GEDUNG B ASISTENSI
10 11
28
T = 0.820 m
40
V = PxLxT
5
107 7 15
10 7
= 68.552 m3
57
25
12
Permukaan Tanah
Urugan Tanah
68
Dipadatkan
160
20
PAS. PONDASI
10
BATU GUNUNG
1 Pc : 4 Psr
40
5
5
15 20 15 5 40
520
5
170 100
De t. Po n d a si
SELA SA R A NTA R BA NG UNA N
SKALA 1 : 30
1 Kolom
kolom K1 16 titik Panjang kolom = 5.600 M
- bekisting 56.320 M2 Bekisting Kolom
v = P X L.total
v = 5.600 x 0.629
= 3.520 M2
Vt = 3.520 x 16.000
= 56.320 M2
- pembesian 403.873 Kg
berat besi dalam 1 kolom
besi Jml p berat/m berat.ttl SAT
B12 4.00 5.600 0.888 19.891 Kg
Beugel 38.00 0.634 0.222 5.351 Kg
25.242 Kg
Vt = 25.242 x 16.000
= 403.873 Kg
2 sloef 20x25
Sloef (20x25)
Panjang Sloof = 77.500 m
- Bekisting 38.750 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.500
= 0.500 M2
Vt = 77.500 x 0.500
= 38.750 M2
Vt = 77.500 x 5.431
= 420.873 Kg
- Pek. Beton 2.325 M3
P = 77.500
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 77.500 X 0.150 X 0.200
= 2.325 M3
3 Balok 15x20
Panjang balok = 76.000 m
- Bekisting 41.800 M2 Bekisting 1m balok
v = PXT
v = 1.000 x 0.550
= 0.550 M2
Vt = 76.000 x 0.550
= 41.800 M2
Vt = 76.000 x 5.431
= 412.727 Kg
- Pek. Beton 2.280 M3
P = 76.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 76.000 X 0.150 X 0.200
= 2.280 M3
4 Rinkbalk 15x20
Panjang balok = 76.000 m
- Bekisting 41.800 M2 Bekisting 1m balok
v = PXT
v = 1.000 x 0.550
= 0.550 M2
Vt = 76.000 x 0.550
= 41.800 M2
Vt = 76.000 x 5.431
= 412.727 Kg
- Pek. Beton 2.280 M3
P = 76.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 76.000 X 0.150 X 0.200
= 2.280 M3
P = 14.000 m
L = 1.1 m
T = 0.05 m
Volume = PxLxT
= 0.77 m3
Total Volume = 2.32 m3
6 Sloef (15x20)
Panjang Sloof = 77.500 m
- Bekisting 31.000 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.400
= 0.400 M2
Vt = 77.500 x 0.400
= 31.000 M2
Vt = 77.500 x 5.431
= 420.873 Kg
- Pek. Beton 2.325 M3
P = 77.500
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 77.500 X 0.150 X 0.200
= 2.325 M3
7 Rinkbalk (12x15)
Panjang Rinkbalk = 77.500 m
- Bekisting 18.600 M2 Bekisting 1m sloof
v = PXT
v = 1.000 x 0.240
= 0.240 M2
Vt = 77.500 x 0.240
= 18.600 M2
Vt = 77.500 x 5.596
= 433.719 Kg
- Pek. Beton 1.744 M3
P = 77.500
L = 0.150 m
T = 0.150 m
V = PXLXT
V = 77.500 X 0.150 X 0.150
= 1.744 M3
3. #REF!
' pek. Profil Kolom Bawah 7.815 M3 Bawah = 0.830 x 0.830 x 1.00
= 0.689 m3
Tengah = 0.700 x 0.700 x 0.80
0.392 m3
Atas 02 =
Luasbawah = 3,14xr2
Diameter R = 0.530
Luasbawah = 3.140 x 0.081 = 0.26 m2
Luas Atas = 3.140 x 0.060 = 0.19 m2
0.44 m2
Luas Rata2 = 0.222 m2
v = 0.222 x 0.090
= 0.020 m3
= 16.000 x 1.272
= 20.352
No Sketsa Vol Sat Perhitungan
BACK UP DATA
SELASAR PENGHUBUNG GEDUNG BUAPTI KE ASISTEN
PONDASI BANGUNAN
a. Pondasi Menerus 36.080 m3
Urugan Pasir
P = 20.000 m
L = 1.100 m
T = 0.050 m
V = PxLxT
= 1.100 m3
SELASAR KIRI KANAN = 2.200 M3
Pondasi Type
P = 20.000 m
L = 1.100 m
T = 0.200 m
V = PxLxT
= 4.400 m3
SELASAR KIRI KANAN = 8.800 M3
4 Pasangan Batu Gunung 1 : 4 40.802 M3 T
Pasangan Batu Gunung 1 : 5
P = 20.000 m
L1 = 0.300 m
L2 = 0.700 m
T = 1.600 m
V = L1 + L2 x tinggi x panjang
2.000
V = 0.500 x 1.600 x 20.000
= 16.000 M3
163
T = 1.630 m
V = P X L X T X Jumlah
V = 0.500 x 1.350 x 1.630 x 4.00
= 4.401 M3
180 50
TTL VOL. = 16.000 + 4.401
= 20.401 m3
Vt = 20.000 x 5.431
= 108.612 Kg
SELASAR KIRI KANAN = 217.225 Kg
- pembesian 203.288 Kg
berat besi dalam 1m
besi Jml p berat/m berat.ttl SAT
B14 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.634 0.222 0.986 Kg
4.538 Kg
Vt = 22.400 x 4.538
= 101.644 Kg
SELASAR KIRI KANAN = 203.288 Kg
V = P x Luas
V = 22.400 X 0.031
= 0.704 M3
SELASAR KIRI KANAN = 1.408 M3
SKETSA
20
15
Vt = 20.000 x 5.431
= 108.612 Kg
SELASAR KIRI KANAN = 217.225 Kg
20
SKETSA
20
15
Vt = 20.000 x 5.431
= 108.612 Kg
SELASAR KIRI KANAN = 217.225 Kg
V = Panjang x Tinggi
= 25.400 X 0.950
V = 24.130 M2
PAS. PONDASI SELASAR KIRI KANAN = 48.26 M2
BATU GUNUNG
1 Pc : 4 Psr
V = Panjang x Tinggi
= 25.400 X 0.950
V = 24.130 M2
PAS. PONDASI SELASAR KIRI KANAN = 48.26 -
BATU GUNUNG
1 Pc : 4 Psr
3. #REF!
' pek. Profil Kolom Bawah 1.954 M3 Bawah = 0.830 x 0.830 x 1.00
= 0.689 m3
Atas 02 =
12
Luasbawah = 3,14xr2
Diameter Rata2 = 0.530
Luasbawah = 3.140 x 0.081 = 0.26 m2
80
v = 0.222 x 0.090
78 = 0.020 m3
83
Volume Kolom
a = 4.000 x 0.064 = 0.26 m3
50
VI PEKERJAAN LANTAI
4,05
Lebar Atap 8.100 m
p = pxl
Volume =
v = 7.300 x 8.100
v = 59.130 m2
730 320
- luas total atap b =
P.atas = 3.200 m
Lebar Atap 4.050 m
p = pxl
Volume =
v = 3.200 x 4.050
v = 12.960 m2
P = 14.600 m
L = 0.500 m
T = 0.450 m
V=pxlxt
v = 14.600 x 0.500 x 0.450
= 3.285 m3
SELASAR KIRI KANAN = 6.57 m3
29.200 m2
- Pas. Bata 1 : 3 P = 14.600 m
L = 1.000 m
V=pxlxt
v = 14.600 x 1.000
= 14.600 m3
SELASAR KIRI KANAN = 29.20 m3
DATA - DATA :
1 PANJANG PONDASI LUAR = 200.4 M
PANJANG PONDASI DALAM BANGUNAN = 52 M
LUAS LANTAI KM/WC
- WC PRIA = 21 M2
- WC WANITA = 21 M2
- WC RUANG TUNGGU = 3.6 M2
45.6 M2
4 JUMLAH KOLOM K1 = 43 Bh
- PANJANG KOLOM = 6.4 M
'-KOLOM TERAS SAMPING,T = 4,4 M,JMLH= 8 BH = 4.4 M
PANJANG TOTAL KOLOM K1 = 310.4 M'
T.Rata2 = 1.500 m
150
Jml = 8.000 bh
V = P X L X T X Jmlh
V = 1.900 X 1.000 X 1.500 X 8.00
= 22.800 M3
10 170 10
10 80 10
TOTAL GALIAN
VT = VOL.P1+VOL.P2
= 91.760 + 22.800
PONDASI P1 PONDASI P2 = 114.560 M3
PONDASI BANGUNAN
b. Pondasi Menerus 219.749 m3
1 Pc : 4 Psr
PAS. PONDASI
Pondasi Type B (Luar Bangunan)
BATU GUNUNG
1 Pc : 4 Psr
P = 200.400 m
L = 1.100 m
20
T = 0.820 m
57
5
10 70 10
V = PxLxT
= 180.761 m3
5 20
10 90 10 TOTAL GALIAN
VT = VOL.P1+VOL.P2
PONDASI DALAM BANGUNAN PONDASI LUAR BANGUNAN = 38.988 + 180.761
= 219.749 M3
2 Urugan Pasir Pondasi 13.074 M3
PONDASI BANGUNAN
1 Pc : 4 Psr
PAS. PONDASI
Pondasi Type B (Luar Bangunan)
BATU GUNUNG
1 Pc : 4 Psr
P = 200.400 m
L = 1.100 m
20
T = 0.050 m
57
5
V = PxLxT
10 70 10
= 11.022 m3
5 20
10 90 10 TOTAL GALIAN
VT = VOL.P1+VOL.P2
= 2.052 + 11.022
= 13.074 M3
3 Urugan Tanah Kembali 83.577 m3
v = 1/4 / vol. Galian Tana m
v = 83.577 m2
V = Luas X tinggi
V = 891.880 X 0.360
= 321.077 M3
V = Luas X tinggi
V = 310.400 X 0.100
= 31.040 M3
1 Pc : 4 Psr
PAS. PONDASI L = 1.100 m
BATU GUNUNG
1 Pc : 4 Psr T = 0.200 m
5 20
V = PxLxT
57
= 44.088 m3
10 70 10
5 20
TOTAL GALIAN
VT = VOL.P1+VOL.P2
10 90 10
= 8.208 + 44.088
= 52.296 M3
7 Pasangan Batu Gunung 1 : 4 210.624 M3 Pondasi Type A (Dalam Bangunan)
Pasangan Batu Gunung 1 : 5
P = 45.600 m
30
L1 = 0.300 m
30
L2 = 0.700 m
T = 0.800 m
V = L1 + L2 x tinggi x panjang
2.000
V = 0.500 x 0.800 x 45.600
PAS. PONDASI
= 18.240 M3
80
BATU GUNUNG
160
1 Pc : 4 Psr
Pondasi Type B
Pasangan Batu Gunung 1 : 5
P = 200.400 m
70 L1 = 0.300 m
L2 = 0.900 m
90
T = 1.600 m
V = L1 + L2 x tinggi x panjang
2.000
V = 0.600 x 1.600 x 200.400
= 192.384 M3
Poer Plat P2
P = 1.900 m
L = 1.000 m
t = 0.070 m
Jml = 8.000 bh
V = P X L X T X Jmlh
V = 1.900 X 1.000 X 0.070 X 8.00
= 1.064 M3
jml = 37.000 Bh
Vt = 37.000 x 0.800
= 29.600 M2
jml = 8.000 Bh
Vt = 8.000 x 0.850
= 6.800 M2
30
Vt = 285.600 x 10.593
= 3,025.319 Kg
- Pek. Beton 17.136 M3
P = 285.600
L = 0.200 m
T = 0.300 m
V = PXLXT
V = 285.600 X 0.200 X 0.300
= 17.136 M3
Vt = 39.000 x 5.431
= 211.794 Kg
- Pek. Beton 1.170 M3
P = 39.000
L = 0.150 m
T = 0.200 m
V = PXLXT
V = 39.000 X 0.150 X 0.200
= 1.170 M3
3 Pek. Kolom Pedestal K1 43 titik Panjang kolom = 110.250 M
- bekisting 103.950 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.943
= 0.943 M2
Vt = 110.250 x 0.943
= 103.950 M2
KOLOM UTAMA
- pembesian TYPE GAMBAR 1,354.964 Kg
(K1)
50
berat besi dalam 1m
30
besi Jml p berat/m berat.ttl SAT
B14 8.00 1.000 1.209 9.669 Kg
GAMBAR Beugel 7.00 0.949 0.395 2.621 Kg
50
12.290 Kg
TULANGAN = 8 Ø 14 MM
Vt = 110.250 x 12.290
TULANGAN BEUGEL = Ø 8 - 150 MM
= 1,354.964 Kg
V = P x Luas
V = 110.250 X 0.071
= 7.796 M3
Vt = 9.800 x 5.044
= 49.430 Kg
V = P x Luas
V = 9.800 X 0.017
= 0.166 M3
12.290 Kg
TULANGAN = 8 Ø 14 MM
Vt = 310.400 x 12.290
TULANGAN = 3,814.791 Kg
BEUGEL = Ø 8 - 150 MM
V = P x Luas
V = 310.400 X 0.071
= 21.950 M3
6 Pek. Kolom Kp ( Praktis ) 104 titik Panjang kolom = 665.600 M
- bekisting 346.112 M2 Bekisting Kolom
v = P X L.total
v = 1.000 x 0.520
= 0.520 M2
Vt = 665.600 x 0.520
= 346.112 M2
- pembesian 3,357.180 Kg
berat besi dalam 1m
besi Jml p berat/m berat.ttl SAT
B12 4.00 1.000 0.888 3.552 Kg
Beugel 7.00 0.540 0.395 1.492 Kg
5.044 Kg
Vt = 665.600 x 5.044
= 3,357.180 Kg
V = P x Luas
V = 665.600 X 0.017
= 11.249 M3
GAMBAR
B10 4.00 1.000 0.617 2.467 Kg
10
Beugel 7.00 0.420 0.395 1.160 Kg
3.627 Kg
TULANGAN = 4 Ø 10
TULANGAN BEUGEL = Ø 8 - 200 Vt = 183.000 x 3.627
= 663.739 Kg
2 D10 MM 2 D10 MM
1 D10 MM B10 3.00 1.000 0.617 1.850 Kg
2 D14 MM
2 D14 MM Beugel 7.00 1.000 0.395 2.763 Kg
9.447 Kg
50
50
2 D12 MM 2 D12 MM
B12 4.00 1.000 0.888 3.552 Kg
1 D12 MM
10
10
2 D16 MM Beugel 7.00 1.750 0.395 4.835 Kg
25 25 2 D14 MM
25 25 14.701 Kg
30
2 D12 MM 2 D12 MM
1 D12 MM
2 D14 MM 2 D14 MM
= 2,303.669 Kg
SKETSA
20
Vt = 141.000 x 5.431
15
= 765.716 Kg
DIM ENSI 150 X 200 150 X 200
TULANGAN TU MPUAN 4 D12 MM 4 D12 MM
TULANGAN EKSRA - -
Vt = 51.400 x 4.440
= 228.216 Kg
Vt = 28.750 x 4.440
= 127.650 Kg
14 Pek. Balok Kuda - Kuda Beton Uk. 15 / 20 cm, Atap Teras Samping Bangunan Panjang Balok Kiri Kanan = 50.500 M
- Bekisting 20.200 M2 Bekisting Kolom
TIPE RINGBALOK
TUMPUAN
RB2 -150 X 200
LAPANGAN
v = P X L.total
15
v = 1.000 x 0.400
= 0.400 M2
20
SKETSA
20
15 Vt = 50.500 x 0.400
DIMENS I 150 X 200 150 X 200
= 20.200 M2
TULANGA N TUMPUAN 4 D12 MM 4 D12 MM
TUL ANGAN EKSRA - -
TUL ANGAN P INGGANG - -
SEN GKANG Ø 6 - 150 Ø 6 - 150
Vt = 50.500 x 5.431
= 274.246 Kg
475
232
TOTAL PANJANG DINDING = PANJANG TTL DINDING - PANJANG KUSEN - PANJANG KM/.WC
= 160.55 M
2 Dinding Tembok Tebal 1/2 Bata (1: 5) 1,108.051 M2 A. PAS. DINDING KELILING
P = 215.000 M
T = 6.100 M
PANJANG DINDING KESELURUHAN = 109 m V = PXT
106 m = 215.000 X 6.100
215 m = 1,311.500 M2
P = 29.000 M
T = 2.400 M
V = PXT
= 29.000 X 2.400
= 69.600 M2
B
P = 8.000 M
T = 2.000 M
V = PXT
= 8.000 X 2.000
= 16.000 M2
V = L X T X JMLH
J1 = 0.750 X 2.850 X 28.000 = 59.85 M2
J2 = 0.600 X 3.500 X 4.000 = 8.40 M2
68.25 m2
KUSEN VENTILASI
V = L X T X JMLH
V1 = 1.450 X 0.550 X 1.000 = 0.80 M2
V2 = 0.750 X 0.550 X 14.000 = 5.78 M2
V.LOBSTER = 0.200 X 0.800 X 28.000 = 4.48 M2
11.05 m2
LUAS DINDING 1 ; 5 =
V = DINDING - KUSEN - TRASRAM
= 1,429.100 - 154.917 - 166.13
= 1,108.051 M2
V = Panjang x Tinggi
= 171.000 X 0.300
V = 51.300 M2
B. Balok Tengah BT
Panjang = 29.000 Bh
Tinggi = 0.800 M
V = Panjang x Tinggi
= 29.000 X 0.800
V = 23.200 M2
V = Panjang x Tinggi
= 32.000 X 1.750
V = 56.000 M2
PANJANG = 80.150 M
TINGGI = 0.900 M
V = PXT
= 80.150 X 0.900
= 72.135 M2
PAS. PONDASI
BATU GUNUNG
1 Pc : 4 Psr
PAS. PONDASI
BATU GUNUNG
1 Pc : 4 Psr
8 Pek.kolom
' pek. Profil Kolom Bawah 5.854 M3 Bawah = 1.260 x 1.260 x 0.18
= 0.286 m3
= 0.318 m3
20
Atas 02 =
Luasbawah = 3,14xr2
Luasbawah = 3.140 x 0.276 = 0.87 m2
Luas Atas = 3.140 x 0.144 = 0.45 m2
123
1.32 m2
Luas Rata = 0.659 m2
v = 0.659 x 0.220
= 0.145 m3
18
13 35 30 35 13
Volume Total = 1.978 m3
Luas Kolom K1 = 1.724 m3 -
Total V 0.255 m3
Jumlah Kolom Utuh = 8.000 Bh
Kolom Sandar Pondasi = 30.000 Bh
Volume Kolom
a = 8.000 x 0.255 = 2.04 m3
b = 30.000 x 0.127 = 3.82 m3 +
5.85 m3
63
Jumlah Kolom Utuh = 8.000 Bh
Kolom Sandar Pondasi = 30.000 Bh
Volume Kolom
a = 8.000 x 0.198 = 1.58 m3
60 b = 30.000 x 0.099 = 2.97 m3 +
4.55 m3
VI PEKERJAAN LANTAI
b. Ventilasi
- Pek. Kusen Kayu 0.291 m3 Panjang = 6.150 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 6.150 X 0.135 X 0.05
= 0.042 M3
V total = V x jumlah
= 0.042 x 7.000
= 0.291 m3
b.Ventilasi 6 buah
- Pek. Kusen Kayu 0.134 - panjang = 3.300 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 3.300 X 0.135 X 0.05
= 0.022 M3
V total = V x jumlah
= 0.022 x 6.000
= 0.134 m3
- Pek. Lapiasan Aluminium Pada Daun Pintu Panil Bagian Dalam 12.096 m2 panjang = 2.400 M
lebar = 0.720 M
jumlah = 7 M
V = PXLXT
= 2.400 X 0.720 X 7.00
= 12.096 m2
a. Jendela 28 buah
- Pek. Kusen Kayu 1.191 m3 panjang = 6.300 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 6.300 X 0.135 X 0.05
= 0.043 M3
V total = V x jumlah
= 0.043 x 28.000
= 1.191 m3
b.Ventilasi 28 buah
- Pek. Kusen Kayu 0.529 m3 panjang = 2.800 M
l = 0.135 M
T = 0.050 M
V = PXLXT
= 2.800 X 0.135 X 0.05
= 0.019 M3
V total = V x jumlah
= 0.019 x 28.000
= 0.529 m3
1. Kuda - Kuda K1
Jumlah Kuda2 = 5.000 bh
Panjang Baja IWF 300 / 200 = 27.000 x 5.000 = 135 M
Panjang Baja IWF 200 = 6.400 x 5.000 = 32 M
4. JURAI LUAR
ATAP 02
2. JURAI LUAR
1. Kuda - Kuda k3
Jumlah Kuda2 = 4.000 bh
Panjang Baja IWF 150 / 100 = 18.100 x 4.000 = 72.4 M
2. JURAI Dalam
ATAP 04
1. Kuda - Kuda 1/1 k.3
Jumlah Kuda2 = 1.000 bh
Panjang Baja IWF 300 / 200 = 12.900 x 1.000 = 12.9 M
Panjang Baja IWF 200 = 16.650 x 1.000 = 16.65 M
2. JURAI LUAR
ATAP 05
1. Kuda - Kuda 1/1 k.2
Jumlah Kuda2 = 1.000 bh
Panjang Baja IWF 300 / 200 = 2.850 x 1.000 = 2.85 M
Panjang Baja IWF 150 = 12.200 x 1.000 = 12.2 M
2. JURAI LUAR
ATAP 06
1. Kuda - Kuda k.4
Jumlah Kuda2 = 1.000 bh
Panjang Baja IWF 150 / 100 = 13.000 x 1.000 = 13 M
3. JURAI LUAR
3. JURAI DALAM
Jumlah Kuda2 = 2.000 bh
Panjang Baja IWF 150 = 7.200 x 2.000 = 14.4 M
G o rd in g Ba ja C a n a l [ 100.50.6
400
P.Bawah 40.000 m
600
p = (p.a+p.b)/2
= 28.000 m
1600 L.Kemiringan = 15.150 m
1200
'b 1600
c v = 28.000 x 15.150
v = 424.200 m2
600
400
a p = 12.000 m
1000
1000 L.Kemiringan = 15.150 m
jumlah = 2.000 Bh
v = 12.000 x 15.150 x 2
v = 363.600 m2
- luas a
p = 10.000 m
L.Kemiringan = 12.650 m
jumlah = 2.000 Bh
v = 10.000 x 12.650 x 2
v = 253.000 m2
- luas b
p = 8.000 m
L.Kemiringan = 10.120 m
jumlah = 2.000 Bh
v = 1.000 x 10.120 x 2
v = 20.240 m2
- luas a
p = 6.000 m
L.Kemiringan = 7.600 m
jumlah = 1.000 Bh
v = 6.000 x 7.600 x 2
v = 91.200 m2
Total Luas = 364.440 m2
ATAP 02 JUMLAH 2 BH
410
Jmlh = 2.000
V = P X LX 2
980
luas area b
P.atas
=
= 17.350 m
P.Bawah
p =
10.000
(p.a+p.b)/2
m
= 13.675 m
L = 4.000 m
Jumlah = 2.000 m
v = 13.675 x 4.000 X 2.000
v = 109.400 m2
LUAS AREA C =
LUAS Ca
P = 5.700 m
L = 10.000 m
Jmlh = 1.000
V = P X LX 2
= 5.700 X 10.000 X 1.000
= 57.000 M2
LUAS Cb
P = 4.100 m
L = 9.000 m
Jmlh = 2.000
V = P X LX 2
= 4.100 X 9.000 X 2.000
= 73.800 M2
Total Luas C = 57.000 + 73.800
= 130.800 m2
TOTAL LUAS AREA ATAP 02 = 130.800 + 109.400 + 312.300
= 552.500 M2
= 552.500 X 2.000
= 1,105.000 M2
LUAS ATAP 03
luas area a =
400 450 P = 13.740 m
L = 4.500 m
Jmlh = 2.000
350
V = P X LX 2
= 13.740 X 4.500 X 2.000
= 123.660 M2
luas area b =
840
P.atas = 13.740 m
P.Bawah
p =
7.500
(p.a+p.b)/2
m
= 10.620 m
350
L = 3.500 m
Jumlah = 2.000 m
v = 10.620 x 3.500 X 2.000
v = 74.340 m2
LUAS AREA C =
LUAS Ca
P = 7.500 m
L = 4.000 m
Jmlh = 2.000
V = P X LX 2
= 7.500 X 4.000 X 2.000
= 60.000 M2
LUAS Cb
P = 4.200 m
L = 5.700 m
Jmlh = 1.000
V = P X LX 2
= 4.200 X 5.700 X 1.000
= 23.940 M2
Total Luas C = 60.000 + 23.940
= 83.940 m2
400
TOTAL LUAS AREA 03 = L.A+L.B+L.C
= 123.660 + 74.340 + 83.940
= 281.940 M2
51
10
1140
atap 04
- luas total atap Samping =
P = 10.150 m
L = 4.000 m
Jmlh = 2.000
V = P X LX 2
= 10.150 X 4.000 X 2.000
760
= 81.200 M2
d. Tengah = 123.000 m2
= 27.600 m2
150.600 m2
e Flafond Luar Bangunan
Teras = 111.010 m2'
Plafond Luar Keliling = 307.620 m2'
Plafond Atap Perisai = 85.800 m2'
504.430 m2'
IX PEKERJAAN SANITAIR
X PEKERJAAN PENGECETAN
4. Pek. Cat Kilap Kusen Pintu, Jendela dan kusen 99.887 m2 Luas Panjang X tebal x jumlah
- Pintu Type P2; Buah = 8.000 X 0.235 x 6.000 11.28
- Pintu Type P3; Buah = 5.600 X 0.235 x 7.000 9.21
- Jendela Type J1; Buah = 9.100 X 0.235 x 28.000 59.88
- Jendela Type J2; Buah = 9.800 X 0.235 x 4.000 9.21
- Ventilasi Type V1; Buah = 4.650 X 0.235 x 1.000 1.09
- Ventilasi Type V2; Buah = 2.800 X 0.235 x 14.000 9.21
LUAS 99.89 m2
P = 177.600 m
L = 0.500 m
T = 0.450 m
V=pxlxt
v = 177.600 x 0.500 x 0.450
= 39.960 m3
27.706 m2
- Pas. Bata 1 : 3 P = 177.600 m
L = 1.040 m
T = 0.150 m
V=pxlxt
v = 177.600 x 1.040 x 0.150
= 27.706 m3
P = 13.000 m
L = 0.700 m
T = 0.150 m
V=pxlxt
v = 13.000 x 0.700 x 0.150
= 1.365 m3
V=pxlxt
v = 13.000 x 0.900
= 11.700 m3
P = 13.000 m
L = 4.000 m
T = 0.200 m
V=pxlxt
v = 13.000 x 4.000 x 0.200
= 10.400 m3
P = 56.000 m
L = 0.500 m
T = 0.350 m
V=pxlxt
v = 56.000 x 0.500 x 0.350
= 9.800 m3
P = 56.000 m
L = 0.400 m
T = 0.400 m
V=pxlxt
v = 56.000 x 0.400 x 0.400
= 8.960 m3
- pek. Dinding Bata 1 : 3 39.200 P = 56.000 m
L = 0.700 m
V=pxlxt
v = 56.000 x 0.700
= 39.200 M2
Vt = 56.000 x 4.069
= 227.865 Kg
Vt = 56.000 x 4.069
= 227.865 Kg
P = 18.300 m
L = 0.900 m
T = 0.180 m
V=pxlxt
v = 18.300 x 0.900 x 0.180
= 2.965 m3
P = 18.300 m
L = 0.900 m
T = 0.200 m
V=pxlxt
v = 18.300 x 0.900 x 0.200
= 3.294 m3
V=pxlxt
v = 18.300 x 0.475 x 1.050
= 9.127 M2
b. Tangga Stage
V=pxlxt
v = 8.050 x 0.270
= 2.174 m3
P = 8.050 m
33 40 40
L =
a = 0.330 x 0.200 = 0.066 m2
a = 0.580 x 0.200 = 0.116 m2
20
18 18
40
V=pxl
v = 8.050 x 0.423
= 3.407 m3
33 40
40
B Pas. Batu Samping Tangga
P = 0.200 m
20
L =
a = 0.330 x 0.200 = 0.066 m2
20
V = p x l xj Jumlah = 4.000
v = 0.200 x 0.822 x 4.000
= 0.658 m3
P = 7.800 m
L = 0.400 m
T = 0.400 m
V=pxlxt
v = 7.800 x 0.400 x 0.400
= 1.248 m3
Vt = 7.800 x 4.069
= 31.738 Kg
xxxxxxxxxxxxxxxxxxxxxxxxxxxx
Direktur
PEMERINTAH KABUPATEN BOMBANA
KECAMATAN POLEANG
Alamat : Jl. Poros Bombana-Kolaka, Kec. Poleang, Kab. Bombana, 93772
TOTAL HARGA
NO URAIAN PEKERJAAN
(Rp.)
I PEKERJAAN PERSIAPAN Rp 3,614,000.00
II PEKERJAAN GEDUNG
A PEKERJAAN STRUKTUR BAWAH (TANAH & PONDASI) Rp 11,747,782.92
B PEKERJAAN STRUKTUR TENGAH (SLOOF, KOLOM DAN BALOK ) Rp 28,558,585.92
C PEKERJAAN DINDING & PLESTERAN Rp 12,552,138.12
D PEKERJAAN LANTAI Rp 5,407,315.29
E PEKERJAAN PINTU & JENDELA Rp 1,628,085.83
F PEKERJAAN PLAMBING Rp 5,116,906.82
H PEKERJAAN PENGECATAN Rp -
III PEK. AKHIR DAN FINISHING Rp 250,000.00
PANJANG PONDASI = 42 M
PONDASI POER PLAT =
UTUH = 26 Bh
STENGAH = 10 Bh
PANJANG SLOOF 15 X30 = 88 M
KOLOM PEDESTAL 30 X 30 = 55.8 M
JUMLAH = 36 BH
PANJANG = 1.55 M
P.TOTAL = 36 X 1.55
= 55.8 M
KOLOM PRAKTIS ( Kp) 15 X 15 = 25.55 M
JUMLAH = 7 BH
PANJANG = 3.65 M
P.TOTAL = 7 X 3.65
= 25.55 M
KOLOM KU1 ( 30 X 30 ) = 140.8 M
Struktur utama JUMLAH = 28 BH
PANJANG = 4 M
P.TOTAL = 28 X 4
= 112 M
LANTAI 02
L. LANTAI TEGEL 40 X 40 = 146.0575 M2
BALKON = 5.2725 M2
R.KPLA = 8.1225 M2
R.STAF = 13.8225 M2
MUSHLLH = 28.3725 M2
AULA = 28.3725 M2
R.TGGU = 48.7 M2
R.JAGA = 8.1225 M2
P.TERA = 5.2725 M2
1 'Galian Tanah Pondasi Batu Gunung Dan Poer Plat #REF! M3 PONDASI MENERUS
P = 42.00 M
L = 0.65 M
T = #REF! M
V = PXTXL
V = 42.00 X 0.65 X #REF!
= #REF! M3
TTL.VOL = A+B+C
= #REF! + 31.72 + 6.10
= #REF! M3
TTL.VOL = A+B+C
= #REF! + 1.30 + 0.25
= #REF! M3
6 Lantai Kerja Pondasi Poer; t = 7cm (f'c=7.4 Mpa (K100) 2.17 M3 PONDASI POER PLAT UTUH
J.P = 26.00 M
P = 1.00 M
L = 1.00 M
T = 0.07 M
V = J.P X P X T X L
V = 26.00 X 1.00 X 1.00 X 0.07
= 1.82 M3
TTL.VOL = A+B
= 1.82 + 0.35
= 2.17 M3
7 Pondasi Poer Type P1 Bekisting 1 Buah Poer Plat
Jumlah = 31.000 bh
PONDASI UTUH PONDASI STENGAH
Jumlah = 26.000 Jumlah = 10.000
- Pek. Bekisting 43.40 M2 Keliling = 4.000 M Keliling = 2.000 M
Tebal = 0.350 M Tebal = 0.350 M
V = Keliling x Tebal V = Keliling x Tebal
= 36.400 M2 = 7.000 M2
= 43.400 M2
37.274 Kg
27.644 Kg
V.TOTAL = P1 + P2
= 969.114 + 276.440
= 1,245.554 kg
PONDASI STENGAH
jumlah = 10.000 bh
P = 1.000 m
L = 0.700 m
T = 0.350 m
V = PXLXT
V = 10.000 X 1.000 X 0.700 X 0.35
V = 2.450 M3
V.TOTAL = P1 + P2
= 9.10 + 2.45
= 11.55 M3
1 Sloof S1 (15x30)
- Bekisting 52.80 M2 P = 88.00 M
L = 0.60 M
v = PXL
v = 88.00 x 0.60
V = 52.80 M2
- Pembesian 821.81 KG
besi Jml p berat/m berat.ttl SAT
B12 5 1.00 1.209 6.043 Kg
B12 2 1.00 0.888 1.776 Kg
Beugel 5 0.77 0.395 1.519 Kg
9.34 Kg
v = P.TTL X BERAT/M
= 88.000 x 9.339
= 821.814 kg
- Pembesian 684.90 KG
besi Jml p berat/m berat.ttl SAT
B14 8 1.00 1.209 9.669 Kg
B12 - 1.00 0.888 - Kg
Beugel 6 1.10 0.395 2.605 Kg
12.27 Kg
28 v = P.TTL X BERAT/M
= 55.800 x 12.274
= 684.897 kg
- Pembesian 1,728.20 KG
besi Jml p berat/m berat.ttl SAT
B14 8 1.00 1.209 9.669 Kg
B12 - 1.00 0.888 - Kg
Beugel 6 1.10 0.395 2.605 Kg
12.27 Kg
v = P.TTL X BERAT/M
= 140.800 x 12.274
= 1,728.198 kg
- Pembesian 113.74 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 25.550 x 4.452
= 113.745 kg
5 Balok Latey
- Bekisting 7.73 M2 P = 25.75 M
L = 0.30 M
v = PXL
v = 25.75 x 0.30
V = 7.73 M2
- Pembesian 99.09 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 25.750 x 3.848
= 99.086 kg
- Pembesian 1,311.84 KG
besi Jml p berat/m berat.ttl SAT
B14 5 1.00 1.209 6.043 Kg
B12 2 1.00 0.888 1.776 Kg
Beugel 6 0.80 0.395 1.894 Kg
9.71 Kg
v = P.TTL X BERAT/M
= 135.050 x 9.714
= 1,311.840 kg
7 Pek.Plat Lantai , T = 12 cm
- Bekisting 158.22 M2 L = 158.22 M
V = 158.22 M2
v = P.TTL X BERAT/M
= 108.00 x 17.883 AREA HASIL HACT CAAD
= 1,931.40 kg
11.10 Kg
v = P.TTL X BERAT/M
= 50.00 x 11.100
= 555.00 kg AREA HASIL HACT CAAD
total = 1,931.40 + 555.00
= 2,486.40 kg
8 PEKERJAN TANGGA
44.000 Kg
47.520 Kg
6.553 Kg
v = P.TTL X BERAT/M
= 26.300 x 9.903
= 260.453 kg
14.80 Kg
v = P.TTL X BERAT/M
= 50.05 x 14.800
= 740.74 kg
6.67
Kolom Teras A 2
P = 8.00 M
L = 1.65 M
JML = 2.00 BH
Kolom Belakang
Luas = 3.68 m2 Area Samping Kiri'
= 3.68 m2 Area Samping Kanan
= 1.43 m2 Area Depan Dan Belakang
- m2
TOTAL Volume
= 69.76 + 26.40 + -
= 96.16 m2
D PEKERJAAN LANTAI
TERAS = 63.36 M2
TERAS DPN = 55.55 M2
GE. UTMA = 53.295 M2
172.21 M2
Tempst Whudu
Jumlah = 1.08 Bh
L = 2.85 m2
V = jumlah x Luas
= 1.08 X 2.85
= 3.08 m2
Tempst Whudu
P = 7.20 m
T = 2.00 m
jmlh = 1.00 bh
V = P X L X Jmlh
= 7.20 X 2.00 X 1.00
= 14.40 m2
Tempst Whudu
P = 7.20 m
T = 0.10 m
jmlh = 1.00 bh
V = P X L X Jmlh
= 7.20 X 0.10 X 1.00
= 0.72 m2
E PEK. PLAFOND
F PEKERJAAN PLAMBING
G PEKERJAAN PENGECATAN
3 Pek. Cat Kilap Daun Pintu , Jendela Dan Ventilasi 10.57 m2 Type Pintu Dan Jendela
P2 = 3.44 m2
P3 = 5.63 m2
J1 = 1.02 m2
V1 = 0.48 m2
10.57 m2
4 Pek. Cat Kilap Kusen Pintu dan Jendela 7.60 m2 Type Pintu Dan Jendela
P2 = 1.67 m2
P3 = 2.42 m2
J1 = 2.28 m2
V1 = 1.22 m2
7.60 m2
### LANTAI 02
- Pembesian 1,296.21 KG
besi Jml p berat/m berat.ttl SAT
B14 8 1.00 1.209 9.669 Kg
B12 - 1.00 0.888 - Kg
Beugel 6 1.18 0.395 2.794 Kg
12.46 Kg
v = P.TTL X BERAT/M
= 104.000 x 12.464
= 1,296.212 kg
2 Kolom KU3 ( 15 X 40 )
- Bekisting 45.36 M2 P = 50.40 M
L = 0.90 M
v = PXL
v = 50.40 x 0.90
V = 45.36 M2
- Pembesian 542.04 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 1.209 4.835 Kg
B10 4 1.00 0.888 3.552 Kg
Beugel 6 1.00 0.395 2.368 Kg
10.75 Kg
v = P.TTL X BERAT/M
= 50.400 x 10.755
= 542.035 kg
- Pembesian 18.00 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 3.800 x 4.736
= 17.997 kg
4 Balok Latey
- Bekisting 10.80 M2 P = 36.00 M
L = 0.30 M
v = PXL
v = 36.00 x 0.30
V = 10.80 M2
- Pembesian 131.42 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 36.000 x 3.651
= 131.424 kg
- Pembesian 404.09 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 - 1.00 0.617 - Kg
Beugel 6 0.88 0.395 2.084 Kg
5.64 Kg
v = P.TTL X BERAT/M
= 71.700 x 5.636
= 404.090 kg
- Pembesian 167.86 KG
besi Jml p berat/m berat.ttl SAT
B14 5 1.00 1.209 6.043 Kg
B12 2 1.00 0.888 1.776 Kg
Beugel 6 0.88 0.395 2.084 Kg
9.90 Kg
v = P.TTL X BERAT/M
= 16.950 x 9.903
= 167.859 kg
7 Pek.Plat Atap
- Bekisting 17.90 M2 L = 11.30 M
V = 17.90 M2
14.80 Kg
v = P.TTL X BERAT/M
= 11.30 x 14.800
= 167.24 kg
15.11 Kg
v = P.TTL X BERAT/M
= 31.80 x 15.108
= 480.45 kg
15.11 Kg
v = P.TTL X BERAT/M
= 6.00 x 15.108
= 90.65 kg
- Pek. Beton 1.21 M3
P = 6.00
Luas = 0.20 m
V = Luas x T
V = 6.00 X 0.20
= 1.21 M3
c Talang Depan ( Tengah) P = 9M
- Bekisting 13.05 M2 L = 1.45 M
V = PXL
V = 9.00 X 1.45
V = 13.05 M2
13.44 Kg
v = P.TTL X BERAT/M
= 9.00 x 13.443
= 120.99 kg
- Pek. Beton 1.04 M3
P = 9.00
Luas = 0.12 M2
V = Luas x T
V = 9.00 X 0.12
= 1.04 M3
- Pembesian 56.73 KG
besi Jml p berat/m berat.ttl SAT
B10 2 1.00 0.617 1.233 Kg
B10 6 1.00 0.617 3.700 Kg
4.93 Kg
v = P.TTL X BERAT/M
= 11.500 x 4.933
= 56.733 kg
D PEKERJAAN ATAP
E PEKERJAAN LANTAI
F PEK. PLAFOND
- Pembesian 122.35 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 24.800 x 4.933
= 122.347 kg
- Pembesian 91.76 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 18.600 x 4.933
= 91.760 kg
- Pengecetan 3.75 M2
F PEKERJAAN PLAMBING
1 Pemasangan 1 buah closet Jongkok Porselen 1.00 Bh 701,404.00 701,404.00
2 Pek. Kran Air 3/4 1.00 Bh 54,257.50 54,257.50
3 Pek. Pipa Air Bersih 3/4" 17.00 m' 37,610.02 639,370.32
4 Pek. Pipa Air Kotor PVC 3" 17.00 m' 71,875.00 1,221,875.00
5 Pek. Septic Tank 1.00 Unit 2,500,000.00 2,500,000.00
5,116,906.82
I PEKERJAAN ATAP DAN PENUTUP ATAP
1. Pek. Kuda-Kuda Kayu kls. II 0.59 m3 8,716,455.00 5,142,708.45
2. Pek. Gording Kayu kls. II 0.68 m3 8,418,025.00 5,744,460.26
3. Pek. Pasangan Atap Spandek 85.61 m2 137,676.00 11,786,442.36
4. Pek. Nok Atap Seng 24.78 m' 65,917.50 1,633,435.65
24,307,046.72
III PEK. AKHIR DAN FINISHING
1 Pek. Pembersihan Akhir 1.00 Ls 250,000.00 250,000.00
JUMLAH 250,000.00
JUMLAH TOTAL 93,181,861.61
6 Lantai Kerja Pondasi Poer; t = 5 cm (f'c=7.4 Mpa (K100) 0.40 M3 PONDASI POER PLAT UTUH
J.P = 8.00 M
P = 1.00 M
L = 1.00 M
T = 0.05 M
V = J.P X P X T X L
V = 8.00 X 1.00 X 1.00 X 0.05
= 0.40 M3
Jumlah = 8.000 bh
Jumlah = 8.000
- Pek. Bekisting 6.00 M2 Keliling = 4.000 M
Tebal = 0.250 M
V = Keliling x Tebal
= 8.000 M2
32.073 Kg
32.07 x 8.00
- Pek. Beton 2.00 M3 = 256.58
jumlah = 8.000 bh
P = 1.000 m
L = 1.000 m
T = 0.250 m
V = PXLXT
V = 8.000 X 1.000 X 1.000 X 0.25
V = 2.000 M3
Jumlah = 1.000 bh
Str 2
p = 1.00 m
l = 0.25 m
t = 1.60 m
V =
= 1.60 + 0.40
= 2.00 x 2.00
= 4.00 m2
V tot = 4.99 m2
85.642 Kg
85.64 x 1.00
- Pek. Beton 0.63 M3 = 85.64
Str 1 = 1.000 bh
P = 1.200 m
L = 0.775 m
T = 0.250 m
V = PXLXT
V = 1.000 X 1.200 X 0.775 X 0.25
V = 0.233 M3
Str 2 = 1.000 bh
P = 1.000 m
L = 0.250 m
T = 1.600 m
V = PXLXT
V = 1.000 X 1.000 X 0.250 X 1.60
V = 0.400 M3
V tot = 0.63 m3
- Pembesian 458.43 KG
besi Jml p berat/m berat.ttl SAT
B12 7.000 49.40 0.888 306.987 Kg
B10 2 49.40 0.617 60.910 Kg
Beugel 314 0.73 0.395 90.537 Kg
458.43 Kg
- Pembesian 125.39 KG
besi Jml p berat/m berat.ttl SAT
B12 8 14.40 0.888 102.270 Kg
Beugel 97 0.60 0.395 23.116 Kg
125.39 Kg
- Pembesian 370.72 KG
besi Jml p berat/m berat.ttl SAT
B12 5.000 49.40 0.888 219.277 Kg
B10 2.000 49.40 0.617 60.910 Kg
Beugel 314.333 0.73 0.395 90.537 Kg
370.72 Kg
- Pembesian 305.22 KG
besi Jml p berat/m berat.ttl SAT
B12 12 24.00 0.888 255.675 Kg
Beugel 161 0.78 0.395 49.549 Kg
305.22 Kg
- Pembesian 230.16 KG
besi Jml p berat/m berat.ttl SAT
B12 8 24.00 0.888 170.450 Kg
Beugel 161 0.94 0.395 59.713 Kg
230.16 Kg
- Pembesian 165.60 KG
besi Jml p berat/m berat.ttl SAT
B12 4 45.00 0.617 110.970 Kg
Beugel 301 0.46 0.395 54.631 Kg
165.60 Kg
Ø8 - 15
15
2 Ø10
- Pembesian 143.54 KG
besi Jml p berat/m berat.ttl SAT
- Pembesian 596.24 KG
besi Jml p berat/m berat.ttl SAT
K12x12 = 0.30
= 0.30 x 8.00
= 2.40 x 3.00
= 7.20 M2
= 0.15
= 0.15 x 8.00
= 1.20 x 3.00
= 3.60 M2
V Tot = 26.64 M2
D PEKERJAAN LANTAI
3 Pek.Plat Lantai , T = 12 cm
- Bekisting 75.00 M2 L = 75.00 M
5.00 M
15.00 M
V = 75.00 M2
16.44 Kg
v = P.TTL X BERAT/M
= 75.00 x 16.444
= 1,233.33 kg
- Pek. Beton 9.38 M3
P = 75.00
L = 0.13 m
V = Luas x T
V = 75.00 X 0.13
= 9.38 M3
P = 1.77 m
L = 0.52 m
V = PXL
= 1.77 X 0.52
= 0.92 m2
= 0.92 x 3.00 x 1.00
Total Volume = 2.76 m2
F PEKERJAAN PLAMBING
G PEKERJAAN PENGECATAN
3 Pek. Cat Kilap Daun Pintu Dan Ventilasi 15.71 m2 Type Pintu Dan Jendela
P1 = 0.81 m2
P2 = 2.18 m2
J1 = 10.93 m2
J2 = 1.79 m2
J3 = 2.13 m3
15.71 m2
H PEKERJAAN ATAP
100
332,17
500
1715
436,43
357,5
1000
715
715
436,43 436,43
1000
436,43
357,5 357,5
1715
I PEKERJAAN TANGGA
Miring = 0.33 M
T.Bek. Samp = 0.25 M
= 0.16 M
Dasar = 0.33 M
V Bekisting/Tangga = 0.66 M
V Total = 10.62 M
- Pembesian 219.05 KG
besi Jml p berat/m berat.ttl SAT
219.05 Kg
J PEK. PLAFOND
L Lt 2 = 97.10 m2 By BIM
Kamar = 49.26 m2
Km = 5.46 m2
Area Overstek = 42.38 m2
K PEKERJAAN TERAS
- Dynabold 8.00 bh
3
Pek. Pasangan Atap Metal 10.80 M2
M
2
DAFTAR HARGA SATUAN PEKERJAAN
HARGA SATUAN
KODE URAIAN PEKERJAAN (Rp.)
A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½batu campuran 1SP:3PP 166,037.08
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½batu campuran 1SP:4PP 162,151.00
LANTAI
Anl. Tambahan Pemasangan 1 m2 lantai Keramik ukuran 40cm x 40cm 142,678.07
Anl. Tambahan Pemasangan 1 m2 lantai Keramik ukuran 40 cm x 40 cm Anti Slip 188,219.90
Anl. Tambahan Pemasangan 1 m2 dinding Keramik ukuran 20 cm x 40 cm 294,649.30
Anl. Tambahan 1 m2 Lantai Beton Sikat 380,000.00
Anl. Tambahan 1 m2 Lantai Penyandang Cacat 750,000.00
Anl. Tambahan Loster 20 /40 27,000.00
A.4.5.1.1 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, plafond 178,997.50
Anl. Tambahan Pemasangan 1 m2 rangka kayu balok 5/7 modul 60 x 60 cm, plafond 186,532.50
A.4.5.1.7 Pemasangan 1 m2 langit-langit Kalsi Board Tebal 4.5 mm 96,361.10
A.4.5.1.9 Pemasangan 1 m' list langit-langit Multipleks Tebal 10 mm Uk. 1 x 5 cm 24,520.38
I. UPAH KERJA
HARGA HARGA UPAH/JAM
No. NAMA TENAGA KERJA SATUAN
UPAH/HARI KERJA KERJA
sk B
- Pekerja Org/Hr Rp 160,000.00 22,857.14###
- Tukang Org/Hr Rp 170,000.00 24,285.71###
- Kepala Tukang Org/Hr Rp 175,000.00 25,000.00###
- Mandor Org/Hr Rp 200,000.00 28,571.43###
A BAHAN DASAR
###
- Tanah Timbunan Pilihan M3 Rp 80,000.00 Lokasi Pekerjaan ###
- Tanah Urug Biasa M3 Rp 80,000.00 Lokasi Pekerjaan ###
- Tanah Humus M3 Rp 97,000.00 Lokasi Pekerjaan ###
- Pasir urug M3 Rp 200,000.00 ###
- Pasir Pasangan M3 Rp 200,000.00 ###
- Pasir Beton M3 Rp 200,000.00 ###
- Portland Cement 50 Kg Zak Rp 72,000.00 ###
- Portland Cement Kg Rp 1,440.00 ###
- Semen Warna Kg Rp 1,500.00 ###
- Batu Belah (Batu Kali) M3 Rp 200,000.00 ###
- Batu Gunung M3 Rp 200,000.00 ###
- Split 2 - 3 cm M3 Rp 400,000.00 Pecah Manual ###
- Kerikil / Batu Telor M3 Rp 400,000.00 ###
- Batu Merah Buah Rp 750.00 ###
B BAHAN KAYU
###
- Balok Kayu Kelas I M3 Rp 4,000,000.00 ###
- Papan Kayu Kelas I M3 Rp 4,000,000.00 ###
- Kayu Kelas II Balok (Sejenis) M3 Rp 3,500,000.00 ###
- Kayu Kelas III Sejenis (Papan Bekisting) M3 Rp 3,000,000.00 ###
- Kayu Dolken dia 8 - 10/4 meter Btg Rp 25,000.00 ###
A.4.1.1.5 Membuat 1 m3 beton mutu f'c=14.5 Mpa (K175), Slump (12±2) cm, w/c=0.66
A.4.1.1.6 Membuat 1 m3 beton mutu f'c=16.9 Mpa (K200), Slump (12±2) cm, w/c=0.61
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 352.000 1,440.00 506,880.00
Pasir beton Kg 731.000 142.86 104,428.57
Kerikil (maks 30 mm) Kg 1,031.000 275.86 284,413.79
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 912,653.61
C PERALATAN
- - -
JUMLAH HARGA ALAT -
A.4.1.1.8 Membuat 1 m3 beton mutu f'c=21.7 Mpa (K250), Slump (12±2) cm, w/c=0.56
A.4.1.1.9 Membuat 1 m3 beton mutu f'c=24.0 Mpa (K275), Slump (12±2) cm, w/c=0.53
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 160,000.00 264,000.00
Tukang Batu L.02 OH 0.275 170,000.00 46,750.00
Kepala Tukang L.03 OH 0.028 175,000.00 4,900.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 332,250.00
B BAHAN
Sement portland Kg 406.000 1,440.00 584,640.00
Pasir beton Kg 684.000 142.86 97,714.29
Kerikil (maks 30 mm) Kg 1,026.000 275.86 283,034.48
Air Ltr 215.000 78.75 16,931.25
JUMLAH TENAGA KERJA 982,320.02
C PERALATAN
- - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,314,570.02
E Overhead & Profit 10 % x D 131,457.00
F Harga Satuan Pekerjaan (D+E) 1,446,027.02
A.4.1.1.10 Membuat 1 m3 beton mutu f'c=26.4 Mpa (K300), Slump (12±2) cm, w/c=0.52
6 Lantai Kerja Pondasi Poer; t = 5 cm (f'c=7.4 Mpa (K100) 0.32 M3 PONDASI POER PLAT UTUH
J.P = 8.00 M
P = 0.90 M
L = 0.90 M
T = 0.05 M
V = J.P X P X T X L
V = 8.00 X 0.90 X 0.90 X 0.05
= 0.32 M3
Jumlah = 8.000 bh
Jumlah = 8.000
- Pek. Bekisting 5.40 M2 Keliling = 3.600 M
Tebal = 0.250 M
V = Keliling x Tebal
= 7.200 M2
- Pembesian 204.59 KG
besi Jml p berat/m berat.ttl SAT
B12 6 47.00 0.888 250.416 Kg
Beugel 314 0.73 0.395 90.562 Kg
340.98 Kg
- Pembesian 59.91 KG
besi Jml p berat/m berat.ttl SAT
B12 6 14.40 0.888 76.723 Kg
Beugel 97 0.60 0.395 23.123 Kg
99.85 Kg
- Pembesian 59.03 KG
besi Jml p berat/m berat.ttl SAT
B12 4 17.50 0.888 62.160 Kg
Beugel 118 0.78 0.395 36.223 Kg
98.38 Kg
- Pembesian 134.81 KG
besi Jml p berat/m berat.ttl SAT
B12 4 24.00 0.888 85.248 Kg
Beugel 161 0.78 0.395 49.562 Kg
134.81 Kg
- Pembesian 71.85 KG
besi Jml p berat/m berat.ttl SAT
B12 4 34.50 0.617 85.100 Kg
Beugel 231 0.38 0.395 34.644 Kg
119.74 Kg
- Pembesian 56.10 KG
besi Jml p berat/m berat.ttl SAT
- Pembesian 14.07 KG
besi Jml p berat/m berat.ttl SAT
- Pembesian 872,753.95 KG
besi Jml p berat/m berat.ttl SAT
D PEKERJAAN LANTAI
DETA I L RI NGBA LK
T AM PA K KA NAN
03 WRS 13 WRS
WRS
WRS
18 WRS
RENCA NA P ONDA SI
07 WRS
DE T A I L SLOOF
RE N CA NA S LOEF
DE T AI L KOLOM PR AK TIS
DE T A I L K OLOM UTAMA
RENCA NA KOLOM
10 WRS
v = P.TTL X BERAT/M
= 0.013 x 7,850
= 103.092 kg
113.66 Kg
F PEKERJAAN PLAMBING
G PEKERJAAN PENGECATAN
3 Pek. Cat Kilap Daun Pintu Dan Ventilasi / Tralis 25.98 m2 Type Pintu Dan Jendela
P1 = 13.13 m2
P2 = 3.37 m2
P3 = 2.24 m2
V1 ( Tralis ) = 7.23 m2
V2 = 0.12 m3
25.98 m2
4 Pek. Cat Kilap Kusen Pintu dan Jendela 5.83 m2 Type Pintu Dan Jendela
P1 = 1.17 m2
P2 = 1.75 m2
P3 = 0.99 m2
J1 = 1.776 m2
V1 = 1.31 m2
5.83 m2
T AM PAK BE LAKANG
DE T AIL RING BA LK
03 WRS 13 WRS
WRS
18 WRS
07 WRS
D E T AI L SLOOF
R E NCAN A SLOE F
D ET AI L KOLOM P R AKTIS
RE NCA NA KOL OM
JUMLAH = 1.00
10 WRS
P = 13.83
L Penampang = 0.010
V = Jumlah X P X L Penampang
= 1.00 x 13.83 x 0.01
= 0.13 m3
2 Pek. Pasangan Atap Seng Gelombang 174.21 M2 Luas Atap utama = 163.55 M2
Luas Atap Kanopi = 10.66 M2
Total Luas Atap = 174.21 M2
I PEKERJAAN LANTAI
1 #REF! #REF! M2
J PEK. PLAFOND
K PEKERJAAN TERAS
- Dynabold 8.00 bh
3
Pek. Pasangan Atap Seng Gelombang 10.80 M2
M
1
2
ANALISA HARGA SATUAN
A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 160,000.00 48,000.00
Tukang batu L.02 OH 0.100 170,000.00 17,000.00
Kepala Tukang L.03 OH 0.010 175,000.00 1,750.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 69,750.00
B BAHAN
Bata merah Bh 70.000 750.00 52,500.00
Semen portland Kg 14.370 1,440.00 20,692.80
Pasir pasang m3 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 81,192.80
C PERALATAN
-
JUMLAH HARGA ALAT -
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:4PP
A.4.5.1.1 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, plafond
A.4.2.1.4 Pemasangan 1 m pintu besi plat baja tebal 2 mm rangkap, rangka besi hollow 40.40.2
A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasat, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 160,000.00 3,200.00
Tukang cat L.02 OH 0.063 170,000.00 10,710.00
Kepala Tukang L.03 OH 0.006 175,000.00 1,102.50
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 15,612.50
B BAHAN
Plamur Tembok Kg 0.100 11,500.00 1,150.00
Cat Tembok Dasar Kg 0.100 42,780.00 4,278.00
Cat Tembok Penutup Kg 0.260 42,780.00 11,122.80
JUMLAH TENAGA KERJA 16,550.80
C PERALATAN
Kuas rol Bh 0.010 70,653.00 706.53
JUMLAH HARGA ALAT 706.53
PEKERJAAN #REF!
LOKASI #REF!
TAHUN ANGG. #REF!
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOL. SAT. SATUAN HARGA
(Rp.) (Rp.)
Err:509
ITEM PEMBAYARAN NO. : 3.1 (2) Analisa EI-312
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 8.00 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 8.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 56.00 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1250 Jam
Rp. Err:509 / M3
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 3.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor (E05) Jam - - -
2. Jack Hammer (E26) Jam 0.1250 Err:509 Err:509
3. Wheel Loader (E15) Jam 0.1250 Err:509 Err:509
4. Excavator (E10) Jam 0.1250 Err:509 Err:509
5 Dump Truck (E08) Jam - - -
Alat bantu Ls 1.0000 225.00 225.00
p = 0.8
l = 0.8
t = 0.2
30.458 Kg
2 Sloof S1 (15x20)
- Bekisting 0.40 M2 P = 1.00 M
L = 0.40 M
v = PXL
v = 1.00 x 0.40
V = 0.40 M2
- Pembesian 4.64 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 - - - - Kg
Beugel 5 0.55 0.395 1.085 Kg
4.64 Kg
v = P.TTL X BERAT/M
= 1.000 x 4.637
= 4.637 kg
- Pembesian 4.85 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 - 1.00 0.617 - Kg
Beugel 6 0.55 0.395 1.302 Kg
4.85 Kg
v = P.TTL X BERAT/M
= 1.000 x 4.854
= 4.854 kg
- Pembesian 6.30 KG
besi Jml p berat/m berat.ttl SAT
B12 4 1.00 0.888 3.552 Kg
B10 2 1.00 0.617 1.233 Kg
Beugel 6 0.64 0.395 1.516 Kg
6.30 Kg
v = P.TTL X BERAT/M
= 1.000 x 6.301
= 6.301 kg
- Pembesian 3.26 KG
besi Jml p berat/m berat.ttl SAT
B10 4 1.00 0.617 2.467 Kg
v = P.TTL X BERAT/M
= 1.000 x 3.256
= 3.256 kg
- Pembesian 3.26 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 1.000 x 3.256
= 3.256 kg
- Pembesian 3.26 KG
besi Jml p berat/m berat.ttl SAT
v = P.TTL X BERAT/M
= 1.000 x 3.256
= 3.256 kg
- Pembesian 3.79 KG
besi Jml p berat/m berat.ttl SAT
B12 - 1.00 0.888 - Kg
B10 4 1.00 0.617 2.467 Kg
Beugel 6 0.56 0.395 1.326 Kg
3.79 Kg
v = P.TTL X BERAT/M
= 1.000 x 3.793
= 3.793 kg
- Pembesian 7.76 KG
besi Jml p berat/m berat.ttl SAT
B12 5 1.00 0.888 4.440 Kg
B10 2 1.00 0.617 1.233 Kg
Beugel 6 0.88 0.395 2.084 Kg
7.76 Kg
v = P.TTL X BERAT/M
= 1.000 x 7.757
= 7.757 kg
- Pembesian 8.37 KG
besi Jml p berat/m berat.ttl SAT
B12 5 1.00 0.888 4.440 Kg
B10 2 1.00 0.617 1.233 Kg
Beugel 6 1.14 0.395 2.700 Kg
8.37 Kg
v = P.TTL X BERAT/M
= 1.000 x 8.373
= 8.373 kg
4.93 Kg
v = P.TTL X BERAT/M
= 1.00 x 4.933
= 4.93 kg