 29.13 X 0.10 X 0.10
= 0.291 M3

6 Balok Latey (UK.13,5 X 15)


- Bekisting 1.38 M2 P = 6.15 M
L = 0.30 M
v = PXL
v = 6.15 x 0.30
V = 1.85 M2

- Pembesian 14.07 KG
besi Jml p berat/m berat.ttl SAT

B10 4 6.15 0.617 15.170 Kg


Beugel 42 0.50 0.395 8.288 Kg
23.46 Kg

- Pek. Beton 0.125 M3


P = 6.15
L = 0.135 m
T = 0.15 m
V = PXLXT
V = 6.15 X 0.14 X 0.15
= 0.125 M3

7 Ringbalk (UK.12 X 15)

- Bekisting 77,878.67 M2 P = 384,586.00 M


L = 0.15 M
T = 0.12 M
v = PXL
v = 384,586.00 x 0.27
V = 103,838.22 M2

- Pembesian 872,753.95 KG
besi Jml p berat/m berat.ttl SAT

B10 4 384,586.00 0.617 ### Kg


Beugel ### 0.50 0.395 ### Kg
### Kg

- Pek. Beton 7,499.427 M3


P = 384,586.00
L = 0.130 m
T = 0.15 m
V = PXLXT
V = 384,586.00 X 0.13 X 0.15
= 7,499.427 M3

C PEKERJAAN DINDING DAN PLASTERAN

1 PEK. DINDING BATA 1 PC ; 5 PSR 77.63 M2


DINDING TINGGI 1 M DINDING TINGGI 3,85 M
P = 30.50 M P = 6.35 M
T = 0.08 M T = 3.35 M
V = PXT V = PXT
= 30.50 X 0.08 = 6.35 X 3.35
= 2.59 M2 = 21.27 M2

VOLUME BUKAAN KUSEN


P3 = 0.80 X 1.90 X 1.00 = 1.52 M2
V2 = 0.48 X 0.68 X 1.00 = 0.33 M2
1.85 M2

TOTAL = 2.59 + 21.27 - 1.85


= 22.02 M2
= 110.90

2 PEK. DINDING BATA 1 PC ; 3 PSR 7.74 M2 TRASRAM KM/WC


P = 6.35 M
T = 0.30 M
V = PXT
= 6.35 X 0.30
= 1.90 M2

TRASRAM KELILING BANGUNAN


P = 30.50 M
T = 0.30 M
V = PXT
= 30.50 X 0.30
= 9.15 M2

TOTAL = 1.90 + 9.15


= 11.05 M2

3 Plesteran Biasa (1:5) 166.32 M2 11.07

4 Plesteran (1:3) 15.48 M2

5 Plasteran beton 28.80 m jkolom = 36.00 m


l = 0.80 m
v = 36.00 x 0.80
= 28.80

D PEKERJAAN LANTAI

1 Pek. Rabat Beton Lantai 4.75 M3 LUAS = 95.00 M2


T = 0.05 M
V = LXT
= 95.00 X 0.05
= 4.75 M3

2 Pek. Urugan Pasir 6.65 M3 LUAS = 95.00 M2


T = 0.07 M
V = LXT
= 95.00 X 0.07
= 6.65 M3

5 Dinding Keramik 20x40 (KM/WC) 6.72 M2 Kamar Mandi


P = 5.60 m
T = 1.20 m
jmlh = 1.00 bh
V = P X L X Jmlh
= 5.60 X 1.20 X 1.00
= 6.72 m2

E PEKERJAAN KUSEN, PINTU/JENDELA


T AM PA K BE LA KANG

DETA I L RI NGBA LK

1 Pek. Pintu Type P1 R E NCAN A RINGBALK

T AM PA K KA NAN

03 WRS 13 WRS

RE NCA NA S ANIT A SI BA NG UNAN

WRS

RE NCA NA I NS TA LA SI LIST RIK

WRS

RE NCA NA I NS TA LA SI LIST RIK

RENC. PERLE T A KA N KU SEN

18 WRS

RENCA NA P ONDA SI

07 WRS

DE T A I L SLOOF

RE N CA NA S LOEF

DE T AI L KOLOM PR AK TIS

DE T A I L K OLOM UTAMA

RENCA NA KOLOM

10 WRS

- Tiang penopang Pintu Dari Kayu Kelas II 0.01 M3 P = 1.00 m


L = 0.06 m
T = 0.12 m
V = PXLXT
= 1.00 X 0.06 X 0.12
= 0.01 m3

- Besi Plat Baja 2 mm 103.09 kg P = 2.70 m


L = 2.43 m
T = 0.002 m
BJB = 7,850 Kg/m3

v = P.TTL X BERAT/M
= 0.013 x 7,850
= 103.092 kg

- Besi Hollow 40.40.2 27.69 M1 1 Daun Pintu


P. Vert = 7.07 m
P. Horiz = 6.78 m
Panjang Hollow = 13.85 m
Total Panjang 2 Daun = 27.69 m

2 Pek. Pintu Type P2

- Kusen Pintu Kayu Kelas II 1.00 Bh


0.04 m3 P = 5.42 m
L = 0.06 m
T = 0.12 m
V = PXLXT
= 5.42 X 0.06 X 0.12
= 0.04 m2 x 1.00
= 0.04 M3

- Pek. Daun Pintu Panil Jati 3 cm 1.69 M2 P = 2.20 m


L = 0.82 m
V = PXL
= 2.20 X 0.82
= 1.80 m2
= 1.80 - 0.12 ( Ventilasi )
= 1.69 m2

- Engsel Pintu 3.00 Bh

- Kunci Pintu 1.00 Bh


- Kaca Tebal 5mm ( Ventilasi ) 0.12 m2 P = 0.70 m
L = 0.17 m
V = PXL
= 0.70 X 0.17
= 0.12 m2

3 Pek. Pintu Type P3 1.00 bh

- Kusen Pintu Kayu Jati 0.03 m3 P = 4.52 m


L = 0.14 m
T = 0.05 m
V = PXLXT
= 4.52 X 0.14 X 0.05
= 0.03 m2 x 1.00
= 0.03 M3

- Pek. Daun Pintu Panil Jati 3 cm 1.12 M2 P = 1.85 m


L = 0.67 m
V = PXL
= 1.85 X 0.67
= 1.24 m2
= 1.24 - 0.12 ( Ventilasi )
= 1.12

- Engsel Pintu 3.00 Bh

- Kunci Pintu 1.00 Bh

- Kaca Tebal 5mm ( Ventilasi ) 0.120 m2 P = 0.60 m


L = 0.20 m
V = PXL
= 0.60 X 0.20
= 0.12 m2

4 Pek. Jendela Atap 4.00 Bh


- Kusen Jendela Kayu 0.38 m3 P = 13.20 m
Luas Pen.g Balok = 0.01
jumlah = 13.20 X 0.01 x 4.00
Total Volume = 0.38

- Pek. Kaca Tebal 5 MM 10.67 M2 P = 1.45 m


L = 0.46 m
V = PXL
= 1.45 X 0.46
= 0.67 m2
= 0.67 x 4.00 x 4.00
Total Volume = 10.67 m2

- Pek. Pemasangan KalsiClad 12.11 M2 Jumlah = 4.00


Luas / Unit = 3.03
Luas Total Clading = Jumlah x Luas / Unit
= 4.00 x 3.03
= 12.11 M2

6 Pek. Ventilasi Type V1 7.00 Bh

- Kusen Jendela Kayu Kelas II 7.00 Bh P = 10.95 m


0.55 m3 L = 0.06 bh
T = 0.12 m
Jumlah = 7.00 bh
V = PXLXT
= 10.95 X 0.06 X 0.12
= 0.08 X 7.00
= 0.55

- BØ16 Teralis 113.66 kg P = 14.40 m


jumlah = 7.00 m

besi Jml p berat/m berat.ttl SAT


B16 5 14.40 1.579 113.664 Kg

113.66 Kg

6 Pek. Ventilasi Type V2 1.00 Bh

- Kusen Jendela Kayu 0.02 M3 P = 2.76 m


L = 0.14 m
T = 0.05 m
V = PXLXT
= 2.76 X 0.14 X 0.05
= 0.02 m2 x 1.00
= 0.02 M3

- Pek. Bingkai Jendela Kaca Jati 3 cm 0.12 M2 P = 2.00 m


L = 0.06 m
V = PXL
= 2.00 X 0.06
= 0.12 m2

- Pek. Kaca Tebal 5 MM 0.11 M2 P = 0.44 m


L = 0.24 m
V = PXL
= 0.44 X 0.24
= 0.11 m2

F PEKERJAAN PLAMBING

Pek. Klosed Duduk Ex. Toto + Pelengkap 1.00 Bh

Pek. Kran Air 3/4 1.00 Bh

Pek. Pipa Air Bersih 3/4" 10.53 m

Pek. Pipa Air Kotor PVC 3" 4.15 m

Pek. Septic Tank + Bak Resapan 1.00 Unit

G PEKERJAAN PENGECATAN

1 Pengecatan Tembok 210.60 m2 Pengecetan Tembok


Plasteran Tembok 1:5 = 166.32 m2
Dinding 1 : 3 = 15.48 m2
Plasteran Beton = 28.80 m2
210.60 m2
2 Pengecatan Plafond #REF! m2

3 Pek. Cat Kilap Daun Pintu Dan Ventilasi / Tralis 25.98 m2 Type Pintu Dan Jendela
P1 = 13.13 m2
P2 = 3.37 m2
P3 = 2.24 m2
V1 ( Tralis ) = 7.23 m2
V2 = 0.12 m3
25.98 m2

4 Pek. Cat Kilap Kusen Pintu dan Jendela 5.83 m2 Type Pintu Dan Jendela
P1 = 1.17 m2
P2 = 1.75 m2
P3 = 0.99 m2
J1 = 1.776 m2
V1 = 1.31 m2
5.83 m2

T AM PAK BE LAKANG

DE T AIL RING BA LK

H PEKERJAAN ATAP T AM PAK KANAN


R E NCAN A RINGB ALK

03 WRS 13 WRS

R E NCANA SANIT ASI BAN GUNAN

1 Pek. Kuda - Kuda 3.00 bh WRS

R E NCANA I NSTA LASI LIS TRIK

WRS

R E NCANA I NSTA LASI LIS TRIK

RENC. P ERLE TA KAN KUSE N

18 WRS

REN CANA P ONDASI

07 WRS

D E T AI L SLOOF

R E NCAN A SLOE F

D ET AI L KOLOM P R AKTIS

- Balok Nok 8/12 0.13 m3


D E T AIL KOLOM UTAMA

RE NCA NA KOL OM

JUMLAH = 1.00
10 WRS

P = 13.83
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 1.00 x 13.83 x 0.01
= 0.13 m3

- Gording 5/10 0.83 m3


JUMLAH = 12.00
P = 13.83
L Penampang = 0.005
V = Jumlah X P X L Penampang
= 12.00 x 13.83 x 0.01
= 0.83 m3

- Balok Sokong 6/12 0.04


JUMLAH = 6.00
P = 0.82
L Penampang = 0.007
V = Jumlah X P X L Penampang
= 6.00 x 0.82 x 0.01
= 0.04 m3

Total Volume Balok 1.00 m3

- Kaki Kuda - Kuda 8/12 0.33 m3


JUMLAH = 3.00
P = 11.56
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 3.00 x 11.56 x 0.01
= 0.33 m3

- Tiang Raja 8/12 0.09 m3


JUMLAH = 3.00
P = 2.98
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 3.00 x 2.98 x 0.01
= 0.09 m3

- Balok Pengunci 8/12 0.02 m3


JUMLAH = 3.00
P = 0.60
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 3.00 x 0.60 x 0.01
= 0.02 m3

- Balok Sokong 8/12 0.13 m3


JUMLAH = 3.00
P = 4.44
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 3.00 x 4.44 x 0.01
= 0.13 m3

- Balok Gapit 6/12 0.07 m3


JUMLAH = 3.00
P = 3.28
L Penampang = 0.007
V = Jumlah X P X L Penampang
= 3.00 x 3.28 x 0.01
= 0.07 m3

- Balok Tarik 8/12 0.23 m3


JUMLAH = 3.00
P = 8.15
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 3.00 x 8.15 x 0.01
= 0.23 m3

Total Volume Balok 0.87 m3

2 Pek. Pasangan Atap Seng Gelombang 174.21 M2 Luas Atap utama = 163.55 M2
Luas Atap Kanopi = 10.66 M2
Total Luas Atap = 174.21 M2

3 Pek. Nok Atap Oundoline 13.79 m'

I PEKERJAAN LANTAI

1 #REF! #REF! M2

J PEK. PLAFOND

Pek. Rangka Plafond Besi Holow modul 60 x 120cm 20.41 M2

2 Pek. Lapis Plafond GRC Board t = 4,5 mm 20.41 M2

3 Pek. List Plafond Gipsum Board 27.58 m'

K PEKERJAAN TERAS

1 Galian Tanah Pondasi Teras 0.86 M3


P = 2.50 M
L penamp. galian = 0.34 M
V = P X Luas Penampang Galian
V = 2.50 X 0.34
= 0.86 M3

2 Pasir Urug Bawah Pondasi 0.08 M3


P = 2.50 M
L = 0.45 M
T = 0.07 M
V = P X T X LX J
V = 2.50 X 0.45 X 0.07
= 0.08 M3
3 Urugan Kembali Galian 0.22 M3
P = 2.50 M
L penamp. galian = 0.09 M
V = P X Luas Penampang Galian
V = 2.50 X 0.09
= 0.22 M3

4 Urugan Pasir Dibawah Lantai 2.50 M3


P = 2.50 M
L penamp. Urugan = 0.16 M2
V = P X Luas Penampang Urugan
V = 2.50 X 0.16
= 0.40 M3

5 Urugan Tanah Dibawah Lantai 0.67 M3 p = 2.50 M2


luas = 0.27
V = 2.50 X 0.27
= 0.67 M3

6 Pemasangan batu kosong (anstamping) 0.17 M3


P = 2.50 M
L = 0.45 M2
T = 0.15 M
V = PXTXL
V = 2.50 X 0.45 X 0.15
= 0.17 M3

7 Pondasi Batu Gunung (1:3) 0.38 M3


P = 2.50 M
L = 0.15 m2
V = PxL
= 2.50 x 0.15
= 0.38 m3

8 Pek. Lantai Rabat Beton 0.48 M3


P = 2.50 M
L = 0.19 m2
V = PxL
= 2.50 x 0.19
= 0.48 m3

J PEKERJAAN LAIN - LAIN

1 Pek. Saluran Keliling Bangunan

- Galian Tanah 2.09 M3


P = 32.50 M
L = 0.06 m2
V = PxL
= 32.50 x 0.06
= 2.09 m3

- Urugan Pasir 1.18 M3


P = 32.50 M
L = 0.04 m2
V = PxL
= 32.50 x 0.04
= 1.18 m3

- Pek. Lantai Rabat Beton 0.46 M3


P = 32.50 M
L = 0.01 m2
V = PxL
= 32.50 x 0.01
= 0.46 m3

- Pek. Dinding Saluran Pas. Bata 1 Pc : 5 Psr 2.22 M3


P = 32.50 M
L = 0.07 m2
V = PxL
= 32.50 x 0.07
= 2.22 m3

- Pek. Acian dengan semen kental 0.33 m2


P = 32.50 M
L = 0.01 m2
V = PxL
= 32.50 x 0.01
= 0.33 m3

Pek. Pipa Pembuangan Air Hujan Dari Talang Beton

Ke saluran Keliling Bangunan

- Pipa Dia. 3"

- Sambungan Knee 3"

Pek. Pembersihan Lokasi

L PEKERJAAN LAIN - LAIN

2 Pek. Rangka Atap Kanopi Teras

- Besi Hollow 40.40.2 22.80 #REF! - KUDA - KUDA 1 = 10.55 M1


- KUDA - KUDA 2 = 8.58 M1
- KUDA - KUDA 3 = 9.36 M1
PANJANG TOTAL = 28.50 M1

- Dynabold 8.00 bh
3
Pek. Pasangan Atap Seng Gelombang 10.80 M2
M

1
2
ANALISA HARGA SATUAN

A.2.3.1. HARGA SATUAN PEKERJAAN TANAH


A. 2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 160,000.00 120,000.00
Mandor L.04 OH 0.025 200,000.00 5,000.00
JUMLAH TENAGA KERJA 125,000.00
B BAHAN
- - -
JUMLAH TENAGA KERJA -
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,000.00


E Overhead & Profit 10 % x D - 12,500.00
F Harga Satuan Pekerjaan (D+E) 137,500.00

A. 2.3.1.9 Pengurugan kembali 1 m3 galian tanah


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 160,000.00 80,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 90,000.00
B BAHAN
- - -
JUMLAH TENAGA KERJA -
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,000.00


E Overhead & Profit 10 % x D - 9,000.00
F Harga Satuan Pekerjaan (D+E) 99,000.00

A. 2.3.1.11 Pengurugan 1 m3 pasir urug


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 160,000.00 48,000.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 50,000.00
B BAHAN
Pasir Urug 1.200 200,000.00 240,000.00
JUMLAH TENAGA KERJA 240,000.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 290,000.00


E Overhead & Profit 10 % x D - 29,000.00
F Harga Satuan Pekerjaan (D+E) 319,000.00

A. 2.3.1.14 Pengurugan 1 m3 Sirtu Padat


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 160,000.00 40,000.00
Mandor L.04 OH 0.025 200,000.00 5,000.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
Tanah Urug 1.200 80,000.00 96,000.00
JUMLAH TENAGA KERJA 96,000.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 141,000.00
E Overhead & Profit 10 % x D - 14,100.00
F Harga Satuan Pekerjaan (D+E) 155,100.00
ANALISA HARGA SATUAN

A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI 0%XD -

A. 3.2.1.2 Pemasangan 1 m3 pondasi batu belah campuran 1SP:4PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 160,000.00 240,000.00
Tukang Batu L.02 OH 0.750 170,000.00 127,500.00
Kepala Tukang L.03 OH 0.075 175,000.00 13,125.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 395,625.00
B BAHAN
Batu belah batu gunung m3 1.200 200,000.00 240,000.00
Semen Portland Kg 163.000 1,440.00 234,720.00
Pasir pasang m3 0.520 200,000.00 104,000.00
JUMLAH TENAGA KERJA 578,720.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 974,345.00


E Overhead & Profit 10 % x D 97,434.50
F Harga Satuan Pekerjaan (D+E) 1,071,779.50

A. 3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP:5PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 160,000.00 240,000.00
Tukang Batu L.02 OH 0.750 170,000.00 127,500.00
Kepala Tukang L.03 OH 0.075 175,000.00 13,125.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 395,625.00
B BAHAN
Batu belah batu gunung m3 1.200 200,000.00 240,000.00
Semen Portland Kg 136.000 1,440.00 195,840.00
Pasir pasang m3 0.544 200,000.00 108,800.00
JUMLAH TENAGA KERJA 544,640.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 940,265.00


E Overhead & Profit 10 % x D 94,026.50
F Harga Satuan Pekerjaan (D+E) 1,034,291.50

A. 3.2.1.9 Pemasangan 1 m3 batu kosong (anstamping)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 160,000.00 124,800.00
Tukang Batu L.02 OH 0.390 170,000.00 66,300.00
Kepala Tukang L.03 OH 0.039 175,000.00 6,825.00
Mandor L.04 OH 0.039 200,000.00 7,800.00
JUMLAH TENAGA KERJA 205,725.00
B BAHAN
Batu belah batu gunung m3 1.200 200,000.00 240,000.00
Pasir pasang m3 0.423 200,000.00 84,600.00
JUMLAH TENAGA KERJA 324,600.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 530,325.00


E Overhead & Profit 10 % x D 53,032.50
F Harga Satuan Pekerjaan (D+E) 583,357.50
ANALISA HARGA SATUAN

A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING 0%XD -

A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 160,000.00 48,000.00
Tukang batu L.02 OH 0.100 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.010 175,000.00 1,750.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah Bh 70.000 750.00 52,500.00
Semen portland Kg 14.370 1,440.00 20,692.80
Pasir pasang m3 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 81,192.80
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 150,942.80


E Overhead & Profit 10 % x D 15,094.28
F Harga Satuan Pekerjaan (D+E) 166,037.08

A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:4PP

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 160,000.00 48,000.00
Tukang batu L.02 OH 0.100 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.010 175,000.00 1,750.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah Bh 70.000 750.00 52,500.00
Semen portland Kg 11.500 1,440.00 16,560.00
Pasir pasang m3 0.043 200,000.00 8,600.00
JUMLAH TENAGA KERJA 77,660.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 147,410.00


E Overhead & Profit 10 % x D 14,741.00
F Harga Satuan Pekerjaan (D+E) 162,151.00

A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP:3PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 160,000.00 48,000.00
Tukang batu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 79,125.00
B BAHAN
Semen portland Kg 7.776 1,440.00 11,197.44
Pasir pasang m3 0.023 200,000.00 4,600.00
JUMLAH TENAGA KERJA 15,797.44
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 94,922.44


E Overhead & Profit 10 % x D 9,492.24
F Harga Satuan Pekerjaan (D+E) 104,414.68
A.4.4.2.4 Pemasangan 1 m2 plesteran 1SP:4PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 160,000.00 48,000.00
Tukang batu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 79,125.00
B BAHAN
Semen portland Kg 6.240 1,440.00 8,985.60
Pasir pasang m3 0.024 200,000.00 4,800.00
JUMLAH TENAGA KERJA 13,785.60
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 92,910.60


E Overhead & Profit 10 % x D 9,291.06
F Harga Satuan Pekerjaan (D+E) 102,201.66
A.4.4.2.27 Pemasangan 1 m2 acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 160,000.00 32,000.00
Tukang batu L.02 OH 0.100 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.010 175,000.00 1,750.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 52,750.00
B BAHAN
Semen portland Kg 3.250 1,440.00 4,680.00
JUMLAH TENAGA KERJA 4,680.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,430.00


E Overhead & Profit 10 % x D 5,743.00
F Harga Satuan Pekerjaan (D+E) 63,173.00

Anl Pemasangan 1M2 Pas. Aluminium Composite ( Seven)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.175 160,000.00 28,000.00
Tukang L.02 OH 1.750 170,000.00 297,500.00
Kepala Tukang L.03 OH 0.175 175,000.00 30,625.00
Mandor L.04 OH 0.009 200,000.00 1,760.00
JUMLAH TENAGA KERJA 357,885.00
B BAHAN
Aluminum Composite Lbr 0.380 920,000.00 349,600.00
Besi Hollow 4 X 4 cm, 1,4 MM M1 4.000 40,192.00 160,768.00
Besi Hollow 2 X 4 Cm ,1,4 MM M1 4.000 30,144.00 120,576.00
Silicon Bh 0.250 83,000.00 20,750.00
Baut Sekrup Bh 12.000 500.00 6,000.00
Perlengkapan Ls 1.000 75,000.00 75,000.00

JUMLAH BAHAN 732,694.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,090,579.00


E Overhead & Profit 10 % x D 109,057.90
F Harga Satuan Pekerjaan (D+E) 1,199,636.90
ANALISA HARGA SATUAN

A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING 0%XD -

Pemasangan 1 m2 lantai Keramik ukuran 40cm x 40cm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.240 160,000.00 38,400.00
Tukang batu L.02 OH 0.120 170,000.00 20,400.00
Kepala Tukang L.03 OH 0.012 175,000.00 2,100.00
Mandor L.04 OH 0.012 200,000.00 2,400.00
JUMLAH TENAGA KERJA 63,300.00
B BAHAN
Granit ukuran 40 x 40 cm Bh 3.100 13,333.33 41,333.33
Semen portland Kg 9.600 1,440.00 13,824.00
Semen warna Kg 1.500 1,500.00 2,250.00
Pasir pasang m3 0.045 200,000.00 9,000.00
JUMLAH TENAGA KERJA 66,407.33
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 129,707.33


E Overhead & Profit 10 % x D 12,970.73
F Harga Satuan Pekerjaan (D+E) 142,678.07

Pemasangan 1 m2 lantai Keramik ukuran 40 cm x 40 cm Anti Slip

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 160,000.00 40,000.00
Tukang batu L.02 OH 0.125 170,000.00 21,250.00
Kepala Tukang L.03 OH 0.013 175,000.00 2,275.00
Mandor L.04 OH 0.013 200,000.00 2,600.00
JUMLAH TENAGA KERJA 66,125.00
B BAHAN
Granit ukuran 40 x 40 cm Bh 6.250 12,800.00 80,000.00
Semen portland Kg 9.800 1,440.00 14,112.00
Semen biasa (PC) Kg 1.300 1,440.00 1,872.00
Pasir pasang m3 0.045 200,000.00 9,000.00
JUMLAH TENAGA KERJA 104,984.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 171,109.00


E Overhead & Profit 10 % x D 17,110.90
F Harga Satuan Pekerjaan (D+E) 188,219.90
Pemasangan 1 m2 dinding Keramik ukuran 20 cm x 40 cm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 160,000.00 144,000.00
Tukang batu L.02 OH 0.090 170,000.00 15,300.00
Kepala Tukang L.03 OH 0.009 175,000.00 1,575.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 161,875.00
B BAHAN
Keramik ukuran 20 x 40 cm Bh 12.500 6,463.04 80,788.00
Semen portland Kg 9.600 1,440.00 13,824.00
Semen warna Kg 1.650 1,440.00 2,376.00
Pasir pasang m3 0.045 200,000.00 9,000.00
JUMLAH TENAGA KERJA 105,988.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 267,863.00


E Overhead & Profit 10 % x D 26,786.30
F Harga Satuan Pekerjaan (D+E) 294,649.30
ANALISA HARGA SATUAN

A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) 0%XD -

A.4.5.1.1 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, plafond

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 160,000.00 56,000.00
Tukang besi L.02 OH 0.350 170,000.00 59,500.00
Kepala Tukang L.03 OH 0.035 175,000.00 6,125.00
Mandor L.04 OH 0.018 200,000.00 3,600.00
JUMLAH TENAGA KERJA 125,225.00
B BAHAN
Rangka metal hollow 40.40.5 mm m' 4.000 7,500.00 30,000.00
Assesories (perkuatan, las dll) Ls 100%xrangka 7,500.00 7,500.00
JUMLAH TENAGA KERJA 37,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 162,725.00


E Overhead & Profit 10 % x D 16,272.50
F Harga Satuan Pekerjaan (D+E) 178,997.50

A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)mm, tebal 9 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 160,000.00 16,000.00
Tukang kayu L.02 OH 0.050 170,000.00 8,500.00
Kepala Tukang L.03 OH 0.005 175,000.00 875.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 26,375.00
B BAHAN
Gypsum Board t = 9 mm Lbr 0.364 126,500.00 46,046.00
Paku Skrup Kg 0.110 138,000.00 15,180.00
JUMLAH TENAGA KERJA 61,226.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 87,601.00


E Overhead & Profit 10 % x D 8,760.10
F Harga Satuan Pekerjaan (D+E) 96,361.10

A.4.5.1.7.a Pemasangan 1 m2 langit-langit Kalsi Board Tebal 4.5 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 160,000.00 16,000.00
Tukang kayu L.02 OH 0.050 170,000.00 8,500.00
Kepala Tukang L.03 OH 0.005 175,000.00 875.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 26,375.00
B BAHAN
Kalsiboard, t = 4.5 mm Lbr 0.364 126,500.00 46,046.00
Paku Skrup Kg 0.110 138,000.00 15,180.00
JUMLAH TENAGA KERJA 61,226.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 87,601.00


E Overhead & Profit 10 % x D 8,760.10
F Harga Satuan Pekerjaan (D+E) 96,361.10
A.4.5.1.9 Pemasangan 1 m' list langit-langit gypsum profil

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 160,000.00 9,600.00
Tukang kayu L.02 OH 0.060 170,000.00 10,200.00
Kepala Tukang L.03 OH 0.006 175,000.00 1,050.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 21,450.00
B BAHAN
List gypsum profil m 1.050 126,500.00 132,825.00
Tepung Gypsum kg 0.150 51,750.00 7,762.50
JUMLAH TENAGA KERJA 140,587.50
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 162,037.50


E Overhead & Profit 10 % x D 16,203.75
F Harga Satuan Pekerjaan (D+E) 178,241.25

A.4.5.1.9 Pemasangan 1 m' list langit-langit Kayu Profil

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 160,000.00 8,000.00
Tukang kayu L.02 OH 0.050 170,000.00 8,500.00
Kepala Tukang L.03 OH 0.005 175,000.00 875.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 17,975.00
B BAHAN
List Kayu Profil m 1.050 3,825.00 4,016.25
Paku kg 0.010 30,000.00 300.00
JUMLAH TENAGA KERJA 4,316.25
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,291.25


E Overhead & Profit 10 % x D 2,229.13
F Harga Satuan Pekerjaan (D+E) 24,520.38

A.4.5.1.1 Pemasangan 1 m2 rangka kayu balok 5/7 modul 60 x 60 cm, plafond

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 160,000.00 56,000.00
Tukang Kayu L.02 OH 0.350 170,000.00 59,500.00
Kepala Tukang L.03 OH 0.035 175,000.00 6,125.00
Mandor L.04 OH 0.018 200,000.00 3,600.00
JUMLAH TENAGA KERJA 125,225.00
B BAHAN
Rangka Balok 5/7 m3 0.013 3,500,000.00 44,100.00
Paku 5 - 10 cm kg 0.010 25,000.00 250.00
JUMLAH TENAGA KERJA 44,350.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 169,575.00


E Overhead & Profit 10 % x D 16,957.50
F Harga Satuan Pekerjaan (D+E) 186,532.50
ANALISA HARGA SATUAN

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP 0%XD -

Pembuatan 1 m2 Atap Aluminium spandek


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 160,000.00 24,000.00
Tukang L.02 OH 0.750 170,000.00 127,500.00
Kepala Tukang L.03 OH 0.008 175,000.00 1,400.00
Mandor L.04 OH 0.006 200,000.00 1,200.00
JUMLAH TENAGA KERJA 154,100.00
B BAHAN
Atap Spandeks m2 1.050 50,000.00 52,500.00
Paku Sekrup Kg 0.020 138,000.00 2,760.00
JUMLAH TENAGA KERJA 55,260.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 209,360.00


E Overhead & Profit 0%XD - -
F Harga Satuan Pekerjaan (D+E) 209,360.00
Pembuatan 1 m' Nok/Bubungan Atap spandek
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 160,000.00 16,000.00
Tukang L.02 OH 1.000 170,000.00 170,000.00
Kepala Tukang L.03 OH 0.100 175,000.00 17,500.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 213,500.00
B BAHAN
Nok Spandek Lbr 1.050 32,500.00 34,125.00
Paku Sekrup Kg 0.020 138,000.00 2,760.00
JUMLAH TENAGA KERJA 36,885.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 250,385.00


E Overhead & Profit 10 % x D 25,038.50
F Harga Satuan Pekerjaan (D+E) 275,423.50

A.4.2.1.18 Pembuatan 1 m' Talang Datar/Jurai Seng BJLS 28 lebat 90 cm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 160,000.00 32,000.00
Tukang las biasa L.02 OH 0.200 170,000.00 34,000.00
Kepala Tukang L.03 OH 0.020 175,000.00 3,500.00
Mandor L.04 OH 0.001 200,000.00 200.00
JUMLAH TENAGA KERJA 69,700.00
B BAHAN
Seng Plat BJLS 28 Lebat 90 cm M' 1.050 68,000.00 71,400.00
Paku Campur Kg 0.015 30,000.00 450.00

JUMLAH TENAGA KERJA 71,850.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 141,550.00


E Overhead & Profit 10 % x D 14,155.00
F Harga Satuan Pekerjaan (D+E) 155,705.00
Pembuatan 1 m' Listplank Rangka Besi Holow 40.40.2 Lapis Kalsiplank t = 6 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 160,000.00 16,000.00
Tukang L.02 OH 0.200 170,000.00 34,000.00
Kepala Tukang L.03 OH 0.005 175,000.00 875.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 51,875.00
B BAHAN
Kalsiplank t = 6 mm Lbr 1.330 44,400.00 59,052.00
Paku Skrup Kg 0.250 138,000.00 34,500.00

JUMLAH TENAGA KERJA 93,552.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 145,427.00


E Overhead & Profit 10 % x D 14,542.70
F Harga Satuan Pekerjaan (D+E) 159,969.70

Pemasangan 1 m3 Konstruksi kuda-kuda expose, kayu kelas II

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 160,000.00 1,072,000.00
Tukang Kayu L.02 OH 20.100 170,000.00 3,417,000.00
Kepala Tukang L.03 OH 2.010 175,000.00 351,750.00
Mandor L.04 OH 0.335 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,907,750.00
B BAHAN
Balok Kayu Kls. II M3 1.200 2,310,000.00 2,772,000.00
Besi strip tebal 5 mm Kg 15.000 10,500.00 157,500.00
Paku 12 cm Kg 5.600 15,500.00 86,800.00

JUMLAH TENAGA KERJA 3,016,300.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,924,050.00


E Overhead & Profit 10 % x D 792,405.00
F Harga Satuan Pekerjaan (D+E) 8,716,455.00

Pemasangan 1 m3 Konstruksi Gording, kayu kelas II

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 160,000.00 1,072,000.00
Tukang Kayu L.02 OH 20.100 170,000.00 3,417,000.00
Kepala Tukang L.03 OH 2.010 175,000.00 351,750.00
Mandor L.04 OH 0.335 200,000.00 67,000.00
JUMLAH TENAGA KERJA 4,907,750.00
B BAHAN
Balok Kayu Kls. II M3 1.100 2,310,000.00 2,541,000.00
Besi strip tebal 5 mm Kg 15.000 10,500.00 157,500.00
Paku 12 cm Kg 3.000 15,500.00 46,500.00

JUMLAH TENAGA KERJA 2,745,000.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,652,750.00


E Overhead & Profit 10 % x D 765,275.00
F Harga Satuan Pekerjaan (D+E) 8,418,025.00
Pemasangan 1 m2 Atap Seng Gelombang

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 160,000.00 19,200.00
Tukang Kayu L.02 OH 0.060 170,000.00 10,200.00
Kepala Tukang L.03 OH 0.006 175,000.00 1,050.00
Mandor L.04 OH 0.006 200,000.00 1,200.00
JUMLAH TENAGA KERJA 31,650.00
B BAHAN
Seng gel. 3" x 6" Lbr 0.700 44,100.00 30,870.00
Paku 1/2" - 1" cm Kg 0.020 28,350.00 567.00

JUMLAH TENAGA KERJA 31,437.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,087.00


E Overhead & Profit 10 % x D 6,308.70
F Harga Satuan Pekerjaan (D+E) 69,395.70

SNI 035a 1 M2 Pasang Atap Spandek

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 160,000.00 32,000.00
Tukang Kayu L.02 OH 0.100 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.010 175,000.00 1,750.00
Mandor L.04 OH 0.001 200,000.00 200.00
JUMLAH TENAGA KERJA 50,950.00
B BAHAN
Atap Spandek M2 1.429 50,000.00 71,450.00
Paku Sekrup Kg 0.020 138,000.00 2,760.00

JUMLAH TENAGA KERJA 74,210.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,160.00


E Overhead & Profit 10 % x D 12,516.00
F Harga Satuan Pekerjaan (D+E) 137,676.00

Pemasangan 1 m' Nok Atap Seng

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 160,000.00 24,000.00
Tukang Kayu L.02 OH 0.070 170,000.00 11,900.00
Kepala Tukang L.03 OH 0.007 175,000.00 1,225.00
Mandor L.04 OH 0.006 200,000.00 1,200.00
JUMLAH TENAGA KERJA 38,325.00
B BAHAN
Seng plat 3" x 6" bjls 28 Lbr 0.300 68,000.00 20,400.00
Paku 1/2" - 1" cm Kg 0.040 30,000.00 1,200.00

JUMLAH TENAGA KERJA 21,600.00


C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,925.00


E Overhead & Profit 10 % x D 5,992.50
F Harga Satuan Pekerjaan (D+E) 65,917.50
ANALISA HARGA SATUAN

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU 0%XD -

A.4.6.1.1 Pembuatan dan Pemasangan 1 M3 Kusen Kayu Kelas II


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 160,000.00 1,120,000.00
Tukang kayu L.02 OH 21.000 170,000.00 3,570,000.00
Kepala Tukang L.03 OH 2.100 175,000.00 367,500.00
Mandor L.04 OH 0.350 200,000.00 70,000.00
JUMLAH TENAGA KERJA 5,127,500.00
B BAHAN
Balok Kayu Kelas II M3 1.100 3,500,000.00 3,850,000.00
Paku Campur Kg 1.250 25,000.00 31,250.00
Lem Kayu Kg 1.000 23,000.00 23,000.00

JUMLAH TENAGA KERJA 3,904,250.00


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 9,031,750.00


E Overhead & Profit 10 % x D 903,175.00
F Harga Satuan Pekerjaan (D+E) 9,934,925.00

A.4.6.1.5 Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel Jati t = 3 cm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 160,000.00 160,000.00
Tukang kayu L.02 OH 3.000 170,000.00 510,000.00
Kepala Tukang L.03 OH 0.300 175,000.00 52,500.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 732,500.00
B BAHAN
Papan Kayu Jati M3 0.040 4,000,000.00 160,000.00
Lem Kayu Kg 0.500 23,000.00 11,500.00

JUMLAH TENAGA KERJA 171,500.00


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 904,000.00


E Overhead & Profit 10 % x D 90,400.00
F Harga Satuan Pekerjaan (D+E) 994,400.00

A.4.6.1.6 Pembuatan dan Pemasangan 1 M2 Bingkai Jendela, Ventilasi t = 3 cm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 160,000.00 128,000.00
Tukang kayu L.02 OH 2.400 170,000.00 408,000.00
Kepala Tukang L.03 OH 0.240 175,000.00 42,000.00
Mandor L.04 OH 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 586,000.00
B BAHAN
Papan Kayu Jati M3 0.024 4,000,000.00 96,000.00
Lem Kayu Kg 0.300 23,000.00 6,900.00

JUMLAH TENAGA KERJA 102,900.00


C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 688,900.00


E Overhead & Profit 10 % x D 68,890.00
F Harga Satuan Pekerjaan (D+E) 757,790.00
ANALISA HARGA SATUAN

A.4.6.2. HARGA SATUAN PEKERJAAN PENGGANTUNGI DAN KACA 0%XD -

A.4.6.2.2 Pemasangan 1 buah kunci tanam 2x putar antik


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 160,000.00 1,600.00
Tukang kayu L.02 OH 0.500 170,000.00 85,000.00
Kepala Tukang L.03 OH 0.050 175,000.00 8,750.00
Mandor L.04 OH 0.005 200,000.00 1,000.00
JUMLAH TENAGA KERJA 96,350.00
B BAHAN
Kunci 2 slang silinder Utama Standar Bh 1.000 290,950.00 290,950.00
JUMLAH TENAGA KERJA 290,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 387,300.00


E Overhead & Profit 10 % x D 38,730.00
F Harga Satuan Pekerjaan (D+E) 426,030.00

A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005 160,000.00 800.00
Tukang kayu L.02 OH 0.500 170,000.00 85,000.00
Kepala Tukang L.03 OH 0.050 175,000.00 8,750.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 95,150.00
B BAHAN
Kunci KM Bulat Kualitas Biasa Bh 1.000 278,300.00 278,300.00
JUMLAH TENAGA KERJA 278,300.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 373,450.00


E Overhead & Profit 10 % x D 37,345.00
F Harga Satuan Pekerjaan (D+E) 410,795.00

A.4.6.2.5 Pemasangan 1 buah engsel pintu


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 160,000.00 2,400.00
Tukang kayu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.001 200,000.00 160.00
JUMLAH TENAGA KERJA 30,685.00
B BAHAN
Engsel pintu Bh 1.000 48,000.00 48,000.00
JUMLAH TENAGA KERJA 48,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 78,685.00


E Overhead & Profit 10 % x D 7,868.50
F Harga Satuan Pekerjaan (D+E) 86,553.50
A.4.6.2.5.a Pemasangan 1 buah grendel pintu

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 160,000.00 2,400.00
Tukang kayu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.001 200,000.00 160.00
JUMLAH TENAGA KERJA 30,685.00
B BAHAN
Grendel Pintu Bh 1.000 20,000.00 20,000.00
JUMLAH TENAGA KERJA 20,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,685.00


E Overhead & Profit 10 % x D 5,068.50
F Harga Satuan Pekerjaan (D+E) 55,753.50

A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 160,000.00 1,600.00
Tukang kayu L.02 OH 0.200 170,000.00 34,000.00
Kepala Tukang L.03 OH 0.020 175,000.00 3,500.00
Mandor L.04 OH 0.001 200,000.00 100.00
JUMLAH TENAGA KERJA 39,200.00
B BAHAN
Engsel jendela kupu-kupu Bh 1.000 19,550.00 19,550.00
JUMLAH TENAGA KERJA 19,550.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,750.00


E Overhead & Profit 10 % x D 5,875.00
F Harga Satuan Pekerjaan (D+E) 64,625.00

A.4.6.2.6.a Pemasangan 1 buah grendel jendela

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 160,000.00 2,400.00
Tukang kayu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.001 200,000.00 160.00
JUMLAH TENAGA KERJA 30,685.00
B BAHAN
Grendel Jendela Bh 1.000 8,050.00 8,050.00
JUMLAH TENAGA KERJA 8,050.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,735.00


E Overhead & Profit 10 % x D 3,873.50
F Harga Satuan Pekerjaan (D+E) 42,608.50
A.4.6.2.9 Pemasangan 1 buah kait angin

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 160,000.00 2,400.00
Tukang kayu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.001 200,000.00 160.00
JUMLAH TENAGA KERJA 30,685.00
B BAHAN
Kait angin Bh 1.000 23,000.00 23,000.00
JUMLAH TENAGA KERJA 23,000.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,685.00


E Overhead & Profit 10 % x D 5,368.50
F Harga Satuan Pekerjaan (D+E) 59,053.50

A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 160,000.00 2,400.00
Tukang kayu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.001 200,000.00 160.00
JUMLAH TENAGA KERJA 30,685.00
B BAHAN
Kaca tebal 5 mm m2 1.100 87,500.00 96,250.00
Sealant Tube 0.050 83,000.00 4,150.00
JUMLAH TENAGA KERJA 100,400.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 131,085.00


E Overhead & Profit 10 % x D 13,108.50
F Harga Satuan Pekerjaan (D+E) 144,193.50

A.4.6.2.17 Pemasangan 1 m2 kaca Akrilik

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 160,000.00 2,400.00
Tukang kayu L.02 OH 0.150 170,000.00 25,500.00
Kepala Tukang L.03 OH 0.015 175,000.00 2,625.00
Mandor L.04 OH 0.001 200,000.00 160.00
JUMLAH TENAGA KERJA 30,685.00
B BAHAN
Kaca Akrilik 8 mm m2 1.100 403,117.44 443,429.19
Sealant Tube 0.050 15,000.00 750.00
JUMLAH TENAGA KERJA 444,179.19
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 474,864.19


E Overhead & Profit 10 % x D 47,486.42
F Harga Satuan Pekerjaan (D+E) 522,350.60

A.4.2.1.11 Pemasangan 1 m kusen pintu aluminium

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 160,000.00 6,880.00
Tukang Aluminium L.02 OH 0.043 170,000.00 7,310.00
Kepala Tukang L.03 OH 0.004 175,000.00 752.50
Mandor L.04 OH 0.002 200,000.00 420.00
JUMLAH TENAGA KERJA 15,362.50
B BAHAN
Profil Aluminium m 1.100 75,000.00 82,500.00
Fixer bh 2.000 4,680.00 9,360.00
Sealent Tube 0.060 15,000.00 900.00
JUMLAH TENAGA KERJA 92,760.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 108,122.50
E Overhead & Profit 10 % x D 10,812.25
F Harga Satuan Pekerjaan (D+E) 118,934.75

A.4.2.1.4 Pemasangan 1 m pintu besi plat baja tebal 2 mm rangkap, rangka besi hollow 40.40.2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 160,000.00 168,000.00
Tukang Las Biasa L.02 OH 1.050 170,000.00 178,500.00
Kepala Tukang L.03 OH 0.105 175,000.00 18,375.00
Mandor L.04 OH 0.052 200,000.00 10,400.00
JUMLAH TENAGA KERJA 375,275.00
B BAHAN
Besi Hollow 40.40.2 m 4.000 40,192.00 160,768.00
Besi plat baja 2 mm m2 1.000 10,500.00 10,500.00
Kawat las Kg 0.050 66,700.00 3,335.00
JUMLAH TENAGA KERJA 174,603.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 549,878.00


E Overhead & Profit 10 % x D 54,987.80
F Harga Satuan Pekerjaan (D+E) 604,865.80
ANALISA HARGA SATUAN

A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN


0%XD -
A.4.7.1.4 Pengecatan 1 m2 Pengecatan Bidang Kayu Baru
(1 LapisPlamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 160,000.00 3,200.00
Tukang cat L.02 OH 0.063 170,000.00 10,710.00
Kepala Tukang L.03 OH 0.006 175,000.00 1,102.50
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 15,612.50
B BAHAN
Cat Meni Kayu Kg 0.200 57,500.00 11,500.00
Plamur Kayu Kg 0.150 57,500.00 8,625.00
Cat Dasar Kg 0.170 57,500.00 9,775.00
Cat Penutup Kg 0.260 57,500.00 14,950.00
Kuas 3 " Bh 0.010 19,626.00 196.26
Pengencer Kg 0.030 31,050.00 931.50
Amplas Lbr 0.200 11,500.00 2,300.00

JUMLAH TENAGA KERJA 48,277.76


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,890.26


E Overhead & Profit 10 % x D 6,389.03
F Harga Satuan Pekerjaan (D+E) 70,279.29

A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasat, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 160,000.00 3,200.00
Tukang cat L.02 OH 0.063 170,000.00 10,710.00
Kepala Tukang L.03 OH 0.006 175,000.00 1,102.50
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 15,612.50
B BAHAN
Plamur Tembok Kg 0.100 11,500.00 1,150.00
Cat Tembok Dasar Kg 0.100 42,780.00 4,278.00
Cat Tembok Penutup Kg 0.260 42,780.00 11,122.80
JUMLAH TENAGA KERJA 16,550.80
C PERALATAN
Kuas rol Bh 0.010 70,653.00 706.53
JUMLAH HARGA ALAT 706.53

D Jumlah (A+B+C) 32,869.83


E Overhead & Profit 10 % x D 3,286.98
F Harga Satuan Pekerjaan (D+E) 36,156.81
A.4.7.1.11 Pemasangan 1 m2 Waterproofing
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 160,000.00 8,000.00
Tukang cat L.02 OH 0.158 170,000.00 26,775.00
Kepala Tukang L.03 OH 0.016 175,000.00 2,756.25
Mandor L.04 OH 0.008 200,000.00 1,500.00
JUMLAH TENAGA KERJA 39,031.25
B BAHAN
Water Profing Kg 0.250 63,250.00 15,812.50
JUMLAH TENAGA KERJA 15,812.50
C PERALATAN
Kuas Bh 0.010 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,843.75


E Overhead & Profit 10 % x D 5,484.38
F Harga Satuan Pekerjaan (D+E) 60,328.13

A.4.7.1.16 Pengecatan 1 m2 permukaan baja dengan menie besi


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 160,000.00 3,200.00
Tukang cat L.02 OH 0.200 170,000.00 34,000.00
Kepala Tukang L.03 OH 0.020 175,000.00 3,500.00
Mandor L.04 OH 0.003 200,000.00 500.00
JUMLAH TENAGA KERJA 41,200.00
B BAHAN
Cat Meni Besi Kg 0.100 57,500.00 5,750.00
Cat Besi Penutup Kg 0.260 -
JUMLAH TENAGA KERJA 5,750.00
C PERALATAN
Kuas Bh 0.010 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,950.00


E Overhead & Profit 10 % x D 4,695.00
F Harga Satuan Pekerjaan (D+E) 51,645.00
ANALISA HARGA SATUAN

A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG 0%XD -


A.5.1.1.1 Pemasangan 1 buah closet duduk/ monoblock'
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.30 160,000.00 528,000.00
Tukang batu L.02 OH 1.10 170,000.00 187,000.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,750.00
Mandor L.04 OH 0.16 200,000.00 32,000.00
JUMLAH TENAGA KERJA 748,750.00
B BAHAN
Closet duduk Unit 1.00 690,000.00 690,000.00
Perlengkapan Ls 0.06 690,000.00 41,400.00
JUMLAH TENAGA KERJA 731,400.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,480,150.00


E Overhead & Profit 10 % x D 148,015.00
F Harga Satuan Pekerjaan (D+E) 1,628,165.00

A.5.1.1.2 Pemasangan 1 buah closet Jongkok Porselen

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.00 160,000.00 160,000.00
Tukang batu L.02 OH 1.15 200,000.00 230,000.00
Kepala Tukang L.03 OH 0.15 400,000.00 60,000.00
Mandor L.04 OH 0.16 200,000.00 32,000.00
JUMLAH TENAGA KERJA 482,000.00
B BAHAN
Closet duduk Unit 1.00 145,000.00 145,000.00
Semen Portland Kg 6.00 1,440.00 8,640.00
Pasir Pasang M3 0.01 200,000.00 2,000.00
JUMLAH TENAGA KERJA 155,640.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 637,640.00


E Overhead & Profit 10 % x D 63,764.00
F Harga Satuan Pekerjaan (D+E) 701,404.00

A.5.1.1.5 Pemasangan 1 buah wastafel


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.20 160,000.00 192,000.00
Tukang batu L.02 OH 1.45 170,000.00 246,500.00
Kepala Tukang L.03 OH 0.15 175,000.00 26,250.00
Mandor L.04 OH 0.06 200,000.00 12,000.00
JUMLAH TENAGA KERJA 476,750.00
B BAHAN
Wastafel Unit 1.20 2,070,000.00 2,484,000.00
Semen portland Kg 6.00 1,440.00 8,640.00
Pasir pasang m3 0.01 200,000.00 2,000.00
Perlengkapan % 1.20 2,484,000.00 2,980,800.00
JUMLAH TENAGA KERJA 5,475,440.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 5,952,190.00


E Overhead & Profit 10 % x D 595,219.00
F Harga Satuan Pekerjaan (D+E) 6,547,409.00
A.5.1.1.5.a Pemasangan 1 Kran Air 1/2"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01 160,000.00 1,600.00
Tukang batu L.02 OH 0.10 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,750.00
Mandor L.04 OH 0.01 200,000.00 1,000.00
JUMLAH TENAGA KERJA 21,350.00
B BAHAN
Kran Air Bh 1.00 27,600.00 27,600.00
Seal Tape Bh 0.03 15,000.00 375.00
JUMLAH TENAGA KERJA 27,975.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,325.00


E Overhead & Profit 10 % x D 4,932.50
F Harga Satuan Pekerjaan (D+E) 54,257.50

A.5.1.1.5.b Pemasangan 1 Kran Air Wastafel


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01 160,000.00 1,600.00
Tukang batu L.02 OH 0.10 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,750.00
Mandor L.04 OH 0.01 200,000.00 1,000.00
JUMLAH TENAGA KERJA 21,350.00
B BAHAN
Kran Air Wastafel Bh 1.00 2,070,000.00 2,070,000.00
Seal Tape Bh 0.03 15,000.00 375.00
JUMLAH TENAGA KERJA 2,070,375.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,091,725.00


E Overhead & Profit 10 % x D 209,172.50
F Harga Satuan Pekerjaan (D+E) 2,300,897.50

A.5.1.1.14 Pemasangan 1 buah floor drain


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01 160,000.00 1,600.00
Tukang batu L.02 OH 0.10 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,750.00
Mandor L.04 OH 0.01 200,000.00 1,000.00
JUMLAH TENAGA KERJA 21,350.00
B BAHAN
Floor drain Unit 1.00 28,750.00 28,750.00
JUMLAH TENAGA KERJA 28,750.00
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,100.00


E Overhead & Profit 10 % x D 5,010.00
F Harga Satuan Pekerjaan (D+E) 55,110.00
A.5.1.1.25 Pemasangan 1 m' pipa PVC tipe AW diameter ½"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.04 160,000.00 5,760.00
Tukang batu L.02 OH 0.06 170,000.00 10,200.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,050.00
Mandor L.04 OH 0.00 200,000.00 400.00
JUMLAH TENAGA KERJA 17,410.00
B BAHAN
Pipa PVC tipe AW diameter ½" m' 1.20 9,583.00 11,499.60
Perlengkapan Ls 0.35 4,024.86 1,408.70
12,908.30
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,318.30


E Overhead & Profit 10 % x D 3,031.83
F Harga Satuan Pekerjaan (D+E) 33,350.13
A.5.1.1.26 Pemasangan 1 m' pipa PVC tipe AW diameter ¾"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.04 160,000.00 5,760.00
Tukang batu L.02 OH 0.06 170,000.00 10,200.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,050.00
Mandor L.04 OH 0.00 200,000.00 400.00
JUMLAH TENAGA KERJA 17,410.00
B BAHAN
Pipa PVC tipe AW diameter ¾" m' 1.20 12,458.00 14,949.60
Perlengkapan Ls 0.35 5,232.36 1,831.33
16,780.93
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,190.93


E Overhead & Profit 10 % x D 3,419.09
F Harga Satuan Pekerjaan (D+E) 37,610.02

A.5.1.1.27 Pemasangan 1 m' pipa PVC tipe AW diameter 1"


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.04 160,000.00 5,760.00
Tukang batu L.02 OH 0.06 170,000.00 10,200.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,050.00
Mandor L.04 OH 0.00 200,000.00 400.00
JUMLAH TENAGA KERJA 17,410.00
B BAHAN
Pipa PVC tipe AW diameter 1" m' 1.20 16,771.00 20,125.20
Perlengkapan Ls 0.35 7,043.82 2,465.34
22,590.54
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,000.54


E Overhead & Profit 10 % x D 4,000.05
F Harga Satuan Pekerjaan (D+E) 44,000.59
A.5.1.1.28 Pemasangan 1 m' pipa PVC tipe AW diameter 1½"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.05 160,000.00 8,640.00
Tukang batu L.02 OH 0.09 170,000.00 15,300.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,575.00
Mandor L.04 OH 0.00 200,000.00 600.00
JUMLAH TENAGA KERJA 26,115.00
B BAHAN
Pipa PVC tipe AW diameter 1½" m' 1.20 37,375.00 44,850.00
Perlengkapan Ls 0.35 13,081.25 4,578.44
49,428.44
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 75,543.44


E Overhead & Profit 10 % x D 7,554.34
F Harga Satuan Pekerjaan (D+E) 83,097.78

A.5.1.1.29 Pemasangan 1 m' pipa PVC tipe AW diameter 2"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.05 160,000.00 8,640.00
Tukang batu L.02 OH 0.09 170,000.00 15,300.00
Kepala Tukang L.03 OH 0.01 175,000.00 1,575.00
Mandor L.04 OH 0.00 200,000.00 600.00
JUMLAH TENAGA KERJA 26,115.00
B BAHAN
Pipa PVC tipe AW diameter 2" m' 1.20 37,375.00 44,850.00
Perlengkapan Ls 0.35 15,697.50 5,494.13
50,344.13
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 76,459.13


E Overhead & Profit 10 % x D 7,645.91
F Harga Satuan Pekerjaan (D+E) 84,105.04
A.5.1.1.31 Pemasangan 1 m' pipa PVC tipe AW diameter 3"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.08 160,000.00 12,960.00
Tukang batu L.02 OH 0.14 170,000.00 22,950.00
Kepala Tukang L.03 OH 0.01 175,000.00 2,362.50
Mandor L.04 OH 0.00 200,000.00 800.00
JUMLAH TENAGA KERJA 39,072.50
B BAHAN
Pipa PVC tipe AW diameter 3" m' 1.20 71,875.00 86,250.00
Perlengkapan Ls 0.35 30,187.50 10,565.63
96,815.63
C PERALATAN
- - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 135,888.13


E Overhead & Profit 10 % x D 13,588.81
F Harga Satuan Pekerjaan (D+E) 149,476.94
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PEMATANGAN LAHAN

PEKERJAAN #REF!
LOKASI #REF!
TAHUN ANGG. #REF!

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOL. SAT. SATUAN HARGA
(Rp.) (Rp.)

II PEKERJAAN PEMATANGAN LAHAN

1 Pekerjaan Galian Tanah Batu 30,840.66 M3 Err:509 Err:509

Err:509
ITEM PEMBAYARAN NO. : 3.1 (2) Analisa EI-312
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA


1 Batu yg dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan Excavator, Compresor
dan Jack Hammer, dimuat ke dlm Truk dengan Loader.
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh : L 3.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 8.00 M3 / Jam

Koefisien Alat / m3 = 1 : Q1 (E05/26) 0.1250 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 4.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 45.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts1 menit
- Waktu tempuh isi = (L : v1) x 60 T1 4.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 3.00 menit
- Muat = (V : Q1) x 60 T3 30.00 menit
- Lain-lain T4 2.00 menit
Ts1 39.00 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 4.26 M3 / Jam


Fk x Ts1

Koefisien Alat / m3 = 1 : Q2 (E08) 0.2349 Jam

Berlanjut ke halaman berikut


ITEM PEMBAYARAN NO. : 3.1 (2) Analisa EI-312
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pahat / Tatah = 2 buah
- Palu Besar = 2 buah

3. TENAGA
Produksi menentukan : JACK HAMMER Q1 8.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 56.00 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1250 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. Err:509 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-312

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 3.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.0000 22,857.14 22,857.14


2. Mandor (L03) Jam 0.1250 28,571.43 3,571.43

JUMLAH HARGA TENAGA 26,428.57

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Compressor (E05) Jam - - -
2. Jack Hammer (E26) Jam 0.1250 Err:509 Err:509
3. Wheel Loader (E15) Jam 0.1250 Err:509 Err:509
4. Excavator (E10) Jam 0.1250 Err:509 Err:509
5 Dump Truck (E08) Jam - - -
Alat bantu Ls 1.0000 225.00 225.00

JUMLAH HARGA PERALATAN Err:509

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) Err:509


E. OVERHEAD & PROFIT 10.0 % x D Err:509
F. HARGA SATUAN PEKERJAAN ( D + E ) Err:509
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
STANDAR VOLUME /M STRUKTUR ( PEKERJAAN BETON DAN PAS. BATU )

1 poe plat teras

p = 0.8
l = 0.8
t = 0.2

Pondasi Poer Type P1 Bekisting 1 Buah Poer Plat


Jumlah = 1.000 bh

- Pek. Bekisting 0.64 - Keliling = 3.200 M


Tebal = 0.200 M
V = Keliling x Tebal
= 0.640 M2

Berat besi dalam 1 Poer Plat


- Pek. Pembesian 30.46 Kg besi jmlh p berat/m berat.ttl SAT
B 12 5 1.940 1.570 15.229 Kg
B 12 5 1.940 1.570 15.229 Kg

30.458 Kg

v = J.p X Jml. Besi Per Buah


= 1.000 x 30.458
= 30.458 kg

- Pek. Beton 0.13 M3 Volume atas


jumlah = 1.000 bh
P = 0.800 m
L = 0.800 m
T = 0.200 m
V = PXLXT
V = 1.000 X 0.800 X 0.800 X ###
V = 0.128 M3

2 Sloof S1 (15x20)
- Bekisting 0.40 M2 P = 1.00 M
L = 0.40 M
v = PXL
v = 1.00 x 0.40
V = 0.40 M2

- Pembesian 4.64 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 - - - - Kg
Beugel 5 0.55 0.395 1.085 Kg
4.64 Kg

v = P.TTL X BERAT/M
= 1.000 x 4.637
= 4.637 kg

- Pek. Beton 0.03 M3 0.18


P = 1.00
L = 0.135 m 5.71
T = 0.20 m
V = PXLXT
V = 1.00 X 0.14 X 0.20
= 0.03 M3
3 Kolom Ku ( Uk,15 x 20)
- Bekisting 0.55 M2 P = 1.00 M
L = 0.55 M
v = PXL
v = 1.00 x 0.55
V = 0.55 M2

- Pembesian 4.85 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 - 1.00 0.617 - Kg
Beugel 6 0.55 0.395 1.302 Kg
4.85 Kg

v = P.TTL X BERAT/M
= 1.000 x 4.854
= 4.854 kg

- Pek. Beton 0.03 M3


P = 1.00
L = 0.15 m
T = 0.20 m
V = PXLXT
V = 1.00 X 0.15 X 0.20
= 0.03 M3

3 Kolom Teras Kt2 ( Uk,15 x 20)


- Bekisting 0.70 M2 P = 1.00 M
L = 0.70 M
v = PXL
v = 1.00 x 0.70
V = 0.70 M2

- Pembesian 6.30 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 2 1.00 0.617 1.233 Kg
Beugel 6 0.64 0.395 1.516 Kg
6.30 Kg

v = P.TTL X BERAT/M
= 1.000 x 6.301
= 6.301 kg

- Pek. Beton 0.03 M3


P = 1.00
L = 0.15 m
T = 0.20 m
V = PXLXT
V = 1.00 X 0.15 X 0.20
= 0.03 M3
4 Kolom Praktis, Uk, 12 X 12
- Bekisting 0.15 M2 P = 1.00 M
L = 0.15 M
v = PXL
v = 1.00 x 0.15
V = 0.15 M2

- Pembesian 3.26 KG
besi Jml p berat/m berat.ttl SAT
B10 4 1.00 0.617 2.467 Kg

Beugel 4 0.50 0.395 0.789 Kg


3.26 Kg

v = P.TTL X BERAT/M
= 1.000 x 3.256
= 3.256 kg

- Pek. Beton 0.01 M3


P = 1.00
L = 0.12 m
T = 0.12 m
V = PXLXT
V = 1.00 X 0.12 X 0.12
= 0.01 M3

5 Balok Latey,Uk 13,5 x 15


- Bekisting 0.30 M2 P = 1.00 M
L = 0.30 M
v = PXL
v = 1.00 x 0.30
V = 0.30 M2

- Pembesian 3.26 KG
besi Jml p berat/m berat.ttl SAT

B10 4 1.00 0.617 2.467 Kg


Beugel 4 0.50 0.395 0.789 Kg
3.26 Kg

v = P.TTL X BERAT/M
= 1.000 x 3.256
= 3.256 kg

- Pek. Beton 0.02 M3


P = 1.00
L = 0.135 m
T = 0.15 m
V = PXLXT
V = 1.00 X 0.135 X 0.15
= 0.02 M3
6 Balok Tengah, uK 13 x 13
- Bekisting 0.26 M2 P = 1.00 M
L = 0.26 M
v = PXL
v = 1.00 x 0.26
V = 0.26 M2

- Pembesian 3.26 KG
besi Jml p berat/m berat.ttl SAT

B10 4 1.00 0.617 2.467 Kg


Beugel 4 0.50 0.395 0.789 Kg
3.26 Kg

v = P.TTL X BERAT/M
= 1.000 x 3.256
= 3.256 kg

- Pek. Beton 0.02 M3


P = 1.00
L = 0.130 m
T = 0.13 m
V = PXLXT
V = 1.00 X 0.130 X 0.13
= 0.02 M3

7 Ringbalok ,Uk 13,5 x 15


- Bekisting 0.30 M2 P = 1.00 M
L = 0.30 M
v = PXL
v = 1.00 x 0.30
V = 0.30 M2

- Pembesian 3.79 KG
besi Jml p berat/m berat.ttl SAT
B12 - 1.00 0.888 - Kg
B10 4 1.00 0.617 2.467 Kg
Beugel 6 0.56 0.395 1.326 Kg
3.79 Kg

v = P.TTL X BERAT/M
= 1.000 x 3.793
= 3.793 kg

- Pek. Beton 0.02 M3


P = 1.00
L = 0.14 m
T = 0.15 m
V = PXLXT
V = 1.00 X 0.14 X 0.15
= 0.02 M3
8 Pek. Balok Plat Lantai BT1 , Uk. 15/30 cm
- Bekisting 0.51 M2 P = 1.00 M
L = 0.51 M
v = PXL
v = 1.00 x 0.51
V = 0.51 M2

- Pembesian 7.76 KG
besi Jml p berat/m berat.ttl SAT
B12 5 1.00 0.888 4.440 Kg
B10 2 1.00 0.617 1.233 Kg
Beugel 6 0.88 0.395 2.084 Kg
7.76 Kg

v = P.TTL X BERAT/M
= 1.000 x 7.757
= 7.757 kg

- Pek. Beton 0.03 M3


P = 1.00
L = 0.15 m
T = 0.20 m DIKURANG PLAT
V = PXLXT
V = 1.00 X 0.15 X 0.20
= 0.03 M3

9 Pek. Balok Plat Lantai BT2 , Uk. 20/40 cm


- Bekisting 0.76 M2 P = 1.00 M
L = 0.76 M
v = PXL
v = 1.00 x 0.76
V = 0.76 M2

- Pembesian 8.37 KG
besi Jml p berat/m berat.ttl SAT
B12 5 1.00 0.888 4.440 Kg
B10 2 1.00 0.617 1.233 Kg
Beugel 6 1.14 0.395 2.700 Kg
8.37 Kg

v = P.TTL X BERAT/M
= 1.000 x 8.373
= 8.373 kg

- Pek. Beton 0.06 M3


P = 1.00
L = 0.20 m
T = 0.30 m DIKURANG PLAT
V = PXLXT
V = 1.00 X 0.20 X 0.30
= 0.06 M3
10 Pek.Plat Lantai , T = 10 cm
- Bekisting 1.00 M2 L = 1.00 M
V = 1.00 M2

Berat besi dalam 1 Poer Plat


- Pembesian 4.93 KG Berat Besi
besi Jml p berat/m berat.ttl SAT
B10 4 1.00 0.617 2.467 Kg
B10 4 1.00 0.617 2.467 Kg

4.93 Kg

v = P.TTL X BERAT/M
= 1.00 x 4.933
= 4.93 kg

- Pek. Beton 0.10 M3


P = 1.00
L 0.10 m
V = Luas x T
V = 1.00 X 0.10
= 0.10 M3

11 Pek. Talang Beton P = 1 M


- Bekisting 1.62 M2 L = 1.62 M
V = 1.62 M2

- Pembesian 12.28 KG Berat Besi Balok


besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B8 2 1.00 0.395 0.789 Kg
Beugel 6 0.75 0.395 1.776 Kg
6.12 Kg

Berat Besi Talang


besi Jml p berat/m berat.ttl SAT
b10.a 5 1.00 0.617 3.083 Kg
b10.b 4 1.05 0.617 2.590 Kg
b10.c 4 0.20 0.617 0.493 Kg
6.17 Kg

total jumlah besi = 6.12 + 6.17


= 12.28
v = P.TTL X BERAT/M
= 1.00 x 12.284
= 12.28 kg

- Pek. Beton 0.16 M3


P = 1.00
L 0.16 m
V = Luas x T
V = 1.00 X 0.16
= 0.157 M3
12 Pek. Saluran Air Keliling Bangunan P = 1 M

- Pek. Galian Tanah 0.18 M3


P = 1.00
L = 0.44
t = 0.40
V = PXLXT
V = 1.00 X 0.44 X 0.40
= 0.176 M3

- Pasir Urug 0.02 M3


P = 1.00
L = 0.44
t = 0.05
V = PXLXT
V = 1.00 X 0.44 X 0.05
= 0.022 M3

- Lantai Kerja 0.02 M3


P = 1.00
L = 0.22
t = 0.07
V = PXLXT
V = 1.00 X 0.22 X 0.07
= 0.015 M3

- Pas. Bata 1Pc : 3 Psr 0.70 m2


P = 1.00 m
L = 0.70 m
V = pxl
V = 1.00 X 0.70
= 0.700 m2

- Pek. Plasteran 1 : 3 0.84 m2


P = 1.00 m
L = 0.84 m
V = pxl
V = 1.00 X 0.84
= 0.840 m2